O & M of PS22 Japan s Primary Seismic Station

Size: px
Start display at page:

Download "O & M of PS22 Japan s Primary Seismic Station"

Transcription

1 T5-O20 O & M of PS22 Japan s Primary Seismic Station Soshi Iwata soshi@jwa.or.jp Station Operator of PS22 J A PA N W E AT H E R A S S O C I AT I O N Vienna, 7th October, TH WORKSHOP ON OPERATION AND MAINTENANCE OF THE IMS 1

2 Japan Weather Association operates 7 IMS waveform stations. PS22 Primary seismic station x1 Auxiliary seismic stations x5 Infrasound station x1 2

3 Nagano Branch office Nagano Tokyo CRF MJB9, MJB9B 5km MJB8 MJB7 MJB1 MJA2 repeater MJB2 MJA1 MJA0 MJA2 MJA4 MJA3 MJB3 MJB5 MJB6 MJB4 100km PS22: 14 x array elements 1 x central element Matsushiro, nagano LAT. 36.5N, LON E Altitude: 406m m TEMP. : -25C - +35C 3

4 Nagano 4

5 Location Design O&M Sensor Replacement Conclusion Independent Sub-Network topology MJB2 MJA1 MJA0 MJB3 MJB4 MJB5 MJA4 MJA3 MJB6 MJB7 MJB1 CRF Vienna MJB8 To Tokyo Nagano VSAT Tokyo 5

6 Location Design O&M Sensor Replacement Conclusion MJA2 Wireless LAN MJA2 repeater MJA2 repeater CRF Vienna To Tokyo Nagano VSAT Tokyo 6

7 Location Design O&M Sensor Replacement Conclusion MJB9 MJB9B CRF To Tokyo MJB9, MJB9B Analogue telephone line CRF Vienna Nagano VSAT Tokyo 7

8 Location Design O&M Sensor Replacement Conclusion MJB2 MJA2 MJA1 MJA0 MJB3 MJA4 MJB4 MJB5 MJA3 MJB6 MJB7 MJB1 MJA2 repeater CRF MJB9, MJB9B MJB8 Co-located site with JMA (Japan Meteorological Agency) 8

9 Borehole Pure IMS site (MJA1, A3, A4, B4, B5, B8) CMG-3V (42-45m deep) 9

10 Borehole Co-located site with JMA (MJA0, A2, B1, B2, B3, B7) IMS sensor (30-42m deep) JMA sensor 10

11 Co-located site with JMA (MJB9, B9B) MJB9B: Streckeisen STS-2 MJB9: Guralp CMG-3V Matsushiro Seismological Observatory, JMA 400m deep in the tunnel 11

12 CRF (Central Recording Facility) Entrance of tunnel (go to MJB9, B9B) 12

13 Lightning Protection PS22 Lightning Strikes 12:00-18:00, 27-July-2008 Tokyo 13

14 Lightning Protection SPD for GPS cable SPD for telephone line SPD for power line 14

15 Troubleshooting DATA AVAILABILITY: 98.1% (JAN-SEP, 2015) Level 1 Trouble Data outage Way of ensuring high DA Way of troubleshooting Check waveform & SOH by eye Check log-watch alert by Reboot a data-sending program if needed Noisy waveform No data Abnormal waveform No data 15

16 Troubleshooting Level 1 Trouble Data outage Way of ensuring high DA Way of troubleshooting Check waveform & SOH by eye Check log-watch alert by Reboot a data-sending program if needed Level 2 Telephone Line failure Line test by Telephone Company remotely 16

17 Troubleshooting Level 1 Trouble Data outage Way of ensuring high DA Way of troubleshooting Check waveform & SOH by eye Check log-watch alert by Reboot a data-sending program if needed Level 2 Telephone Line failure Line test by Telephone Company remotely Level 3 Equipment hang-up Equipment reboot by LO on site Equipment replacement by LO if needed Line test by Telephone Company on site if needed 17

18 Level 1 Trouble Data outage Normal digitizer removed temporarily Way of ensuring high DA Way of troubleshooting Check waveform & SOH by eye Check log-watch alert by Reboot a data-sending program if needed Level 2 Telephone Line failure Line test by Telephone Company remotely Level 3 Level 4 Equipment hang-up Equipment failure Troubleshooting Equipment reboot by LO on site Equipment Maybe faulty replacement digitizer by LO if needed Line test by Telephone Company on site if needed Investigation by SO on site Equipment replacement if needed Line replacement by Telephone Company 18

19 Troubleshooting Level 1 Trouble Data outage Way of ensuring high DA Way of troubleshooting Check waveform & SOH by eye Check log-watch alert by Reboot a data-sending program if needed Level 2 Telephone Line failure Line test by Telephone Company remotely Level 3 Level 4 Equipment hang-up Equipment failure Equipment reboot by LO on site Equipment replacement by LO if needed Line test by Telephone Company on site if needed Investigation by SO on site Equipment replacement if needed Line replacement by Telephone Company Level 5 Sensor damage Sensor replacement by USM fund 19

20 Accessibility in winter Difficulties Bee attack in summer Flash flood in summer Bear encounter in autumn 20

21 21

22 Set up a tripod above the borehole 22

23 Set up a tripod above the borehole Wind the cable onto the winch 23

24 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass 24

25 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock 3-Jaw Hole lock 25

26 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable 26

27 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Load-bearing cable 27

28 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Strain relief mechanism comes out 28

29 Sensor Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Strain relief mechanism comes out Then the sensor comes out Three-jaw hole lock 29

30 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Strain relief mechanism comes out Then the sensor comes out Wash the sensor 30

31 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Strain relief mechanism comes out Then the sensor comes out Wash the sensor Remove the sensor cable 31

32 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Strain relief mechanism comes out Then the sensor comes out Wash the sensor Remove the sensor cable Separate the three-jaw hole lock 32

33 New sensor 3-jaw hole lock Sensor cable Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Strain relief mechanism comes out Then the sensor comes out Wash the sensor Remove the sensor cable Separate the three-jaw hole lock Connect the sensor cable & the threejaw hole lock to a new sensor New sensor 33

34 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Strain relief mechanism comes out Then the sensor comes out Wash the sensor Remove the sensor cable Separate the three-jaw hole lock Connect the sensor cable & the threejaw hole lock to a new sensor Down the new sensor 34

35 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Strain relief mechanism comes out Then the sensor comes out Wash the sensor Remove the sensor cable Separate the three-jaw hole lock Connect the sensor cable & the threejaw hole lock to a new sensor Down the new sensor Finish re-installation 35

36 Set up a tripod above the borehole Wind the cable onto the winch Lock the sensor mass Retract the three-jaw hole lock Open the borehole lid & wind the cable Keep winding Strain relief mechanism comes out Then the sensor comes out Wash the sensor Remove the sensor cable Separate the three-jaw hole lock Connect the sensor cable & the threejaw hole lock to a new sensor Down the new sensor Finish re-installation Extract jaw, unlock mass, calibration 36

37 Original manual for sensor replacement 37

38 PS22, Japan s Primary Seismic Station 14 array sites (8 are co-located at JMA sites) DA: 98.1% (Jan-Sep, 2015) Main cause of data interruption: Communication line failure Equipment hang-up Equipment failure Sensor damage Difficulty: To identify the damaged equipment (e.g. no status lamp with Nano digitizer) To install/remove sensor at the co-located site To access some sites in winter Short of spare (currently no spare digitizer) 38

39 Thank you very much for your kind attention 39

Norway IMS Stations. Norwegian NDC. Operated by independent foundation NORSAR

Norway IMS Stations. Norwegian NDC. Operated by independent foundation NORSAR Norway IMS Stations Norwegian NDC Operated by independent foundation NORSAR 6 IMS stations in Norway Seismic Arrays: NOA (PS27) ARCES (PS28) SPITS (AS72) Seismic Stations: JMIC (AS73) Radionuclide Station:

More information

The International Monitoring System: Overview, Measurement Systems and Calibration

The International Monitoring System: Overview, Measurement Systems and Calibration CCAUV/17-36 The International Monitoring System: Overview, Measurement Systems and Calibration Workshop of the Consultative Committee for Acoustics, Ultrasound and Vibration - Measurement of imperceptive

More information

ANNEX C TERMS OF REFERENCE

ANNEX C TERMS OF REFERENCE ANNEX C TERMS OF REFERENCE SUPPLY AND DELIVERY OF TEST KITS FOR INFRASOUND STATIONS ON A CALL-OFF BASIS TABLE OF CONTENTS 1 INTRODUCTION... 2 2 PRODUCT DESCRIPTION... 2 2.1 TYPE 1 TEST KIT... 2 2.2 TYPE

More information

MINIMUS MINIMUS+ SMART SEISMIC DIGITISER WITH ADVANCED DATA-PROCESSING CAPABILITY AND SOFTWARE COMMUNICATIONS

MINIMUS MINIMUS+ SMART SEISMIC DIGITISER WITH ADVANCED DATA-PROCESSING CAPABILITY AND SOFTWARE COMMUNICATIONS MINIMUS MINIMUS+ SMART SEISMIC DIGITISER WITH ADVANCED DATA-PROCESSING CAPABILITY AND SOFTWARE COMMUNICATIONS KEY FEATURES > > Advanced software communications for quick and easy instrument and data management

More information

RADIAN POSTHOLE AND BOREHOLE MINIMUM SIZE. MAXIMUM RANGE. UNRIVALLED VERSATILITY.

RADIAN POSTHOLE AND BOREHOLE MINIMUM SIZE. MAXIMUM RANGE. UNRIVALLED VERSATILITY. RADIAN POSTHOLE AND BOREHOLE MINIMUM SIZE. MAXIMUM RANGE. UNRIVALLED VERSATILITY. At just 55 mm diameter, the Radian is the ideal subsurface digital seismometer > Operational at any angle with Bluetooth

More information

Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity

Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity Site Surveys for Offshore Windfarms: How to Spend your Money Wisely in an Age of Austerity Richard Orren, Global Technical Head, Director Mark Finch, Geotechnical Director Senergy Survey and GeoEngineering

More information

Radiodetection Pipeline Products

Radiodetection Pipeline Products Radiodetection Pipeline Products For efficient troubleshooting of cathodic protection systems on buried pipelines The Pipeline Range Pipeline Products Radiodetection is the world leader in the field of

More information

System Failure Operational Recovery

System Failure Operational Recovery System Failure Operational Recovery VLBI data acquisition is a complex technical challenge for operators using various electronic data acquisition systems, large radio telescopes that use various drive

More information

Structure Health Monitoring System Using MEMS-Applied Vibration Sensor

Structure Health Monitoring System Using MEMS-Applied Vibration Sensor Structure Health Monitoring System Using MEMS-Applied Vibration Sensor SAKAUE Satoru MURAKAMI Keizo KITAGAWA Shinji ABSTRACT Recently, studies have come to be increasingly energetically conducted on structure

More information

Relative Calibration of Inertial Seismometers Emil Farkas 1, Iuliu Szekely 2

Relative Calibration of Inertial Seismometers Emil Farkas 1, Iuliu Szekely 2 Relative Calibration of Inertial s Emil Farkas 1, Iuliu Szekely 2 1 Preparatory Commission for the Nuclear-Test-Ban Treaty Organization, Juchgasse 18/1/29 A-1030, Vienna, Austria, +43-1-941-1765, farkas_emil@yahoo.com

More information

Ambient Weather F007PF 8-Channel Wireless Water Thermometer User Manual

Ambient Weather F007PF 8-Channel Wireless Water Thermometer User Manual Ambient Weather F007PF 8-Channel Wireless Water Thermometer User Manual Table of Contents 1 Introduction... 2 2 Getting Started... 2 Parts List... 2 2.1 Water Thermometer Sensor Set Up... 2 3 Glossary

More information

Kenji HIRATA Hiroko SUGIOKA Itaru FUJISAWA Takeshi KATAYAMA. Yuka KAIHO Kenji HISHIKI. Shizuo KASHIWABARA

Kenji HIRATA Hiroko SUGIOKA Itaru FUJISAWA Takeshi KATAYAMA. Yuka KAIHO Kenji HISHIKI. Shizuo KASHIWABARA RMS a M. kmps, b M. km P S c M. P RMS M. M On a relation between inherent sensor noise characteristics and event detectability of seismic network of the real-time seafloor geophysical observatory off Kushiro-Tokachi

More information

Module 11a. Initiating Cause Code Form 4.X RELIABILITY ACCOUNTABILITY

Module 11a. Initiating Cause Code Form 4.X RELIABILITY ACCOUNTABILITY Module 11a Initiating Cause Code Form 4.X 1 M11 Initiating and Sustained Cause Codes An Initiating Cause Code that describes the initiating cause of the outage. A Sustained Cause Code that describes the

More information

Covert Tunnel Detection Technologies

Covert Tunnel Detection Technologies 2015 Covert Tunnel Detection Technologies Homeland Security Research Corp. Covert Tunnel Detection Technologies 2015 August 2015 Homeland Security Research Corp. (HSRC) is an international market and technology

More information

CS-200. PORTABLE TRAFFIC LIGHT CONTROLLER (Software 1.05) OPERATION AND SERVICE MANUAL

CS-200. PORTABLE TRAFFIC LIGHT CONTROLLER (Software 1.05) OPERATION AND SERVICE MANUAL CS-200 PORTABLE TRAFFIC LIGHT CONTROLLER (Software 1.05) OPERATION AND SERVICE MANUAL CS-200 Operation and Service Manual Page 2 Manufactured by: LINCAST INTERNATIONAL PTY. LTD. 2/3 Sir Laurence Drive

More information

Driveway Alarm INSTALLATION MANUAL

Driveway Alarm INSTALLATION MANUAL WIRELESS ACCESS CONTROLS Driveway Alarm INSTALLATION MANUAL Mounting post Transmitter Receiver Transformer Sensor Kit Includes: Transmitter Module Sensor Receiver Transformer Mounting post (3 pieces) Installation

More information

HD 9408T BARO - HD 9408TR BARO HD 9908T BARO - HD 9408PS 50

HD 9408T BARO - HD 9408TR BARO HD 9908T BARO - HD 9408PS 50 HD 9408T BARO - HD 9408TR BARO HD 9908T BARO - HD 9408PS 50 BAROMETRIC PRESSURE TRANSMITTERS - STATIC PORT FOR BAROMETRIC MEASUREMENTS GENERAL DESCRIPTION HD 9408T BARO, HD 9408TR BARO and HD 9908T BARO

More information

SAPLING WIRELESS SYSTEM

SAPLING WIRELESS SYSTEM SAPLING WIRELESS SYSTEM Sapling Wireless System DESCRIPTION A Wireless Clock System starts with a master clock with a transmitter. The master clock s transmitter transmits the time data to the secondary

More information

Technical Education Catalog 2018

Technical Education Catalog 2018 North American Market Technical Education Catalog 2018 JMA Wireless Technical Education Series offers instruction for people designing, installing, and commissioning the JMA Wireless TEKO DAS Platform,

More information

Metrological Telecommunication System Development Project

Metrological Telecommunication System Development Project Philippines Metrological Telecommunication System Development Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Site Map:

More information

Remote Monitoring of Environmental Sites using Solar Powered Wi-Fi Enabled Systems

Remote Monitoring of Environmental Sites using Solar Powered Wi-Fi Enabled Systems Remote Monitoring of Environmental Sites using Solar Powered Wi-Fi Enabled Systems Mark Landress, P.G. Project Navigator, Ltd 10497 Town & Country Way Suite 830 Houston, TX 77024 www.projectnavigator.com

More information

Development of a sonic boom measurement system at JAXA

Development of a sonic boom measurement system at JAXA Proceedings of the Acoustics 2012 Nantes Conference 23-27 April 2012, Nantes, France Development of a sonic boom measurement system at JAXA K. Veggeberg National Instruments, 11500 N. Mopac C, Austin,

More information

ES8000-S V-LOCK ELECTRICAL SPECIFICATION INSTALLATION INSTRUCTIONS

ES8000-S V-LOCK ELECTRICAL SPECIFICATION INSTALLATION INSTRUCTIONS ES8000-S V-LOCK Part No. ES8000-221 - 1116 INSTALLATION INSTRUCTIONS IMPORTANT Please read the instructions carefully prior to installation. It is important to follow the instructions precisely to ensure

More information

Infrasound station in South Africa IS 47. Francois Delport

Infrasound station in South Africa IS 47. Francois Delport Infrasound station in South Africa IS 47 Francois Delport Introduction 1. CTBTO related stations in SA and other regions 2. Shared facilities at the main CTBTO station in SA (PS 39 & IS 47) 3. Seismic

More information

V-Lock Wall Mount Assembly Kit. User s Guide. Replacement accessory for Extron System INTEGRATOR SI 26 and SI 28 Surface Mount Speakers

V-Lock Wall Mount Assembly Kit. User s Guide. Replacement accessory for Extron System INTEGRATOR SI 26 and SI 28 Surface Mount Speakers User s Guide V-Lock Wall Mount Assembly Kit Replacement accessory for Extron System ITEGRATOR SI 26 and SI 28 Surface Mount Speakers 68-1364-01 Rev. A 01 07 Introduction Packaging Information The V-Lock

More information

Heritage MedCall. Sentry E-Call Model HM-527 Resident Host Panel

Heritage MedCall. Sentry E-Call Model HM-527 Resident Host Panel Heritage MedCall Sentry E-Call Model HM-527 Resident Host Panel 430-527B 0305 Heritage MedCall, Inc. Issue 1, March 2005 Heritage Medcall Sentry Emergency Call System Model 527 Host Panel Installation

More information

CMG DM24 DIGITISER OPERATOR S GUIDE

CMG DM24 DIGITISER OPERATOR S GUIDE CMG DM24 DIGITISER OPERATOR S GUIDE DESIGNED AND MANUFACTURED BY: GÜRALP SYSTEMS LIMITED 3 MIDAS HOUSE CALLEVA PARK ALDERMASTON READING BERKS, RG7 8EA ENGLAND Telephone: +44 (0) 118 9819056 Fax: +44 (0)

More information

Aqua-Gen 3PV INSTRUCTIONS

Aqua-Gen 3PV INSTRUCTIONS Aqua-Gen 3PV INSTRUCTIONS INSTALLATION INSTRUCTIONS CONTROLLER: Find a suitable location to mount the control box* radio note. The controller must be installed out of direct weather and no closer than

More information

User s Manual. Ground Resistance Clamp On Tester MODEL

User s Manual. Ground Resistance Clamp On Tester MODEL User s Manual Ground Resistance Clamp On Tester MODEL 382357 Warranty EXTECH INSTRUMENTS CORPORATION warrants the basic instrument to be free of defects in parts and workmanship for one year from date

More information

Connecting the Radio:

Connecting the Radio: Connecting the Radio: Step 1: Connect the Cat5 cable from the radio into the RJ-45 jack marked CPE on the POE injector. The POE injector is not weather proof and should be installed indoors. Step 2: Connect

More information

Time and Frequency Transmission Facilities

Time and Frequency Transmission Facilities Time and Transmission Facilities Ohtakadoya-yama LF Standard Time and Transmission Station Disseminating accurate Japan Standard Time (JST)! Time synchronization of radio clocks Time standard for broadcasting

More information

WS-7136U Wireless 433 MHz Temperature Station. Instruction Manual

WS-7136U Wireless 433 MHz Temperature Station. Instruction Manual WS-7136U Wireless 433 MHz Temperature Station Instruction Manual TABLE OF CONTENTS Topic Page Inventory of Contents 3 Additional Equipment 4 Quick Setup 5-9 Detailed Setup Guide Battery Installation 10-12

More information

24th Seismic Research Review Nuclear Explosion Monitoring: Innovation and Integration

24th Seismic Research Review Nuclear Explosion Monitoring: Innovation and Integration ON INFRASOUND DETECTION AND LOCATION STRATEGIES Rodney Whitaker, Douglas ReVelle, and Tom Sandoval Los Alamos National Laboratory Sponsored by National Nuclear Security Administration Office of Nonproliferation

More information

3000W multi Pir light controller

3000W multi Pir light controller 3000W multi Pir light controller Cat No. MLB3000 - Black Cat No. MLW3000 - White Installation & Operating Instructions INSTALLATION & operating instructions SECTION ONE GENERAL INFORMATION The unit utilises

More information

SmartSenseCom Introduces Next Generation Seismic Sensor Systems

SmartSenseCom Introduces Next Generation Seismic Sensor Systems SmartSenseCom Introduces Next Generation Seismic Sensor Systems Summary: SmartSenseCom, Inc. (SSC) has introduced the next generation in seismic sensing technology. SSC s systems use a unique optical sensing

More information

PHOTOGRAPHING THE ELEMENTS

PHOTOGRAPHING THE ELEMENTS PHOTOGRAPHING THE ELEMENTS PHIL MORGAN FOR SOUTH WEST STORM CHASERS CONTENTS: The basics of exposure: Page 3 ISO: Page 3 Aperture (with examples): Pages 4-7 Shutter speed: Pages 8-9 Exposure overview:

More information

GNSS (GPS) buoy array in the Pacific for natural disaster mitigation. Teruyuki KATO Earthquake Research Institute the University of Tokyo, Japan

GNSS (GPS) buoy array in the Pacific for natural disaster mitigation. Teruyuki KATO Earthquake Research Institute the University of Tokyo, Japan GNSS (GPS) buoy array in the Pacific for natural disaster mitigation Teruyuki KATO Earthquake Research Institute the University of Tokyo, Japan 1 (Modified from Oki & Koketsu, 2011) Historical megaquakes

More information

TRIMLIGHT SELF-INSTALL TRAINING MANUAL

TRIMLIGHT SELF-INSTALL TRAINING MANUAL 1 TRIMLIGHT SELF-INSTALL TRAINING MANUAL 2 Double Strand System (Entire system will can have 2 colors at a time) 3 One Sided Location Control Box Layout TO NOTE: Control Boxes mounted far from the living

More information

3000W MULTI PIR LIGHT CONTROLLER

3000W MULTI PIR LIGHT CONTROLLER 3000W MULTI PIR LIGHT CONTROLLER Cat No. MLB3000 Black Cat No. MLW3000 White Installation & Operating Instructions INSTALLATION & OPERATING INSTRUCTIONS E G Dusk/Dawn Time Override/Holiday Mode F H Lens

More information

Non-Intrusive Ultrasonic Corrosion-Rate Measurements in Lieu of Manual and Intrusive Methods

Non-Intrusive Ultrasonic Corrosion-Rate Measurements in Lieu of Manual and Intrusive Methods Non-Intrusive Ultrasonic Corrosion-Rate Measurements in Lieu of Manual and Intrusive Methods Mark Feydo, Steve Strachan, Bruce Pellegrino Sensor Networks, Inc. 176-500 Technology Drive Boalsburg, PA, 16827,

More information

CMG-1T OCEAN BOTTOM SEISMOMETER

CMG-1T OCEAN BOTTOM SEISMOMETER CMG-1T OCEAN BOTTOM SEISMOMETER OPERATOR S GUIDE REVISIONS ISSUE ECN DATE COMMENTS A First 15.05.96 B 24.01.97 Add drawings and photos. C 14.09.99 Addition of Appendix A DESIGNED AND MANUFACTURED BY: GÜRALP

More information

CONTRIBUTION OF THE IMS GLOBAL NETWORK OF HYDROACOUSTIC STATIONS FOR MONITORING THE CTBT PAULINA BITTNER, EZEKIEL JONATHAN, MARCELA VILLARROEL

CONTRIBUTION OF THE IMS GLOBAL NETWORK OF HYDROACOUSTIC STATIONS FOR MONITORING THE CTBT PAULINA BITTNER, EZEKIEL JONATHAN, MARCELA VILLARROEL CONTRIBUTION OF THE IMS GLOBAL NETWORK OF HYDROACOUSTIC STATIONS FOR MONITORING THE CTBT PAULINA BITTNER, EZEKIEL JONATHAN, MARCELA VILLARROEL Provisional Technical Secretariat of the Preparatory Commission

More information

Close and Distant Electric Fields due to Lightning Attaching to the Gaisberg Tower

Close and Distant Electric Fields due to Lightning Attaching to the Gaisberg Tower 4 th International Symposium on Winter Lightning (ISWL2017) Close and Distant Electric Fields due to Lightning Attaching to the Gaisberg Tower Naomi Watanabe 1, Amitabh Nag 1, Gerhard Diendorfer 2, Hannes

More information

Establishment of New Low-Cost and High-Resolution Real-Time Continuous Strong Motion Observation Network by CEORKA

Establishment of New Low-Cost and High-Resolution Real-Time Continuous Strong Motion Observation Network by CEORKA Establishment of New Low-Cost and High-Resolution Real-Time Continuous Strong Motion Observation Network by CEORKA T. Akazawa Geo-Research Institute, Japan M. Araki alab Inc., Japan S. Sawada & Y. Hayashi

More information

2. Measurement Range / Further specifications of the LOG_aLevel system

2. Measurement Range / Further specifications of the LOG_aLevel system 1. Introduction General Acoustics, e.k., founded in 1996, with its origins as an acoustics and sensors research and services partnership, is now a high-end technology producer of sophisticated water level

More information

GENERAL OPERATIONAL PRECAUTIONS

GENERAL OPERATIONAL PRECAUTIONS GENERAL OPERATIONAL PRECAUTIONS WARNING! When using electric tools, basic safety precautions should always be followed to reduce the risk of fire, electric shock and personal injury, including the following.

More information

Aqua-Gen 3BR INSTRUCTIONS

Aqua-Gen 3BR INSTRUCTIONS Aqua-Gen 3BR INSTRUCTIONS INSTALLATION INSTRUCTIONS CONTROLLER: Find a suitable location to mount the control box* radio note. The controller must be installed out of direct weather and no closer than

More information

[TDSS -2015] JRC Ispra 2-3 July 2015

[TDSS -2015] JRC Ispra 2-3 July 2015 [TDSS -2015] JRC Ispra 2-3 July 2015 [TDSS-2015] Tsunami Decision Support Systems Workshop JRC Tools European Crisis Management Laboratory 2-3 July 2015 Alessandro Annunziato European Commission - JRC

More information

OKI B721/B731/MPS5501 Printer Important Information Update

OKI B721/B731/MPS5501 Printer Important Information Update OKI B721/B731/MPS5501 Printer Important Information Update 543 Toner Sensor Error after installing a new or replacement print cartridge into the printer. Check the print cartridge for the following problem

More information

Optimize Outage Management and Improve Underground System Reliability

Optimize Outage Management and Improve Underground System Reliability SEL-8301 Underground Distribution Sensor Optimize Outage Management and Improve Underground System Reliability Line current measurement accuracy of 1.5 percent allows for more effective switching decisions

More information

Parts. Backplate. Battery Cover. Backup Key. Touchscreen Assembly. Inside Assembly. Thumbturn. Strike. Reinforcement Plate. Bolt.

Parts. Backplate. Battery Cover. Backup Key. Touchscreen Assembly. Inside Assembly. Thumbturn. Strike. Reinforcement Plate. Bolt. Quick Start Guide Backplate Backup Key Battery Cover Touchscreen Assembly Parts Strike Bolt Inside Assembly Thumbturn Reinforcement Plate Set Screw Reinforcement Screws Inside Assembly Screw Backplate

More information

)454 1 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU

)454 1 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU INTERNATIONAL TELECOMMUNICATION UNION )454 1 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU 30%#)&)#!4)/.3 /& 3)'.!,,).' 3934%-.O 4%34).'!.$ -!).4%.!.#% )454 Recommendation 1 (Extract from the "LUE "OOK)

More information

Fluke Three-Phase Power Quality Recorder Topas. Class-A compliance for the most demanding power quality tests

Fluke Three-Phase Power Quality Recorder Topas. Class-A compliance for the most demanding power quality tests Test Equipment Depot - 800.517.8431-99 Washington Street Melrose, MA 02176 - TestEquipmentDepot.com Fluke 1760 Three-Phase Power Quality Recorder Topas Technical Data Class-A compliance for the most demanding

More information

Point to Point PTP500

Point to Point PTP500 Point to Point PTP500 The PTP Family of Products Product Family 2.5GHz 4.5GHz 4.9GHz 5.4GHz 5.8GHz Enhanced Max data rate EBS band DoD/Nato Public Safety Unlicensed Unlicensed IDU Mar'08 PTP600 Full 300Mbps

More information

Wireless Traffic Control Solutions (cover story) By Joe Wise, Solar Traffic Controls

Wireless Traffic Control Solutions (cover story) By Joe Wise, Solar Traffic Controls IMSA Journal Issue: July/August 2002 Wireless Traffic Control Solutions (cover story) By Joe Wise, Solar Traffic Controls About eight years ago, I saw the need for solar electric to meet the requirements

More information

1. Instrument diagnostics Interpreting the Optical Image and Diagnostic Values Prism washing... 8

1. Instrument diagnostics Interpreting the Optical Image and Diagnostic Values Prism washing... 8 1 (14) TROUBLESHOOTING GUIDE Contents 1. Instrument diagnostics... 2 2. Interpreting the Optical Image and Diagnostic Values... 3 3. Prism washing... 8 4. Typical Faults and Causes... 11 5. Preventive

More information

wireless computer owner s manual 80mm x 110mm Black

wireless computer owner s manual 80mm x 110mm Black wireless computer owner s manual 80mm x 110mm Black Contents Package Contents... 3 Using Your Computer... 4 1.Main Unit Setup... 4 1. Initiation of Main Unit 2. Basic Display Modes 2. Overview of Button

More information

Ultramonit sensorbelt; a system for wall thickness monitoring. Håvard Sletvold Axess Orkla Inspection AS, Orkanger, Norway

Ultramonit sensorbelt; a system for wall thickness monitoring. Håvard Sletvold Axess Orkla Inspection AS, Orkanger, Norway Ultramonit sensorbelt; a system for wall thickness monitoring Håvard Sletvold Axess Orkla Inspection AS, Orkanger, Norway Email: hsl@axess.no Permanent monitoring - Agenda Technology background Overview

More information

OPERATION AND MAINTENANCE MANUAL TRIAXIAL ACCELEROMETER MODEL PA-23 STOCK NO

OPERATION AND MAINTENANCE MANUAL TRIAXIAL ACCELEROMETER MODEL PA-23 STOCK NO OPERATION AND MAINTENANCE MANUAL TRIAXIAL ACCELEROMETER MODEL PA-23 STOCK NO. 990-60700-9801 GEOTECH INSTRUMENTS, LLC 10755 SANDEN DRIVE DALLAS, TEXAS 75238-1336 TEL: (214) 221-0000 FAX: (214) 343-4400

More information

P E R F O R M A N C E D E P E N D A B I L I T Y A V A I L A B I L I T Y

P E R F O R M A N C E D E P E N D A B I L I T Y A V A I L A B I L I T Y PeakVelocity in Octave Bandwidth (db wrt 1m 2 /s 2 ) 0-25 -50-75 -100-125 -150-175 -200-225 -250 The Earthquake Spectrum Local events ~10 km Several seconds to 30 Hz Regional ~100 km 30 seconds to 10 Hz

More information

DIANE MODEL PASS-THRU

DIANE MODEL PASS-THRU INSTALLATION INSTRUCTIONS MODELS D101 AND D10 DIANE MODEL PASS-THRU 50 E. Vernon Avenue, Los Angeles, CA 90058-186 Phone: (800) 41-6144 EXT. 7760 Fax: (800) 458-7496 crlaurence.com Email: transaction@crlaurence.com

More information

ELECTRIC FIELD WAVEFORMS OF UPWARD LIGHTNING FORMING HOT SPOT IN WINTER IN JAPAN

ELECTRIC FIELD WAVEFORMS OF UPWARD LIGHTNING FORMING HOT SPOT IN WINTER IN JAPAN ELECTRIC FIELD WAVEFORMS OF UPWARD LIGHTNING FORMING HOT SPOT IN WINTER IN JAPAN Mikihisa SAITO Masaru ISHII Fumiyuki FUJII The University of Tokyo, Tokyo, Japan Akiko. SUGITA Franklin Japan, Co, Sagamihara,

More information

27th Seismic Research Review: Ground-Based Nuclear Monitoring Technologies

27th Seismic Research Review: Ground-Based Nuclear Monitoring Technologies ROBUST REMOTE SEISMIC STATION Paul B. Akers and Kevin B. Wilbanks Geotech Instruments, LLC Sponsored by National Nuclear Security Administration Office of Nonproliferation Research and Engineering Office

More information

SensOrLoc Sensitivity, Orientation, and Location Checking Procedures at GSN and ANSS Stations CRH Version 2: 5 Feb 2008

SensOrLoc Sensitivity, Orientation, and Location Checking Procedures at GSN and ANSS Stations CRH Version 2: 5 Feb 2008 SensOrLoc Sensitivity, Orientation, and Location Checking Procedures at GSN and ANSS Stations CRH Version 2: 5 Feb 2008 The purpose of these procedures is to accurately check the sensitivity, orientation,

More information

FPS. FPS Flexible Position Sensor. Function description. Your advantages and benefits

FPS.  FPS Flexible Position Sensor. Function description. Your advantages and benefits FPS www.comoso.com Accessories Sensor System FPS Flexible Position Sensor FPS Flexible Position Sensor The optional FPS sensor system measures the position of gripper jaws. It then indicates in which of

More information

Power Quality Monitoring and Analytics for Transmission and Distribution Systems

Power Quality Monitoring and Analytics for Transmission and Distribution Systems Power Quality Monitoring and Analytics for Transmission and Distribution Systems Doug Dorr Electric Power Research Institute Manager Advanced Monitoring Applications Group PQSynergy 2012 Evolving Smarter

More information

WARNING: Read these instructions before using the machine DOVETAIL JIG MODEL NO: CDTJ12 / CDTJ24 PART NO: ,

WARNING: Read these instructions before using the machine DOVETAIL JIG MODEL NO: CDTJ12 / CDTJ24 PART NO: , WARNING: Read these instructions before using the machine DOVETAIL JIG MODEL NO: CDTJ12 / CDTJ24 PART NO: 6462170, 6462175 OPERATION & MAINTENANCE INSTRUCTIONS LS0111 INTRODUCTION Thank you for purchasing

More information

Verification test of fault locator on a 6.6 kv power distribution line

Verification test of fault locator on a 6.6 kv power distribution line 627 Verification test of fault locator on a 6.6 kv power distribution line Y. Mitoma1, H. Yoshizumi1, S. Uematsu1, T. Ishii1, K. Amano2 & T. Tanaka2 1 2 East Japan Railway Company, Japan Fujikura Ltd.,

More information

INSTALLATION AND MAINTENANCE MANUAL FOR P/N: D564-A /240VAC, 50/60 Hz, L864 RED MEDIUM INTENSITY BEACON

INSTALLATION AND MAINTENANCE MANUAL FOR P/N: D564-A /240VAC, 50/60 Hz, L864 RED MEDIUM INTENSITY BEACON INSTALLATION AND MAINTENANCE MANUAL FOR P/N: D564-A13-001 120/240VAC, 50/60 Hz, L864 RED MEDIUM INTENSITY BEACON 1 of 14 Contents Page List of Figures and Tables...2 Reference Drawings...2 Section 1: Overview...3

More information

DV28. This light can be surface. DV28 technical specifications

DV28. This light can be surface. DV28 technical specifications DV28 This light can be surface mounted in areas needing low level lighting for steps, walkways, doorways and for general lighting on larger boats. The bolted bezel is machined stainless steel 316 L and

More information

ALMA Interferometer and Band 7 Cartridge

ALMA Interferometer and Band 7 Cartridge ALMA Interferometer and Band 7 Cartridge B7 Cartridge designed, assembled and tested by: S. Mahieu, D. Maier (mixer team lead), B. Lazareff (now at IPAG) G. Celestin, J. Chalain, D. Geoffroy, F. Laslaz,

More information

Product Manual MNX10050 / REV B MODELS:

Product Manual MNX10050 / REV B MODELS: VIBRATION ANALYSIS HARDWARE Product Manual MNX10050 / REV B MODELS: CC-AXX & JXX CC-C2X & C3X Field Installable Connector Kits Contents Section I Overview Introduction... 2 Description... 2 Section II

More information

GMS-xx GSR-IAxx User Manual Appendix Simple Interconnection Network

GMS-xx GSR-IAxx User Manual Appendix Simple Interconnection Network GMS-xx GSR-IAxx User Manual Appendix Simple Interconnection Network GeoSIG Ltd, Ahornweg 5A, 5504 Othmarsingen, Switzerland Phone: + 41 44 810 2150, Fax: + 41 44 810 2350 info@geosig.com, www.geosig.com

More information

BY JASON SOUCHAK, Megger

BY JASON SOUCHAK, Megger IMPROVING SYSTEM RELIABILITY WITH OFFLINE PD TESTING BY JASON SOUCHAK, Megger Partial discharge (PD) testing is a new generation of diagnostic testing for medium- and high-voltage underground power cable

More information

LARGE FLAT PANEL DISPLAY STATIC MOUNT PST 2000 Series

LARGE FLAT PANEL DISPLAY STATIC MOUNT PST 2000 Series INSTALLATION INSTRUCTIONS LARGE FLAT PANEL DISPLAY STATIC MOUNT The PST static wall mount accommodates large flat screens weighing up to 200 lbs (90.72kg). The teardrop holes in the mount allow for quick

More information

CONSTRUCTION AND OPERATION OF A WORK VESSEL LOCATION AND NAVIGATION INFORMATION SYSTEM FOR FISHING PORT CONSTRUCTION

CONSTRUCTION AND OPERATION OF A WORK VESSEL LOCATION AND NAVIGATION INFORMATION SYSTEM FOR FISHING PORT CONSTRUCTION CONSTRUCTION AND OPERATION OF A WORK VESSEL LOCATION AND NAVIGATION INFORMATION SYSTEM FOR FISHING PORT CONSTRUCTION by Shimpei Nagano 1, Masaaki Wada 2 (Ph.D.), Shuichi Tanaka 3, Masayuki Fudo 4 and Akira

More information

GETTING STARTED. Radio layout. LCD display with icons

GETTING STARTED. Radio layout. LCD display with icons GETTING STARTED Radio layout LCD display with icons 1. Key lock button 2. Battery meter 3. Main channel indicator 4. Scan icon 5. Roger beep indicator 6. CTCSS sub-channel indicator 7. VOX indicator 1

More information

Wireless Data Gathering Panel MODEL TS0825

Wireless Data Gathering Panel MODEL TS0825 Wireless Data Gathering Panel MODEL TS0825 Wireless Data Gathering Panel: Model TS0825 INSTALLATION GUIDE The TS0825 Wireless Data Gathering Panel may be installed up to 1.5km from the Challenger panel

More information

Instromet Wireless Wind Sensor Interface Installation Instructions

Instromet Wireless Wind Sensor Interface Installation Instructions Instromet Wireless Wind Sensor Interface Installation Instructions Wind speed and direction only Introduction: These instructions cover the installation and operation of Instromet Weather Systems wireless

More information

ANEMOMETER VECTOR A100L2 & VECTOR A100LK & VECTOR A100LM

ANEMOMETER VECTOR A100L2 & VECTOR A100LK & VECTOR A100LM ANEMOMETER VECTOR A100L2 & VECTOR A100LK & VECTOR A100LM ORDER - N O ELECTRICAL SUPPLY HEATING SUPPLY MODEL IN EOL MANAGER A100LK & A100LM A100L2 4.75..28 VDC max 1.3 ma 6.5..28 VDC max 2 ma No heating

More information

Video Intercom System Introduction

Video Intercom System Introduction Video Intercom System Introduction CONTENTS Application Products Installation Operation Video Intercom System Service for residential area, Provide two-way video/audio call between visitors and residents,

More information

GEONET -CORS Network of japan-

GEONET -CORS Network of japan- GEONET -CORS Network of japan- Basara Miyahara Geospatial Information Authority of Japan Geospatial and GNSS CORS Infrastructure Forum Kuala Lumpur - Malaysia Geospatial Information Authority of Japan

More information

Telescopic Tree Pruner

Telescopic Tree Pruner Telescopic Tree Pruner Instruction Manual After Sales Support Now you have purchased a Gardenline product you can rest assured in the knowledge that as well as your 3 year parts and labour guarantee you

More information

Ambient Weather WS-0270 Wireless Indoor / Outdoor Thermometer with Indoor Humidity User Manual

Ambient Weather WS-0270 Wireless Indoor / Outdoor Thermometer with Indoor Humidity User Manual Ambient Weather WS-0270 Wireless Indoor / Outdoor Thermometer with Indoor Humidity User Manual Table of Contents 1 Introduction... 1 2 Getting Started... 1 2.1 Parts List... 2 2.2 Recommend Tools... 2

More information

CRD WR_LOG _ WR LOG WIRELESS MONITORING SYSTEM READOUT UNITS AND DATALOGGERS

CRD WR_LOG _ WR LOG WIRELESS MONITORING SYSTEM READOUT UNITS AND DATALOGGERS CRD WR_LOG _ WR LOG WIRELESS MONITORING SYSTEM READOUT UNITS AND DATALOGGERS WR LOG WIRELESS MONITORING SYSTEM WR LOG wireless monitoring system is composed by a number of nodes to which instruments are

More information

Power Quality Overview

Power Quality Overview Power Quality Overview James Brackett P.E. Colorado Springs Utility, GE, Retired What I will present today Introduction and thank you PQ overview Cause of PQ problems How Smart Grid, DER, VVAR and AMI

More information

Electrical and Automation Engineering, Fall 2018 Spring 2019, modules and courses inside modules.

Electrical and Automation Engineering, Fall 2018 Spring 2019, modules and courses inside modules. Electrical and Automation Engineering, Fall 2018 Spring 2019, modules and courses inside modules. Period 1: 27.8.2018 26.10.2018 MODULE INTRODUCTION TO AUTOMATION ENGINEERING This module introduces the

More information

WIND VANE THIES FIRST CLASS 2014 TMR

WIND VANE THIES FIRST CLASS 2014 TMR WIND VANE THIES FIRST CLASS 2014 TMR ORDER - N O ELECTRICAL OUTPUT ELECTRICAL SUPPLY HEATING SUPPLY MODEL IN EOL MANAGER 4.3151.00.173 0...5 V 4.3151.10.173 0...5 V 12 24 VDC 4.5 ma + Iout 12 24 VDC 4.5

More information

Special edition paper

Special edition paper Development of a Network-based Signal Control System for Automatic Block Signals Jun Nishiyama* Tadao Miura* Kazumi Hayakawa* Reiji Ishima* Satoshi Fukui* We have carried out development of a network-based

More information

The New Mesoscale Eastern Range Lightning Information Network (MERLIN)

The New Mesoscale Eastern Range Lightning Information Network (MERLIN) 18th Conference on Aviation Range and Aerospace Meteorology Unclassified (22-26 Jan 2017) The New Mesoscale Eastern Range Lightning Information Network (MERLIN) William P. Roeder and Jon M. Saul Meteorologists

More information

Phantom Dome - Advanced Drone Detection and jamming system

Phantom Dome - Advanced Drone Detection and jamming system Phantom Dome - Advanced Drone Detection and jamming system *Picture for illustration only 1 1. The emanating threat of drones In recent years the threat of drones has become increasingly vivid to many

More information

Wireless Simple Diagnostic System for Rotating Machine Vibration

Wireless Simple Diagnostic System for Rotating Machine Vibration Preventive Maintenance Rotating Machine Wireless Simple Diagnostic System for Rotating Machine Vibration For Safety, Relief and Easy to see. 03Z1-E-0010 03Z1-J-0010 Contribute to Planning of Preventive

More information

Wind Direction Transmitter First Class analogue output x0.1xx

Wind Direction Transmitter First Class analogue output x0.1xx THE WORLD OF WEATHER DATA - THE WORLD OF WEATHER DATA - THE WORLD OF WEATHER DATA Instruction for Use 021514/03/09 Wind Direction Transmitter First Class analogue output 4.3150.x0.1xx ADOLF THIES GmbH

More information

FT702LT HEAVY DUTY WIND SPEED AND WIND DIRECTION IN ONE TOUGH PACKAGE FT702LT. series

FT702LT HEAVY DUTY WIND SPEED AND WIND DIRECTION IN ONE TOUGH PACKAGE FT702LT. series FT702LT U L T R A S O N I C HEAVY DUTY W I N D S E N S O R WIND SPEED AND WIND DIRECTION IN ONE TOUGH PACKAGE FT702LT series Proven High Availability The FT702LT ultrasonic anemometer is the result of

More information

Contents Package Contents... 3 Introduction... 4 Using Your Computer... 6

Contents Package Contents... 3 Introduction... 4 Using Your Computer... 6 1 Contents Package Contents... 3 Introduction... 4 Using Your Computer... 6 1.Main Unit Setup... 6 1. Initiation of Main Unit 2. Basic Display Modes 2. Overview of Button Operation... 8 1. In Data Setting

More information

Atomic Forecast Station with Moon Phase

Atomic Forecast Station with Moon Phase Atomic Forecast Station with Moon Phase For online video support: http://bit.ly/laxtechtalk Model: S84107 Instruction Manual DC: 080817 Welcome to the La Crosse Technology family! We hope you enjoy your

More information

ANALYSIS OF REPEATED ICESAT FULL WAVEFORM DATA: METHODOLOGY AND LEAF-ON / LEAF-OFF COMPARISON

ANALYSIS OF REPEATED ICESAT FULL WAVEFORM DATA: METHODOLOGY AND LEAF-ON / LEAF-OFF COMPARISON ANALYSIS OF REPEATED ICESAT FULL WAVEFORM DATA: METHODOLOGY AND LEAF-ON / LEAF-OFF COMPARISON Hieu Duong 1 Norbert Pfeifer 2 Roderik Lindenbergh 1 1 1: DEOS, MGP-FRS, 2: University of Innsbruck, Institute

More information

CRD WR_LOG _ WR LOG WIRELESS MONITORING SYSTEM READOUT UNITS AND DATALOGGERS

CRD WR_LOG _ WR LOG WIRELESS MONITORING SYSTEM READOUT UNITS AND DATALOGGERS CRD _ WR LOG WIRELESS MONITORING SYSTEM READOUT UNITS AND DATALOGGERS _EN_03_12/2018 WR LOG WIRELESS MONITORING SYSTEM WR LOG wireless monitoring system is composed by a number of nodes to which instruments

More information

PROFEO : PROGRAMME FRANCILIEN D ETUDES DES ORAGES. P. Blanchet, P. Lalande, P. Laroche Onera Châtillon France

PROFEO : PROGRAMME FRANCILIEN D ETUDES DES ORAGES. P. Blanchet, P. Lalande, P. Laroche Onera Châtillon France 2006 19th International Lightning Detection Conference 24-25 April Tucson, Arizona, USA 1st International Lightning Meteorology Conference 26-27 April Tucson, Arizona, USA PROFEO : PROGRAMME FRANCILIEN

More information

Operation of the Norwegian National Seismic Network

Operation of the Norwegian National Seismic Network Operation of the Norwegian National Seismic Network 2010 Supported by University of Bergen and Norwegian Oil Industry Association Prepared by Department of Earth Science University of Bergen Allegaten

More information