DuPont Self-Adhered Flashing Systems Installation Guidelines

Size: px
Start display at page:

Download "DuPont Self-Adhered Flashing Systems Installation Guidelines"

Transcription

1 Installation Instructions for Windows and oors FTER Water-Resistive arrier (WR) is Installed upont Self-dhered Flashing Systems Installation Guidelines INSTLLTION INSTRUTIONS FOR WINOWS N OORS FTER WTER-RESISTIVE RRIER (WR) IS INSTLLE FOR UILINGS LESS THN 5 STORIES N LOW-RISE MULTI- FMILY RESIENTIL UILINGS LESS THN 6 STORIES REVISION 11/17

2 upont Self-dhered Flashing Systems Installation Guidelines Table of ontents pplicable Products... 2 Required Materials ased on Project Requirements, etails, and Specifications*... 3 Warranty... 3 General Instructions... 3 Key Installation Requirements for rainable Window / oor Installation Under the Limited Product and Labor Warranty... 4 Integral Flanged Window FTER upont Tyvek WR is Installed... 5 Integral Flanged djacent Rectangular Windows FTER upont Tyvek WR is Installed rip ap Installation with Integral Flanged Windows and oors Integral Flanged oor FTER upont Tyvek WR is Installed rick Mold Window FTER upont Tyvek WR Is Installed pplicable Products upont Self-dhered Flashing Systems Products PROUT upont FlexWrap NF upont FlexWrap EZ upont StraightFlash upont StraightFlash VF upont Flashing Tape Water-Resistive arriers (WR) WITH 6 in 9 in 2.75 in 4 in 9 in 6 in 4 in 6 in 9 in 12 in rick Mold oor FTER upont Tyvek WR Is Installed Field pplied Flanged Window FTER upont Tyvek WR Is Installed Field pplied Flanged oor FTER upont Tyvek WR Is Installed Non-Flanged Window FTER upont Tyvek WR Is Installed Non-Flanged oor FTER upont Tyvek WR Is Installed Integral Flanged Window with a Wood uck ump-out FTER upont Tyvek WR is Installed PROUT IMENSIONS RE upont Tyvek HomeWrap 3 ft x 100 ft 3 ft x 165 ft 5 ft x 200 ft 9 ft x 100 ft 9 ft x 150 ft 10 ft x 100 ft 10 ft x 150 ft 300 sq ft 495 sq ft 1,000 sq ft 900 sq ft 1,350 sq ft 1,000 sq ft 1,500 sq ft upont Tyvek StuccoWrap 5 ft x 200 ft 1,000 sq ft upont Tyvek rainwrap upont Tyvek ThermaWrap LE upont Tyvek ommercialwrap upont Tyvek ommercialwrap 9 ft x 125 ft 10 ft x 125 ft 5 ft x 150 ft 9 ft x 100 ft 5 ft x 200 ft 10 ft x 125 ft 5 ft x 200 ft 10 ft x 125 ft 1,125 sq ft 1,250 sq ft 750 sq ft 900 sq ft 1,000 sq ft 1,250 sq ft 1,000 sq ft 1,250 sq ft opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 2

3 upont Self-dhered Flashing Systems Installation Guidelines Required Materials ased on Project Requirements, etails, and Specifications* PROUT upont Tyvek Tape upont Tyvek Wrap ap Fasteners or recommended fastening system upont Window & oor Foam upont Residential Sealant, or other recommended sealant upont dhesive/primer acker Rod rushes for Surface Preparation J-Roller *pply per manufacturers guidelines. For non upont products, upont assumes no liability in use of recommended products; installers need to evaluate suitability of recommended products in their end-use applications. Warranty Please refer to the upont Weatherization Products 10-Year Limited Warranty for uildings Less Than 5 Stories and Low-Rise Multi-Family Residential uildings Less Than 6 Stories. NOTE: In order to make a claim under the upont Weatherization Products 10-Year Limited Product and Labor Warranty, you must have met all of the terms and conditions of the warranty, including use of the applicable upont Installation Guidelines. In the event that a specific detail or installation technique is not covered in the upont Installation Guidelines at the time you are building, then the Key Installation Requirements outlined in this document must have been followed in order to make a claim under the warranty. It is in the sole discretion of upont to determine if full compliance with the Key Installation Requirements exists. Please contact upont or a upont Tyvek Specialist if you have any questions regarding any upont Installation Guideline. General Instructions These installation guidelines are intended for buildings less than 5 Stories and low-rise multi-family residential buildings less than 6 stories when performance requirements do not exceed STM E1677 (65 mph equivalent structural load and 15 mph equivalent wind-driven rain water infiltration), and window/door design ratings that do not exceed P45. upont self-adhered flashing systems products should be installed on clean, dry surfaces that are free of frost. Wipe surfaces to remove moisture, dirt, grease and other debris that could interfere with adhesion. pply pressure along entire surface of flashing for a good bond using firm hand pressure, J-roller, or alternate tool without sharp edges (such as a plastic carpet tuck tool) to assist with application of uniform pressure during installation of upont self-adhered flashing systems products. Remove all wrinkles and bubbles that may allow for water intrusion by smoothing surface and repositioning as necessary. When flashing the sill area for windows and doors, upont recommends the use of 6 wide upont FlexWrap NF for 2 x 4 framing and 9 wide upont FlexWrap NF for 2 x 6 framing. s an option, if a rigid back dam is desired, cut the corner back dam the length of the sill and nail into place on the interior edge of the sill prior to installation of upont FlexWrap NF. Then install upont FlexWrap NF over sill and corner guard back dam. If using 6 upont FlexWrap NF with optional rigid back dam, seal ends of corner guard with upont Residential Sealant or recommended sealant. oor and window rough sill framing must be level or slightly sloped to the exterior to ensure proper drainage to the exterior. This best practice ensures continuous support with positive slope to the exterior. upont self-adhered flashing systems products are not intended for throughwall flashing applications. In lieu of temporarily taping, upont Tyvek flaps at window head and jambs can be tucked under the upont Tyvek air and water barrier. upont Residential Sealant should be tooled flat to allow the natural curing process to create a concave joint. Please contact your local upont Tyvek Specialist for additional information and installation support. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 3

4 upont Self-dhered Flashing Systems Installation Guidelines O NOT STRETH upont FlexWrap NF when installing along the length of sills or jambs. upont FlexWrap NF is only intended to be extended when covering corners or curved sections. upont self-adhered flashing systems products perform best when installed at temperatures above 25 F ( 4 ). void placing upont Tyvek Wrap ap Fasteners where flashing or upont Tyvek Tape will be installed; however, upont Tyvek Wrap ap Fasteners can be applied over the flashing. dverse weather conditions or cold temperatures may require use of a primer to promote adhesion of upont self-adhered flashing products to most common building materials. oncrete, masonry, and fiber-faced exterior gypsum board require the use of upont dhesive/primer. Please call Tyvek ( ), visit or consult your local upont Tyvek Specialist for additional information and installation support. Key Installation Requirements for rainable Window / oor Installation Under the Limited Product and Labor Warranty When flashing windows or doors, the following principles must be followed: When installed properly, upont StraightFlash, upont FlexWrap NF, and upont Flashing Tape provide nail sealability at window/door openings to help protect critical window-wall interfaces. Metal sill pan flashing may be used, but must not replace flexible sill flashing that provides nail sealability. upont self-adhered flashing systems products comply with M , Voluntary Specification for Self dhering Flashing Used for Installation of Exterior Wall Fenestration Products, which has a modified version of STM 1970 that is more representative for vertical wall applications. irect water onto an acceptable air and water barrier drainage plane with an unobstructed path to the exterior of the wall. Provide a drainage path for any water intrusion through the window/door attachment system that collects at the sill. Properly integrate flashing with acceptable upont Tyvek WR in accordance with the details in this installation guideline. upont self-adhered flashing systems products must be applied with a minimum 2 lap onto the WR. upont requires that upont FlexWrap NF and StraightFlash be covered within nine months (270 days) of installation. upont requires that upont Flashing Tape be covered within four months (120 days) of installation. Ensure that window / door and flashing system design takes into account common factors that will impact performance, such as: limate considerations: Rainfall, Wind, Temperature (hot / cold cycles), Humidity uilding design: Window / Wall esign (overhangs, recessed openings, bumpouts), Wall ssembly (wood frame or masonry), Window System (wood or vinyl), New onstruction or Replacement Window drainage path UV exposure prior to the construction of the exterior facade Field testing the window / door and wall installation as a complete system is a recommended best practice. Use of trained installers is highly recommended. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 4

5 upont Self-dhered Flashing Systems Installation Guidelines Integral Flanged Window FTER upont Tyvek WR is Installed This method applies to the following products: upont StraightFlash, upont FlexWrap NF and upont Flashing Tape STEP 1 Prepare the upont Tyvek WR for window installation:. Make an I-ut (Standard I-ut) in the upont Tyvek WR (modified I-ut is also accepted). For an I-ut, begin with a horizontal cut across the bottom and the top of the window frame (for round top windows, the cut should begin above the mull joint). From the center, cut straight down to the sill.. ut two 45 degree slits a minimum of 8 extending from the corner of the window head, up and away from the window opening. This will create a flap above the rough opening to expose sheathing or framing members to allow head flashing installation (see step 4). Flip head flap up and temporarily secure with upont Tyvek Tape. LTERNTE METHO TO SEURE HE FLP: In lieu of temporarily taping, the head flap can be tucked under the upont Tyvek WR. NOTE: Some windows and flashing widths may require longer slits.. Fold side flaps into rough opening and secure to inside wall. ut off excess flaps if desired. 8 Minimum Exterior Exterior lternate Method to Secure Head Flap 8 Minimum for Roundtop Windows opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 5

6 upont Self-dhered Flashing Systems Installation Guidelines STEP 2. ut upont FlexWrap NF at least 12 LONGER than width of rough opening sill (S). Use roll widths sufficient to achieve a minimum of 1 adhesion EYON where the window frame will be located, ensuring 2 3 adhesion onto the face of the wall.. Remove wide piece of release paper. Position on horizontal sill by aligning the inside edge of the narrow release paper with the face of the wall to ensure 2 3 of the FlexWrap NF will be adhered to the face of the wall with a minimum of 6 up each jamb. dhere into rough opening.. Remove narrow release paper.. Fan out FlexWrap NF at corners and adhere onto face of wall. ontinue adhering onto face of wall along sill. overage of upont FlexWrap NF should be 2 3 onto the face of the wall. No Gap in orner Window Jamb upont FlexWrap NF 3 (S) WRONG Sill ORRET FRONT VIEW ORNER ETIL Sill Width + 12 inches 6 Minimum O NOT STRETH opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 6

7 upont Self-dhered Flashing Systems Installation Guidelines STEP 3 pply upont Residential Sealant, upont or recommended sealant, on three sides (jambs and head) as shown below. For Rectangular Windows STEP 4. Install window according to manufacturer s instructions.. ut two pieces of upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape for jamb flashing extending 1 above window head flange and below bottom edge of sill flashing. Remove release paper and press tightly along sides of window frame. OPTIONL: If installing a drip cap as part of the window installation before the upont self-adhered flashing membrane at the window head flange, see rip ap Installation Section and refer to Option 1. NOTE: The vertical leg of the drip cap must not be taller than the window head flange when installing drip cap according to Option 1.. ut a piece of upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape for head flashing long enough to extend beyond outer edges of jamb flashings. Remove release paper and install completely covering flange and adhering to exposed sheathing or framing members. OPTIONL: If installing a drip cap as part of the window installation, but after the window head flashing, see rip ap Installation Section and refer to Option 2. NOTE: Ensure proper shingling. upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape at jambs must overlap the upont FlexWrap NF at the sill and adhere to the upont Tyvek WR below the sill. OPTIONL: pply upont Residential Sealant, or recommended sealant at sill with at least two (2) 2 gaps in the sealant bead for every 4 of window to allow for drainage. INORRET INORRET ORRET upont FlexWrap NF upont StraightFlash upont StraightFlash reverse flashed flush with upont overlaps upont opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 FlexWrap NF FlexWrap NF 7

8 upont Self-dhered Flashing Systems Installation Guidelines STEP 5. Flip down upper flap of upont Tyvek WR so it lays flat across head flashing.. ut ~1 strip of the upont Tyvek WR at lower horizontal edge of head flap.. t the head, continuous tape seams as shown with upont Tyvek Tape. O NOT TPE at bottom of window. NOTE: Skip-taping at head with a maximum of two (2) 2 gaps for every 3 of window is acceptable if an air barrier is not required or if additional drainage is desired. OPTIONL: If installing a drip cap FTER the upont Tyvek WR head flap is flipped down and sealed, see rip ap Installation Section and refer to Option 3. STEP 6 Final Step Install upont Residential Sealant, or recommended sealant, (and backer rod as necessary) around the window opening at the interior. It is also acceptable to use upont Window & oor Foam or recommended foam on jambs and head, but it should not be used at sill and 6 up the jambs from the sill. The seal created by the sealant (and backer rod as necessary) or foam will also serve as a back dam. upont Residential Sealant should be tooled flat to allow the natural curing process to create a concave shape. e sure that the sealant penetrates the grooves of the upont FlexWrap NF around the sill. NOTE: Installations that specify a window/door design rating of P45 or greater require extra precautions. See General Instructions for performance requirements exceeding this design rating. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 8

9 upont Self-dhered Flashing Systems Installation Guidelines For Roundtop Windows STEP 4 NOTE: Follow rectangular window instructions (Steps 1 through 4) for proper installation of sill and jamb flashing prior to head flashing installation. Install head flashing. ut upont FlexWrap NF head flashing at least 12 LONGER than the arc length (H) of round-top window.. Remove both release papers and install to conform around top of window, covering entire mounting flange and adhering to exposed sheathing or framing members. Head flashing should overlap jamb flashings by at least 6. STEP 5. Flip down upper flap of upont Tyvek WR so it lays flat across head flashing.. ut ~1 strip of the upont Tyvek WR at lower horizontal edge of head flap.. Tape seams as shown. O NOT TPE at bottom of window. t the head, continuous tape seams as shown with upont Tyvek Tape. Skip-taping at the head is acceptable if an air barrier is not required or if additional drainage is desired. 6 Minimum (H) STEP 6 Final Step Install upont Residential Sealant, or recommended sealant, (and backer rod as necessary) around the window opening at the interior. It is also acceptable to use upont Window & oor Foam or recommended foam on jambs and head, but it should not be used at sill and 6 up the jambs from the sill. The seal created by the sealant (and backer rod as necessary) or foam will also serve as a back dam. upont Residential Sealant should be tooled flat to allow the natural curing process to create a concave shape. e sure that the sealant penetrates the grooves of the upont FlexWrap NF around the sill. NOTE: Installations that specify a window/ door design rating of P45 or greater require extra precautions. See General Instructions for performance requirements exceeding this design rating. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 9

10 upont Self-dhered Flashing Systems Installation Guidelines Integral Flanged djacent Rectangular Windows FTER upont Tyvek WR is Installed This method applies to upont StraightFlash, upont FlexWrap NF and upont Flashing Tape STEP 1 Prepare upont Tyvek WR for window installation:. Make I-uts (Standard I-ut) in the upont Tyvek WR (modified I-uts are also accepted) for each adjacent window rough opening. For an I-ut, begin with a horizontal cut across the bottom and the top of the window frame. From the center, cut straight down to the sill.. ut the upont Tyvek WR along the top and bottom of the shared window framing and/or sheathing to connect the top and bottom of the I-uts as shown. Remove the upont Tyvek WR to expose the vertical sheathing/framing.. ut two 45 degree slits a minimum of 8 extending from each outside corners of the window rough openings, up and away from the window opening. This will create a flap above the adjacent window rough openings to expose sheathing or framing members to allow head flashing installation (see step 5). NOTE: Some windows and flashing widths may require longer slits. 8 Minimum opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 10

11 upont Self-dhered Flashing Systems Installation Guidelines. Flip head flap up and temporarily secure with upont Tyvek Tape. LTERNTE METHO TO SEURE HE FLP: In lieu of temporarily taping, the head flap can be tucked under the upont Tyvek WR. E. Fold the 2 side flaps into rough opening and secure to inside wall. ut off excess flaps if desired. E E lternate Method to Secure Head Flap opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 11

12 upont Self-dhered Flashing Systems Installation Guidelines Option 1 When Using upont Tyvek WR at Sheathing/Framing Separating djacent Windows Follow STEPS 2-5 when using a piece of upont Tyvek WR between the windows. Refer to djacent Window Option 2, when using upont self-adhered flashing products between adjacent windows.. Fold the two side flaps into rough opening, and secure. ut off excess flaps if necessary. STEP 2 Preparation of framing/sheathing separating adjacent windows using upont Tyvek WR.. ut a piece of upont Tyvek WR wide enough to cover the framing/sheathing between windows when wrapped into the window rough openings and 8" longer than the height of the rough opening.. ut corners to create side flaps that will fold into adjacent window rough openings with 2" of the Tyvek WR piece extending above the rough openings and 6" below.. Install Tyvek WR piece onto the framing/sheathing between windows. o not install fasteners within 6" of the rough openings. upont Tyvek Tape may be used if necessary to hold Tyvek WR piece in place. Seal vertical seams below window with upont Tyvek Tape. 2 H H+8 F 6 F opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 12

13 upont Self-dhered Flashing Systems Installation Guidelines Option 1 (continued) STEP 3. ut 2 pieces of upont FlexWrap NF at least 12 LONGER than width of rough opening sill (S). Use roll widths sufficient to achieve a minimum of 1 adhesion EYON where the window frame will be located, ensuring 2 3 adhesion onto the face of the wall.. Remove wide piece of release paper from the first piece of upont FlexWrap NF. Position on horizontal sill by aligning the inside edge of the narrow release paper with the face of the wall to ensure 2 3 of the FlexWrap NF will be adhered to the face of the wall with a minimum of 6 up each jamb. dhere into rough opening.. Remove narrow release paper from the upont FlexWrap NF.. Fan out upont FlexWrap NF at bottom corners onto face of wall and framing/ sheathing between windows. overage of upont FlexWrap NF should be 2 3 onto the face of the wall. E. Repeat Steps - for second window. NOTE: The upont FlexWrap NF installed in the second window may overlap the upont FlexWrap NF installed in the first window at the vertical exposed sheathing/framing separating the windows. No Gap in orner Window Jamb upont FlexWrap NF WRONG Sill ORRET FRONT VIEW ORNER ETIL 3 6 Minimum E O NOT STRETH (S) Sill Width + 12 inches opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 13

14 upont Self-dhered Flashing Systems Installation Guidelines Option 1 (continued) STEP 4 pply upont Residential Sealant, upont or recommended sealant, on three sides (jambs and head) of each window as shown below. OPTIONL: pply upont Residential Sealant, or recommended sealant at sill with at least two (2) 2 gaps in the sealant bead for every 4 of window to allow for drainage. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 14

15 upont Self-dhered Flashing Systems Installation Guidelines Option 1 (continued) STEP 5. Install windows according to manufacturer s instructions.. ut four pieces of upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape for jamb flashing extending 1 above window head flanges and below bottom edge of sill flashing. Remove release paper and press tightly along sides of window frame. NOTE: The upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape for the inside jamb flashing of one window may overlap the upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape on the inside jamb of the other window. OPTIONL: If installing a drip cap as part of the window installation before the upont self-adhered flashing membrane at the window head flange, see rip ap Installation Section and refer to Option 1. The vertical leg of the drip cap must not be taller than the window head flange when installing drip cap according to Option 1.. ut a piece of upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape for head flashing long enough to extend beyond edges of flashing at outer jambs. Remove release paper and adhere to head flanges, extending onto sheathing. The upont self-adhered membrane over the window must extend beyond the top edge of the upont self-adhered membrane previously installed between windows.. ontinue to STEP 6. NOTE: Ensure proper shingling. upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape at jambs must overlap the upont FlexWrap NF at the sill and adhere to the Tyvek WR below the sill. OPTIONL: If installing a drip cap as part of the window installation, but after the window head flashing, see rip ap Installation Section and refer to Option 2. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 15

16 upont Self-dhered Flashing Systems Installation Guidelines Option 2 When using upont self-adhered membrane at sheathing/ framing separating adjacent windows. STEP 2. ut 2 pieces of upont FlexWrap NF at least 12 LONGER than width of rough opening sill (S). Use roll widths sufficient to achieve a minimum of 1 adhesion EYON where the window frame will be located, ensuring 2 3 adhesion onto the face of the wall.. Remove wide piece of release paper from the first piece of upont FlexWrap NF. Position on horizontal sill by aligning the inside edge of the narrow release paper with the face of the wall to ensure 2 3 of the FlexWrap NF will be adhered to the face of the wall with a minimum of 6 up each jamb. dhere into rough opening.. Remove narrow release paper from the upont FlexWrap NF.. Fan out upont FlexWrap NF at bottom corners onto face of wall and framing/ sheathing between windows. overage of upont FlexWrap NF should be 2 3 onto the face of the wall. E. Repeat Steps - for second window. NOTE: The upont FlexWrap NF installed in the second window may overlap the upont FlexWrap NF installed in the first window at the vertical exposed sheathing/framing separating the windows. No Gap in orner Window Jamb upont FlexWrap NF WRONG Sill ORRET FRONT VIEW ORNER ETIL 6 Minimum E O NOT STRETH (S) Sill Width + 12 inches opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 16

17 upont Self-dhered Flashing Systems Installation Guidelines Option 2 (continued) STEP 3. ut a piece of 9 wide upont StraightFlash or upont Flashing Tape 4 longer than the height of the rough opening.. Remove release paper and center the upont StraightFlash or upont Flashing Tape onto the face of the vertical exposed framing/sheathing with the bottom edge aligned with the sill rough opening. dhere the exposed butyl onto the face of the vertical exposed framing/sheathing and 4 above the window rough openings.. Make horizontal cuts in the upont StraightFlash or upont Flashing Tape along the top of the rough opening to the edge of the vertical framing/sheathing between windows.. Fold the resulting upont StraightFlash or upont Flashing Tape flaps into the rough opening and adhere. STEP 4 pply upont Residential Sealant, upont or recommended sealant, on three sides (jambs and head) of each window as shown below. 4 H H+4 OPTIONL: pply upont Residential Sealant, or recommended sealant at sill with at least two (2) 2 gaps in the sealant bead for every 4 opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 of window to allow for drainage. 17

18 upont Self-dhered Flashing Systems Installation Guidelines Option 2 (continued) STEP 5. Install windows according to manufacturer s instructions.. ut four pieces of upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape for jamb flashing extending 1 above window head flanges and below bottom edge of sill flashing. Remove release paper and press tightly along sides of window frame. NOTE: The upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape for the inside jamb flashing of one window may overlap the upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape on the inside jamb of the other window. OPTIONL: If installing a drip cap as part of the window installation before the upont self-adhered flashing membrane at the window head flange, see rip ap Installation Section and refer to Option 1. The vertical leg of the drip cap must not be taller than the window head flange when installing drip cap according to Option 1.. ut a piece of upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape for head flashing long enough to extend beyond edges of flashing at outer jambs. Remove release paper and adhere to head flanges, extending onto sheathing. The upont self-adhered membrane over the window must extend beyond the top edge of the upont self-adhered membrane previously installed between windows. NOTE: Ensure proper shingling. upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape at jambs must overlap the upont FlexWrap NF at the sill and adhere to the Tyvek WR below the sill. OPTIONL: If installing a drip cap as part of the window installation, but after the window head flashing, see rip ap Installation Section and refer to Option 2. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 18

19 upont Self-dhered Flashing Systems Installation Guidelines Option 2 (continued) STEP 6. Flip down upper flap of upont Tyvek WR so it lays flat across head flashing.. ut ~1 strip of the upont Tyvek WR at lower horizontal edge of head flap.. Tape seams as shown. O NOT TPE at bottom of window. t the head, continuous tape seams as shown with upont Tyvek Tape. Skip-taping at the head is acceptable if an air barrier is not required or if additional drainage is desired.. Tape down diagonal seams of upont Tyvek WR. OPTIONL: If installing a drip cap FTER the upont Tyvek WR head flap is flipped down and sealed, see rip ap Installation Section and refer to Option 3. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 19

20 upont Self-dhered Flashing Systems Installation Guidelines Option 2 (continued) STEP 7 Final Step Install upont Residential Sealant or recommended sealant (and backer rod as necessary) around the window openings at the interior. It is also acceptable to use upont Window & oor Foam or recommended foam on jambs and head, but it should not be used at sill and 6 up the jambs from the sill. The seal created by the sealant (and backer rod as necessary) will also serve as a back dam. upont Residential Sealant should be tooled flat to allow the natural curing process to create a concave shape. e sure that the sealant penetrates the grooves of the upont FlexWrap NF around the sill. NOTE: Installations that specify a window/door design rating of P45 or greater require extra precautions. See General Instructions for performance requirements exceeding this design rating. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 20

21 upont Self-dhered Flashing Systems Installation Guidelines rip ap Installation with Integral Flanged Windows and oors The following drip cap options can also be used for integral flanged doors. Option 1. over the head flange and top edge of the drip cap with a piece of upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape. The upont self-adhered flashing systems product should be long enough to extend beyond the jamb flashing and adhere a minimum of 2 onto the wall. drip cap with a short vertical leg can be installed at the window head flange so it is integrated with the upont self-adhered flashing membrane installed at the head of the window EFORE the upont Tyvek WR head flap is flipped down and sealed. NOTE: When using this method, the vertical leg of the drip cap must not be taller than the window head flange when installed. STEP 1. fter the window is installed and jamb flashing applied, cut a piece of metal or vinyl drip cap slightly LONGER than the width of the window. Place a bead of upont Residential Sealant, or recommended sealant, on the rear side of the vertical leg N a bead on the rear side of the bottom horizontal leg. Install the drip cap tight against the window head flange. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 21

22 upont Self-dhered Flashing Systems Installation Guidelines Option 1 (continued) STEP 2. Flip down upont Tyvek WR head flap so it lays flat across the upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape covering the drip cap and window head flange.. ut ~1 strip of the upont Tyvek WR at lower horizontal edge of head flap.. Tape seams as shown. O NOT TPE at bottom of window. t the head, continuous tape seams as shown with upont Tyvek Tape. Skip-taping at the head is acceptable if an air barrier is not required or if additional drainage is desired.. Tape down diagonal seams of upont Tyvek WR. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 22

23 upont Self-dhered Flashing Systems Installation Guidelines rip ap Installation with Integral Flanged Windows and oors Option 2 drip cap can be installed over the head flashing above the window head EFORE the upont Tyvek WR head flap is flipped down and sealed. STEP 1. fter the upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape is installed over window head flange, cut metal or vinyl drip cap slightly LONGER than the width of the window.. Install the drip cap tight against the window head flashing and cover the top edge with upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape extending past the top and sides of the drip cap. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 23

24 upont Self-dhered Flashing Systems Installation Guidelines Option 2 (continued) STEP 2. Flip down upont Tyvek WR head flap so it lays flat across the upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape covering the drip cap.. ut ~1 strip of the upont Tyvek WR at lower horizontal edge of head flap.. Tape seams as shown. O NOT TPE at bottom of window. t the head, continuous tape seams as shown with upont Tyvek Tape. Skip-taping at the head is acceptable if an air barrier is not required or if additional drainage is desired.. Tape down diagonal seams of upont Tyvek WR. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 24

25 upont Self-dhered Flashing Systems Installation Guidelines rip ap Installation with Integral Flanged Windows and oors Option 3 drip cap can be installed over the upont Tyvek WR above the window head FTER the upont Tyvek WR head flap is flipped down and sealed. STEP 1. fter upont Tyvek WR head flap is flipped down and sealed, cut metal or vinyl drip cap slightly LONGER than the width of the window and install.. s a recommended best practice, cover the top edge of the drip cap with upont StraightFlash, upont FlexWrap NF, or upont Flashing Tape extending past the top and sides of the drip cap and side edges of the window head flashing. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 25

26 upont Self-dhered Flashing Systems Installation Guidelines Integral Flanged oor FTER upont Tyvek WR is Installed This installation guideline is intended for doors installed above grade and/or with wood floor construction. This method applies to the following products: upont StraightFlash, upont FlexWrap NF and upont Flashing Tape STEP 1 Prepare upont Tyvek WR for door installation:. Make an I-ut (Standard I-ut) in the WR. For an I-ut, begin with a horizontal cut across the bottom and the top of the door frame. From the center, cut straight down to the sill.. ut two 45 degree slits a minimum of 8 extending from the corner of the door head up and away from door opening from the corner of the header, to create a flap above the rough opening to expose sheathing or framing members, to allow head flashing installation (see step 8). NOTE: Some doors and flashing widths may require longer slits.. Flip head flap up and temporarily secure with upont Tyvek Tape. LTERNTE METHO TO SEURE HE FLP: In lieu of temporarily taping, the head flap can be tucked under the upont Tyvek WR.. Fold side flaps into rough opening and secure to inside wall. ut off excess flaps if desired. 8 Minimum lternate Method to Secure Head Flap 8 Minimum opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 26

27 upont Self-dhered Flashing Systems Installation Guidelines STEP 2 Preparation of sill flashing:. ut upont FlexWrap NF at least 12 LONGER than width of rough opening sill (S). Use roll widths sufficient to achieve a minimum of 1 adhesion EYON where the window frame will be located, ensuring 2 3 adhesion onto the face of the wall.. 9 upont FlexWrap NF has perforated release paper to help with the formation of the back dam (see Step 9). To ensure that the perforation tears cleanly, fold the perforation 180 and crease the flashing.. Remove the two widest pieces of release paper leaving the narrowest release paper on the flashing. When the finished floor is applied, the release paper can be removed and the back dam can be completed. STEP 3. Position the sill flashing as indicated so the section with the release paper still attached extends past the door threshold on the inside. Ensure that 2 3 of the FlexWrap NF will be adhered to the face of the wall with a minimum of 6 up each jamb. dhere into rough opening. When the 1 of release paper is removed, the remaining section of upont FlexWrap NF can be used to form a back dam. OPTIONL: reate back dam by folding back narrow section of upont FlexWrap NF: Some flooring cannot accomodate a back dam. In that case fold the back dam on top of upont FlexWrap NF in the sill. The door will be installed on top of the fold to create a back dam (see Side View etail below). 6-inch for 2x4-inch studs 9-inch for 2x6-inch studs EXTERIOR INTERIOR oor Front Overlap Scored Release Paper oor Threshold Transition Threshold Flooring OPTION ack upont StraightFlash High Pressure Skirt (OPTIONL, See STEP 6) upont FlexWrap NF upont Tyvek WR Sub Floor orner Guard (optional) Sheathing (S) Sill Length + 12 inches reak Scored Release Paper Peel Off 2-pieces of Release Paper 5 6 Minimum O NOT STRETH WRONG No Gap in orner oor Jamb upont FlexWrap NF Sill ORRET FRONT VIEW ORNER ETIL SIE VIEW ETIL opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 27

28 upont Self-dhered Flashing Systems Installation Guidelines STEP 4 Fan out FlexWrap NF at corners and adhere onto face of wall. ontinue adhering onto face of wall along sill. overage of upont FlexWrap NF should be 2 3 onto the face of the wall. STEP 5 pply upont Residential Sealant, or recommended sealant, on three sides (jambs and head) as shown below. OPTIONL: pply upont Residential Sealant, or recommended sealant at threshold with at least two (2) 2 gaps in the sealant bead for every 4 of door to allow for drainage. opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 28

29 upont Self-dhered Flashing Systems Installation Guidelines STEP 6 (OPTIONL) For extreme weather conditions, performance requirements exceeding STM E1677, or window/door design ratings of P45 or greater, see General Instructions.. reate the high pressure skirt by cutting a piece of upont Tyvek WR 1 wider than the width of door opening and approximately 10 in depth.. ut a 4 piece of upont StraightFlash or upont Flashing Tape to the same width as the skirt. Remove two pieces of release paper and adhere to the upont Tyvek WR.. Remove the last piece of release paper and attach the skirt to the underside of the door. This skirt may be made with upont StraightFlash, upont Flashing Tape, or upont StraightFlash VF. 4 upont StraightFlash 10 utyl dhesive ttach remaining exposed butyl to underside of door opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 29

30 upont Self-dhered Flashing Systems Installation Guidelines STEP 7. OPTIONL: dhere high pressure skirt to the bottom threshold of the door.. Install door according to manufacturer s instructions.. ut two pieces of upont StraightFlash, or upont FlexWrap NF, or upont Flashing Tape for jamb flashing extending 1 above door head flange and below bottom edge of sill flashing. Remove release paper and press tightly along sides of door frame. OPTIONL: If installing a drip cap as part of the door installation before the upont selfadhered flashing membrane at the door head flange, see rip ap Installation Section and refer to Option 1. The vertical leg of the drip cap must not be taller than the door head flange when installing drip cap according to Option 1.. ut a piece of upont StraightFlash, or upont FlexWrap NF, or upont Flashing Tape for head flashing, which extends beyond outer edges of jamb flashings. Remove release paper and install completely covering mounting flange and adhering to exposed sheathing or framing members (see ). OPTIONL: If installing a drip cap as part of the door installation, but after the door head flashing, see rip ap Installation Section and refer to Option 2. NOTE: Ensure proper shingling. upont StraightFlash or upont Flashing Tape must overlap upont FlexWrap NF and adhere to the upont Tyvek WR. INORRET upont FlexWrap NF reverse flashed INORRET upont StraightFlash flush with upont FlexWrap NF ORRET upont StraightFlash overlaps upont FlexWrap NF opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 30

31 upont Self-dhered Flashing Systems Installation Guidelines STEP 8. Flip down upper flap of upont Tyvek WR so it lays flat across head flashing.. ut ~1 strip of the upont Tyvek WR at lower horizontal edge of head flap.. t the head, continuous tape seams as shown with upont Tyvek Tape. Skiptaping at the head is acceptable if an air barrier is not required or if additional drainage is desired. O NOT TPE at bottom of door.. Tape down diagonal seams of upont Tyvek WR. OPTIONL: If installing a drip cap FTER the upont Tyvek WR head flap is flipped down and sealed, see rip ap Installation Section and refer to Option 3. STEP 9 Final Step. OPTIONL: When the interior flooring is ready to install, remove release paper and use Folding Option One or Two (shown below) to form back dam.. Install upont Residential Sealant, or recommended sealant, (and backer rod as necessary) around the window opening at the interior. It is also acceptable to use upont Window & oor Foam or recommended foam on jambs and head, but it should not be used at sill and 6 up the jambs from the sill. The seal created by the sealant (and backer rod as necessary) or foam will also serve as a back dam. upont Residential Sealant should be tooled flat to allow the natural curing process to create a concave shape. e sure that the sealant penetrates the grooves of the upont FlexWrap NF around the sill. NOTE: Installations that specify a window/door design rating of P45 or greater require extra precautions. See General Instructions for performance requirements exceeding this design rating. Folding Option One Folding Option Two OR Fold Out and Up Fold In and Up Fastening Option One Fastening Option Two OR Staples Tape opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 31

32 upont Self-dhered Flashing Systems Installation Guidelines rick Mold Window FTER upont Tyvek WR Is Installed This method applies to the following products: upont StraightFlash, upont StraightFlash VF, upont FlexWrap NF and upont Flashing Tape STEP 1 Prepare upont Tyvek WR for window installation:. Make an I-ut (Standard I-ut) in the upont Tyvek WR (modified I-ut is also accepted). For an I-ut, begin with a horizontal cut across the bottom and the top of the window frame. From the center, cut straight down to the sill.. ut two 45 degree slits a minimum of 8 extending from the corner of the window head, up and away from the window opening. This will create a flap above the rough opening to expose sheathing or framing members to allow head flashing installation. Flip head flap up and temporarily secure with upont Tyvek Tape. LTERNTE METHO TO SEURE HE FLP: In lieu of temporarily taping, the head flap can be tucked under the upont Tyvek WR. NOTE: Some windows and flashing widths may require longer slits.. Fold side flaps into rough opening and secure to inside wall. ut off excess flaps if desired. 8 Minimum Exterior Exterior lternate Method to Secure Head Flap 8 Minimum opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 32

33 upont Self-dhered Flashing Systems Installation Guidelines STEP 2. ut upont FlexWrap NF at least 12 LONGER than width of rough opening sill (S). Use roll widths sufficient to achieve a minimum of 1 adhesion EYON where the window frame will be located, ensuring 2 3 adhesion onto the face of the wall.. Remove wide piece of release paper. Position on horizontal sill by aligning the inside edge of the narrow release paper with the face of the wall to ensure 2 3 of the FlexWrap NF will be adhered to the face of the wall with a minimum of 6 up each jamb. dhere into rough opening.. Remove narrow release paper.. Fan out FlexWrap NF at corners and adhere onto face of wall. ontinue adhering onto face of wall along sill. overage of upont FlexWrap NF should be 2 3 onto the face of the wall. No Gap in orner Window Jamb upont FlexWrap NF 3 (S) WRONG Sill ORRET FRONT VIEW ORNER ETIL Sill Width + 12 inches 6 Minimum O NOT STRETH opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 33

34 upont Self-dhered Flashing Systems Installation Guidelines STEP 3. Prepare head flashing by cutting a piece of upont StraightFlash VF at least 12" LONGER than the head length.. reak the scored release paper on one side of the head flashing by folding it back and forth upon itself.. enter the upont StraightFlash VF on the window head and position so that it contacts the window frame and interior side of the brick mold. Remove the outer release paper and adhere the flashing to the window frame. Use the inner release paper to form a tight seal in the corner.. Remove the inner release paper and adhere the flashing to the back of the brick mold. E. eginning at the junction of the jamb and head, and away from the corner, cut the upont StraightFlash VF at a 45 angle. F. Fold the newly created flashing flap down flat against the brick mold. G. Fold remaining head flashing flaps down and adhere to the jamb frame. E E F G rick Mold Perforated Release Paper utyl VIEW - Window Window Window Window Window opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 34

35 upont Self-dhered Flashing Systems Installation Guidelines STEP 4. Prepare jamb flashing by cutting a piece of upont StraightFlash VF at least 6" LONGER than the jamb.. reak the scored release paper on one side of the jamb flashing by folding it back and forth upon itself.. Position so that the upont StraightFlash VF contacts the window frame and interior side of the brick mold. Ensure that the jamb flashing is positioned 1-1/2 inch below the top edge of the head flashing. Jamb flashing adhesive must come in contact with head flashing adhesive and overlap by one-inch.. Remove the outer release paper and adhere the flashing to the window frame. Use the inner release paper to form a tight seal in the corner. E. Remove the inner release paper and adhere the flashing to the back of the brick mold. F. Repeat on opposite jamb. Make sure the adhesive on these pieces will overlap. 1-1/2 E Window Window Window opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 35

36 upont Self-dhered Flashing Systems Installation Guidelines STEP 5. eginning at the junction of the jamb and head, and away from the corner, cut the upont StraightFlash VF at a 45 angle. Repeat this procedure at the junction of the sill and jamb.. Fold cut jamb, sill and head corners flashing parallel to the window frame so that the jamb flashing lies flat.. Fold the newly created jamb flashing flaps down at all corners and adhere to the window frame. STEP 6. Install the window per manufacturer s instructions.. Remove the remaining release paper from the upont StraightFlash VF jamb flashing and press firmly to adhere the butyl adhesive to the upont Tyvek WR.. Remove the release paper at the head and adhere the upont StraightFlash VF to the wall surface. Window OPTIONL: pply upont Residential Sealant, or recommended sealant at sill with at least two (2) 2 gaps in the sealant bead for every 4 of window to allow for drainage. INORRET upont FlexWrap NF reverse flashed INORRET upont StraightFlash flush with upont FlexWrap NF ORRET upont StraightFlash overlaps upont FlexWrap NF NOTE: o not reverse shingle. upont StraightFlash must overlap upont opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 FlexWrap NF and adhere to the substrate. 36

37 upont Self-dhered Flashing Systems Installation Guidelines STEP 7. OPTIONL: over exposed butyl with upont StraightFlash, upont Flashing Tape or upont Tyvek Tape. OPTIONL: If installing a drip cap as part of the window installation EFORE the upont Tyvek WR head flap is flipped down and sealed, see rip ap Installation Section and refer to Option 2.. Flip down upper flap of upont Tyvek WR so it lays flat across head flashing.. ut ~1 strip of the upont Tyvek WR at lower horizontal edge of head flap.. Tape seams as shown. O NOT TPE at bottom of window. t the head, continuous tape seams as shown with upont Tyvek Tape. Skip-taping at the head is acceptable if an air barrier is not required or if additional drainage is desired. E. Tape down diagonal seams of upont Tyvek WR. OPTIONL: If installing a drip cap FTER the upont Tyvek WR head flap is flipped down and sealed, see rip ap Installation Section and refer to Option 3. STEP 8 Final Step Install upont Residential Sealant, or recommended sealant, (and backer rod as necessary) around the window opening at the interior. It is also acceptable to use upont Window & oor Foam or recommended foam on jambs and head, but it should not be used at sill and 6 up the jambs from the sill. The seal created by the sealant (and backer rod as necessary) or foam will also serve as a back dam. upont Residential Sealant should be tooled flat to allow the natural curing process to create a concave shape. e sure that the sealant penetrates the grooves of the upont FlexWrap NF around the sill. NOTE: Installations that specify a window/door design rating of P45 or greater require extra precautions. See General Instructions for performance requirements exceeding this design rating. E opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 37

38 upont Self-dhered Flashing Systems Installation Guidelines rick Mold oor FTER upont Tyvek WR Is Installed This installation guide is intended for doors installed above grade and/or with wood floor construction. This method applies to the following products: upont StraightFlash, upont StraightFlash VF, upont FlexWrap NF, and upont Flashing Tape STEP 1 Prepare the upont Tyvek WR for door installation:. Make an I-ut (Standard I-ut) in the upont Tyvek WR. For an I-ut, begin with a horizontal cut across the bottom and the top of the door frame. From the center, cut straight down to the sill.. ut two 45 degree slits a minimum of 8 extending from the corner of the door head, up and away from door opening. This will create a flap above the rough opening to expose sheathing or framing members to allow head flashing installation (see step 8). NOTE: Some doors and flashing widths may require longer slits.. Flip head flap up and temporarily secure with upont Tyvek Tape. LTERNTE METHO TO SEURE HE FLP: In lieu of temporarily taping, the head flap can be tucked under the upont Tyvek WR.. Fold side flaps into rough opening, and secure to inside wall framing. ut off excess flaps if desired. 8 Minimum lternate Method to Secure Head Flap 8 Minimum opyright 2017 E. I. du Pont de Nemours and ompany. ll Rights Reserved. K Rev. 11/17 38

DuPont Self-Adhered Flashing Systems Installation Guidelines

DuPont Self-Adhered Flashing Systems Installation Guidelines ir arrier Rough Opening Treatment for Integral Flanged Windows EFORE Water-Resistive arrier (WR) is Installed DuPont Self-dhered Flashing Systems Installation Guidelines IR RRIER ROUGH OPENING TRETMENT

More information

DuPont Flashing Systems Installation Guidelines. INstallation instructions after water-resistive. Version 2

DuPont Flashing Systems Installation Guidelines. INstallation instructions after water-resistive. Version 2 DuPont Flashing Systems Installation Guidelines Helping you get the job done right INstallation instructions after water-resistive barrier (wrb) is installed Version 2 Table of ontents pplicable Products...2

More information

DuPont Flashing Systems Installation Guidelines

DuPont Flashing Systems Installation Guidelines Installation Instructions for Brick Mold FTER Water-Resistive Barrier (WRB) is Installed DuPont Flashing Systems Installation Guidelines INSTLLTION INSTRUTIONS FOR BRIK MOLD WINDOW FTER WTER-RESISTIVE

More information

DuPont Flashing Systems Installation Guidelines

DuPont Flashing Systems Installation Guidelines Installation Instructions for Field pplied Flanged BEFORE Water-Resistive Barrier (WRB) is Installed DuPont Flashing Systems Installation Guidelines INSTLLTION INSTRUTIONS FOR FIELD PPLIED FLNGED DOOR

More information

DuPont Flashing Systems Installation Guidelines

DuPont Flashing Systems Installation Guidelines Installation Instructions for Field pplied Flanged EFORE Water-Resistive arrier (WR) Is Installed DuPont Flashing Systems Installation Guidelines INSTLLTION INSTRUCTIONS FOR FIELD PPLIED FLNGED WINDOW

More information

DuPont Flashing Systems Installation Guidelines

DuPont Flashing Systems Installation Guidelines Installation Instructions for Non-Flanged BEFORE Water-Resistive Barrier (WRB) is Installed DuPont Flashing Systems Installation Guidelines INSTLLTION INSTRUTIONS FOR NON-FLNGED DOOR BEFORE WTER-RESISTIVE

More information

DuPont Flashing Systems Installation Guidelines. Version 2

DuPont Flashing Systems Installation Guidelines. Version 2 upont Flashing Systems Installation Guidelines Helping you get the job done right Brick Mold, Non-Flanged and Field pplied Flanged FTER Water-Resistive Barrier (WRB) Is Installed Version 2 Table of ontents

More information

DuPont Flashing Systems Installation Guidelines. Version 2

DuPont Flashing Systems Installation Guidelines. Version 2 DuPont Flashing Systems Installation Guidelines Helping you get the job done right rick Mold, Non-Flanged and Field pplied Flanged EFORE Water-Resistive arrier (WR) Is Installed Version 2 Table of ontents

More information

DuPont Self-Adhered Flashing Systems Products

DuPont Self-Adhered Flashing Systems Products DuPont Self-Adhered Flashing Systems Products Installation of Integral Flanged Windows in Recessed Openings Before Water-Resistive Barrier (WRB) Is Installed For up to 4" Recess Using Single and Double

More information

DuPont Flashing Systems Installation Guidelines. Version 2

DuPont Flashing Systems Installation Guidelines. Version 2 DuPont Flashing Systems Installation Guidelines Helping you get the job done right Brick Mold, Non-Flanged and Field pplied Flanged BEFORE Water-Resistive Barrier (WRB) Is Installed Version 2 Table of

More information

DuPont Flashing Systems Installation Guidelines

DuPont Flashing Systems Installation Guidelines Installation Instructions for Integral Flanged Windows in Recessed Openings BEFORE Water-Resistive Barrier (WRB) is installed DuPont Flashing Systems Installation Guidelines INSTALLATION INSTRUCTIONS FOR

More information

DuPont Flashing Systems Installation Guidelines. Integral Flanged Door Before water-resistive. Version 2

DuPont Flashing Systems Installation Guidelines. Integral Flanged Door Before water-resistive. Version 2 DuPont Flashing Systems Installation Guidelines Helping you get the job done right Integral Flanged Door Before water-resistive barrier (wrb) is installed Version 2 Table of Contents Applicable Products...2

More information

DuPont Flashing Systems Commercial Installation Guidelines

DuPont Flashing Systems Commercial Installation Guidelines DuPont DuPont Flashing Systems Commercial Installation Guidelines FOR NON-FLNGED LUMINUM WINDOW FTER WRB IS INSTLLED Table of Contents pplicable Products... 2 Recommended Materials... 2 Optional Materials...

More information

DuPont Flashing Systems Commercial Installation Guidelines

DuPont Flashing Systems Commercial Installation Guidelines DuPont DuPont Flashing Systems Commercial Installation Guidelines FOR STOREFRONT WINDOW ON A KNEE WALL AFTER WRB IS INSTALLED Table of Contents Applicable Products... 2 Recommended Materials... 2 Optional

More information

DuPont Tyvek Fluid Applied Flashing Commercial Installation Guidelines

DuPont Tyvek Fluid Applied Flashing Commercial Installation Guidelines DuPont Tyvek Fluid pplied W DuPont Tyvek Fluid pplied Flashing and Joint Compound DuPont Tyvek Fluid pplied Flashing Commercial Installation Guidelines METHODS FOR SUPERIOR PROTECTION GINST IR ND WTER

More information

DUPONT TYVEK FLUID APPLIED FLASHING INSTALLATION GUIDELINES METHODS FOR SUPERIOR PROTECTION AGAINST AIR AND WATER INTRUSION

DUPONT TYVEK FLUID APPLIED FLASHING INSTALLATION GUIDELINES METHODS FOR SUPERIOR PROTECTION AGAINST AIR AND WATER INTRUSION DuPont Tyvek Fluid pplied W+ DuPont Tyvek Fluid pplied Flashing and Joint ompound+ DUPONT TYVEK FLUID PPLIED FLSHING INSTLLTION GUIDELINES METHODS FOR SUPERIOR PROTETION GINST IR ND WTER INTRUSION DuPont

More information

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding** TYPAR WEATHER PROTECTION SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS Table of Contents...01 Special Installation Considerations...01 Code Requirements...02 Approvals and Reports...02 Recommended Materials...02

More information

ForceField Air & Water Barrier System. installation instructions

ForceField Air & Water Barrier System. installation instructions ForceField Air & Water Barrier System installation instructions Protection and Performance inside and out The ForceField air and water barrier system consists of engineered wood sheathing panels laminated

More information

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3 45 45 6 6 Step 1. Modify Weather Resistive Barrier 1.A Cut the weather resistive barrier flush to the recessed opening (per diagram). Remove the cut away weather resistive barrier, exposing recessed opening

More information

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3 Step 1. Install Sill Flashing Product: 9" or 12" RainBuster #440 SubZero Flashing Tape 1.A Flashing Length = (Rough Opening Width) + 12" 1.B Install sill flashing flush with the sill of the rough opening.

More information

Sun Windows General Information New Construction Hinged Door Installation Instructions

Sun Windows General Information New Construction Hinged Door Installation Instructions A G H F H H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape F. Apply

More information

Installation Instructions

Installation Instructions Installation Instructions HYDROGAP DRAINABLE HOUSEWRAP AND ACCESSORIES Page Basic Installation and Window Flashing: Pre-Installation Considerations 2 List of Approved Compatible Products 3 METHOD I: Modified

More information

Eagle clad double-hung window installation instructions

Eagle clad double-hung window installation instructions Eagle clad double-hung window installation instructions These instructions are for typical installation in new typical wood frame wall construction. These instructions and methods are not intended for

More information

Building Wrap and Flashing

Building Wrap and Flashing Insulati o n Fifth Revision January 2019 Building Wrap and Flashing INSTALLATION GUIDE FOR RESIDENTIAL & LIGHT COMMERCIAL APPLICATIONS 1. General Information 2. Usage & Limitations MAX, HPW, VW, RainDrop

More information

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation. Installation Guide for E-Series/Eagle High-Performance Mullion Windows with LVL Reinforcement and Installed Using Type B Clips Thank you for choosing Andersen. Instructions are for typical, new wood-framed

More information

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Sun Windows General Information New Construction Sliding Door Installation Instructions H F A G B D C H F H E H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

Building Wrap and Flashing

Building Wrap and Flashing Insulati o n First Revision November 2017 Building Wrap and Flashing INSTALLATION GUIDE FOR RESIDENTIAL & LIGHT COMMERCIAL APPLICATIONS 1. General Information 2. Usage & Limitations 5. Handling & Storage

More information

All Window Installation Instruction

All Window Installation Instruction 1 All Window Installation Instruction Hurd Window Installation Instructions for Nail Fin & Wood Brick Mould Units Nail Fin Windows See Pages 2-11 Wood Brick Mould Windows See Pages 2-6, 8 & 12BM - 14BM

More information

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1 Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1 August 2007 This addendum was developed by the InstallationMasters Institute

More information

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door Installation Guide for E-Series/Eagle Clad Hinged Inswing French Door Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place.

More information

Providing 3 Layers of Protection

Providing 3 Layers of Protection Providing 3 Layers of Protection Barrier 1: Barrier 2: Barrier 3: Integrate the Opening Seal the Exterior Seal the Interior Standard Integral Flange After Housewrap Standard Window Integral Flange After

More information

Flashing Materials. Rough Opening Preparation

Flashing Materials. Rough Opening Preparation Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or

More information

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3 Products: 12" RainBuster #415 Self-Adhered Flashing Membrane-40mil 12" RainBuster #415 Self-Adhered Flashing Membrane-25mil 12" RainBuster #420 Nail On Flashing Membrane-25mil RainBuster #430-4.0 Recess

More information

window installation Guide wood FRaMinG New Construction

window installation Guide wood FRaMinG New Construction window installation Guide wood FRaMinG New Construction IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements supersede

More information

Tools required by installer: Materials required by installer:

Tools required by installer: Materials required by installer: Installation Guidelines For Quaker Window Products Vinyl product line (Single Hung, Double Hung, Sliding Window, Fixed Window, Casement, Awning, and Hopper) Installer: Read these instructions completely

More information

HydroGap Drainable Housewrap: Installation Instructions

HydroGap Drainable Housewrap: Installation Instructions METHOD I: MODIFIED O or CUT-BACK Method STEP 1 Unroll HydroGap Drainable Housewrap with blue spacers facing to the exterior and fasten to sheathing with nails, staples or cap fasteners. Fasteners should

More information

3M Air and Vapour Barrier 3015 Technical guide

3M Air and Vapour Barrier 3015 Technical guide 3M Air and Vapour Barrier 3015 Technical guide Product overview Typical physical properties For installation ease and flexibility, 3M Air and Vapour Barrier 3015 High performance 3M acrylic adhesive grabs

More information

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.

More information

Features & Benefits: For Use with OSI QUAD Window & Door System. Recommended For:

Features & Benefits: For Use with OSI QUAD Window & Door System. Recommended For: Description: OSI Butyl Flash is a rubberized butyl backed, self-adhering 15-mil membrane. The foil backed exterior allows the flashing to be exposed to UV rays for at least 12 years. It is efficient, easy

More information

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary. for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) Thank you for selecting JELD -WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows with nailing fin or primed wood windows with exterior trim. While the

More information

Before installation, check your local and state requirements for this type of install.

Before installation, check your local and state requirements for this type of install. 1 Remove Packaging & Inspect Your Patio Door Remove shipping materials such as corner covers or pads. 2 Inspect Rough Opening Verify that the width and height of the patio door are each 1/2" to 3/4" smaller

More information

Butyl Flash. Installation Instructions. Prep & General Conditions

Butyl Flash. Installation Instructions. Prep & General Conditions Prep & General Conditions All surfaces must be clean, dust free, smooth and dry. Do not apply over sealants or uncured caulks containing plasticizers or solvents. This includes most silicones and polyurethane

More information

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS Thank you for selecting C l i m a t e G u a r d products. Attached are our recommended installation instructions for Vinyl windows with an integral (2400-02) will not affect application of the ClimateGuard

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply

More information

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions

More information

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS 2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed

More information

Installation of Fiberglass Windows

Installation of Fiberglass Windows Installation of Fiberglass Windows Before you begin please read and understand these installation instructions. The following installation instructions are recommended by Norwood and failure to follow

More information

WindowSeal. Installation Instructions. Prep & General Conditions

WindowSeal. Installation Instructions. Prep & General Conditions Prep & General Conditions All surfaces must be clean, dust free, smooth and dry. Do not apply over sealants or uncured caulks containing solvents or plasticizers. This includes most silicones and polyurethane

More information

In the 30-plus years that I ve been a remodeling contractor, I ve

In the 30-plus years that I ve been a remodeling contractor, I ve New Window in Redundant s and attention to detail keep out air and water By Mike Sloggatt In the 30-plus years that I ve been a remodeling contractor, I ve replaced hundreds of windows. The difficulties

More information

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Installation Guidelines Next Dimension Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Windsor Windows & Doors Windsor Windows & Doors 900 S. 19 th St. 2210 Stafford St. Extn

More information

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl bay, bow and garden windows which incorporate an integral nailing fin. Read these instructions

More information

UNIT 5: EXTERIOR DOORS AND WINDOWS

UNIT 5: EXTERIOR DOORS AND WINDOWS KEY CONCEPTS 1. Identify tools needed for exterior door and window installation 2. Last step to weather proofing the home 3. Steps to installing exterior doors and windows 4. Maintenance and safety of

More information

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows Guide for E-Series/Eagle Clad Mechanically Fastened Windows Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place. Instructions

More information

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl bay, bow and garden windows which incorporate an integral nailing fin. While the use of

More information

Integrity Polygon and Round Top Installation and Finishing Instructions

Integrity Polygon and Round Top Installation and Finishing Instructions Integrity Polygon and Round Top Installation and Finishing Instructions 08/20/2004 70852 BEFORE YOU BEGIN IMPORTANT: Read these instructions thoroughly before beginning to install your Integrity Polygon

More information

Installation Recommendations for Finless Frame Doors

Installation Recommendations for Finless Frame Doors Installation Recommendations for Finless Frame Doors These installation recommendations are made available by MI Windows and Doors, LLC (MI) to assist with the integration of finless or flange sliding

More information

Norwood Windows Permaglass Fiberglass Products Installation Instruction

Norwood Windows Permaglass Fiberglass Products Installation Instruction Norwood Windows Permaglass Fiberglass Products Installation Instruction Care and storage of fiberglass windows: Fiberglass products purchased from Norwood Windows must be stored in a dry sheltered area

More information

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII0) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood and clad wood bay

More information

Vinyl Windows and Doors Manufactured by Pella Corporation

Vinyl Windows and Doors Manufactured by Pella Corporation Vinyl Windows and Doors Manufactured by Pella Corporation Part Number: V981255 2009 Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

More information

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS CORE WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS Proper Window & Door Flashing Although all possible measures have been taken to insure the accuracy of the material presented,

More information

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII0) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood and clad wood bay

More information

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction DOOR INSTALLATION GUIDE WOOD FRAMING New Construction IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing doors. Any local building code requirements supersede

More information

How To Install Windows: Nail-Fin Application

How To Install Windows: Nail-Fin Application How To Install Windows: Nail-Fin Application Required Tools & Materials: Materials: 1 3/4" galvanized roofing nails. Nails must penetrate at least 1" into framing For mulled and/or DP50 or above units:

More information

900 SERIES WALL PANELS

900 SERIES WALL PANELS CI-DS-01-900 CI-PP-01-900 CI-PJ-01-900 CI-PJ-02-900 CI-PJ-03-900 CI-BS-01-900 CI-BS-02-900 CI-BS-03-900 CI-BS-04-900 CI-BS-05-900 CI-OC-01-900 CI-OC-02-900 CI-IC-01-900 CI-FO-01-900 CI-FO-02-900 CI-FO-03-900

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nail Fin (JII025) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nail Fin (JII025) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS for Wood/Clad Wood Windows without Exterior Trim or Nail Fin (JII025) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows

More information

INSTALLATION INSTRUCTIONS DOUBLE-HUNG WINDOW WITH FINS

INSTALLATION INSTRUCTIONS DOUBLE-HUNG WINDOW WITH FINS 2012 Pella Corporation INSTALLATION INSTRUCTIONS DOUBLE-HUNG WINDOW WITH FINS Part Number: 802L0105 Installation Instructions for Typical Wood Frame Construction. These instructions were developed tested

More information

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG 2008 Pella Corporation Part Number: 80ED0101 INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG Instrucciones en español

More information

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS NEW CONSTUCTION, REPLACEMENT & FLUSH FIN WINDOWS NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION.

More information

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside. Effective Date: 10/1/2017 Tools Needed Kit Contents Hardware Kit Safety Glasses Cordless drill Phillips screw bit Two-step drill bit (3/8-1/8 ) utility knife Interior Mullion Exterior Mullion Cover clamps

More information

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING 2009 Pella Corporation Part Number: 80DZ0101 INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING Brickmould/Flat Casing Aluminum Head Flashing Corner

More information

Installation Instructions for Vinyl Windows with Integral Nailing Fin (JII001)

Installation Instructions for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nail fin. Not all window types may be installed into every wall

More information

French. Doors. Installing. In California, contractors have been

French. Doors. Installing. In California, contractors have been Installing French In California, contractors have been heard to grumble that there are only two types of French doors: the kind that leak and the kind that are going to leak. When they have the first kind,

More information

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations

More information

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Standard Lap and Self-Aligning Lap Siding Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.

More information

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE) THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE) fig.3 Casement, Awning, Fixed Casement, Direct-Set, Double-Hung, Single-Hung & Horizontal Slider Windows Materials

More information

Installation Materials Required: Tools Required: 6" self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8" drill bit

Installation Materials Required: Tools Required: 6 self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8 drill bit installation instructions for CUSTOM WOOD & FIBERGLASS EXTERIOR FOLDING DOOR SYSTEMs (JII101) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for

More information

Installation Guide - Evolution Series Wood Siding

Installation Guide - Evolution Series Wood Siding Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration

More information

New Window. in an Old Opening. A leak-free installation depends on compatible materials and multiple layers of defense

New Window. in an Old Opening. A leak-free installation depends on compatible materials and multiple layers of defense New Window in an Old Opening A leak-free installation depends on compatible materials and multiple layers of defense BY Bill RoBinson visit finehomebuilding.com to see a video of this window installation.

More information

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL WOOD PIVOTING CIRCLE/ OVAL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to these instructions will VOID any

More information

Sliding Glass Door Assembly and Installation Guide

Sliding Glass Door Assembly and Installation Guide Sliding Glass Door Assembly and Installation Guide Index Door System Components and Hardware The following components are needed to complete the installation of your Sliding Patio Door unit. Check all

More information

INSTALLATION INSTRUCTIONS for Fiberglass Sliding Patio Doors with Applied Nailing Fin (JII104) IMPORTANT INFORMATION AND GLOSSARY

INSTALLATION INSTRUCTIONS for Fiberglass Sliding Patio Doors with Applied Nailing Fin (JII104) IMPORTANT INFORMATION AND GLOSSARY Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Fiberglass Sliding Patio Doors with Applied Nailing Fin. Read these instructions thoroughly

More information

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK StormMaster Slate General Instructions IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM

More information

PRIMED STRAND REVERSIBLE SHAKE

PRIMED STRAND REVERSIBLE SHAKE PRIMED STRAND REVERSIBLE SHAKE PRIOR TO INSTALLATION Inspect product for any issues before installing (breakage, surface defects, foreign objects). Do not install questionable product. Report any problems

More information

INSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin

INSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin INSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin Wall systems designed to manage water or that have been upgraded to manage water are important for a trouble free installation. Site

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2012 Pella Corporation Part Number: 80WH0101 INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Installation Instructions for Typical Wood Frame Construction.

More information

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement 1 Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement The following instructions are a supplement

More information

United States 32" Features and Benefits of WEATHERMATE Sill Pan

United States 32 Features and Benefits of WEATHERMATE Sill Pan PRODUCT/INSTALLATION INFORMATION United States RESIDENTIAL is a translucent, molded polymer sill pan for flashing the base of windows. Its molded design features front flashing that extends approximately

More information

FMA/AAMA/WDMA Installation Update FMA Spring Conference Duck Key, Florida April 27, 2010

FMA/AAMA/WDMA Installation Update FMA Spring Conference Duck Key, Florida April 27, 2010 FMA/AAMA/WDMA Installation Update FMA Spring Conference Duck Key, Florida April 27, 2010 James D. Katsaros, PhD DuPont Building Innovations FMA Installation Committee Chairman Key Flashing & Installation

More information

Installation Instructions for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Installation Instructions for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024) for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Aluminum Clad Wood Windows

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO 2008 Pella Corporation Part Number: 801P0101 INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO Corner Corner Top Fin Corner

More information

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to

More information

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME

More information

Self-Adhering Reflective Sheet Membrane

Self-Adhering Reflective Sheet Membrane application instructions preparation All surfaces must be dry and clean. Dirt, dust and any other foreign matter must be removed. TW Flash-n-wrap 40 must be applied when air, substrate, and membrane temperatures

More information

CFDTT-01. Control Joint Study (General)

CFDTT-01. Control Joint Study (General) Trim Method Classic Method Notes: Control joints are required and should be located by the designer at the following locations on the construction documents: 144 sf (13.4 sm) is the maximum overall area

More information

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016 Windows Installed into Walls with Polyiso and Wood Framing Installation Instructions Picture Frame Method Revised 10/24/2016 Background There are many acceptable ways to mount and detail windows for support

More information