a k a architecture + design inc
|
|
- Beatrix Flynn
- 5 years ago
- Views:
Transcription
1 Project Info ddress: Garibaldi rive, lack Tusk Village, Legal ddress: LOT,.L. 0, PLN 98, NW PI: Zoning: Residential (SLR rea ) Part, (Post isaster) Req'd Provided Min. Parcel rea: 7,00.0 sq.ft. 7,5. sq.ft. Max. Site overage in sq.ft: 80.5 sq.ft sq.ft. Max. Site overage (%): 5 % 7. % Front Setback (West - VP#97) 0.0 m.5 m Side Setbacks (North - VP#97) 0.0 m 0.0 m Side Setbacks (South - VP#97).5m.5m Rear Setback (ast - Hydro R.O.W.) 0.0 m 0.0 m uilding Height (VP#97): 5.0 m 0.0 m Parking Spaces (VP #97): 0 0 GF: rea rea Garage (L),95.9 sq.ft 78.9 m Roof Void (L) 7. sq.ft. m Total 08. sq.ft m Suite (L ntry + L) 7.9 sq.ft m Total GF (Suite + Roof Void),5.5 sq.ft 5.00 m Project irectory rchitect: aka architecture + design (T) () Government Road (F) () Squamish,.. V8 ON7 Surveyor: unbury and ssoc. (T) () nd venue (F) Squamish, V8 0 Structural ngineer: Mountain Resort ngineering (T) P.O. ox 58 (F) Whistler, V0N 0 LT ngineer quilibrium onsulting Inc. (T) -70- #0-88 West 8th venue (F) Vancouver, V5Y X onstruction Manager (T) Whirlwind Homes P.O. o Whistler, V0N 0 Geotechnical Ocean Sun (T) () PO ox 99 Garibaldi Highlands Squamish, V0N T0 rawing List 0.00 over Sheet 0.0 General Notes and ssemblies 0.0 oor Schedule and etails.0 Site Plan (F) (F) Notes, Stats, irectory.0 Foundation Plan & L Floor Plan.0 L Floor Plan & Roof Plan S S S S S S0 S07 S08 S09 S0 GNRL NOTS (FOUNTION) TILS (FOUNTION) FOUNTION PLN GNRL NOTS N TYPIL TILS (LT) L FLOOR PLN L / LOW ROOF PLN HIGH ROOF PLN STIONS N TILS (LT) STIONS N TILS (LT) STIONS N TILS (LT).0 levations.0 /" Sections.0 /" Section, / Wall Sections. / Wall Sections.0 Foundation & Framing etails.0 etails 0.00 ISION HISTORY
2 Wall Schedule Floor Schedule Roof Schedule uilding nvelope Notes General Notes Type escription FRR/ref ST R' Type escription FRR/ref ST Type escription FRR/ref ST W Foundation Wall F Slab on Grade R Typical LT Roof. S STRUTURL FOR LL SHR WLL LOTIONS. O NOT SL RWINGS. rainage Mat (at below grade locations) Sealed oncrete finish Roof finish (refer to elevations) MINTIN FIR RTINGS T LL SHR WLLS. Waterproofing or amproofing to geotech specs Reinforced oncrete Slab (See Structural wgs) Self-adhered roof membrane. VRIFY LL FIXTUR IMNSIONS N RUIR R/I oncrete wall, thickness as per struct. mil Polyethylene Vapour arrier / Ply Roof Sheathing. S TILS FOR MH IN RT WLLS. LRNS FOR FRMING WLLS. INLUING Rigid Insulation / Rigid Insulation PLUMING FIXTURS, PPLINS, INTS, LOKRS, xterior Wall LT with exterior insulation HR FRR ompact Fill 7 PLy LT panels. OTTOM FRMING PLTS IN ONTT WITH TH MILLWORK, T.) Siding, See elevations for mat'ls and locations (North Wall Only) ompacted Undisturbed Soil ONRT FOUNTION SHLL PRSSUR TRT / Rainscreen/airspace R LT ave LUMR, OR FOM SILL GSKT SHLL. LL IMNSIONS MUST HK N VRIFI Y x PT furring on edge F LT Floor..5 hr.5 HR FRR 50 Roof finish PROVI UNR TH PLTS. TH ONTRTOR PRIOR TO ONSTRUTION. RPORT Roxul xterior insulation (North Wall only) (Non-combustible) Finish flooring Self-adhered roof membrane NY ISRPNIS TO TH RHITT. Rigid Insulation (S,W, Walls) / OS panels / Ply Roof Sheathing. TYVK OMMRIL WRP MUST INSTLL Tyvec ommercial uilding Wrap x Studs on edge w/ x Furring UNR LL LING. WHR RWINGS INIT. LL IMNSIONS TO F OF ONRT, F OF PLYWOO 5 ply LT panel wall (all LT joins taped with / Sound bsorptive insulation between 7 ply LT roof panel, US TYVK OMMRIL WRP. T WLLS OR F OF STU T WLLS Siga tape to create air barrier) coustic Underlayment UNLSS NOT OTHRWIS. 7 ply LT Floor panels R Flat Roof No Insulation 5. LL HORIZ. VINYL "J" TRIMS SHLL PRFORT Gravel on /W /" " O. 5. OORS IN STU WLLS TO LOT / FROM W Interior Wall - LT Panel F xterior eck. 5 min 5 min FRR layers (base and cap) torch-on roof membrane JNT WLL TO ROUGH OPNING (TYP.) LT panel onc. Pavers Plywood Sheathing (See Structural wgs) / Rubber Pedestals Sleepers cut for slope to drain. LL WOO LING PROUTS (I; KN RS,. LR' INITS TO F OF FINISH. Interior Wall FRR.5hr ().5 HR FRR 50 layers torch-on roof membrane 7 ply LT panels R SIWLL SHINGLS, N GL N TRIM (non-loadbearing) Table Table Plywood Sheathing (See Structural wgs) ORS) MUST LSO K PRIM. 7. S STRUTURL RWINGS FOR LL Layers.7mm type X GW -..., Sleepers cut for slope to drain R Flat Roof xterior Insulation SHR WLL LOTIONS N SSMLIS. Steel 00mm O 95min Sc 7 ply LT panels Gravel on 7. THROUGH-WLL FLSHING IS RUIR T.5 Mineral wool insulation layers torch-on roof membrane LL HORIZ. XPNSION JOINTS, UILING N 8. S STRUTURL RWINGS FOR LL FRMING MMRS. Layers.7mm type X GW F xterior eck Interior Space under..5 hr.5 HR FRR Plywood Sheathing (See Structural wgs) TRIMS, N LOW TH GL N LOUVR onc. Pavers Tapered Isoboard Insulation VNTS. LL THROUGH-WLL FLSHINGS MUST W5 Interior x Framed Wall (non-load bearing) 5 min FRR / Rubber Pedestals 7 ply LT panels HV " HIGH K LG. LL HORIZ. LPS MUST / TYP X GW Table layers torch-on SS membrane " MIN. N ULK. x wood O.. UNO -..., Plywood Sheathing (See Structural wgs) R5 Flat Roof Interior Insulation / TYP X GW 5min Sleepers cut for slope to drain Gravel on 8. THROUGH-WLL FLSHING MUST PROVI 7 ply LT panels layers torch-on roof membrane T LL HNGS IN SIING MTRIL. W Interior x Framed Wall (non-load bearing) x drop ceiling w/ Plywood Sheathing (See Structural wgs) / GW / Rigid Insulation Sleepers cut for slope to drain 9. SL LL PNTRTIONS INLUING LTRIL OXS x wood O.. UNO / GW 7 ply LT panels WITH SLF-HRING MMRN TO HIN. / GW R8 batt insulaiton mil UV poly vapour barrier, taped 0. LL STRUTURL WOO LMNTS W7 xterior x Framed Wall (xisting Tower frame) / GW SHLL PRSSUR TRT OR HV N Siding, See elevations for mat'ls and locations PINT OR STIN PPLI. / Rainscreen/airspace ONLY PRIMRS SHLL US ON Rigid Insulation LL PL & STIK PROUTS. xterior Grade Ply Sheathing. LL HOS IS R TO PL x wood O.. (existing) THROUGH /" HOL IN X PI OF PM. mil UV poly vapour barrier / xterior Grade GW. NSUR THT TH STNR WINOW MMRN SUNING SHTS R PROVI () Method of FRR calculation derived from TO TH RWS T TH TIM OF WINOW Table -... () to achieve 90 min FRR with INSTLLTION N INLU IN TH Layers.7mm type X GW both sides ONSTRUTION OUMNTS. Plus Insulation value from table -... (5min). FOR NTURL ONRT FINISH US ONRT WTRPROOFING MIXTUR, PROUT TO IW PRIOR TO US.. LL MMRNS N SLNTS MUST N SMPLS OF LL VNTS, PS N UTS THT PNTRT TH NVLOP OR ROOF MUST PROVI FOR INSTLLTION GINS. 5. LT PNLS MUST TP T JOINS TO NSUR ONTINUOUS IR RRIR.. SSMLY NOTS. GW: Fastener types and spacing must conform to S 8.-M, "Gypsum oard pplication.".. dded materials may be required in addition to what is shown. Refer to structural drawings to ensure a complete list of assemblies. 5. ontinuously vent all warm roof systems. nsure that all areas of roof are continuously vented.. o not block airflow over rafters and / or strapping. 7. Torch -On roof membrane to be -Ply fibreglass-reinforced asphaltic roofing membrane. 8. Sound absorptive material includes fibre processed from rock, slag, glass or cellulose fibre. It must fill at least 90% of the cavity thickness or the wall to have the listed ST value. The absorptive material should not overfill the cavity for the wall to have the listed ST value. The absorptive material should not overfill the cavity to the point of producing significant outward pressure on the finishes; such an assembly will not achieve the ST rating. Where the absorptive material used with steel stud assemblies is in batt form, "steel stud batts," which are wide enough to fill the cavity from the web of one stud to the web of the adjacent stud, must be used. bsorptive material required for the higher fire-resistance rating is mineral fibre processed from rock or slag with a mass of at least.8 kg/m for 50mm thickness,.8 kg/m for 89mm thickness and.0 kg/m for 5mm thickness and completely filling the wall cavity. For assemblies with double woods studs on separate plates, absorptive material is required in the stud cavities on both sides. Non-Vented roofs to have lb closed-cell polyurethane spray foam insulation as both a thermal and air barrier.. IF Q-TRT STRPPING IS UTILIZ, STINLSS STL NILS R RUIR TO VOI TH RISK OF ORROSION. IF ORT OR -TRT STRPPING IS UTILIZ, HOT IPP GLVNIZ FSTNRS R RUIR TO PROVI UT ORROSION RSISTN. 7. WRP WTR-RSISTNT-RRIR T LL N ORNRS WITH 8" SLF-HR MMRN Z bbreviations V bove FF bove Finished Floor S coustic Sealant TW etween LG uilding R acker Rod R oard K aulking ON oncrete ONT ontinuous SK ountersink L lectrical NV nvelope PM thylene propylene diene monomer FIXT Fixture FN Foundation GW Gypsum Wall oard MM Membrane PT Preasure Treated PT Painted RO Rough Opening General Notes and ssemblies S Self-dhering SIM Similar U/S Underside V Vapour arrier W/ With N/ W Wood Water Resistant arrier, ie Tyvek 0.0 Siting, GL -5 im. '-7" 7// K ISION HISTORY
3 POLYURTHN ULK LING TO TRIM oor Schedule SIING - LP ULK N TP TO PRSTRIP LL XT. OORS SHLL ST INTO ONT S OF URTHN ULK T TH SILL N UP TH JM. TH OOR FRM RIK MOULS MUST LSO K ULK Refer to plans for door swings oor Type Size Operation Thickness oor Material Frame Notes '-8" x Overhead /" lum Wood c/w power opener & weatherstripping xterior c/w triple glazing c/w low headroom track '0" x '-8" Swing /" Metal Metal hr weatherstripped c/w threshold self-closing '-8" x '-8" Swing /" Wood Wood weatherstripped c/w threshold transom c/w door viewer RO & ULK FRM TO PRSTRIP WOO TRIM FF xterior oors 8'-0" '-8", 5 '-8" x '-8" Swing /" Metal Metal hr weatherstripped c/w threshold self-closing 5 '-8"" x '-8" Swing /" Wood Wood weatherstripped c/w threshold transom, Sidelight ULK TO LT Typ. oor Jamb etail Scale: " = '-0" '" x '-8" Swing /8" Metal Metal Interior '-0" x '-8" Swing, i-part /8" Wood Wood weatherstripped c/w threshold '-8" '-8" x '-8" Swing /8" Wood Wood ULK TP ULK TRIM TO PR-STRIP FF Interior oors,, 5 '-" x '-8" i-fold, i-part /8" Wood Wood 5 x '-8" i-fold, i-part /8" Wood Wood ULK TWN TRIM N OOR FRM RO & ULK POUR ON. WLKWY RIN ROK Hollow Metal oor Head - Section Scale: " = '-0" OOR PNL INTRMITTNT PT SHIM LUMINUM FLSHING ULK THRSHOL SILL GSKT SILL TO ONT W/ JM (TYP). POLYURTHN SLNT W TRIM K NGL PL & STIK T SILL & " UP OOR JM oor Schedule and etails RING MT MP-PROOFING W ON FN /" = '-0" ntry oor onc. Slab Scale: " = '-0" 0.0 ISION HISTORY
4 Window Membrane Sequence N/ 0.0 ISION HISTORY
5 General Notes. O NOT SL RWINGS. ldg nvelope Notes OMMON PROPRTY RO NTRLIN 9'- / [m] 5'- /" Limiting istance [7.7m] '-0 /" Limiting istance [.97m] 9'-8 /" [m] 7'-9 /8" Limiting istance [8.7m] '-7" 0m UILING STK '- 5/8" [.5m] PROPRTY LIN.000m '- / ON. ON. 8'- / L Road hwh OMMON PROPRTY 7 5 5'-0" '-0" 5'-0" '-0" 8'-0 /" [5m] PROPRTY LIN.00m 0m UILING STK MTRIL: SL ON FINISH TYP..0.5m UILING STK PROPRTY LIN.8m RO.0 USL SIT R: 8.57sq.ft. 5'-" Limiting istance [9.8m] 9" '- S XISTING WSTWTR OLLTION UILING MIN 0m UILING STK Limiting istance [m] bollards typ '-" '-9" 8'-0" 8'-0" '-9" 8'-0" '-0" 8'-0" '-7" NOT:. F OF LT PNLS ON GRILINS.0. IMNSIONING TO F OF LT PNLS UNO.. MRGNY LIGHTING N MHNIL VNTILTION OF STORG GRG IS RUIR.. OUTOR INSULTION NOT SHOWN IN PLN FOR LRITY LIN OF XISTING KIOSK.55 LIN OF XISTING FIR HLL LIN OF XTNT OF OVRHNGS TO OUTSI F OF FSI..HYRO N POWR UTHORITY RIGHT OF WY MTRIL: SPHLT RIVWY '- /" Limiting istance [7.7m] PROPRTY LIN 9.59m LOT PROPRTY LIN r= 9.000m a=.7m LOT PROPRTY LIN.000m. VRIFY LL FIXTUR IMNSIONS N RUIR LRNS FOR FRMING WLLS. INLUING PLUMING FIXTURS, PPLINS, INTS, LOKRS, MILLWORK, T.). LL IMNSIONS MUST HK N VRIFI Y TH ONTRTOR PRIOR TO ONSTRUTION. RPORT NY ISRPNIS TO TH RHITT.. LL IMNSIONS TO F OF ONRT, F OF PLYWOO T WLLS OR F OF STU T WLLS UNLSS NOT OTHRWIS. 5. OORS IN STU WLLS TO LOT / FROM JNT WLL TO ROUGH OPNING (TYP.). 'LR' INITS TO F OF FINISH. 7. S STRUTURL RWINGS FOR LL SHR WLL LOTIONS N SSMLIS. 8. S STRUTURL RWINGS FOR LL FRMING MMRS. Legend S NOT# 0 S F F KY NOT WLL TYP OOR NUMR WINOW NUMR WINOW TYP SMOK TTOR XHUST FN RON MONOXI TTOR XISTING GR FINISH GR. S STRUTURL FOR LL SHR WLL LOTIONS. OTTOM FRMING PLTS IN ONTT WITH TH ONRT FOUNTION SHLL PRSSUR TRT LUMR, OR FOM SILL GSKT SHLL PROVI UNR TH PLTS.. OMMRIL TYVK IR RRIR, FULLY SL MUST UNR LL LING.. LL HORIZ. VINYL "J" TRIMS SHLL PRFORT /W /" " O. 5. LL WOO LING PROUTS (I; KN RS, R SIWLL SHINGLS, N GL N TRIM ORS) MUST LSO K PRIM.. THROUGH WLL FLSHING IS RUIR T LL HORIZ. XPNSION JOINTS, UILING N TRIMS, N LOW TH GL N LOUVR VNTS. LL THROUGH WLL FLSHINGS MUST HV " HIGH K LG. LL HORIZ. LPS MUST " MIN. N ULK 7. LL FSTNRS SHLL HOT-IPP GLVNIZ, XPT WHN USING PRSSUR TRT LUMR. Q RUIRS STINLSS STL FSTNRS. 8. LL PNTRTIONS MUST HV N VINYL TRIM KIT. 9. LL STRUTURL WOO LMNTS SHLL PRSSUR TRT OR HV N PINT OR STIN PPLI. ONLY PRIMRS SHLL US ON LL PL & STIK PROUTS. 0. LL HOS IS R TO PL THROUGH /" HOL IN X PI OF PM. LL LTRIL OXS MUST HV SLS N FLNGS. "X" PI OF FLSHING PPR MUST SL TO TH K SI OF TH FLNG N TH FIL UILING PPR MUST SL TO TH TOP N SIS OF TH FLNG. LP TH OTTOM OF TH FLSHING PPR UNR TH FLNG OVR TH FIL PPR (SHINGL STLY) LL SURF MOUNT LIGHT PNS MUST ON "X" PI OF FLSHING PPR LPP INTO TH FIL PPR (SHINGL STYL). SL TH WIR TO TH PPR FOR INSTLLING TH PN.. NSUR THT TH STNR TIL SHTS R PROVI TO TH RWS T TH TIM OF WINOW INSTLLTION N INLU IN TH ONSTRUTION OUMNTS.. THROUGH-WLL FLSHING MUST PROVI T LL HNGS IN SIING MTRIL.. ON LRG XPOS RS OF ONRT, US OTS OF LSTOMRI PINT ON TH ONRT TO WTRPROOF THS RS. FILL LL UG HOLS PRIOR TO PINTING. FOR NTURL ONRT FINISH US ONRT WTRPROOFING MIXTUR, TO. 5. LL MMRNS N SLNTS MUST N SMPLS OF LL VNTS, PS N UTS THT PNTRT TH NVLOP OR ROOF MUST PROVI FOR INSTLLTION GINS. bbreviations V FF S TW LG R R K ON ONT SK L NV PM FIXT FN GW MM PT PT RO S SIM U/S V bove bove Finished Floor coustic Sealant etween uilding acker Rod oard aulking oncrete ontinuous ountersink lectrical nvelope thylene propylene diene monomer Fixture W/ With W Foundation Gypsum Wall oard Membrane Preasure Treated Painted Rough Opening Self-dhering Similar Underside Vapour arrier Wood Water Resistant arrier, ie Tyvek Site Plan /8" = '-0".0 ISION HISTORY
6 5'-0" '-0" 5'-0" '-0" '-" 7'-0" 5'-8" '-" 8'-" 5' '- /" '-0" '-8" W LT LPPING - ONFIRM? 0 0 9'-" '-0" '-" 7'-0" 0 0 '-7" 8'-0" '-0" 8'-0" '-0" L % SLOP TO RIN 9'-" 7'-0" 8'-8" 5'-5" SUIT NTRY W7 L W7 HSS POSTS (refer to structural) 00mm min 50mm min W/ mm min hwh 7'-0" MILOXS.5 HR HOS TOWR F L HR 0 % SLOP TO RIN 7.5 0" UP SUIT STIR W5 O '-" HR '-8 /" H L W W5 5'-8" H/ L 5'-8" W '-7 /8" '- 7/8" W5 LIGN F.R. RHR W5 5 Y.0.5 HR W '-" '-9" '-" '-" 5'-7 / '- / '-9 / 5'- / T.O. onc L '- TV, TRILR STORG SLOP TO RIN % typ. 5'-" Y 0 OTT LINS OF WLLS OV TYP. OTT LINS OF GL MS OVR TYP. (RF TO STRUTURL) Y 0 Y 0 OTT LINS OF WLLS OV TYP. 8'-0".0 HR '-0 / 5'-" folding workbenches MILOXS 9" '- S MIN US WITING R SLOP TO RIN 5% OOR /L SLOP TO RIN % typ. SLOP TO RIN 5% SLOP TO RIN % typ. Min. % typ. 5'-0" RIN SLOP TO LIN OF ROOF VOI OV LIN OF ROOF VOI OV '-9 / W W W 9" W W L SLOP TO RIN 5% L L '-0" OTT LINS OF GL MS OVR TYP. (RF TO STRUTURL) OOR /L LIN OF FLT ROOF OVR '-8" bollards typ xisting Grade L W '-7" 8'-0" '-" W W '- 5/8" STP IN FNN WLL T.O. FOUNTION WLL L. 0.8m (0.0 LVL _ +7.5" + 8") ONTRTOR TO VRIFY FOUNTION FOR XISTING HOS TOWR HOS TOWR FOUNTION FOR XISTING STRUTUR - TH SI? 5'- /" 7'- /" '-" '-9" S.O.G. OVR TYP. RFR TO STRUTURL FOR FOUNTION SPS. T.O. FOUNTION WLLS L m (0.0 LVL _ + 8") T.O. FOUNTION WLL TO U/S SL T MN OORS TYP. T.O. FOUNTION WLL MIN 8" FROM FIN. GR (00.5m) T.O. FOUNTION WLL TO U/S SL T OVRH OORS TYP. W W '- / W W W W STP IN FNN WLL T OOR W 8'-0" '-0" '-7" 8'-0" '-0" 8'-0" '-7".0..0 '-" '-9" 8'-0" 8'-0" '-9" '-" '-7" 8'-0" '-0" 8'-0" '-7".0.0 '-" '-9" 8'-0" 8'-0" '-9" Foundation & L Plans W NOT:. F OF LT PNLS ON GRILINS 9'-" STL POST (RFR TO STRUTURL) NOT:. F OF LT PNLS ON GRILINS. IMNSIONING TO F OF LT PNLS UNO.. IMNSIONING TO F OF LT PNLS UNO. 5'-0" '-0". MRGNY LIGHTING N MHNIL VNTILTION OF STORG GRG IS RUIR.. OUTOR INSULTION NOT SHOWN IN PLN FOR LRITY 5'-0" '-0". MRGNY LIGHTING N MHNIL VNTILTION OF STORG GRG IS RUIR.. OUTOR INSULTION NOT SHOWN IN PLN FOR LRITY /" = '-0" OPYRIGHT RSRV: This design and drawing is the exclusive property of a k a architecture + design and cannot be used for any purpose without the written consent of the rchitect. This drawing is not to be used for construction until issued for that purpose by the rchitect. PRIOR TO OMMNMNT OF TH WORK: Prior to commencement of the Work, the ontactor shall review and verify drawing dimensions, datums and levels to identify all.0 descrepancies between information on this drawing.0 and ) actual site conditions; and; ) the remaining ontract ocuments. The ontractor shall bring these items to ISION HISTORY
7 5'-0" '-0" 5'-0" '-0" '-" '-" '-0" '-8" '-" LIN OF ROOF OVR 0 0 LIN OF WLL LOW TYP '-7".0 KN R OV 9'-9" '-" 7'-0" '-". LIN OF ROOF OVR LIN OF WLL LOW W7 bbq W7 KN R OV K 0 9'-7 /8" W7 HOS TOWR W OPN TO LOW W L window L window IK GOMORGN: 00X7cm 5x HSS POST 08 W '-" 5'-" '-" '-" 8'- /8" 5'- 5/8" '-" N '- /".5 HR FR 5x HSS POST ROOF VOI INING ROOM 0 SINK KITHN 00 LIVING ROOM 0 '-5" W '- / 7'-0 / '-" '-0" 0'-9" RFR TO STRUTURL FOR LGR TIL STOV LOS LOS 0 OPN TO LOW THROOM 8 / x 7" GL (refer to Structural) '-0 / 7'- /" '-" '-7 / 8 / x 7" GL (refer to Structural) 5'-8" 5'-0" 5'-0".5 HR W '-0" W W W W '- / W HLL '- / '-7" 0 S 09 W ROOM kohler K-7-0 7'-0" F OF M LOW '-" min W W 8'-0" '-9" 0'-7 5/8" W '-8 / 0'-" '-9" 0'-9" W ROOM 07 '-" LIN OF ROOF OVR TYP. LOS '- / / '-" '-9" 8'-0" 8'-0" '-9" 8'-0" '-0" '-7".0. L window L window 0º SLOP N '-" FR SINK : SLOP N : SLOP N W RFR TO STRUTURL FOR LGR TIL STOV Q kohler K-7-0 IK GOMORGN: 00X7cm Q 5 SNOW RTNTION '-" '-9" 8'-0" 8'-0" '-9" 8'-0" '-0" '-" LIN OF ROOF OVR ROOF VOI 7'-".0 ROOF LOW.5 HR '-0" OPN TO LOW LIN OF ROOF OVR '-8" 8'-0" NOT XTNT OF FLOOR TO OMMO WLL LIPS '-7" '-".0 ROOF LOW 8'-0" NOT XTNT OF FLOOR TO OMMO WLL LIPS '-7" L & Roof Plan LIN OF WLL LOW LIN OF WLL LOW TYP. NOT:. F OF LT PNLS ON GRILINS '-0 /. IMNSIONING TO F OF LT PNLS UNO. NOT:. F OF LT PNLS ON GRILINS. IMNSIONING TO F OF LT PNLS UNO. 5'-0" '-0". MRGNY LIGHTING N MHNIL VNTILTION OF STORG GRG IS RUIR.. OUTOR INSULTION NOT SHOWN IN PLN FOR LRITY 5'-0" '-0". MRGNY LIGHTING N MHNIL VNTILTION OF STORG GRG IS RUIR.. OUTOR INSULTION NOT SHOWN IN PLN FOR LRITY /" = '-0" OPYRIGHT RSRV: This design and drawing is the exclusive property of a k a architecture + design and cannot be used for any purpose without the written consent of the rchitect. This drawing is not to be used for construction until issued for that purpose by the rchitect. PRIOR TO OMMNMNT OF TH WORK: Prior to commencement of the Work, the ontactor shall review and verify drawing dimensions, datums and levels to identify.0 all descrepancies between information on this.0 drawing and ) actual site conditions; and; ) the remaining ontract ocuments. The ontractor shall bring these items to ISION HISTORY
8 5'-0" '-0" 0 0 8'-0" 0 '-0" 8'-0" '-7" aka HOS TOWR VNT, PINT 0.55 T.O. Ridge GL VNT, PINT WOO LLY., STIN WOO KN R, STIN VINYL WINOWS PINT FSI LUMINUM & GLSS GURRIL " PINT FSI '- 5/8" '-8" 8'-0" '-8" 88 WST WST WST Scale: /" = '-0" 5'-0" South levation '-0" 00.7 MIL OXS 88 '-8" 8'-0" VRTIL WOO SIING '-0" FIR-MNT PLNK SIING '- / 80 '- / W HRI SHINGL SIING W 780 " W 780 '-8" '- /" min. typ. '-" eiling.995 5'-0 / 0'-" 0'-" LIMITING ISTN: WLL : 7.7m rea of F: 5.9sm rea of UPO: 5.7sm Ratio: Proposed- 5.8% Permitted: % WLL : 8.5m rea of F:.7sm rea of UPO: 5.7sm Ratio: Proposed- 8.5% Permitted- 8.% WLL :.97m rea of F:.7sm rea of UPO: 0% Ratio: Proposed- 0% Permitted- 8% ( 00 table...) eiling '-7" 0 8'-0" West levation Scale: /" = '-0" 0 '-0" 0 8'-0" '-" 0'-" WINOW NOT: min opener area.5sm opener min. clear dim. 80mm bedrooms '-9" 5'-" eiling eiling '- / 5'-9" '-9" '-9 /" '-0" W '-0" '-0" '-0" 599 SIM W5.995 '-" levations '-0" OMPRTMNT '' OMPRTMNT '' 00.7 ISION HISTORY North levation Scale: /" = '-0" 08 LIMITING ISTN: M R OF XPOSING UILING F: ompartment : 9 m ompartment :.5 m R OF UNPROTT OPNING: ompartment : 0 m ompartment :. m Percentage Unprotected opening: 9.% PRMITT: ompartment : 0.% ompartment : % ( 00 table...) 5'-0" T.O. Ridge /" = '-0" ast levation Scale: /" = '-0".0
9 5'-0" '-0" '-0" '-0" 8'-0" '-7" '-0" 8'-0" L Wall, eam T.O. Ridge. '-" R 0'-".0 / x 7" GL / R 0'-" K 09 F Kitchen 00 F athroom 09 /" x GL eiling R R F ROOF VOI (STORG) Line of underside /" x " GL beam over doors typ. Refer to structural for ledger specs F KITHN 00.5 HR F.R. R INING ROOM 0 8 / x " GL '- 7/8" LIVING ROOM 0 8'-0" F ROOF VOI 8 / x " GL R.0 R 8 / x " GL R5 eiling W/ Y 0 Y 0 Y 0 Y 0 Y 0 8".0 STION Scale: /" = '-0" % SLOP TO RIN F 5% SLOP TO RIN 00.7 F TYP..0 STION Scale: /" = '-0" 5'-0" '-0" '-0" '-0" 8'-0" '-7" '-" 0.55 " T.O. Ridge '- 5/8" K 0 F R R LIVING ROOM 0 8 / x " GL beyond HR IN LOS 0 ROOM 0 F /" x " GL (refer to structural - depth min).5 HR F.R. R R F X 0'-" eiling R. R SUIT NTRY HR F.R. R 8 / x " GL F Refer to structural for ledger specs F.5 HR F.R. R 8 / x " GL R R 8 / x " GL 0'-" eiling Sections Y 0 SUIT NTRY 00 W/ HOS TOWR MILOXS STION Scale: /" = '-0" F TYP. % SLOP TO RIN 5% SLOP TO RIN 0" 00.7 RWLSP F TYP. NOT: " min below grade for Frost Protection Typ..0 STION Scale: /" = '-0" /" = '-0".0 ISION HISTORY
10 5'-0".0 '-0" R R '-" eiling INING ROOM 0 LOS HLL 07 ROOM F HOS TOWR 0.5 HR F.R. R F R.995 eiling '-7" Y 0 R SLOP TO RIN % SLOP TO RIN 5% 8'-" ROOF VOI R.0 RFR TO.O LVL FOR RIN PTTRN.0 U/S footing " min below grade Frost Protection Typ. F TYP. Section at Hose Tower Scale: /" = '-0" /8" R RFR TO STRUTURL FOR FRMING NGL SPS LGR - RFR TO STRUTURL OTT LIN OF XTNT OF FLOOR YON T VOI TO OMMO WLL LIPS NOT: IS FOUNTION HIGHT.0 Y 0 Y Sections 00.7 '- / W F 8" F % SLOP TO RIN 8" Wall Section Scale: ctual Size.0 Wall Section Scale: / = '-0" Scale s Noted.0 ISION HISTORY
11 5'-0" R.0.0 '-" 5'-0" R W eiling eiling eiling R 8'-" '-" MIN K 09 STIR 00 Kitchen 00 8'-" '-" MIN..0 K 09 STIR 00 HR STORG.0 SUIT STIR '-".995 F F.995 F F SIM Y W/ Y 0 0 '- LOST ". W Wall Section Scale: ctual Size '- / W Wall Section Scale: ctual Size '- /. Section Through Stair Scale: ctual Size '- / 00.7 Wall Sections / = '-0". ISION HISTORY
12 '-" "X" LUM RILING P /" X " STL HNNL MM TMPR GLSS " MX. PSTL S ON PVRS LYRS TORH-ON MMRN OOR PNL THRSHOL ULK " SILL TO ONT W/ JM (TYP). POLYURTHN SLNT W TRIM K NGL INTRMITTNT PT SHIM UG SRN X STOPS WOO POST PR STRUTURL x STOP. MTL ROOF FINISH SM /" PLY ROOF SHTHING X8 " O.. UNO FLSHING TRIM ON PLY SHTHING Flashing /" X " STL HNNL FLOOR LVL LIN RIP FLSHING PINT GR X /" MX. " MX. / RUR PISTL ON PVRS TORH-ON MMRN x SLPRS (VRY WITH SLOP) MIN. % SLOP TO RIN RUN S S SHT UNR OOR THRSHOL, UP N OVR K NGL. FLSHING K ULK 7-PLY LT PNLS HNGR LOW T -x POST UG SRN X ORNR POSTS TYP. x SLTS x STRINGR THRU OLTS " FSI OR, PINT GR / MIN TP FLSHING TRIM ONT ULKING SIING - S LVTIONS FOR TYP PT W " O INH RIGI INSULTION (ROXUL OMFORT OR) 5-PLY LT PNLS HR S STRUT FOR ONNTION 5 Hose Tower etail - Plan View at Vent Scale: / = '-0" Hose Tower Vent etail Option - Section View (-) Scale: / = '-0" eck Railing etail Scale: / = '-0" eck/wall etail Scale: / = '-0" Patio oor Sill etail Scale: " = '-0" W.R.. K ULK (TYP.) PT X FURRING ON G LP SIING S..M. UG SRN TYP FROST OVR, MIN, RFR TO STRUTURL FOR ONNTION TIL FILTR LOTH GRVL MPPROOFING ONTINUOUS PRFORT RIN 8" MIN. ONRT FOOTING 5/8" x 9" GL S PLT RFR TO STRUTURL (S08) RF TO STRUTURL S08 FOR SPS / TYP. 7 0" TYP. Stair etail Scale: / = '-0" 7.5 TYP. " X STRINGR F Foundation and Framing etails ase of Garage Wall Scale: / = '-0" Noted.0 ISION HISTORY
13 LYRS TORH-ON MMRN UP N OVR UR LPP OVR FLSHING SIING - PLNK - X UR FLSHING PT x FURRING (RINSRN) LP ROOF MMRN OVR FLSHING INSULTION STOP FLSHING LOKING K ULK LP (TYP.) TO OVRLP K LG OF H FLSHING / / IRSMOUTH (TYP) RFR TO STRUTURL FLSHING TRIM TP X0 ON X0 FSI ORS RTURN SM OVR N OF LT X0 ON X0 FSI ORS RO & ULK FRM TO SLOP H FLSHING /W FOL N MS, TYP. GLZING PR-STRIP UG SRN K ULK WINOW FLNG ULK TO LT " LYRS TORH-ON MMRN UP WLL 00MM SM TPR ISOOR INSULTION LYRS TORH-ON MMRN Flat Roof ave Scale: " = '-0" Window Head etail Scale: " = '-0" FRMING NGL RF TO STRUTURL FLSHING GLULM M - RFR TO STRUTURL GL M RF TO STRUT UG SRN TYP ULK TO LT RTURN OVR INSULTION Scale: / = '-0" Flat Roof / Wall onnection OR - LPP SIING PT x FURRING ON G (RINSRN) SLNT (TYP.) 7 Typical Outside orner, Plan Scale: " = '-0" SIING - LP SHINGL " (TYP.) Scale: / = '-0" Flat Roof / Wall onnection /8" /8" ULKING /" LUMINUM "J" HORIZONTL LP SIING " TYP /8" /8" ULKING LUMINUM NGL & FLT R S MMRN WRPS ORNR " /W 5 Scale: " = '-0" Window Head etail PR-STRIP TP KR RO & IR RRIR SLNT, /8" MIN. GP K ULK FLNG T H N JM ONLY WITH ULKING etails " SLNT /" PM GSKT TP PT W FURRING HORIZONTL MNTITIOUS SIING. OUTSI ORNR. HORIZONTL LPP OUTSI ORNR NOT: FOR ILLUSTRTION ONLY RFR TO STRUTURL FOR ORNR ONNTIONS luminum Reveal Strip (ontinue at window above) / = '-0" 8 xterior Wall Penetration, Typ. Scale: " = '-0" 7 Typical Outside orner, Plan Scale: " = '-0" Window Jamb etail - LT Wall Scale: " = '-0".0 ISION HISTORY POLYURTHN ULK /8" ULKING
OR BUILDING PERMIT SHEET DATA PRELIMINARY NOT FOR CONSTRUCTION PROJECT. Author. Checker STAMP INTERIOR DESIGN: REVIEWED BY: DRAWN BY:
80 PRK VNU, LL 80 PRK VNU UP SUMITTL.5.03 PROJT ONTT INFORMTION OWNR RHITT ONTRTOR 80 Park venue, LL Onwuegbu rchitecture, LL. New Star General ontractors 590 Sidewinder r. 94 Parkridge rive 60 west 590
More informationPRILEX STEEL DETAILING LLC
PRILX STL TILING Project: Mountain Tech enter RFI# Subject: Structural pproval Set & Revised esign Set Seq. # ate: //0 Originator: Gaston Fernandez References Structural approval set "000 Structural Steel
More informationG-001. hord coplan macht Reed St. Wheat Ridge, CO SCHEMATIC DESIGN 07/30/15. Jeffco Schools 7-12 Reconfiguration: Stevens Elem.
5 hord coplan macht Nineteenth Street enver, O. 800 P 0.07.0977 www.hcm.com ONSULTNT: Jeffco Schools 7- Reconfiguration: Stevens lem. School 00 Reed St. SHMTI SIGN 07/0/5 PROJT: Jeffco Schools 7- Reconfiguration:
More informationMatthew Frankel 24 Drayton Street Savannah GA
Matthew Frankel rayton Street Savannah G 9--8056 mfrankel@hansensavannah.com en arter nterprises One uckhead Plaza. 060 Peachtree Road, NW. Suite 800 tlanta G 005 X 0 West roughton Street. Savannah, G
More informationNOT FOR CONSTRUCTION:
' - 8 /8" 4' - 7 7/8" 9' - 4" ' - 8 /8" 4' - ' - 8 /8" ' - 8 /8" 4' - 7 7/8" ' - 8" 9' - 4" ' - 8 /8" 4' - ' - 8 /8" ' - 8 /8" 4' - ' - 8 /8" 9' - 4" 4' - 7 7/8" ' - 8 /8" 0' - 5 /" / / - ROOM UNIT - ROOM
More informationEARL GREY SCHOOL GYM CONSTRUCTION: 845 HILLCREST AVENUE SW, CALGARY, ALBERTA CONSULTANTS: ARCHITECTURAL: STRUCTURAL: MECHANICAL: ELECTRICAL:
ONSTRUTION: 845 HILLREST VENUE SW, LGRY, LERT ONSULTNTS: RHITETURL: STRUTURL: MEHNIL: ELETRIL: #00, 000-9th VE. S.W. LGRY, LERT. PHONE: (403) 6-85 F: (403) 37-639 RESS RWING INE RWING REFERENE RHITETURL
More informationA-206 POWDER SF 4'-11"x 10'-7" POCKET W/ (2) DOORS 1 A-204 FLATSCREEN T.V. LINE OF TERRACE ABOVE SLOPED. 6 x 9 WINDOW OPENING W/ GALLERY
POWR 4 S '" x '" 5 S 4'"x '" () TRSH.O. ate W.H. ISPLY S SHOWR OOR 4 S '" x '" UST LOST () 5 SMT () QTR. R. IX ( ) L. PNL () UST ROOM ( 4 5 S '" x '" WIN " ILIN Heat n lo Primo 4 UP R escription NTILVR
More informationNEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING
NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes
More informationCode Review The following is a review of selected portions of the International Building Code 2015 (IBC2015) which apply to this project.
ESIGNE Y: RWN Y: HEKE Y: TE: SLE: //07 /" = '-0" OVER SHEET Hoover Metal uildings, Inc. PROJET FOR: PPROVLS: TE REVISIONS: Y: UILING "" P.O. ox 99 Lexington, S 907 (80)9-98 ode Review The following is
More informationWAYNE STATE UNIVERSITY ART ROOMS 250 & 254 RENOVATION 150 ART BUILDING DETROIT, MI WSU PROJECT NUMBER:
T PROJT TM: OLUMN LIN SIGNTION UILING STION UT INITOR - - PRTIL STION UT INITOR - LVTION INITOR INTRIOR LVTION INITOR X-- L LG O OL ON ONT ONST OOR ORR PT /W F I IM ISP N S /W WG F J L L LV Q W XIST XT
More informationP-194 Sheet Bar Measures 1 inch
esigned y: No.: 9 0 N. PRK RO, SUIT 0 HOLLYWOO, LORI 0 PHON: (9) - X: (9) 08- Janine M. lexander, P.. P.. No. 9, L PVMNT RSTORTION N MRKING TILS Y JM rawn y: hecked y: K P-9 SRIPTION WTR MIN RPLMNT PROGRM
More informationCENTER LINES OF OPTICAL CONNECTOR NOTE 2 CENTER LINES OF OPTICAL CONNECTOR CFP2-BASELINE-DRAWING 1L A3-B1-SW006 1/15 DETAIL B A16
02 4.0 7 04 NTR LINS O OPTIL ONNTOR NOT 2 MSURMNT IRLOW IRTION TIL 1 01 07 -- 17 1 05 0 20 19 NTR LINS O OPTIL ONNTOR 12 15 0 11 NOT. r 2-0 NOT.5 f PIN 5 PIN 104 2-21 14 1 4-09 TOP N OTTOM LIMITS O TH
More informationDESIGN AND CODE CRITERIA. Olivette FD AUTHORITY HAVING JURISTICTION. City of Olivette. Saint Louis County
9 STONYSI LN OLIVTT, MO 6 0 S RNT V ST LOUIS, MO 6 66. 6. 787 O L MP UTHORITY HVING JURISTITION ity of Olivette Saint Louis ounty pplicable odes 0 0 0 008 0 ON H OM M R 9 STONYSI LN Olivette odes & Permits:
More informationGriffin Chapel. Owner: Designer: Civil Engineer: Vicinity Map
Griffin hapel / Thursday, November 02, 207 : M / GRIIN HPPL.plnGriffin hapel Griffin hapel. alifornia Title 24 requirements have been taken into consideration. Refer to Title 24 energy analysis calculations
More informationbarrier free living board presentation june 14 th n17015 / / jcj architecture
board presentation june 4 th n705 / 07-064 / jj arhiteture square footage analysis square footage analysis uilding ore Spaes uilding ore Spaes uilding ore Spaes arrier Free Living Supportive Housing Shared
More informationMaterial List for Log Complete Packages
Material List for Log Complete Packages DAYLIGHT BASEMENT EXTERIOR WALLS ( If Applicable ) 2X6 Pressure Treated Sills With 6" Foam Sill Sealer 2X6 K.D. Spruce Plates And Studs 2X10 K.D. Spruce Headers
More informationGarage Design Guide. October 2018
Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief
More informationA Women's Restroom North Scale: 3/8" = 1'-0" 113 Women's Restroom South Scale: 3/8" = 1'-0" Keyed Notes Scale: NTS. 108 Men's Restroom North
'-0" '-" '-0" 6 '-6" " '-" '-6" '-6" 6'-0 " 6" 7 7 '-6" " '-" '-6" 6 '-0" '-" '-" '-0" 6 7 9 0 6 7 Toilet & Urinal Partitions, Re: Specs. oor and Frame as scheduled. Grab ar, Re: ccessory Schedule. Framed
More informationDuPont Self-Adhered Flashing Systems Installation Guidelines
Installation Instructions for Windows and oors FTER Water-Resistive arrier (WR) is Installed upont Self-dhered Flashing Systems Installation Guidelines INSTLLTION INSTRUTIONS FOR WINOWS N OORS FTER WTER-RESISTIVE
More informationDistribution: X Owner X Landscape X Structural X Mechanical. X Civil X Electrical X Acoustical. Date of
planning architecture construction NUM 03 istribution: X Owner X Landscape X Structural X Mechanical X ivil X lectrical X coustical Project: venir Museum ddendum No.: Project 15037-00-00 (rchitect s) ate
More informationA REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS
WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME
More informationBRICK CONCRETE ROUGH LUMBER CMU PLYWOOD FINISH LUMBER. RIGID INSULATION PH: URL:
5 4 RHITTURL RVITIONS / V ST J JT FF LT LUM NO RH SPH SSY UTO IR ONITIONING OV OUSTI, OUSTIL MRINS WITH ISILITIS T JUSTL JNT OV FINISH FLOOR LTRNT LUMINUM NOIZ RHITT, RHITTURL SPHLT SSMLY UTOMTI TT KR
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationThe better way to build TM. Installation Manual ROOF SIPs
The better way to build TM Installation Manual ROOF SIPs August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials..............................................
More informationEDUCATIONAL CLASS 1 EDUCATIONAL CLASS 2 ELEVATOR SKY LIGHT ABOVE PATIO /INNER COURTYARD FLOOR ABOVE BUILDING MG/ BOARD MEETING ROOM ADMIN ROOM 1
Z YNTHI ZHORUK rchitect Inc..WSHRM 770 0 80 7000 970 40 4400 6 PHON - 90..4480 MIN NTRY 4 60 000 740 800 4 MIN NTRY UP 6 6 7 7. 799 479 VSTIUL LOY 700 NQUT ROOM 0800 690 YM OURT MIN STIR 000 7 4400 447
More informationStaff Review Date: September 13, 2017 HDC PID#
harlotte Historic istrict ommission pplication for a ertificate of ppropriateness Staff Review ate: September, 07 H 07-6 PI# 087 LOL HISTORI ISTRIT: PROPERTY RESS: SUMMRY OF REQUEST: PPLINT: ilworth 60
More informationMONOGRAM 48" BUILT-IN SIDE-BY-SIDE REFRIGERATOR
MONOGRM 48" UILT-IN SI-Y-SI RFRIGRTOR STION 1 STNR INSTLLTION 1/4" FRM PNLS 3/4" OVRLY PNLS STION 2 FLUSH INST INSTLLTION STNR INSTLLTION 25 1/2" (64.8) 48" (121.9) 23 7/8" (60.7) 1 3/4" (4.4) *84" (213.4)
More informationWater Street Apartments
9//5, :8 PM: /Volumes/H/DESIGN/LIENTS/_TIVE PROJETS/MFM--Multifamily-IslandHousingTrust-MV/H--MFM-05-RHID/MFM- -050909.pln 9//5 Water Street partments PROJET INFORMTION lient: Designer: uilder/ontractor:
More informationPERMIT DRAWINGS GULF COAST AMMONIA TERMINAL DOCK GULF COAST AMMONIA (GCA) GALVESTON COUNTY, TEXAS DECEMBER 2018
PRMIT RWINGS GUL OST MMONI TRMINL OK GUL OST MMONI (G) GLVSTON OUNTY, TXS LIST O RWINGS RWING NO. RWING TITL LTST RVISION T TITL SHT HOUSTON 2 OVRLL PROPOS SIT PLN TXS ITY SIT LOTION PROPOS SIT PLN 4 PROPOS
More informationAIRFORCE CIVIL ENGINEERING CENTER DYNAMIC PROTOTYPE DEVELOPMENT GENERAL MAINTENANCE/PERIODIC INSPECTION HANGAR
esigned y: rawn y: hecked y: Reviewed y: : ontract No: SIZ: IL NM: 22" x 34" pproved US RMY NGINR ISTRIT ORPS O NGINRS 1 RWING LIST NUMR NM -1 OVR -1 MOULS -2 MOULS -3 MOULS -4 MOULS -5 PROO O ONPT (PO)
More informationE-0.1 TRIAD 41ST TRIAD CAPITAL TH AVENUE NE SEATTLE, WA SYMBOL SCHEDULE A S S O C I A T E S, I N C. REVISIONS
IL LOTION: :\\RWIN\TRI \-0. TRI - YMOL.W 0 P 9% T 0.. P UMITTL 0.0. MUP UMITTL 0.. IUN YMOL HUL PROJT : RWN Y: R HK Y: R/R -0. IL LOTION: :\\RWIN\TRI \-.0 TRI - IT.W (NOT ON IT) TH VNU N 0' R.O.W. ITIN
More informationA '-4" 10'-10" 16'-6" 7'-0" 23'-0" 10 3/4" 9'-6" 5 1/4" 2'-11 1/2" 2'-6" 3'-2 3/4" 3'-1" 4'-8 3/4" 2'-5 3/4" 2'-6" 7'-2" R.O. HD 7'-3" R.O.
Name of Trust, First Floor Plan -. -. 7'-" 0'-0" '-" 7'-0" '-0" -. N '-0" 9'-0" 7'-" 7'-" '-0" '-" " 0" '- /" '-0" '- /" 9" '-0" 9" '-0" 0 /" '-" '- /" '-" '-" '-0" '-" 0 /" 9'-" /" '- /" '-" '- /" '-"
More informationDisclaimer for Review of Plans
isclaimer for Review of Plans The San rancisco Planning ode requires that the plans of certain proposed projects be provided to members of the public prior to the ityʹs approval action on the project.
More informationHOMES BY NOVARE DEVELOPMENT
9 PARK LANE SW A0 A A A3 A A5 A A7 A9 A0 A A A3 DRAWING INDEX COVER SITE PLAN MAIN FLOOR PLAN SECOND FLOOR PLAN ASEMENT PLAN ELEVATIONS ELEVATIONS GARAGE PLANS UILDING SECTIONS UILDING SECTIONS & NOTES
More informationMaterial Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft
Material Report for plan: Willowdale A Page 1 of 7 SQUARE FOOTAGE TOTAL Area 1692 sqft EXCAVATION & FOUNDATION EXCAVATION & BACKFILL Conc. Footing (volume) 5 m³ 122.50 612.50 Conc. Footing (length) 6"x20"
More informationMonogram 48" Built-In Side-by-Side Refrigerator
Monogram 48" uilt-in Side-by-Side Refrigerator STION 1 FLUSH INST INSTLLTION STION 2 STNR INSTLLTION 1/4" FRM PNLS 3/4" OVRLY PNLS OVRLL IMNSIONS FTR PNL INSTLL FLUSH INST INSTLLTION 50" (127.0) 26" (66.0)
More informationOUTSIDE STRIKE INSIDE. TEMPLATE-S6100 Devices covered by this template: Panic Rim Device and Fire Rim Device. FINISHED FLOOR
TRIM MOUNTING HOLS: 1. rill 7/16 dia. Thru Holes 4X THIS SI UP FOR LHR OOR 4X.375 dia. US FOR SXOLTS STRIK MOUNTING HOLS: 1. rill.201 dia. (#7 rill) holes 2X. 2. Use #1/4-20 Tap JUST TH STRIK FOR PROPR
More informationMONOGRAM 36" BUILT-IN FRENCH-DOOR BOTTOM-FREEZER
MONOGRM 36" UILT-IN FRNH-OOR OTTOM-FRZR STION 1 FLUSH INST INSTLLTION STION 2 STNR INSTLLTION FRM PNLS 3/4" OVRLY PNLS MONOGRM 36" UILT-IN FRNH-OOR OTTOM-FRZR OVRLL IMNSIONS FTR PNL INSTLL 38" (96.5) FLUSH
More informationDuPont Self-Adhered Flashing Systems Installation Guidelines
ir arrier Rough Opening Treatment for Integral Flanged Windows EFORE Water-Resistive arrier (WR) is Installed DuPont Self-dhered Flashing Systems Installation Guidelines IR RRIER ROUGH OPENING TRETMENT
More informationInstallation of Fiberglass Windows
Installation of Fiberglass Windows Before you begin please read and understand these installation instructions. The following installation instructions are recommended by Norwood and failure to follow
More informationSTEP 7 'KEY' ON INNER INSERT ASSY. H. CRIMP CONTACTS ONTO INDIVIDUAL CONDUCTORS (REFER TO SHEET 5 FOR DETAILS).
STP STP INTIY LS S RQUIR I. SLI TH RI OVR TH RIMP ONTTS.. SLI OMPONNTS ONTO L(S) IN TH ORR SHOWN TH RR O TH GROMMT WILL INIT TH ORINTTION & HOL INTIITION LTTRS **TWINX & TRIX SSMLY WITH RUING OLLR** OR
More information2012 IBC CHAPTER 17 STRUCTURAL TESTS AND SPECIAL INSPECTIONS
UIR RSRH ON \\asbs\ata\\projects\lsp\lspollab I\uzzsaw\_Struct Sync Folder\UIR Research One_Struct_0.rvt /0/0 ::0 PM 0000 GNRL. The structure reflected on the drawings is structurally sound in its completed
More informationCustom corner pile by Skyline Steel. Backfill with limestone quarry compacted in 6-8" layers to min. 95% dry density. 12" thk RC Footing 61'-9"
' ustom corner pile by Skyline Steel ' SKZ sheet piles by SKYLINL, installed as per manufacturers recommendations ' ' " ' " ' Mx0 6 steel 6' 9'0" 9' ' ' New Ø precast xisting bridge to be xisting pile
More information5' Multi-Purpose Easi-Frame Assembly Instructions
1 5' Multi-Purpose asi-frame ssembly Instructions Using this frame with: n XL Joinery door pair (using hinges) with either a fixed or hinged asi-frame emi Panel XL Panels used as a i-fold with a fixed
More information8' Multi-Purpose Easi-Frame Assembly Instructions
1 8' Multi-Purpose asi-frame ssembly Instructions Using this frame with: n XL Joinery door pair (using hinges) with either fixed or hinged asi-frame side panels or emi Panels on either side asi-frame Panels
More informationStaff Review Date: August 9, 2017 HDC PID#
harlotte Historic istrict ommission pplication for a ertificate of ppropriateness Staff Review ate: ugust 9, 0 H 0-0 PI# 00 LOL HISTORI ISTRIT: PROPERTY RESS: SUMMRY OF REQUEST: PPLINT/OWNER: ilworth 9
More information10x10 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationREQUEST FOR QUALIFICATIONS FOR CONSILODATED RENT-A-CAR AND PUBLIC PARKING DECK C RFQ FOR DESIGN-BUILD PRE-CAST CONCRETE PROVIDER
Greenville-Spartanburg irport istrict onsolidated Rent--ar and Public Parking eck RFQ / esign-uild Pre-ast oncrete Provider ddendum No. REQUEST FOR QULIFITIONS FOR ONSILOTE RENT--R N PULI PRKING EK RFQ
More informationE-Blueprints. Children s Backyard Playhouse 8 x sq. feet main 32 sq feet porch 2 x 4 Framed Walls 6' Ceiling Height
SDS-CAD - Specialized Design Systems E-BLUEPRINTS C ABINS G ARAGES Children s Backyard Playhouse 8 x 10 80 sq. feet main 32 sq feet porch 2 x 4 Framed Walls 6' Ceiling Height Plan sets contain the following:
More informationLocation Map Project: Home2 Applicant: Buhl Investors Minnetonka I LLC Address: 6030 Clearwater Dr ( a) ±
ROW L N R R R RW T R T W R T I W 49 4 T RST 49 4 INT T RST INT R T W L IT W R KR R Nine Mile reek 6 T O N I 494 OUN T OR S I494 TO OR6 Subject Property Y RO 6 OUNTY RO 6 IWY 6 6 WY I IWY 6 Y 6 IW Location
More informationA B C D 12.PROVIDE PLUMBING PER STATE PLUMBING CODE REQUIREMENTS 13.HVAC SYSTEM TO BE DESIGN BUILD, PROVIDE PER STATE CODE REQUIREMENTS.
PL LG PRTITIS, RS ITMS T RMV XISTIG R XISTIG PRTITI W R FULL HIGHT PRTITI PRTIL HIGHT PRTITI TRT LIMIT LI RM M 0 W T W IMSI T TH F F FRMIG R MSRY T W STRUTI, TYP. IMSI T TH F F FIISH T XISTIG STRUTI IMSI
More information6x6 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationDuPont Flashing Systems Installation Guidelines
Installation Instructions for Field pplied Flanged BEFORE Water-Resistive Barrier (WRB) is Installed DuPont Flashing Systems Installation Guidelines INSTLLTION INSTRUTIONS FOR FIELD PPLIED FLNGED DOOR
More informationHello, Linx Part Number CSI-RGFB-ccc-UFFR CSI-RSFB-ccc-UFFR CSI-RSFE-ccc-UFFR CSI-SAFB-ccc-UFFR CSI-SAFE-ccc-UFFR
rom: Sent: To: Subject: ttachments: Kris Lafko Wednesday, May, 0 0:0 M Pcn System PN# - Updated Linx able ssembly rawings WinZip ompressed ttachments.zip Hello, In performing
More informationSTEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504
ATTACH TO STRUC- TURE ABOVE 1/8"Ø BOLT W/ LOCKING NUT #12 WIRE TIE IN PLANE EACH TEE ANGLED 45 FROM HORIZ ATTACH 2" FROM INTERSECTION COMPRESSION POST LOCATE WITHIN 2" OF TEE INTERSECTION SIZE STRUTS FOR
More informationPANCAKE HEAD SCREWS Piercing Point and Drill Point
WOO OR THIN MTL Piercing apacity: S & 410SS
More informationDear Contractor, I am glad that you are interested in our window rebate program.
Dear Contractor, I am glad that you are interested in our window rebate program. I have included three documents with this letter. One is our form to indicate your intention to participate in the program.
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e H O W B U I L D S H E D. C O M Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationHOW TO BUILD A 12X8 SHED
HOW TO BUILD A 12X8 SHED With Illustrations, Drawings & Step By Step Details Note: This is a sample plan from RyanShedPlans. All other plans in our collection goes indepth with more details, more instructions,
More informationMaterials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel
This 8 12-ft. shed features a simple gable roof, double doors, and side and rear windows for natural lighting. With full-height walls and doors, there's ample room for storing large items or creating a
More informationDuPont Flashing Systems Installation Guidelines
Installation Instructions for Non-Flanged BEFORE Water-Resistive Barrier (WRB) is Installed DuPont Flashing Systems Installation Guidelines INSTLLTION INSTRUTIONS FOR NON-FLNGED DOOR BEFORE WTER-RESISTIVE
More informationLAYOUT OF STONE PILE SCALE=1:100 SECTION OF PILE FOUNDATION SCALE=1:100 BUILDING LINE TRENCH LINE
22120 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2120 2000 1500 1500 2000 1500 REV. ESRIPTION TE 2000 UILING LINE TRENH LINE 2000 2000 2000 16175 GROUN LEVEL 2000 (STONE PILE) GGREGTE N SN (1:4)
More information24 X32 3 CAR GARAGE POLE BARN STYLE FRAME
24 X32 3 CAR GARAGE POLE BARN STYLE FRAME 3 ENTRY DOOR 2 WINDOWS, 1 @ EA. END 1-16 X8 GARAGE DOOR 1-9 X8 GARAGE DOOR 4 CONCRETE SLAB 10 WALLS 4/12 PITCH METAL ROOF METAL SIDING INDEX PAGE DESCRIPTION 1
More informationProperty Line. House Type 4. 1,280 sf 6' - 0" 6' - 6" 10' - 0" 6' - 6" 10' - 0" 6' - 0" 6' - 6" 10' - 0" 6' - 6" House Type 5 1,088 sf 5' - 0"
COMMON WORK ARCHITECT, PLLC 0 0 90 / COMMONWORK.ARCHI Property Line House Type,80 sf House Type,80 sf 6' - 6" 6' - 6" 8' - 0" 6' - 6" OHE OHE Building not in project scope 7' - 0" ' - 0" 8' - 0" House
More informationDuPont Flashing Systems Installation Guidelines
Installation Instructions for Field pplied Flanged EFORE Water-Resistive arrier (WR) Is Installed DuPont Flashing Systems Installation Guidelines INSTLLTION INSTRUCTIONS FOR FIELD PPLIED FLNGED WINDOW
More informationMULTI-STORY FIRE STOPPING ASSEMBLY FRAMED OPENING JAMB (LOW CELL) INDEX SHEET
KPH-DS-01-MTLV KPH-PP-01-MTLV KPH-PP-02-MTLV KPH-PJ-01-MTLV KPH-PJ-02-MTLV KPH-PJ-03-MTLV KPH-PJ-04-MTLV KPH-PJ-05-MTLV KPH-FS-01-MTLV KPH-FS-02-MTLV KPH-FS-03-MTLV KPH-BS-01-MTLV KPH-BS-02-MTLV KPH-BS-03-MTLV
More informationBest Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.
Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy
More information12x12 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationFlashing Materials. Rough Opening Preparation
Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or
More informationST. ANDREWS TINY HOME VILLAGE SITE PLAN
16 PUBLIC ALLEY FENCE ENCLOSURE = 70-0 4 WOOD FENCE AROUND SLEEPING UNITS 10-0 10-0 14-0 11-6 13-0 4 WOOD FENCE AROUND 14-9 12-8 3/4 BATH HOUSE PAVILION ADA SLEEPING UNIT FENCE ENCLOSURE = 73-5 SLEEPING
More informationDuPont Flashing Systems Installation Guidelines. Version 2
DuPont Flashing Systems Installation Guidelines Helping you get the job done right rick Mold, Non-Flanged and Field pplied Flanged EFORE Water-Resistive arrier (WR) Is Installed Version 2 Table of ontents
More informationMETAL CONCRETE CONCRETE BATT INSULATION, SOUND ATTENUATION BLANKET MASONRY UNIT RIGID INSULATION WOOD BITUMINOUS PAVING PLYWOOD EARTH
GENERL NOTES N SPEIFITIONS: MISELLNEOUS BY ESRIPTION ESIGN N LOING BBREVITIONS: SWN LUMBER LMINTE VENEER LUMBER (LVL) SYMBOLS: ONRETE METL STEEL STU PRTITION ONRETE MSONRY UNIT BTT INSULTION, SOUN TTENUTION
More informationSSRLS-3 / SSRLU-3 Installation Instructions
5mm Hex Nut Upper Telescoping hannel & Screws Packing List QTY. ITM 1 Top Telescoping hannel 1 ottom Telescoping hannel w/ self drilling screw 15" 18" 1 Top and ottom Rod with connecting arm 25-½ 2 ¼ -
More informationNorwood Windows Permaglass Fiberglass Products Installation Instruction
Norwood Windows Permaglass Fiberglass Products Installation Instruction Care and storage of fiberglass windows: Fiberglass products purchased from Norwood Windows must be stored in a dry sheltered area
More informationInstallation Guide - Evolution Series Wood Siding
Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration
More informationInstallation Instructions Model # TEL-100 / 200 Manual Locking or Self Locking
INSTLLTION INSTRUTIONS TL-100 / 200 GSS-oors TL 1-406-212-2334 MIL rg@gssdoors.com W www.gssdoors.com GSS oors (406) 212-2334 (406) 897-2121 rg@gssdoors.com www.gssdoors.com TM Multi-Point eadbolt Installation
More informationRF / ELECTRICAL PARAMETER MIN TYP MAX UNIT
TL00 800-000 MHz 5W Linear Power mplifier SRIPTION This class Gas module is designed for both military and commercial applications. It is capable of supporting any signal type and modulation format, including
More information8x8 Shed Plans and Building Guide
Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact
More informationMTROPOLITN STT UNIVRSITY SIN UTION NTR 80 St. Peter Street, Ste. 00 Saint Paul, MN 0..0 bwbr.com onsultants opyright 0 LKP ngineers, Inc. 9 West ounty Rd, Suite 00 Saint Paul, MN - Phone:.. ax:.. www.lkpb.com
More informationDW HORIZONTAL INSTALLATION
AR-PJ-01-DW2H 2" HORIZONTAL PANEL JOINT AR-PJ-02-DW2H 2" VERTICAL PANEL JOINT AR-PJ-03-DW2H 3" HORIZONTAL PANEL JOINT AR-PJ-04-DW2H 3" VERTICAL PANEL JOINT AR-PJ-05-DW2H CUSTOM REVEAL AR-PJ-06-DW2H DW-2000S
More informationBUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame
BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood
More informationDuPont Flashing Systems Installation Guidelines. INstallation instructions after water-resistive. Version 2
DuPont Flashing Systems Installation Guidelines Helping you get the job done right INstallation instructions after water-resistive barrier (wrb) is installed Version 2 Table of ontents pplicable Products...2
More informationInstallation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
More informationDuPont Flashing Systems Installation Guidelines
Installation Instructions for Brick Mold FTER Water-Resistive Barrier (WRB) is Installed DuPont Flashing Systems Installation Guidelines INSTLLTION INSTRUTIONS FOR BRIK MOLD WINDOW FTER WTER-RESISTIVE
More informationMONOGRAM 36" INDUCTION COOKTOP
OVRLL IMNSIONS 1 1/16" (2.7) utout overlap 36" (91.4) 33 7/8" (86.0) utout width 5/8" (1.6) utout overlap SPIITIONS Overall Width 36" (91.4 cm) 20 3/8" (51.8) 19 1/8" (48.6) utout depth Overall epth 20
More informationPRIMED STRAND REVERSIBLE SHAKE
PRIMED STRAND REVERSIBLE SHAKE PRIOR TO INSTALLATION Inspect product for any issues before installing (breakage, surface defects, foreign objects). Do not install questionable product. Report any problems
More informationINSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS
2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed
More informationS6PF ISO VIEW D INCH_D_REV G S6PF
RWN.WISHON NUTILUS, IN. T 09//0 00 S NUTILUS RIV, VNOUVR, W 9 LL PPLIL NUTILUS STNRS N SPIITIONS PPLY. ITM efault/qty. PRT NO. SRIPTION -0 ROSSMMR " -0 rossmember Seat ootpad -0 HNL, P LY JUSTL -0 HNL
More informationSite Context 1 : 1500 SITE STATISTICS LOT: (NOT TO SCALE) 27,845.44SM 60.40SM EXISTING LOT AREA EXISTING LOT FRONTAGE (COLERAINE DRIVE)
RVISIONS, RORS. // View erial L L L SIT SUR INX and TULTION L - LNSP / SO R - ONRT PV R - SPLT PV R - RLIM SPLT PV R - L m L9 L mm m :,9.SM -.%,.SM -.%,.SM -.%,.SM -.% m Site reas Index : UILIN "" I L
More informationWith Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans
12 X 8 Shed Plans With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans Blueprints And Diagrams Instructions For Building The Shed
More informationMAXIMUM PANEL ATTACHMENT FASTENER SPACING IS 24" O.C. ALL FASTENERS TO PENETRATE WOOD 3/4" MIN. AND METAL FRAMING 1/2" MIN.
PLYWOOD SHEATHING DMI SOFFIT PANEL #10-13 GP PANCAKE HEAD (JC) - J CLOSURE (LC) - L CLOSURE #9-15 X 1 1/2" WOODZAC GP APPROVED MOISTURE BARRIER SOFFIT TO WALL PANEL WPRP-H-01-00 APPROVED MOISTURE BARRIER
More informationTHESE DETAILS ARE PROVIDED AS A GUIDELINE FOR PROPER PANEL AND ASSOCIATED COMPONENT INSTALLATION, AND ARE BASED ON INDUSTRY ACCEPTED PRACTICES.
FRKPV-DS-01-MTLH FRKPV-PJ-01-MTLH FRKPV-PJ-02-MTLH FRKPV-PJ-03-MTLH FRKPV-FS-01-MTLH FRKPV-FS-02-MTLH FRKPV-BS-01-MTLH FRKPV-BS-02-MTLH FRKPV-BS-03-MTLH FRKPV-BS-04-MTLH FRKPV-OC-01-MTLH FRKPV-IC-01-MTLH
More informationInstallation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
More informationSTACKING MULTI-SLIDE DOOR SYSTEM
SMSD STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION! CAUTION Lead-based paint may be present in older homes, and the removal
More informationINSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL
WOOD PIVOTING CIRCLE/ OVAL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to these instructions will VOID any
More informationMONOGRAM 36" INDUCTION COOKTOP
OVRLL IMNSIONS 1 1/16" (2.7) utout overlap 36" (91.4) 33 7/8" (86.0) utout width 5/8" (1.6) utout overlap SPIITIONS Overall Width 36" (91.4 cm) 20 3/8" (51.8) 19 1/8" (48.6) utout depth Overall epth 20
More information3M Air and Vapour Barrier 3015 Technical guide
3M Air and Vapour Barrier 3015 Technical guide Product overview Typical physical properties For installation ease and flexibility, 3M Air and Vapour Barrier 3015 High performance 3M acrylic adhesive grabs
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationStrands & Standards CARPENTRY 2
Strands & Standards CARPENTRY 2 COURSE DESCRIPTION This is the second in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden structures and fixtures
More informationDuPont Flashing Systems Installation Guidelines. Version 2
upont Flashing Systems Installation Guidelines Helping you get the job done right Brick Mold, Non-Flanged and Field pplied Flanged FTER Water-Resistive Barrier (WRB) Is Installed Version 2 Table of ontents
More information