A common vision of a new Tracker is now essential It may not be final but a focus for shared efforts is now vital

Size: px
Start display at page:

Download "A common vision of a new Tracker is now essential It may not be final but a focus for shared efforts is now vital"

Transcription

1 CMS Tracker Phase II Upgrade planning A common vision of a new Tracker is now essential It may not be final but a focus for shared efforts is now vital G Hall

2 New injectors + IR upgrade phase 2 Linac4 + IR Early upgrade operation phase 1 Collimation phase 2 Geoff Hall TK Upgrade Jan

3 Phase I upgrade involves only the pixel system unless we discover that FED improvement is required The design for easy pixel replacement was very wise we can replace whenever we are ready to do so Possible scenario andtimely R&Dshould evolve it gracefully towards Phase II Phase II upgrade: design pixel system with 4 barrel layers and expanded endcap Phase I should fix mechanical envelope and services study PT (stacked) layers to contribute to trigger (and alternatives) design outer tracker to match cost, power and performance needs However, the official Phase II SLHC schedule is not so tolerant a careful assessment of timescales and costs is required very soon Geoff Hall TK Upgrade Jan

4 Proposed dates for documents Concept mid 2008 LOI/TP mid 2009 TDR Early 2010 Phase I Upgrades Strawman TP/LOI TDR Phase 2 Upgrades Mid 2009 Mid Normally, for a TDR, engineering studies should be sufficiently advanced usually evidence fromprototypingthatconcepts that areviable beam tests of trigger modules probably essential Geoff Hall TK Upgrade Jan

5 Time constraints 18 months to LoI (must report more progress than simulated layout) ~3 years ( ) for R&D prior to TDR TDR preparation likely to need ~6months Review Project plan (outline sketch not revisited since 2007) ensure to examine coupling between tasks which include Sensors and assembly technology(/ies) Electronics FE, trigger, control, monitoring, off detector Module development cooling, interconnects, mechanics Power system completely new system Links electrical and optical with concentrator ASICs Phase II pixel system Costing provisional quotes essential by TDR stage Geoff Hall TK Upgrade Jan

6 Physics requirements Many arguments for upgrade which so far provide modest guidance, eg SM Higgs improve statistics to investigate couplings SUSY measure more exclusive final states rare top decays requiring goodb tagging new gauge bosons perhaps not much demand on tracker? The general request is for improved tracking performance pileup issues in dense environment good vertex resolution (~400 vertices in 20cm 0.5mm spacing) but tracking performance cannot be sacrificed for other motives Within a few years we will know more and may need to react design should be flexible and adaptable tolerant tof variations, iti eg occupancy, specific physics channels Geoff Hall TK Upgrade Jan

7 Negative How ambitious do we wish to be? resources have so far been very limited compared to the project scope CMS continues to demand priority and all resources seem stretched the overall economic situation appears uncertain downscoping is painful and demoralising Positive we have achieved much in the past years therefore we should be aggressive in future technology progress will help us (and is essential to succeed!) a recession can make technology access easier Nevertheless, it seems prudent to develop a system which matches likely resources further assessment is needed dd Geoff Hall TK Upgrade Jan

8 EoI estimated 30MCHF (pixels) + 90MCHF (outer tracker) assumed to include triggering functions but R&D costs are extra Budget Not so different from present system, yet far more demanding R&D funding is not yet in place, although h beginning i to flow we have not made serious estimates of R&D costs some important items are very expensive, such as ASIC engineering effort and funding are tightly linked We must work quickly with Resource Manager to improve estimatesandestablish and establish likelyfunding some agencies need extra arguments and possibly documentation to release funds Geoff Hall TK Upgrade Jan

9 What is maximum tolerable power? Power Task Force will report recommend DC DC converters ~12V Present current is considered to be maximal ~15kA Upper limit ~180kW including all losses within the Tracker over simple calculation? What is a realistic target for a new cooling system? What external power source can be afforded/provided? present Si Tracker 35kW requires 300kVA supply Do we want a.../45/90/180 kw Tracker? Power up to now we have usually assumed a direct relationship between material budget and power what does physics require? It is not easy to estimate electronic power for new functions Geoff Hall TK Upgrade Jan

10 The track trigger challenge What are minimum track trigger requirements? (My synthesis) single electron tracker point validating a calorimeter projection single muon a tracker point in a limited η φ window jets information on proximity/local density of high p T hits? photon triggers?? separation of primary vertices full η coverage (±2.5) It is not easy for the trigger to state their hirequirements in terms the tracker can interpret directly it would be natural for the trigger to evaluate a concept providing reasonable minimal information, not maximal we have proposed two layers, at radii covering full η range It is essential to know how this performs before going to more ambitious layouts Geoff Hall Liverpool Jan

11 Trigger primitive generation After several years, only a few ideas for implementation both have significant weaknesses which need R&D ti trigger layers are inevitably it much more power hungry (=material) Cluster width sensitive to sensor thickness, rejection adequate?, η coverage (since outer tracker) with no solution so far for endcaps Stacked layers (doublets spaced 1 2mm radially) original simulations based on tiny pixels and no multiple scattering but full simulations of coarser pixel layers support concept applying correlation logic still raises serious practical problems the problem of inter layer communication is unproven and will cost power, which may be a show stopper NB monolithic detectors are equally subject to this problem From Tracker perspective, it is crucial to demonstrate modules to provide primitives before worrying about perfect triggering most likely a balance between tracking and triggering must be adopted Geoff Hall TK Upgrade Jan

12 Technologies Generic or common R&D projects look likely to develop some components (especially link system elements) our influence over specifications depends on our ability to specify our requirements (soon) ASICprocesses willevolve further during project lifetime no major (tracker) designs yet in 130nm but expertise exists a simple outer readout chip might be delivered in ~ 1 year and then can be evaluated, with modules & sensors vital aid and learning engineers more cautious about 90nm expensive, substantial learning, much more complex design rules & tools sharing costs may be essential number of systems to be developed must be limited outer tracker and trigger layers = 2 (but could be larger) our engineering resources are modest and many ASICs needed Geoff Hall TK Upgrade Jan

13 The role of monolithic detectors Can they be major contributors to new Tracker? Pros a single concept providing tracking and trigger functions would be easier to build a common effort around Cons the technology is unproven and unlikely to mature rapidly there are many unknowns which will require time and effort the R&D cost may be high, since deep sub micron processes If good progress could be shown in ~2 years, it will not be too lateto to review the trackerdesign significant power or functional advantages would be a strong motivation to adopt a new technology, even if late Geoff Hall TK Upgrade Jan

14 Simplicity was a big factor in our previous success the future is more complex Past vs future There were impressive achievements, but modest novelty sensors, ASICs, assembly technology, cooling, engineering, used standard or proven technologies (links were main exception) Previous upgrade projects have not usually been on this scale improvements, using technologies which were mastered earlier Contingency is required in setting targets power and cost, like entropy, seem to go in one direction correcting issues alwaysadds adds time, usually cost andpower New issues will arise or old ones grow in importance operating temperature, alignment, deep evaluation of new functions, all kinds of testing, extraction and installation in irradiated region, Geoff Hall TK Upgrade Jan

15 Small steps, in the right order Geoff Hall TK Upgrade Jan

Prototyping stacked modules for the L1 track trigger

Prototyping stacked modules for the L1 track trigger Prototyping stacked modules for the L1 track trigger tbc Aachen (tbc) D. Newbold, C. Hill Bristol University D. Abbaneo, K. Gill, A. Marchioro CERN P. Hobson Brunel University A. Ryd Cornell University

More information

CMS SLHC Tracker Upgrade: Selected Thoughts, Challenges and Strategies

CMS SLHC Tracker Upgrade: Selected Thoughts, Challenges and Strategies : Selected Thoughts, Challenges and Strategies CERN Geneva, Switzerland E-mail: marcello.mannelli@cern.ch Upgrading the CMS Tracker for the SLHC presents many challenges, of which the much harsher radiation

More information

Expected Performance of the ATLAS Inner Tracker at the High-Luminosity LHC

Expected Performance of the ATLAS Inner Tracker at the High-Luminosity LHC Expected Performance of the ATLAS Inner Tracker at the High-Luminosity LHC Noemi Calace noemi.calace@cern.ch On behalf of the ATLAS Collaboration 25th International Workshop on Deep Inelastic Scattering

More information

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration UNESP - Universidade Estadual Paulista (BR) E-mail: sudha.ahuja@cern.ch he LHC machine is planning an upgrade program which will smoothly bring the luminosity to about 5 34 cm s in 228, to possibly reach

More information

PoS(LHCP2018)031. ATLAS Forward Proton Detector

PoS(LHCP2018)031. ATLAS Forward Proton Detector . Institut de Física d Altes Energies (IFAE) Barcelona Edifici CN UAB Campus, 08193 Bellaterra (Barcelona), Spain E-mail: cgrieco@ifae.es The purpose of the ATLAS Forward Proton (AFP) detector is to measure

More information

What do the experiments want?

What do the experiments want? What do the experiments want? prepared by N. Hessey, J. Nash, M.Nessi, W.Rieger, W. Witzeling LHC Performance Workshop, Session 9 -Chamonix 2010 slhcas a luminosity upgrade The physics potential will be

More information

Track Triggers for ATLAS

Track Triggers for ATLAS Track Triggers for ATLAS André Schöning University Heidelberg 10. Terascale Detector Workshop DESY 10.-13. April 2017 from https://www.enterprisedb.com/blog/3-ways-reduce-it-complexitydigital-transformation

More information

CMS Compact Muon Solenoid Super LHC: Detector and Electronics Upgrade

CMS Compact Muon Solenoid Super LHC: Detector and Electronics Upgrade CMS Compact Muon Solenoid Super LHC: Detector and Electronics Upgrade HCAL Muon chambers Tracker ECAL 4T solenoid 1 Total weight: 12,500 t Overall diameter: 15 m Overall length 21.6 m Magnetic field 4

More information

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration The LHCb Upgrade BEACH 2014 XI International Conference on Hyperons, Charm and Beauty Hadrons! University of Birmingham, UK 21-26 July 2014 Simon Akar on behalf of the LHCb collaboration Outline The LHCb

More information

10.01: Development of Radiation Hard Pixel Detectors for the CMS Tracker Upgrade for the SLHC

10.01: Development of Radiation Hard Pixel Detectors for the CMS Tracker Upgrade for the SLHC CMS Upgrade MB Response to SLHC Document: 10.01: Development of Radiation Hard Pixel Detectors for the CMS Tracker Upgrade for the SLHC (Contact Person: Simon Kwan, Fermilab) It is our intent to recommend

More information

CMS Phase 2 Upgrade: Preliminary Plan and Cost Estimate

CMS Phase 2 Upgrade: Preliminary Plan and Cost Estimate CMS Phase 2 Upgrade: Preliminary Plan and Cost Estimate CMS Collaboration Submitted to the CERN LHC Experiments Resource Review Board October 2013 Abstract With the major discovery of a Higgs boson in

More information

CMS Tracker Upgrades. R&D Plans, Present Status and Perspectives. Benedikt Vormwald Hamburg University on behalf of the CMS collaboration

CMS Tracker Upgrades. R&D Plans, Present Status and Perspectives. Benedikt Vormwald Hamburg University on behalf of the CMS collaboration R&D Plans, Present Status and Perspectives Benedikt Vormwald Hamburg University on behalf of the CMS collaboration EPS-HEP 2015 Vienna, 22.-29.07.2015 CMS Tracker Upgrade Program LHC HL-LHC ECM[TeV] 7-8

More information

A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment

A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment 3 rd Workshop on LHCbUpgrade II LAPP, 22 23 March 2017 A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment Evangelos Leonidas Gkougkousis On behalf of the ATLAS HGTD community

More information

Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4. Final design and pre-production.

Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4. Final design and pre-production. high-granularity sfcal Performance simulation, option selection and R&D Figure 41. Overview of the time-line and milestones for the implementation of the high-granularity sfcal. tooling and cryostat modification,

More information

Upgrade of the CMS Tracker for the High Luminosity LHC

Upgrade of the CMS Tracker for the High Luminosity LHC Upgrade of the CMS Tracker for the High Luminosity LHC * CERN E-mail: georg.auzinger@cern.ch The LHC machine is planning an upgrade program which will smoothly bring the luminosity to about 5 10 34 cm

More information

The Vertex Tracker. Marco Battaglia UC Berkeley and LBNL. Sensor R&D Detector Design PhysicsBenchmarking

The Vertex Tracker. Marco Battaglia UC Berkeley and LBNL. Sensor R&D Detector Design PhysicsBenchmarking The Vertex Tracker Marco Battaglia UC Berkeley and LBNL Sensor R&D Detector Design PhysicsBenchmarking Sensor R&D CCD Sensors N. de Groot Reports from LCFI progress with successful tests of CPCCD clocked

More information

Phase 1 upgrade of the CMS pixel detector

Phase 1 upgrade of the CMS pixel detector Phase 1 upgrade of the CMS pixel detector, INFN & University of Perugia, On behalf of the CMS Collaboration. IPRD conference, Siena, Italy. Oct 05, 2016 1 Outline The performance of the present CMS pixel

More information

Double Stack Tracking Trigger Strawman

Double Stack Tracking Trigger Strawman Double Stack Tracking Trigger Strawman Scope of this Discussion: Outer Tracker The region of the inner-most Pixel Layers is fundamentally challenging g at the SLHC, especially for the Sensor Technology

More information

The CMS Pixel Detector Upgrade and R&D Developments for the High Luminosity LHC

The CMS Pixel Detector Upgrade and R&D Developments for the High Luminosity LHC The CMS Pixel Detector Upgrade and R&D Developments for the High Luminosity LHC On behalf of the CMS Collaboration INFN Florence (Italy) 11th 15th September 2017 Las Caldas, Asturias (Spain) High Luminosity

More information

Test Beam Measurements for the Upgrade of the CMS Phase I Pixel Detector

Test Beam Measurements for the Upgrade of the CMS Phase I Pixel Detector Test Beam Measurements for the Upgrade of the CMS Phase I Pixel Detector Simon Spannagel on behalf of the CMS Collaboration 4th Beam Telescopes and Test Beams Workshop February 4, 2016, Paris/Orsay, France

More information

The Commissioning of the ATLAS Pixel Detector

The Commissioning of the ATLAS Pixel Detector The Commissioning of the ATLAS Pixel Detector XCIV National Congress Italian Physical Society Genova, 22-27 Settembre 2008 Nicoletta Garelli Large Hadronic Collider MOTIVATION: Find Higgs Boson and New

More information

`First ep events in the Zeus micro vertex detector in 2002`

`First ep events in the Zeus micro vertex detector in 2002` Amsterdam 18 dec 2002 `First ep events in the Zeus micro vertex detector in 2002` Erik Maddox, Zeus group 1 History (1): HERA I (1992-2000) Lumi: 117 pb -1 e +, 17 pb -1 e - Upgrade (2001) HERA II (2001-2006)

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS CR -2017/349 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 09 October 2017 (v4, 10 October 2017)

More information

Real-time flavour tagging selection in ATLAS. Lidija Živković, Insttut of Physics, Belgrade

Real-time flavour tagging selection in ATLAS. Lidija Živković, Insttut of Physics, Belgrade Real-time flavour tagging selection in ATLAS Lidija Živković, Insttut of Physics, Belgrade On behalf of the collaboration Outline Motivation Overview of the trigger b-jet trigger in Run 2 Future Fast TracKer

More information

Muon Collider background rejection in ILCroot Si VXD and Tracker detectors

Muon Collider background rejection in ILCroot Si VXD and Tracker detectors Muon Collider background rejection in ILCroot Si VXD and Tracker detectors N. Terentiev (Carnegie Mellon U./Fermilab) MAP 2014 Winter Collaboration Meeting Dec. 3-7, 2014 SLAC New MARS 1.5 TeV Muon Collider

More information

LHC detector upgrade challenges

LHC detector upgrade challenges LHC detector upgrade challenges Outline: Introduction LHC machine phase I and II -> overall detector limitations Phase I detector changes for ATLAS and CMS Phase II challenges, some examples LHCb and ALICE

More information

Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC

Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC Ankush Mitra, University of Warwick, UK on behalf of the ATLAS ITk Collaboration PSD11 : The 11th International Conference

More information

arxiv: v2 [physics.ins-det] 13 Oct 2015

arxiv: v2 [physics.ins-det] 13 Oct 2015 Preprint typeset in JINST style - HYPER VERSION Level-1 pixel based tracking trigger algorithm for LHC upgrade arxiv:1506.08877v2 [physics.ins-det] 13 Oct 2015 Chang-Seong Moon and Aurore Savoy-Navarro

More information

CMS Tracker Upgrade for HL-LHC Sensors R&D. Hadi Behnamian, IPM On behalf of CMS Tracker Collaboration

CMS Tracker Upgrade for HL-LHC Sensors R&D. Hadi Behnamian, IPM On behalf of CMS Tracker Collaboration CMS Tracker Upgrade for HL-LHC Sensors R&D Hadi Behnamian, IPM On behalf of CMS Tracker Collaboration Outline HL-LHC Tracker Upgrade: Motivations and requirements Silicon strip R&D: * Materials with Multi-Geometric

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS CR -2010/043 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 23 March 2010 (v4, 26 March 2010) DC-DC

More information

Silicon W Calorimeters for the PHENIX Forward Upgrade

Silicon W Calorimeters for the PHENIX Forward Upgrade E.Kistenev Silicon W Calorimeters for the PHENIX Forward Upgrade Event characterization detectors in middle PHENIX today Two central arms for measuring hadrons, photons and electrons Two forward arms for

More information

The CMS Phase II upgrade Pixel Detector. Krishna Thapa Physics 627, Spring 2016

The CMS Phase II upgrade Pixel Detector. Krishna Thapa Physics 627, Spring 2016 The CMS Phase II upgrade Pixel Detector Krishna Thapa Physics 627, Spring 2016 Krishna Thapa, The PLT Detector of CMS, PLT Meeting, 12 January 2016 Outline Why does CMS need an upgrade? Why Pixel Detectors?

More information

Data acquisition and Trigger (with emphasis on LHC)

Data acquisition and Trigger (with emphasis on LHC) Lecture 2 Data acquisition and Trigger (with emphasis on LHC) Introduction Data handling requirements for LHC Design issues: Architectures Front-end, event selection levels Trigger Future evolutions Conclusion

More information

Pixel sensors with different pitch layouts for ATLAS Phase-II upgrade

Pixel sensors with different pitch layouts for ATLAS Phase-II upgrade Pixel sensors with different pitch layouts for ATLAS Phase-II upgrade Different pitch layouts are considered for the pixel detector being designed for the ATLAS upgraded tracking system which will be operating

More information

CMS Tracker studies. Daniel Pitzl, DESY

CMS Tracker studies. Daniel Pitzl, DESY CMS Tracker studies Daniel Pitzl, DESY Present CMS silicon tracker Design Material budget Upgrade phase I: 4 layer pixel 5 layer pixel? Resolution studies with broken line fits CMS Si Tracker 2 Phase I

More information

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Olloqui on behalf of the LHCb Collaboration Universitat de Barcelona, Facultat de Física,

More information

A new strips tracker for the upgraded ATLAS ITk detector

A new strips tracker for the upgraded ATLAS ITk detector A new strips tracker for the upgraded ATLAS ITk detector, on behalf of the ATLAS Collaboration : 11th International Conference on Position Sensitive Detectors 3-7 The Open University, Milton Keynes, UK.

More information

ATLAS ITk and new pixel sensors technologies

ATLAS ITk and new pixel sensors technologies IL NUOVO CIMENTO 39 C (2016) 258 DOI 10.1393/ncc/i2016-16258-1 Colloquia: IFAE 2015 ATLAS ITk and new pixel sensors technologies A. Gaudiello INFN, Sezione di Genova and Dipartimento di Fisica, Università

More information

Module Integration Sensor Requirements

Module Integration Sensor Requirements Module Integration Sensor Requirements Phil Allport Module Integration Working Group Sensor Geometry and Bond Pads Module Programme Issues Numbers of Sensors Required Nobu s Sensor Size Summary n.b. 98.99

More information

ATLAS strip detector upgrade for the HL-LHC

ATLAS strip detector upgrade for the HL-LHC ATL-INDET-PROC-2015-010 26 August 2015, On behalf of the ATLAS collaboration Santa Cruz Institute for Particle Physics, University of California, Santa Cruz E-mail: zhijun.liang@cern.ch Beginning in 2024,

More information

CMS Phase II Tracker Upgrade GRK-Workshop in Bad Liebenzell

CMS Phase II Tracker Upgrade GRK-Workshop in Bad Liebenzell CMS Phase II Tracker Upgrade GRK-Workshop in Bad Liebenzell Institut für Experimentelle Kernphysik KIT University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association

More information

Tracking Detectors for Belle II. Tomoko Iwashita(Kavli IPMU (WPI)) Beauty 2014

Tracking Detectors for Belle II. Tomoko Iwashita(Kavli IPMU (WPI)) Beauty 2014 Tracking Detectors for Belle II Tomoko Iwashita(Kavli IPMU (WPI)) Beauty 2014 1 Introduction Belle II experiment is upgrade from Belle Target luminosity : 8 10 35 cm -2 s -1 Target physics : New physics

More information

Serial Powering vs. DC-DC Conversion - A First Comparison

Serial Powering vs. DC-DC Conversion - A First Comparison Serial Powering vs. DC-DC Conversion - A First Comparison Tracker Upgrade Power WG Meeting October 7 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH Aachen University Outline Compare Serial Powering

More information

Silicon Sensor and Detector Developments for the CMS Tracker Upgrade

Silicon Sensor and Detector Developments for the CMS Tracker Upgrade Silicon Sensor and Detector Developments for the CMS Tracker Upgrade Università degli Studi di Firenze and INFN Sezione di Firenze E-mail: candi@fi.infn.it CMS has started a campaign to identify the future

More information

L1 Track Finding For a TiME Multiplexed Trigger

L1 Track Finding For a TiME Multiplexed Trigger V INFIERI WORKSHOP AT CERN 27/29 APRIL 215 L1 Track Finding For a TiME Multiplexed Trigger DAVIDE CIERI, K. HARDER, C. SHEPHERD, I. TOMALIN (RAL) M. GRIMES, D. NEWBOLD (UNIVERSITY OF BRISTOL) I. REID (BRUNEL

More information

CMS electron and _ photon performance at s = 13 TeV. Francesco Micheli on behalf of CMS Collaboration

CMS electron and _ photon performance at s = 13 TeV. Francesco Micheli on behalf of CMS Collaboration CMS electron and _ photon performance at s = 13 TeV on behalf of CMS Collaboration 2 Electrons and Photons @ CMS Electrons and photons are crucial for CMS physics program: SM precision physics, Higgs coupling

More information

Level-1 Track Trigger R&D. Zijun Xu Peking University

Level-1 Track Trigger R&D. Zijun Xu Peking University Level-1 Trigger R&D Zijun Xu Peking University 2016-12 1 Level-1 Trigger for CMS Phase2 Upgrade HL-LHC, ~2025 Pileup 140-250 Silicon based Level 1 Trigger Be crucial for trigger objects reconstruction

More information

Thin Silicon R&D for LC applications

Thin Silicon R&D for LC applications Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC Next Linear Collider:Physic requirements Vertexing 10 µ mgev σ r φ,z(ip ) 5µ m 3 / 2 p sin

More information

Pixel characterization for the ITS/MFT upgrade. Audrey Francisco

Pixel characterization for the ITS/MFT upgrade. Audrey Francisco Pixel characterization for the ITS/MFT upgrade Audrey Francisco QGP France, Etretat, 14/10/2015 Outline 1 The MFT upgrade 2 Pixel sensor Technology choice Full scale prototypes 3 Characterization campaign

More information

Nikhef jamboree - Groningen 12 December Atlas upgrade. Hella Snoek for the Atlas group

Nikhef jamboree - Groningen 12 December Atlas upgrade. Hella Snoek for the Atlas group Nikhef jamboree - Groningen 12 December 2016 Atlas upgrade Hella Snoek for the Atlas group 1 2 LHC timeline 2016 2012 Luminosity increases till 2026 to 5-7 times with respect to current lumi Detectors

More information

The High-Voltage Monolithic Active Pixel Sensor for the Mu3e Experiment

The High-Voltage Monolithic Active Pixel Sensor for the Mu3e Experiment The High-Voltage Monolithic Active Pixel Sensor for the Mu3e Experiment Shruti Shrestha On Behalf of the Mu3e Collaboration International Conference on Technology and Instrumentation in Particle Physics

More information

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips Strip Detectors First detector devices using the lithographic capabilities of microelectronics First Silicon detectors -- > strip detectors Can be found in all high energy physics experiments of the last

More information

irpc upgrade project for CMS during HL-LHC program

irpc upgrade project for CMS during HL-LHC program irpc upgrade project for CMS during HL-LHC program 1) CMS muon spectrometer 2) irpc project 3) Team, activities, timing M. Gouzevitch (IPNL, France) and T.J Kim (Hanyang University, Korea) FJPPL/FKPPL

More information

Large Silicon Tracking Systems for ILC

Large Silicon Tracking Systems for ILC Large Silicon Tracking Systems for ILC Aurore Savoy Navarro LPNHE, Universite Pierre & Marie Curie/CNRS-IN2P3 Roles Designs Main Issues Current status R&D work within SiLC R&D Collaboration Tracking Session

More information

The Run-2 ATLAS. ATLAS Trigger System: Design, Performance and Plans

The Run-2 ATLAS. ATLAS Trigger System: Design, Performance and Plans The Run-2 ATLAS Trigger System: Design, Performance and Plans 14th Topical Seminar on Innovative Particle and Radiation Detectors October 3rd October 6st 2016, Siena Martin zur Nedden Humboldt-Universität

More information

The ATLAS tracker Pixel detector for HL-LHC

The ATLAS tracker Pixel detector for HL-LHC on behalf of the ATLAS Collaboration INFN Genova E-mail: Claudia.Gemme@ge.infn.it The high luminosity upgrade of the LHC (HL-LHC) in 2026 will provide new challenges to the ATLAS tracker. The current Inner

More information

A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Detector system

A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Detector system A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Detector system C.Agapopoulou on behalf of the ATLAS Lar -HGTD group 2017 IEEE Nuclear Science Symposium and Medical Imaging Conference

More information

2 nd ACES workshop, CERN. Hans-Christian Kästli, PSI

2 nd ACES workshop, CERN. Hans-Christian Kästli, PSI CMS Pixel Upgrade 2 nd ACES workshop, CERN Hans-Christian Kästli, PSI 3.3.2009 Scope Phase I (~2013): CMS pixel detector designed for fast insertion/removal Can replace system during normal shutdown Planned

More information

A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Calorimeter system Detector concept description and first beam test results

A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Calorimeter system Detector concept description and first beam test results A High-Granularity Timing Detector for the Phase-II upgrade of the ATLAS Calorimeter system Detector concept description and first beam test results 03/10/2017 ATL-LARG-SLIDE-2017-858 Didier Lacour On

More information

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties 10 th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors Offline calibration and performance of the ATLAS Pixel Detector Attilio Andreazza INFN and Università

More information

BaBar and PEP II. Physics

BaBar and PEP II. Physics BaBar and PEP II BaBar SVT DCH DIRC ECAL IFR Trigger Carsten Hast LAL Orsay December 8th 2000 Physics Main Goal: CP Violation sin2β,sin2α PEP II Performance Backgrounds December 8th 2000 Carsten Hast PEP

More information

Status of ATLAS & CMS Experiments

Status of ATLAS & CMS Experiments Status of ATLAS & CMS Experiments Atlas S.C. Magnet system Large Air-Core Toroids for µ Tracking 2Tesla Solenoid for inner Tracking (7*2.5m) ECAL & HCAL outside Solenoid Solenoid integrated in ECAL Barrel

More information

Evaluation of the Radiation Tolerance of Several Generations of SiGe Heterojunction Bipolar Transistors Under Radiation Exposure

Evaluation of the Radiation Tolerance of Several Generations of SiGe Heterojunction Bipolar Transistors Under Radiation Exposure 1 Evaluation of the Radiation Tolerance of Several Generations of SiGe Heterojunction Bipolar Transistors Under Radiation Exposure J. Metcalfe, D. E. Dorfan, A. A. Grillo, A. Jones, F. Martinez-McKinney,

More information

High Luminosity ATLAS vs. CMOS Sensors

High Luminosity ATLAS vs. CMOS Sensors High Luminosity ATLAS vs. CMOS Sensors Where we currently are and where we d like to be Jens Dopke, STFC RAL 1 Disclaimer I usually do talks on things where I generated all the imagery myself (ATLAS Pixels/IBL)

More information

New fabrication and packaging technologies for CMOS pixel sensors: closing gap between hybrid and monolithic

New fabrication and packaging technologies for CMOS pixel sensors: closing gap between hybrid and monolithic New fabrication and packaging technologies for CMOS pixel sensors: closing gap between hybrid and monolithic Outline Short history of MAPS development at IPHC Results from TowerJazz CIS test sensor Ultra-thin

More information

The CMS Outer HCAL SiPM Upgrade.

The CMS Outer HCAL SiPM Upgrade. The CMS Outer HCAL SiPM Upgrade. Artur Lobanov on behalf of the CMS collaboration DESY Hamburg CALOR 2014, Gießen, 7th April 2014 Outline > CMS Hadron Outer Calorimeter > Commissioning > Cosmic data Artur

More information

Richard L. Bates SUPA, School of Physics and Astronomy, Glasgow University, Glasgow, G12 8QQ, UK

Richard L. Bates SUPA, School of Physics and Astronomy, Glasgow University, Glasgow, G12 8QQ, UK ATLAS pixel upgrade for the HL-LHC SUPA, School of Physics and Astronomy, Glasgow University, Glasgow, G12 8QQ, UK E-mail: richard.bates@glasgow.ac.uk From 2024, the HL-LHC will provide unprecedented proton-proton

More information

PoS(Vertex 2007)034. Tracking in the trigger: from the CDF experience to CMS upgrade. Fabrizio Palla 1. Giuliano Parrini

PoS(Vertex 2007)034. Tracking in the trigger: from the CDF experience to CMS upgrade. Fabrizio Palla 1. Giuliano Parrini Tracking in the trigger: from the CDF experience to CMS upgrade 1 INFN Pisa Largo B. Pontecorvo 3, 56127 Pisa, Italy E-mail:Fabrizio.Palla@cern.ch Giuliano Parrini University and INFN Florence Via G. Sansone

More information

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II Journal of Physics: Conference Series PAPER OPEN ACCESS Performance of the ALAS Muon rigger in Run I and Upgrades for Run II o cite this article: Dai Kobayashi and 25 J. Phys.: Conf. Ser. 664 926 Related

More information

Data acquisition and Trigger (with emphasis on LHC)

Data acquisition and Trigger (with emphasis on LHC) Lecture 2! Introduction! Data handling requirements for LHC! Design issues: Architectures! Front-end, event selection levels! Trigger! Upgrades! Conclusion Data acquisition and Trigger (with emphasis on

More information

ATLAS Tracker HL-LHC

ATLAS Tracker HL-LHC ATLAS Tracker Upgrade @ HL-LHC Birmingham Seminar 8/3/16 Prof. Tony Weidberg (Oxford) Birmingham 8/3/17 ATLAS Upgrade 1 ATLAS Tracker Upgrade @ HL-LHC Physics Motivation HL-LHC & Technical Challenges Trigger

More information

Resolution studies on silicon strip sensors with fine pitch

Resolution studies on silicon strip sensors with fine pitch Resolution studies on silicon strip sensors with fine pitch Stephan Hänsel This work is performed within the SiLC R&D collaboration. LCWS 2008 Purpose of the Study Evaluate the best strip geometry of silicon

More information

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol University of Bristol E-mail: sophie.richards@bristol.ac.uk The upgrade of the LHCb experiment is planned for beginning of 2019 unitl the end of 2020. It will transform the experiment to a trigger-less

More information

The CMS electromagnetic calorimeter barrel upgrade for High-Luminosity LHC

The CMS electromagnetic calorimeter barrel upgrade for High-Luminosity LHC Journal of Physics: Conference Series OPEN ACCESS The CMS electromagnetic calorimeter barrel upgrade for High-Luminosity LHC To cite this article: Philippe Gras and the CMS collaboration 2015 J. Phys.:

More information

ATLAS Phase-II trigger upgrade

ATLAS Phase-II trigger upgrade Particle Physics ATLAS Phase-II trigger upgrade David Sankey on behalf of the ATLAS Collaboration Thursday, 10 March 16 Overview Setting the scene Goals for Phase-II upgrades installed in LS3 HL-LHC Run

More information

Norbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009

Norbert Meyners, DESY. LCTW 09 Orsay, Nov. 2009 DESY Test Beam Facilities - Status and Plan Norbert Meyners, DESY LCTW 09 Orsay, 3.-5. Nov. 2009 DESY Test Beam DESY provides three test beam lines with 1-5 (-6) GeV/c electrons Very simple system, no

More information

CMS Pixel Detector design for HL-LHC

CMS Pixel Detector design for HL-LHC Journal of Instrumentation OPEN ACCESS CMS Pixel Detector design for HL-LHC To cite this article: E. Migliore View the article online for updates and enhancements. Related content - The CMS Data Acquisition

More information

Measurement of the charged particle density with the ATLAS detector: First data at vs = 0.9, 2.36 and 7 TeV Kayl, M.S.

Measurement of the charged particle density with the ATLAS detector: First data at vs = 0.9, 2.36 and 7 TeV Kayl, M.S. UvA-DARE (Digital Academic Repository) Measurement of the charged particle density with the ATLAS detector: First data at vs = 0.9, 2.36 and 7 TeV Kayl, M.S. Link to publication Citation for published

More information

Trigger Overview. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000

Trigger Overview. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000 Overview Wesley Smith, U. Wisconsin CMS Project Manager DOE/NSF Review April 12, 2000 1 TriDAS Main Parameters Level 1 Detector Frontend Readout Systems Event Manager Builder Networks Run Control System

More information

The VELO Upgrade. Eddy Jans, a (on behalf of the LHCb VELO Upgrade group) a

The VELO Upgrade. Eddy Jans, a (on behalf of the LHCb VELO Upgrade group) a The VELO Upgrade Eddy Jans, a (on behalf of the LHCb VELO Upgrade group) a Nikhef, Science Park 105, 1098 XG Amsterdam, The Netherlands E-mail: e.jans@nikhef.nl ABSTRACT: A significant upgrade of the LHCb

More information

Noise Characteristics Of The KPiX ASIC Readout Chip

Noise Characteristics Of The KPiX ASIC Readout Chip Noise Characteristics Of The KPiX ASIC Readout Chip Cabrillo College Stanford Linear Accelerator Center What Is The ILC The International Linear Collider is an e- e+ collider Will operate at 500GeV with

More information

Tracking and Alignment in the CMS detector

Tracking and Alignment in the CMS detector Tracking and Alignment in the CMS detector Frédéric Ronga (CERN PH-CMG) for the CMS collaboration 10th Topical Seminar on Innovative Particle and Radiation Detectors Siena, October 1 5 2006 Contents 1

More information

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer Advancements in Nuclear Instrumenta2on Measurement Methods and their Applica2ons 20-24 April 2015, Lisbon Congress Center Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1

More information

Towards a 10 μs, thin high resolution pixelated CMOS sensor system for future vertex detectors

Towards a 10 μs, thin high resolution pixelated CMOS sensor system for future vertex detectors Towards a 10 μs, thin high resolution pixelated CMOS sensor system for future vertex detectors Rita De Masi IPHC-Strasbourg On behalf of the IPHC-IRFU collaboration Physics motivations. Principle of operation

More information

The ILD Detector Concept and the LoI Process

The ILD Detector Concept and the LoI Process The ILD Detector Concept and the LoI Process Karsten Buesser for Ties Behnke SILC Collaboration Meeting 18.12.2007 The Goal ILC is precision experiment -> consequences for the detector M. Thomson, Cambridge

More information

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group The LHCb Vertex Locator : status and future perspectives Marina Artuso, Syracuse University for the VELO Group The LHCb Detector Mission: Expore interference of virtual new physics particle in the decays

More information

ISIS2 as a Pixel Sensor for ILC

ISIS2 as a Pixel Sensor for ILC ISIS2 as a Pixel Sensor for ILC Yiming Li (University of Oxford) on behalf of UK ISIS Collaboration (U. Oxford, RAL, Open University) LCWS 10 Beijing, 28th March 2010 1 / 24 Content Introduction to ISIS

More information

ITk silicon strips detector test beam at DESY

ITk silicon strips detector test beam at DESY ITk silicon strips detector test beam at DESY Lucrezia Stella Bruni Nikhef Nikhef ATLAS outing 29/05/2015 L. S. Bruni - Nikhef 1 / 11 Qualification task I Participation at the ITk silicon strip test beams

More information

arxiv: v1 [physics.ins-det] 26 Nov 2015

arxiv: v1 [physics.ins-det] 26 Nov 2015 arxiv:1511.08368v1 [physics.ins-det] 26 Nov 2015 European Organization for Nuclear Research (CERN), Switzerland and Utrecht University, Netherlands E-mail: monika.kofarago@cern.ch The upgrade of the Inner

More information

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group The LHCb VELO Upgrade Stefano de Capua on behalf of the LHCb VELO group Overview [J. Instrum. 3 (2008) S08005] LHCb / Current VELO / VELO Upgrade Posters M. Artuso: The Silicon Micro-strip Upstream Tracker

More information

VELO: the LHCb Vertex Detector

VELO: the LHCb Vertex Detector LHCb note 2002-026 VELO VELO: the LHCb Vertex Detector J. Libby on behalf of the LHCb collaboration CERN, Meyrin, Geneva 23, CH-1211, Switzerland Abstract The Vertex Locator (VELO) of the LHCb experiment

More information

The MUSE experiment. Technical Overview. Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem

The MUSE experiment. Technical Overview. Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem The MUSE experiment Technical Overview Guy Ron (for the MUSE collaboration) Hebrew University of Jerusalem MUSE is not your garden variety scattering experiment Low beam flux Large angle, non-magnetic

More information

Lecture 11. Complex Detector Systems

Lecture 11. Complex Detector Systems Lecture 11 Complex Detector Systems 1 Dates 14.10. Vorlesung 1 T.Stockmanns 1.10. Vorlesung J.Ritman 8.10. Vorlesung 3 J.Ritman 04.11. Vorlesung 4 J.Ritman 11.11. Vorlesung 5 J.Ritman 18.11. Vorlesung

More information

The LHCb trigger system

The LHCb trigger system IL NUOVO CIMENTO Vol. 123 B, N. 3-4 Marzo-Aprile 2008 DOI 10.1393/ncb/i2008-10523-9 The LHCb trigger system D. Pinci( ) INFN, Sezione di Roma - Rome, Italy (ricevuto il 3 Giugno 2008; pubblicato online

More information

CMS RPC HL-LHC upgrade with fast timing detectors

CMS RPC HL-LHC upgrade with fast timing detectors Maxime Gouzevitch CMS RPC HL-LHC upgrade with fast timing detectors on behalf of the CMS MUON group ICHEP, SEOUL, 2018 1) RPC upgrade project and motivation 2-3) Requirements and design 4-7) Validation

More information

The CMS HGCAL detector for HL-LHC upgrade

The CMS HGCAL detector for HL-LHC upgrade on behalf of the CMS collaboration. National Taiwan University E-mail: arnaud.steen@cern.ch The High Luminosity LHC (HL-LHC) will integrate 10 times more luminosity than the LHC, posing significant challenges

More information

Totem Experiment Status Report

Totem Experiment Status Report Totem Experiment Status Report Edoardo Bossini (on behalf of the TOTEM collaboration) 131 st LHCC meeting 1 Outline CT-PPS layout and acceptance Running operation Detector commissioning CT-PPS analysis

More information

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration ATLAS Muon Trigger and Readout Considerations Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration ECFA High Luminosity LHC Experiments Workshop - 2016 ATLAS Muon System Overview

More information

D. Ferrère, Université de Genève on behalf of the ATLAS collaboration

D. Ferrère, Université de Genève on behalf of the ATLAS collaboration D. Ferrère, Université de Genève on behalf of the ATLAS collaboration Overview Introduction Pixel improvements during LS1 Performance at run2 in 2015 Few challenges met lessons Summary Overview VCI 2016,

More information

Vertex Detector. ECFA/DESY Workshop Amsterdam, April 2003 Chris Damerell. Conceptual design requirements (update) Detector technology options

Vertex Detector. ECFA/DESY Workshop Amsterdam, April 2003 Chris Damerell. Conceptual design requirements (update) Detector technology options Vertex Detector ECFA/DESY Workshop Amsterdam, April 2003 Chris Damerell Conceptual design requirements (update) Detector technology options Route to convergence Construction, commissioning, operation and

More information