1 Unversty of Wollongong Research nlne Faculty of Informatcs - Papers (Archve) Faculty of Engneerng and Informaton Scences 2007 Sad mnmzaton of a remote dstrbuton feeder Ka Zou Unversty of Wollongong, kz965@uow.edu.au Wckramaarachch W. Keerthpala Unversty of Wollongong, wkeerth@uow.edu.au Sarath Perera Unversty of Wollongong, sarath@uow.edu.au Publcaton Detals K. Zou, W. W. Keerthpala & S. Perera, "Sad mnmzaton of a remote dstrbuton feeder," n Conference Proceedngs of the 2007 Australasan Unverstes Power Engneerng Conference: AUPEC 2007, 2007, pp Research nlne s the open access nsttutonal repostory for the Unversty of Wollongong. For further nformaton contact the UW brary: research-pubs@uow.edu.au

2 Sad mnmzaton of a remote dstrbuton feeder Abstract Dstrbuton system relablty assessment s an mportant part of dstrbuton system operaton and plannng. Ths paper presents some approaches taken to mnmze the SAIDI (System Average Interrupton Duraton Index) for a remote dstrbuton feeder n an 11kV dstrbuton system. Resultng from unavalablty of alternatve backup supples from the other adjacent feeders, dstrbuted generators (DG) can be used as backup supples n ths case. Coordnatng dstrbuton automaton (DA) system wth DGs, the restoraton area can be made larger and the outage tme can be shorter, consequently, the dstrbuton system relablty can be mproved sgnfcantly. In ths paper, factors affectng SAIDI are dscussed and methods ncludng feeder reconfguraton, recloser nstallaton and replacement and DG nstallaton are appled to mnmze SAIDI. Comparatve studes are performed and related results are addressed. Keywords Sad, mnmzaton, remote, dstrbuton, feeder Dscplnes Physcal Scences and athematcs Publcaton Detals K. Zou, W. W. Keerthpala & S. Perera, "Sad mnmzaton of a remote dstrbuton feeder," n Conference Proceedngs of the 2007 Australasan Unverstes Power Engneerng Conference: AUPEC 2007, 2007, pp Ths conference paper s avalable at Research nlne:

3 1 SAIDI nmzaton of a Remote Dstrbuton Feeder Ka Zou, W. W.. Keerthpala, and S. Perera Abstract Dstrbuton system relablty assessment s an mportant part of dstrbuton system operaton and plannng. Ths paper presents some approaches taken to mnmze the SAIDI (System Average Interrupton Duraton Index) for a remote dstrbuton feeder n an 11kV dstrbuton system. Resultng from unavalablty of alternatve backup supples from the other adjacent feeders, dstrbuted generators (DG) can be used as backup supples n ths case. Coordnatng dstrbuton automaton (DA) system wth DGs, the restoraton area can be made larger and the outage tme can be shorter, consequently, the dstrbuton system relablty can be mproved sgnfcantly. In ths paper, factors affectng SAIDI are dscussed and methods ncludng feeder reconfguraton, recloser nstallaton and replacement and DG nstallaton are appled to mnmze SAIDI. Comparatve studes are performed and related results are addressed. Index Terms Power dstrbuton relablty, power dstrbuton protecton, dstrbuted generator. D I. INTRDUCTIN ISTRIBUTIN relablty s the ablty of the dstrbuton system to perform ts functon under stated condtons for a stated perod of tme wthout falure [1]. Relablty mprovement of electrc dstrbuton systems has been an object of research efforts over many years. Relablty ndces for dstrbuton systems have been defned by several groups to set benchmarks n power system desgn. The power system desgn and mantenance programs performed by utltes should depend on the relablty ndces n order to mprove system relablty effectvely. In rural areas, lack of alternatve backup supples from other adjacent feeders s an obstacle to havng hghly relable supply n these areas. Buldng a new nterconnecton feeder n remote area s qute tme-consumng and cost-neffectve due to complex geographcal envronment. But wth the development of dstrbuton automaton (DA) and anuscrpt receved August 15, 2007; revsed ctober 20, Ka Zou s wth the School of Electrcal, Computer and Telecommuncatons Engneerng, Unversty of Wollongong, Wollongong, NSW, 2522 Australa (e-mal: kz965@uow.edu.au). W.W..Keerthpala s wth the School of Electrcal, Computer and Telecommuncatons Engneerng, Unversty of Wollongong, Wollongong, NSW, 2522 Australa (e-mal: wkeerth@uow.edu.au). S.Perera s wth the School of Electrcal, Computer and Telecommuncatons Engneerng, Unversty of Wollongong, Wollongong, NSW, 2522 Australa (e-mal: sarath@uow.edu.au). dstrbuted generaton (DG), the dstrbuton systems located n rural area can have hgher relablty at relatvely lower operaton and mantenance costs. DGs are flexble to nstall and cost-effcent to operate and mantenan. DGs can also be regarded as backup supples durng nterruptons. Approprate coordnaton of DA and DG has great mpact on nterrupton duraton and frequency, whch s sgnfcantly affect the system relablty. In ths paper, some approaches taken to assess the relablty of a remote dstrbuton system quanttatvely are dscussed. In Secton II, a remote dstrbuton feeder under study s ntroduced and analysed. Factors affectng SAIDI are dscussed and approaches to mnmze SAIDI ncludng feeder reconfguraton, recloser replacement and DG nstallaton are presented n Secton III. Smulaton and related results are n Secton IV followed by conclusons n Secton V. II. FEEDER UNER STUDY The dstrbuton feeder to be analysed s an 11kV feeder located n a remote area. The topology of ths feeder s shown n Fg. 1. It s assumed that the length of each secton s 2km. The feeder sectons from 1 to 14 are the man feeder protected by a breaker at the begnnng of ths feeder. The feeder sectons from 15 to 17 are the branch sectons protected by a fuse connected at the begnnng of ther related branch. The feeder sectons from 18 to 31 are the extended branch sectons representng ncreasng number of customers n ths area. For smplcty, the components such as feeder sectons, manual swtches and transformers n each secton are combned together as one component by usng relablty-networkequvalent method [2] and the load ponts are lumped together n each secton. It s also assumed that customers are unformly dstrbuted and there are 15 customers n each secton. Ths dstrbuton feeder s suppled by an 11kV busbar and no backup supply s avalable for any secton of ths feeder resultng from the geographcal locaton of the entre feeder. III. FACTRS AFFECTING SAIDI The objectve of ths paper s to mnmze the dstrbuton system relablty ndex SAIDI for feeder under study. SAIDI can be calculated by usng ( [3]:

4 2 Fg. 2. Topology of a Smple Feeder TABE I RIT FR THE FEEDER SHWN IN FIG. 2(A) Fg. 1. Topology of the Remote Dstrbuton Feeder SAIDI T = 1 = T = 1 r N N ( confguraton of the feeder and protecton scheme [4]. From ( and (2), SAIDI can be calculated as follows: where T s the total number of sectons, r s the outage tme for each nterrupton at, N s the number of nterrupted customers for each sustaned nterrupton durng the reported perod. To calculate the outage tme for each load pont n relaton to dfferent scenaros durng outages, Repar and Isolaton Tme atrx (RIT) s used n ths paper. RIT = ( m ( m 11 m m mm mm ( m 1( ( ( 1( ( ( n where j s the outage tme for secton j when there s a fault on secton, m s the total number of man feeder sectons and n s the total number of branch sectons. The square RIT can be dvded nto 4 regons. The toprght regon (from 11 to mm) ndcates the outage tme on man feeder secton for faults on the other man feeder secton j. The top-left (from 1( to ) regon shows the outage tme on healthy man feeder for faults on branches. Smlarly, the bottom-left regon (from (1 to (m) shows the outage tme for each branch secton when there are faults on man feeder sectons and the bottom-rght regon (from (( to (() ndcates the outage tme for each branch secton when there are faults on the other branch sectons. utage tme could be ether repar tme or solaton tme dependng on dfferent fault locatons, topology and ) (2) SAIDI = n n ( λ ) N j = 1 j = 1 n = 1 N where λ s the fault rate for secton. Form (3), t s clear that three parameters (outage tme for each secton, fault rate for each secton and the number of customers) can affect SAIDI drectly. Snce the total number of customers cannot be changed n ths feeder and the nherent characterstcs of ths feeder makes the fault rate constant over a long-term perod [5], therefore, ths paper only dscusses the factors affectng outage tme. Factors affectng outage tme are dscussed n the followng sub-sectons: A. Feeder Confguraton The physcal feeder topology cannot be changed easly due to hgh cost and geographcal dstrbuton of customers, but dfferent protecton schemes can change the confguraton of a feeder [6]. For nstance, the confguraton of the feeder shown n Fg. 2 can be changed by adjustng the breaker settng and removng the fuse nstalled at the begnnng of feeder secton 5 to form a new man feeder and a fuse can be nstalled at the begnnng of feeder secton 3 to form a new branch. Though feeder confguraton can be reconfgured easly, however, the feeder capacty lmts and thermal lmts should be consdered. It s assumed that the fault rate for each secton n Fg. 2 s 0.05 faults per year and there are 10 customers served by each secton. The repar tme and solaton tme s assumed to be 6 (3)

5 3 TABE II RIT FR THE FEEDER SHWN IN FIG.2(B) TABE III RIT FR THE FEEDER SHWN IN FIG.3 TABE IV RIT FR THE FEEDER SHWN IN FIG. 3 Fg. 3. Topology of a Smple Feeder wth AR hours and 2 hours respectvely. The RITs for Fg. 2(a) and Fg. 2(b) s shown n Table I and Table II respectvely. In both tables, the columns are the fault locatons and the rows are the related outage tme for each secton. The SAIDI for the feeder n Fg. 2(a) s 0.88 hour per year and SAIDI for the feeder n Fg. 2(b) s 0.90 hour per year showng a slght reducton n relablty levels. However, the reconfgured feeder wll exhbt mproved relablty and hence the SAIDI can be reduced. B. Protecton Scheme As mentoned above, dfferent protecton schemes can change the feeder confguraton. Not only that, dfferent protecton schemes can also affect the outage tme for dfferent feeder sectons. A dstrbuton feeder wth suffcent DA should be more relable and the average outage tme for a specfc perod should be shorter. But the cost of mplementng DA has a trade-off relatonshp wth the relablty ssues. To have relatvely hgher relablty performance whle reducng the captal nvestment s very mportant for utltes [7, 8]. An example s llustrated to explan the effect of the protecton devces. For the same feeder shown n Fg. 2(a), t s supposed that a new automatc recloser s to be nstalled at the begnnng of feeder secton 3 as shown n Fg. 3. In ths case, the new RIT s gven n Table III and the calculated SAIDI s 0.82 hour per year. The system relablty s mproved due to addtonal automatc recloser. The outage tme wll be more dffcult to determne f large number of automatc reclosers s appled. In Secton IV, the effect of dfferent locatons and number of automatc reclosers on system relablty wll be compared n detal. C. Avalablty of Backup Supply In urban area, backup supples are not consdered as a problem due to hghly meshed network. But n remote area, where the dstrbuton feeder s far away from the other dstrbuton feeders, the backup supples from the other feeders become unavalable. To buld an nterconnecton feeder as a backup supply of the exstng feeder s expensve and costneffcent. In ths case, n order to mprove system relablty, use of DGs s a good soluton. Nowadays, DGs are wdely used n load sheddng and voltage support n dstrbuton systems. DGs are consdered to be relable backup supples when part of the dstrbuton system exhbts an outage [7, 8]. Coordnatng wth DA, the restoraton area can be larger and the restoraton process can be much faster [10]. Table IV shows the RIT when a DG s nstalled at the end of feeder secton 4 shown n Fg. 3. It s assumed that the capacty of DG s suffcent to supply the whole feeder. Compared wth the SAIDI of feeders shown n Fg. 2 and Fg. 3, the value of SAIDI n ths case can go further down to 0.5 hour per year, whch proves that approprate nstallaton of DGs can result n better system relablty. ore cases about the mplementaton of DG for the feeder shown n Fg. 1 wll be dscussed n Secton IV and the assocated SAIDI values are also calculated n Secton IV. A. Assumptons IV. CASE STUDIES To evaluate the relablty beneft of mplementng dfferent protecton schemes and employng DGs as backup supples, dfferent comparatve studes are conducted. The assumptons behnd n varous case studes are descrbed as followng:

6 4 Protecton Devces: Protecton devces ncludng automatc recloser, fuse and crcut breaker are used n case studes. All the protecton devces are assumed to be 100% relable all the tme, whch means that all the protecton devces can trp faults as they are needed. So the fault rate for protecton devces s 0 faults per year. 2) Repar Tme: Repar tme s the tme taken to repar or replace the faulted electrc components. Repar tme can vary dependng on several factors such as dfferent faulted electrc component, weather condton and fault locaton. For smplcty, repar tme n case studes s assumed to be 6 hours for each faulted secton regardless of dfferent condtons. 3) Isolaton Tme: Isolaton tme n ths paper s defned as the tme taken to locate the fault and the tme taken to solate the fault from system. Isolaton tme also can vary dependng on the factors such as travel tme, avalable number of crews, fault locaton and dfferent types of electrc components. In ths paper, the solaton tme s 2 hours for each secton. 4) Fault Rate: Fault rate for each feeder secton s assumed to be faults per year per km. In ths paper, only the fault rate of feeder s consdered because only the faults on 11kV feeder sectons can affect other healthy sectons. 5) Fuse: All fuses are assumed to be nstalled at the begnnng of the branches and they are 100% relable. It s also assumed that the fuses can only trp the faults located on the branch sde and all the fuses have been set and coordnated wth other protecton devces properly. 6) Automatc Recloser: There are two types of automatc reclosers used n case studes. ne s the undrectonal automatc recloser whch can only detect the faults located downstream; another s the bdrectonal automatc recloser whch can detect the faults on both sdes. It s assumed that all automatc reclosers can coordnate correctly to solate the faults as needed. 7) Dstrbuted Generator: In case studes, t s assumed that the capacty of dstrbuted generator s suffcent to supply the whole feeder and the dstrbuted generator can run n slandng mode when requred. In ths paper, all DGs are only started to supply the feeder sectons whch are n outage subject to an emergency mode. Due to feeder capacty lmt, the DG nstalled n branch sectons can only supply related branch, but dstrbuted generator nstalled n man feeder sectons can supply both man feeder and branch sectons. B. Comparatve Case Studes Descrptons of these comparatve case studes are shown n Table V. An overall bref descrpton of 6 case studes s as follows: Case 1: Number of automatc reclosers s placed along the feeder and the recloser placement has been optmzed to mnmze SAIDI. The feeder confguraton s not changed and DGs are not appled n ths case. 2) Case 2 and 3: Number of automatc reclosers and ther placement are consdered. DGs are ntroduced n these two cases. ne DG s placed at the end of man feeder n Case 2 and one DG s placed s placed at the end of the branch n Fg. 4. Results of Case Studes TABE V DESCRIPTIN F CASE STUDIES Case 3. 3) Case 4: The feeder s reconfgured n ths case. The fuse at the begnnng of feeder secton 15 s removed and a new fuse s placed at the begnnng of feeder secton 6 to form a new branch. Number of automatc reclosers s consdered and ther placement s optmzed. 4) Case 5 and 6: DGs are appled n both two cases for the reconfgured feeder. The dfference s that the dstrbuted generator s nstalled at the end of man feeder n Case 5 whle n Case 6 the dstrbuted generator s nstalled at the end of branch. C. Results of Case Studes The results of 6 comparatve case studes are llustrated n Fg. 4. It s notced that f the feeder s reconfgured wth automatc reclosers or DGs, the system relablty wll become worse for ths feeder. The value of SAIDI wll ncrease slghtly, from 737 mnutes n Case 1 to 749 mnutes n Case 4, f only feeder reconfguraton s appled. Comparng Case 1 and Case 2 wth Case 4 and Case 5, t s obvous that the values of SAIDI are reduced f automatc reclosers are placed properly and the DG s nstalled at the end of man feeder when the feeder s reconfgured. But n Case 3 and Case 6, when the dstrbuted generator s placed at the end of the branch, the value of SAIDI wll ncrease f the feeder s reconfgured. It s also obvous from Fg. 4 that the value of SAIDI decreases wth the ncrease of the number of automatc reclosers. But the rate of decrease of SAIDI becomes smaller

7 5 when the number of automatc reclosers s ncreased. Consequently, t s suggested that the utltes should consder a tradeoff between captal cost and relablty mprovement. In comparatve case studes, t s ndcated that Case 3 gves the best results. Even when no automatc recloser s appled, the maxmum value of SAIDI n Case 3 can be half of the value n Case 1. If 5 automatc reclosers are nstalled, the value of SAIDI can reach ts lowest value of 164 mnutes. Smlar values are obtaned for Case 5. V. CNCUSINS Ths paper presented some approaches for the SAIDI mnmzaton of a remote dstrbuton feeder n an 11kV dstrbuton system. The approaches are based on the relablty-network-equvalent model n whch the mpacts of feeder confguraton, automatc recloser placement and dstrbuted generator applcaton are ncluded n the analyss. The factors affectng system relablty were also ndcated n ths paper. Comparatve case studes are performed to evaluate the system relablty mprovement by usng dfferent methods. The study results llustrated n ths paper ndcate that the system relablty s mproved by applyng a dstrbuted generator as a backup supply. Coordnatng automatc recloser wth dstrbuted generator, the system relablty can be further mproved. In ths paper, DG was assumed to be completely defned. However, future research s requred n optmzng the locaton and sttng of dfferent types of dstrbuted generators. REFERENCES [1] Cheryl A. Warren, Dstrbuton Relablty - What s t? IEEE Industry Applcatons agazne, Vol. 2, Issue 4, July-Aug 1996, pp [2] R.Bllnton and P.Wang, Relablty-network-equvalent approach to dstrbuton-system-relablty evaluaton'', IEEE Proceedngs. Generaton. Transmsson and Dstrbuton, Vol. 145, No. 2, arch 1998, pp [3] IEEE gude for electrc power dstrbuton relablty ndces, IEEE , [4] Carr.W. Predctve dstrbuton relablty analyss consderng post fault restoraton and coordnaton falure, Rural Electrc Power Conference, IEEE, 5-7 ay 2002, Pages: B3-B3_6. [5] R.Bllnton and R.N.Allan, Relablty Evaluaton of Power Systems, 2nd ed. Plenum, New York, [6] R.E.Brown, Electrc Power Dstrbuton Relablty. arcel Dekker, New York, 2002 [7] A.S.Pabla, Electrc Power Dstrbuton. cgraw-hll, New York, 2004 [8] cdermott, T.E.Dugan, R.C, PQ, relablty and DG, Industry Applcaton agazne, IEEE, Vol.9, Iss.5, pp.17-23, Sept.-ct [9].H.J.Bollen, Y.Sun, G.W.Ault, Relablty of Dstrbuton Networks wth DER ncludng Intentonal Islandng, Future Power Systems, 2005 Internatonal Conference on, pp.1-6, Nov [10] S.Kazem,.Fotuh-Fruzabad, R.Bllnton, Relablty assessment of an automated dstrbuton system, Generaton, Transmsson & Dstrbuton, IET, Vol.1, pp , arch 2007.

An Adaptive Over-current Protection Scheme for MV Distribution Networks Including DG

An Adaptive Over-current Protection Scheme for MV Distribution Networks Including DG An Adaptve Over-current Protecton Scheme for MV Dstrbuton Networks Includng DG S.A.M. Javadan Islamc Azad Unversty s.a.m.javadan@gmal.com M.-R. Haghfam Tarbat Modares Unversty haghfam@modares.ac.r P. Barazandeh

More information

MTBF PREDICTION REPORT

MTBF PREDICTION REPORT MTBF PREDICTION REPORT PRODUCT NAME: BLE112-A-V2 Issued date: 01-23-2015 Rev:1.0 Copyrght@2015 Bluegga Technologes. All rghts reserved. 1 MTBF PREDICTION REPORT... 1 PRODUCT NAME: BLE112-A-V2... 1 1.0

More information

Calculation of the received voltage due to the radiation from multiple co-frequency sources

Calculation of the received voltage due to the radiation from multiple co-frequency sources Rec. ITU-R SM.1271-0 1 RECOMMENDATION ITU-R SM.1271-0 * EFFICIENT SPECTRUM UTILIZATION USING PROBABILISTIC METHODS Rec. ITU-R SM.1271 (1997) The ITU Radocommuncaton Assembly, consderng a) that communcatons

More information

Comparative Analysis of Reuse 1 and 3 in Cellular Network Based On SIR Distribution and Rate

Comparative Analysis of Reuse 1 and 3 in Cellular Network Based On SIR Distribution and Rate Comparatve Analyss of Reuse and 3 n ular Network Based On IR Dstrbuton and Rate Chandra Thapa M.Tech. II, DEC V College of Engneerng & Technology R.V.. Nagar, Chttoor-5727, A.P. Inda Emal: chandra2thapa@gmal.com

More information

Electricity Network Reliability Optimization

Electricity Network Reliability Optimization Electrcty Network Relablty Optmzaton Kavnesh Sngh Department of Engneerng Scence Unversty of Auckland New Zealand kav@hug.co.nz Abstract Electrcty dstrbuton networks are subject to random faults. On occurrence

More information

SAIDI MINIMIZATION OF A REMOTE DISTRIBUTION FEEDER. Kai Zou, W. W. L. Keerthipala and S. Perera

SAIDI MINIMIZATION OF A REMOTE DISTRIBUTION FEEDER. Kai Zou, W. W. L. Keerthipala and S. Perera SAIDI INIIZATIN F A RETE DISTRIBUTIN FEEDER Ka Zou, W. W.. Keerthpala ad S. Perera Uversty of Wollogog School of Electrcal ad Computer Telecommucato Egeerg Wollogog, NSW 2522, Australa Abstract Dstrbuto

More information

Customer witness testing guide

Customer witness testing guide Customer wtness testng gude Ths gude s amed at explanng why we need to wtness test equpment whch s beng connected to our network, what we actually do when we complete ths testng, and what you can do to

More information

D-STATCOM Optimal Allocation Based On Investment Decision Theory

D-STATCOM Optimal Allocation Based On Investment Decision Theory Internatonal Conference on Computer Engneerng, Informaton Scence & Applcaton Technology (ICCIA 2016) D-STATCOM Optmal Allocaton Based On Investment Decson Theory Yongjun Zhang1, a, Yfu Mo1, b and Huazhen

More information

Uncertainty in measurements of power and energy on power networks

Uncertainty in measurements of power and energy on power networks Uncertanty n measurements of power and energy on power networks E. Manov, N. Kolev Department of Measurement and Instrumentaton, Techncal Unversty Sofa, bul. Klment Ohrdsk No8, bl., 000 Sofa, Bulgara Tel./fax:

More information

The Effect Of Phase-Shifting Transformer On Total Consumers Payments

The Effect Of Phase-Shifting Transformer On Total Consumers Payments Australan Journal of Basc and Appled Scences 5(: 854-85 0 ISSN -88 The Effect Of Phase-Shftng Transformer On Total Consumers Payments R. Jahan Mostafa Nck 3 H. Chahkand Nejad Islamc Azad Unversty Brjand

More information

Optimum Allocation of Distributed Generations Based on Evolutionary Programming for Loss Reduction and Voltage Profile Correction

Optimum Allocation of Distributed Generations Based on Evolutionary Programming for Loss Reduction and Voltage Profile Correction ISSN : 0976-8491(Onlne) ISSN : 2229-4333(rnt) Optmum Allocaton of Dstrbuted Generatons Based on Evolutonary rogrammng for Reducton and Voltage rofle Correcton 1 Mohammad Saleh Male, 2 Soodabeh Soleyman

More information

PRACTICAL, COMPUTATION EFFICIENT HIGH-ORDER NEURAL NETWORK FOR ROTATION AND SHIFT INVARIANT PATTERN RECOGNITION. Evgeny Artyomov and Orly Yadid-Pecht

PRACTICAL, COMPUTATION EFFICIENT HIGH-ORDER NEURAL NETWORK FOR ROTATION AND SHIFT INVARIANT PATTERN RECOGNITION. Evgeny Artyomov and Orly Yadid-Pecht 68 Internatonal Journal "Informaton Theores & Applcatons" Vol.11 PRACTICAL, COMPUTATION EFFICIENT HIGH-ORDER NEURAL NETWORK FOR ROTATION AND SHIFT INVARIANT PATTERN RECOGNITION Evgeny Artyomov and Orly

More information

Voltage security constrained reactive power optimization incorporating wind generation

Voltage security constrained reactive power optimization incorporating wind generation Unversty of Wollongong Research Onlne Faculty of Engneerng and Informaton Scences - Papers: Part A Faculty of Engneerng and Informaton Scences 2012 Voltage securty constraned reactve power optmzaton ncorporatng

More information

To: Professor Avitabile Date: February 4, 2003 From: Mechanical Student Subject: Experiment #1 Numerical Methods Using Excel

To: Professor Avitabile Date: February 4, 2003 From: Mechanical Student Subject: Experiment #1 Numerical Methods Using Excel To: Professor Avtable Date: February 4, 3 From: Mechancal Student Subject:.3 Experment # Numercal Methods Usng Excel Introducton Mcrosoft Excel s a spreadsheet program that can be used for data analyss,

More information

DISTRIBUTION SYSTEMS RELIABILITY ANALYSIS PACKAGE USING MATLAB GRAPHICAL USER INTERFACE (GUI)

DISTRIBUTION SYSTEMS RELIABILITY ANALYSIS PACKAGE USING MATLAB GRAPHICAL USER INTERFACE (GUI) Internatonal Journal on Techncal and Physcal Problems of Engneerng (IJTPE) Publshed by Internatonal Organzaton of IOTPE ISSN 2077-3528 IJTPE Journal www.otpe.com jtpe@otpe.com March 2012 Issue 10 Volume

More information

Resource Allocation Optimization for Device-to- Device Communication Underlaying Cellular Networks

Resource Allocation Optimization for Device-to- Device Communication Underlaying Cellular Networks Resource Allocaton Optmzaton for Devce-to- Devce Communcaton Underlayng Cellular Networks Bn Wang, L Chen, Xaohang Chen, Xn Zhang, and Dacheng Yang Wreless Theores and Technologes (WT&T) Bejng Unversty

More information

Optimal Phase Arrangement of Distribution Feeders Using Immune Algorithm

Optimal Phase Arrangement of Distribution Feeders Using Immune Algorithm The 4th Internatonal Conference on Intellgent System Applcatons to Power Systems, ISAP 2007 Optmal Phase Arrangement of Dstrbuton Feeders Usng Immune Algorthm C.H. Ln, C.S. Chen, M.Y. Huang, H.J. Chuang,

More information

Smart Grid Fault Location, Isolation, and Service Restoration (FLISR) Solutions to Manage Operational and Capital Expenditures

Smart Grid Fault Location, Isolation, and Service Restoration (FLISR) Solutions to Manage Operational and Capital Expenditures 1 Smart Grd Fault Locaton, Isolaton, and Servce Restoraton (FLISR) Solutons to Manage Operatonal and Captal Expendtures Adam Gauc, P.Eng. Schneder Electrc North Amerca Abstract Wth new requrements beng

More information

熊本大学学術リポジトリ. Kumamoto University Repositor

熊本大学学術リポジトリ. Kumamoto University Repositor 熊本大学学術リポジトリ Kumamoto Unversty Repostor Ttle Wreless LAN Based Indoor Poston and Its Smulaton Author(s) Ktasuka, Teruak; Nakansh, Tsune CtatonIEEE Pacfc RIM Conference on Comm Computers, and Sgnal Processng

More information

Rejection of PSK Interference in DS-SS/PSK System Using Adaptive Transversal Filter with Conditional Response Recalculation

Rejection of PSK Interference in DS-SS/PSK System Using Adaptive Transversal Filter with Conditional Response Recalculation SERBIAN JOURNAL OF ELECTRICAL ENGINEERING Vol., No., November 23, 3-9 Rejecton of PSK Interference n DS-SS/PSK System Usng Adaptve Transversal Flter wth Condtonal Response Recalculaton Zorca Nkolć, Bojan

More information

Dynamic Optimization. Assignment 1. Sasanka Nagavalli January 29, 2013 Robotics Institute Carnegie Mellon University

Dynamic Optimization. Assignment 1. Sasanka Nagavalli January 29, 2013 Robotics Institute Carnegie Mellon University Dynamc Optmzaton Assgnment 1 Sasanka Nagavall snagaval@andrew.cmu.edu 16-745 January 29, 213 Robotcs Insttute Carnege Mellon Unversty Table of Contents 1. Problem and Approach... 1 2. Optmzaton wthout

More information

Methods for Preventing Voltage Collapse

Methods for Preventing Voltage Collapse Methods for Preventng Voltage Collapse Cláuda Res 1, Antóno Andrade 2, and F. P. Macel Barbosa 3 1 Telecommuncatons Insttute of Avero Unversty, Unversty Campus of Avero, Portugal cres@av.t.pt 2 Insttute

More information

A Mathematical Model for Restoration Problem in Smart Grids Incorporating Load Shedding Concept

A Mathematical Model for Restoration Problem in Smart Grids Incorporating Load Shedding Concept J. Appl. Envron. Bol. Sc., 5(1)20-27, 2015 2015, TextRoad Publcaton ISSN: 2090-4274 Journal of Appled Envronmental and Bologcal Scences www.textroad.com A Mathematcal Model for Restoraton Problem n Smart

More information

Research of Dispatching Method in Elevator Group Control System Based on Fuzzy Neural Network. Yufeng Dai a, Yun Du b

Research of Dispatching Method in Elevator Group Control System Based on Fuzzy Neural Network. Yufeng Dai a, Yun Du b 2nd Internatonal Conference on Computer Engneerng, Informaton Scence & Applcaton Technology (ICCIA 207) Research of Dspatchng Method n Elevator Group Control System Based on Fuzzy Neural Network Yufeng

More information

NATIONAL RADIO ASTRONOMY OBSERVATORY Green Bank, West Virginia SPECTRAL PROCESSOR MEMO NO. 25. MEMORANDUM February 13, 1985

NATIONAL RADIO ASTRONOMY OBSERVATORY Green Bank, West Virginia SPECTRAL PROCESSOR MEMO NO. 25. MEMORANDUM February 13, 1985 NATONAL RADO ASTRONOMY OBSERVATORY Green Bank, West Vrgna SPECTRAL PROCESSOR MEMO NO. 25 MEMORANDUM February 13, 1985 To: Spectral Processor Group From: R. Fsher Subj: Some Experments wth an nteger FFT

More information

Network Reconfiguration for Load Balancing in Distribution System with Distributed Generation and Capacitor Placement

Network Reconfiguration for Load Balancing in Distribution System with Distributed Generation and Capacitor Placement World Academy of Scence, Engneerng and Technology nternatonal Journal of Electrcal and Computer Engneerng Networ Reconfguraton for Load Balancng n Dstrbuton System wth Dstrbuted Generaton and Capactor

More information

Walsh Function Based Synthesis Method of PWM Pattern for Full-Bridge Inverter

Walsh Function Based Synthesis Method of PWM Pattern for Full-Bridge Inverter Walsh Functon Based Synthess Method of PWM Pattern for Full-Brdge Inverter Sej Kondo and Krt Choesa Nagaoka Unversty of Technology 63-, Kamtomoka-cho, Nagaoka 9-, JAPAN Fax: +8-58-7-95, Phone: +8-58-7-957

More information

Integration of Asset and Outage Management Tasks for Distribution Systems

Integration of Asset and Outage Management Tasks for Distribution Systems 1 Integraton of Asset and Outage Management Tasks for Dstrbuton Systems Y. Dong, Student Member, IEEE, V. Aravnthan, Student Member, IEEE, M. Kezunovc, Fellow, IEEE, and W. Jewell, Fellow, IEEE Abstract

More information

TECHNICAL NOTE TERMINATION FOR POINT- TO-POINT SYSTEMS TN TERMINATON FOR POINT-TO-POINT SYSTEMS. Zo = L C. ω - angular frequency = 2πf

TECHNICAL NOTE TERMINATION FOR POINT- TO-POINT SYSTEMS TN TERMINATON FOR POINT-TO-POINT SYSTEMS. Zo = L C. ω - angular frequency = 2πf TECHNICAL NOTE TERMINATION FOR POINT- TO-POINT SYSTEMS INTRODUCTION Because dgtal sgnal rates n computng systems are ncreasng at an astonshng rate, sgnal ntegrty ssues have become far more mportant to

More information

A Classification Technique for Protection Coordination Assessment of Distribution Systems with Distributed Generation

A Classification Technique for Protection Coordination Assessment of Distribution Systems with Distributed Generation Proceedngs of the 4 th Internatonal Mddle East Power Systems Conference (MEPCON, Caro Unversty, Egypt, December,, Paper ID. A Classfcaton Technque for Protecton Coordnaton Assessment of Dstrbuton Systems

More information

antenna antenna (4.139)

antenna antenna (4.139) .6.6 The Lmts of Usable Input Levels for LNAs The sgnal voltage level delvered to the nput of an LNA from the antenna may vary n a very wde nterval, from very weak sgnals comparable to the nose level,

More information

Optimal Network Reconfiguration with Distributed Generation Using NSGA II Algorithm

Optimal Network Reconfiguration with Distributed Generation Using NSGA II Algorithm (IJARAI) Internatonal Journal of Advanced Research n Artfcal Intellgence, Optmal Network Reconfguraton wth Dstrbuted Generaton Usng NSGA II Algorthm Jasna Hvzefendć Faculty of Engneerng and Informaton

More information

Figure.1. Basic model of an impedance source converter JCHPS Special Issue 12: August Page 13

Figure.1. Basic model of an impedance source converter JCHPS Special Issue 12: August Page 13 A Hgh Gan DC - DC Converter wth Soft Swtchng and Power actor Correcton for Renewable Energy Applcaton T. Selvakumaran* and. Svachdambaranathan Department of EEE, Sathyabama Unversty, Chenna, Inda. *Correspondng

More information

Application of Intelligent Voltage Control System to Korean Power Systems

Application of Intelligent Voltage Control System to Korean Power Systems Applcaton of Intellgent Voltage Control System to Korean Power Systems WonKun Yu a,1 and HeungJae Lee b, *,2 a Department of Power System, Seol Unversty, South Korea. b Department of Power System, Kwangwoon

More information

Power loss and Reliability optimization in Distribution System with Network Reconfiguration and Capacitor placement

Power loss and Reliability optimization in Distribution System with Network Reconfiguration and Capacitor placement Internatonal Journal of Scentfc Research Engneerng & Technology (IJSRET), ISSN 2278 0882 692 Power loss and Relablty optmzaton n Dstrbuton System wth Network Reconfguraton and Capactor placement A.Manasa

More information

Micro-grid Inverter Parallel Droop Control Method for Improving Dynamic Properties and the Effect of Power Sharing

Micro-grid Inverter Parallel Droop Control Method for Improving Dynamic Properties and the Effect of Power Sharing 2015 AASRI Internatonal Conference on Industral Electroncs and Applcatons (IEA 2015) Mcro-grd Inverter Parallel Droop Control Method for Improvng Dynamc Propertes and the Effect of Power Sharng aohong

More information

High Speed, Low Power And Area Efficient Carry-Select Adder

High Speed, Low Power And Area Efficient Carry-Select Adder Internatonal Journal of Scence, Engneerng and Technology Research (IJSETR), Volume 5, Issue 3, March 2016 Hgh Speed, Low Power And Area Effcent Carry-Select Adder Nelant Harsh M.tech.VLSI Desgn Electroncs

More information

NETWORK 2001 Transportation Planning Under Multiple Objectives

NETWORK 2001 Transportation Planning Under Multiple Objectives NETWORK 200 Transportaton Plannng Under Multple Objectves Woodam Chung Graduate Research Assstant, Department of Forest Engneerng, Oregon State Unversty, Corvalls, OR9733, Tel: (54) 737-4952, Fax: (54)

More information

A NSGA-II algorithm to solve a bi-objective optimization of the redundancy allocation problem for series-parallel systems

A NSGA-II algorithm to solve a bi-objective optimization of the redundancy allocation problem for series-parallel systems 0 nd Internatonal Conference on Industral Technology and Management (ICITM 0) IPCSIT vol. 49 (0) (0) IACSIT Press, Sngapore DOI: 0.776/IPCSIT.0.V49.8 A NSGA-II algorthm to solve a b-obectve optmzaton of

More information

Research on Controller of Micro-hydro Power System Nan XIE 1,a, Dezhi QI 2,b,Weimin CHEN 2,c, Wei WANG 2,d

Research on Controller of Micro-hydro Power System Nan XIE 1,a, Dezhi QI 2,b,Weimin CHEN 2,c, Wei WANG 2,d Advanced Materals Research Submtted: 2014-05-13 ISSN: 1662-8985, Vols. 986-987, pp 1121-1124 Accepted: 2014-05-19 do:10.4028/www.scentfc.net/amr.986-987.1121 Onlne: 2014-07-18 2014 Trans Tech Publcatons,

More information

A study of turbo codes for multilevel modulations in Gaussian and mobile channels

A study of turbo codes for multilevel modulations in Gaussian and mobile channels A study of turbo codes for multlevel modulatons n Gaussan and moble channels Lamne Sylla and Paul Forter (sylla, forter)@gel.ulaval.ca Department of Electrcal and Computer Engneerng Laval Unversty, Ste-Foy,

More information

Graph Method for Solving Switched Capacitors Circuits

Graph Method for Solving Switched Capacitors Circuits Recent Advances n rcuts, ystems, gnal and Telecommuncatons Graph Method for olvng wtched apactors rcuts BHUMIL BRTNÍ Department of lectroncs and Informatcs ollege of Polytechncs Jhlava Tolstého 6, 586

More information

Distributed generation for minimization of power losses in distribution systems

Distributed generation for minimization of power losses in distribution systems Unversty of Wollongong Research Onlne Faculty of ngneerng and nformaton Scences - Papers: Part A Faculty of ngneerng and nformaton Scences 006 Dstrbuted generaton for mnmzaton of power losses n dstrbuton

More information

ECE315 / ECE515 Lecture 5 Date:

ECE315 / ECE515 Lecture 5 Date: Lecture 5 Date: 18.08.2016 Common Source Amplfer MOSFET Amplfer Dstorton Example 1 One Realstc CS Amplfer Crcut: C c1 : Couplng Capactor serves as perfect short crcut at all sgnal frequences whle blockng

More information

A Current Differential Line Protection Using a Synchronous Reference Frame Approach

A Current Differential Line Protection Using a Synchronous Reference Frame Approach A Current Dfferental Lne rotecton Usng a Synchronous Reference Frame Approach L. Sousa Martns *, Carlos Fortunato *, and V.Fernão res * * Escola Sup. Tecnologa Setúbal / Inst. oltécnco Setúbal, Setúbal,

More information

A MODIFIED DIRECTIONAL FREQUENCY REUSE PLAN BASED ON CHANNEL ALTERNATION AND ROTATION

A MODIFIED DIRECTIONAL FREQUENCY REUSE PLAN BASED ON CHANNEL ALTERNATION AND ROTATION A MODIFIED DIRECTIONAL FREQUENCY REUSE PLAN BASED ON CHANNEL ALTERNATION AND ROTATION Vncent A. Nguyen Peng-Jun Wan Ophr Freder Computer Scence Department Illnos Insttute of Technology Chcago, Illnos vnguyen@t.edu,

More information

Voltage Quality Enhancement and Fault Current Limiting with Z-Source based Series Active Filter

Voltage Quality Enhancement and Fault Current Limiting with Z-Source based Series Active Filter Research Journal of Appled Scences, Engneerng and echnology 3(): 246-252, 20 ISSN: 2040-7467 Maxwell Scentfc Organzaton, 20 Submtted: July 26, 20 Accepted: September 09, 20 Publshed: November 25, 20 oltage

More information

A Comparison of Two Equivalent Real Formulations for Complex-Valued Linear Systems Part 2: Results

A Comparison of Two Equivalent Real Formulations for Complex-Valued Linear Systems Part 2: Results AMERICAN JOURNAL OF UNDERGRADUATE RESEARCH VOL. 1 NO. () A Comparson of Two Equvalent Real Formulatons for Complex-Valued Lnear Systems Part : Results Abnta Munankarmy and Mchael A. Heroux Department of

More information

On Operational Availability of a Large Software-Based Telecommunications System

On Operational Availability of a Large Software-Based Telecommunications System On Operatonal Avalablty of a Large Software-Based Telecommuncatons System Randy Cramp and Mladen A. Vouk Wendell Jones North Carolna State Unversty BNR Inc. Department of Computer Scence, Box 826 P.O.

More information

Optimal Sizing and Allocation of Residential Photovoltaic Panels in a Distribution Network for Ancillary Services Application

Optimal Sizing and Allocation of Residential Photovoltaic Panels in a Distribution Network for Ancillary Services Application Optmal Szng and Allocaton of Resdental Photovoltac Panels n a Dstrbuton Networ for Ancllary Servces Applcaton Reza Ahmad Kordhel, Student Member, IEEE, S. Al Pourmousav, Student Member, IEEE, Jayarshnan

More information

High Speed ADC Sampling Transients

High Speed ADC Sampling Transients Hgh Speed ADC Samplng Transents Doug Stuetzle Hgh speed analog to dgtal converters (ADCs) are, at the analog sgnal nterface, track and hold devces. As such, they nclude samplng capactors and samplng swtches.

More information

The Dynamic Utilization of Substation Measurements to Maintain Power System Observability

The Dynamic Utilization of Substation Measurements to Maintain Power System Observability 1 The Dynamc Utlzaton of Substaton Measurements to Mantan Power System Observablty Y. Wu, Student Member, IEEE, M. Kezunovc, Fellow, IEEE and T. Kostc, Member, IEEE Abstract-- In a power system State Estmator

More information

Time-frequency Analysis Based State Diagnosis of Transformers Windings under the Short-Circuit Shock

Time-frequency Analysis Based State Diagnosis of Transformers Windings under the Short-Circuit Shock Tme-frequency Analyss Based State Dagnoss of Transformers Wndngs under the Short-Crcut Shock YUYING SHAO, ZHUSHI RAO School of Mechancal Engneerng ZHIJIAN JIN Hgh Voltage Lab Shangha Jao Tong Unversty

More information

Evaluate the Effective of Annular Aperture on the OTF for Fractal Optical Modulator

Evaluate the Effective of Annular Aperture on the OTF for Fractal Optical Modulator Global Advanced Research Journal of Management and Busness Studes (ISSN: 2315-5086) Vol. 4(3) pp. 082-086, March, 2015 Avalable onlne http://garj.org/garjmbs/ndex.htm Copyrght 2015 Global Advanced Research

More information

Dual Functional Z-Source Based Dynamic Voltage Restorer to Voltage Quality Improvement and Fault Current Limiting

Dual Functional Z-Source Based Dynamic Voltage Restorer to Voltage Quality Improvement and Fault Current Limiting Australan Journal of Basc and Appled Scences, 5(5): 287-295, 20 ISSN 99-878 Dual Functonal Z-Source Based Dynamc Voltage Restorer to Voltage Qualty Improvement and Fault Current Lmtng M. Najaf, M. Hoseynpoor,

More information

IEE Electronics Letters, vol 34, no 17, August 1998, pp ESTIMATING STARTING POINT OF CONDUCTION OF CMOS GATES

IEE Electronics Letters, vol 34, no 17, August 1998, pp ESTIMATING STARTING POINT OF CONDUCTION OF CMOS GATES IEE Electroncs Letters, vol 34, no 17, August 1998, pp. 1622-1624. ESTIMATING STARTING POINT OF CONDUCTION OF CMOS GATES A. Chatzgeorgou, S. Nkolads 1 and I. Tsoukalas Computer Scence Department, 1 Department

More information

@IJMTER-2015, All rights Reserved 383

@IJMTER-2015, All rights Reserved 383 SIL of a Safety Fuzzy Logc Controller 1oo usng Fault Tree Analyss (FAT and realablty Block agram (RB r.-ing Mohammed Bsss 1, Fatma Ezzahra Nadr, Prof. Amam Benassa 3 1,,3 Faculty of Scence and Technology,

More information

Efficient Large Integers Arithmetic by Adopting Squaring and Complement Recoding Techniques

Efficient Large Integers Arithmetic by Adopting Squaring and Complement Recoding Techniques The th Worshop on Combnatoral Mathematcs and Computaton Theory Effcent Large Integers Arthmetc by Adoptng Squarng and Complement Recodng Technques Cha-Long Wu*, Der-Chyuan Lou, and Te-Jen Chang *Department

More information

FACTS Devices Allocation Using a Novel Dedicated Improved PSO for Optimal Operation of Power System

FACTS Devices Allocation Using a Novel Dedicated Improved PSO for Optimal Operation of Power System Journal of Operaton and Automaton n Power Engneerng Vol. 1, No., Summer & Fall 013, Pages: 14-135 http://journals.uma.ac.r/joape FACTS Devces Allocaton Usng a Novel Dedcated Improved PSO for Optmal Operaton

More information

Network Reconfiguration in Distribution Systems Using a Modified TS Algorithm

Network Reconfiguration in Distribution Systems Using a Modified TS Algorithm Network Reconfguraton n Dstrbuton Systems Usng a Modfed TS Algorthm ZHANG DONG,FU ZHENGCAI,ZHANG LIUCHUN,SONG ZHENGQIANG School of Electroncs, Informaton and Electrcal Engneerng Shangha Jaotong Unversty

More information

APPLICATION OF FUZZY MULTI-OBJECTIVE METHOD FOR DISTRIBUTION NETWORK RECONFIGURATION WITH INTEGRATION OF DISTRIBUTED GENERATION

APPLICATION OF FUZZY MULTI-OBJECTIVE METHOD FOR DISTRIBUTION NETWORK RECONFIGURATION WITH INTEGRATION OF DISTRIBUTED GENERATION Journal of Theoretcal and Appled Informaton Technology 2005 ongong JATIT & LLS ISSN: 1992-8645 www.jatt.org E-ISSN: 1817-3195 APPLICATION OF FUZZY MULTI-OBJECTIVE METHOD FOR DISTRIBUTION NETWORK RECONFIGURATION

More information

Safety and resilience of Global Baltic Network of Critical Infrastructure Networks related to cascading effects

Safety and resilience of Global Baltic Network of Critical Infrastructure Networks related to cascading effects Blokus-Roszkowska Agneszka Dzula Przemysław Journal of Polsh afety and Relablty Assocaton ummer afety and Relablty emnars, Volume 9, Number, Kołowrock Krzysztof Gdyna Martme Unversty, Gdyna, Poland afety

More information

A Digital Content Distribution Using a Group-Key and Multi-layered Structure Based on Web

A Digital Content Distribution Using a Group-Key and Multi-layered Structure Based on Web A Dgtal Content Dstrbuton Usng a Group-Key and Mult-layered Structure Based on Web Yun-J Na and Il Seo Ko 2 Department of Internet Software, Honam Unversty 59-, Seobong-Dong, Gwangsan-Gu, Gwangju 506-74,

More information

Priority based Dynamic Multiple Robot Path Planning

Priority based Dynamic Multiple Robot Path Planning 2nd Internatonal Conference on Autonomous obots and Agents Prorty based Dynamc Multple obot Path Plannng Abstract Taxong Zheng Department of Automaton Chongqng Unversty of Post and Telecommuncaton, Chna

More information

Webinar Series TMIP VISION

Webinar Series TMIP VISION Webnar Seres TMIP VISION TMIP provdes techncal support and promotes knowledge and nformaton exchange n the transportaton plannng and modelng communty. DISCLAIMER The vews and opnons expressed durng ths

More information

Keywords LTE, Uplink, Power Control, Fractional Power Control.

Keywords LTE, Uplink, Power Control, Fractional Power Control. Volume 3, Issue 6, June 2013 ISSN: 2277 128X Internatonal Journal of Advanced Research n Computer Scence and Software Engneerng Research Paper Avalable onlne at: www.jarcsse.com Uplnk Power Control Schemes

More information

Optimal Allocation of Static VAr Compensator for Active Power Loss Reduction by Different Decision Variables

Optimal Allocation of Static VAr Compensator for Active Power Loss Reduction by Different Decision Variables S. Aucharyamet and S. Srsumrannukul / GMSARN Internatonal Journal 4 (2010) 57-66 Optmal Allocaton of Statc VAr Compensator for Actve Power oss Reducton by Dfferent Decson Varables S. Aucharyamet and S.

More information

A Control and Communications Architecture for a Secure and Reconfigurable Power Distribution System: An Analysis and Case Study

A Control and Communications Architecture for a Secure and Reconfigurable Power Distribution System: An Analysis and Case Study A and Communcatons Archtecture for a Secure and Reconfgurable Power Dstrbuton System: An Analyss and Case Study Anthony M. Gacomon*, S. Massoud Amn*, and Bruce F. Wollenberg*! *Department of Electrcal

More information

A Novel Soft-Switching Two-Switch Flyback Converter with a Wide Operating Range and Regenerative Clamping

A Novel Soft-Switching Two-Switch Flyback Converter with a Wide Operating Range and Regenerative Clamping 77 Journal of ower Electroncs, ol 9, No 5, September 009 JE 9-5- A Novel Soft-Swtchng Two-Swtch Flybac Converter wth a Wde Operatng Range and Regeneratve Clampng Marn-Go Km and Young-Seo Jung * Dvson of

More information

HUAWEI TECHNOLOGIES CO., LTD. Huawei Proprietary Page 1

HUAWEI TECHNOLOGIES CO., LTD. Huawei Proprietary Page 1 Project Ttle Date Submtted IEEE 802.16 Broadband Wreless Access Workng Group Double-Stage DL MU-MIMO Scheme 2008-05-05 Source(s) Yang Tang, Young Hoon Kwon, Yajun Kou, Shahab Sanaye,

More information

Traffic balancing over licensed and unlicensed bands in heterogeneous networks

Traffic balancing over licensed and unlicensed bands in heterogeneous networks Correspondence letter Traffc balancng over lcensed and unlcensed bands n heterogeneous networks LI Zhen, CUI Qme, CUI Zhyan, ZHENG We Natonal Engneerng Laboratory for Moble Network Securty, Bejng Unversty

More information

THE ARCHITECTURE OF THE BROADBAND AMPLIFIERS WITHOUT CLASSICAL STAGES WITH A COMMON BASE AND A COMMON EMITTER

THE ARCHITECTURE OF THE BROADBAND AMPLIFIERS WITHOUT CLASSICAL STAGES WITH A COMMON BASE AND A COMMON EMITTER VOL. 0, NO. 8, OCTOBE 205 ISSN 89-6608 2006-205 Asan esearch Publshng Network (APN. All rghts reserved. THE ACHITECTUE OF THE BOADBAND AMPLIFIES WITHOUT CLASSICAL STAGES WITH A COMMON BASE AND A COMMON

More information

Guidelines for CCPR and RMO Bilateral Key Comparisons CCPR Working Group on Key Comparison CCPR-G5 October 10 th, 2014

Guidelines for CCPR and RMO Bilateral Key Comparisons CCPR Working Group on Key Comparison CCPR-G5 October 10 th, 2014 Gudelnes for CCPR and RMO Blateral Key Comparsons CCPR Workng Group on Key Comparson CCPR-G5 October 10 th, 2014 These gudelnes are prepared by CCPR WG-KC and RMO P&R representatves, and approved by CCPR,

More information

AFV-P 2U/4U. AC + DC Power Solutions. series. Transient Generation for Disturbance Tests. only. High Performance Programmable AC Power Source

AFV-P 2U/4U. AC + DC Power Solutions. series. Transient Generation for Disturbance Tests. only. High Performance Programmable AC Power Source AFV-P seres Hgh Performance Programmable AC Power Source only 2U/4U Intutve Touch Screen HMI Output Frequency up to 15-1000Hz Power Lne Smulatons: Step & Ramp Features Fast Response Tme: 300μs AC Source

More information

Evolutionary Programming for Reactive Power Planning Using FACTS Devices

Evolutionary Programming for Reactive Power Planning Using FACTS Devices Bplab Bhattacharyya, kash Kumar Gupta,. Das Evolutonary Programmng for Reactve Power Plannng Usng Devces BIPLAB BHATTACHARYYA *, IKAH KUMAR GUPTA 2 AND.DA 3, 2, 3 Department of Electrcal Engneerng, Indan

More information

An Optimal Load Shedding Approach for Distribution Networks with DGs considering Capacity Deficiency Modelling of Bulked Power Supply

An Optimal Load Shedding Approach for Distribution Networks with DGs considering Capacity Deficiency Modelling of Bulked Power Supply An Optmal Load Sheddng Approach for Dstrbuton Networks wth DGs consderng Capacty Defcency Modellng of Bulked ower Supply A. R. Malekpour, A.R. Sef, M. R. Hesamzadeh 2, Graduate Student Member, IEEE, and

More information

Design of Shunt Active Filter for Harmonic Compensation in a 3 Phase 3 Wire Distribution Network

Design of Shunt Active Filter for Harmonic Compensation in a 3 Phase 3 Wire Distribution Network Internatonal Journal of Research n Electrcal & Electroncs Engneerng olume 1, Issue 1, July-September, 2013, pp. 85-92, IASTER 2013 www.aster.com, Onlne: 2347-5439, Prnt: 2348-0025 Desgn of Shunt Actve

More information

Strategies for Enhanced Dual Failure Restorability with Static or Reconfigurable p-cycle Networks

Strategies for Enhanced Dual Failure Restorability with Static or Reconfigurable p-cycle Networks Reprnt of paper to appear at the 2004 Internatonal Conference on Communcatons (ICC 2004), Pars, France, June 2004. Strateges for Enhanced Dual Falure Restorablty wth Statc or Reconfgurable p-cycle Networs

More information

Automatic Voltage Controllers for South Korean Power System

Automatic Voltage Controllers for South Korean Power System Automatc Voltage lers for South Korean Power System Xng Lu Vathanathan Man Venkatasubramanan Tae-Kyun Km Washngton State Unversty Korea Electrc Power Research nsttute Pullman, WA 9964-2752 Seoul, South

More information

MASTER TIMING AND TOF MODULE-

MASTER TIMING AND TOF MODULE- MASTER TMNG AND TOF MODULE- G. Mazaher Stanford Lnear Accelerator Center, Stanford Unversty, Stanford, CA 9409 USA SLAC-PUB-66 November 99 (/E) Abstract n conjuncton wth the development of a Beam Sze Montor

More information

A New Type of Weighted DV-Hop Algorithm Based on Correction Factor in WSNs

A New Type of Weighted DV-Hop Algorithm Based on Correction Factor in WSNs Journal of Communcatons Vol. 9, No. 9, September 2014 A New Type of Weghted DV-Hop Algorthm Based on Correcton Factor n WSNs Yng Wang, Zhy Fang, and Ln Chen Department of Computer scence and technology,

More information

An Effective Approach for Distribution System Power Flow Solution

An Effective Approach for Distribution System Power Flow Solution World Academy of Scence, Engneerng and Technology nternatonal Journal of Electrcal and Computer Engneerng ol:, No:, 9 An Effectve Approach for Dstrbuton System Power Flow Soluton A. Alsaad, and. Gholam

More information

Digital Transmission

Digital Transmission Dgtal Transmsson Most modern communcaton systems are dgtal, meanng that the transmtted normaton sgnal carres bts and symbols rather than an analog sgnal. The eect o C/N rato ncrease or decrease on dgtal

More information

A Fuzzy-based Routing Strategy for Multihop Cognitive Radio Networks

A Fuzzy-based Routing Strategy for Multihop Cognitive Radio Networks 74 Internatonal Journal of Communcaton Networks and Informaton Securty (IJCNIS) Vol. 3, No., Aprl 0 A Fuzzy-based Routng Strategy for Multhop Cogntve Rado Networks Al El Masr, Naceur Malouch and Hcham

More information

A MODIFIED DIFFERENTIAL EVOLUTION ALGORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS

A MODIFIED DIFFERENTIAL EVOLUTION ALGORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS A MODIFIED DIFFERENTIAL EVOLUTION ALORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS Kaml Dmller Department of Electrcal-Electroncs Engneerng rne Amercan Unversty North Cyprus, Mersn TURKEY kdmller@gau.edu.tr

More information

Power Loss Reduction and Voltage Profile improvement by Photovoltaic Generation

Power Loss Reduction and Voltage Profile improvement by Photovoltaic Generation Internatonal Journal of Engneerng Trends and Technology (IJETT) Volume 0 Number 4 Feb 05 ower Loss Reducton and Voltage rofle mprovement by hotovoltac Generaton Seyed Reza Seyednour #, Homayoun Ebrahman

More information

Case studies: Electric Power Network and Road Network in Italy

Case studies: Electric Power Network and Road Network in Italy Systemc Sesmc Vulnerablty and Rsk Analyss for Buldngs, Lfelne Networks and Infrastructures Safety Gan Case studes: Electrc Power Network and Road Network n Italy Francesco Cavaler, UROMA SYNER-G Fnal Workshop,

More information

Comparison of Two Measurement Devices I. Fundamental Ideas.

Comparison of Two Measurement Devices I. Fundamental Ideas. Comparson of Two Measurement Devces I. Fundamental Ideas. ASQ-RS Qualty Conference March 16, 005 Joseph G. Voelkel, COE, RIT Bruce Sskowsk Rechert, Inc. Topcs The Problem, Eample, Mathematcal Model One

More information

Performance Analysis of Multi User MIMO System with Block-Diagonalization Precoding Scheme

Performance Analysis of Multi User MIMO System with Block-Diagonalization Precoding Scheme Performance Analyss of Mult User MIMO System wth Block-Dagonalzaton Precodng Scheme Yoon Hyun m and Jn Young m, wanwoon Unversty, Department of Electroncs Convergence Engneerng, Wolgye-Dong, Nowon-Gu,

More information

RC Filters TEP Related Topics Principle Equipment

RC Filters TEP Related Topics Principle Equipment RC Flters TEP Related Topcs Hgh-pass, low-pass, Wen-Robnson brdge, parallel-t flters, dfferentatng network, ntegratng network, step response, square wave, transfer functon. Prncple Resstor-Capactor (RC)

More information

Passive Filters. References: Barbow (pp ), Hayes & Horowitz (pp 32-60), Rizzoni (Chap. 6)

Passive Filters. References: Barbow (pp ), Hayes & Horowitz (pp 32-60), Rizzoni (Chap. 6) Passve Flters eferences: Barbow (pp 6575), Hayes & Horowtz (pp 360), zzon (Chap. 6) Frequencyselectve or flter crcuts pass to the output only those nput sgnals that are n a desred range of frequences (called

More information

Allocation of optimal distributed generation using GA for minimum system losses in radial distribution networks

Allocation of optimal distributed generation using GA for minimum system losses in radial distribution networks MultCraft Internatonal Journal of Engneerng, Scence and Technology Vol., No. 3, 010, pp. 94-106 INTERNATIONA JOURNA OF ENGINEERING, SCIENCE AND TECHNOOGY www.est-ng.com 010 MultCraft mted. All rghts reserved

More information

Trends in Power System Protection and Control

Trends in Power System Protection and Control Proceedngs of the 32nd Hawa Internatonal Conference on System Scences 1999 Trends n Power System Protecton and Control Mroslav Begovc 1, Damr Novosel 2, and Mle Mlsavljevc 1 1 Georga Insttute of Technology,

More information

A Novel Optimization of the Distance Source Routing (DSR) Protocol for the Mobile Ad Hoc Networks (MANET)

A Novel Optimization of the Distance Source Routing (DSR) Protocol for the Mobile Ad Hoc Networks (MANET) A Novel Optmzaton of the Dstance Source Routng (DSR) Protocol for the Moble Ad Hoc Networs (MANET) Syed S. Rzv 1, Majd A. Jafr, and Khaled Ellethy Computer Scence and Engneerng Department Unversty of Brdgeport

More information

THE IMPACT OF TECHNOLOGY ON THE PRODUCTION OF INFORMATION

THE IMPACT OF TECHNOLOGY ON THE PRODUCTION OF INFORMATION THE IMPACT OF TECHNOLOGY ON THE PRODUCTION OF INFORMATION Adt Mukherjee PhD Program Krannert Graduate School of Management, Purdue Unversty West Lafayette, IN 47907 Emal: amukher@krannert.purdue.edu Jungpl

More information

onlinecomponents.com

onlinecomponents.com PRO- CRIMPER* III Hand Crmpng Instructon Sheet Tool Assembly 58535-1 wth 408-4021 De Assembly 58535-2 29 JUL 09 PROPER USE GUIDELINES Cumulatve Trauma Dsorders can result from the prolonged use of manually

More information

Optimal Placement of PMU and RTU by Hybrid Genetic Algorithm and Simulated Annealing for Multiarea Power System State Estimation

Optimal Placement of PMU and RTU by Hybrid Genetic Algorithm and Simulated Annealing for Multiarea Power System State Estimation T. Kerdchuen and W. Ongsakul / GMSARN Internatonal Journal (09) - Optmal Placement of and by Hybrd Genetc Algorthm and Smulated Annealng for Multarea Power System State Estmaton Thawatch Kerdchuen and

More information

Inverse Halftoning Method Using Pattern Substitution Based Data Hiding Scheme

Inverse Halftoning Method Using Pattern Substitution Based Data Hiding Scheme Proceedngs of the World Congress on Engneerng 2011 Vol II, July 6-8, 2011, London, U.K. Inverse Halftonng Method Usng Pattern Substtuton Based Data Hdng Scheme Me-Y Wu, Ja-Hong Lee and Hong-Je Wu Abstract

More information

Intelligent Wakening Scheme for Wireless Sensor Networks Surveillance

Intelligent Wakening Scheme for Wireless Sensor Networks Surveillance The Frst Internatonal Workshop on Cyber-Physcal Networkng Systems Intellgent Wakenng Scheme for Wreless Sensor Networks Survellance Ru Wang, Le Zhang, L Cu Insttute of Computng Technology of the Chnese

More information

Radial Distribution System Reconfiguration in the Presence of Distributed Generators

Radial Distribution System Reconfiguration in the Presence of Distributed Generators 4th Internatonal Conference on Coputer, Mechatroncs, Control and Electronc Engneerng (ICCMCEE 205) Radal Dstrbuton Syste Reconfguraton n the Presence of Dstrbuted Generators Xngquan J, a, Q Lu, GuoZheng

More information