Run coordination Summary. C. Gemme INFN Genova on behalf of Run Coordination August 16 th, 2016

Size: px
Start display at page:

Download "Run coordination Summary. C. Gemme INFN Genova on behalf of Run Coordination August 16 th, 2016"

Transcription

1 Run coordination Summary C. Gemme INFN Genova on behalf of Run Coordination August 16 th, 2016

2 LHC Cardiogram b 2172 b Slow Dump of ATLAS Toroid due to electrical glitch during work on the network. 7h recovery in the interfill Dipole A31L2 inves8ga8ons and mi8ga8ons 2. PS vacuum leak 2

3 LHC Cardiogram 3x3 2172b 2220 b 2220b should be the maximum this year 3

4 The problem: Two quenches while ramping down RB.A12 from 6 ka with -10 A/s 10 June 547 A 3 Aug 295 A à The second event triggered detailed inves8ga8ons. Could be explained with inter-turn short in dipole A31L2 Follow-up (Wednesday) AddiBonal instrumentabon Measurement campaign Various types of cycles evening and overnight. Thursday: analysis of measurements A31L2 No sign of changes in short High current quenches and Fast Power Abort must be avoided: would destroy the magnet Mi8ga8ons: ü Remove global protecbon mechanism: implemented on Thursday and validated ü Reduce BLM thresholds: changed on Thursday/ Friday ü Increase QPS thresholds on A31L2: new board installed on Thursday and successfully validated. 4

5 LHC plans Plan: Con8nue physics with 2220 bunches Slowly increase bunch intensity up to 1.2e11 bunch intensity Targe8ng restricted range for bunch fla^ening for LHCb (from current fill: ns à ns) In discussion Decrease crossing angle from 375 to 300 urad à 10% more luminosity, z-length of luminous region, pile-up Special fill request by CMS: low-mu running Remove week 43 for pp running to have one more week for training 2 sectors to 7TeV Luminosity levelling test already this year 5

6 ATLAS Week b b b b b b b Slow Dump ATLAS Toroid Cosmis Data taking

7 TDAQ Silvia Fressard- Batraneanu, Jeremy Love Smooth running. Patch for HLTSV available to fix occasional resource starva8on. Patch pending installa8on, needs at least one run with high rates before pufng in produc8on Problema8c Tile ROL fibres In collabora8on with Tile, organizing the installa8on of new spares Weekly physics efficiency : 94.03% Trigger held by system

8 IBL 8ming Pixel IBL 8ming not op8mal since TIM replacement aier MD. Since then, running with 2BC. Special fill 5183 on Monday with Individual bunch and a 8ming scan of -10ns/+10ns performed. Timing constants in the TIM have been applied: we recovered most of the hits but we s8ll seem to have a frac8on of clusters on tracks from the neighboring bins. 1 BC on-8me hit efficiency > 99% è 1 BC in the next fill. IBL calibra8on IBL calibra8on was finally recovered aier the sw upgrade during MD re-tuning needed to compensate from TID effects New version of fw for IBL and Layer2 with debugging capabili8es to analyze the TTC-TIM stream Marcello Bindi Best week of the year for Pixel in term of data taking efficiency è dead- Bme = 0.41%

9 SCT/TRT Chiara Debenede?, A. Bocci, D. Derendarz, A. Romaniouk SCT In general Very quiet running. In Fill 5183, one problema8c link not shown as removable by the shiier and not automa8cally recoverable. Set ROD forma^er overflow limit to 1600 (>max number of hits per link to protect against non-physical pa^erns). deployed on Few RODs in Stable beam, ok. TRT Stable data taking DAQ: Needs also replacement of one TTC board that works correctly during data taking but fails in test pulses FastOR: Observed lower rate than expected. Caused by the change of the readout mode for high threshold bits (from Mar 2016), for three bit readout to single middle bit. May be reverted in future cosmics run.

10 L1 Calo/ L1Topo Kate Whalen L1Calo: Generally a quiet week for L1Calo! Monitoring improvements. L1Topo Test of complex dead8me with random triggers: bucket 3 changed from 7/260 -> 14/260 -> 15/260 (not deployed yet, need more tes8ng) Muon items enabled since Saturday morning, Fill 5197 Total rate ~ 15 khz (L1), 60 Hz (HLT) Timing checks: all algorithms are well-8med

11 LAr Jose Benitez HW An HV module (EMEC A) exchanged on Sunday due to 4 problema8c channels. To be followed up if readings were correct. M167.C3 (HEC C) HV decreased due to new short HECA cell 0x3b1a5200 (tower 0x ) disabled at each run, consider if permanently disable this shaper switch Reprocessing to consider it DQ/Monitoring under test: online flagging of Mini Noise Bursts (prev. offline) added DQMD checks for PU removal: turning yellow if 1-2 PU s are disabled, red if >2 - to complement informa8on in Shiier Assistant

12 TILE link failure Silvia Fracchia Repeated stopless removals of ROL ROD5 EBC33-36 (4 neighbouring modules, intolerable defect for DQ) Star8ng from Sunday from during stable beam, with consequent HLT problems Caused >3 hours interrup8on in data taking Several tests and a^empts to recover it (power cycles, TTC restarts, turning off affected modules) Finally turned out to be a problem with ROD-ROS link, similar to what occurred on 13th July in LBA The fiber was eventually replaced with a working one out of two spares the subs8tute fiber has low op8cal power due to fiber end misaligned in the connector. Reflectometry measurement on Monday spot problem in the same loca8on for the downstream links. Emergency plan: restore a spare fiber from two bad ones Short term plan: install few addi8onal spare fibers (2 per ROD crate)

13 TILE link failure Rafał Bielski With the Tile ROL disabled any chain trying to read data from Tile sending events to debug stream at L1 rate. 21:25 Switched to standby keys to mi8gate the HLT backpressure for 40 22:00 Disabled all jet/met chains Recovery completed at 01:00

14 Muons Claudio Luci CSC MDT CSC latency is now set using ATLAS latency (Instead of sefng it manually and comparing it to Atlas latency) RCD crash has been fixed. This was also the cause for some failed recovery. The fake chamber drop reported to CHIP by RCD is under study. RPC Access to cavern to disconnect a module from HV channel TGC Few other cases under close monitoring and inves8ga8on. new Sector Logic firmware was deployed to reduce L1_MU4 rate.

15 Other subsystems Trigger New sw release deployed on Tuesday à fine Mul8ple keys deployed during the week, following LHC programs, including overnight Cosmics run decrease in TRT rate wrt earlier cosmic runs due to change in readout (March), which can be reverted for the next cosmic run Data prepara8on Lucid Everything is working fine on the data processing side GM infrastructure is working smoothly too Main point now is to update references: Running smoothly. Only pending issue is the automa8c recovery from all SEU occurences ongoing. BCM/BLM/DBM BCM/BLM/: Some minor hw interven8on done or in progress DBM: debug and commissioning when there was no LHC running.

16 Conclusions In general smooth data-taking with increasing efficiency. Only serious problem Tile link on Sunday evening. Next week MD2 and 2.5 km commissioning. 6/7 weeks of pp running lei

Opera&on of the Upgraded ATLAS Level- 1 Central Trigger System

Opera&on of the Upgraded ATLAS Level- 1 Central Trigger System Opera&on of the Upgraded ATLAS Level- 1 Central Trigger System Julian Glatzer on behalf of the ATLAS Collabora&on 21 st Interna&onal Conference on Compu&ng in High Energy and Nuclear Physics 13/04/15 Julian

More information

Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC

Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC Kirchhoff-Institute for Physics (DE) E-mail: sebastian.mario.weber@cern.ch ATL-DAQ-PROC-2017-026

More information

The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern

The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group ~ Contents ~ 1. ATLAS Level1 Trigger 2. Endcap

More information

Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics

Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics How to compose a very very large jigsaw-puzzle CMS ECAL Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin,

More information

Data acquisi*on and Trigger - Trigger -

Data acquisi*on and Trigger - Trigger - Experimental Methods in Par3cle Physics (HS 2014) Data acquisi*on and Trigger - Trigger - Lea Caminada lea.caminada@physik.uzh.ch 1 Interlude: LHC opera3on Data rates at LHC Trigger overview Coincidence

More information

The Status of ATLAS. Xin Wu, University of Geneva On behalf of the ATLAS collaboration. X. Wu, HCP2009, Evian, 17/11/09 ATL-GEN-SLIDE

The Status of ATLAS. Xin Wu, University of Geneva On behalf of the ATLAS collaboration. X. Wu, HCP2009, Evian, 17/11/09 ATL-GEN-SLIDE ATL-GEN-SLIDE-2009-356 18 November 2009 The Status of ATLAS Xin Wu, University of Geneva On behalf of the ATLAS collaboration 1 ATLAS and the people who built it 25m high, 44m long Total weight 7000 tons

More information

arxiv: v2 [physics.ins-det] 20 Oct 2008

arxiv: v2 [physics.ins-det] 20 Oct 2008 Commissioning of the ATLAS Inner Tracking Detectors F. Martin University of Pennsylvania, Philadelphia, PA 19104, USA On behalf of the ATLAS Inner Detector Collaboration arxiv:0809.2476v2 [physics.ins-det]

More information

The Run-2 ATLAS. ATLAS Trigger System: Design, Performance and Plans

The Run-2 ATLAS. ATLAS Trigger System: Design, Performance and Plans The Run-2 ATLAS Trigger System: Design, Performance and Plans 14th Topical Seminar on Innovative Particle and Radiation Detectors October 3rd October 6st 2016, Siena Martin zur Nedden Humboldt-Universität

More information

Commissioning Status and Results of ATLAS Level1 Endcap Muon Trigger System. Yasuyuki Okumura. Nagoya TWEPP 2008

Commissioning Status and Results of ATLAS Level1 Endcap Muon Trigger System. Yasuyuki Okumura. Nagoya TWEPP 2008 Commissioning Status and Results of ATLAS Level1 Endcap Muon Trigger System Yasuyuki Okumura Nagoya University @ TWEPP 2008 ATLAS Trigger DAQ System Trigger in LHC-ATLAS Experiment 3-Level Trigger System

More information

arxiv: v1 [physics.ins-det] 25 Oct 2012

arxiv: v1 [physics.ins-det] 25 Oct 2012 The RPC-based proposal for the ATLAS forward muon trigger upgrade in view of super-lhc arxiv:1210.6728v1 [physics.ins-det] 25 Oct 2012 University of Michigan, Ann Arbor, MI, 48109 On behalf of the ATLAS

More information

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration ATLAS Muon Trigger and Readout Considerations Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration ECFA High Luminosity LHC Experiments Workshop - 2016 ATLAS Muon System Overview

More information

Firmware development and testing of the ATLAS IBL Read-Out Driver card

Firmware development and testing of the ATLAS IBL Read-Out Driver card Firmware development and testing of the ATLAS IBL Read-Out Driver card *a on behalf of the ATLAS Collaboration a University of Washington, Department of Electrical Engineering, Seattle, WA 98195, U.S.A.

More information

Level-1 Calorimeter Trigger Calibration

Level-1 Calorimeter Trigger Calibration December 2004 Level-1 Calorimeter Trigger Calibration Birmingham, Heidelberg, Mainz, Queen Mary, RAL, Stockholm Alan Watson, University of Birmingham Norman Gee, Rutherford Appleton Lab Outline Reminder

More information

Data acquisition and Trigger (with emphasis on LHC)

Data acquisition and Trigger (with emphasis on LHC) Lecture 2 Data acquisition and Trigger (with emphasis on LHC) Introduction Data handling requirements for LHC Design issues: Architectures Front-end, event selection levels Trigger Future evolutions Conclusion

More information

ATLAS Phase-II trigger upgrade

ATLAS Phase-II trigger upgrade Particle Physics ATLAS Phase-II trigger upgrade David Sankey on behalf of the ATLAS Collaboration Thursday, 10 March 16 Overview Setting the scene Goals for Phase-II upgrades installed in LS3 HL-LHC Run

More information

The Commissioning of the ATLAS Pixel Detector

The Commissioning of the ATLAS Pixel Detector The Commissioning of the ATLAS Pixel Detector XCIV National Congress Italian Physical Society Genova, 22-27 Settembre 2008 Nicoletta Garelli Large Hadronic Collider MOTIVATION: Find Higgs Boson and New

More information

What do the experiments want?

What do the experiments want? What do the experiments want? prepared by N. Hessey, J. Nash, M.Nessi, W.Rieger, W. Witzeling LHC Performance Workshop, Session 9 -Chamonix 2010 slhcas a luminosity upgrade The physics potential will be

More information

Upgrade of the ATLAS Thin Gap Chamber Electronics for HL-LHC. Yasuyuki Horii, Nagoya University, on Behalf of the ATLAS Muon Collaboration

Upgrade of the ATLAS Thin Gap Chamber Electronics for HL-LHC. Yasuyuki Horii, Nagoya University, on Behalf of the ATLAS Muon Collaboration Upgrade of the ATLAS Thin Gap Chamber Electronics for HL-LHC Yasuyuki Horii, Nagoya University, on Behalf of the ATLAS Muon Collaboration TWEPP 2017, UC Santa Cruz, 12 Sep. 2017 ATLAS Muon System Overview

More information

A Cosmic Muon Tracking Algorithm for the CMS RPC based Technical Trigger

A Cosmic Muon Tracking Algorithm for the CMS RPC based Technical Trigger A Cosmic Muon Tracking Algorithm for the CMS RPC based Technical Trigger by Rajan Raj Thilak Department of Physics University of Bari INFN on behalf of the CMS RPC-Trigger Group (Bari, Frascati, Sofia,

More information

Triggers: What, where, why, when and how

Triggers: What, where, why, when and how Triggers: What, where, why, when and how ATLAS as an example (Other detectors do exist...) Alex Martyniuk (UCL) November 21, 2017 1 / 23 Alex Martyniuk Triggering: What is it even? Triggering: A system/process

More information

LHC Experiments - Trigger, Data-taking and Computing

LHC Experiments - Trigger, Data-taking and Computing Physik an höchstenergetischen Beschleunigern WS17/18 TUM S.Bethke, F. Simon V6: Trigger, data taking, computing 1 LHC Experiments - Trigger, Data-taking and Computing data rates physics signals ATLAS trigger

More information

Data acquisition and Trigger (with emphasis on LHC)

Data acquisition and Trigger (with emphasis on LHC) Lecture 2! Introduction! Data handling requirements for LHC! Design issues: Architectures! Front-end, event selection levels! Trigger! Upgrades! Conclusion Data acquisition and Trigger (with emphasis on

More information

D. Ferrère, Université de Genève on behalf of the ATLAS collaboration

D. Ferrère, Université de Genève on behalf of the ATLAS collaboration D. Ferrère, Université de Genève on behalf of the ATLAS collaboration Overview Introduction Pixel improvements during LS1 Performance at run2 in 2015 Few challenges met lessons Summary Overview VCI 2016,

More information

Current Status of ATLAS Endcap Muon Trigger System

Current Status of ATLAS Endcap Muon Trigger System Current Status of ATLAS Endcap Muon Trigger System Takuya SUGIMOTO Nagoya University On behalf of ATLAS Japan TGC Group Contents 1. Introduction 2. Assembly and installation of TGC 3. Readout test at assembly

More information

ATLAS Tracker and Pixel Operational Experience

ATLAS Tracker and Pixel Operational Experience University of Cambridge, on behalf of the ATLAS Collaboration E-mail: dave.robinson@cern.ch The tracking performance of the ATLAS detector relies critically on the silicon and gaseous tracking subsystems

More information

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II Journal of Physics: Conference Series PAPER OPEN ACCESS Performance of the ALAS Muon rigger in Run I and Upgrades for Run II o cite this article: Dai Kobayashi and 25 J. Phys.: Conf. Ser. 664 926 Related

More information

The ATLAS Trigger in Run 2: Design, Menu, and Performance

The ATLAS Trigger in Run 2: Design, Menu, and Performance he ALAS rigger in Run 2: Design, Menu, and Performance amara Vazquez Schroeder, on behalf of the ALAS Collaboration McGill University E-mail: tamara.vazquez.schroeder@cern.ch he ALAS trigger system is

More information

The CMS ECAL Laser Monitoring System

The CMS ECAL Laser Monitoring System The CMS ECAL Laser Monitoring System IPRD 2008 11th Topical Seminar On Innovative Particle and Radiation Detectors Adi Bornheim California Institute of Technology On behalf of the CMS ECAL Collaboration

More information

CMS Silicon Strip Tracker: Operation and Performance

CMS Silicon Strip Tracker: Operation and Performance CMS Silicon Strip Tracker: Operation and Performance Laura Borrello Purdue University, Indiana, USA on behalf of the CMS Collaboration Outline The CMS Silicon Strip Tracker (SST) SST performance during

More information

Calorimeter Monitoring at DØ

Calorimeter Monitoring at DØ Calorimeter Monitoring at DØ Calorimeter Monitoring at DØ Robert Kehoe ATLAS Calibration Mtg. December 1, 2004 Southern Methodist University Department of Physics Detector and Electronics Monitoring Levels

More information

Triggering at ATLAS. Vortrag von Johannes Haller, Uni HH Am ATLAS-D Meeting, September 2006

Triggering at ATLAS. Vortrag von Johannes Haller, Uni HH Am ATLAS-D Meeting, September 2006 Triggering at ATLAS Vortrag von Johannes Haller, Uni HH Am ATLAS-D Meeting, September 2006 Trigger Challenge at the LHC Technical Implementation Trigger Strategy, Trigger Menus, Operational Model, Physics

More information

Monika Wielers Rutherford Appleton Laboratory

Monika Wielers Rutherford Appleton Laboratory Lecture 2 Monika Wielers Rutherford Appleton Laboratory Trigger and Data Acquisition requirements for LHC Example: Data flow in ATLAS (transport of event information from collision to mass storage) 1 What

More information

Minutes of the ALICE Technical Board, CERN

Minutes of the ALICE Technical Board, CERN ALICE MIN-2012-10 TB_F-2012 Date 15.10.2012 Minutes of the ALICE Technical Board, CERN 11.10.2012 1. Minutes The draft minutes of the June 2012 TB were approved. No minutes were taken of the July, August

More information

Detector for LHC collisions

Detector for LHC collisions Readiness of the ATLAS Pixel Detector for LHC collisions Beniamino Di Girolamo CERN PH Department Outline LHC, ATLAS, Pixel: who s who LHC status ATLAS status Pixel readiness 2008 run outcome Current issues

More information

Design and Performance of the ATLAS Muon Detector Control System

Design and Performance of the ATLAS Muon Detector Control System Design and Performance of the ATLAS Muon Detector Control System Alessandro Polini on behalf of the ATLAS Muon Collaboration INFN Bologna, via Irnerio 46, 40126 Bologna, I E-mail: alessandro.polini@bo.infn.it

More information

Operational Experience with the ATLAS Pixel Detector

Operational Experience with the ATLAS Pixel Detector The 4 International Conferenceon Technologyand Instrumentation in Particle Physics May, 22 26 2017, Beijing, China Operational Experience with the ATLAS Pixel Detector F. Djama(CPPM Marseille) On behalf

More information

The trigger system of the muon spectrometer of the ALICE experiment at the LHC

The trigger system of the muon spectrometer of the ALICE experiment at the LHC The trigger system of the muon spectrometer of the ALICE experiment at the LHC Francesco Bossù for the ALICE collaboration University and INFN of Turin Siena, 09 June 2010 Outline 1 Introduction 2 Muon

More information

Phase 1 upgrade of the CMS pixel detector

Phase 1 upgrade of the CMS pixel detector Phase 1 upgrade of the CMS pixel detector, INFN & University of Perugia, On behalf of the CMS Collaboration. IPRD conference, Siena, Italy. Oct 05, 2016 1 Outline The performance of the present CMS pixel

More information

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group The LHCb VELO Upgrade Stefano de Capua on behalf of the LHCb VELO group Overview [J. Instrum. 3 (2008) S08005] LHCb / Current VELO / VELO Upgrade Posters M. Artuso: The Silicon Micro-strip Upstream Tracker

More information

CALICE AHCAL overview

CALICE AHCAL overview International Workshop on the High Energy Circular Electron-Positron Collider in 2018 CALICE AHCAL overview Yong Liu (IHEP), on behalf of the CALICE collaboration Nov. 13, 2018 CALICE-AHCAL Progress, CEPC

More information

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties 10 th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors Offline calibration and performance of the ATLAS Pixel Detector Attilio Andreazza INFN and Università

More information

First-level trigger systems at LHC. Nick Ellis EP Division, CERN, Geneva

First-level trigger systems at LHC. Nick Ellis EP Division, CERN, Geneva First-level trigger systems at LHC Nick Ellis EP Division, CERN, Geneva 1 Outline Requirements from physics and other perspectives General discussion of first-level trigger implementations Techniques and

More information

VErtex LOcator (VELO)

VErtex LOcator (VELO) Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group 1 Overview Introduction LHCb experiment. The Vertex Locator (VELO). Description of System.

More information

1 Detector simulation

1 Detector simulation 1 Detector simulation Detector simulation begins with the tracking of the generated particles in the CMS sensitive volume. For this purpose, CMS uses the GEANT4 package [1], which takes into account the

More information

Spectrometer cavern background

Spectrometer cavern background ATLAS ATLAS Muon Muon Spectrometer Spectrometer cavern cavern background background LPCC Simulation Workshop 19 March 2014 Jochen Meyer (CERN) for the ATLAS Collaboration Outline ATLAS Muon Spectrometer

More information

Development and Test of a Demonstrator for a First-Level Muon Trigger based on the Precision Drift Tube Chambers for ATLAS at HL-LHC

Development and Test of a Demonstrator for a First-Level Muon Trigger based on the Precision Drift Tube Chambers for ATLAS at HL-LHC Development and Test of a Demonstrator for a First-Level Muon Trigger based on the Precision Drift Tube Chambers for ATLAS at HL-LHC K. Schmidt-Sommerfeld Max-Planck-Institut für Physik, München K. Schmidt-Sommerfeld,

More information

Hardware Trigger Processor for the MDT System

Hardware Trigger Processor for the MDT System University of Massachusetts Amherst E-mail: tcpaiva@cern.ch We are developing a low-latency hardware trigger processor for the Monitored Drift Tube system in the Muon spectrometer. The processor will fit

More information

Real-time flavour tagging selection in ATLAS. Lidija Živković, Insttut of Physics, Belgrade

Real-time flavour tagging selection in ATLAS. Lidija Živković, Insttut of Physics, Belgrade Real-time flavour tagging selection in ATLAS Lidija Živković, Insttut of Physics, Belgrade On behalf of the collaboration Outline Motivation Overview of the trigger b-jet trigger in Run 2 Future Fast TracKer

More information

The CMS ECAL Laser Monitoring System

The CMS ECAL Laser Monitoring System The CMS ECAL Laser Monitoring System CALOR 2006 XII INTERNATIONAL CONFERENCE on CALORIMETRY in HIGH ENERGY PHYSICS Adi Bornheim California Institute of Technology Chicago, June 8, 2006 Introduction CMS

More information

Diamond sensors as beam conditions monitors in CMS and LHC

Diamond sensors as beam conditions monitors in CMS and LHC Diamond sensors as beam conditions monitors in CMS and LHC Maria Hempel DESY Zeuthen & BTU Cottbus on behalf of the BRM-CMS and CMS-DESY groups GSI Darmstadt, 11th - 13th December 2011 Outline 1. Description

More information

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data S. Abovyan, V. Danielyan, M. Fras, P. Gadow, O. Kortner, S. Kortner, H. Kroha, F.

More information

Magnet Powering with zero downtime a dream?

Magnet Powering with zero downtime a dream? Magnet Powering with zero downtime a dream? M. Zerlauth LHC Performance Workshop February 2012 Thanks to : HWC team, H.Thiesen, V.Montabonnet, J.P.Burnet, S.Claudet, E.Blanco, R.Denz, R.Schmidt, E.Blanco,

More information

Data Quality Monitoring of the CMS Pixel Detector

Data Quality Monitoring of the CMS Pixel Detector Data Quality Monitoring of the CMS Pixel Detector 1 * Purdue University Department of Physics, 525 Northwestern Ave, West Lafayette, IN 47906 USA E-mail: petra.merkel@cern.ch We present the CMS Pixel Data

More information

Overview of the ATLAS Trigger/DAQ System

Overview of the ATLAS Trigger/DAQ System Overview of the ATLAS Trigger/DAQ System A. J. Lankford UC Irvine May 4, 2007 This presentation is based very heavily upon a presentation made by Nick Ellis (CERN) at DESY in Dec 06. Nick Ellis, Seminar,

More information

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer Advancements in Nuclear Instrumenta2on Measurement Methods and their Applica2ons 20-24 April 2015, Lisbon Congress Center Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1

More information

Beam Condition Monitors and a Luminometer Based on Diamond Sensors

Beam Condition Monitors and a Luminometer Based on Diamond Sensors Beam Condition Monitors and a Luminometer Based on Diamond Sensors Wolfgang Lange, DESY Zeuthen and CMS BRIL group Beam Condition Monitors and a Luminometer Based on Diamond Sensors INSTR14 in Novosibirsk,

More information

Operation and performance of the CMS Resistive Plate Chambers during LHC run II

Operation and performance of the CMS Resistive Plate Chambers during LHC run II Operation and performance of the CMS Resistive Plate Chambers during LHC run II, Isabel Pedraza Benemérita Universidad Autónoma de Puebla On behalf of the CMS collaboration XXXI Reunión Anual de la División

More information

Hardware Commissioning

Hardware Commissioning Hardware Commissioning an update the status of the documentation the report on the resources the programme of the coming year Roberto Saban on behalf of the Hardware Commissioning Working Group status

More information

Hardware Trigger Processor for the MDT System

Hardware Trigger Processor for the MDT System University of Massachusetts Amherst E-mail: tcpaiva@cern.ch We are developing a low-latency hardware trigger processor for the Monitored Drift Tube system for the Muon Spectrometer of the ATLAS Experiment.

More information

EPJ C direct. The ATLAS trigger system. 1 Introduction. 2 The ATLAS experiment. electronic only. R. Hauser, on behalf of the ATLAS collaboration

EPJ C direct. The ATLAS trigger system. 1 Introduction. 2 The ATLAS experiment. electronic only. R. Hauser, on behalf of the ATLAS collaboration Eur Phys J C 34, s01, s173 s183 (2004) Digital Object Identifier (DOI) 10.1140/epjcd/s2004-04-018-6 EPJ C direct electronic only The ATLAS trigger system R. Hauser, on behalf of the ATLAS collaboration

More information

Development of Telescope Readout System based on FELIX for Testbeam Experiments

Development of Telescope Readout System based on FELIX for Testbeam Experiments Development of Telescope Readout System based on FELIX for Testbeam Experiments, Hucheng Chen, Kai Chen, Francessco Lanni, Hongbin Liu, Lailin Xu Brookhaven National Laboratory E-mail: weihaowu@bnl.gov,

More information

The Phase-II ATLAS ITk Pixel Upgrade

The Phase-II ATLAS ITk Pixel Upgrade The Phase-II ATLAS ITk Pixel Upgrade Anna Macchiolo, Max-Planck-Ins2tut für Physik on behalf of the ATLAS Collabora2on PM2018-14th Pisa Mee2ng on Advanced Detectors Why a new Inner Tracker (ITk) for ATLAS?

More information

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Olloqui on behalf of the LHCb Collaboration Universitat de Barcelona, Facultat de Física,

More information

2008 JINST 3 S Implementation The Coincidence Chip (CC) Figure 8.2: Schematic overview of the Coincindence Chip (CC).

2008 JINST 3 S Implementation The Coincidence Chip (CC) Figure 8.2: Schematic overview of the Coincindence Chip (CC). 8.2 Implementation Figure 8.2: Schematic overview of the Coincindence Chip (CC). 8.2.1 The Coincidence Chip (CC) The Coincidence Chip provides on-detector coincidences to reduce the trigger data sent to

More information

Field Programmable Gate Array (FPGA) for the Liquid Argon calorimeter back-end electronics in ATLAS

Field Programmable Gate Array (FPGA) for the Liquid Argon calorimeter back-end electronics in ATLAS Field Programmable Gate Array (FPGA) for the Liquid Argon calorimeter back-end electronics in ATLAS Alessandra Camplani Università degli Studi di Milano The ATLAS experiment at LHC LHC stands for Large

More information

CERN/LHCC LHCC September 2007 LARGE HADRON COLLIDER COMMITTEE. Minutes of the ninetieth meeting held on Tuesday, 25 September 2007

CERN/LHCC LHCC September 2007 LARGE HADRON COLLIDER COMMITTEE. Minutes of the ninetieth meeting held on Tuesday, 25 September 2007 CERN/LHCC 2007-027 LHCC 90 25 September 2007 LARGE HADRON COLLIDER COMMITTEE Minutes of the ninetieth meeting held on Tuesday, 25 September 2007 OPEN SESSION 1. LHC Status Report: Lyn Evans 2. ATLAS Status

More information

ATLAS ITk and new pixel sensors technologies

ATLAS ITk and new pixel sensors technologies IL NUOVO CIMENTO 39 C (2016) 258 DOI 10.1393/ncc/i2016-16258-1 Colloquia: IFAE 2015 ATLAS ITk and new pixel sensors technologies A. Gaudiello INFN, Sezione di Genova and Dipartimento di Fisica, Università

More information

Radia%on Damage Observa%on in the ATLAS Pixel Detector Using the High Voltage Delivery System

Radia%on Damage Observa%on in the ATLAS Pixel Detector Using the High Voltage Delivery System Radia%on Damage Observa%on in the ATLAS Pixel Detector Using the High Voltage Delivery System Sally Seidel University of New Mexico on behalf of the ATLAS Collabora;on December 6, 2011 HSTD 08, Taipei,

More information

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group The LHCb Vertex Locator : status and future perspectives Marina Artuso, Syracuse University for the VELO Group The LHCb Detector Mission: Expore interference of virtual new physics particle in the decays

More information

DAQ & Electronics for the CW Beam at Jefferson Lab

DAQ & Electronics for the CW Beam at Jefferson Lab DAQ & Electronics for the CW Beam at Jefferson Lab Benjamin Raydo EIC Detector Workshop @ Jefferson Lab June 4-5, 2010 High Event and Data Rates Goals for EIC Trigger Trigger must be able to handle high

More information

Totem Experiment Status Report

Totem Experiment Status Report Totem Experiment Status Report Edoardo Bossini (on behalf of the TOTEM collaboration) 131 st LHCC meeting 1 Outline CT-PPS layout and acceptance Running operation Detector commissioning CT-PPS analysis

More information

ATLAS and CMS Upgrades and the future physics program at the LHC D. Contardo, IPN Lyon

ATLAS and CMS Upgrades and the future physics program at the LHC D. Contardo, IPN Lyon ATLAS and CMS Upgrades and the future physics program at the LHC D. Contardo, IPN Lyon CMS LHCb ALICE p-p LHC ring: 27 km circumference ATLAS 1 Outline 2 o First run at the LHC 2010-2012 Beam conditions

More information

Nikhef jamboree - Groningen 12 December Atlas upgrade. Hella Snoek for the Atlas group

Nikhef jamboree - Groningen 12 December Atlas upgrade. Hella Snoek for the Atlas group Nikhef jamboree - Groningen 12 December 2016 Atlas upgrade Hella Snoek for the Atlas group 1 2 LHC timeline 2016 2012 Luminosity increases till 2026 to 5-7 times with respect to current lumi Detectors

More information

Construction and Performance of the stgc and MicroMegas chambers for ATLAS NSW Upgrade

Construction and Performance of the stgc and MicroMegas chambers for ATLAS NSW Upgrade Construction and Performance of the stgc and MicroMegas chambers for ATLAS NSW Upgrade Givi Sekhniaidze INFN sezione di Napoli On behalf of ATLAS NSW community 14th Topical Seminar on Innovative Particle

More information

The BaBar Silicon Vertex Tracker (SVT) Claudio Campagnari University of California Santa Barbara

The BaBar Silicon Vertex Tracker (SVT) Claudio Campagnari University of California Santa Barbara The BaBar Silicon Vertex Tracker (SVT) Claudio Campagnari University of California Santa Barbara Outline Requirements Detector Description Performance Radiation SVT Design Requirements and Constraints

More information

The ATLAS detector at the LHC

The ATLAS detector at the LHC The ATLAS detector at the LHC Andrée Robichaud-Véronneau on behalf of the ATLAS collaboration Université de Genève July 17th, 2009 Abstract The world s largest multi-purpose particle detector, ATLAS, is

More information

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration The LHCb Upgrade BEACH 2014 XI International Conference on Hyperons, Charm and Beauty Hadrons! University of Birmingham, UK 21-26 July 2014 Simon Akar on behalf of the LHCb collaboration Outline The LHCb

More information

Tests of the CMS Level-1 Regional Calorimeter Trigger Prototypes

Tests of the CMS Level-1 Regional Calorimeter Trigger Prototypes Tests of the CMS Level-1 Regional Calorimeter Trigger Prototypes W.H.Smith, P. Chumney, S. Dasu, M. Jaworski, J. Lackey, P. Robl, Physics Department, University of Wisconsin, Madison, WI, USA 8th Workshop

More information

Trigger and Data Acquisition at the Large Hadron Collider

Trigger and Data Acquisition at the Large Hadron Collider Trigger and Data Acquisition at the Large Hadron Collider Acknowledgments This overview talk would not exist without the help of many colleagues and all the material available online I wish to thank the

More information

First-level trigger systems at LHC

First-level trigger systems at LHC First-level trigger systems at LHC N. Ellis CERN, 1211 Geneva 23, Switzerland Nick.Ellis@cern.ch Abstract Some of the challenges of first-level trigger systems in the LHC experiments are discussed. The

More information

Status of the LHCb Experiment

Status of the LHCb Experiment Status of the LHCb Experiment Werner Witzeling CERN, Geneva, Switzerland On behalf of the LHCb Collaboration Introduction The LHCb experiment aims to investigate CP violation in the B meson decays at LHC

More information

Requirements and Specifications of the TDC for the ATLAS Precision Muon Tracker

Requirements and Specifications of the TDC for the ATLAS Precision Muon Tracker ATLAS Internal Note MUON-NO-179 14 May 1997 Requirements and Specifications of the TDC for the ATLAS Precision Muon Tracker Yasuo Arai KEK, National High Energy Accelerator Research Organization Institute

More information

How did the LHC access system perform in 2009

How did the LHC access system perform in 2009 How did the LHC access system perform in 2009 L. Ponce On behalf of the OP team And a special thanks to all the volunteers who helped giving access Outline Some preliminary remarks Status and major issues

More information

The Run-2 ATLAS Trigger System

The Run-2 ATLAS Trigger System he Run-2 ALAS rigger System Arantxa Ruiz Martínez on behalf of the ALAS Collaboration Department of Physics, Carleton University, Ottawa, ON, Canada E-mail: aranzazu.ruiz.martinez@cern.ch Abstract. he

More information

The LUCID-2 Detector RICHARD SOLUK, UNIVERSITY OF ALBERTA FOR THE ATLAS- LUCID GROUP

The LUCID-2 Detector RICHARD SOLUK, UNIVERSITY OF ALBERTA FOR THE ATLAS- LUCID GROUP The LUCID-2 Detector RICHARD SOLUK, UNIVERSITY OF ALBERTA FOR THE ATLAS- LUCID GROUP LUCID (LUminosity Cerenkov Integrating Detector) LUCID LUCID LUCID is the only dedicated luminosity monitor in ATLAS

More information

Commissioning of the ATLAS Pixel Detector with Cosmic Data and Status of the ATLAS detector at the LHC

Commissioning of the ATLAS Pixel Detector with Cosmic Data and Status of the ATLAS detector at the LHC Commissioning of the ATLAS Pixel Detector with Cosmic Data and Status of the ATLAS detector at the LHC Overview LHC and ATLAS Pixel Detector Commissioning Pixel Opto-heaters Slow Controls Readout Calibration

More information

Micromegas for muography, the Annecy station and detectors

Micromegas for muography, the Annecy station and detectors Micromegas for muography, the Annecy station and detectors M. Chefdeville, C. Drancourt, C. Goy, J. Jacquemier, Y. Karyotakis, G. Vouters 21/12/2015, Arche meeting, AUTH Overview The station Technical

More information

LHC COMMISSIONING AT HIGHER ENERGY

LHC COMMISSIONING AT HIGHER ENERGY LHC COMMISSIONING AT HIGHER ENERGY P. Collier, F. Bordry, J. Wenninger, CERN, Geneva, Switzerland Abstract The LHC has just come to the end of its first Long Shutdown (LS1) and preparations are underway

More information

Preparing for the Future: Upgrades of the CMS Pixel Detector

Preparing for the Future: Upgrades of the CMS Pixel Detector : KSETA Plenary Workshop, Durbach, KIT Die Forschungsuniversität in der Helmholtz-Gemeinschaft www.kit.edu Large Hadron Collider at CERN Since 2015: proton proton collisions @ 13 TeV Four experiments:

More information

The ATLAS Muon System

The ATLAS Muon System 22/12/2015 The ATLAS Muon System Massimo Corradi (INFN Roma-1) 1 Summary Overall design Track reconstruction Performance measurements Trigger Outlook 2 specifications Physics Requirements from the Technical

More information

L1 Track Finding For a TiME Multiplexed Trigger

L1 Track Finding For a TiME Multiplexed Trigger V INFIERI WORKSHOP AT CERN 27/29 APRIL 215 L1 Track Finding For a TiME Multiplexed Trigger DAVIDE CIERI, K. HARDER, C. SHEPHERD, I. TOMALIN (RAL) M. GRIMES, D. NEWBOLD (UNIVERSITY OF BRISTOL) I. REID (BRUNEL

More information

TRIGGER & DATA ACQUISITION. Nick Ellis PH Department, CERN, Geneva

TRIGGER & DATA ACQUISITION. Nick Ellis PH Department, CERN, Geneva TRIGGER & DATA ACQUISITION Nick Ellis PH Department, CERN, Geneva 1 Lecture 1 2 LEVEL OF LECTURES Students at this School come from various backgrounds Phenomenology Analysis of physics data from experiments

More information

The CMS Muon Trigger

The CMS Muon Trigger The CMS Muon Trigger Outline: o CMS trigger system o Muon Lv-1 trigger o Drift-Tubes local trigger o peformance tests CMS Collaboration 1 CERN Large Hadron Collider start-up 2007 target luminosity 10^34

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS CR -2017/402 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 06 November 2017 Commissioning of the

More information

Belle Monolithic Thin Pixel Upgrade -- Update

Belle Monolithic Thin Pixel Upgrade -- Update Belle Monolithic Thin Pixel Upgrade -- Update Gary S. Varner On Behalf of the Pixel Gang (Marlon, Fang, ) Local Belle Meeting March 2004 Univ. of Hawaii Today s delta Have shown basic scheme before Testing

More information

A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment

A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment 3 rd Workshop on LHCbUpgrade II LAPP, 22 23 March 2017 A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment Evangelos Leonidas Gkougkousis On behalf of the ATLAS HGTD community

More information

Barrel LVL1 Muon Trigger Coincidence Matrix ASIC: User Requirement Document

Barrel LVL1 Muon Trigger Coincidence Matrix ASIC: User Requirement Document Barrel LVL1 Muon Trigger Coincidence Matrix ASIC: User Requirement Document Authors:, E. Petrolo, A. Salamon, R. Vari, S. Veneziano Keywords:ATLAS, Level-1, Barrel, ASIC Abstract The Coincidence Matrix

More information

L1 Trigger Activities at UF. The CMS Level-1 1 Trigger

L1 Trigger Activities at UF. The CMS Level-1 1 Trigger L1 Trigger Activities at UF Current team: Darin Acosta (PI) Alex Madorsky (engineer) Lev Uvarov (PNPI engineer) Victor Golovtsov (PNPI engineer) Daniel Holmes (postdoc, CERN-based) Bobby Scurlock (grad

More information

LHCb Trigger & DAQ Design technology and performance. Mika Vesterinen ECFA High Luminosity LHC Experiments Workshop 8/10/2016

LHCb Trigger & DAQ Design technology and performance. Mika Vesterinen ECFA High Luminosity LHC Experiments Workshop 8/10/2016 LHCb Trigger & DAQ Design technology and performance Mika Vesterinen ECFA High Luminosity LHC Experiments Workshop 8/10/2016 2 Introduction The LHCb upgrade will allow 5x higher luminosity and with greatly

More information

CMS Tracker Upgrades. R&D Plans, Present Status and Perspectives. Benedikt Vormwald Hamburg University on behalf of the CMS collaboration

CMS Tracker Upgrades. R&D Plans, Present Status and Perspectives. Benedikt Vormwald Hamburg University on behalf of the CMS collaboration R&D Plans, Present Status and Perspectives Benedikt Vormwald Hamburg University on behalf of the CMS collaboration EPS-HEP 2015 Vienna, 22.-29.07.2015 CMS Tracker Upgrade Program LHC HL-LHC ECM[TeV] 7-8

More information