REDESIGN OF THE ESKOM CAPE CORRIDOR OUT-OF-STEP TRIPPING SCHEME. A Bartylak ESKOM System Operator

Size: px
Start display at page:

Download "REDESIGN OF THE ESKOM CAPE CORRIDOR OUT-OF-STEP TRIPPING SCHEME. A Bartylak ESKOM System Operator"

Transcription

1 REDESIGN OF THE ESKOM CAPE CORRIDOR OUT-OF-STEP TRIPPING SCHEME A Bartylak ESKOM System Operator ABSTRACT In this paper a new design of the ESKOM Out-Of- Step (OOS) tripping scheme is proposed. ESKOM commissioned OOS scheme on the Transmission power transfer corridor to Cape in early nineties based on impedance measuring out-of-step tripping relays positioned in the middle of the corridor. Latest reinforcements of the Transmission system, addition of gas turbines as well as commissioning of substantial amount of variable Renewable Power Plants (RPPs) have changed the performance of the corridor to an extent that the reliability of the existing OOS tripping scheme have been affected. Investigations presented in this paper showed that the observability of the scheme has been reduced and the sustainability of the island after system separation became questionable in some system configurations. In conclusion this paper recommends replacing existing impedance measuring scheme with Phasor Measurement based Wide Area Protection System (WAPS). The paper also explains merits behind replacing system separation approach with generator dropping scheme to arrest generators transient instability induced by system events. KEY WORDS Transient instability, Out-Of-Step protection, Phasor Measurements, Wide Area Protection Systems, Network Separation, Generator Dropping Scheme. INTRODUCTION The purpose of the OOS scheme is to detect possible unstable operation of generators following severe (multiphase, long duration) faults on the Transmission system. Faults close to Power Station cleared in traditional Zone 2 back-up tripping time (~450ms) may fall in this category. Probability of such faults is very low considering redundant protection and teleprotection systems deployed at Transmission EHV level. Buszone protection, however, is not redundant and failure of Buszone to operate at 400kV substation close to power station may result in violation of transient stability limits. Loss of transient stability of generators results in their asynchronous (out of step) operation with the rest of the system and inevitable shut down of all units following multiple pole slips with severe variations of voltages and currents. Such incident, if not interrupted, would result in prolonged voltage oscillations on the network leading to shut down of many connected customers and could result in damage or at least cumulative life expenditure of turbo-generators and/or auxiliary equipment at all power stations exposed to such conditions. ESKOM identified potential risk of such incidents on long power transfer corridor between remote 2x1000MWs nuclear power station close to Cape Town (Power Station PS A) and the reminder of the ESKOM generation pool, not far from Johannesburg at a distance of approximately 1500km. To minimize impact of such incidents ESKOM commissioned OOS tripping scheme at two strategically positioned 400kV substations in late nineties. The purpose of the OOS scheme was to separate unstable generators from the rest of the system with sufficient load on created island to sustain their operation after system separation. At that time the system separation was the only sustainable option available. Gen dropping solution was not considered as it could results in voltage collapse of the corridor after separation in some system configurations. Later Undervoltage Load Shedding Scheme (UVLS) was also commissioned to safeguard. Since then the Cape corridor network has been substantially reinforced with commissioning of additional 2000MWs of gas generation, 6 new Transmission substations and extension of 765kV network down to Cape Town. Figure 1 illustrates 765kV extension overlapping the back-bone 400kV series compensated network. After commissioning of 765kV corridor full system separation was to be achieved by unblocking Power Swing Blocking functions on 765kV lines. Such unblocking should result in tripping of the line during unstable power swings associated with loss of transient stability. The figure 1 also indicates schematically location of present OOS scheme, impedance measurement area and network separation points.

2 Figure 1. Corridor network of 1997 and 2017 with indicated locations of OOS Tripping Scheme Extension of 765kV corridor paralleled the existing 400kV corridor which significantly affected overall impedance of combined corridor. This also affected operation and performance of installed OOS tripping scheme. OPERATION AND PERFORMANCE OF THE IMPEDANCE OOS SCHEME The existing OOS system separation scheme is based on traditional impedance measurement which differentiates between system faults and power swings by measuring impedance locus speed of movement on the X/R plane. For this measurement relays with 2 impedance characteristics are commonly used and the time difference between their successive pick-ups is converted into speed of movement in ohms/second or equivalent swing frequency in Hz. Many relays deploy 3 measuring characteristics for enhanced security and flexibility of application. An example of out-of-step tripping relay characteristics is shown on figure 2 below. [pri.ohm] [pri.ohm Droerivier - Muldersvlei (Kappa) OST Zone (All): Pol +Seq Zl A j pri.ohm Zl B -1.#IO + j -1.#IO pri.ohm Zl C j pri.ohm Tripping Time: s Figure 2. Example of impedance characteristics used for detection of power swings. To verify prospective performance of the existing scheme on the network the OOS relays were modelled on simulator and number of scenarios of possible unstable conditions were simulated. The evaluation included observability of the system as well as performance of created island after system separation. Detailed analysis indicated deficiencies of current solution in present system configuration and in particular in future development of the network with increasing penetration of renewable power plants (RPPs) in the area. Reduced impedance between Power Station PS A generators and the system resulted in impedance locus movement a lot closer to PS A generators. The OOS relays installed at Substations SS A and SS B are still able to detect unstable conditions and issue a separation command in most system configurations but the unblocked impedance relays on SS C SS D 765kV line are not able to complete network separation. The zero voltage electrical centre does not cross this line and enters either SS D 765/400kV transformer or after number of out-ofstep cycles SS D SS E 765kV line. Tripping of SS D SS E 765kV line, however, does not separate the network still coupled via SS D 765/400kV transformer. As immediate remedial action an additional Direct Transfer Tripping (DTT) has been commissioned to trip the SS D-SS C 765kV breaker at substation SS D on every operation of OOS scheme either at Substation SS A or SS B. In some circumstances, however, particularly with one PS A generator out of service, the existing OOS tripping scheme may not be able to detect OOS conditions due to electrical centre being out of impedance measurement reach. Analysis of possible solutions to ensure reliable operation of OOS scheme in all system configurations including envisaged future developments revealed that application of impedance measurement method for detection of unstable conditions would require installation of number of additional OOS impedance relays on a lot more meshed network around Cape Town to be

3 able to measure electrical centre location closer to PS A. The OOS relays would have to be installed also on SS D 765/400kV transformer as well as on both gen transformers of PS A units. Unblocking of all impedance relays on the network cannot be considered due to uncontrolled separation of the network without any guaranties of active power balance after separation. In addition it became clear that the impedance measurement method to detect unstable conditions performs best during classical behaviour of the network that can be simplified to two machine oscillations. Our present network configuration with additional generation commissioned and more expected in future does not guarantee such behaviour. High costs, complexity and questionable reliability of such system directed the OOS investigation into more modern, directly applicable and relatively simple technology based on Phasor Measurement Units (PMUs). APPLICATION OF WAPS TO OOS DETECTION Very attractive method that can be simple, reliable and sufficient to detect all possible OOS conditions no matter how they were initiated and in what system configurations is to deploy direct measurement of angle between PS A generators terminal voltage and voltage of the main generation pool as indicated on figure 3 below. can be issued once this angle indicates out-ofphase operation (over 180 deg) of PS A generators with regard to the rest of the interconnected system. Such scheme is inherently independent of system configuration, loading, generation pattern, etc. and it is immune to any network expansion. Similar systems are commissioned in other countries in the world. Voltage Angle Measurement at PS A For effective detection of out of-step operation of PS A generators the measurement must be taken from both units generators terminals. This is necessary to detect conditions where zero voltage electrical centre enters gen transformer impedance and not the impedance of transmission lines or transformers. This measurement, if necessary, can be moved to HV side of PS A gen transformers and the terminal voltage angle can be computed by means of calculating voltage drop across the gen transformer impedance, which is dynamically constant. For this calculation gen transformer HV current must be measured and voltage drop across the transformer calculated and subtracted from the measured voltage at HV side. Such arrangement is possible but would add unnecessary complications (voltage selector circuit to cover for possible different linking of gen transformers) reducing overall reliability of the scheme. Preferably direct measurement of generator terminal voltage should be used. In some circumstances the zero voltage electrical centre doesn t even cross PS A gen transformers but enters generator impedance directly. In such conditions one of PS A generator Pole Slip protection should operate resulting in generators shut down. This protection cannot be substituted by OOS system but attempts can be considered to detect OOS condition before generator Pole Slip protection will operate i.e. just after the first OOS swing to limit impact on turbo-generators and to facilitate trip-to-house-load operation. Figure 3. Angle between PS A and the system voltages as direct indication of synchronous operation. Phasor Measurement Units (PMUs) have been designed specifically for this purpose, have long history of being used in monitoring manner, including in ESKOM, and are considered a fully mature technology. By connecting the two PMUs together via telecommunication system a simple and reliable scheme can be proposed where an angle between PS A voltage and the reference voltage is measured and OOS tripping command Reference Voltage Angle Measurement The most important aspect in selection of reference voltage is its location. On more meshed network topology with generators spread across the network Eigenvalue analysis is usually necessary to identify pools of generators that behave in similar manner during instability. On the considered corridor where the PS A plays predominant role the main generation pool behaves essentially like infinite busbar and it is sufficient to select substation where voltage oscillations are negligible during corridor instability.

4 Measurement too far away from PS A may result in high standing angle difference which may affect speed and security of the scheme. It may also affect speed and reliability of communication channels. Number of dynamic simulations were performed to ensure that the location of reference voltage will provide required performance of the scheme. The system was studied in normal conditions and with different sets of outages, loading and generation patterns. Close-by and long duration far away faults were simulated and voltage angles and magnitudes at many busbars were monitored. The purpose of these simulations was to prove that for any simulated conditions voltages at selected busbar(s) remain measurable during out-of-step conditions and reflective of the rest of the system. Example of one simulation result is shown on figure 4 for illustration [deg] SS G and SS H voltage angles [ms] 1014 Koeberg PS A Rotor 1: Rotor Angle angle with reference to reference machine angle Koeberg PS A Terminal U1 24kV: Voltage, Angle Relative Angle Koeberg PS A HV 400kV: Voltage Voltage, Angle Relative Angle Acacia SS E Voltage 400kV: Voltage, Angle Relative Angle Muldersvlei SS D Voltage 400kV: Angle Voltage, Relative Angle Kappa 400kV: Voltage, Relative Angle Droerivier SS A Voltage 400kV: Angle Voltage, Relative Angle Hydra SS F 400kV: Voltage Voltage, Angle Relative Angle Beta SS 400kV: G Voltage Voltage, Angle Relative Angle Grootvlei SS H Voltage 400kV: Angle Voltage, Relative Angle Pluto 400kV: Voltage, Relative Angle Kendal 400kV: Voltage, Relative Angle Figure 4. Voltage angle on kV Transmission busbars during PS A instability, example. Only on two occasions out of all simulations 400kV voltage at SS A showed out-of-step conditions with regard to the reference voltage indicating electrical centre between SS A and SS F. SS F voltage did not. Therefore one substation away from SS F i.e. either SS G or SS H will provide appropriate reference to detect OOS conditions in all possible scenarios. Loss of system synchronism as a result of faults at either SS G or H 400kV is only possible for a very long duration 3 phase faults above 3 seconds. Such faults are close to impossible on Transmission network considering level of local and remote back-ups. Moreover faults on busbars selected for PMU installation should not create serious problems either as for OOS detection the most important is to measure angle after the fault has been cleared and when voltages are recovering. The results indicated locations at SS G and SS H 400kV as fully adequate. To cater for possible outages of PS A units and to provide adequate redundancy two fully independent systems are proposed: System 1 - to measure voltage angle between PS A Unit 1 and SS H 400kV and System 2 - to measure voltage angle between PS A Unit 2 and SS G 400kV. OOS detection algorithm The algorithm to detect corridor unstable conditions must be able to detect transient instability caused by any possible event on the network (faults in particular) in any system and generation configuration as well as loading of the network. The algorithm must be immune to future network development including possible high penetration of renewable power plants with associated reduced system inertia or commissioning of additional large synchronous generation. The algorithm must remain stable for any possible event on the network that does not result in system instability. The algorithm shall remain stable during intermittent failures of time synchronisation or communication with remote PMUs. It shall also remain stable on return to service of failed time synchronisation or communication channel. To verify validity of the approach to use PMU measurements for OOS tripping a model of such OOS system was developed in power system simulator and tested on cases where blind spots were found in existing scheme. The OOS scheme was installed (on simulator) at substation SS H and measured voltage angle between PS A generator terminal voltage and SS H 400kV busbar voltage. Three algorithms were implemented and tested:

5 Pure measurement of angle δ between voltages with trip command issued at the angle: δ > 180deg Such simple algorithm could operate prematurely due to potential large standing angle between measurement points or unnecessarily in case of loss of time synchronisation. This algorithm also cannot detect OOS within generator impedance (pole slip). Measurement of slip frequency between the two voltages (dδ/dt) and speed of slip frequency change (angle acceleration d2δ/dt or RoCoF). Trip command is issued when both slip frequency and acceleration exceed pre-set limits Ks and Ka for specific duration of time T: dδ/dt > Ks and d 2 δ/dt > Ka This algorithm is used in SEL-3378 Synchrophasor Vector Processor Relay successfully implemented in Brazil and Uruguay (OOS schemes), Peru and Georgia (Gen dropping schemes). It can also detect generator pole slip conditions, if required. Measurement of slip frequency between the two voltages (dδ/dt) and speed of slip frequency change (angle acceleration d2δ/dt or RoCoF). Trip command is issued when magnitude of composite vector of slip frequency and angle acceleration exceeds pre-defined level Ksa for a specific time duration Tsa: (K*dδ/dt) 2 + (d 2 δ/dt) 2 > (Ksa) 2 This algorithm constitutes a circular or elliptic characteristic of slip frequency and angle acceleration between the two measured voltages. The advantage of this algorithm is fast operation. It can also detect generator pole slip conditions. More algorithms or combination of different algorithms can be considered to improve dependability and security of the scheme depending on market offerings and internal tests. The initial tests of PMU based OOS tripping scheme with the above three algorithms showed excellent performance in both stable and unstable conditions. The slip frequency and acceleration of the angle between the two voltages differs so much during stable swings and unstable out-ofstep conditions that the detection of correct tripping conditions seems to be very reliable. Figure 5 shows plots of angle acceleration on vertical axis (Hz/s) against slip frequency on horizontal axis (Hz). Two conditions are plotted on figure 5 the smaller blue trajectory represents movement of speed/acceleration vector during marginally stable condition on critical clearance time (CCT) and the bigger red trajectory represents the same vector movement during outof-step conditions ~ 1 millisecond above CCT. The trajectories of such vectors indicate excellent separation between stable and unstable conditions which can be used in detection algorithms Power Swing on Critical Clearance Time - Blue [Hz] PMUCalcDSL: Slip frequency in Hz / Slip frequency change in Hz/s PMUCalcDSL: Slip frequency in Hz / Slip frequency change in Hz/s Possible Tripping Characteristic Figure 5. Speed/Acceleration vector trajectory during stable (blue) and unstable (red) swings. As mentioned before, simulations also showed that in some circumstances the electrical centre crosses PS A generators impedance and not even gen transformers impedance, which theoretically should be beyond the reach of proposed OOS scheme which measures voltage angle between PS A generators terminals and the rest of the system as this voltage angle departs by less that 180 deg. However, the two tested algorithms based on measurement of speed and acceleration still operated correctly after the first swing. Another advantage of algorithms based on speed and acceleration is that they should be immune to loss of time synchronisation as this will manifest itself in very slow movement of angle well below thresholds of speed and acceleration settings and as such the scheme should be fully functional even 20.00

6 if the synchronisation is lost for prolonged periods. Pure angle measurements (d > 180deg) does not have this immunity and is dependent on standing angle difference as a result of normal power transfer therefore much less secure. Telecommunication Requirements Fast and reliable communication between remote PMUs and OOS IED is a critically important element for successful implementation of PMU based OOS scheme. Continuous communication of phasor magnitude and angle from PMU to OOS IED with latency shorter than 100ms and availability higher than 99.99% is required. The telecommunication channels must ensure N-1 compliance i.e. failure of any single component or subsystem of the telecommunication network shall not result in failure of communication channel. Channels used to improve reliability of the system must not have any common modes of failures. In case single channels are not able to provide required reliability two or more independent channels may be necessary. Time Synchronization Precise angle measurement is highly dependent on time stamping therefore high precision time synchronisation of every deployed PMU and OOS IED is important. Due to possible intermittent failures or fading of GPS type of synchronisation an alternative solutions could be considered such as deployment of Atomic Clocks unless detection algorithms are fully immune to synchronisation failures and stable on return and instantaneous readjustment of time stamp. FREQUENCY STABILITY OF THE ISLAND The most important aspect for successful island is its ability to control frequency. Separation from the transmission system always leaves an island in either excess or deficit of active power, which means that the available governing to reduce increasing frequency as well as available Under Frequency Load Shedding (UFLS) to trim the load in case of underfrequency has to be sufficient after separation. Therefore the following two conditions may result in unsustainable island: 1. If the amount of power generation on the island is high (including all RPPs currently installed and to be installed in the future) and the load on the island is low, substantial amount of power will be exported from separation points to the rest of the system. In such cases system separation may not be successful if the frequency would be rising faster than RoCoF relays settings or would reach levels of overfrequency settings after separation. As a result PS A generators would trip and the whole island would collapse. 2. If the amount of power generation on the island is low (e.g. no or little generation from RPPs and/or with some generation outages) and the load on the island is high, substantial amount of power will be imported via separation points. In such conditions system separation could result in active power deficit on the island higher than capability of UFLS scheme to trim the load after separation. UFLS scheme design caters for a maximum of 50% of actual load to be shed if all underfrequency stages are activated. Practically it can be safely assumed that 40% of actual load will definitely be disconnected. If this amount of UFLS is not sufficient to arrest frequency above 47Hz the PS A generators will trip and the island will also collapse. In both situations system separation would result in tripping of PS A generators and a total black-out of the island. In such conditions it is a lot safer for PS A generators and connected customers to use gen dropping option. In this way out-of-step operation of PS A generators will cease immediately and controlled trip-to-house load sequence will be initiated. The transmission network will recover without major consequences. In line with SA Grid Code such incident on the scale of the entire system (i.e. without separation) should not result in frequency drop below 49.0Hz which means that only first few stages of UFLS will be activated. The Transmission system will not be separated therefore ready for synchronisation of PS A generators immediately substantially limiting the extent of the incident. To detect in what condition the island is operating in terms of the amount of active power deficit or surplus prior to incident a continuous measurement of import or export would be required. For this measurement additional PMUs would have to be installed at the points of separation i.e. at SS A, B and C as well as at generation points at PS B, C and D. Based on this status the OOS System should select between system islanding and gen dropping execution. The Figure 6 below illustrates the required measurements at the island separation points as well as the additional generation injection points. Active power deficit or surplus of the island (P Island ) can be calculated by summating all measurements. The addition of power generated by PS B, C and D is required as these generators would have to be shut down after separation to ensure transiently stable island and to improve recovery of PS A generators following OOS conditions. Simulations show that the PS B, C and

7 D may not regain stability immediately after system separation which would result in prolonged voltage oscillations that may affect stability of PS A generators. replace the currently installed separation system with Gen Dropping scheme for all situations of transient instability on the corridor. For comparison hardware requirements of pure Gen Dropping scheme is shown on figure 8 below. Such scheme requires 4 PMUs and 2 telecommunication channels. It is obvious that the reliability of such scheme can be expected a magnitude higher than complicated combination of Islanding and Gen. Dropping scheme. In addition with PS A gen dropping scheme the gen dropping of smaller generators (PS B, C and D) is not needed anymore. If necessary, local voltage beat measurement could be implemented to speed up disconnection of any generator that would not regain stability after PS A gen dropping operation. Figure 6. System Islanding and Gen Dropping Scheme depending on island loading. Figure 7 below indicates schematically hardware requirements of a scheme that would fulfil requirements to differentiate between conditions that would require system separation and gen dropping and be able to execute both options. Figure 8. Hardware Requirements for PMU based Gen Dropping Scheme. Figure 7. Potential Hardware Requirements for PMU based System Islanding Scheme. The system would require 10 PMUs and 28 telecommunication channels. The above illustration does not include any additional redundancies that should be provided for security of such intrusive scheme. In addition the stability of the island even if the right initial active power balance is measured and achieved becomes more and more questionable considering highly variable and growing output of Renewable Power Plants. Considering the complexity of such combination of Islanding and Gen Dropping systems as well as growing levels of RPPs and reinforcements of the transmission network it has been concluded to REDUDNDANCY REQUIREMENTS Two fully independent systems one measuring angle between PS A Unit 1 and SS H 400kV substation and the second between PS A Unit 2 and SS G 400kV substation provide for dependability of the scheme (one out of two) and will cater for PS A units outages. As a second layer of redundancy it is proposed to duplicate the two schemes with a requirement for both of them operating (two-out-of-two) to improve security of the system. Figure 9 below illustrates schematically the proposed system.

8 Figure 9. Hardware Requirements for PMU based Gen Dropping Scheme. In this way the scheme is fully redundant for both dependability and security. Only in situations where one PS A generator is out of service the redundancy for improved dependability would not be provided with system security maintained at the highest level all the time. Considering very much reduced probability of PS A generators instability after reinforcements in the network this compromise is acceptable. The last incident of PS A transient instability that required OOS scheme operation was in CONCLUSIONS Long Transmission corridors connecting two generation pools are always susceptible to transient instability resulting in OOS conditions. Unless probability of such incidents is negligible and the risk of occurrence acceptable long power transfer corridors should be protected against OOS condition. Generator that lost its synchronism with the Transmission system has to be separated from the network. The separation can be provided either by disconnecting OOS generators from the system (gen dropping scheme) or by separating OOS generators from the system with portion of the network to balance load and generation (network islanding scheme). The benefits of gen dropping scheme is simpler design, more deterministic performance and a lot easier restoration. Disconnected generation on the network, however, has to be replaced by available spinning reserve and UFLS operation. Gen dropping scheme can only be considered where the network can sustain the corridor operation with disconnected generation from voltage control and thermal limitations perspectives. The benefit of islanding scheme is possibility to ride through the OOS incident without disconnecting any generators and as a result less UFLS operation. The success rate of islanding scheme, however, depends on excellent performance of many subsystems responsible for detection of island power demand and capability of island to sustain its operation after separation. With growing penetration of non-dispatchable RPPs on the ESKOM network it is becoming more and more difficult to guarantee sustainability of such island. At the same time reinforcements of the corridor allowed to sustain the corridor without PS A generation reducing probability of OOS incident. The same reinforcements (change of system impedances) also resulted in loss of full observability of the existing OOS islanding scheme which prompted re-design investigation. The existing islanding OOS scheme is based on impedance measurements. To make such scheme fully observable substantial amount of additional OOS relays would have to be commissioned including some on transmission transformers and gen transformers. Complexity of such scheme, costs of implementation and potential problems with reliability re-focused the investigation into application of PMU technology and WAPS. To gain confidence in application of this new technology to OOS problem on the ESKOM Transmission system the WAPS system was modelled on dynamic simulator and large number of simulations were run to evaluate different detection algorithms as well as reliability with excellent results. Fresh look at the current system separation scheme also highlighted potential problems with frequency stability of prospective island. For secure operation of the scheme in wide range of system configurations gen dropping option would have to be added to ensure reliable performance of the system in high active power unbalance conditions where island could not be sustainable. To add such an option to the existing scheme the active power demand of the island would have to be measured before the system could decide what type of execution is viable islanding or gen dropping. This requirement would increase complexity of the scheme tenfold. Considering all above aspects of scheme reliability, costs, impact on customers, system restoration and future network development ESKOM decided to replace the existing islanding scheme based on impedance measurement with gen dropping WAPS scheme based on PMU measurements.

9 REFERENCES [1] Power System Stability and Control - P. M. Anderson and A. A. Fouad New York: John Wiley & Sons, [2] Advanced Angle Stability Controls - Cigre Task Force , April [3] Power System Stability and Control - P. Kundur, New York: McGraw-Hill, [4] Hydrogenerators behaviour under transient conditions - CIGRE A1.35 WG Brochure 665, Sep [5] The Total Solution to Phase Angle Stability, Frequency and Voltage Problems for Operating Long-distance Bulk Power Transmission System - S.Yoshiyama, K.Takafuji, H.Taguchi, K.Hara, Y.Kowada. [6] IEEE Standard for Synchrophasor Measurements for Power Systems - IEEE Std C , New York, NY USA. [7] Real-Time Application of Synchrophasor for Improving Reliability, NERC, 10/18/2010. [8] Advanced Real-Time Synchrophasor Applications Edmund O. Schweitzer, III, David Whitehead, Armando Guzmán, Yanfeng Gong, and Marcos Donolo, SEL Journal of Reliable Power, Volume 2, Number 2, May 2011

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78)

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78) Power Plant and Transmission System Protection Coordination Loss-of of-field (40) and Out-of of-step Protection (78) System Protection and Control Subcommittee Protection Coordination Workshop Phoenix,

More information

Using Synchrophasors for Controlled Islanding A Prospective Application in the Uruguayan Power System

Using Synchrophasors for Controlled Islanding A Prospective Application in the Uruguayan Power System 1 Using Synchrophasors for Controlled Islanding A Prospective Application in the Uruguayan Power System Glauco Taranto & Ricardo Franco IEEE PES General Meeting 2013 Vancouver, Canada R. Franco, C. Sena,

More information

Transmission System Phase Backup Protection

Transmission System Phase Backup Protection Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need

More information

Fault Ride Through Principles. and. Grid Code Proposed Changes

Fault Ride Through Principles. and. Grid Code Proposed Changes Fault Ride Through Principles and Grid Code Proposed Changes Document identifier: FRT Principles and Proposals Authored by: Jonathan O Sullivan / Alan Rogers Document version: Ver 1.3 Checked by: Anne

More information

Power Plant and Transmission System Protection Coordination Fundamentals

Power Plant and Transmission System Protection Coordination Fundamentals Power Plant and Transmission System Protection Coordination Fundamentals NERC Protection Coordination Webinar Series June 2, 2010 Jon Gardell Agenda 2 Objective Introduction to Protection Generator and

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION 23 rd International Conference on Electricity Distribution Lyon, 5-8 June 25 Paper 48 ADVANCED VECT SHIFT ALGITHM F ISLANDING DETECTION Murali KANDAKATLA Hannu LAAKSONEN Sudheer BONELA ABB GISL India ABB

More information

Phasor-based wide area monitoring in the South African power system

Phasor-based wide area monitoring in the South African power system Phasor-based wide area monitoring in the South African power system by D H Wilson, R A Folkes, Psymetrix, UK; A Edwards B Berry Eskom; N Mbuli, Tshwane University of Technology; Brian van Rensburg, Actom

More information

NERC Protection Coordination Webinar Series June 30, Dr. Murty V.V.S. Yalla

NERC Protection Coordination Webinar Series June 30, Dr. Murty V.V.S. Yalla Power Plant and Transmission System Protection ti Coordination Loss-of-Field (40) and Out-of of-step Protection (78) NERC Protection Coordination Webinar Series June 30, 2010 Dr. Murty V.V.S. Yalla Disclaimer

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Volts Per Hertz (24), Undervoltage (27), Overvoltage (59), and Under/Overfrequency (81) Protection System Protection and Control Subcommittee

More information

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/ ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Anti-Islanding Today, Successful Islanding in the Future

Anti-Islanding Today, Successful Islanding in the Future Anti-Islanding Today, Successful Islanding in the Future John Mulhausen and Joe Schaefer Florida Power & Light Company Mangapathirao Mynam, Armando Guzmán, and Marcos Donolo Schweitzer Engineering Laboratories,

More information

Synchronous Measurement, Control, & Protection of Electric Power Systems. Dr. Edmund O. Schweitzer, III February 29, 2012

Synchronous Measurement, Control, & Protection of Electric Power Systems. Dr. Edmund O. Schweitzer, III February 29, 2012 Synchronous Measurement, Control, & Protection of Electric Power Systems Dr. Edmund O. Schweitzer, III February 29, 2012 Copyright SEL 2011 The Future of Power Systems No Blackouts New Sources Better Control

More information

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination Technical Reference Document Power Plant and Transmission System Protection Coordination NERC System Protection and Control Subcommittee Revision 1 July 2010 Table of Contents 1. Introduction... 1 1.1.

More information

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link. Mr.S.B.Dandawate*, Mrs.S.L.Shaikh** *,**(Department of Electrical Engineering, Walchand College of

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation

More information

THE ROLE OF SYNCHROPHASORS IN THE INTEGRATION OF DISTRIBUTED ENERGY RESOURCES

THE ROLE OF SYNCHROPHASORS IN THE INTEGRATION OF DISTRIBUTED ENERGY RESOURCES THE OLE OF SYNCHOPHASOS IN THE INTEGATION OF DISTIBUTED ENEGY ESOUCES Alexander APOSTOLOV OMICON electronics - USA alex.apostolov@omicronusa.com ABSTACT The introduction of M and P class Synchrophasors

More information

Power System Stability. Course Notes PART-1

Power System Stability. Course Notes PART-1 PHILADELPHIA UNIVERSITY ELECTRICAL ENGINEERING DEPARTMENT Power System Stability Course Notes PART-1 Dr. A.Professor Mohammed Tawfeeq Al-Zuhairi September 2012 1 Power System Stability Introduction Dr.Mohammed

More information

Transmission Protection Overview

Transmission Protection Overview Transmission Protection Overview 2017 Hands-On Relay School Daniel Henriod Schweitzer Engineering Laboratories Pullman, WA Transmission Line Protection Objective General knowledge and familiarity with

More information

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble: It is in the public interest for the North American Electric Reliability Corporation

More information

Loss of Mains Protection

Loss of Mains Protection Loss of Mains Protection Summary All generators that are connected to or are capable of being connected to the Distribution Network are required to implement Loss of Mains protection. This applies to all

More information

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6

More information

Wide-Area Measurements to Improve System Models and System Operation

Wide-Area Measurements to Improve System Models and System Operation Wide-Area Measurements to Improve System Models and System Operation G. Zweigle, R. Moxley, B. Flerchinger, and J. Needs Schweitzer Engineering Laboratories, Inc. Presented at the 11th International Conference

More information

NVESTIGATIONS OF RECENT BLACK-

NVESTIGATIONS OF RECENT BLACK- DIGITAL VISION outs indicate that the root cause of almost all major power system disturbances is voltage collapse rather than the underfrequency conditions prevalent in the blackouts of the 1960s and

More information

Application Example Document ID: SA Rev. - September 24, 2004

Application Example Document ID: SA Rev. - September 24, 2004 Application Example Rev. - September 24, 2004 1 Summary Phasor based control of braking resistors A case study applied to large power oscillations experienced in the Swedish grid 1997 Phasor measurement,

More information

Digital Fault Recorder Deployment at HVDC Converter Stations

Digital Fault Recorder Deployment at HVDC Converter Stations Digital Fault Recorder Deployment at HVDC Converter Stations On line continuous monitoring at HVDC Converter Stations is an important asset in determining overall system performance and an essential diagnostic

More information

Transmission Line Protection Objective. General knowledge and familiarity with transmission protection schemes

Transmission Line Protection Objective. General knowledge and familiarity with transmission protection schemes Transmission Line Protection Objective General knowledge and familiarity with transmission protection schemes Transmission Line Protection Topics Primary/backup protection Coordination Communication-based

More information

each time the Frequency is above 51Hz. Continuous operation is required

each time the Frequency is above 51Hz. Continuous operation is required GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA

More information

A New Subsynchronous Oscillation (SSO) Relay for Renewable Generation and Series Compensated Transmission Systems

A New Subsynchronous Oscillation (SSO) Relay for Renewable Generation and Series Compensated Transmission Systems 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium A New Subsynchronous Oscillation (SSO) Relay for Renewable Generation and Series Compensated

More information

Task Force on Synchrophasor Protection Applications NASPI Engineering Analysis Task Team Matthew Rhodes 3/22/16

Task Force on Synchrophasor Protection Applications NASPI Engineering Analysis Task Team Matthew Rhodes 3/22/16 NASPI White Paper: Integrating Synchrophasor Technology into Power System Protection Applications Update Report Task Force on Synchrophasor Protection Applications NASPI Engineering Analysis Task Team

More information

NERC Protection Coordination Webinar Series June 23, Phil Tatro

NERC Protection Coordination Webinar Series June 23, Phil Tatro Power Plant and Transmission System Protection Coordination Volts Per Hertz (24), Undervoltage (27), Overvoltage (59), and Under/Overfrequency (81) Protection NERC Protection Coordination Webinar Series

More information

ISSUES OF SYSTEM AND CONTROL INTERACTIONS IN ELECTRIC POWER SYSTEMS

ISSUES OF SYSTEM AND CONTROL INTERACTIONS IN ELECTRIC POWER SYSTEMS ISSUES OF SYSTEM AND CONTROL INTERACTIONS IN ELECTRIC POWER SYSTEMS INDO-US Workshop October 2009, I.I.T. Kanpur INTRODUCTION Electric Power Systems are very large, spread over a wide geographical area

More information

Relay Performance During Major System Disturbances

Relay Performance During Major System Disturbances Relay Performance During Major System Disturbances Demetrios Tziouvaras Schweitzer Engineering Laboratories, Inc. Presented at the 6th Annual Conference for Protective Relay Engineers College Station,

More information

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR)

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR) 7 February 2018 RM Zavadil COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR) Brief Overview of Sub-Synchronous Resonance Series

More information

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017 Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the

More information

Approximating a Power Swing and Out-of-Step Condition for Field Testing

Approximating a Power Swing and Out-of-Step Condition for Field Testing Approximating a Power Swing and Out-of-Step Condition for Field Testing By Jason Buneo and Dhanabal Mani Megger, Ltd Jason.Buneo@megger.com Dhanabal.Mani@megger.com Abstract Testing a power swing or out-of-step

More information

AORC Technical meeting 2014

AORC Technical meeting 2014 http : //www.cigre.org B4-112 AORC Technical meeting 214 HVDC Circuit Breakers for HVDC Grid Applications K. Tahata, S. Ka, S. Tokoyoda, K. Kamei, K. Kikuchi, D. Yoshida, Y. Kono, R. Yamamoto, H. Ito Mitsubishi

More information

RELIABILITY: Our Advantages, Challenges, and Opportunities

RELIABILITY: Our Advantages, Challenges, and Opportunities RELIABILITY: Our Advantages, Challenges, and Opportunities NERC Reliability Leadership Summit March 21, 2017 Edmund O. Schweitzer, III Ph.D. President, Schweitzer Engineering Laboratories, Inc. Copyright

More information

Fixed Series Compensation

Fixed Series Compensation Fixed Series Compensation High-reliable turnkey services for fixed series compensation NR Electric Corporation The Fixed Series Compensation (FSC) solution is composed of NR's PCS-9570 FSC control and

More information

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination Agenda Item 5.h Attachment 1 A Technical Reference Document Power Plant and Transmission System Protection Coordination Draft 6.9 November 19, 2009 NERC System Protection and Control Subcommittee November

More information

Standard Development Timeline

Standard Development Timeline PRC-026-1 Relay Performance During Stable Power Swings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

Chapter 10: Compensation of Power Transmission Systems

Chapter 10: Compensation of Power Transmission Systems Chapter 10: Compensation of Power Transmission Systems Introduction The two major problems that the modern power systems are facing are voltage and angle stabilities. There are various approaches to overcome

More information

Setting and Verification of Generation Protection to Meet NERC Reliability Standards

Setting and Verification of Generation Protection to Meet NERC Reliability Standards 1 Setting and Verification of Generation Protection to Meet NERC Reliability Standards Xiangmin Gao, Tom Ernst Douglas Rust, GE Energy Connections Dandsco LLC. Abstract NERC has recently published several

More information

BED INTERCONNECTION TECHNICAL REQUIREMENTS

BED INTERCONNECTION TECHNICAL REQUIREMENTS BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2

More information

System Protection Schemes in Power Network based on New Principles

System Protection Schemes in Power Network based on New Principles System Protection Schemes in Power Network based on New Principles Daniel Karlsson, ABB Automation Products AB S-721 59 Västerås, SWDN daniel.h.karlsson@se.abb.com Abstract This report describes how a

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),

More information

PROTECTION SIGNALLING

PROTECTION SIGNALLING PROTECTION SIGNALLING 1 Directional Comparison Distance Protection Schemes The importance of transmission system integrity necessitates high-speed fault clearing times and highspeed auto reclosing to avoid

More information

PMU Application in Out-of-Step Protection

PMU Application in Out-of-Step Protection G.N.Taranto 1/8 Rio de Janeiro 2nd International Workshop PMU Application in Out-of-Step Protection Glauco N. Taranto COPPE/UFRJ Programa de Engenharia Elétrica G.N.Taranto 2/8 References 2 APPLICATION

More information

Hamdy Faramawy Senior Application Specialist ABB Sweden

Hamdy Faramawy Senior Application Specialist ABB Sweden Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy

More information

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS Giuseppe Di Marzio NTNU giuseppe.di.marzio@elkraft.ntnu.no Olav B. Fosso NTNU olav.fosso@elkraft.ntnu.no Kjetil Uhlen SINTEF

More information

Practical PMU Applications for Utilities

Practical PMU Applications for Utilities Practical PMU Applications for Utilities University of Washington EE Graduate Seminar November 1 st, 2012 Manu Parashar Douglas Wilson SynchroPhasor Technology Phasor Measurement Units (PMUs) Next generation

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0 DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

A New Approach Applied to Adaptive Centralized Load Shedding Scheme

A New Approach Applied to Adaptive Centralized Load Shedding Scheme A New Approach Applied to Adaptive Centralized Load Shedding Scheme HAMID BENTARZI*, ABDERRAHMANE OUADI*, NADIR GHOUT*, FARID MAAMRI* and NIKOS E.MASTORAKIS** *Signals and Systems Laboratory (SiSyLAB)

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

EE 742 Chapter 9: Frequency Stability and Control. Fall 2011

EE 742 Chapter 9: Frequency Stability and Control. Fall 2011 EE 742 Chapter 9: Frequency Stability and Control Fall 2011 Meeting demand with generation Large and slow changes (24 hr) in power demand are met by unit commitment Medium and relatively fast changes (30

More information

Phase Angle Monitoring:

Phase Angle Monitoring: Phase Angle Monitoring: Industry Experience Following the 2011 Pacific Southwest Outage Recommendation 27 Ryan D. Quint, PhD, PE NERC SMS Coordinator NASPI Work Group Meeting October 2016 Background Purpose:

More information

A Topology-based Scheme for Adaptive Underfrequency Load Shedding

A Topology-based Scheme for Adaptive Underfrequency Load Shedding A Topology-based Scheme for Adaptive Underfrequency Load Shedding Dinh Thuc Duong and Kjetil Uhlen Department of Electric Power Engineering NTNU, Norwegian University of Science and Technology Trondheim,

More information

A Software Tool for Real-Time Prediction of Potential Transient Instabilities using Synchrophasors

A Software Tool for Real-Time Prediction of Potential Transient Instabilities using Synchrophasors A Software Tool for Real-Time Prediction of Potential Transient Instabilities using Synchrophasors Dinesh Rangana Gurusinghe Yaojie Cai Athula D. Rajapakse International Synchrophasor Symposium March 25,

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

MidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above

MidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above MidAmerican Energy Company Reliability Planning Criteria for 100 kv and Above March 13, 2018 Issued by: Dehn Stevens, Director System Planning and Services 1.0 SCOPE This document defines the criteria

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays

More information

Effect of Increased Generation and AVR on the Transient Stability at a Nuclear Power Plant

Effect of Increased Generation and AVR on the Transient Stability at a Nuclear Power Plant Preprints of the 19th World Congress The International Federation of Automatic Control Effect of Increased Generation and AVR on the Transient Stability at a Nuclear Power Plant PJ Emmanuel and KA Folly

More information

Integration of Variable Renewable Energy

Integration of Variable Renewable Energy Integration of Variable Renewable Energy PRAMOD JAIN, Ph.D. Consultant, USAID Power the Future October 1, 2018 Almaty, Republic of Kazakhstan Venue: Almaty University of Power Engineering and Telecommunications

More information

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers Disclaimer: All information presented in the report, the results and the related computer program, data,

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

G. KOEPPL Koeppl Power Experts Switzerland

G. KOEPPL Koeppl Power Experts Switzerland PS3: Substation Design: New Solutions and Experiences Bus-Node Substation A Big Improvement in Short-Circuit and Switching Properties at Reduced Substation Costs G. KOEPPL Koeppl Power Experts Switzerland

More information

SynchroPhasor use at OG&E. Austin D. White P.E. Steven E. Chisholm Oklahoma Gas & Electric

SynchroPhasor use at OG&E. Austin D. White P.E. Steven E. Chisholm Oklahoma Gas & Electric SynchroPhasor use at OG&E Austin D. White P.E. Steven E. Chisholm Oklahoma Gas & Electric Outline Hardware/Software Overview Current Deployment Status Use at OG&E Problems Solved & Interesting Findings

More information

Application for A Sub-harmonic Protection Relay. ERLPhase Power Technologies

Application for A Sub-harmonic Protection Relay. ERLPhase Power Technologies Application for A Sub-harmonic Protection Relay ERLPhase Power Technologies 1 Outline Introduction System Event at Xcel Energy Event Analysis Microprocessor based relay hardware architecture Sub harmonic

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Protective Relaying for DER

Protective Relaying for DER Protective Relaying for DER Rogerio Scharlach Schweitzer Engineering Laboratories, Inc. Basking Ridge, NJ Overview IEEE 1547 general requirements to be met at point of common coupling (PCC) Distributed

More information

Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks

Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks Working Group Meeting June 5-6, 2012 Accurate Synchrophasor Estimation to Support the Islanding Maneuver of Active Distribution Networks Prof. Mario Paolone EPFL, Switzerland - Distributed Electrical Systems

More information

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow Module 1 : Fundamentals of Power System Protection Lecture 3 : Protection Paradigms - System Protection Objectives In this lecture we will: Overview dynamics in power systems. Introduce system protection

More information

SEL-311C TRANSMISSION PROTECTION SYSTEM

SEL-311C TRANSMISSION PROTECTION SYSTEM SEL-3C TRANSMISSION PROTECTION SYSTEM ADVANCED TRANSMISSION LINE PROTECTION, AUTOMATION, AND CONTROL Bus ANSI NUMBERS/ACRONYMS AND FUNCTIONS 52 3 3 2 P G 8 O U 27 68 50BF 67 P G Q 50 P G Q 59 P G Q 5 P

More information

Microgrid Islanding with a Battery Energy Storage System (BESS) Gabriel Haines

Microgrid Islanding with a Battery Energy Storage System (BESS) Gabriel Haines Microgrid Islanding with a Battery Energy Storage System (BESS) Gabriel Haines 27/03/2018 1 INTRODUCTION A microgrid is a small group of generation sources and loads that operate together as one system.

More information

P5 Policy 5: Emergency Operations

P5 Policy 5: Emergency Operations RG CE OH Policy 5: Emergency Operations V 3.1 Page 1 of 18 P5 Policy 5: Emergency Operations Document Control Version Number: V 3.1 Approved By: RG CE Plenary Date Approved: 43 rd RG CE Plenary Meeting

More information

Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network

Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network M. Karimi, Student Member, IEEE, H. Mokhlis, Member, IEEE, A. H. A. Bakar, Member, IEEE, J. A. Laghari, A. Shahriari,

More information

ISSN: Page 298

ISSN: Page 298 Sizing Current Transformers Rating To Enhance Digital Relay Operations Using Advanced Saturation Voltage Model *J.O. Aibangbee 1 and S.O. Onohaebi 2 *Department of Electrical &Computer Engineering, Bells

More information

Study on the Improvement of the Special Protection Scheme (SPS) in the Korean power system

Study on the Improvement of the Special Protection Scheme (SPS) in the Korean power system Study on the Improvement of the Special Protection Scheme (SPS) in the Korean power system Jeonghoon Shin, Suchul Nam, Seungtae Cha, Jaegul Lee, Taekyun Kim, Junyoen Kim, Taeok Kim, Hwachang Song Abstract--This

More information

Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline

Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline Internet Seminar October 1, 2002 Vijay Vittal Students: Haibo You, Zhong Yang 2002 Iowa State University EPRI/DoD Initiative

More information

Switch-on-to-Fault Schemes in the Context of Line Relay Loadability

Switch-on-to-Fault Schemes in the Context of Line Relay Loadability Attachment C (Agenda Item 3b) Switch-on-to-Fault Schemes in the Context of Line Relay Loadability North American Electric Reliability Council A Technical Document Prepared by the System Protection and

More information

NEW DESIGN OF GROUND FAULT PROTECTION

NEW DESIGN OF GROUND FAULT PROTECTION NEW DESIGN OF GROUND FAULT PROTECTION J. Blumschein*, Y. Yelgin* *SIEMENS AG, Germany, email: joerg.blumschein@siemens.com Keywords: Ground fault protection, directional element, faulted phase selection

More information

Adaptive Autoreclosure to Increase System Stability and Reduce Stress to Circuit Breakers

Adaptive Autoreclosure to Increase System Stability and Reduce Stress to Circuit Breakers Adaptive Autoreclosure to Increase System Stability and Reduce Stress to Circuit Breakers 70 th Annual Conference for Protective Relay Engineers Siemens AG 2017 All rights reserved. siemens.com/energy-management

More information

Generator Protection GENERATOR CONTROL AND PROTECTION

Generator Protection GENERATOR CONTROL AND PROTECTION Generator Protection Generator Protection Introduction Device Numbers Symmetrical Components Fault Current Behavior Generator Grounding Stator Phase Fault (87G) Field Ground Fault (64F) Stator Ground Fault

More information

Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation Data Files

Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation Data Files 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2014 Grid of the Future Symposium Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation

More information

NERC Protection Coordination Webinar Series July 15, Jon Gardell

NERC Protection Coordination Webinar Series July 15, Jon Gardell Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

Measurement tools at heart of Smart Grid need calibration to ensure reliability

Measurement tools at heart of Smart Grid need calibration to ensure reliability Measurement tools at heart of Smart Grid need calibration to ensure reliability Smart grid; PMU calibration position 1 The North American interconnections, or electric transmission grids, operate as a

More information

Standard Development Timeline

Standard Development Timeline PRC-026-1 Relay Performance During Stable Power Swings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the

More information

Synchrophasors for Distribution Applications

Synchrophasors for Distribution Applications 1 Synchrophasors for Distribution Applications Greg Hataway, PowerSouth Energy Cooperative Bill Flerchinger, Schweitzer Engineering Laboratories, Inc. Roy Moxley, formerly of Schweitzer Engineering Laboratories,

More information

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Alexander Apostolov AREVA T&D Automation I. INTRODUCTION The electric utilities industry is going through significant

More information

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation

More information