Installer. Antenna Brunswick, ME. Antennas Expansion & Install Two NVIS B&W Antennas Camp Chamberlain, ME. Antennas Expansion Passadumkeag, ME
|
|
- Anna Peters
- 5 years ago
- Views:
Transcription
1 Client Name General Description Date Town of Scarborough, ME Supply/Build 180 Self Support Tower and 21 Awarded Antenna Systems Install for Sub-or to Install 140 Self Support MAY 2019 Tower at Weslaco, TX Maine Army National Guard, Troubleshoot RF Lines Bangor Army Air Station APR 2019 Crew Training Month Recertification of Climber Safety and R56 MAR 2019 Installer Maine Army National Guard, Remove and Replace Damaged NVIS B&W FEB 2019 Antenna Brunswick, ME Maine Army National Guard, Statewide Cross Band Radios and UHF/VHF JAN/FEB 2019 Antennas Expansion & Install Two NVIS B&W Antennas Camp Chamberlain, ME Maine Army National Guard, Statewide Cross Band Radios and UHF/VHF DEC 2018 Antennas Expansion Passadumkeag, ME Maine Army National Guard, Statewide Cross Band Radios and Antennas DEC 2018 Expansion Musquash, ME Antenna Systems and Microwave Link at NOV 2018 Albuquerque, NM Antenna Systems and Microwave Link at Salt OCT 2018 Lake City, UT Guy Wire Replacement and Tower Painting at Bellevue, VT SEP 2018 MICC Ft. Drum, US Army US Navy, Annual maintenance contract for six tower Antenna Systems and Microwave Link at Palos Verdes, CA Antenna Systems and Microwave Link at Santiago Peak, CA Communications Shelter Interior Grounding Upgrade at Mt. Mansfield, VT Replace Ice Damaged Microwave Antenna Mounts and Ice Shields at Mt. Mansfield, VT Five Tower Inspections and Maintenance Recommendations Replace/Upgrade Four Antenna Systems and Laguna Peak at Pt. Mugu, CA AUG 2018 AUG 2018 JUL 2018 JUL 2018 JUN 2018 JUN 2018 MAY 2018 Annual Tower Inspection MAY 2018
2 Maine Army National Guard, US Navy, US Navy, Maine Army National Guard, Town of Bristol, NH Wheeler AAF, US Army US Navy, Sub-or to install 140 Self Support APR 2018 Tower at McAllen, TX Statewide Cross Band Radios and UHF/VHF JAN/FEB/MAR Antennas South Portland, Brunswick, & 2018 Augusta, ME Antenna Install and Tower Maintenance on JAN/FEB 2018 Laguna Peak at Pt. Mugu, CA Antenna/Line Repairs San Nicholas Island and DEC 2017 Microwave Dish Removals Pt. Mugu, CA Statewide Cross Band Radios and UHF/VHF NOV/DEC Antennas 2017 Install new Safety Climb and Tower Structural OCT 2017 Analysis Mt. Mansfield, VT Install new guy wires and anchors at Pierson SEP/OCT 2017 Hill, VT Install new safety ladder and safety climb on SEP self-support tower at Mt. Snow, VT Remove existing communication site and JUN/JUL/AUG install new 80 self-support tower with antennas and new communications shelter Install approximately 53 of cable bridge, two AUG 2017 antennas and two runs of LMR 400 through building to communications desk AUG 2017 Annual Tower Inspection MAY 2017 Ice Bridge and Safety Climb at Philo, VT Safety Climb at Pierson Hill, VT Safety Climb at Streeter Hill, VT Lightning Protection and Grounding at Brownington, VT 58 Antenna/Line Repairs on Laguna Peak at Pt. Mugu, CA Lightning Protection Install in St. Albans, VT Antenna/Line Install on Moose Mountain, NH MAY 2017 MAY 2017 APR/MAY 2017 MAR 2017
3 GAM Electronics, a division of Yankee Microwave Inc Town of Bristol, NH Emergency Services Maryland Transportation Authority NEC Ft. Drum Install Safety Climb at Terrace St, VT Grounding at Williston Barracks, VT Cable Management, Grounding and Exothermic Welding at Pierson Hill, VT Antenna/Line Install at Millstone Hill, VT JAN 2017 Product Line Expansion Project DEC 2016 JAN 2017 FEB 2017 MAR 2017 Low band custom Omni antenna located atop Mount Mansfield Build 80 Self-Support Tower Site Permit Quarterly maintenance contract for six tower Annual 22 tower maintenance and inspection contract OCT/NOV 2016 OCT 2016 SEP 2016 AUG 2016 JUN/JUL/AUG 2016 Annual Tower Inspection JUN 2016 Quarterly maintenance contract for six tower (one add l tower) Sub-or to upgrade/expand microwave links dish antennas, wave guides, and associated interior communications building equipment Sugarloaf Mountain, Kingston, Maine Remove and replace ODU microwave radio Champlain, New York Replace PTZ camera and mount MAY 2016 APR 2016 MAR 2016 FEB 2016 JAN 2016 JAN 2016 Replace broken lightning rod 80 tower JAN 2016
4 FEMA Lockheed Martin FEMA FEMA Minnesota DOT NEC West Point, US Army MICC Ft. Drum, US Army University of Texas Pine Bluff Arsenal, Arkansas Sub-or to install 50 square HF antenna on rooftop at National Guard base for FEMA in Nebraska Sub-or to erect two monopoles at Lockheed Radar Test Facility in New Jersey Sub-or to install 50 square HF antenna on rooftop at National Guard base for FEMA in West Virginia Sub-or to install HF straight wire antenna for FEMA on capitol building rooftop in Delaware Replace lighting system with FAA approved LED side markers and flash beacons on five towers Replace guy wires and hardware on five self-support towers JAN 2016 NOV 2015 OCT 2015 SEP 2015 SEP 2015 SEP 2015 AUG 2015 JUL 2015 JUL 2015 JUL 2015 Tower Inspection JUL 2015 Maintenance and LED light repair on control towers at Range 48, Ft. Drum, New York JUN 2015 Annual Tower Inspection JUN 2015 Replace ten AC units in five communication shelters at various sites Replace lighting system with FAA approved LED side markers and flash beacons on five towers MAY 2015 APR 2015 APR 2015 MAR 2015
5 Boone National Guard, Frankfort, KY NEC Ft. Drum, US Army MICC Ft. Drum, US Army Picatinny Arsenal, New Jersey Install rooftop communications self-support tower and antenna systems including grounding Replace antenna system and lightning protection on 80 tower Inspect five towers at Range 48, Ft. Drum, New York Sub-or to inspect LMR tower and repair beacon light Spruce Mountain, Maine PTZ camera alignment service Houlton, Maine Replace safety climb system on monopole Coburn Gore Point of Entry Calias Ferry Point Houlton, Maine Jackman Point of Entry Burke Tower Install outdoor NEMA communications box Richford, Vermont Install outdoor NEMA communications box Champlain, New York Relocate all radio equipment to GFM DDB box at tower base on new foundation including ground ring and underground ac circuit MT. Alone, New York Replace 12 guy wires and hardware, paint MAR 2015 FEB 2015 JAN 2015 NOV 2014 NOV 2014
6 Minnesota DOT FEMA and Virginia State Police SAAB Sensis Oregon Caves National Park Service Cherry Point MCAS, North Carolina NEC Ft. Drum Perform statewide tower inspections including AUG 2014 guy wire tensioning and tower alignment. Install FAA approved LED lighting systems Annual Tower Inspection AUG 2014 Canaan, Vermont on 80 tower Sub-or to install VHF and UHF radio communication systems at two tower sites including grounding to R56 Motorola standards Ben Young Hill, Vermont Repair and test grounding system and treat anchor points for corrosion. Nelson Hill, Vermont Install 6 port entry enclosure with boots Champlain, New York Tower repair and maintenance and install microwave link Sub-contractor for complete build of a radar test tower for defense contractor (SAAB Sensis) serving US Navy and other DOD contracts. Install a two link microwave system for data and telecommunications LMR radio antenna services, relocation and repair, including servicing of existing LMR equipment. Tower inspection and maintenance, replace three guy wires and tension all existing wires. Installation of LED lighting system as per FAA specifications LMR radio antenna service, relocation and repair. Inspect two tower sites, including painting to FAA specified orange and white. AUG 2014 AUG 2014 JUL 2014 JUL 2014 JUL 2014 JUN 2014 JUN 2014 JAN 2014 OCT 2013 AUG 2013
Client Name General Description Date
Client Name General Description Date Town of Scarborough, ME Supply/Build 180 Self Support Tower and Awarded Antenna Systems Install for Maine Army National Guard, Statewide Cross Band Radios and Antennas
More informationClient Name General Description Date State of Vermont, Department of Guy wire replacement and tower painting at SEP Bellevue, VT.
Client Name General Description Date Guy wire replacement and tower painting at SEP 2018 Bellevue, VT Annual maintenance contract for six tower AUG 2018 FBI, Department of Justice Antenna Systems and Microwave
More informationClient Name General Description Date Hawaii MARS Maintenance Contract Annual maintenance contract for six tower AUG 2018
Client Name General Description Date Annual maintenance contract for six tower AUG 2018 FBI, Department of Justice Antenna Systems at Palos Verdes, CA AUG 2018 FBI, Department of Justice Antenna Systems
More informationClient Name General Description Date Customs Border Protection Sub-Contractor install 140 Self Support Tower APR 2018 Maine Army National Guard,
Client Name General Description Date Customs Border Protection Sub-Contractor install 140 Self Support Tower APR 2018 Maine Army National Guard, Statewide Cross Band Radios and Antennas JAN/FEB/MA R 2018
More informationClient Name General Description Date
Client Name General Description Date Town of Bristol, NH Remove existing communication site and install new 80 self-support tower with 7 antennas and new communications shelter JUN/JUL/AUG 2017 Wheeler
More informationRecreation Facility Hours
NORMAL HOURS Recreation Facility Hours August 1, 2016 July 31, 2017 Last Revised: July 29, 2016 Effective Dates 2016: AUG 23 31, SEP 1 2, SEP 6 16, SEP 18 23, SEP 25 30, OCT 1 7, OCT 9 18, OCT 24 30, NOV
More informationAssembly Manual. Mobile Communications ANTENNA SYSTEMS LBI ERICSSONZM ERICSSONZM
ERICSSONZM LBI-38983 Mobile Communications ANTENNA SYSTEMS ERICSSONZM Ericsson GE Mobile Communications Inc. Mountain View Road Lynchburg Virginia 24502 Printed in U.S.A. Assembly Manual LBI-38983 TABLE
More informationMetrological Telecommunication System Development Project
Philippines Metrological Telecommunication System Development Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Site Map:
More informationAPPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 1. BATTERIES, MODULAR FLOODED LEAD-ACID 2. BATTERIES, MODULAR VALVE REGULATED LEAD ACID
APPENDIX H PRICE WORKSHEETS, REVISED 12/26/15 BIDDER INSTRUCTIONS: All Bidder pricing must be based on the Sample Product provided in Appendix H Mandatory Requirements. Any category in Appendix H that
More informationGENERAL INSPECTION AND MAINTENANCE PROCEDURE FOR FIXED HF ANTENNA SYSTEMS
Bulletin 7591056,Revision A 1. SCOPE GENERAL INSPECTION AND MAINTENANCE PROCEDURE FOR FIXED HF ANTENNA SYSTEMS It is the intent of this procedure that all equipment and components of the antenna system
More informationSTATE AGENCIES FOR SURPLUS PROPERTY
SUPP 1 DoD 4160.21-M STATE AGENCIES FOR SURPLUS PROPERTY ALABAMA CALIFORNIA Surplus Division California State for 4401 Northern By-Pass Surplus P.O. BOX 210487 701 Burning Tree Road Montgomery, AL 36121-0487
More informationState Capitals Directions:
State Capitals Directions: Using the word bank of state capitals below, match the capitals to their state. Hint: Use a map of the United States to help you locate the capitals. State Capitals Albany -
More informationDirectorate of Joint Strategic Communication Support
MWO GO Crabbe Antenna Structure LCMM Directorate of Joint Strategic Communication Support Canadian Armed Forces Arctic Training Center/National Resources Canada/Polar Continental Shelf Program Strategic
More informationUniversity of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /geng.13.
Simpson, B., & Vardanega, P. J. (2014). Results of monitoring at the British library excavation. Proceedings of the ICE - Geotechnical Engineering, 167(2), 99-116. DOI: 10.1680/geng.13.00037 Peer reviewed
More informationAssessing the Feasibility of Wind Power Production for the University of Rhode Island s Bay Campus
University of Rhode Island DigitalCommons@URI Senior Honors Projects Honors Program at the University of Rhode Island 2009 Assessing the Feasibility of Wind Power Production for the University of Rhode
More informationLegislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013
Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November
More informationClimate Update. Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University Presented by Reagan Waskom
Climate Update Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University Presented by Reagan Waskom http://ccc.atmos.colostate.edu Presented to Water Availability Task
More informationClimate Update. Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University.
Climate Update Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University http://ccc.atmos.colostate.edu Presented to Water Availability Task Force, Denver, CO, April 18,
More informationRADIO AND TELEVISION SATELLITE EQUIPMENT
ARTICLE 810 RADIO AND TELEVISION SATELLITE EQUIPMENT Introduction to Article 810 Radio and Television Satellite Equipment This article covers transmitter and receiver (antenna) equipment and the wiring
More informationPast, Present and Future U.S. Lamb Market, 2013
Past, Present and Future U.S. Lamb Market, 2013 Tim Petry Livestock Economist www.ag.ndsu.edu/livestockeconomics It was the best of times, it was the worst of times Source: Chapter 1, A Tale of Two Cities
More informationRecommended Citations
Recommended Citations Entire set Kunkel, K., R. Frankson, J. Runkle, S. Champion, L. Stevens, D. Easterling, and B. Stewart (Eds.), 2017: State Climate Summaries for the United States. NOAA Technical Report
More informationActive Cable TV Connections. Active Residential Cable Modem Customers. Page FIRST QUARTER REPORT
21-22 FIRST QUARTER REPORT Active Cable TV Connections AFN Cable connections in the business plan are projected to be 2,44 by July 22. As of October 31, 21, there are 1,895 connections, which means AFN
More informationUDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America
RPSEA 09121-3300 3300-05 05 Autonomous Inspection of Subsea Facilities Phase I Final Presentation / Phase II Status Report UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July
More informationAppendix B. Oregon Ship Sailings, 1824 to The Hudson Bay Supply Ship Sailings to the Columbia River, 1824 to 1846
Appendix B Oregon Ship Sailings, 1824 to 1848 The Hudson Bay Supply Ship Sailings to the Columbia River, 1824 to 1846 HBC Ship Dep LON Arv COL Dep COL Arv LON Notes William & Ann Jul 27 1824 Apr 8 1825
More informationSpace and Missile Systems Center
Space and Missile Systems Center Global Positioning Systems Directorate GPS Status & Modernization Progress: Service, Satellites, Control Segment, and Military GPS User Equipment 3 Nov 2016 Col Steve Whitney,
More informationClimate Update. Nolan Doesken State Climatologist Atmospheric Science Department Colorado State University.
Climate Update Nolan Doesken State Climatologist Atmospheric Science Department Colorado State University http://ccc.atmos.colostate.edu Presented to Water Availability Task Force, Denver, CO, July 24,
More informationBridge Condition Assessment Using Remote Sensors
A Summary of the 4th Quarterly Report for the Technical Activities Council Bridge Condition Assessment Using Remote Sensors Michigan Technological University USDOT Cooperative Agreement No. DTOS59-10-H-00001
More informationVAN BUREN COUNTY TENNESSEE
VAN BUREN COUNTY TENNESSEE CONSOLIDATED LISTING OF MICROFILMED VAN BUREN COUNTY RECORDS CONSISTING OF ROLLS 1-43, 45-67 and A9296 A9328 Note: I - available through Interlibrary Loan TENNESSEE STATE LIBRARY
More informationSoutheast Region Reserve Components. Conveyance Progress Report
Southeast Region Reserve Components Conveyance Progress Report As of 1 October 2017 Page 2 1 October 2017 BRAC 2005 TABLE OF CONTENTS Summary 2-4 Site Narratives 5-11 Closure Overview Federal and State
More informationA B C Title # of issues Approximate holdings American genealogist 116
1 2 3 4 5 6 7 8 9 10 11 12 13 Title # of issues Approximate holdings American genealogist 116 Ancestral notes from Chedwato 19 v.4 no.6, v.5 no.2, v.6 no.6, v.7 no.1,3,4,5,6, v.8 no.1, v.9 no.1, v.10 no.2,3,
More informationEstimation of Fault Resistance from Fault Recording Data. Daniel Wong & Michael Tong 2014-November-5
Estimation of Fault Resistance from Fault Recording Data Daniel Wong & Michael Tong 2014-November-5 Agenda Project Background & Introduction Fault Resistance & Effect Estimation Algorithm Estimation Results
More informationSPECIAL SPECIFICATION 8802 Radio Communication Tower Inspection, Maintenance, and Repair
2004 Specifications CSJ 6228-45-001 & 6248-06-001 SPECIAL SPECIFICATION 8802 Radio Communication Tower Inspection, Maintenance, and Repair 1. Description. This specification describes service to provide
More informationRE-ESTABLISHING ONE WORLD TRADE CENTER AS A MAJOR COMMUNICATIONS HUB IN NYC
June 3, 2013 RE-ESTABLISHING ONE WORLD TRADE CENTER AS A MAJOR COMMUNICATIONS HUB IN NYC The spire is finally in place; the building has reached 1776 feet and is now the tallest building in North America.
More informationNUTC R293. Field Evaluation of Thermographic Bridge Concrete Inspection Techniques. Glenn Washer
Field Evaluation of Thermographic Bridge Concrete Inspection Techniques by Glenn Washer NUTC R293 A National University Transportation Center at Missouri University of Science and Technology Disclaimer
More informationClimate Update March 2006 Meeting
Climate Update March 2006 Meeting Nolan Doesken Colorado Climate Center presented at the Joint Meeting of the Flood Task Force & Water Availability Task Force, NRCS, Denver, CO, March 14, 2006 Prepared
More informationPractice Test Chapter 8 Sinusoidal Functions
FOM 12 Practice Test Chapter 8 Sinusoidal Functions Name: Multiple Choice Identify the choice that best completes the statement or answers the question. Block: _ 1. Convert 120 into radians. A. 2 3 B.
More informationDrought Update January 18, 2005 WATF Meeting
Drought Update January 18, 2005 WATF Meeting Nolan J. Doesken Colorado Climate Center presented at the Water Availability Task Force meeting, NWS, Boulder, January 18, 2005 Prepared by Odie Bliss http://ccc.atmos.colostate.edu
More informationClimate Update September 24, 2003 WATF meeting
Climate Update September 24, 2003 WATF meeting Nolan Doesken Colorado Climate Center Prepared by Odie Bliss http://ccc.atmos.colostate.edu August 2003 Precipitation as a percent of the 1971-2000 average.
More information800MHz Advisory Board August 24, 2017
BCSO Communications Division Butler Regional Interoperable Communications System 800MHz Advisory Board August 24, 2017 How We Got Here The BRICS 800 MHz System was constructed in 2008 The cost to build
More informationDrought Update for March 2006
Drought Update for March 2006 Roger A. Pielke, Sr. Colorado Climate Center presented at the Water Availability Task Force meeting, Division of Wildlife, Denver, CO, April 20, 2006 Prepared by Odie Bliss
More informationAppendix C Site Visits
Appendix C Site Visits November, 2003 Page 1 of 12 The following 13 sites were visited during the period of December 11, 2002 through January 10, 2003: Page # North Park (tower site)... 2 Sherman Hill
More informationNATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP. Embargo until hours on 11 th January 2013
NATIONAL INSTITUTE OF ECONOMIC AND SOCIAL RESEARCH ESTIMATES OF MONTHLY GDP Embargo until 15.00 hours on 11 th January 2013 Our monthly estimates of GDP suggest that output declined by 0.3 per cent in
More informationNEW LEASE AMENDMENT TO EXISTING LEASE RECONTRACT BTS ANCHOR TENANT
NEW LEASE AMENDMENT TO EISTING LEASE RECONTRACT BTS ANCHOR TENANT PLEASE RETURN THIS APPLICATION VIA EMAIL TO: Vertical Bridge 750 Park of Commerce Drive E-Mail: Suite 200 Boca Raton, FL 33487 Attn: Regional
More informationEpinephrine Salts Medicinal Nitroglycerine P & U Listed Syringe Waste. Epinephrine Salts. Medicinal Nitroglycerine
Epinephrine Salts Medicinal Nitroglycerine P & U Listed Syringe Waste Following is a list of each state and whether or not they are consistent with the EPA s stance on Epinephrine Salts, Medicinal Nitroglycerine
More informationClimate Update. Wendy Ryan Research Associate For Nolan Doesken, State Climatologist.
Climate Update Wendy Ryan Research Associate For Nolan Doesken, State Climatologist Atmospheric Science Department Colorado State University http://ccc.atmos.colostate.edu Presented to Water Availability
More informationany questions I had after the job was done, they didn't just vanish after the bill was paid. To edit this sidebar, go to admin backend's.
Cal painters quizno santa monica california Best Painters in Santa Monica, CA - Dream Painter Santa Monica, Steve Roddey Painting & Decorating, Casa Painting Services, CertaPro Painters of Santa. Hire
More informationDelivering Reliability. Services. Strength You Can Count On. oldcastleprecast.com/services
Delivering Reliability A Strength You Can Count On SERVICES TENANT IMPROVEMENTS Above And Below Ground Solutions Strength You Can Count On Oldcastle Precast is well trained and knowledgeable in all aspects
More informationIndoor/Outoor Antenna User s Manual
Indoor/Outoor Antenna User s Manual 34140 Version 2 10/06/16 WARNING: INSTALLATION OF THIS PRODUCT NEAR POWER LINES IS DANGEROUS, FOR YOUR SAFETY, FOLLOW THE INSTALLATION DIRECTIONS. WATCH FOR WIRES! YOU
More informationWhite Paper. GPS Jamming. Increasing system resilience to counteract intentional and unintentional GPS signal interferences
White Paper GPS Jamming Increasing system resilience to counteract intentional and unintentional GPS signal interferences Mark Hendrick, Engineering Program Manager 07/2011 1474-002 RevA White Paper GPS
More informationSource 2018 COURSE SCHEDULE SGT. MAJ. PHIL FASCETTI GIVES BACK UC SAN DIEGO EXTENSION CELEBRATES 25 YEARS OF MAKING SAFER WORK SPACES SAFETY FEST
SAFETY Source S AV I N G L I V E S W I T H W O R K F O R C E E D U C AT I O N, P R E PA R AT I O N & A W A R E N E S S Est. 1992 UC SAN DIEGO EXTENSION CELEBRATES 25 YEARS OF MAKING SAFER WORK SPACES SAFETY
More informationAWOS A Site Preparation Manual
Automated Weather Observing System AWOS A Site Preparation Manual 3000-A-025 Rev. B FAA APPROVED ECP233 2017 Aug 25 NOT FAA APPROVED All Weather Inc. 1165 National Drive Sacramento, CA 95834 USA 800.824.5873
More informationPhase 2 Silver Line Update
Phase 2 Silver Line Update Committee for Dulles Leslie Pereira, Communications & Outreach Manager Capital Rail Constructors February 16, 2017 Safety Since Notice to Proceed: Manpower Hours: 3,280,898
More informationSEQUATCHIE COUNTY TENNESSEE
SEQUATCHIE COUNTY TENNESSEE CONSOLIDATED LISTING OF MICROFILMED SEQUATCHIE COUNTY RECORDS CONSISTING OF ROLLS 1-74 and A14858 A14944 Note: I - available through Interlibrary Loan PRESERVATION SERVICES
More informationFDOT Voice Radio Communications and Microwave Network
FDOT Voice Radio Communications and Microwave Network Presented at the 2013 Transportation Hazards and Security Summit and Peer Exchange, AASHTO Special Committee Meeting on Wireless Communications Technology
More informationClimate Update May 2006 Meeting
Climate Update May 26 Meeting Nolan Doesken Colorado Climate Center presented at the Joint Meeting of the Flood Task Force & Water Availability Task Force, DOW, Denver, CO, May 16, 26 Prepared by Odie
More informationClimate Update July 2006 Meeting
Climate Update July 2006 Meeting Nolan Doesken, State Climatologist Colorado Climate Center presented at the Water Availability Task Force, DOW, Denver, CO, July 20, 2006 Prepared by Odie Bliss http://ccc.atmos.colostate.edu
More informationHam Radio Safety In & Out Of The Shack
Ham Radio Safety In & Out Of The Shack Areas of Discussion Electrical Safety AC Power Grounding Antenna Safety Mobile Installations Electrical Safety AC Safety Grounding Most ham stations DO NOT require
More informationIndex Public Library Funding & Technology Access Study,
Index Public Library Funding & Technology Access Study, 2010-2011 Discussions of urban, suburban, or rural libraries in the summary sections are indexed. Additional data for all types of metropolitan status
More informationVLF-LF Loop Antenna Installation at Cohoe Radio Observatory Whitham D. Reeve. 1. Introduction
VLF-LF Loop Antenna Installation at Cohoe Radio Observatory Whitham D. Reeve 1. Introduction In early June 2018 I temporarily installed a loop antenna and a software defined radio (SDR) receiver at Cohoe
More informationReport. Name Birth date Birth location Death date Death location Spouse
Report Name Birth date Birth location Death date Death location Spouse Cravens, S A 1838 Cravens, Salley E 1847 Gadbury, J Cravens, Sallie 1785 Somerset, Washington, Pennsylvania 1850 Greene Hills, Illinois
More informationTraining Course Calendar 2014
Training Course Calendar 2014 +234 (0) 805821 0999 or +234 (0) 146061 www.falckprimeatlantic.com FALCK PRIME ATLANTIC COURSE CALENDAR 2014 January February March April 1 2 3 4 5 1 2 31 1 2 1 2 3 4 5 6
More informationMERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR)
PROJECT SPONSOR AND LEAD AGENCY MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR) The Marin Emergency Radio Authority (MERA) is a
More informationTower Grounding Training For Telecommunications Networks
Tower Grounding Training For Telecommunications Networks Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq The
More informationSECTION 35 ANTENNAS AND TOWERS
SECTION 35 ANTENNAS AND TOWERS Section: 515-35-1 Purpose and Intent 515-35-2 General Standards 515-35-3 Certification, Inspection and Maintenance 515-35-4 Tower Design 515-35-5 Co-Location Requirement
More informationRichard Rickett, General Manager Engineering and Procurement - March Case Study
Richard Rickett, General Manager Engineering and Procurement - March 2015 Case Study Case Study : Diverless Fast Track Repair of Mooring System Introduction ~ 300 floating production units in use around
More informationBridge Condition Assessment Using Remote Sensors
A Summary of the 10 th Quarterly Report for the Technical Advisory Council Bridge Condition Assessment Using Remote Sensors Michigan Technological University Cooperative Agreement No. DTOS59-10-H-00001
More informationFIXED MOUNT DVRS INDOOR/OUTDOOR APPLICATION NOTE. March 2016 Version 4
FIXED MOUNT DVRS INDOOR/OUTDOOR APPLICATION NOTE March 2016 Version 4 CONTENTS APPLICATION NOTE Introduction...2 Trunking Systems...2 The Need for Coverage...2 The Challenge...3 FDVR Solution...3 Other
More informationCONOPS Interoperability. Maine Emergency Management Agency & Maine Department of Public Safety State of Maine 7/6/2015
2015 CONOPS Interoperability Maine Emergency Management Agency & Maine Department of Public Safety State of Maine 7/6/2015 CONOPS Interoperability Purpose This Concept of Operations Plan (CONOPS) provides
More informationCONOPS Interoperability
2015 CONOPS Interoperability Maine Emergency Management Agency & Maine Department of Public Safety State of Maine 7/6/2015 Table of Contents Section 1 General...3 A. Purpose. 3 B. Definitions..4 C. Assumptions..
More informationSTRLodgingPerformanceSnapshotAugust2017CYTD
% Occupancy % Occ ADR % ADR RevPAR % RevPAR County Cityof Downtown MissionValey MissionBay LaJola Pt.LomaPeninsula NorthCoastal(UTC,I-5Cor. NorthInland(I-15Coridor) 78.7% 83.4% 8 78. 8 81. 83.7% 8 79.8%
More informationPQ Data Applications in Con Edison
PQ Data Applications in Con Edison John Foglio July 29th, 2014 Power Quality Monitoring System 69 PQ monitors currently installed in our secondary networks 2 Power Quality Monitoring System 135 PQ monitors
More informationWeakley County District Public Safety Tower Study
Weakley County 9-1-1 District 2014 Public Safety Tower Study February 19, 2014 In 2012, the FCC mandated that all Public Safety Radio Spectrum migrate to narrow band frequencies. The effect of this mandate
More informationMANCHUKUO. First Regular Issue 5 Characters in Top Panel Ordinary Paper - No Watermark 25 Jul f. Brown-Red. 4 f. Yellow-Olive.
First Regular 5 Characters in Top Panel Ordinary Paper - No Watermark 25 Jul 1932 ½ f 1 f Bistre-Brown Brown-Red Dull Purple 5 f Slate Chestnut Emerald Vermillion 7 f 8 f Deep Grey Yellow-Brown Red-Orange
More informationState Population Yes No.Alabama 4,822,023 2 Alabama: Sessions (R-AL), Nay.Alaska 731,449 2 Alaska: Begich (D-AK), Nay.Arizona 6,553, Arizona:
State Population Yes No.Alabama 4,822,023 2 Alabama: Sessions (R-AL), Nay.Alaska 731,449 2 Alaska: Begich (D-AK), Nay.Arizona 6,553,255 1 1 Arizona: Flake (R-AZ), Nay.Arkansas 2,949,131 2 Arkansas: Boozman
More informationPage 2 of 20. Table of contents. Page
Page 2 of 20 Table of contents Page 1. Summary of Test... 3 1.1 Purpose of test... 3 1.2 Standards... 3 1.3 List of applied test to the EUT... 3 1.4 Modification to the EUT by laboratory... 3 2. Equipment
More informationSubtracting Rational Numbers
. How can you use what you know about subtracting integers to subtract rational numbers? ACTIVITY: Work with a partner. Use a number line to find the difference. a. Then move unit left to end at. Subtract.
More informationExample Macro WTS Facility
Example Macro WTS Facility Partially screened panel antennas attached to the face of an existing rooftop-penthouse, on a medical office building Cable trays used to minimize visibility of cabling Example
More informationSigns of End of Life FM Antennas and Transmission Line Systems
Signs of End of Life FM Antennas and Transmission Line Systems Thomas B. Silliman, PE Copyright 2017 Electronics Research, Inc. All rights reserved. Introduction Factors that influence the life of antennas
More informationMillhouser, Frances Page 1 2/3/2015
Millhouser, Frances Page 1 2/3/2015 TITLE ^ Indicates last time on list Month* Indicates when new title or new issues added PERIODICALS TO TRADE DATE ^ AAHGS News 2012: Nov/Dec; 2013:Jul/Aug; Nov/Dec ^
More informationRod Larson President, Latin America. Houston, Texas March 9-10, 2011
Rod Larson President, Latin America Houston, Texas March 9-10, 2011 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Gulf of Mexico: Post-Macondo Slowdown
More informationTHE 3905 CENTURY CLUB, INC POINT AWARD APPLICATION (AND SUBSEQUENT 1000-POINT INCREMENTS) (EACH BAND/MODE SEPARATELY) (NOT ENDORSABLE)
THE 3905 CENTURY CLUB, INC. 2000-POINT AWARD APPLICATION (AND SUBSEQUENT 1000-POINT INCREMENTS) (EACH BAND/MODE SEPARATELY) (NOT ENDORSABLE) The requirements for the 2000-Point Award are simple. You just
More informationDrought Update November 23, 2004 WATF Meeting
Drought Update November 23, 2004 WATF Meeting Nolan J. Doesken Colorado Climate Center presented at the Water Availability Task Force meeting, DOW, Denver, November 23, 2004 Prepared by Odie Bliss http://ccc.atmos.colostate.edu
More informationMonitoring of Mosul Reservoir Using Remote Sensing Techniques For the Period After ISIS Attack in 9 June Muthanna Mohammed Abdulhameed AL Bayati
For the Period After ISIS Attack in 9 June 2014 Lecture: University of Technology Baghdad- Building and Construction Dept 1- Introduction The Mosul Dam is the fourth largest dam in the Middle East,(1)established
More information60% 100% 100% Performance Report YTD YTD YTD. June Development Services Division. In this Edition. target: 100% target: 100% target: 100%
City of McKinney Development Services 221 N. Tennessee St. McKinney, TX 7509 McKinney s, including the Building Inspections, Code Compliance, Engineering and Planning Departments, strives to provide excellent
More informationThe Confederation Commemorative
The 1917 3 Confederation Commemorative Leopold Beaudet Admiral Study Group meeting, BNAPEX 2008 (revised in 2018) Introduction Based on a study by Richard M. Morris of the 1917 3 Confederation commemorative
More informationSite Surveying and Antenna Mounting
Site Surveying and Antenna Mounting Abdus Salam ICTP, February 2005 School on Digital Radio Communications for Research and Training in Developing Countries Ermanno Pietrosemoli Latin American Networking
More informationCisco Access Points with Smart Antenna Connectors 2
Cisco Access Points with Smart Antenna Connectors Cisco Access Points with Smart Antenna Connectors 2 Revised: April 19, 2017, Cisco Access Points with Smart Antenna Connectors Application question: Can
More informationRADIO AND TELEVISION TOWER & EQUIPMENT PROPERTY DAMAGE APPLICATION
RADIO AND TELEVISION TOWER & EQUIPMENT PROPERTY DAMAGE APPLICATION Date of Report: Reported By: Office: Frequency: Address: 1. Broadcasting Co. Principal Mailing Address: Call Letters: Tower Location:
More informationPublic Safety Radio Communications System Update. Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011
Public Safety Radio Communications System Update Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011 Purpose Review state of the current radio system Council to consider M&C P11234
More informationTHE GI UNDERGROUND PRESS COLLECTION. Papers, (Predominantly, 1970) 3.5 linear feet
THE GI UNDERGROUND PRESS COLLECTION Papers, 1967-1971 (Predominantly, 1970) 3.5 linear feet Accession Number 485 L.C. Number MS The papers of the GI Underground Press were placed in the Archives of Labor
More informationEconomic and Real Estate Market Outlook
Economic and Real Estate Market Outlook By Lawrence Yun, Ph.D. Chief Economist, National Association of REALTORS Presentation at Miami International Congress Miami, FL November 1, 2016 Lifetime Wealth
More informationNZQA unit standard version 3 Page 1 of 5. Install and maintain telecommunications radio frequency systems
Page 1 of 5 Title Install and maintain telecommunications radio frequency systems Level 4 Credits 25 Purpose This unit standard covers installation and maintenance of telecommunications radio frequency
More informationRadio Test Kit MANUAL
Test Kit MANUAL Goals: Will radios work? What antennas are needed? Revision: 6/7 Safety YOU ARE RESPONSIBLE FOR YOUR SAFETY YOU ARE RESPONSIBLE FOR THE RADIO TEST KIT Replacement Cost = $7,85 A service/repair
More informationHousing Market Outlook
Housing Market Outlook By Lawrence Yun, Ph.D. Chief Economist, National Association of REALTORS Presentation at National Conference of State Legislatures Washington, DC December 7, 2018 Very Long Economic
More informationKB7APU repeater system. MotoTRBO/Digital Mobile Radio information.
KB7APU repeater system MotoTRBO/Digital Mobile Radio information. How Field SAR Coms Work How Repeaters Work First DMR HAM radio system in the State of Oregon What is DMR (Digital Mobile Radio)? How to
More informationTurning the Pages of History
MEDIA KIT EDITORIAL SUMMARY Features Every issue of Strategy & Tactics, World at War, and Modern War includes 3-4 feature articles plus several shorter articles. Regular topics and columns include New
More informationSITE NAME: BADGER MOUNTAIN PROJECT NEW SITE BUILD PROJECT INFORMATION SITE NAME SITE ADDRESS: SEC. 35, T. 11S, R. 73W OF THE 6th PM PARK COUNTY, CO BA
SITE NAME: BADGER MOUNTAIN PROJECT NEW SITE BUILD PROJECT INFORMATION SITE NAME SITE ADDRESS: SEC. 35, T. 11S, R. 73W OF THE 6th PM PARK COUNTY, CO BADGER MOUNTAIN SEC. 35, T. 11S, R. 73W OF THE 6th PM
More informationNational Radio Channels. PPM measurement October 2017
National Radio Channels PPM measurement October 17 Background This overview describes the development of radio broadcasting at national levels with updated figures from October 17. The Norwegian Media
More informationReal Estate Trends and Outlook
Real Estate Trends and Outlook Lawrence Yun, Ph.D. Chief Economist NATIONAL ASSOCIATION OF REALTORS Presentation at NAR Region XII Conference Coeur d Alene, ID March 5, 2015 GDP Burst in 2014 Q2, Q3, Q4
More informationSWAN LAKE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT 1
SWAN LAKE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT 1 1. General Description Figure 1 provides a map of the Swan Lake Watershed. The watershed is characterized by two major parallel
More information