City of Medford, Oregon STORMWATER MANAGEMENT PROGRAM (SWMP) TO MEET NPDES PHASE II MS4 COMPLIANCE

Size: px
Start display at page:

Download "City of Medford, Oregon STORMWATER MANAGEMENT PROGRAM (SWMP) TO MEET NPDES PHASE II MS4 COMPLIANCE"

Transcription

1 City of Medfod, Oegon STORMWATER MANAGEMENT PROGRAM (SWMP) TO MEET NPDES PHASE II MS4 COMPLIANCE FIVE-YEAR PROGRAM FOR MARCH MARCH 2004

2 City of Medfod, Oegon STORMWATER MANAGEMENT PROGRAM (SWMP) TO MEET NPDES PHASE II MS4 COMPLIANCE FIVE-YEAR PROGRAM FOR MARCH MARCH 2004 City of Medfod 411 West 8th Steet Medfod, Oegon 97501

3 CITY OF MEDFORD STORM WATER MANAGEMENT PROGRAM (SWMP) TO MEET NPDES PHASE II MS4 COMPLIANCE Five Yea Pogam, Mach I, the undesigned, cetify unde penalty of law that this document and all attachments wee pepaed unde my diection o supevision in accodance with a system designed to assue that qualified pesonnel popely gathe and evaluate the infomation submitted. Based on my inquiy of the peson o pesons who manage the system, o those pesons diectly esponsible fo gatheing the infomation, the infomation submitted is, to the best of my knowledge and belief, tue, accuate, and complete. I am awae that thee ae significant penalties fo submitting false infomation, including the possibility of fine and impisonment fo knowing violations. Coy Cebbin, P.E. Public Woks Diecto

4 City of Medfod, Oegon Stomwate Management Pogam (SWMP) to Meet NPDES Phase II MS4 Compliance Five-Yea Pogam fo Mach TABLE OF CONTENTS Title Page No. 1.0 Intoduction Stomwate Public Education Pogam Develop a Stomwate Education and Outeach Stategy Stomwate Bochue fo the Geneal Public Tageted Stomwate Bochues Stom Dain Stenciling Pomote Wate Quality Education with School Disticts Wok with Voluntee Goups on Stomwate Education Pojects Develop a Stomwate Speakes Bueau Ceate Stomwate Public Sevice Announcements (Optional) Design a Stomwate Display Ceate a Stomwate Web Site Stomwate Public Involvement and Paticipation Pogam Public Review/Public Meetings Distibute News Releases Stakeholde Advisoy Panel Illicit Dischage Detection and Elimination Pogam Stom Sewe System Map Odinance to Pohibit Non-Stomwate Dischages Detect and Addess Non-Stomwate Dischages Conduct Field Inspections Spill Response Plan Plan fo Enfocement Actions Tain Municipal Staff on Spill and Illicit Dischage BMPs Constuction Site Stomwate Runoff Contol Pogam Adopt an Eosion and Sediment Contol Odinance Tain Plan Reviewes and Field Inspectos Review Site Plans fo Eosion and Sediment Contols Receive Infomation fom Public Inspect Constuction Sites Povide Infomation on Taining fo Constuction Opeatos i

5 ...TABLE OF CONTENTS 6.0 Post-Constuction Stomwate Management Pogam Odinance Requiing Post-Constuction Contol Develop a Plan to Addess Post-Constuction Runoff Taining fo Plan Reviewes and Field Inspectos Site Plan Review fo Post-Constuction BMPs Inspections of Stuctual Post-Constuction BMPs Pollution Pevention in Municipal Opeations Pogam Opeation and Maintenance Plan Pak and Open Space Maintenance Vehicle and Equipment Washing New Constuction and Land Distubances Dust Contol Pactices Stomwate System Maintenance Open Channels and Stuctual Stomwate Contols Road, Highway and Paking Lot Maintenance Flood Management Pojects Employee Taining on O&M Implementation Evaluation and Assessment Appendices A. Stom Sewe System Map LIST OF TABLES No. Title Page No. 2-1 Stomwate Public Education Pogam Stomwate Public Involvement and Paticipation Pogam Illicit Dischage Detection and Elimination Pogam Constuction Site Stomwate Runoff Contol Pogam Post-Constuction Stomwate Management Pogam Pollution Pevention in Municipal Opeations Pogam ii

6 CITY OF MEDFORD, OREGON STORMWATER MANAGEMENT PROGRAM (SWMP) 1.0 INTRODUCTION This Stomwate Management Pogam (SWMP) fo the City of Medfod, Oegon, has been developed to meet the Municipal Sepaate Stom Sewe System (MS4) pemit equiements of the National Pollutant Dischage Elimination System (NPDES). The MS4 pogam fo small juisdictions is often called NPDES Phase II. The pogam outlined in this document was developed fo a five-yea peiod. Although this SWMP has been developed specifically fo the City of Medfod, many of the effots outlined in this pogam have been coodinated egionally. A Stomwate Advisoy Team (SWAT) was fomed in 2003 to coodinate the Phase II pogam within the egion. The SWAT is made up of epesentatives fom Ashland, Cental Point, Jackson County, Medfod, Phoenix and Talent. The municipalities involved in the egional effot hied a consultant to develop individual pogams along with documenting a egional appoach. The Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide (Febuay 2004) was pepaed as a egional guideline fo the individual juisdiction pogams. The Regional Guide is being submitted along with this SWMP. The Regional Guide descibes six minimum measues along with sample checklists, methods to measue activities, and othe tools to assist the communities in meeting the Phase II equiements. The Rogue Valley Council of Govenments (RVCOG) is woking with the juisdictions to facilitate public education and involvement equiements. This egional teaming aangement is expected to continue thoughout this pogam. This SWMP is aanged by the six minimum measues. At the beginning of each section is a summay table listing each poposed activity associated with the measue addessed in that section. The table indicates whethe the activity is scheduled to be pefomed egionally (woking togethe with othe juisdictions) and whethe the activity is cuently being pefomed. A patial status means some of the activity has been pefomed, but moe is planned to meet equiements. The last five columns indicate which yeas (duing the 5-yea pemit peiod) that the activity is scheduled to be pefomed by the juisdiction, woking eithe jointly o independently, as applicable. The summay tables ae followed by desciptions of schedules, measuable goals, esponsible paties, and othe implementation issues fo each activity. Cost infomation is included in Appendix A. The measuable goals poposed fo each activity wee established though vaious means. Geneally, they epesent what seemed easonable fo each situation, based on past expeience and common pactices fo stomwate management. Cetain activities have pecedent activities, so those ae scheduled accodingly. Fom a pactical sense, not all activities can be pefomed in Yea 1, so a conscientious attempt was made to spead them out ove the 5-yea pemit tem. Each goal and its fequency/schedule will be evaluated duing the annual epoting effot. 1 Mach7, 2004

7 Stomwate Management Pogam (SWMP) 2.0 STORMWATER PUBLIC EDUCATION PROGRAM Medfod intends to paticipate in a egional stomwate public education pogam with othe membes of the SWAT. This pogam is discussed in detail in the Regional Guide and is summaized in Table 2-1. The actual implementation of the pogam will be a combination of egional effots paid fo by each membe of the SWAT and activities caied out at the local levels. The actual method of implementing each of the activities will be detemined at futue SWAT meetings.. RVCOG has implemented a pogam to educate the public about the egional coodination effot to pepae the 5-yea pogam and what the NPDES Phase II pogam means to the community. This wok included conducting open houses, a television talk show, and pesentations to City Councils. The following descibes these effots that have aleady taken place, along with the plan fo the poposed 5-yea pogam. TABLE 2-1. STORMWATER PUBLIC EDUCATION PROGRAM Regional Cuent Pemit Yea BMP Activity / Desciption Activity? Activity? Stomwate Education and Outeach Stategy Yes Completed Stomwate Bochue fo the Geneal Public Yes Yes Tageted Stomwate Bochues Yes Patial Stom Dain Stenciling No Yes Wate Quality Education with Schools Yes Patial Voluntee Goups on Stomwate Education Yes Patial Stomwate Speakes Bueau Yes Yes Stomwate Public Sevice Announcements Optional No Stomwate Display/Exhibit Yes Yes Stomwate Web Site Yes Patial Activity scheduled fo pemit yea No activity scheduled fo pemit yea 2.1 Develop a Stomwate Education and Outeach Stategy [Regional Guide Section 2.3.1] The following 5-yea pogam is defined as the egional stategy fo implementing stomwate education. The pogam was developed by RVCOG woking closely with the membes of the SWAT. The stategy will follow guidelines pepaed in the Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide. Schedule & Completion Date: The stategy has been developed as pat of the Regional Guide and theefoe this task is complete. Measuable Goal: The SWAT intends to meet bi-monthly o quately (evey two o thee months) to detemine the effectiveness of the pogam. If it is detemined mino modifications to the pogam ae equied to each a lage audience these will be outlined in the annual epoting. Mach 7,

8 City of Medfod, Oegon Responsible Paty: City of Medfod Public Woks Diecto. 2.2 Stomwate Bochue fo the Geneal Public [Regional Guide Section 2.3.2] The City plans to develop and distibute a stomwate bochue fo the geneal public. The bochue will eithe be developed by the City o the City will wok with othe membes of the SWAT to develop a egional bochue. Distibution methods fo bochues will vay acoss the egion howeve the City of Medfod will include the homeowne bochues in one nomal utility bill mailing. Schedule & Completion Date: The development and distibution of geneal stomwate bochues will be facilitated egionally stating in Measuable Goal: One geneal mailing in yea two and yea fou. Responsible Paty: City of Medfod Public Woks Diecto. 2.3 Tageted Stomwate Bochues [Regional Guide Section 2.3.3] Within the fist two yeas, RVCOG will develop a tageted bochue fo eosion contol (see Section 5.6). The bochue will discuss the need fo eosion contol along within geneal pevention and whee moe infomation can be obtained. The bochue will be included in all building pemit application packages. Othe tageted bochues might include homeownes along ceek coidos, o bochues descibing new development equiements as pat of this pogam. Schedule & Completion Date: Develop eosion contol bochue by yea two. Develop second tageted bochue by yea five. Tageted goup to be detemined by SWAT in yea 3. Measuable Goal: Eosion Contol tageted bochue included in all building pemits by yea thee. Responsible Paty: City of Medfod Public Woks Diecto. 2.4 Stom Dain Stenciling [Regional Guide Section 2.3.4] The city of Medfod cuently has a Stom Dain Stenciling Pogam. The City will supply equipment and mateial fo voluntee oganizations to stencil the wods Dump No Waste Dains to Steams on city stom dains. It is estimated that appoximately 1/3 of the stom dain have been stenciled city wide. Some of the new developments ae including stom dains with the no dumping message aleady cast on to the gate. Schedule & Completion Date: This pogam will continue until all stom dains have been stenciled. City Staff will investigate the wea of the stenciling in yea thee and five to 3 Mach 7, 2004

9 Stomwate Management Pogam (SWMP) detemine if the stom dains will need epainting. All stom dains of new development and oad impovement pojects will be painted following poject completion. Measuable Goal: Measuable goal will be to monito existing stencil fo wea and to include stom dain stenciling in the City final inspection fo new development. Responsible Paty: City of Medfod Public Woks Diecto. 2.5 Pomote Wate Quality Education with School Disticts [Regional Guide Section 2.3.5] Though the SWAT the City of Medfod will coodinate and pomote stomwate Education. Initial plans ae to contact this effot with RVCOG, howeve no fomal ageement has been developed at this time. The effot will include meeting with educatos to detemine how RVCOG Staff can povide educational instuction and mateial to local educatos. The coodination will include woking with local oganizations and school disticts to develop a wate quality education pogam. The city will follow guidelines pepaed in the Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide fo futue education pojects. Details of how the egional effot will assist educatos will be detemined based on the initial meetings with the educatos. Schedule & Completion Date: The egional effot will stat appoaching school disticts and educatos in yea thee to detemine the best methods to coodinate effots. Measuable Goal: Contact all school disticts within the stom dain system bounday by the end of pemit yea 3. Measuable goals fo the detailed education will be based on the appoach chosen to assist educatos. The goals and achievements will be pesented in the annual epoting. Responsible Paty: City of Medfod Public Woks Diecto. 2.6 Wok with Voluntee Goups on Stomwate Education Pojects [Regional Guide Section 2.3.6] Medfod will wok with local voluntee oganizations to discuss oppotunities to integate stomwate into existing education pojects. The pogam will follow guidelines pepaed in the Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide. Schedule & Completion Date: The egional effot will assist any goups seeking oppotunities to help educate the geneal public o specific goups concening wate quality. Howeve in yea thee the egional effot though the RVCOG will poactively seek goups to assist in stomwate education. Measuable Goal: Assist any goups actively contacting the SWAT. In yeas thee though five actively contact at least 2 voluntee oganizations pe yea to discuss and pomote stomwate education. Responsible Paty: City of Medfod Public Woks Diecto. Mach 7,

10 City of Medfod, Oegon 2.7 Develop a Stomwate Speakes Bueau [Regional Guide Section 2.3.7] RVCOG has facilitated stomwate pesentations fo the egion. Two pesentations have been given in the egion ove the past yea and anothe is scheduled in the Sping of The thee Open Houses ae an effot to educate the public about the egional effot fo developing Stomwate Management Plans to meet the NPDES Phase II equiements. The meetings wee held (o will be held) at thee diffeent locations in ode to each a boad audience. Paticipants leaned about the egional effot to develop plans fo effective stomwate management, and how the esulting pogams will help potect ou steams and wetlands. Topics included: Impacts of stomwate, methods fo managing stomwate unoff, Benefits of stomwate management, egulatoy equiements, and municipal plans and pogams. The Open Houses wee as follows: Monday, Novembe 17, 2003 fom 4-7 pm Held in Ashland 20 in attendance Thusday, Januay 22, 2004 fom 4-7 pm Held in Medfod 25 in attendance The Sping 2004 Meeting date and location to be detemined RVCOG paticipates in a bi-monthly community television pogam Regional Focus which educates the public on local issues. On Novembe 10, 2003 the show focused on stomwate and the egional effot fo developing Stomwate Management Plans to meet the NPDES Phase II equiements. The show was ecoded and epeated 8-10 times ove the month. The show coveed topics such as: The dynamics of stomwate unoff The impotance of stomwate management The benefits of stomwate management Stomwate pollution pevention What the public can do if they see a poblem Schedule & Completion Date: Speakes ae available fom RVCOG and the SWAT paticipating communities. The SWAT will maintain available speakes on stomwate issues. Measuable Goal: Keep ecods of any stomwate pesentations and the numbe of attendees o numbe of times the pogam was epeated. Responsible Paty: City of Medfod Public Woks Diecto. 2.8 Ceate Stomwate Public Sevice Announcements [Optional] [Regional Guide Section 2.3.8] A public sevice announcement (PSA) has not been scheduled within the fist 5 yeas of the pemit. This altenative will be investigated if gant funding becomes available o if it is 5 Mach 7, 2004

11 Stomwate Management Pogam (SWMP) found that othe public education effots ae not adequate. RVCOG will investigate gant funding to boaden stomwate education including a Public Sevice Announcement. Schedule & Completion Date: Not scheduled fo fist five yeas of the pogam. Measuable Goal: The numbe of Public Sevice Announcements will be kept if any occu duing the fist five yeas. Responsible Paty: None at this time. 2.9 Design a Stomwate Display [Regional Guide Section 2.3.9] RVCOG has developed a lage assotment of stomwate exhibits and display mateials to be used thoughout the egion. RVCOG will peiodically update these mateials and make them available to the SWAT paticipating communities and othes. Schedule & Completion Date: These items aleady exist and will be peiodically updated as needed. Measuable Goal: This item will not have a measuable goal. RVCOG and seveal of the SWAT communities aleady have displays and moe will be ceated as needed. Responsible Paty: City of Medfod Public Woks Diecto Ceate a Stomwate Web Site [Regional Guide Section ] RVCOG has begun developing a stomwate section on thei website. At this time the website includes a definition of stomwate, impacts to stomwate and stomwate elated links. The website is located at: Schedule & Completion Date: Complete a stomwate web site section by the end of pemit yea 5. The site will be updated as needed. Measuable Goal: The measuable goal is simply accomplishing the development of stomwate web site section by the end of pemit yea 5. Responsible Paty: City of Medfod Public Woks Diecto. Mach 7,

12 City of Medfod, Oegon 3.0 STORMWATER PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM Medfod intends to paticipate in a egional stomwate public involvement and paticipation pogam with othe membes of the SWAT. This pogam is discussed in detail in the Regional Guide and summaized in Table 3-1. The implementation of the pogam will be a combination of egional effots paid fo by membes of the SWAT and activities caied out at the local level. The actual method of implementing each activity will be detemined at futue SWAT meetings. The following descibes the 5-yea pogam. TABLE 3-1. STORMWATER PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM Regional Cuent Pemit Yea BMP Activity / Desciption Activity? Activity? Public Review/ Public Meetings Yes Patial Distibute News Releases Yes Patial Stakeholde Advisoy Panel (SWAT) Yes Patial Activity scheduled fo pemit yea No activity scheduled fo pemit yea 3.1 Public Review/Public Meetings [Regional Guide Section 3.3.1] The City of Medfod will wok with the SWAT to investigate methods to encouage the involvement of the public in stomwate activities. A significant amount of public input and involvement has been included in the development of the Regional Guide. This effot will continue thoughout the 5-yea pogam and the SWAT is committed to woking with inteested individuals o goups. The pogam discussed in the Regional Guide will be developed to allow public comment on stomwate pogams and pojects. Schedule & Completion Date: The egional effot fo public eview and public meetings stated pio to the submittal of this pogam to the Oegon Depatment of Envionmental Quality (DEQ). It will continue thoughout the 5-yea pogam. Measuable Goal: Hold at least one public meeting and publish at least two public notices duing each yea of the 5-yea pogam. Responsible Paty: City of Medfod Public Woks Diecto. 3.2 Distibute News Releases [Regional Guide Section 3.3.2] RVCOG distibuted a news elease to advetise the Open Houses fo the Regional Stomwate Planning Poject. Thee have been aticles and news stoies on stomwate, but moe detailed aticles ae expected once the plans ae developed. 7 Mach 7, 2004

13 Stomwate Management Pogam (SWMP) The local news station KDRV TV-12 inteviewed membes of the Stomwate Advisoy Committee (SWAT) following thei meeting on Fiday Januay 23, 2004 in egad to the stomwate plans and pogams being developed in the egion. Schedule & Completion Date: The distibution of news eleases will be povided when the local pess is available and inteested in stomwate topics. No schedule fo this has been developed and oppotunities will depend on the news agencies inteest in stomwate activities. Measuable Goal: At least one news elease stoy on the juisdictions stomwate pogam will be distibuted to local papes each yea stating in pemit yea 2. Responsible Paty: City of Medfod Public Woks Diecto. 3.3 Stomwate Advisoy Team (SWAT) [Regional Guide Section 3.3.3] The SWAT has been developed fo the egion to coodinate egional stomwate pogams. The SWAT is a stomwate advisoy panel with staff fom each juisdiction and will solicit input on the development and implementation of the stomwate pogam. Input will be solicited fom epesentatives of businesses, industies, consevation goups, esidential and civic associations, and othe inteested stakeholdes. Schedule & Completion Date: The SWAT has aleady been developed and the panel will have bi-monthly o quately meetings to coodinate the egional effot. Input fom the epesentatives of the community will be solicited as needed fo key decisions in the futue. Measuable Goal: Dates and attendance will be kept fo each meeting. A summay of topics discussed and key decisions will be kept and submitted as pat of the annual epot. Responsible Paty: City of Medfod Public Woks Diecto. Mach 7,

14 City of Medfod, Oegon 4.0 ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM In ode to meet egulations unde 40CFR122.34(b)(3) an Illicit Dischage Detection and Elimination Pogam will be developed fo the City of Medfod. The following pesents the equiements fo the pogam, how they ae being achieved and the implementation schedule. In addition to the following equied best management pactices (BMPs), infomational bochues on illicit dischages will be ceated fo the geneal public as a pat of the Public Education equiements. TABLE 4-1. ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM Regional Cuent Pemit Yea BMP Activity / Desciption Activity? Activity? Ceate a System Map No Patial Update System Map No Patial Develop & Adopt Stomwate Odinance No Yes Illicit Dischage Plan No Patial Field Inspections No Patial Spill Response Plan (ceate new plans o eview and update existing plans) No Yes Enfocement Plan No Patial Taining fo Staff No No Activity scheduled fo pemit yea No activity scheduled fo pemit yea 4.1 Stom Sewe System Map [Regional Guide Section 4.3.1] Medfod is in the pocess of ceating a stom sewe system map. The city has ove 100 miles of stom pipe, 55 miles of oadside ditches and 25 miles of ceek channels. The map is included in Appendix B. The stom sewe system map will be updated as a pat of the Illicit Dischage Detection and Elimination activities and the Post-Constuction pogam activities. As new development is pemitted the dainage system will be added to the base map. Schedule & Completion Date: The City is cuently in the pocess of developing a system map. Measuable Goal: The stom sewe system map will be completed by Yea 2 and updated annually theeafte. Responsible Paty: The City of Medfod - Public Woks Diecto. 9 Mach 7, 2004

15 Stomwate Management Pogam (SWMP) 4.2 Odinance to Pohibit Non-Stomwate Dischages [Regional Guide Section 4.3.2] Section of the City of Medfod s City Code cuently has an odinance fo Industial Waste peteatment which pevents illicit dischages into the stom dainage system. Sections though of the Medfod s City Code descibe the enfocement actions that may occu if a violation occus. Additionally, Medfod ecently adopted City Code and evised section to include dischaging pollutant to the stom system. Medfod City Code Section : It is unlawful to dischage, pemit the dischage, o pemit o allow a connection that will esult in the dischage of sewage o industial waste into a stom dain. Medfod City Code Section 4.850: This odinance makes it unlawful to dischage polluting elements into the stomwate system. Section states the enfocement that can be taken if a violation occus. Schedule & Completion Date: An illicit dischage odinance has aleady been adopted in Medfod, howeve it may need to be updated fo NPDES Phase II compliance. Measuable Goal: Update odinance as needed to comply with NPDES Phase II by end of Yea 2. Maintain ecods of violations and actions taken when an illicit dischage is found. Responsible Paty: The City of Medfod - Public Woks Diecto. 4.3 Detect and Addess Non-Stomwate Dischages [Regional Guide Section 4.3.3] An Illicit Dischage Plan will be pepaed as outlined in the Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide. This will include a pocedue fo the inspection and detection of illicit dischages. The following components will be included in the plan: 1. Identification of pioity aeas fo assessment 2. Field assessment activities 3. Routine schedule fo system inspection 4. Chaacteization of any dischages found 5. Pocedues to tace an illicit dischage 6. Pocedues to emove an illicit dischage Cuently the city does not have a poactive illicit dischage detection pogam. Illicit dischages ae investigated as necessay; this includes when thee is a complaint o if an illicit dischage is found duing maintenance activities. City cews look fo illicit dischage as a pat of thei outine maintenance. The City of Medfod Cuently has a video tuck that is being used to develop a visual ecod of the sanitay pipes thoughout the City. It is the City s plan to use this tuck to develop a video ecod of stom pipes. The schedule will be to stat with citical aeas in yea thee of the pogam. Mach 7,

16 City of Medfod, Oegon Medfod city codes and povide the City with egulations to emove illicit dischages if detected. Schedule & Completion Date: The Illicit Dischage Plan will be developed in yea 3 of the 5-yea pogam. Geneal inspection fo dy weathe flow will continue until this plan is developed. Measuable Goal: Implement the pogam by the end of pemit yea 3 Responsible Paty: The City of Medfod - Public Woks Diecto. 4.4 Conduct Field Inspections [Regional Guide Section 4.3.4] This activity is simply implementing the Illicit Dischage Plan developed unde Section 4.3 of this submittal. The plan will develop a schedule and epoting pocedues to be used when conducting these inspections. The outline of this plan can be found in the Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide. At a minimum each outfall shall be inspected on a 3 yea otation. Appopiate actions will be taken to detemine the souce of any illicit dischages found duing the inspections. The city has a video tuck which can be used to help tace down dy weathe flows in the stom system. Schedule & Completion Date: The Illicit Dischage Plan will be developed in yea thee of the 5-yea pogam. Geneal inspection fo dy weathe flow will continue until this plan is developed. Inspection and epoting along with stating a cycle to insue all outfalls ae included in the inspection otation and will stat in yea fou following the development of the plan. Measuable Goal: Continue cuent inspection pocess until detection plan with inspection otation is developed. Following development of the Illicit Dischage Plan is developed begin implementing the plan. Responsible Paty: The City of Medfod - Public Woks Diecto. 4.5 Spill Response Plan [Regional Guide Section 4.3.5] Medfod cuently has a Spill Response Plan. The plan includes cleanup of public spill and epoting to the Oegon Emegency Response System (OERS). The city has a tuck dedicated to spill cleanup. Schedule & Completion Date: Medfod will continue to follow the Spill Response Plan. Measuable Goal: Maintain ecods of all spill and clean up pocedues. Responsible Paty: The City of Medfod - Public Woks Diecto. 11 Mach 7, 2004

17 Stomwate Management Pogam (SWMP) 4.6 Plan fo Enfocement Actions [Regional Guide Section 4.3.6] Enfocement action fo illicit dischage violation is pesented in Sections though of the Medfod s City Code and in section Schedule & Completion Date: An enfocement plan has been developed and adopted in Medfod. Measuable Goal: Enfocements will be documented. All ecods will be epoted annually. Responsible Paty: The City of Medfod - Public Woks Diecto. 4.7 Tain Municipal Staff on Spill and Illicit Dischage BMPs [Regional Guide Section 4.3.7] Once the above items ae completed elevant municipal staff will be tained on the pope BMPs to use fo spill esponse and illicit dischage detection and emoval. The staff taining will occu in combination with taining fo Pollution Pevention. Refeshe taining will update staff on changes to the pocedues as needed. Schedule & Completion Date: The taining of staff will begin in yea one with efeshe couses and couses fo new staff conducted annually. Selected staff will go to egional taining classes and develop a pogam to tain all staff within the City cews. Measuable Goal: The numbe of staff time spent in class along with class subjects will be documented and epoted annually. Responsible Paty: The City of Medfod - Public Woks Diecto. Mach 7,

18 City of Medfod, Oegon 5.0 CONSTRUCTION SITE STORMWATER RUNOFF CONTROL PROGRAM In ode to meet egulations unde 40 CFR (b)(4) the City of Medfod will develop, implement, and enfoce a pogam to educe pollutants in any stomwate unoff fom constuction activities. The egulations coveing this activity will be pat of the oveall City stomwate odinance being developed in the fist yea of the 5-yea pogam. The size of the constuction activity coveed by the odinance will be detemined duing the odinance development. Meetings with City Council howeve, will cove, at a minimum, constuction activity of 1-ace o lage. The following pesents the equiements fo the pogam, how they ae being achieved and the implementation schedule. TABLE 5-1. CONSTRUCTION SITE STORMWATER RUNOFF CONTROL PROGRAM Regional Cuent Pemit Yea BMP Activity / Desciption Activity? Activity? Develop & Adopt Stomwate Odinance No Patial Develop Regional Eosion Contol Manual (o adopt state o othe manual) No No Develop Expetise in Review & Inspection (Staff Taining) No No Taining fo Contactos and Developes Possibly No Review Eosion Contol Plans No No Receive Infomation fom Public No No Inspect Constuction Sites No No Infomation Bochues fo Contactos Yes No Activity scheduled fo pemit yea No activity scheduled fo pemit yea 5.1 Adopt an Eosion and Sediment Contol Odinance [Regional Guide Section 5.3.1] Medfod will develop an odinance which will include constuction site unoff fo constuction pojects distubing at least 1 ace. The odinance will equie that constuction sites comply with eosion and sediment contol equiements in any Design Manuals o Standads adopted by the City of Medfod. The odinance will be pepaed as outlined in the Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide. The odinance will also addess the contol of dust fom constuction sites. City Code 6.361, which pohibits tack-out onto city steets, is the only city odinance at this time which specifies eosion contol pactices. Medfod City Code Section 6.361: No peson shall dive o move any vehicle that tacks o deposits mud, dit o debis upon the suface of any steet, alley, sidewalk o othe public way. 13 Mach 7, 2004

19 Stomwate Management Pogam (SWMP) Schedule & Completion Date: The stomwate odinance is scheduled to be updated in the fist yea and adopted in the second yea of the five yea pogam. Measuable Goal: Adopt Odinance and Design Manual by the end of pemit yea 2 Responsible Paty: The City of Medfod - Public Woks Diecto. 5.2 Tain Plan Reviewes and Field Inspectos [Regional Guide Section 5.3.2] Medfod will tain City staff esponsible fo eviewing plans and inspecting constuction sites to ensue that eosion and sediment contol BMPs ae popely installed and maintained. If possible, taining will be coodinated with taining on post-constuction stomwate management. Refeshe taining will update staff on changes to the pocedues as needed. Medfod may paticipate in a egional taining pogam. This might include taining pogams by DEQ and RVCOG. Schedule & Completion Date: Tain plan eviewes and field inspecto by the end of pemit yea 2 Measuable Goal: The numbe of hous spent in class along with class subjects will be documented and epoted annually. Responsible Paty: City of Medfod Public Woks Diecto. 5.3 Review Site Plans fo Eosion and Sediment Contols [Regional Guide Section 5.3.3] Once a stomwate odinance is adopted fo Medfod, constuction site plans will be eviewed to ensue they ae in compliance with local odinances and stomwate management manuals. Plans will also be eviewed to fo appopiate use of eosion and sediment BMPs as well as post-constuction contols. Schedule & Completion Date: Stat eviewing site plans fo eosion contol beginning in yea 3. This will allow development of the stomwate odinance and taining of staff. Until that time the 1200-C pemit pocess administeed by DEQ will be used to eview and contol constuction unoff in Medfod. Measuable Goal: Once this effot has stated City staff will monito the numbe of pemit eviews, the numbe of on-site inspections, and the numbe of on-site evisions equied. If enfocement is equied this will also be ecoded. All ecods will be epoted annually. Responsible Paty: DEQ fo fist two yeas; City of Medfod Public Woks Diecto beginning in Yea 3. Mach 7,

20 City of Medfod, Oegon 5.4 Receive Infomation fom Public [Regional Guide Section 5.3.4] On bochues, pemit applications and othe publications the phone numbe of the City s Public Woks Depatment will be given to allow the public to epot complaints and/o comments fom the geneal public egading constuction site unoff. These comments and follow up activities will be monitoed intenally by City Staff. The City s constuction inspecto will eceive infomation on the complaint by the end of the day and will be esponsible fo following up on each complaint within 2 days. The phone numbe will be published in the local phone book, in stomwate bochues, and on the RVCOG stomwate website. Schedule & Completion Date: All new Eosion Contol Publications will include the phone numbe fo complaints. Measuable Goal: Recod the numbe of complaints eceived and handled, and submit with the annual epot. Responsible Paty: The City of Medfod - Public Woks Diecto. 5.5 Inspect Constuction Sites [Regional Guide Section 5.3.5] All constuction sites which ae equied to submit site plans fo eosion and sediment contol will be inspected to ensue that the selected BMPs ae installed and maintained coectly. Site plans must also eflect changes made on-site afte the plans wee eviewed. The fequency of inspection will be detemined based on the complexity of the poject and the pioitization citeia pesented in the Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide. Each constuction site shall be inspected at least once. Schedule & Completion Date: Inspection will stat in yea 3 of the pogam. Measuable Goal: Recods of the inspections and any follow-up wok will be kept and submitted annually. Responsible Paty: The City of Medfod - Public Woks Diecto. 5.6 Povide Infomation on Taining fo Constuction Opeatos [Regional Guide Section 5.3.6] A bochue on constuction site eosion contol and post constuction contols will be pepaed and distibuted (see Section 2.3). This will include bief desciptions of methods, souces of infomation fo eosion contol methods including DEQ s manual and web sites. The bochue will also include infomation on taining available fo local constuction opeatos. The taining will be eithe by DEQ as pat of thei eosion contol manual o lead by RVCOG and paid fo by the membes of the SWAT. 15 Mach 7, 2004

21 Stomwate Management Pogam (SWMP) Schedule & Completion Date: Develop Eosion Contol bochue by yea 2. Schedule a class fo constuction opeato in yea fou. It is assumed the DEQ taining couses will be enough in yea one though thee. Measuable Goal: Document the distibution of the eosion contol bochue and the scheduled classes along with attendance and submit with the annual epot. Responsible Paty: City of Medfod Public Woks Diecto. Mach 7,

22 City of Medfod, Oegon 6.0 POST-CONSTRUCTION STORMWATER MANAGEMENT PROGRAM In ode to meet egulations unde 40 CFR (b)(5) the City of Medfod is cuently developing stomwate detention equiements fo development within the city. The following pesents the equiements fo the pogam, how they ae being achieved, and the implementation schedule. BMP Activity / Desciption TABLE 6-1. POST-CONSTRUCTION STORMWATER MANAGEMENT PROGRAM Regional Activity? Develop & Adopt Stomwate Odinance No Patial Develop (o adopt existing) Regional Design Manual [opt. each Juisdiction Develop Manual] Develop Expetise in Review & Inspection (Staff Taining) Taining fo Local Enginees and Developes Review of Site Plans and Inspection fo Post-Constuction BMPs Activity scheduled fo pemit yea No activity scheduled fo pemit yea 6.1 Odinance Requiing Post-Constuction Contol [Regional Guide Section 6.3.1] No No Yes Pemit Yea Cuent Activity? Medfod is in the pocess of adopting an odinance fo post-constuction contol. The daft stomwate detention facilities odinance specifies the detention facility equiements and the opeations and maintenance equiements. It is poposed that the cities land and site development codes be evised to equie stomwate facilities fo new steets and any development ceating o adding 4,000 sq. ft. of moe of impevious suface. A one lot single family esidential poject would be exempt. Post-development dischage would be limited to that of the pedevelopment ate of flow fom the 10 yea stom event o less, with the exception of development in the Midway and Elk Ceek dainage basins, which postdevelopment stomwate flows to a maximum dischage of 0.25 cubic feet pe second (cfs) pe ace of developed aeas fo the 10 yea stom event. Medfod cuently has post-constuction contol equiements fo Elk Ceek and Midway Dainage Basins, pe the Compehensive Medfod Aea Dainage Maste Plan as adopted by the Medfod City Council in These equiements state that unoff fom any new commecial o industial development within eithe the Elk Ceek o Midway Dainage Basins, shall limit the peak unoff ates duing the design stoms to 0.25 cfs pe ace of new o edevelopment. Medfod equies an enginee egisteed in the State of Oegon shall pepae the design. This plan shall show the entie poject site with sufficient spot elevations to detemine the diection of unoff to the stom dainage system as well as elevations on the dainage system. All oof dains and foundation dains shall be connected No No No No No 17 Mach 7, 2004

23 Stomwate Management Pogam (SWMP) diectly to a stom dain system. Upon completion of the poject, the applicant s design enginee shall cetify that the constuction of the contolled stomwate elease dainage system was constucted pe plan. Medfod is cuently woking with the City of Ashland to develop Engineeing Development standads, which will include equiements fo post development unoff contol. The City cuently does not equie stomwate quality teatment of developments. Schedule & Completion Date: The stomwate odinance coveing both stomwate quality and quantity is scheduled to be pepaed in the fist yea and adopted in the second yea of the five yea pogam. Measuable Goal: Adopt odinance by the end of pemit yea 2 Responsible Paty: The City of Medfod - Public Woks Diecto. 6.2 Develop a Plan to Addess Post-Constuction Runoff [Regional Guide Section 6.3.2] Medfod will eithe develop a stomwate design manual o wok with local juisdictions to adopt a egional design manual fo addessing stomwate issues. The manual will include constuction site eosion and sediment contols as well as design guidelines fo postconstuction wate quality BMPs and unoff quantity contol. The manual will eithe be newly developed o by adoption of an existing manual. Medfod has ageed to wok with the egional SWAT in an attempt to bing egional consistency with development standads and unoff contol standads. Taining fo local enginees and developes will be available egionally, o locally, depending upon how the manual is developed. Schedule & Completion Date: Implement plan by the end of pemit yea thee Measuable Goal: The adoption of the odinance by yea two and design manual by yea thee will be the measuable goals fo this activity. Responsible Paty: The City of Medfod - Public Woks Diecto. 6.3 Taining fo Plan Reviewes and Field Inspectos [Regional Guide Section 6.3.3] Once an updated odinance is in place, Medfod will tain City staff esponsible fo eviewing plans and inspecting constuction sites to ensue that appopiate postconstuction stomwate management is employed. If possible, taining will be coodinated with taining on eosion and sediment contol BMPs. Refeshe taining will update staff on changes to the pocedues as needed. Schedule & Completion Date: The taining of staff will begin in yea one with efeshe couses and couses fo new staff conducted annually. Selected staff will go to egional taining classes and develop a pogam to tain all staff within the city cews. Mach 7,

24 City of Medfod, Oegon Measuable Goal: The numbe of hous spent in taining, along with subjects, will be documented and epoted annually. Responsible Paty: The City of Medfod - Public Woks Diecto. 6.4 Site Plan Review fo Post-Constuction BMPs [Regional Guide Section 6.3.4] Once the updated stomwate odinance is adopted and design citeia o a design manual is developed, the City staff will stat eviewing pemit dawings fo compliance with local odinances and stomwate management manuals. Plans will also be eviewed fo appopiate post-constuction contols as well as eosion and sediment BMPs. Schedule & Completion Date: Stat eviewing site plans fo post constuction BMPs beginning in yea 3. This will allow development of the stomwate odinance and taining of staff. Measuable Goal: Once this effot has stated City staff will monito the numbe of plan eviews, the numbe of on-site inspections, and the numbe of on-site evisions equied. If enfocement is equied this will also be ecoded. All ecods will be epoted annually. Responsible Paty: The City of Medfod - Public Woks Diecto. 6.5 Inspections of Stuctual Post-Constuction BMPs [Regional Guide Section 6.3.5] The poposed post-constuction detention odinance includes equiements fo opeation and maintenance. An Opeations and Maintenance Plan (O&M Plan) will be equied pio to obtaining a building pemit o appoval to constuction the stomwate detention facilities. Once the facility is constucted, the enginee will be equied to file a constuction inspection epot with the city pio to final acceptance. Schedule & Completion Date: Requie that public and pivate development with post constuction BMPs include an opeations and maintenance pogam beginning in yea 3. This will allow development of the stomwate odinance and taining of staff. Measuable Goal: Once this effot has stated, City staff will keep ecods of the numbe of BMPs installed, inspection schedules, and pocedues. The city will also maintain copies of the inspection epots fo each facility. If enfocement is equied this will also be ecoded. All ecods will be epoted annually. Responsible Paty: The City of Medfod - Public Woks Diecto. 19 Mach 7, 2004

25 Stomwate Management Pogam (SWMP) 7.0 POLLUTION PREVENTION IN MUNICIPAL OPERATIONS PROGRAM In ode to meet egulations unde 40 CFR (b)(6) the City of Medfod will develop a fomal opeations and maintenance plan. The following pesents the equiements fo the plan, how they ae being achieved and the implementation schedule. Basically, most City opeations aleady meet the equiements fo NPDES, and the O&M Plan will be a documentation of existing activities with mino modifications to educe pollutants. TABLE 7-1. POLLUTION PREVENTION IN MUNICIPAL OPERATIONS PROGRAM Regional Cuent Pemit Yea BMP Activity / Desciption Activity? Activity? Develop O&M Plan No Patial Develop Pak/Open Space O&M Guide No Patial Vehicle/Equipment Washing BMPs No Patial New Constuction and Land Distubance No Patial Dust Contol BMPs No Yes Stomwate System Maintenance No Yes Open Channel/Stuctual BMPs No Patial Deicing BMPs (i.e. sanding and sweeping) No Yes Flood Management BMPs No Patial Taining fo Employees on O&M No Yes Activity scheduled fo pemit yea No activity scheduled fo pemit yea 7.1 Opeation and Maintenance Plan [Regional Guide Section 7.3.1] The City of Medfod will eview existing Public Woks O&M activities and document the activities in an Public Woks Opeation and Maintenance (O&M) Plan that will addess municipal activities. The O&M Plan shall include the following: Desciptions of the equied maintenance activities and pocedues as it elates to existing municipal opeations and pogams A list of esponsible depatment and pesonnel fo each activity A schedule of activities, including maintenance, inspections & epots. Review use of hebicides and pesticide by the Public Woks Depatment and maintain ecods when applied. The following sections discuss the paticula maintenance activities to be addess is futhe detail. Pactices fo each maintenance activities will be pepaed as outlined in the Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide. Mach 7,

26 City of Medfod, Oegon Schedule & Completion Date: Pepae Public Woks O&M plan in yea one and implement the plan by the end of pemit yea 2 Measuable Goal: Plan pepaation and ecods of Public Woks use of hebicide and pesticide ae the measuable goals fo this activity. Responsible Paty: The City of Medfod - Public Woks Diecto. 7.2 Pak and Open Space Maintenance [Regional Guide Section 7.3.2] The Public Woks Depatment will wok with the City of Medfod s Paks Depatment to implement many of the BMP s developed unde activity 7.1 above. These pactices include educing and monitoing fetilize, hebicide and pesticide application; vegetation maintenance and disposal; and tash management. Schedule & Completion Date: Schedule a meeting with the Paks Depatment in yea 2 to discuss existing Paks Depatment activities and potential modifications to pak activities. Measuable Goal: No measuable goals fo this activity. Responsible Paty: The City of Medfod - Public Woks Diecto. 7.3 Vehicle and Equipment Washing [Regional Guide Section 7.3.3] Medfod will implement vehicle and equipment washing pactices as developed in the O&M Plan. All publicly owned vehicles shall be washed in a self contained coveed building o a designated wash aea that meets the equied citeia as pesented in the Rogue Valley Regional NPDES Phase II Stomwate Pogam Guide. Medfod is scheduled to constuct a vehicle and equipment washing facility duing Schedule & Completion Date: Medfod is scheduled to constuct a vehicle and equipment washing facility in Measuable Goal: Complete constuction by the end of Responsible Paty: The City of Medfod - Public Woks Diecto. 7.4 New Constuction and Land Distubances [Regional Guide Section 7.3.4] Medfod cuently equies that BMPs ae followed fo public constuction pojects. This pactice will continue once the O&M Plan is developed. Public constuction pojects will be equied to follow same equiements and pocedues as pivate development. Constuction will be equied to following local odinances and stomwate management manuals. 21 Mach 7, 2004

27 Stomwate Management Pogam (SWMP) Schedule & Completion Date: Medfod will continue to eview public constuction pojects fo eosion and sediment contol. Measuable Goal: City staff will monito the numbe of plan eviews, the numbe of onsite inspections, and the numbe of on-site evisions equied. All ecods will be epoted annually. Responsible Paty: The City of Medfod - Public Woks Diecto. 7.5 Dust Contol Pactices [Regional Guide Section 7.3.5] Eosion contol and dust contol is cuently equied fo all public constuction pojects as pat of the bid documents and specifications. Odinances to include all pivate constuction pojects will be developed unde Section 5.1. Schedule & Completion Date: Implement pactices by the end of pemit yea 3. Measuable Goal: No sepaate measuable goal fo this activity. Responsible Paty: The City of Medfod - Public Woks Diecto. 7.6 Stomwate System Maintenance [Regional Guide Section 7.3.6] Medfod will continue to implement thei existing stomwate system maintenance schedule. The pogam will be document in the O&M Plan. The following summaizes the existing activities and schedule fo maintenance pefomed on the stom dain system in Medfod: Stom Line Cleaning 5 yea otation Culvets 5 yea otation Dainage Ditches as needed, some cleaned each yea Ceeks annual vegetation maintenance & debis emoval (8 miles/yea) Inlets 5 yea otation and as needed Tash acks weekly in winte Manholes 5 yea otation Schedule & Completion Date: Medfod will continue cuent stom dain system maintenance activities. Measuable Goal: Maintain ecods of stom dain system cleaning and maintenance activities and submit in annual epot. Waste disposal opeations will be included in the ecods. Responsible Paty: The City of Medfod - Public Woks Diecto. Mach 7,

28 City of Medfod, Oegon 7.7 Open Channels and Stuctual Stomwate Contols [Regional Guide Section ] Medfod will implement open channel and stuctual stomwate contol maintenance as developed in the O&M Plan. Open channel and stuctual stomwate contols will be inspected and maintained egulaly. Waste fom the stomwate contols will be disposed of popely, and ecods of cleaning and maintenance will be kept. Medfod cuently conducts annual vegetation maintenance and debis emoval in the ceek. Schedule & Completion Date: Implement pactices by the end of pemit yea 3 Measuable Goal: Maintain ecods of maintenance activities and submit in annual epot. Responsible Paty: The City of Medfod - Public Woks Diecto. 7.8 Road, Highway and Paking Lot Maintenance [Regional Guide Section ] The City of Medfod s Road Depatment cuently follows pollution pevention/good housekeeping pactices with thei sanding and steet sweeping. Once the O&M Plan is adopted, the Road Depatment will continue to following pactices developed in the Plan fo snow emoval. Medfod contacts to the Oegon Depatment of Tanspotation (ODOT) fo deicing activities, deicing only occus on ovepasses. All sanding mateials ae kept in a concete bin specifically fo that pupose. The city conducts steet sweeping on all cub and gutte steets evey 3-4 weeks with a egeneative type steet sweepe. Steets ae also swept afte steets ae sanded and the gavel is no longe needed on the oads. Schedule & Completion Date: Medfod will continue to follow these pocedues once the O&M Plan is adopted. Measuable Goal: Maintain ecods of maintenance activities and submit in annual epot. Responsible Paty: The City of Medfod - Public Woks Diecto. 7.9 Flood Management Pojects [Regional Guide Section ] Medfod will implement flood management poject evaluation and eview pocedues as developed in the O&M Plan. All new flood management pojects will include wate quality consideations. Pioity existing flood management pojects will be identified and e-evaluated with wate quality consideations. 23 Mach 7, 2004

29 Stomwate Management Pogam (SWMP) A Stomwate Management Plan is cuently being pepaed fo Medfod. This document will include an evaluation of the CIP plan pesented in the Septembe 1996 Compehensive Medfod Aea Dainage Maste Plan. The plan included ecommendations fo flood management pojects that include wate quality consideations. Schedule & Completion Date: The Stomwate Management Plan will be completed and adopted in pemit yea 1. Measuable Goal: Implement the Stomwate Management Plan once it is adopted. Responsible Paty: The City of Medfod - Public Woks Diecto Employee Taining on O&M Implementation [Regional Guide Section 7.3.7] Once the above items ae completed, elevant municipal city staff will be tained on opeation and maintenance pocedues as descibed in the O&M Manual. The staff taining will occu in combination with taining fo Illicit Dischage and spill plan. Taining will be geneal fo all municipal employees and moe specific taining will be included fo specific pogam aeas. Refeshe taining will update staff on changes to the pocedues as needed. An eosion contol taining was held fo stom and sewe cews in the Fall of Schedule & Completion Date: The taining of staff will begin in yea thee with efeshe couses and couses fo new staff conducted annually. Measuable Goal: The numbe of hous spent in taining, along with subjects, will be documented and epoted annually. Responsible Paty: The City of Medfod - Public Woks Diecto. Mach 7,

30 City of Medfod, Oegon 8.0 EVALUATION AND ASSESSMENT In pepaation fo the annual epoting equiements the City of Medfod will document pogam implementation and pogess. The Measuable Goals listed in this Pogam ae initial goals. The city is woking towads meeting those equiements fo the Phase II pemit that ae not cuently being implemented. The Measuable Goals in this Pogam eflect the implementation schedule of each of the BMPs. Once the BMP has been implemented the city will evise the Measuable Goal fo that equiement to tack the pogess of implementation, effectiveness o envionmental impovement as appopiate. 25 Mach 7, 2004

31 APPENDIX A. STORM SEWER SYSTEM MAP City of Medfod, Oegon Stomwate Management Pogam (SWMP) to Meet NPDES Phase II MS4 Compliance Five-Yea Pogam fo Mach Mach 2004

32 Ñ ÊÚ % % Ú Ê Midway Dainage $ $ $ $ $ $ $ $ $ Ñ $ % Lone Pine Ceek Lazy Ceek 194 $ Legend Bea Ceek East % $ $ Ñ 72 Ñ Ñ Bea Ceek West % Elk Ceek % Ú Ê Ú Ê Ñ Wate Quality Monitoing Locations ÚÊ Routine sites % Stom Dain sites Ñ TMDL sites $T Agicultue Sites Stomdain Lines Phase II Juisdictional Bounday NPDES Pemit Sites Taxlots 6541 S Wate Bodies Steets Ú5327 Ê UGB Lason Ceek Basin Divides Stom System Outfalls City Bounday N W S 4854 E Bea Ceek South Cooked Ceek Feet City of Medfod Stom System Mapping

NICKEL RELEASE REGULATIONS, EN 1811:2011 WHAT S NEW?

NICKEL RELEASE REGULATIONS, EN 1811:2011 WHAT S NEW? NICKEL RELEASE REGULATIONS, EN 1811:2011 WHAT S NEW? BACKGROUND: EN 1811 is the intenationally ecognised test method which was devised almost 12 yeas ago to detemine the ate of nickel elease fom jewelley,

More information

Optimal Design of Smart Mobile Terminal Antennas for Wireless Communication and Computing Systems

Optimal Design of Smart Mobile Terminal Antennas for Wireless Communication and Computing Systems Optimal Design of Smat Mobile Teminal Antennas fo Wieless Communication and Computing Systems Autho Lu, Junwei, Yang, Shiyou Published 2007 Confeence Title 2007 4th Intenational Symposium on Electomagnetic

More information

Updated sheet quantities Clarified security camera information and existing network rack approximate location Added and additional light pole

Updated sheet quantities Clarified security camera information and existing network rack approximate location Added and additional light pole ADDENDUM NO. DATE: November 7, 18 POJECT: OWNE: BID DATE: Marquette High School Parking Lot Improvements Marquette Area Public Schools Wednesday, December 5, 18 at 1: a.m. The following shall be incorporated

More information

EXISTING RIGHT-IN/RIGHT-OUT ACCESS CONNECTION TO REMAIN LOCATION TO BE DETERMINED DURING PERMITTING PROCESS) PARKING ENVELOPE

EXISTING RIGHT-IN/RIGHT-OUT ACCESS CONNECTION TO REMAIN LOCATION TO BE DETERMINED DURING PERMITTING PROCESS) PARKING ENVELOPE 223 GAHAM STEET, NC 2822 74333325 WWWLADESIGNCOM FULL MOVEMENT ACCESS EXF ( 8 PL ANTI NG S 6 SID 4 S ETBA CK F LK OM B ACK PUBL IC OAD /W) IGHT-IN/IGHT-OUT ACCESS CONNECTION TO TIP EWA OD MID-BLOCK COSSING

More information

AMERICAN NATIONAL STANDARD

AMERICAN NATIONAL STANDARD ENGINEERING COMMITTEE Inteface Pactices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 48-1 2015 Test Method fo Measuing Shielding Effectiveness of Passive and Active Devices Using a GTEM Cell NOTICE

More information

Spectrum Sharing between Public Safety and Commercial Users in 4G-LTE

Spectrum Sharing between Public Safety and Commercial Users in 4G-LTE 1 Spectum Shaing between Public Safety and Commecial Uses in 4G-LTE Haya Shajaiah, Ahmed Abdel-Hadi and Chales Clancy Badley Depatment of Electical and Compute Engineeing Viginia Tech, Alington, VA, 22203,

More information

GRADE 6 FLORIDA. Division WORKSHEETS

GRADE 6 FLORIDA. Division WORKSHEETS GRADE 6 FLORIDA Division WORKSHEETS Mental division stategies invese opeations As we know, multiplication and division ae invese opeations. 8 9 = 7 This means they do the evese of each othe: 7 9 = 8 We

More information

Statement of Works Data Template Version: 4.0 Date:

Statement of Works Data Template Version: 4.0 Date: Statement of Woks Data Template Vesion: 4.0 Date: 16.08.17 This Statement of Woks (SoW) Data Template is to be completed by Distibution Netwok Opeatos (DNOs) in ode to povide National Gid the equied data

More information

Gas Tube Arresters. Certifications, Device Selection Purpose, Operation, Installation Part Number Construction, Part Marking. General Information

Gas Tube Arresters. Certifications, Device Selection Purpose, Operation, Installation Part Number Construction, Part Marking. General Information Gas Tube Aestes The Potection Poducts Goup of Wold Poducts Inc., specializing in potection poducts fo AC and DC cicuits, is poud to featue a full line of Gas Tube Aestes. Ceamic Gas Tube Aestes povide

More information

1 Performance and Cost

1 Performance and Cost Pefomance and Cost Analysis and Reseach of Ai-Cooled Using Small Diamete Coppe Tubes Wu Yang, Li Changsheng and Deng Bin Abstact Replacing coppe tubes with aluminum tubes and using coppe tubes with smalle

More information

IEEE Broadband Wireless Access Working Group < Modifications to the Feedback Methodologies in UL Sounding

IEEE Broadband Wireless Access Working Group <  Modifications to the Feedback Methodologies in UL Sounding Poject Title Date Submitted IEEE 802.16 Boadband Wieless Access Woking Goup Modifications to the Feedback Methodologies in UL Sounding 2008-01-14 Souce(s) Fed Vook, Jeff Zhuang,

More information

Figure Geometry for Computing the Antenna Parameters.

Figure Geometry for Computing the Antenna Parameters. Spheical Coodinate Systems Definitions Figue 1.2.1 Geomety fo Computing the Antenna Paametes. Antenna Radiation Patten: The distibution of adiated enegy fom an antenna ove a suface of constant adius centeed

More information

Efficient Power Control for Broadcast in Wireless Communication Systems

Efficient Power Control for Broadcast in Wireless Communication Systems Efficient Powe Contol fo Boadcast in Wieless Communication Systems A. T. Chonopoulos Compute Science Depatment Univesity of Texas at San Antonio San Antonio, TX Email:atc@cs.utsa.edu P. Cotae Depatment

More information

ScienceDirect. Simplified Generation of Electromagnetic Field within EMC Immunity Test Area

ScienceDirect. Simplified Generation of Electromagnetic Field within EMC Immunity Test Area Available online at www.sciencediect.com ScienceDiect Pocedia Engineeing 69 ( 014 ) 7 34 4th DAAAM Intenational Symposium on Intelligent Manufactuing and Automation, 013 Simplified Geneation of Electomagnetic

More information

Noise Attenuation Due to Vegetation

Noise Attenuation Due to Vegetation Noise Attenuation Due to Vegetation Vasile BACRIA Politehnica Univesity of Timisoaa, Bd. M.Viteazu,1, 300222 Timisoaa, bacia@mec.upt.o Nicolae HERISANU Politehnica Univesity of Timisoaa, Bd. M. Viteazu,

More information

CS61C : Machine Structures

CS61C : Machine Structures inst.eecs.bekeley.edu/~cs61c CS61C : Machine Stuctues Lectue 29 Intoduction to Pipelined Execution Lectue PSOE Dan Gacia www.cs.bekeley.edu/~ddgacia Bionic Eyes let blind see! Johns Hopkins eseaches have

More information

nat i o n a l s t r at e g y for co u n t er i n g b i o lo g i ca l t h r e at s

nat i o n a l s t r at e g y for co u n t er i n g b i o lo g i ca l t h r e at s nat i o n a l s t at e g y fo co u n t e i n g b i o lo g i ca l t h e at s national secuity council n ov e M b e 2 0 0 9 THE WHITE HOUSE WASHINGTON Novembe 23,2009 My Fellow Ameicans, Since the dawn of

More information

E /11/2018 AA

E /11/2018 AA B-3 CU 1 CU 2 CU 3 EVISIONS BY GFI,WP GFI AHU 1 AHU 2 AHU 3 GFI,WP MECH. WOMEN'S 6 MEN'S 7 OFFICE 3 8 TEACE 14 OFFICE 4 9 TC 10 PNL 'A' PNL 'B' A-31 GFI A-33 F A-30 A-28 OFFICE 5 11 GFI A-35 OFFICE 2 5

More information

HYBRID FUZZY PD CONTROL OF TEMPERATURE OF COLD STORAGE WITH PLC

HYBRID FUZZY PD CONTROL OF TEMPERATURE OF COLD STORAGE WITH PLC Jounal of Theoetical and Applied Infomation Technology 28 th Febuay 2013. Vol. 48 No.3 2005-2013 JATIT & LLS. All ights eseved. ISSN: 1992-8645 www.jatit.og E-ISSN: 1817-3195 HYBRID FUZZY PD CONTROL OF

More information

IAS 2.4. Year 12 Mathematics. Contents. Trigonometric Relationships. ulake Ltd. Robert Lakeland & Carl Nugent

IAS 2.4. Year 12 Mathematics. Contents. Trigonometric Relationships. ulake Ltd. Robert Lakeland & Carl Nugent Yea 12 Mathematics IS 2.4 Tigonometic Relationships Robet Lakeland & al Nugent ontents chievement Standad.................................................. 2 icula Measue.......................................................

More information

Experimental Investigation of Influence on Non-destructive Testing by Form of Eddy Current Sensor Probe

Experimental Investigation of Influence on Non-destructive Testing by Form of Eddy Current Sensor Probe Expeimental Investigation of Influence on Non-destuctive Testing by Fom of Eddy Cuent Senso Pobe Fengyun Xie * and Jihui Zhou School of Mechanical and Electonical Engineeing, East China Jiaotong Univesity,

More information

Wireless Communication (Subject Code: 7EC3)

Wireless Communication (Subject Code: 7EC3) COMPUCOM INSTITUTE OF TECHNOLOGY & MANAGEMENT, JAIPUR (DEPARTMENT OF ELECTRONICS & COMMUNICATION) Notes Wieless Communication (Subject Code: 7EC3) Pepaed By: LOKESH KUMAR ARYA Class: B. Tech. IV Yea, VII

More information

Diagnosis method of radiated emission from battery management system for electric vehicle

Diagnosis method of radiated emission from battery management system for electric vehicle Available online at www.sciencediect.com ScienceDiect Enegy Pocedia 88 (2016 ) 662 667 CUE2015-Applied Enegy Symposium and Summit 2015: Low cabon cities and uban enegy systems Diagnosis method of adiated

More information

Design recommendations

Design recommendations Wate & Wastewate Design ecommendations fo pump stations with vetically installed Flygt axial- and mixed flow pumps Contents Flygt PL and LL pump intoduction 4 Geneal consideations fo pumping station design

More information

Investigation. Name: a About how long would the threaded rod need to be if the jack is to be stored with

Investigation. Name: a About how long would the threaded rod need to be if the jack is to be stored with Think Unit bout 6 This Lesson Situation 1 Investigation 1 Name: Think about the design and function of this automobile jack. Use the uto Jack custom tool to test ou ideas. a bout how long would the theaded

More information

N2-1. The Voltage Source. V = ε ri. The Current Source

N2-1. The Voltage Source. V = ε ri. The Current Source DC Cicuit nalysis The simplest cicuits to undestand and analyze ae those that cay diect cuent (DC). n this note we continue ou study of DC cicuits with the topics of DC voltage and cuent souces, the idea

More information

ABSTRACTT FFT FFT-' Proc. of SPIE Vol U-1

ABSTRACTT FFT FFT-' Proc. of SPIE Vol U-1 Phase econstuction stategies in phase-locking system based on multi-apetue wave font sensos P.A. Semenov, S.D. Pol skikh Shvabe-Reseach, Moscow, Russian Fedeation; e-mail: pite@bk.u ABSTRACTT System of

More information

THE UNIVERSITY OF NEW SOUTH WALES. School of Electrical Engineering & Telecommunications

THE UNIVERSITY OF NEW SOUTH WALES. School of Electrical Engineering & Telecommunications THE UNIESITY OF NEW SOUTH WAES School of Electical Engineeing & Telecommunications EE97 POWE EETONIS FO ENEWABE AND DISTIBUTED GENEATION EXAMINATION Session (Supplementay Exam) TIME AOWED: 3 hous TOTA

More information

Synopsis of Technical Report: Designing and Specifying Aspheres for Manufacturability By Jay Kumler

Synopsis of Technical Report: Designing and Specifying Aspheres for Manufacturability By Jay Kumler OPTI 51 Synopsis (Gad Requiement #1) G. Desoches Synopsis of Technical Repot: Designing and Specifying Asphees fo Manufactuability By Jay Kumle Novembe 1, 007 Reviewed by: Gead Desoches Abstact Since asphees

More information

Published in: International Journal of Material Forming. Document Version: Peer reviewed version

Published in: International Journal of Material Forming. Document Version: Peer reviewed version A Vitual Inspection Technique fo Assessing the Dimensional Accuacy of Foged Compesso Blades Using FE Modeling and CMM Inspection Makem, J., Ou, H., Amstong, C., Rennie, A., & Nikov, S. (2008). A Vitual

More information

Analysis of a Fractal Microstrip Patch Antenna

Analysis of a Fractal Microstrip Patch Antenna 124 Analysis of a Factal Micostip Patch Antenna Vibha Rani Gupta and Nisha Gupta* Bila Institute of Technology, Mesa, Ranchi-835215, Jhakhand, India. vgupta@bitmesa.ac.in, ngupta@bitmesa.ac.in Abstact-

More information

Generalized Release Planning for Product-Line Architectures

Generalized Release Planning for Product-Line Architectures Genealized Release Planning fo Poduct-Line Achitectues Louis J. M. Taboda Macquaie Gaduate School of Management, Macquaie Univesity, NSW 2109, Austalia Louis.Taboda@poCentic.com Abstact. This pape elaboates

More information

A multichannel Satellite Scheduling Algorithm

A multichannel Satellite Scheduling Algorithm A multichannel Satellite Scheduling Algoithm J.S. Gilmoe and R. Wolhute Depatment of Electonic Engineeing Univesity of Stellenbosch 7600 Stellenbosch, South Afica Email: jgilmoe@dsp.sun.ac.za, wolhute@sun.ac.za

More information

Design of A Circularly Polarized E-shaped Patch Antenna with Enhanced Bandwidth for 2.4 GHz WLAN Applications

Design of A Circularly Polarized E-shaped Patch Antenna with Enhanced Bandwidth for 2.4 GHz WLAN Applications VNU Jounal of Science: Comp. Science & Com. Eng., Vol. 31, No. 2 (2015) 1-7 Design of A Ciculaly Polaized E-shaped Patch Antenna with Enhanced Bandwidth fo 2.4 GHz WLAN Applications Hong Van Tam 1, Luong

More information

Parameters of spinning AM reticles

Parameters of spinning AM reticles Paametes of spinning AM eticles onald G. Digges, Cal E. Halfod, and Glenn D. Boeman A new method of obtaining amplitude modulation (AM) fo detemining taget location with spinning eticles is pesented. The

More information

Realistic Simulation of a Wireless Signal Propagation in an Urban Environment

Realistic Simulation of a Wireless Signal Propagation in an Urban Environment Realistic Simulation of a Wieless Signal Popagation in an Uban Envionment Keyukuma J. Patel Univesity of Southen Queensland Toowoomba, Austalia e-mail: keyupatel@ieee.og Andew Y. J. Lee Nanyang Technological

More information

WIRELESS SENSORS EMBEDDED IN CONCRETE

WIRELESS SENSORS EMBEDDED IN CONCRETE 7th Euopean Wokshop on Stuctual Health Monitoing July 8-11, 2014. La Cité, Nantes, Fance Moe Info at Open Access Database www.ndt.net/?id=17296 WIRELESS SENSORS EMBEDDED IN CONCRETE Amal Abbadi 1 Phd Student,

More information

Analysis and Implementation of LLC Burst Mode for Light Load Efficiency Improvement

Analysis and Implementation of LLC Burst Mode for Light Load Efficiency Improvement Analysis and Implementation of LLC Bust Mode fo Light Load Efficiency Impovement Bin Wang, Xiaoni Xin, Stone Wu, Hongyang Wu, Jianping Ying Delta Powe Electonics Cente 238 Minxia Road, Caolu Industy Zone,

More information

Study on Arc Envelope Grinding Process of Revolving Curved Surface Lingye Kong1, a,qiusheng Yan2,b,Yongliang Qiu1,c and Tengxiong Qiu1,d

Study on Arc Envelope Grinding Process of Revolving Curved Surface Lingye Kong1, a,qiusheng Yan2,b,Yongliang Qiu1,c and Tengxiong Qiu1,d nd Intenational Confeence on Machiney, Mateials Engineeing, Chemical Engineeing and iotechnology (MMECE 015 Study on Ac Envelope Ginding Pocess of Revolving Cuved Suface Lingye Kong1, a,qiusheng Yan,b,Yongliang

More information

B O S L E Y W A S H DETENTION BASIN

B O S L E Y W A S H DETENTION BASIN B O S L E Y W A S H DETENTION BASIN MESA COUNTY WATE DIVISION 5 WATE DISTICT 72 DAM I.D. NUMBE 720425 LIST OF DAWINGS IS CONTAINED ON SHEET 2. MANDATOY PE-BID CONFEENCE I HEEBY DECLAE THAT THESE PLANS

More information

Signal Extraction Technology

Signal Extraction Technology Extaction Technology Intoduction Masimo SET pulse oximety is a new and fundamentally distinct method of acquiing, pocessing and epoting ateial oxygen satuation and pulse ate. As illustated below, Masimo

More information

Optimised Wireless Network Using Smart Mobile Terminal Antenna (SMTA) System

Optimised Wireless Network Using Smart Mobile Terminal Antenna (SMTA) System Optimised Wieless Netwok Using Smat Mobile Teminal Antenna (SMTA) System Autho Lu, Junwei, Sciven, Ian, Wate, Wayne Published 2010 Confeence Title Poceedings of IEEE APEMC2010 DOI https://doi.og/10.1109/apemc.2010.5475858

More information

CHEVY TH350/700R AUTO TRANSMISSION TO JEEP 4.0L, ENGINE BLOCKS NEW STYLE

CHEVY TH350/700R AUTO TRANSMISSION TO JEEP 4.0L, ENGINE BLOCKS NEW STYLE Paso Robles, CA 93447 PAGE 1 OF 5 KIT CONSISTS OF: No. Qty Pat No. Desciption 1. 2 716123 GM ENGINE DOWEL PIN 2. 1 716138-F TORQUE CONVERTER ADAPTER 3. 2 716138-DB DOWEL BOLTS 4. 1 716138-PLT ADAPTER PLATE

More information

Near-field Computation and. Uncertainty Estimation using Basic. Cylindrical-Spherical Formulae

Near-field Computation and. Uncertainty Estimation using Basic. Cylindrical-Spherical Formulae Nea-field Computation and Uncetainty Estimation using Basic Cylindical-Spheical Fomulae Poject... IEC 63 Subject... Basic Nea-Field Computation Document numbe... N/A Revision... 3 Autho... F.D. du Plessis

More information

Design recommendations. for pump stations with vertically installed Flygt axial and mixed flow pumps

Design recommendations. for pump stations with vertically installed Flygt axial and mixed flow pumps esign ecommendations fo pump stations with vetically installed Flygt axial and mixed flow pumps ontents Systems Engineeing.........................................................................................

More information

Multiagent Reinforcement Learning Dynamic Spectrum Access in Cognitive Radios

Multiagent Reinforcement Learning Dynamic Spectrum Access in Cognitive Radios Sensos & Tansduces 204 by IFSA Publishing, S L http://wwwsensospotalcom Multiagent Reinfocement Leaning Dynamic Spectum Access in Cognitive Radios Wu Chun, 2 Yin Mingyong, 2 Ma Shaoliang, Jiang Hong School

More information

VLSI Implementation of Low Complexity MIMO Detection Algorithms

VLSI Implementation of Low Complexity MIMO Detection Algorithms , Impact Facto :.643 eissn : 349-000 & pissn : 394-4544 Intenational Jounal of Reseach and Applications (Ap-Jun 015 Tansactions) (6): 309-313 Intenational Confeence on Emeging Tends in Electonics & Telecommunications

More information

Comparison Between Known Propagation Models Using Least Squares Tuning Algorithm on 5.8 GHz in Amazon Region Cities

Comparison Between Known Propagation Models Using Least Squares Tuning Algorithm on 5.8 GHz in Amazon Region Cities 106 Compaison Between Known Popagation Models Using Least Squaes Tuning Algoithm on 5.8 GHz in Amazon Region Cities Buno S. L. Casto, Mácio R. Pinheio, Gevásio P. S. Cavalcante Fedeal Univesity of Paá

More information

Assignment 0/0 2 /0 8 /0 16 Version: 3.2a Last Updated: 9/20/ :29 PM Binary Ones Comp Twos Comp

Assignment 0/0 2 /0 8 /0 16 Version: 3.2a Last Updated: 9/20/ :29 PM Binary Ones Comp Twos Comp * Dynamic Memoy *Big O Notation*Stacks *Exteme Pogamming*Selection Sot*Insetion Sot*Watefall Model Sting*Aays*AayList*Client Seve*Atificial Intelligence*Inheitance*Files*Video Games*Shot cicuit evaluation*

More information

Design of an LLC Resonant Converter Using Genetic Algorithm

Design of an LLC Resonant Converter Using Genetic Algorithm Design of an LLC Resonant Convete Using Genetic Algoithm H. H. Nien, C. K. Huang, S. K. Changchien, C. H Chan Dept. of Electical Engineeing, Chienkuo Technology Univesity E-mail: nien@ctu.edu.tw Dept,

More information

Sliding Mode Control for Half-Wave Zero Current Switching Quasi-Resonant Buck Converter

Sliding Mode Control for Half-Wave Zero Current Switching Quasi-Resonant Buck Converter Sliding Mode Contol fo Half-Wave Zeo Cuent Switching Quasi-Resonant Buck Convete M. Ahmed, Student membe, IEEE, M. Kuisma, P. Silventoinen Abstact This pape focuses on the pactical implementation of sliding

More information

A New Buck-Boost DC/DC Converter of High Efficiency by Soft Switching Technique

A New Buck-Boost DC/DC Converter of High Efficiency by Soft Switching Technique A New Buck-Boost D/D onvete of High Efficiency by Soft Switching Technique Dong-Kul Kwak, Seung-Ho Lee, and Do-Young Jung Pofessional Gaduate School of Disaste Pevention, Kangwon National Univesity, 45-711,

More information

Proposal of Circuit Breaker Type Disconnector for Surge Protective Device

Proposal of Circuit Breaker Type Disconnector for Surge Protective Device Poposal of Cicuit Beake Type Disconnecto fo Suge Potective Device MASAO SHIBAYAMA, HITOSHI KIJIMA Polytechnic Univesity 2-32-1 Ogawanishi, Kodaia, Tokyo, 187-0035 JAPAN hkijima@uitec.ac.jp Abstact: - A

More information

30-BAUD PRIVATE LINE CHANNELS

30-BAUD PRIVATE LINE CHANNELS BELL SYSEM Plant Seies PRACCES SECON 312-011-101 ssue 1, July 1970 A&Co Standad 30-BAUD PRVAE LNE CHANNELS NERFACE SPECFCAON 1. GENERAL NRODUCON 1.01 he pupose of this specification is to define the inteface

More information

Design and Characterization of Conformal Microstrip Antennas Integrated into 3D Orthogonal Woven Fabrics

Design and Characterization of Conformal Microstrip Antennas Integrated into 3D Orthogonal Woven Fabrics Design and Chaacteization of Confomal Micostip Antennas Integated into 3D Othogonal Woven Fabics Xin Wang 1, Lan Yao 1, Fujun Xu 2, Dongchun Zhou 1, Yiping Qiu 1 1 College of Textiles, Donghua Univesity,

More information

Analysis of the optimized low-nonlinearity lateral effect sensing detector

Analysis of the optimized low-nonlinearity lateral effect sensing detector Jounal of hysics: Confeence Seies Analysis of the optimized low-nonlineaity lateal effect sensing detecto To cite this aticle: Saeed Olyaee et al J. hys.: Conf. Se. 76 4 Related content - Neual netwok

More information

Microwave Finite Element Modeling Applications to Coupled Electromagnetic-Thermal Problems and Characterization of Dielectric Materials

Microwave Finite Element Modeling Applications to Coupled Electromagnetic-Thermal Problems and Characterization of Dielectric Materials Micowave Finite Element Modeling Applications to Coupled Electomagnetic-Themal Poblems and Chaacteization of Dielectic Mateials Hulusi Acikgoz, Yann Le Bihan, Olivie Meye, and Lionel Pichon Laboatoie de

More information

Analysis of Occurrence of Digit 0 in Natural Numbers Less Than 10 n

Analysis of Occurrence of Digit 0 in Natural Numbers Less Than 10 n meican Intenational Jounal of Reseach in Fomal, pplied & Natual Sciences vailable online at http://www.iasi.net ISSN (Pint): 2328-3777, ISSN (Online): 2328-3785, ISSN (CD-ROM): 2328-3793 IJRFNS is a efeeed,

More information

Investigation and Analysis of Inception Voltage and Field Distribution in Power Cables with Internal Cavities in Dielectric

Investigation and Analysis of Inception Voltage and Field Distribution in Power Cables with Internal Cavities in Dielectric Investigation and Analysis of Inception Voltage and Field Distibution in Powe Cables with Intenal Cavities in Dielectic A. A. Hossam-Eldin Electical Eng. Depatment Faculty of Engineeing Alexandia Univesity,

More information

An Efficient Control Approach for DC-DC Buck-Boost Converter

An Efficient Control Approach for DC-DC Buck-Boost Converter 2016 Published in 4th Intenational Symposium on Innovative Technologies in Engineeing and Science 3-5 Novembe 2016 (ISITES2016 Alanya/Antalya - Tukey) An Efficient Contol Appoach fo DC-DC Buck-Boost Convete

More information

ONE-WAY RADAR EQUATION / RF PROPAGATION

ONE-WAY RADAR EQUATION / RF PROPAGATION ONE-WAY RADAR EQUATION / RF PROPAGATION The one-way (tansmitte to eceive) ada equation is deived in this section. This equation is most commonly used in RWR o ESM type of applications. The following is

More information

CHEROKEE COUNTY BOARD OF COMMISSIONERS REGULAR MEETING FEBRUARY 28,1997 MINUTES

CHEROKEE COUNTY BOARD OF COMMISSIONERS REGULAR MEETING FEBRUARY 28,1997 MINUTES 288 CHEROKEE COUNTY BOARD OF COMMISSIONERS REGULAR MEETING FEBRUARY 28,997 MINUTES Call to Ode-Chaiman Lathem-0:00 a.m. Pesent-Chaiman Lathem Vice-Chaiman Long Commissione Biello Commissione Ray Commissione

More information

INVESTIGATION OF CLOSE-TO-WALL WIRELESS SENSOR DEPLOYMENT USING 2D FINITE-DIFFERENCE TIME-DOMAIN MODELLING. Y. Wu and I. J.

INVESTIGATION OF CLOSE-TO-WALL WIRELESS SENSOR DEPLOYMENT USING 2D FINITE-DIFFERENCE TIME-DOMAIN MODELLING. Y. Wu and I. J. 2 nd Intenational Confeence on Wieless Communications in Undegound and Confined Aeas August 25-27, 2008 Val-d O - Québec - Canada INVESTIGATION OF CLOSE-TO-WALL WIRELESS SENSOR DEPLOYMENT USING 2D FINITE-DIFFERENCE

More information

DESIGN AND PARAMETRIC EVALUATION OF RECTANGULAR MICROSTRIP PATCH ANTENNA FOR GSM APPLICATION

DESIGN AND PARAMETRIC EVALUATION OF RECTANGULAR MICROSTRIP PATCH ANTENNA FOR GSM APPLICATION DESIGN AND PARAMETRIC EVALUATION OF RECTANGULAR MICROSTRIP PATCH ANTENNA FOR GSM APPLICATION RAHUL T. DAHATONDE, SHANKAR B. DEOSARKAR Dept. of E & TC, D. Babasaheb Ambedka Technological Univesity, Lonee,

More information

where and are polynomials with real coefficients and of degrees m and n, respectively. Assume that and have no zero on axis.

where and are polynomials with real coefficients and of degrees m and n, respectively. Assume that and have no zero on axis. function whee is an unknown constant epesents fo the un-modeled dynamics The pape investigates the position contol of electical moto dives that can be configued as stuctue of Fig 1 This poblem is fomulated

More information

Design and Implementation of 4 - QAM VLSI Architecture for OFDM Communication

Design and Implementation of 4 - QAM VLSI Architecture for OFDM Communication Design and Implementation of 4 - QAM VLSI Achitectue fo OFDM Communication R. Achitha 1, S. Bhagyalakshmi 2, V. Jaya Suthi 3, D. T. Menakadevi 4 U.G. Students, Depatment of ECE, Adhiyamaan College of Engineeing,

More information

GAMMA SHAPED MONOPOLE PATCH ANTENNA FOR TABLET PC

GAMMA SHAPED MONOPOLE PATCH ANTENNA FOR TABLET PC GAMMA SHAPED MONOPOLE PATCH ANTENNA FOR TABLET PC Islam Md. Rafiqul, Mohammad Shawkat Habib and Khaizuan Abdullah Depatment of Electical and Compute Engineeing, Intenational Islamic Univesity Malaysia,

More information

Chamber Influence Estimation for Radiated Emission Testing in the Frequency Range of 1 GHz to 18 GHz

Chamber Influence Estimation for Radiated Emission Testing in the Frequency Range of 1 GHz to 18 GHz Chambe Influence Estimation fo Radiated Emission Testing in the Fequency Range of 1 GHz to 18 GHz Alexande Kiz Electomagnetic Compatibility and RF-Engineeing ARC eibesdof eseach GmbH eibesdof, Austia alexande.kiz@acs.ac.at

More information

Cyclic Constellation Mapping Method for PAPR Reduction in OFDM system

Cyclic Constellation Mapping Method for PAPR Reduction in OFDM system 2013 8th Intenational Confeence on Communications and Netwoking in China (CHINACOM) Cyclic Constellation Mapping Method fo PAPR Reduction in OFDM system Yong Cheng, Jianhua Ge, Jun Hou, and Fengkui Gong

More information

Bryan Hospital patient. Your Guide G to Fundraising Success. Together we can make every moment count for sick kids

Bryan Hospital patient. Your Guide G to Fundraising Success. Together we can make every moment count for sick kids Byan Hospital patient G You Guide G to Fundaising Success Togethe we can make evey moment count fo sick kids 1 Thank you fo joining usg Owen Kidney patient Thanks to the suppot of people like you, Sydney

More information

Distributed Spectrum Allocation via Local Bargaining

Distributed Spectrum Allocation via Local Bargaining Distibuted Spectum Allocation via Local Bagaining Lili Cao Shanghai Jiaotong Univesity, Shanghai, P.R. China Email: cao li li@yahoo.com Haitao Zheng Micosoft Reseach Asia, Beijing, P.R. China Email: htzheng@ieee.og

More information

QoE Enhancement of Audio Video IP Transmission with IEEE e EDCA in Mobile Ad Hoc Networks

QoE Enhancement of Audio Video IP Transmission with IEEE e EDCA in Mobile Ad Hoc Networks QoE Enhancement of Audio Video IP Tansmission with IEEE 8.e in Mobile Ad Hoc Netwoks Toshio Nunome and Shuji Tasaka Depatment of Compute Science and Engineeing, Gaduate School of Engineeing, Nagoya Institute

More information

Current Compensation Techniques for Lowvoltage High-performance Current Mirror Circuits

Current Compensation Techniques for Lowvoltage High-performance Current Mirror Circuits Southen Illinois Univesity Cabondale OpenSIUC Aticles Depatment of Electical and Compute Engineeing 7-06 Cuent Compensation Techniques fo Lowvoltage High-pefomance Cuent Mio Cicuits Stefan Leitne Haibo

More information

ISSN: [Reddy & Rao* et al., 5(12): December, 2016] Impact Factor: 4.116

ISSN: [Reddy & Rao* et al., 5(12): December, 2016] Impact Factor: 4.116 IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY SIMULATION COMPARISONS OF INDUCTION MOTOR DRIVE WITH ESTIMATOR AND PLL V. Nasi Reddy *, S. Kishnajuna Rao*, S.Nagenda Kuma * Assistant

More information

UNCERTAINTY ESTIMATION OF SIZE-OF-SOURCE EFFECT MEASUREMENT FOR 650 NM RADIATION THERMOMETERS

UNCERTAINTY ESTIMATION OF SIZE-OF-SOURCE EFFECT MEASUREMENT FOR 650 NM RADIATION THERMOMETERS XIX IMEKO Wold Congess Fundamental and Applied Metology Septembe 6 11, 29, Lisbon, Potugal UNCERTAINTY ESTIMATION OF SIZE-OF-SOURCE EFFECT MEASUREMENT FOR 65 NM RADIATION THERMOMETERS Fumihio Sakuma, Laina

More information

III. MANAGEMENT OF SCARCE RESOURCES

III. MANAGEMENT OF SCARCE RESOURCES III. MANAGEMENT OF SCARCE RESOURCES 1. Fequenc spectum Fequenc spectum is a unique, scace natual esouce, and its optimal management ma bing social and economic benefits fo the societ as a whole. To this

More information

Key Laboratory of Earthquake Engineering and Engineering Vibration, China Earthquake Administration, China

Key Laboratory of Earthquake Engineering and Engineering Vibration, China Earthquake Administration, China Shake Table Test fo Lage Indiect-Ai-Cooling Towe Stuctue of Fie Powe Plant Pat I Junwu DAI, Yongqiang YANG & Xuan WNG Key Laboatoy of athquake ngineeing and ngineeing Vibation, China athquake Administation,

More information

R. Brent Murphy, M.Sc., P.Geo., VP Environmental Affairs Seabridge Gold Inc.

R. Brent Murphy, M.Sc., P.Geo., VP Environmental Affairs Seabridge Gold Inc. Memoandum Date: Decembe 22, 2017 To: Fom: Cc: Subject: R. Bent Muphy, M.Sc., P.Geo., VP Envionmental Affais Seabidge Gold nc. Amy Elliott Ph.D., and Gaeth Wolff, B.Sc., P.Geo. Deboah Muggli, Ph.D., M.Sc.,

More information

(12) Patent Application Publication (10) Pub. No.: US 2010/ A1

(12) Patent Application Publication (10) Pub. No.: US 2010/ A1 US 2010O212962A1 (19) United States (12) Patent Application Publication (10) Pub. No.: US 2010/0212962 A1 ROsten et al. (43) Pub. Date: (54) ASSEMBLY FOR DRILLING AND LOGGING, (30) Foeign Application Pioity

More information

Design of FIR Filter using Filter Response Masking Technique

Design of FIR Filter using Filter Response Masking Technique Design of FIR Filte using Filte Response Masking Technique Sandeep Shivastava, Alok Jain, Ram Kuma Soni Abstact- In this pape autho is tying to implement Fequency esponse masking (FRM) technique. In this

More information

Low-Complexity Time-Domain SNR Estimation for OFDM Systems

Low-Complexity Time-Domain SNR Estimation for OFDM Systems Low-Complexity Time-Domain SR Estimation fo OFDM Systems A. jaz, A.B. Awoseyila and B.G. Evans A low-complexity SR estimation algoithm fo OFDM systems in fequency-selective fading channels is poposed.

More information

Channel Frequency Optimization of a Future AMSU-B-Like Millimeter-Wave Radiometer for Integrated Water Vapor Retrieval in polar regions

Channel Frequency Optimization of a Future AMSU-B-Like Millimeter-Wave Radiometer for Integrated Water Vapor Retrieval in polar regions Poceedings of the 4th WSEAS Intenational Confeence on REMOTE SENSING (REMOTE'8) Channel Fequency Optimization of a Futue AMSU-B-Like Millimete-Wave Radiomete fo Integated Wate Vapo Retieval in pola egions

More information

Analysis and Design of a 1MHz LLC Resonant Converter with Coreless Transformer Driver

Analysis and Design of a 1MHz LLC Resonant Converter with Coreless Transformer Driver Analysis and Design of a MHz C Resonant Convete with Coeless Tansfome Dive Mingping Mao, Dimita Tchobanov, Dong i 3, Matin Maez.,Tongji Univesity, Siping Rd 39, 9 Shanghai -China., Faunhofe Institute of

More information

PT PROP LEVEE (BY OTHERS) TX54 TX54 TX70

PT PROP LEVEE (BY OTHERS) TX54 TX54 TX70 (+) 1.97% (+) 2.52% (+) 1.88% (+) 1.43% (+).75% (+).62% THIS PINT IS FUNISHED FO INFOMATION ONLY. THE PLAN INFOMATION O OTHE DATA SHOWN HEEON IS SUBJECT TO CHANGE AND MUST NOT BE CONSTUED AS FINAL. FO

More information

f. r VIRGINIA: IN THE CIRCUIT COURT FOR THE CITY OF CHARLOTTESVILLE v. Case No. CL

f. r VIRGINIA: IN THE CIRCUIT COURT FOR THE CITY OF CHARLOTTESVILLE v. Case No. CL f. VIRGINIA: IN THE CIRCUIT COURT FOR THE CITY OF CHARLOTTESVILLE FREDERICK W. PAYNE, et al, Plaintiffs, v. Case No. CL17000145-00 CITY OF CHARLOTTESVILLE, VIRGINIA, et al, Defendants. SUPPLEMENTAL R EPLY

More information

Development of Corona Ozonizer Using High Voltage Controlling of Produce Ozone Gas for Cleaning in Cage

Development of Corona Ozonizer Using High Voltage Controlling of Produce Ozone Gas for Cleaning in Cage Moden Envionmental Science and Engineeing (ISSN 333-58) July 07, Volume 3, No. 7, pp. 505-509 Doi: 0.534/mese(333-58)/07.03.07/0 Academic Sta Publishing Company, 07 www.academicsta.us Development of Coona

More information

Upon roll call the following Aldermen were present: Carla Colstad, Bill Hert, Kenton Kepp, Jeremy Krebs, Randy Angevine and Jerry Wemple.

Upon roll call the following Aldermen were present: Carla Colstad, Bill Hert, Kenton Kepp, Jeremy Krebs, Randy Angevine and Jerry Wemple. THE COMMON COUNCIL CITY OF HARDIN, MONTANA Januay 03, 2012- Minutes FINANCE MEETING: At 6:30 p.m., the Council and Mayo eviewed claims. COUNCIL MEETING: The Regula Council Meeting fo Januay 03, 2012 was

More information

Absolute calibration of null correctors using twin computer-generated holograms

Absolute calibration of null correctors using twin computer-generated holograms Absolute calibation of null coectos using twin compute-geneated hologams Poteep C.V. Mallik a, Rene Zehnde a, James H. Buge a, Alexande Poleshchuk b a College of Optical Sciences, The Univesity of Aizona,

More information

FreeSpace ZA 2120-HZA Zone Amplifier

FreeSpace ZA 2120-HZA Zone Amplifier Poduct Desciption The Bose zone amplifie is designed to povide basic amplification and sound system expansion when using font-end Bose poducts such as FeeSpace integated zone amplifies and ContolSpace

More information

The Periodic Ambiguity Function Its Validity and Value

The Periodic Ambiguity Function Its Validity and Value The Peiodic Ambiguity Function Its Validity and Value Nadav Levanon Dept. of Electical Engineeing Systems Tel Aviv Univesity Tel Aviv, Isael nadav@eng.tau.ac.il Abstact The peiodic ambiguity function (PAF)

More information

Optimization of the law of variation of shunt regulator impedance for Proximity Contactless Smart Card Applications to reduce the loading effect.

Optimization of the law of variation of shunt regulator impedance for Proximity Contactless Smart Card Applications to reduce the loading effect. Optimization of the law of vaiation of shunt egulato impedance fo Poximity Contactless Smat Cad Applications to educe the loading effect. Catheine Maechal, Dominique Paet. Laboatoie LIT ESIGETEL, ue du

More information

INCREMENTAL REDUNDANCY (IR) SCHEMES FOR W-CDMA HS-DSCH

INCREMENTAL REDUNDANCY (IR) SCHEMES FOR W-CDMA HS-DSCH ICREMETAL REDUDACY (IR) SCHEMES FOR W-CDMA HS-DSCH Amitava Ghosh 1, Kenneth Stewat, Rapeepat Ratasuk 1, Eoin Buckley, and Raa Bachu 1 Advanced Radio Technology, GTSS, Motoola, Alington Heights, IL, USA

More information

I I l I I. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

I I l I I. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Pubic Discosue Authoized Pubic Discosue Authoized Lao Road Secto Poject (Unde Deveopment Gant Ageements No. H547-LA, No. H7890-LA and No. TF093083 between the Govenment of Lao PDR and the ntenationa Deveopment

More information

Localization Algorithm for a mobile robot using igs

Localization Algorithm for a mobile robot using igs Poceedings of the 17th Wold Congess The Intenational Fedeation of Automatic Contol Seoul, Koea, July 6-11, 008 Localization Algoithm fo a mobile obot using igs DaeGeun Seo *, JangMyung Lee** * Electical

More information

INCIDENT BRIEFING (ICS 201) 2. Incident Number: NF4RC Date/Time Initiated: EOC TECHNICIAN COURSE 2018

INCIDENT BRIEFING (ICS 201) 2. Incident Number: NF4RC Date/Time Initiated: EOC TECHNICIAN COURSE 2018 4. Map/Sketch (include sketch, showing the total aea of opeations, the incident site/aea, impacted and theatened aeas, oveflight esults, tajectoies, impacted shoelines, o othe gaphics depicting situational

More information

Metal face seals product listings

Metal face seals product listings poduct listings Undestanding key tale elements Designed to e use-fiendly, CR Seals and poduct listings convey a good deal of infomation on evey line. As you familiaize youself with the tales, keep these

More information

Antenna fundamentals: With answers to questions and problems (See also Chapter 9 in the textbook.)

Antenna fundamentals: With answers to questions and problems (See also Chapter 9 in the textbook.) adio Technology Metopolia/A. Koivumäki Antenna fundamentals: With answes to questions and poblems (See also Chapte 9 in the textbook.) 1. a) Make up a definition fo the tem "antenna". Answe: One definition:

More information

The mathematical structure known as a graph has the valuable feature of

The mathematical structure known as a graph has the valuable feature of Copyight, Pinceton Univesity Pess No pat of this book may be means without pio witten pemission of the publishe 1 Intoducing Gaphs The mathematical stuctue known as a gaph has the valuable featue of helping

More information

An Improved Implementation of Activity Based Costing Using Wireless Mesh Networks with MIMO Channels

An Improved Implementation of Activity Based Costing Using Wireless Mesh Networks with MIMO Channels Poceedings of the 10th WSEAS Intenational Confenence on APPLIED MATHEMATICS, Dallas, Texas, USA, Novembe 1-3, 2006 262 An Impoved Implementation of Activity Based Costing Using Wieless Mesh Netwoks with

More information

A cone is a solid formed by one circular base and a vertex.

A cone is a solid formed by one circular base and a vertex. Volume of Cones Lesson 4.7 A cone is a solid fomed by one cicula base and a vetex. EXPLORE! Rita is making snow cones fo he fiends. She has fou cylindical glasses that she is using to take the cushed ice

More information