FORM - 2 THE PATENTS ACT, (39 of 1970) THE PATENTS RULES, 2003 COMPLETE. Specification. (See Section 10; Rule 13) OVERPASS BRIDGE
|
|
- Luke Lucas
- 5 years ago
- Views:
Transcription
1 FORM - 2 THE PATENTS ACT, 1970 (39 of 1970) & THE PATENTS RULES, 2003 COMPLETE Specification (See Section 10; Rule 13) OVERPASS BRIDGE DAKE DHANANJAY an Indian National, of "Vedh", , Mitra Mandal Colony, Parvati, Pune Maharashtra, India THE FOLLOWING SPECIFICATION PARTICULARLY DESCRIBES THE INVENTION AND THE MANNER IN WHICH IT IS TO BE PERFORMED
2 FIELD OF INVENTION The present invention is a portable roadway in order to solve the problem of commuting which arises as a result of various circumstances. BACKGROUND OF THE INVENTION Traffic is an essential evil of the urban landscape across the globe. Traffic congestion and re-routing causes serious problems during road maintenance, building of flyovers, creating underpasses to main arterial roads. During these activities, the traffic on the main road is affected either severely, or blocked and re-routed completely on other small arteries, there by leading to unprecedented congestion, fuel wastage, waste of time and high pollution. Such diversions also lead to enormous strain on transport and other infrastructure that is not geared or designed for such purpose. Usually, when the maintenance work is scheduled on a particular part of a main road, altemative connections on the road network are exploited in order to keep the flow of traffic moving. Where altemative connections are not possible detours or diversions are prepared on the road along the road network to maintain the flow of traffic. In situations where detours and diversions are also not possible, the road work is carried out lane by lane. The use of altemative connections, detours and diversions, and lane by lane road work leads to unprecedented congestion, fuel wastage, waste of time and high pollution. Such diversions also lead to enormous strain on transport and other infrastructure that is not geared or designed for such purpose.
3 Several kinds of overpasses for various purposes have been disclosed in the prior arts. U.S. Patent No. 498,994 issued 6 June, 1893 discloses a non-portable permanent bridges made of heavy duty construction with steel I-beams which are bolted together on opposite sides of wooden cross members. These are permanent bridges which employ bridge frame sections of H-shaped cross sections, which are fixed together by diagonal braces riveted to the I-beams and are extremely heavy and as such they are not portable. U.S. Patent No. 854,329 issued 21 May, 1907 discloses a portable bridge in the form of two separate longitudinal sections. However, the bridge in U.S. Patent No. 854,329 was designed for carrying automobiles and other small vehicles for crossing ditches or trenches for military use only and was only about 10 feet long. It was designed such that it could be carried on the side of an automobile during its travel. Such portable bridge employed two longitudinal bridge sections each formed of one piece of sheet metal which is not strong enough for transporting logging trucks and other heavy equipment. Furthermore, the opposite ends are not firmly secured in order to prevent relative movement. U.S. Patent No. 4,073,025 issued 14 February, 1978 discloses a portable bridge structure for carrying trucks and other large vehicles. It includes two longitudinal bridge sections which are transported separately to the bridge site and are fastened together after installation by means of pivotal diaphragm members. The pivotal diaphragm members are pivotally attached to one bridge section and after pivoting into position, are bolted to bracing flanges on both sections to fixedly secure the sections together. Each bridge section includes at
4 least one longitudinal support member and a plurality of cross members extending across the top of such support member to provide a support frame of a generally T-shaped cross section. The deck is made of wood and covered with asphalt. The portable bridge of U.S. Patent No. 4,073,025 is transported to the site as two separate longitudinal bridge sections which are joined together at the site. One disadvantage of the invention of U.S. Patent No. 4,073,025 is that the installation of the bridge at site may cause congestion of the traffic for a long duration. Another disadvantage of this invention is in regards to transportation of the two longitudinal bridge sections, which are quite bulky. Again another disadvantage of this invention arises due to the use of wood decking which is severely affected by weather and hence tends to weaken over time. Yet another disadvantage of the invention of U.S. Patent No. 4,073,025 is that it cannot serve as a permanent overbridge if the need arises. Accordingly, there is a need for an improved portable overpass bridge which minimizes or eliminates one or more of the shortcomings as set forth above. OBJECT OF THE INVENTION It is an object of the present invention to provide a portable overpass bridge which is capable of withstanding intense traffic load. Another object of the present invention is to provide a solution to traffic rerouting. Still another object of the present invention is to provide a portable bridge which is not affected by weather.
5 Yet another object of the present invention is to reduce time required in installing overpass of the prior art. Another object of the present invention is to provide a portable overpass bridge at a reduced cost. Still another object of the present invention is to provide a portable overpass which is easy to install. Yet another object of the present invention is to provide a portable overpass which simple in construction. Further an object of the present invention is to provide a portable overpass w)licl$ requires less ImiL~teL~aIxe. Still another object of the present invention is to provide a portable overpass which is robust. Yet another object of the present invention is to provide a portable overpass which can be installed for temporary usage and can also be installed for permanent use. SUMMARY OF THE INVENTION In accordance with the present invention there is provided a portable overpass bridge comprising: a) a plurality of foundation blocks adapted to be located at the site where the overpass bridge is required;
6 b) a plurality of columns adapted to be fitted to said foundations; c) a plurality of arcuate pre-fabricated carriage way segments cooperating with each other; d) means to connect the arcuate carriage way segments to each other; e) at least two on-road embankments; and f) a continuous surface layer of suitable coating material provided over at least a portion of said carriage way segments. Typically, the overpass bridge is an arch shaped structure. Typically, the foundations are of pre-fabricated RCC or of fast setting cement for in situ process or driven piles of composite materials. Typically, the supporting columns are typically fused, cast, welded, bolted or glued to form an interface with the foundation. Typically, the carriage way segments are of steel. Typically, the means such as welds, adhesions, bolts or interlaces are provided in order to allow carriage way segments to cooperate with each other. Typically, the protective railings are provided along the length of the arch shaped overpass bridge.
7 Typically, the two on -road embankments are provided on either ends of the overpass bridge. Typically, the on -road embankments are of fast setting cement or alternate material. Typically, the cooperating carriage way segments are coated with low modulus epoxy material. Typically, the carriage way segments are configured to form different configurations, such as a single lane arch, a double lane arch, a bent arch, a flyover arch or an intersection arch, depending upon the layout of the main road. In accordance with another aspect of the invention, there is provided a method of manufacturing a portable overpass bridge comprising of the following steps: a. marking of the areas on the main road; b. laying of the foundations on the marked areas; c. inserting the insert plates in each of the foundations; d. forming an interface of the interface with the supporting columns by casting, fusing, welding, bolting or gluing; e. placing of the carriage way segments across the desired and designed length for construction of the overpass bridge; and f. providing a top coat over the deck of the overpass bridge to provide a smooth and wear-resistant surface.
8 BRIEF DESCRIPTION OF THE FIGURES Other aspects of the invention will become apparent by consideration of the accompanying drawing and their description stated below, which is merely illustrative of a preferred embodiment of the invention and does not limit in any way the nature and scope of the invention. Figure 1 illustrates the elevation of the overpass bridge and the underpass; Figure 2 illustrates the plan view of the overpass bridge installed over a main road and the underpass as shown in figure 1; Figure 3 illustrates the sectional view of the overpass bridge showing the various parts of the overpass as well as the foundation; Figure 4 illustrates the plan view of the overpass bridge shown in figure 3 installed over the entire with of the main road and the underpass; Figure 5; illustrates another embodiment of the ovetpass bridge; Figure 6 illustrates the installation of an overpass bridge on a single road; Figure 7 illustrates the installation of two overpass bridge forming 2 flyovers; Figure 8the joint detail in case of an overpass bridge construction on a road intersection; Figure 9 illustrates another joint detail in case of an overpass bridge construction on a road intersection; Figure 10 illustrates another joint detail in case of an overpass bridge construction on a road intersection; Figure 11 illustrates an alternative method of installation of an overpass bridge on a four road intersection for construction of an underpass aligned at oblique angle to the angle of the over pass;
9 Figure 12 illustrates another alternative method of installation of an overpass bridge on a four road intersection for construction of an underpass aligned at oblique angle to the angle of the over pass; Figure 13 illustrates another alternative method of installation of an overpass bridge on a road for construction of a curved underpass; Figure 14 illustrates another alternative method of installation of an overpass bridge on a road for construction of a three way underpass; and Figure 15 illustrates another alternative method of installation of an overpass bridge on a road for construction of an underpass. DETAILED DESCRIPTION OF THE INVENTION Referring to the accompanied drawings, an overpass bridge, in accordance with this invention is generally indicated by the reference numeral 10 and is particularly shown in figure 1 to figure 5 of the drawing. Figure 1 shows the elevation of the overpass bridge 10 and the figure 2 shows the plan view of the overpass bridge 10. The overpass bridge 10 of an appropriate height is constructed in an efficient manner over a space along the main road, where an underpass 14 is to be provided. The overpass bridge 10 is an arch shaped structure or custom geometry of multiple segments of straight lines or curves. The overpass bridge 10 is typically of light weight composite or appropriate material such as steel, concrete, concrete-steel, polymer composite, or otherwise. Figure 3 shows the elevation of the section of the overpass bridge 10 and figure 4 shows the plan view of the overpass bridge 10 shown in figure 3. A
10 plurality of foundations 24a, 24b, 24c, and 24d, illustrated in figure 3, are typically of pre-cast RCC or of fast setting cement for in-situ processes. The foundations 24a, 24b, 24c, and 24d are provided at pre-defined locations. An insert plate (not seen in figure) is inserted in the RCC foundations 24a, 24b, 24c, and 24d for the fixing of supporting columns 25a, 25b, 25c, and 25d of the overpass bridge 10. The supporting columns 25a, 25b, 25c, and 25d of the overpass bridge 10 are typically fused, cast, welded, bolted or glued to appropriate detail of the interface that has been fixed in the foundations 24a, 24b, 24c, and 24d. The supporting columns 25a, 25b, 25c, and 25d that interface with the foundations 24a, 24b, 24c, and 24d have been indicated to be along the central spine 23 of the overpass bridge 10. The supporting columns 25a, 25b, 25c, and 25d can be along the entire width of the overpass, if the weights and the structure of a plurality of carriage way segments 12 of the overpass bridge 10 demand such type of supporting columns 25a, 25b, 25c, and 25d. A transition could also be envisaged, where there are few supporting columns 25a, 25b, 25c, and 25d and a few carriage way segments 12 across the width of the overpass bridge 10. Figure 3 shows two on-road embankments 22a and 22b provided, one on each end of the overpass bridge 10. As seen in figure 3, the section of the on-road embankments 22a and 22b are triangular in shape. The on-road embankments 22a and 22b is typically of RCC or of the same material as that of the foundations 24a, 24b, 24c, and 24d. The on-road embankments 22a and 22b is filled typically with "filling grout". The on-road embankments 22a and 22b are provided in order to allow for a smooth edge surface to enable the incoming or outgoing vehicles to smoothly cross over the overpass bridge 10.The overpass
11 bridge 10 can be constructed without the foundations 24a, 24b, 24c, and 24d and the on-road embankments 22a and 22b, in situations where very short crossovers are required. Figure 3 shows that the overpass bridge 10 has joints 16a and 16b which connects the plurality of carriage way segments 12. One such carriage way segment 12, shown in figure 3, is connected by joints 16a and 16b. The joints 16a and 16b are typically welded, bolted, or interlaced, depending upon the requirement of a specific site and design conditions. The material for the carriage way segments 12 are typically selected from steel, reinforced concrete, polyester resin, fiber glass. The carriage way segments 12 are provided over a constant or varying interval of 4m to 20 m along the length of the overpass bridge 10. The carriage way segments 12 of the overpass bridge 10 is typically of prefabricated steel, manufactured at factory, extruded using a machine at site, or welded and assembled at site. Typically, a mechanized, optimized, pre-designed structure is used in order to achieve speed of installation at site. The speed of installation and commissioning at site is crucial since the blockage of traffic has to be kept at minimum. The dimensional considerations of the pre-manufactured and assembled carriage way segments 12 that cany traffic are essentially guided by two parameters. Firstly, the requirement of the size of the underpass 14 to be constructed and secondly the minimum height required for the workflow for the construction of the underpass 14. The length L of the overpass bridge 10 is '
12 principally guided by the cross sectional width Dl of the under pass 14 to be constructed. The width D2 of the overpass bridge 10 is guided by the total number of lanes of the main road 18 over which the overpass bridge 10 is to be installed. In figure 4 a single overpass bridge 10 spanning the complete width of the main road. However, the overpass bridge can be installed lane by lane along the desired length of the main road 18 to enable continuity of traffic in the lanes where the overpass bridge 10 has not been installed. The "lane by lane" installation of the overpass enables the construction of the underpass 14 can be initiated in the lane over which the overpass bridge has been installed while the traffic is allowed to flow along the other lanes. The overpass bridge 10 is constructed such that there are no supports along the width Dl of the underpass 14 in the area where a clear span is expected. The height H of the overpass bridge 10 is provided according to the clear space needed along the width Dl of the underpass 14 in order to facilitate smooth workflow for the construction of the underpass 14. The minimum height of the vertical rise of the overpass bridge 10 with respect to the ground level typically ranges from 1.2 m to 4.5 m. The gradient of the overpass bridge 10 is a variable that is fixed for a particular type of overpass bridge design. The gradient of the overpass bridge 10 can range between 1: 15 to 1 :30 depending on the compliance requirements at the site. The compliant gradients and progressions are easily achieved at the design stage and efficiently executed during actual construction.
13 The pre-manufactured carriage way segments 12 are transported on site using an appropriate transport. The type of transport used to transport the carriage way segments 12 is optimized for site specific conditions which helps in short time commissioning of the overpass bridge 10. Seamless continuity and integration of the pre-manufactured carriage way segments 12 with the road can be achieved typically by the use of in-site compounds, grout materials in order to ensure a seamless integration of the carriage way segments 12. The overpass bridge 10 provides one of the carriage way segments 12 to act as a cantilever on the area of the underpass which allows various combination of single or multiple underpasses 14 to be constructed, without halting the traffic for a long duration. The overpass bridge 12 is provided with overpass railings 15 and posts 17, shown in figure 1, in order avoid accidents by preventing the vehicles from running off the edge of the overpass. The railings 15 and posts 17 are provided along the edges of the overpass bridge 12. The sides of the carriage way segments 12 of the overpass bridge 10, over which the vehicles are to cross, are provided with a top coat (not shown in figures) to provide a smooth, wear-resistant, compliant road for vehicular traffic to pass over. The top coat (not shown in figures) for the road on the deck of the overpass bridge 10 is typically of a standard surfacing, or modem thin overlay system, where the carriage way segments 12 are coated with a low modulus epoxy coating which fuses and adheres with clean steel surface.
14 Figure 5 shows another embodiment of figure 1 wherein the supporting columns 25b and 25c have been replaced by V-shaped columns 26a and 26b respectively. Figure 6 to figure 10 illustrate some of the joint details in case of two overpass bridges are constructed over intersecting roads. The type of joint provided depends on the requirement details. Figure 6 illustrates a joint detail in case of installation of an overpass bridge 10 on a road. Figure 7 illustrates the installation of two overpass bridge 10 forming 2 flyovers. The gradient of the lower overpass bridge flyover 19 is less than the gradient of the overpass bridge flyover 21 illustrates the joint detail in case of an overpass bridge construction on a road intersection. Figure 8 illustrates another joint detail in case of an overpass bridge construction on a road intersection. Figure 9 illustrates yet another joint detail in case of an overpass bridge construction on a road intersection. Figure 10 to figure 14 illustrates various options of constructing the underpass 14 after installation of the overpass bridge 10. The underpass 14 can be constructed in various combinations and the design of the overpass bridge 10 is generic so as to allow for the underpasses 14 to be constructed with least hindrance to traffic. Figure 10 illustrates an alternative method of installation of an overpass bridge 10 on a four road intersection for construction of an underpass aligned at oblique angle to the angle of the over pass. Figure 11 illustrates another alternative method of installation of an overpass bridge 10 on a four road intersection for construction of an underpass 14. Figure 12 illustrates another alternative method of installation of an overpass bridge 10 on a road for construction of a curved underpass 14. Figure 13 illustrates another
15 alternative method of installation of an overpass bridge 10 on a road for construction of a three way underpass 14. Figure 14 illustrates another alternative method of installation of an overpass bridge 14 on a road for construction of an underpass 14. The step by step construction of the overpass 10 is illustrated with the help of the figure 3 showing the elevation of the overpass bridge 10 and the underpass 14 and the figure 4 showing the plan view of the overpass bridge 10 and the underpass 14. The location for laying of the foundations is marked on the main road. The premarked areas assigned on the main road 18 are treated for the foundations 24a, 24b, 24c, and 24d of the overpass bridge 10. Typically, fast setting cement are used for in-situ processes to provide for quick setting of the foundations and thereof appropriate detailing is carried out for setting up of the support structures 25a, 25b, 25c, and 25d of the overpass bridge 10. The main road 18 may or may not be required to be dug for laying of foundations 24a, 24b, 24c, and 24d. The insert plates (not seen in figure) are inserted in the foundations 24a, 24b, 24c, and 24d. The insert plates helps in fixing the supporting columns 25a, 25b, 25c, and 25d of the overpass bridge 10 to the foundations 24a, 24b, 24c, and 24d. The supporting columns 25a, 25b, 25c, and 25d are installed along the entire width of the overpass, depending on the type of overpass bridge 10 required.
16 The bearing points on the surface where the load of the overpass is transferred and strengthened to sustain the load capacity, either temporarily or permanently, as envisaged by the situation and purpose. The pre-manufactured carriage way segments 12 are placed across the desired and designed length for construction of the overpass bridge 10 either from one side or from either sides. In case, longer length of the carriage way segments 12 is needed, the edges of the carriage way segments 12 may be designed as special sliding expansion joints across the width of the pre-manufactured carriage way segments 12. The pre-manufactured carriage way segments 12 are placed upon appropriately sliding out the expansion joints in order to achieve the desired length. The traffic is allowed to cross the overpass bridge 10, designed to withstand dynamic traffic load, on completion of edge grouting. The safety railings 15 and posts 17 are provided on all edges of the overpass bridge 10 to help in preventing accidents. The top coat (not shown in the figures), typically of low modulus epoxy is provided on the deck for the road. The low modulus epoxy coating is allowed to fuse and adhere with the clean steel surface of the carriage way segments 12, before allowing vehicular traffic to pass over the overpass bridge 12. TECHNICAL ADVANTAGES The invention as described herein above offers several advancements over similar products disclosed in the prior art. The portable overpass bridge in accordance with the present invention is simple in construction. The present
17 invention helps in reducing the cost of installation. Furthermore, the present invention provides for a portable overpass bridge which can be installed to serve either as a temporary or permanent overpass. The portable overpass bridge in accordance with the present invention further aids in solving problems of commuting which arises as a result of maintenance and laying of cables, drainage and sewage maintenance, laying of telephone or electricity lines across main roads, storm water drainage system construction across main road, emergency flood-like situations, where the main road sections are prone to be submerged under water. ECONOMIC SIGNIFICANCE Since the portable overpass bridge can be installed lane by lane on the main road, it helps in initiating the underpass construction at the earliest and hence saving time. Again, the ability to install the portable overpass bridge lane by lane, also helps in reducing the investment cost required in manufacturing, transporting and installing an overpass bridge for the entire width of the road. The present invention also helps in preventing blockage and re-routing of traffic to smaller roads there by leading to unprecedented lengths of congestion, fuel wastage, waste of time and higher pollution levels. While considerable emphasis has been placed herein on the components and component parts of the preferred embodiments, it will be appreciated that many embodiments can be made and that many changes can be made in the preferred embodiments without departing from the principles of the invention. These and other changes in the preferred embodiment as well as other embodiments of the
18 invention will be apparent to those skilled in the art from the disclosure herein, whereby it is to be distinctly understood that the foregoing descriptive matter is to be interpreted merely as illustrative of the invention and not as a limitation.
19 I Claim: 1. A portable overpass bridge comprising: a) a plurality of defined locations at the site where the overpass bridge is required; b) a plurality of columns adapted to be fitted to said locations; c) a plurality of arcute pre-fabricated carriage way segments cooperating with each other; f) means to connect the arcute carriage way segments to each other; g) at least two on-road embankments; and f) a continuous surface layer of suitable non wearing coating material provided over at least a portion of said carriage way segments. 2. A portable overpass bridge as claimed in claim 1, wherein said overpass bridge is an arch shaped structure. 3. A portable overpass bridge as claimed in claim 1, wherein said overpass bridge has custom geometry of multiple segments having a straight line or curve profiles. 4. A portable overpass bridge as claimed in claim 1, wherein foundations of pre-fabricated RCC, fast setting cement are provided at said locations. 5. A portable overpass bridge as claimed in claim 4, wherein said supporting columns are fused, cast, welded: bolted or glued to form an interface with the foundation.
20 6. A portable overpass bridge as claimed in claim 1, wherein said supporting columns are of steel. 7. A portable overpass bridge as claimed in claim 1, wherein said means typically welds, adhesions, bolts or interlaces are provided in order to allow carriage way segments to cooperate with each other. 8. A portable overpass bridge as claimed in claim 1, wherein protective railings are provided along the length of the overpass bridge. 9. A portable overpass bridge as claimed in claim 1, wherein two on -road embankments are provided on either ends of the overpass bridge. 10.A portable overpass bridge as claimed in claim 9, wherein the on -road embankments are of fast setting cement. 1 l.a portable overpass bridge as claimed in claim 1, wherein said non- wearing coating material is of low modulus epoxy material, polysulfide epoxy mortar, poly-urea or polyurethane. 12.A portable overpass bridge as claimed in claim 1, wherein said carriage way segments are configured to form different configurations, such as a single lane arch, a double lane arch, a bent arch, a flyover arch or an intersection arch, depending upon the layout of the main road. 13.The method of manufacturing a portable overpass bridge in accordance with claim 1, comprising the following steps:
21 a. marking of areas on a main road; b. optionally laying of foundations on the marked areas; c. inserting insert plates in each of the foundations or in the marked areas; d. forming an interface with supporting columns by casting, fusing, welding, bolting or gluing; e. placing of carriage way segments across the desired and designed length for construction of the overpass bridge; and f providing a top coat of non wearing coating material over the deck of the overpass bridge to provide a smooth and wear-resistant surface. Dated this 26Ih day of March, f R. K. DEWAN & CO. 1 APPLICANT'S PATENT ATTORNEY
John J. Vaillancourt Steven L. Camara Daniel W. French NOTICE
Serial Number Filing Date Inventor 09/152.475 11 September 1998 John J. Vaillancourt Steven L. Camara Daniel W. French NOTICE The above identified patent application is available for licensing. Requests
More information(12) United States Patent (10) Patent No.: US 7.458,305 B1
US007458305B1 (12) United States Patent (10) Patent No.: US 7.458,305 B1 Horlander et al. (45) Date of Patent: Dec. 2, 2008 (54) MODULAR SAFE ROOM (58) Field of Classification Search... 89/36.01, 89/36.02,
More informationUnited States Patent (19) Sun
United States Patent (19) Sun 54 INFORMATION READINGAPPARATUS HAVING A CONTACT IMAGE SENSOR 75 Inventor: Chung-Yueh Sun, Tainan, Taiwan 73 Assignee: Mustek Systems, Inc., Hsinchu, Taiwan 21 Appl. No. 916,941
More informationApril 1, T., HIGH 1 2,237,226
April 1, 1941. T., HIGH 1 2,237,226 April 1, 1941. 2,237,226 ~~ 2 1 i r O, Zz T. i. High 2,237,226 ROOF CONSTRUCTION Filed Jan. 2, 1940 3. Sheets-Sheet 3 (AAN 53 Attorneys Patented Apr. 1, 1941 2,237,226
More information(12) United States Patent (10) Patent No.: US 6,892,743 B2
USOO6892743B2 (12) United States Patent (10) Patent No.: US 6,892,743 B2 Armstrong et al. (45) Date of Patent: May 17, 2005 (54) MODULAR GREENHOUSE 5,010,909 A * 4/1991 Cleveland... 135/125 5,331,725 A
More information(12) Patent Application Publication (10) Pub. No.: US 2012/ A1
(19) United States (12) Patent Application Publication (10) Pub. No.: US 2012/0103923 A1 Mansor et al. US 2012O103923A1 (43) Pub. Date: May 3, 2012 (54) (76) (21) (22) (63) (60) RAIL CONNECTOR FORMODULAR
More informationValue Engineering Design Build MODULAR INFRASTRUCTURE
Value Engineering Design Build MODULAR INFRASTRUCTURE VALUE ENGINEERING When infrastructure projects find themselves in densely populated areas, or occur on a site with poor conditions, the opportunity
More informationEdgerail Aluminum Bridge Railing System Specification & Installation Instructions
Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification
More informationIII IIII III. United States Patent (19) Cheng. 11) Patent Number: 5,529,288 (45) Date of Patent: Jun. 25, 1996
United States Patent (19) Cheng 54 STRUCTURE OF A HANDRAIL FOR A STARCASE 76 Inventor: Lin Cheng-I, P.O. Box 82-144, Taipei, Taiwan 21 Appl. No.: 284,223 22 Filed: Aug. 2, 1994 (51 Int. Cl.... E04F 11/18
More informationRAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch
Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted
More informationDYNAMIC CHARACTERISTICS OF A BRIDGE ESTIMATED WITH NEW BOLT-TYPE SENSOR, AMBIENT VIBRATION MEASUREMENTS AND FINITE ELEMENT ANALYSIS
C. Cuadra, et al., Int. J. of Safety and Security Eng., Vol. 6, No. 1 (2016) 40 52 DYNAMIC CHARACTERISTICS OF A BRIDGE ESTIMATED WITH NEW BOLT-TYPE SENSOR, AMBIENT VIBRATION MEASUREMENTS AND FINITE ELEMENT
More information24" B B Joint X501 Joint See MARKINGS Note PCB-RXX-350-TL3 " X501 Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOT
B B Joint Joint See MARKINGS Note PCB-RXX-350-TL3 " Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOTES GENERAL: This barrier may be manufactured with reinforcing steel
More informationWilliam H. Nedderman, Jr. NOTICE. The above identified patent application is available for licensing. Requests for information should be addressed to:
_ _ Serial Number Filing Date Inventor 09/332,407 14 June 1999 William H. Nedderman, Jr. NOTICE The above identified patent application is available for licensing. Requests for information should be addressed
More informationSWITCH STAND Switch Stand Assembly Connecting Rod Target Assembly (when required) TURNOUT ACCESSORIES Standard Tie Plates Rail Anchors Joints
Turnouts A turnout is an arrangement of a switch, a frog and closure rails, which diverts rolling stock from one track to another. Because industrial trackwork often handles lighter loads at slower speeds
More informationCopperjacketed Core wire 30X
US 2005OO61538A1 (19) United States (12) Patent Application Publication (10) Pub. No.: US 2005/0061538A1 Blucher (43) Pub. Date: Mar. 24, 2005 (54) HIGH VOLTAGE ELECTRICAL POWER (86) PCT No.: PCT/US01/48758
More information(12) Patent Application Publication (10) Pub. No.: US 2004/ A1
US 2004.0060551A1 (19) United States (12) Patent Application Publication (10) Pub. No.: US 2004/0060551A1 Gallops, JR. (43) Pub. Date: Apr. 1, 2004 (54) METHOD FOR MANUFACTURING (21) Appl. No.: 10/255.287
More informationUnited States Patent (19)
United States Patent (19) 11 US006023898A Patent Number: JOSey (45) Date of Patent: Feb. 15, 2000 54 METAL FRAME BUILDING 4,050,498 9/1977 Lucchetti... 52?657 X CONSTRUCTION 4,283,892 8/1981 Brown. 4,588,156
More information(12) United States Patent (10) Patent No.: US 7,805,823 B2. Sembritzky et al. (45) Date of Patent: Oct. 5, 2010
US007805823B2 (12) United States Patent (10) Patent No.: US 7,805,823 B2 Sembritzky et al. (45) Date of Patent: Oct. 5, 2010 (54) AXIAL SWAGE ALIGNMENT TOOL (56) References Cited (75) Inventors: David
More informationHGV TRAFFIC CONTROL PLATE
O&M MANUAL HGV TRAFFIC CONTROL PLATE PART NO NMFP - 01 Product Overview HGV Traffic Control Plates A robust and heavy duty flow plate suitable for both HGV s and cars in high traffic areas. Alternating
More information30 DAY PILL CUTTING DEVICE
DN0311 30 DAY PILL CUTTING DEVICE Technical Field [001] The present invention relates to an improved pill or tablet cutting device and more particularly to a pill cutter for simultaneously cutting a plurality
More informationJacquard -harness of a weaving machine
Wednesday, December 26, 2001 United States Patent: 4,057,084 Page: 1 ( 251 of 266 ) United States Patent 4,057,084 Mueller November 8, 1977 Jacquard -harness of a weaving machine Abstract An improvement
More information(12) United States Patent (10) Patent No.: US 6,681,489 B1. Fleming (45) Date of Patent: Jan. 27, 2004
USOO6681489B1 (12) United States Patent (10) Patent No.: Fleming (45) Date of Patent: Jan. 27, 2004 (54) METHOD FOR MANUFACTURING A 5,732,582 A 3/1998 Knudson... 72/131 VEHICLE FRAME ASSEMBLY 5,855,394
More information(12) Patent Application Publication (10) Pub. No.: US 2002/ A1
US 20020046661A1 (19) United States (12) Patent Application Publication (10) Pub. No.: US 2002/0046661 A1 Hawkins (43) Pub. Date: Apr. 25, 2002 (54) HYDRAULIC PRESS (52) U.S. Cl.... 100/269.17 (76) Inventor:
More informationThe below identified patent application is available for licensing. Requests for information should be addressed to:
DEPARTMENT OF THE NAVY OFFICE OF COUNSEL NAVAL UNDERSEA WARFARE CENTER DIVISION 1176 HOWELL STREET NEWPORT Rl 02841-1708 IN REPLY REFER TO Attorney Docket No. 300104 25 May 2017 The below identified patent
More informationSAGITTAL SAW BACKGROUND OF THE INVENTION
SAGITTAL SAW BACKGROUND OF THE INVENTION Sagittal bone saws function through angular oscillation of the saw cutting blade, and are used primarily in applications that require plunge cutting of bone. However,
More informationA WORD ABOUT BRACING PART A - BUILDING A STRAIGHT, PILE BENT, OPEN DECK TRESTLE. Built in Place, Straight
BUILDING LARGE SCALE TRESTLES You have many options when building a large scale trestle. The choices you make may be based on the prototype you are modeling; the era or industry you are modeling; or, simply
More informationUnited States Patent [19]
United States Patent [19] Landeis 111111 1111111111111111111111111111111111111111111111111111111111111 US005904033A [11] Patent Number: [45] Date of Patent: May 18, 1999 [54] VINE CUTTER [76] Inventor:
More informationUnited States Patent [19]
United States Patent [19] Stiles [1 1] [45] USOOS373660A Patent Number: Date of Patent: Dec. 20, 1994 [54] TRELLIS SUPPORT SYSTEM [75] Inventor: Herbert D. Stiles, Blackstone, Va. [73] Assignees: Virginia
More informationInstallation Guide. Deckorum. Composite Decking
Installation Guide Deckorum Composite Decking 1. Introduction Welcome to Deckorum Installation Guide Please fully read the installation guide before commencing any installation works. This will provide
More informationInstallation Guide. deckorum Composite Decking
Installation Guide deckorum Composite Decking 1. Introduction Welcome to Deckorum installation Guide Please fully read the installation guide before commencing any installation works. This will provide
More informationResidential & Industrial Fence
Residential & Industrial Fence Assembly Instructions CONTENTS 02: OVERVIEW & CONTENTS 03: PRODUCT SPECIFICATIONS 04: GETTING STARTED 05: WALL ATTACHMENT & LINE POST ASSEMBLY 06: CORNER POST ASSEMBLY 07:
More informationTECHNICAL MANUAL. OPTIMAJOINT Free Movement Joint. Free Movement Joint System for Heavy Traffic
TECHNICAL MANUAL OPTIMAJOINT Free Movement Joint Free Movement Joint System for Heavy Traffic Version: PEIKKO GROUP 12/2018 OPTIMAJOINT Free Movement Joint Free Movement Joint System for heavy traffic
More informationDeep Creek Canyon US Highway 12
Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location
More informationJointed Precast Concrete Pavement
NATIONAL PRECAST CONCRETE ASSOCIATION Manual for Jointed Precast Concrete Pavement 3rd Edition Authors Peter Smith, P.E. Mark B. Snyder, Ph.D., P.E. Graphic Designer Deborah Templeton NPCA Precast Concrete
More informationUnited States Patent [19]
United States Patent [19] Dombchik et ai. 111111 1111111111111111111111111111111111111111111111111111111111111 US006092348A [11] Patent Number: 6,092,348 [45] Date of Patent: Jui. 25, 2000 [54] ALUMNUM
More information(12) United States Patent
(12) United States Patent US007124695B2 (10) Patent No.: US 7,124.695 B2 Buechler (45) Date of Patent: Oct. 24, 2006 (54) MODULAR SHELVING SYSTEM 4,635,564 A 1/1987 Baxter 4,685,576 A 8, 1987 Hobson (76)
More informationInstallation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2
Evolve bi-fold Installation Guide 1. Before you start p2 8. Door restrictor- optional p9 2. Measuring and surveying p2 3. Configuration details p4 4. Installation p5 5. Glazing p5 6. Glazing packer details
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationMethod and weaving loom for producing a leno ground fabric
Wednesday, December 26, 2001 United States Patent: 6,311,737 Page: 1 ( 9 of 319 ) United States Patent 6,311,737 Wahhoud, et al. November 6, 2001 Method and weaving loom for producing a leno ground fabric
More information11 Patent Number: 5,584,458 Rando 45) Date of Patent: Dec. 17, (56) References Cited (54) SEAERS FOR U.S. PATENT DOCUMENTS
United States Patent (19) III IIHIIII USOO5584458A 11 Patent Number: 5,584,458 Rando 45) Date of Patent: Dec. 17, 1996 (56) References Cited (54) SEAERS FOR U.S. PATENT DOCUMENTS 4,926,722 5/1990 Sorensen
More information6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.
Kentucky Society of Professional Engineers May 23 rd, 2014 Lexington KY Milton Madison Bridge Slide Aaron L. Stover, PE, SE Michael Baker Jr., Inc. Project Partners The Challenge Milton, KY Existing Bridge
More informationDISTRIBUTION STATEMENT A Approved for Public Release Distribution Unlimited
Serial Number 09/152.477 Filing Date 11 September 1998 Inventor Anthony A. Ruffa NOTICE The above identified patent application is available for licensing. Requests for information should be addressed
More informationUnited States Patent 19
United States Patent 19 Swayney et al. USOO5743074A 11 Patent Number: 45 Date of Patent: Apr. 28, 1998 54) 76) 21) 22 51 (52) 58 LAWN MOWER DECK PROTECTING DEVICE Inventors: Ernest Edward Swayney; Norman
More informationY 6a W SES. (12) Patent Application Publication (10) Pub. No.: US 2005/ A1. (19) United States. Belinda et al. (43) Pub. Date: Nov.
(19) United States US 2005O2521.52A1 (12) Patent Application Publication (10) Pub. No.: Belinda et al. (43) Pub. Date: Nov. 17, 2005 (54) STEELTRUSS FASTENERS FOR MULTI-POSITIONAL INSTALLATION (76) Inventors:
More informationModule 10 : Improvement of rock mass responses. Content
IMPROVEMENT OF ROCK MASS RESPONSES Content 10.1 INTRODUCTION 10.2 ROCK REINFORCEMENT Rock bolts, dowels and anchors 10.3 ROCK BOLTING MECHANICS Suspension theory Beam building theory Keying theory 10.4
More information10 x 10 Arch Top Pergola
0 x 0 Arch Top Pergola I N S T A L L A T I O N G U I D E O P T I O N A L A C C E S S O R I E S Privacy Fence Panel System ( Panels & Middle Post Included) Bolt Down Bracket Kit (Set of ) Additional Shade
More informationAttorney Docket No Date: 9 July 2007
DEPARTMENT OF THE NAVY NAVAL UNDERSEA WARFARE CENTER DIDMSION NEWPORT OFFICE OF COUNSEL PHONE: (401) 832-3653 FAX: (401) 832-4432 NEWPORT DSN: 432-3653 Date: 9 July 2007 The below identified patent application
More informationSEAT-SUPPORTED COAT HANGER FOR AUTOMOBILES [HANGING GARMENTS ON SEATS]
SEAT-SUPPORTED COAT HANGER FOR AUTOMOBILES [HANGING GARMENTS ON SEATS] CROSS-REFERENCE TO RELATED APPLICATIONS [0001] Not applicable. 5 PRIORITY CLAIM [0002] Option 1: This application claims benefit of
More informationSECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section
02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,
More informationEMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL
EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid
More information(12) Patent Application Publication (10) Pub. No.: US 2012/ A1
US 20120047754A1 (19) United States (12) Patent Application Publication (10) Pub. No.: US 2012/0047754 A1 Schmitt (43) Pub. Date: Mar. 1, 2012 (54) ELECTRICSHAVER (52) U.S. Cl.... 30/527 (57) ABSTRACT
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More information10 x 10 Flat Top Two Tone Pergola
0 x 0 Flat Top Two Tone Pergola Models: Bordeaux ASSEMBLY GUIDE OPTIONAL ACCESSORIES Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post) Bolt Down Bracket Kit ( for Pergola) Ver.0-00
More informationSECTION THERAPEUTIC POOL ACCESSORIES
PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 13 17 23.11 THERAPEUTIC POOL ACCESSORIES SPEC WRITER NOTES: Delete between // // if not applicable to project. Also, delete any other item or paragraph not applicable
More informationUSO A United States Patent Patent Number: 5,510,581 Angel 45) Date of Patent: Apr. 23, 1996
III IIHIIII USO055581A United States Patent 19 11 Patent Number: 5,5,581 Angel 45) Date of Patent: Apr. 23, 1996 54 MASS-PRODUCED FLAT MULTIPLE-BEAM FOREIGN PATENT DOCUMENTS LOAD CELL AND SCALES 53-31740
More informationName two reasons why bridges are built. Name two places where you would find a bridge?
Name two reasons why bridges are built. Name two places where you would find a bridge? Before bridges were invented how would an individual travel across a large span of land or huge masses of water Objectives:
More informationUnited States Patent [191
United States Patent [191 Harmon [54] ATTACHMENT FOR STAPLING GUN [76] Inventor: Everette Harmon, 8505 S. Miller, Oklahoma City, Okla. 73159 [21] Appl. No.: 748,706 [22] Filed: Dec. 8, 1976 [51] Int. Cl.2.....
More informationSegmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG
1 Segmental Bridge Technology Established and Evolving W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG 2 Segmental Bridge Topics Addressed Definition of concrete segmental
More informationPRODUCT INFORMATION Penco Wide-Span Shelving
PRODUCT INFORMATION Penco Wide-Span Shelving 2946 Larimer St. Denver, CO 80205 303-295-1100 / 800-373-7693 FAX 303-295-2464 Email info@snyderequipment.com www.snyderequipment.com Wide Span Shelving Penco
More informationPrecision Folding Technology
Precision Folding Technology Industrial Origami, Inc. Summary Nearly every manufacturing process has experienced dramatic improvements in accuracy and productivity as well as declining cost over the last
More informationInstallation Instructions for. Handrail Component System
Handrail STEP-BY-STEP Installation Instructions for Handrail Component System Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32
More informationGeneral Guidelines:
ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please
More information(12) United States Patent (10) Patent No.: US 6,347,876 B1
USOO6347876B1 (12) United States Patent (10) Patent No.: Burton (45) Date of Patent: Feb. 19, 2002 (54) LIGHTED MIRROR ASSEMBLY 1555,478 A * 9/1925 Miller... 362/141 1968,342 A 7/1934 Herbold... 362/141
More information(12) United States Patent (10) Patent No.: US 6,663,057 B2
USOO6663057B2 (12) United States Patent (10) Patent No.: US 6,663,057 B2 Garelick et al. (45) Date of Patent: Dec. 16, 2003 (54) ADJUSTABLE PEDESTAL FOR BOAT 5,297.849 A * 3/1994 Chancellor... 297/344.
More informationWednesday, February 20, 2002 United States Patent: 3,990,481 Page: 1. United States Patent 3,990,481 Graf November 9, 1976.
Wednesday, February 20, 2002 United States Patent: 3,990,481 Page: 1 ( 241 of 247 ) United States Patent 3,990,481 Graf November 9, 1976 Leno heddles Abstract A wear resistant leno heddle is disclosed
More informationPrecast Concrete Panels for Rapid Pavement Repair
Precast Concrete Panels for Rapid Pavement Repair Scott Shuler, Ph. D., P. E. Colorado State University Ft. Collins, CO 80523-1584 Gary Dewitt, P. E. Colorado Department of Transportation Evans, Colorado
More informationDOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410
DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original
More informationPENSTOCK VALVES. Performance through Excellence
VALVES & MANUFACTURING (1988) LTD. PENSTOCK VALVES Performance through Excellence SLIDEGATES WEIR GATES STOP LOGS SLIDEGATES PRECISION FACE SEALING VALVES WEIR GATES STOP LOGS SLIDEGATES Actuation Installation
More informationINSTALLATION MANUAL Sluice Gates, Stop-logs & Screens
INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens INTRODUCTION During manufacture and assembly of equipment great care is taken to ensure accuracy in mating the sealing faces on frame and doors, especially
More informationUnited States Patent (19) [11] Patent Number: 5,746,354
US005746354A United States Patent (19) [11] Patent Number: 5,746,354 Perkins 45) Date of Patent: May 5, 1998 54 MULTI-COMPARTMENTAEROSOLSPRAY FOREIGN PATENT DOCUMENTS CONTANER 3142205 5/1983 Germany...
More informationSection 914. JOINT AND WATERPROOFING MATERIALS
914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.
More informationNOTICE. The above identified patent application is available for licensing. Requests for information should be addressed to:
Serial No.. Filing Date 1 July 1 Inventor Earl S. Nickerson Wayne C. Tucker NOTICE The above identified patent application is available for licensing. Requests for information should be addressed to: ÄBprovsa
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More information(19) United States (12) Patent Application Publication (lo) Pub. No.: US 2014/ Al Singh ( 4 3 ) Pub. Date: J u l. 3, 2014
11111111111111111111111111111 (19) United States (12) Patent Application Publication (lo) Pub. No.: US 2014/0186144 Al Singh ( 4 3 ) Pub. Date: J u l. 3, 2014 (54) SYSTEM FOR LOW PROFILE TRANSLATION (52)
More information(12) Patent Application Publication (10) Pub. No.: US 2016/ A1
US 2016O2.91546A1 (19) United States (12) Patent Application Publication (10) Pub. No.: US 2016/0291546 A1 Woida-O Brien (43) Pub. Date: Oct. 6, 2016 (54) DIGITAL INFRARED HOLOGRAMS GO2B 26/08 (2006.01)
More informationWAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence
MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised
More informationshawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.
shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures
More information10x10 Trellis Pergola
0x0 Trellis Pergola ASSEMBLY GUIDE Ver.0-7 Table of Contents PAGE Introduction & Overview...................................................... Pergola Materials Overview..............................................................
More informationInstallation Manual for Gate Guard
Installation Manual for Gate Guard Fast Opening Barrier Gate for Emergencies and Contra Flow Innovative safety technology from SGGT of Germany TABLE OF CONTENTS Page Number Preface 3 Introduction 3 System
More informationAltering vibration frequencies of workpieces, such as gas turbine engine blades. Abstract
United States Patent 5,988,982 Clauer November 23, 1999 Altering vibration frequencies of workpieces, such as gas turbine engine blades Abstract A method of modifying the vibration resonance characteristics
More informationPANEL CRIB PIERS AND TOWERS
CHAPTER 17 PANEL CRIB PIERS AND TOWERS Panel crib piers are made of trusses with panels set horizontally or vertically and are normally braced with transoms, sway bracing, rakers, bracing frames, and tie
More informationMPA-9000 Universal Ceiling Projector Mount Kit
I N S T R U C T I O N M A N U A L Universal Ceiling Projector Mount Kit The Universal Ceiling Projector Mount provides a unique, simplified method of ceiling mounting your inverted projector. This low
More informationjoining materials - wood
UNIT D E S I G N A N D M A N U F A C T U R E : C O U R S E M A T E R I A L Wood joints joining materials - wood The majority of joints used in woodcraft have been designed specifically to attain the maximum
More informationRAPID RIVER RUSTIC, INC.
TAG UNIT CODE STYLE MANUFACTURER EXTERIOR DOOR SCHEDULE ROUGH OPENING SIZE JAMB SIZE FIRE RATING LABEL NOTES COLOR DETAIL HEADER WIDTH HEIGHT *Conventional construction code minimum for use with A3 only.
More information1.1 RELATED DOCUMENTS
SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections
More information(12) United States Patent (10) Patent No.: US 8,187,032 B1
US008187032B1 (12) United States Patent (10) Patent No.: US 8,187,032 B1 Park et al. (45) Date of Patent: May 29, 2012 (54) GUIDED MISSILE/LAUNCHER TEST SET (58) Field of Classification Search... 439/76.1.
More informationUnited States Patent 19 Clifton
United States Patent 19 Clifton (54) TAPE MEASURING SQUARE AND ADJUSTABLE TOOL GUIDE 76 Inventor: Norman L. Clifton, 49 S. 875 West, Orem, Utah 84058-5267 21 Appl. No.: 594,082 22 Filed: Jan. 30, 1996
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationButt Two pieces of wood meeting with flat sides adjoining usually at right angles. Some type of connector is needed to prevent movement.
Wood Connections There are basically five different types of connectors: Interlocking (carpentry joints), Dowel, Metal Connectors, Special Formed Connectors and Adhesives. I Interlocking (Carpentry Joints)
More informationSECTION 19: Endwood Fusion Welded Gate Installation Guide
SECTION 19: Endwood Fusion Welded Gate Installation Guide ASSEMBLY AND INSTALLATION FOR: Fusion Welded Gates Gate Frame with Full Size Pickets Privacy & Board on Board California & Shadowbox Gate width
More informationSECTION CHAIN LINK FENCING
SECTION 32 31 13 CHAIN LINK FENCING PART 1 - GENERAL 1.01 SECTION INCLUDES A. The Work specified in this Section consists of furnishing and installing permanent chain link fences and gates in accordance
More informationUnit 8 Precast Concrete
Part ⅠIllustrated Words and Concepts Figure 8-1 Precast Slabs on a Frame of Precast Columns Figure 8-2 Hollow-core Slabs Supported on Precast Concrete Wall Panels Part Ⅱ Passages Passage A Precast Concrete
More informationItem 550 Chain Link Fence
Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating
More information(12) Patent Application Publication (10) Pub. No.: US 2013/ A1
(19) United States (12) Patent Application Publication (10) Pub. No.: US 2013/0081252 A1 Markgraf et al. US 2013 0081252A1 (43) Pub. Date: Apr. 4, 2013 (54) ARRANGEMENT FOR FIXINGA COMPONENT INSIDE OF
More informationCity of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE
1.0 GENERAL 1.1 Scope 1.1.1 The work shall consist of supply and installing chain link fence, including braces and gates, as shown on the plans and specifications at the locations designated by the Engineer.
More informationLeveling Foot RB210. Leg Extender RLT66
Landing for Right & Left Turn R342 ITEMS # 0254049, 0254061, 0254072, 0254076, 0016567, 0254099, 0254110, 0054116, 0254117, 0254126, 0254140, 0254150, 0254156 CUSTOM ACCESS RAMP SYSTEM MODELS # R100, R242,
More informationA well-know material which has been found to be preferred for use as the release film 14 is a nitrocellulose in a butyl cellosolve solvent.
DRY TRANSFER SHEET 1 This invention relates to a dry transfer sheet of the type having a plurality of pigmented release film portions on one side of a supporting sheet with a film of pressuresensitive
More information(12) Patent Application Publication (10) Pub. No.: US 2003/ A1
(19) United States US 2003OO3OO63A1 (12) Patent Application Publication (10) Pub. No.: US 2003/0030063 A1 Sosniak et al. (43) Pub. Date: Feb. 13, 2003 (54) MIXED COLOR LEDS FOR AUTO VANITY MIRRORS AND
More information(12) Patent Application Publication (10) Pub. No.: US 2009/ A1
(19) United States (12) Patent Application Publication (10) Pub. No.: US 2009/0073337 A1 Liou et al. US 20090073337A1 (43) Pub. Date: Mar. 19, 2009 (54) (75) (73) (21) (22) (30) LCD DISPLAY WITH ADJUSTABLE
More informationNumber Object Category Attribute Name Explanation Examples Further comments
1 STORY 2 GRID 3 COLUMN 2 Story Elevation Absolute elevation for story (the name "story" is prefered over "level", as level is used in e.g. Revit Typically, our elevations for a project are all relative
More information