ELECTRICAL INTEGRITY ISSUES OF SUBSEA DISTRIBUTION EQUIPMENT AND UMBILICALS

Size: px
Start display at page:

Download "ELECTRICAL INTEGRITY ISSUES OF SUBSEA DISTRIBUTION EQUIPMENT AND UMBILICALS"

Transcription

1 ELECTRICAL INTEGRITY ISSUES OF SUBSEA DISTRIBUTION EQUIPMENT AND UMBILICALS Author: Neil Douglas, Managing Director, Viper Subsea LLP, Portishead, UK. Date: 2013 Presented at: SUBSEA AUSTRALASIA CONFERENCE 2013 Abstract: Subsea electro-hydraulic and all electric control systems rely on the integrity of the electrical elements within the main umbilical, the electrical jumpers, and electrical connectors throughout the subsea distribution system. This paper looks at a range of examples of failures, the causes, the consequences, and also reviews different design solutions to avoid such failures. In addition, a range of methods for monitoring the electrical integrity of the distribution system, locating points of failure and predicting rates of degradation are considered.

2 1 Introduction Electrical and electro-hydraulic control systems offer significant performance benefits when compared to direct hydraulic control systems, but they do suffer from failures within their electrical distribution components typically umbilicals, umbilical termination assemblies (UTAs), electrical distribution units (EDUs), electrical connectors, and electrical flying leads (EFLs). Historically, the main control system vendors have taken responsibility for the delivery and performance of all the distribution hardware with the exception of the umbilical, but ultimately, the large financial consequences associated with in-service failures are to the oil/gas field Operator s account. Insulation Resistance (IR) measurement is commonly used to determine the integrity of subsea electrical cables and connectors. A low IR effectively means that there is a breakdown in the integrity of the insulating material that surrounds electrical conductors and more practically, indicates that sea water is entering the electrical distribution system. Once water has started penetrating insulating materials, there is a high probability that ultimately electrical breakdown and failure will occur. Subsea electrical failures are experienced in the majority of subsea production systems at some point during the field life cycle. Such failures can be seen during system commissioning, almost immediately after the equipment is immersed in seawater, whilst other failures manifest themselves later in field life and are time related. There are a number of failure modes that result in water ingress which lead to ultimate system failure. The cost of subsea electrical failures in subsea umbilicals and control and distribution systems is significant in terms of marine intervention costs, replacement hardware, and lost production, the costs are typically many millions of dollars per field over its life cycle. The majority of operators work on the basis of when not if an electrical IR failure will occur. With more complex subsea field developments there are typically hundreds of electrical jumpers and thousands of electrical connectors installed all expected to perform in a harsh environment for decades. Unless the industry adopts best practice for avoiding IR failures and continuous monitoring of the subsea distribution system, high operational costs will continue to be incurred. Across the industry there is significant experience in the causes of these electrical integrity failures but also a large number of lessons that can be learned and shared. 2 System Architectures Subsea electrical distribution networks are designed to support a specific field layout. This layout may change during the field s life as new discoveries are made and more wells are required at new locations to maintain production. Generally the electrical distribution systems are bespoke to the project with designs receiving input and demands from the design houses, the Operators, the Control System vendors and also the umbilical, equipment, and component suppliers. Unsurprisingly, with such disparate designs, the industry continues to learn and re-learn the same lessons; a number of failures that we are experiencing in current projects have been seen in previous years and decades. That is not to say that improvements are not being made; lessons learnt by the component suppliers are generally incorporated into product designs and associated processes, but such components benefit from the fact that they are typically used across multiple projects and across all global regions. 3 Failures in Electrical Distribution Systems 3.1 Failure Types Each electrical jumper, connector, and penetrator acts as a potential source of failure with three failure modes: open circuit; short circuit; line insulation failure (current leakage to earth). If there is no fault protection in the distribution network, a single fault (either earth leakage or short-circuit/over-current) can take down the electrical supply and everything that is connected to it. Even with dual redundant supplies a single fault could take out the redundancy and two faults could take out the complete system. Subsea electrical distribution systems historically have suffered from poor reliability. The reasons for this are varied but in general can be broken down into three main headings: System Design Installation and Operating Environment Component Manufacture and Assembly From a systems design perspective, the following characteristics, either fully or partially, can be applied to most electrical distribution network implementations. From these characteristics, it can easily be seen how the system design can have such a large impact on the reliability and availability of the electrical distribution network. Large numbers of series and branch connected umbilicals & jumpers forming a series of networks. Design approach relies on high reliability of components and intervention as the means of repair. Large numbers of interconnected electrical connectors. Minimal condition monitoring. No means of isolating faults except by intervention.

3 Once a failure has occurred and has been identified, it can be categorized into one of two types, namely Intrinsic, (where the faults relate to design, materials or hardware assembly) or Extrinsic (where the faults relate to handling, installation, environment, mechanical stressing and misapplication). Such failures can cause slow degradation of integrity over time or can result in an immediate catastrophic failure. Intrinsic Failures that have been seen in the past include: Cracks in epoxy in connectors (Figure 1) Elastomeric failures (including bellows) Mechanical splice failures Polyethylene moulding failures (cathodic disbondment) Compression gland failures due to ambient pressure on cable Insufficient compensation volume in connectors Shuttle pin assembly failure (Figure 2) Inadequate material selection / material compatibility Inadequate adhesion to connector parts during moulding processes Fracturing of electrical pin inserts Poor soldering workmanship (flux, excessive quantity and sharp edges) (Figure 3) Incorrect boot seals applied (wrong type and size) Damaged/split boot seals Use of incorrect crimping tools (Figure 4) Non-waterproof designs used as secondary barrier (Figure 5) Examples of previously experienced extrinsic failures include Calcareous and/or marine deposit around compensation and pin shrouds (Figure 7) Lateral mechanical stresses placed on connectors when cables are installed on structures ROV impact damage Connectors left exposed subsea for too long (not properly parked or protected) (Figure 8) Cable sheath damage Nascent hydrogen penetration into conductor insulation material Fishing/trawl board impact Harsh seabed currents that can fatigue components 3.2 Installation and Operating Environment Failures Installing subsea umbilicals in deep-water is a challenging task requiring a high level of expertise to avoid stressing the umbilicals. In addition to electrical lines, subsea umbilicals also contain hydraulic, chemical, and in some case optical lines, all terminated to a seabed structure that can weigh greater than 10 tonnes. Installation of this equipment is dependent upon having the right weather conditions and that all the stresses imparted into the umbilical are adequately controlled. There have been a number of instances where equipment has been significantly degraded during installation. After installation the electrical system is subject to external damage such as fishing gear impact and harsh seabed currents that can fatigue components that are not secured to the seabed. The dynamic section of the umbilical from the host facility to the seabed is subject to additional fatigue loads caused by vessel movement (for floating installations) and the various tidal currents that occur throughout the water column. 3.3 UMBILICAL Failures A previously published paper (Rossiter), reported that: i. 50% of all umbilical failures arise from incorrect installation and handling ii. 20% of all failures arise from electrical faults iii. 10% of failures arise from incorrect operation iv. 20% of failures arise either singly or in combination, as a result of material/component defect, incorrect repair, marine life or extreme environment. Experience suggests that there will be a significant decline in the umbilical IR after installation, generally this will be a substantial reduction over time. Such declines in the umbilical IR may well be masked by the more localised faults encountered elsewhere in jumpers, connectors and Subsea Control Modules. Despite the best endeavours of the umbilical manufacturers, moisture penetration is a continuing problem. Many of the problems leading to a reduction in IR have been identified (Lofaro & Villaran, 2010) in a table listing possible failure mechanisms in electrical cables. Whilst the report and table were compiled for the nuclear industry in the USA, the table gives a comprehensive listing of the most likely water intrusion failure mechanisms, causes and effects. It is recognised that some moisture will eventually penetrate the plastic covering materials through diffusion and permeation, owing to pressure and material density differentials, leading in the long run to a soggy dielectric. Permeation of molecules (water and hydrogen) through insulation barriers depends on many factors, including: concentration (partial pressure) temperature, differential pressure either side of the barrier, time of exposure and barrier thickness. Permeation of any hydrogen molecules will also depend on presence of anodes and localised cathodic protection potentials.

4 The only effective way of reducing this is to employ thicker insulation materials, which inevitably increase the capital cost and decreases flexibility but this may be the penalty for getting a more reliable cable. A technique employed by the subsea power cable industry, is to use a double layer, tandem extrusion process. This lays down the dielectric insulation materials around the conductor in two half thickness layers. This prevents any flaw affecting the whole layer and the discontinuity between them acts as a barrier to their growth Water Treeing in Umbilicals Published literature (Boggs & Xu) (Hai & Thang) on failures in subsea cables gives much attention to Water Treeing; however, it is not clear if this is a problem for systems operating at low voltage, i.e. less than about 500V. The effect can be summarised as a tree like breakdown of the dielectric insulation material (see Figure 9) due to stressing by the electric field in the cable. To occur, there needs to be contamination or a local defect or inclusion in the insulation material, which, under the effect of the alternating field and in the presence of moisture, grows to form a tree like structure, which can eventually cross the insulator and cause a breakdown. Such trees can also grow from a surface defect. Water trees need 70-80% relative humidity within the insulation to grow, they do not need free water. Techniques have been developed (Boone, Eichhorn, & Sahadlich) (Abib & Daniel) for minimising this effect in power cables but there is a dichotomy of view in the industry. American manufacturers of waterproof cable have tended to use tree retardant, cross-linked polyethylene (TR-XPLE) where an additive is used to retard treeing. While a successful technique, it has some manufacturing difficulties and affects flexibility of the finished cable. In Europe, the trend has been to employ rigorous cleanliness and attention to quality in the manufacture of the insulation materials and during the extrusion process, to minimise contaminants and inclusions and hence the seeds for treeing. Independent reports suggest both approaches, whilst having various pros and cons, generally result in similar performance. Whilst water treeing may not be considered a serious problem at the voltages generally employed for subsea control systems, it is dependent on both voltage and time and therefore it may be considered that over a long enough period, such effects could become an issue and it is suggested that this might be the subject of an independent investigation by, for instance, a university materials department. 3.4 Electrical Connector Failures The mass majority of failures in electrical connectors are attributed to either sub-standard assembly or elastomeric failure. The following list provides a top level summary of the types of failure seen historically: Cable Boot Crimp Adaptor Insulation Sleeve Pressure Compensation Boot Cable Seal Up stand (Flux) Cable Insulation Gel Fill Shuttle pin While some of these failure points have been eliminated or improved with the latest designs, the quality of the connector assembly can be a major contributory cause of failures, and this applies equally to the latest design as to those earlier generation designs. It has to be recognised that these components are operating in a very hostile environment and that only the very highest standard of assembly can be accepted for every connector, termination and assembly. It should be further recognised that just because a component has passed its FAT, there may still be latent manufacturing faults, which only long term emersion will elicit. Without applying the highest quality approach, failures are bound to continue. Failures in jumpers/connectors have also been identified that have been the result of, or exacerbated by, rough handling, which unfortunately is a natural consequence of the way they have to be installed by remote means. The force required to remove connectors also increases when calcareous and marine growth deposits are present. This is not always considered within connector designs and often leads to failures, especially in older installations. 4 Insulation Resistance It is normal for most subsea installations powered from the surface, to be equipped with devices that continuously monitor the Insulation Resistance of each of the power circuits. These Line Insulation Monitoring (LIM) devices generally impress a dc voltage onto the ac supply and measure the associated dc current leaking to ground. The acceptance criteria for subsea umbilicals and jumper assemblies is for an IR value in excess of 10 GOhms, however experience shows that once the equipment is deployed this level falls off and if sound, tends to stabilise at a lower level. However any faults in the cable/jumper connector, resulting in moisture ingress can result in a continuing reduction in IR over a period of months or years. A LIM device will provide continuous monitoring of the IR for each cable, allowing prediction of likely failures arising in a Subsea Control Module (SCM), or group of SCMs, providing advance warning of un-serviceability and the possible loss of associated production capacity. This method works until some form of galvanic isolation is present in the system such as a transformer, in the subsea UTA or EDU, as is the case in many systems. Even without the galvanic isolation, the LIM located on the topsides is unable to distinguish between an IR failure in the bulk insulation within the umbilical or a failure in the subsea network at the end of the umbilical and beyond. Historically LIMs used in these topsides applications have been products that were originally designed for onshore power networks with much shorter cables, and

5 higher levels of IR. This results in the LIM devices not operating satisfactorily when the IR drops to low levels giving both high errors in the IR readings and also instability. Figure 10 shows the output readings of two electrical pairs in an umbilical in the North Sea. The X axis represents time, and in this particular graph, the total time period is two years. The figure illustrates a number of issues discussed in this paper namely, a failing electrical distribution system, and secondly the instability of the topsides LIM or are the IR figures really varying as shown? The currents flowing in an umbilical are complex, and are shown graphically in Figure 11; as well as the leakage current there is a capacitive charging current and an absorption current. These different currents, if known, can be used to extract much more detail on the performance and integrity of the umbilical insulation. In particular, the data can be used to distinguish between a subsea IR problem and a failure in the umbilical bulk insulation. Viper Subsea has developed a LIM, known as the V-LIM (see Figure 12), that is specifically designed to be optimally suited for subsea umbilicals it offers high accuracy and high stability measurements at low IR levels, operates with power-line signalling and importantly also measures a range of other parameters relating to the integrity of the umbilical enabling the differentiation between umbilical failures and those in the other subsea distribution equipment. 4.1 Minimum Acceptable IR Levels On the topsides, the LIMs have the ability to set an alarm and subsequently to de-energise the subsea circuit at predefined IR thresholds. In practice, operators wish to keep the system running as long as possible in the presence of low IR, and would only shut down if a dangerous or unsafe condition occurred and hence the trip threshold tends to be reduced to the minimum. The main safety device in such circumstances is the over-current circuit breaker, which will be triggered if the leakage current plus normal load current together exceeds the safety trip level. In such circumstances, the main concern would be of excessive heating in conductors or connectors due to excessive current flow, which could eventually cause a local failure. The most common question from operators is What is an acceptable IR level for my system? Overload circuit breakers are designed to trip when a large current flows, usually due to a short circuit, which is generally a transient event to which the circuit breaker will respond within seconds. However the increased load current due to subsea IR reduction tends to be a long term, steadily increasing value, which is unlikely to trigger the circuit breaker until significant current flow is registered. It is questionable whether the topside equipment and wiring will have been rated for such a high continuous current flow. The effect of the increasing leakage current can however result in system failure well in advance of any protective circuit breaker operating: the leakage may result in a loss of voltage regulation in the SEMs and also result in the inability of the network to supply power on demand to the SEMs. Viper Subsea has undertaken a number of system analyses in order to determine minimum acceptable IR thresholds for different projects. Such analyses compare results of different failure modes i.e. water ingress along the length of the umbilical versus ingress into discrete points in the distribution network. These analyses are used to predict not only the envelope of operation with respect to water ingress, but also, with live field data, an estimate in time as to how long the system is likely to stay operational. It is generally surprising, just how low the IR level can go before there is any loss in system operability. The power lost in the umbilical through leakage increases quickly for an IR of less than 100 kohms but a considerable reduction in IR can be withstood. Even when the IR reduces to a few kohms, the supply current would typically only double in value. With this in mind a system which is to all intents and purposes operating successfully below the LIM threshold could be only a few kohms from failure without further warning. It has been shown that it is unlikely that the leakage current resulting from such low values of IR, will of itself be sufficient to trip the over-current circuit breaker. A generalised breakdown of cable insulation, resulting in distributed leakage currents sufficient to trip the circuit breakers, although possible, is generally unlikely. When the circuit breaker does operate, in most cases the leakage and therefore low IR can be attributed to localised breakdown leading to short or near short circuit conditions. Heating due to high leakage currents (modest if distributed evenly and submerged) at a localised defect could cause a local rise in temperature, even in the presence of cold water in the vicinity, leading to further breakdown and an inevitable short circuit to ground. 4.2 Failure Protection It is fairly common practice to utilise some form of current protection in the Electrical Distribution Unit (EDU). Typically such protection would take the form of one of the following: Passive current limiters (resistors or inductors) Positive Temperature Coefficient Thermistors (PTC s) Solid state relays (controlled by local electronics) Fuses PTC devices are not ideal: they are typically restricted to a maximum operating voltage of 260V a.c. and have to be mounted in parallel to accommodate full load current. Fuses are typically one shot and require subsea intervention to replace them. (Fuses can also fail with age and under normal current conditions.) Subsea Electronic Modules (SEMs) typically have their own internal protection fuses, PTC s or current fold-back circuitry in the front end Power Supply Units (PSUs) and because of this, the question has to be asked what is the over-current protection in the EDU protecting? In reality it is providing protection against the failure of electrical connectors and cables in the distribution network only, and not failures within the SEMs or connected sensors. We have already seen that the predominant failure mode of connectors and jumpers is water ingress, which results in a reduction in IR before any over-current situation exists. It therefore should be obvious that the preferred technical solution should be to utilise switches in the EDU that are operated from circuitry that is monitoring IR as well as current. Monitoring of IR in each leg of the distribution network

6 will provide the best electrical integrity data and also assist in fault finding. More recent projects have utilised active over-current protection devices in the EDUs. Typically, this active circuitry would monitor the current flow and use solid state relays to isolate any fault. The use of active electronics allows these relays to be switched on demand from the surface (to assist in fault diagnosis) and also to send current and voltage data back to surface monitoring electronics. 5 Pre-deployment testing All equipment will have been subjected to a factory acceptance test, which tests components to their operational limits to elicit possible faults due to inherent defects and workmanship errors. This applies to umbilicals, jumpers, terminations and distribution units. However, many low IR faults are only found after periods of immersion in service and are not found during pre-deployment testing, suggesting that such testing is not sufficiently rigorous. Clearly not all equipment can be subjected to hyperbaric tests before deployment due to its physical size, but consideration should be given to making the FAT and other pre-deployment testing more searching. Testing could be extended in duration, be to more severe test levels and utilise more sophisticated tests. During any test regime, components must not be over stressed, otherwise latent potential faults could be created. As well as FATs, equipment may well be subject to additional testing on the dockside and/or on the installation vessel prior to deployment and after deployment. This represents an opportunity to get base-line performance characteristics, which can be used as a standard against which subsequent measurements can be compared and to form the base-line for future trending of performance. Such additional measurements might include: Umbilical polarisation index (dc test) Dielectric loss factor (ac test) Time domain reflectometry test 6 Condition Monitoring 6.1 Online Condition monitoring and diagnostics On the basis that despite the best testing, some faults will occur, as has been previously discussed, it has been normal to install Line Insulation Monitoring units at the topside power supply. Since all measurements are made from one end, only a limited picture is available of the condition of the distribution system and there is a need to know not only that a fault has occurred but where it is in the network, to guide intervention planning. The system status can be improved somewhat by using the SCMs to monitor their own condition and in some cases to look back up the distribution system. However this latter capability is only possible if a transformer provides galvanic isolation between the topside and subsea LIMs. A more complete picture of the network status can be made if monitoring is located at the distribution point and is able to monitor each leg of the distribution system separately. Viper Subsea has developed an active electrical distribution unit to provide this functionality: Voltage and current measurements are made continuously, while IR and loop resistance measurements are made on an isolated leg, once the switch is opened. Use of such a circuit on each of the outputs of a distribution unit, enables condition monitoring, fault detection and isolation. Fault isolation can be accomplished either automatically, with over current or low IR triggering the circuit breaker to open, or on command by alerting the Master Control Station (MCS) / operator to an out of specification condition The V-SLIM The V-SLIM (see Figure 13) has been developed by Viper Subsea specifically to assist with subsea fault finding and the trending of the electrical integrity performance with time. The V-SLIM can be deployed into the subsea network to provide instant readings or to be left deployed, gathering integrity data for trending and failure prediction. The V-SLIM can be connected to one cable or bulkhead connector or, more usually, plugged between two halves of a connector pair. It measures voltage and current (normal and leakage) and can identify whether earth leakage problem is upstream or downstream of the unit. It also can undertake a loop resistance measurement and provide full transient (waveform) analyses. It is fully compatible with existing control system equipment from all manufacturers and can operate in circuit with the system powered or isolated. 6.2 Offline Condition Monitoring Non Intrusive Techniques Offline condition monitoring requires manual intervention and specialist personnel. To perform this activity the subsea equipment needs to be shut-down and therefore impacts on oil/gas production. As all testing is performed from the host installation there is no requirement for a subsea Intervention vessel to perform operations with equipment on the seabed.

7 6.2.1 Surface Insulation Resistance (Megger) Testing By utilising a higher test voltage to record insulation resistance than that used by the LIM instruments, a higher accuracy of measurement can be obtained due to the leakage currents becoming much larger. Testing with an Insulation Resistance Test unit such as a Megger can be undertaken at 500Vdc. Testing at voltages above this with a fully configured system is normally not possible due to input voltage limitations of the Subsea Control Modules. A benefit of such testing is that the applied voltage is similar to that of the peak applied voltage that the system normally operates at i.e. in the range 200 to 500V and therefore stresses the insulation materials to similar level as would be seen in normal operation. Such IR testing is always performed immediately after umbilical installation and this provides a bench mark for future interventions. To allow comparison of results it is important that the same test meter type is used otherwise results may vary significantly. Temperature has a major bearing on the resistive properties of cable insulation materials such that just a 10oC rise in temperature can cause the IR to decrease by up to 50% of its value. Field readings however, because of the consistency of both the environment and the measuring equipment, can be expected to be repeatable to an estimated accuracy of +/- 5% Time Domain Reflectometer (TDR) Similar to Insulation Resistance Testing, Time Domain Reflectometers (TDR) are typically used as a reactive test tool in response to a failure. The TDR operates by transmitting a pulse of energy down the defective line. When the pulse reaches a discontinuity in the line a percentage of energy is reflected back to the instrument. As the transmission characteristics of the cables are all known, the time taken for the pulse to propagate through the system can be calculated. Each reflection can be correlated with a known location in the system and anomalies identified. Every connection in the distribution network will be identified in the TDR measurement in addition to areas of significant electrical defects such as broken cables, unmated connections or very low impedance faults (<1kΩ). These significant anomalies will show up as a peak or trough on the TDR. Figure 14 shows a simplified example of a TDR output graph when an IR fault occurs. The result given by the TDR is invariably a graph giving peaks and troughs where the impedance has changed. Provided the distances between each connection in the system are known, it should be clear where any anomalies lie. These anomalies are potentially where the electrical faults will be. However, for this to work appropriately the Velocity of Propagation (VOP) of the cable must be known. This is usually given by the manufacturer of the cable, but there are various methods of finding this with a healthy line. As with the insulation test tool, TDR testing utilises skilled personnel and requires the system to be powered down and isolated. 6.3 Offline Condition Monitoring Subsea Intrusive Techniques When is not possible to identify actual fault locations via online or non-intrusive offline condition monitoring techniques, subsea intervention is necessary. This involves the mobilisation of a specialist intervention vessel that is equipped with Remotely Operated Vehicles (ROVs) that can undertake basic activities such as making and breaking of connections on the seabed, fitting test connectors and undertaking electrical tests Subsea Megger Industrial and Marine Engineering Services Ltd (IMES) have developed, in conjunction with BP, a subsea Megger and loop resistance tool. The tool is based upon a commercially available Megger unit packaged within a one atmosphere enclosure to withstand the ambient hydrostatic pressure. It is mounted on a Remotely Operated Vehicle (ROV) and a flying lead is plugged into the subsea network by ROV. The unit is remotely operated via topside test console located on the intervention vessel with power and communications being provided via the ROV s infrastructure. Within the subsea Megger, a number of relays are provided that allow all permutations of core to core and core to ground testing to be performed. A number of relays are also incorporated that are remotely operable to allow short circuits to be applied when performing bridge testing from the host installation. This allows various combinations of tests to be performed in a single ROV dive trip Line Resonance Analysis The Line Resonance Analysis (LIRA) method (Fantoni, 2009) was developed by the Halden Reactor Project five or six years ago. It is based on transmission line theory. The behaviour of a transmission line depends on its length in comparison with the wavelength of the electric signal traveling into it. When the transmission line length is much lower than the wavelength, as happens when the cable is short and the signal frequency is low, the line has no influence on the circuit behaviour and the circuit impedance, as seen from the generator side, is equal to the load impedance at any time. However, if the line length and/or the signal frequency are high enough, the line impedance seen from the generator does not match the load. LIRA includes an algorithm to evaluate an accurate line impedance spectrum from noise measurements. Line impedance estimation is then used as the basis for local and global degradation assessment. Tests performed with LIRA show that thermal degradation of the cable insulation and mechanical damage on the insulation do have an impact on the transmission line capacitance (C) and to a lesser extent on the inductance (L). Direct measurement of C (and L) would not be effective due to the electrical noise normally present in installed cables. LIRA monitors C variations through its impact on the complex line impedance, taking advantage of the strong amplification factor on some properties of the phase and amplitude of the impedance figure.

8 Since the LIRA technique looks at variations in the complex line impedance, the technique is only beneficial if it is used regularly, and results are obtained when the system is initially installed and is known to be good. It is difficult to discriminate between cable faults (degradation) and load faults (changes in load reactance).

9

10

11 7 Conclusion This paper has summarised most of the known causes of subsea electrical IR failures and the subsea electrical fault detection techniques that are currently available. Awareness of the design, manufacture, and test issues as well as the methods available for monitoring integrity, locating faults and predicting time to failure should lead to a higher availability of the electrical distribution network. Throughout the paper, observations and recommendations have been made. Those that are considered to be the most critical to improve the reliability and integrity of the distribution network are summarised below, together with a few additional recommendations that have not been addressed in this paper: Reducing vulnerability to faults by limiting the number of drops and number of series connectors forming any particular network; More focus should be applied to ensuring component reliability and the selection of components based on reliability; Ensure all electrical flying leads and EDUs are field replaceable; More stringent hyperbaric testing as part of FAT for components/assemblies which need to keep out water from electrical circuits; Implement 100% inspection of component parts and workmanship; Ensure dual redundant water barriers are truly independent; Ensure dielectric fluid has no entrained moisture (to get very good IR, it is necessary to drive out any residual moisture by gentle heating of the components and dielectric fluid in an oven before or during assembly. Use of centrifugal drying of the dielectric fluid might also be considered); Maintainability would be significantly improved by incorporating an ability to detect and identify the location of failures: Monitor IR on each output leg of the subsea electrical distribution unit; Provide an option to isolate a leg when an IR or over-current fault is detected; Enable the operator to remotely increase trip threshold; Failure of the monitoring system should result in power always being available to the consumers. i.e. failure of the monitoring devices maintains system power; Electrical systems in warm water environments should protect the electrical system from marine growth: Suitable shrouding of termination assemblies; Ability to inject calcareous removal chemicals such as sulphamic acid;

12 8 References Boggs, S., & Xu, J. (n.d.). Water Treeing-Filled versus Unfilled Cable Insulation. University of Connecticut. Boone, W., Eichhorn, R. M., & Sahadlich, H. (n.d.). Long life cables by use of tree retardant insulation and super clean shields. Jicable, Fantoni, P. (2009). Condition Monitoring of Electrical Cables Using Line Resonance Analysis (LIRA). 17th International Conference on Nuclear Engineering. Brussels. Hai, V. T., & Thang, N. D. (n.d.). Final breakdown on water tree degraded polymer insulation. Hanoi University of Technology. Lofaro, R., & Villaran, M. (2010). Essential Elements of an Electric Cable Conditioning Monitoring Program. Brookhaven: United States Nuclear Regulatory Commission. Rossiter, S. (n.d.). Long Life Dynamic Power Cables for Deep-Water. London: BPP-Tech.

13 Figure 1 Crack in Epoxy Figure 2 Shuttle Pin Failure

14 Figure 3 Poor Soldering Figure 4 Incorrect Crimping Tool

15 Figure 5 Non-Waterproof Secondary Barrier Figure 6 Consequence of Water Ingress on the Male Pins of a Controlled Environment Connector

16 Figure 7 Calcareous Growth around a Connector Body

17 Figure 8 Marine Growth on an Exposed Connector Figure 9 Water Treeing

18 Figure 10 Output LIM Readings from Two Channels of an Umbilical Figure 11 Non-Load Currents Flowing in an Umbilical

19 Figure 12 High Performance Line Insulation Monitoring for Topside Use (2013) Figure 13 The V-SLIM (2013)

20 Figure 14 Graphical Output from a TDR Test Figure 15 Bridge Configuration

21 Figure 16 Holborn Loop Equivalent Circuits Figure 17 Cable Discharge Mapping Set-up

22 Figure 18 Output from a Cable Discharge Test

23 Please contact Viper Innovations for further information on V-LIM PORTISHEAD OFFICE Viper Innovations Ltd Unit 3, Marine View Office Park 45 Martingale Way Portishead Bristol BS20 7AW United Kingdom Tel: +44 (0) ABERDEEN OFFICE Viper Innovations Ltd Unit F10 The Enterprise Centre Exploration Drive Bridge of Don Aberdeen AB 23 8GX United Kingdom Tel: +44 (0)

ENGINEERING INNOVATION

ENGINEERING INNOVATION ENGINEERING INNOVATION ENGINEERING INNOVATION Viper Subsea provides control system distribution solutions for the global subsea oil and gas industry. Our product and service offering covers the full life

More information

POWER DELIVERY AND UMBILICAL CABLE OPTIMISATION FOR LONG OFFSET TIEBACKS

POWER DELIVERY AND UMBILICAL CABLE OPTIMISATION FOR LONG OFFSET TIEBACKS POWER DELIVERY AND UMBILICAL CABLE OPTIMISATION FOR LONG OFFSET TIEBACKS Author: Paul Overton 1, Daniel Denning 1, Neil Douglas 1, Daniel Byrd 2, Rory Mackenzie 2 1 Viper Subsea LLP, Portishead, United

More information

Controls and Communications Connectors Diamould electrical connectors

Controls and Communications Connectors Diamould electrical connectors Controls and Communications Connectors Diamould electrical connectors APPLICATIONS Subsea production systems controls Connectivity to tree, manifold, choke, and chemical injection metering valve (CIMV)

More information

Partial Discharge, Survey or Monitor?

Partial Discharge, Survey or Monitor? July 2014 Partial Discharge, Survey or Monitor? 24-7 Partial Discharge monitoring is the ultimate tool for finding insulation weaknesses before they fail. Introduction It s well established that Partial

More information

THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR

THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR THE EVOLUTION OF NON-INTRUSIVE PARTIAL DISCHARGE TESTING OF MV SWITCHGEAR Neil DAVIES and Chris LOWSLEY EA Technology Ltd. - United Kingdom Neil.Davies@eatechnology.com INRODUCTION The trend for extending

More information

Subsea Control Systems

Subsea Control Systems Subsea Control Systems Simplifying Subsea Production INGENIOUS SIMPLICITY Proserv s direct hydraulic and multiplexed production subsea control systems provide control and shutdown of subsea wells together

More information

IMPLEMENTATION OF CABLE HEAD REMOTE SWITCH UNIT TO INCREASE EFFICIENCY AND PRODUCTIVITY OF ONBOARD TESTING IN THE ABSENCE OF LAND INSTALLATIONS

IMPLEMENTATION OF CABLE HEAD REMOTE SWITCH UNIT TO INCREASE EFFICIENCY AND PRODUCTIVITY OF ONBOARD TESTING IN THE ABSENCE OF LAND INSTALLATIONS IMPLEMENTATION OF CABLE HEAD REMOTE SWITCH UNIT TO INCREASE EFFICIENCY AND PRODUCTIVITY OF ONBOARD TESTING IN THE ABSENCE OF LAND INSTALLATIONS Stephen Coy, Jon Elliott (Alcatel-Lucent Submarine Networks)

More information

BY JASON SOUCHAK, Megger

BY JASON SOUCHAK, Megger IMPROVING SYSTEM RELIABILITY WITH OFFLINE PD TESTING BY JASON SOUCHAK, Megger Partial discharge (PD) testing is a new generation of diagnostic testing for medium- and high-voltage underground power cable

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM D. Clark¹ R. Mackinlay² M. Seltzer-Grant² S. Goodfellow² Lee Renforth² Jamie McWilliam³ and Roger

More information

Be on guard for effective testing: Introduction

Be on guard for effective testing: Introduction Be on guard for effective testing: Introduction The development of the insulation tester by Evershed and Vignoles is part of our electrical history, with insulation testers produced by Megger Instruments

More information

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN

CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 75 CHAPTER 5 CONCEPT OF PD SIGNAL AND PRPD PATTERN 5.1 INTRODUCTION Partial Discharge (PD) detection is an important tool for monitoring insulation conditions in high voltage (HV) devices in power systems.

More information

16/09/2014. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems

16/09/2014. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems OIL & GAS Introduction to Subsea Production Systems 08 Production Control Systems September 2014 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER Module structure Section 1 Introduction to control systems

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

USING DAMPED AC VOLTAGES

USING DAMPED AC VOLTAGES MODERN & TESTING DIAGNOSIS OF POWER CABLES USING DAMPED AC VOLTAGES BY EDWARD GULSKI AND ROGIER JONGEN, Onsite HV Solutions ag, Switzerland AND RALPH PATTERSON, Power Products & Solutions LLC, United States

More information

ABSTRACT 1 INTRODUCTION

ABSTRACT 1 INTRODUCTION ELECTROMAGNETIC ANALYSIS OF WIND TURBINE GROUNDING SYSTEMS Maria Lorentzou*, Ian Cotton**, Nikos Hatziargyriou*, Nick Jenkins** * National Technical University of Athens, 42 Patission Street, 1682 Athens,

More information

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions 1 Transmission transformers are important links in the bulk power system. They allow transfer of power from generation centers, up to the high-voltage grid, and to bulk electric substations for distribution

More information

INDEX OF REVISIONS DESCRIPTION AND/OR AFFECTED SHEETS

INDEX OF REVISIONS DESCRIPTION AND/OR AFFECTED SHEETS E&P Pag. 1 / 14 Pre-salt Standard Steel Tube Umbilical Types Umbilical Electrical Cable Element DPT-SUB/ES/DCT INDEX OF REVISIONS REV DESCRIPTION AND/OR AFFECTED SHEETS 0 Original ORIGINAL REV. A REV.

More information

WIRE AND CABLE ENGINEERING GUIDE

WIRE AND CABLE ENGINEERING GUIDE Excerpt From Prysmian s WIRE AND CABLE ENGINEERING GUIDE Page 1 of 8 CABLE TESTING Testing represents an integral part in the life of a cable. A cable will be subjected to multiple tests in its lifetime

More information

Introduction. AC or DC? Insulation Current Flow (AC) 1. TECHNICAL BULLETIN 012a Principles of Insulation Testing. Page 1 of 10 January 9, 2002

Introduction. AC or DC? Insulation Current Flow (AC) 1. TECHNICAL BULLETIN 012a Principles of Insulation Testing. Page 1 of 10 January 9, 2002 Page 1 of 10 January 9, 2002 TECHNICAL BULLETIN 012a Principles of Insulation Testing Introduction Probably 80% of all testing performed in electrical power systems is related to the verification of insulation

More information

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables William Higinbotham, Neil Davies and Victor Chan EA Technology LLC, New Jersey; USA, EA Technology Pty Ltd, Brisbane Australia; EA

More information

Device Interconnection

Device Interconnection Device Interconnection An important, if less than glamorous, aspect of audio signal handling is the connection of one device to another. Of course, a primary concern is the matching of signal levels and

More information

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May 26 2011 St Pete Beach, Fl HDW ELECTRONICS, INC. THE BEST IN CABLE FAULT LOCATING TECHNOLOGY by Henning Oetjen Frank

More information

The design of Ruthroff broadband voltage transformers M. Ehrenfried G8JNJ

The design of Ruthroff broadband voltage transformers M. Ehrenfried G8JNJ The design of Ruthroff broadband voltage transformers M. Ehrenfried G8JNJ Introduction I started investigating balun construction as a result of various observations I made whilst building HF antennas.

More information

ONLINE OFFLINE B Y WIL L IAM H IG INBOT H AM,

ONLINE OFFLINE B Y WIL L IAM H IG INBOT H AM, ONLINE OFFLINE VERSUS FEATURE PARTIAL DISCHARGE TESTING FOR CABLE ASSESSMENT B Y WIL L IAM H IG INBOT H AM, EA Technology, LLC Medium voltage cables have three distinct phases to their lifecycle: (1) new

More information

The C-Kore Subsea TDR. Automated Cost-Effective and Reliable Subsea Testing

The C-Kore Subsea TDR. Automated Cost-Effective and Reliable Subsea Testing 1 The C-Kore Subsea TDR Automated Cost-Effective and Reliable Subsea Testing C-Kore Introduction 2 Greg Smith General Manager Working with C-Kore for 8 years Frequently supported products in the field

More information

INSTRUCTIONS FOR THE COMMISSIONING AND MAINTENANCE OF DIGITAL GENERATOR PROTECTION 3 I - PRINCIPLES AND APPLICATIONS 4 on 5 6 7 Figure 5 - Inverse time curve (N1) 8 9 1 0 1 1 1 2 1 3 All relays are delivered

More information

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations Presented by: James Young, JDR Engineering Director 1 MCE DEEPWATER DEVELOPMENT 2015 1. Introduction 2. JDR Cables and Umbilicals

More information

Power Delivery to Subsea Cabled Observatories

Power Delivery to Subsea Cabled Observatories Power Delivery to Subsea Cabled Observatories Adrian Woodroffe 1, Michael Wrinch 2, and Steven Pridie 1 1 Oceanworks International Corp. #3-1225 E. Keith Road, North Vancouver, BC, V7J 1J3, Canada 2 Hedgehog

More information

WIRELESS INSULATOR POLLUTION MONITORING SYSTEM

WIRELESS INSULATOR POLLUTION MONITORING SYSTEM SYSTEM OVERVIEW Pollution monitoring of high voltage insulators in electrical power transmission and distribution systems, switchyards and substations is essential in order to minimise the risk of power

More information

INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES

INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES INVESTIGATION ON THE TECHNOLOGIES FOR DEFECT LOCALIZATION AND CHARACTERIZATION ON MEDIUM VOLTAGE UNDERGROUND LINES Gonzalo MAIZ, Iberdrola Distribución, (Spain), gmaiz@iberdrola.es Armando RODRIGO, Instituto

More information

OMNETICS CONNECTOR CORPORATION PART I - INTRODUCTION

OMNETICS CONNECTOR CORPORATION PART I - INTRODUCTION OMNETICS CONNECTOR CORPORATION HIGH-SPEED CONNECTOR DESIGN PART I - INTRODUCTION High-speed digital connectors have the same requirements as any other rugged connector: For example, they must meet specifications

More information

Managing Complex Land Mobile Radio Systems

Managing Complex Land Mobile Radio Systems Anyone responsible for a multiple-site, multiple-channel land mobile radio communications system knows that management of even just a single site can often be a complex task. Failures or degradation in

More information

TD_485 Transceiver Modules Application Guide 2017

TD_485 Transceiver Modules Application Guide 2017 TD_485 Transceiver Modules Application Guide 2017 1. RS485 basic knowledge... 2 1.1. RS485 BUS basic Characteristics... 2 1.2. RS485 Transmission Distance... 2 1.3. RS485 bus connection and termination

More information

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics Dominique Bolliger, Ph.D. HV TECHNOLOGIES, Inc. Manassas, VA, USA d.bolliger@hvtechnologies.com Abstract In

More information

EPG. by Chris C. Kleronomos

EPG. by Chris C. Kleronomos April 1994 EFFECTIVE EQUIPMENT GROUNDING ECOS Electronics Corporation by Chris C. Kleronomos The quality of the electrical wiring and grounding in a facility containing sensitive electronic equipment is

More information

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED SECTION 16280 LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED PART 1 - GENERAL 1.1 SUMMARY This specification defines the requirements for active harmonic filter systems in order to meet IEEE-519-2014

More information

EI HIGH VOLTAGE INSULATION TESTING POLICY

EI HIGH VOLTAGE INSULATION TESTING POLICY Network(s): Summary: ENGINEERING INSTRUCTION EI 09-0001 HIGH VOLTAGE INSULATION TESTING POLICY EPN, LPN, SPN This engineering instruction details the policy for the on-site insulation testing of new and

More information

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound Africa Utility Week Focus Day 2014 Substation Condition Monitoring Benefits of Ultrasound Agenda Review - Substation Condition Monitoring Electrical discharge Types and origin In switchgear Results/consequences

More information

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis feature By brandon dupuis An Introduction to Electrical diagnostic TesTIng of Power Transformers 38 Transformers are the largest, most expensive, and highly critical components of most utility substations.

More information

ECM3 EARTH CONTINUITY RELAY

ECM3 EARTH CONTINUITY RELAY TECHNICAL DATASHEET ECM3 EARTH CONTINUITY RELAY Electrical Protection for Hard Rock Mines Application The ECM3 has been designed to provide earth continuity protection for cables containing pilot cores.

More information

BARTINGTON INSTRUMENTS. How to use this Manual... 3 Symbols Glossary Introduction to the Mag Vector Measurements and Conventions...

BARTINGTON INSTRUMENTS. How to use this Manual... 3 Symbols Glossary Introduction to the Mag Vector Measurements and Conventions... Table of Contents How to use this Manual... 3 Symbols Glossary... 3 Introduction to the Mag648... 4 Vector Measurements and Conventions... 4 Installing the Mag648... 5 Siting the Magnetometer (Environment

More information

Electrical Equipment Condition Assessment

Electrical Equipment Condition Assessment Feature Electrical Equipment Condition Assessment Using On-Line Solid Insulation Sampling Importance of Electrical Insulation Electrical insulation plays a vital role in the design and operation of all

More information

Cable fault location. The shortcut to locating a fault

Cable fault location. The shortcut to locating a fault Cable fault location The shortcut to locating a fault Reliable cable fault location with BAUR Top quality supply is our utmost concern You want to offer your customers a reliable power supply and to use

More information

Procurement Risk Management of Flexible Pipes and Umbilicals. Presented by Hanh Ha Kuala Lumpur Convention Centre 9 th June 2010

Procurement Risk Management of Flexible Pipes and Umbilicals. Presented by Hanh Ha Kuala Lumpur Convention Centre 9 th June 2010 Procurement Risk Management of Flexible Pipes and Umbilicals Presented by Hanh Ha Kuala Lumpur Convention Centre 9 th June 2010 Content Who are BPP-TECH? SURF Procurement What is it about. How and where

More information

Transformer Protection

Transformer Protection Transformer Protection Nature of transformer faults TXs, being static, totally enclosed and oil immersed develop faults only rarely but consequences large. Three main classes of faults. 1) Faults in Auxiliary

More information

The Basics of Insulation Testing

The Basics of Insulation Testing The Basics of Insulation Testing Feature by Jim Gregorec IDEAL Industries, Inc. What Is Insulation Testing? In a perfect world, all the electrical current sent along a conductive wire would reach its intended

More information

FLUX 11 Pocket installation manual SENSITIVE INDUCTIVE LOOP DECTOR

FLUX 11 Pocket installation manual SENSITIVE INDUCTIVE LOOP DECTOR FLUX 11 Pocket installation manual SENSITIVE INDUCTIVE LOOP DECTOR 1. Introduction The FLUX 11 is a single channel plug-in inductive loop detector designed for vehicle access applications, and interfaces

More information

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento

EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS. C. Ceretta, R. Gobbo, G. Pesavento Sept. 22-24, 28, Florence, Italy EFFECT OF INTEGRATION ERROR ON PARTIAL DISCHARGE MEASUREMENTS ON CAST RESIN TRANSFORMERS C. Ceretta, R. Gobbo, G. Pesavento Dept. of Electrical Engineering University of

More information

AGN 008 Vibration DESCRIPTION. Cummins Generator Technologies manufacture ac generators (alternators) to ensure compliance with BS 5000, Part 3.

AGN 008 Vibration DESCRIPTION. Cummins Generator Technologies manufacture ac generators (alternators) to ensure compliance with BS 5000, Part 3. Application Guidance Notes: Technical Information from Cummins Generator Technologies AGN 008 Vibration DESCRIPTION Cummins Generator Technologies manufacture ac generators (alternators) to ensure compliance

More information

2 Grounding of power supply system neutral

2 Grounding of power supply system neutral 2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the

More information

Pressurised Subsea Pipeline Repair Recent Case Studies

Pressurised Subsea Pipeline Repair Recent Case Studies Despite good pipeline design and integrity management schemes, pipelines can and do get damaged and need to be repaired. Damage can be caused by any number of factors, such as dragged anchors, landslides,

More information

Operation Manual for. Mag648 and Mag649 Low Power Three-Axis Magnetic Field Sensors

Operation Manual for. Mag648 and Mag649 Low Power Three-Axis Magnetic Field Sensors Operation Manual for Mag648 and Mag649 Low Power Three-Axis Magnetic Field Sensors Table of Contents 1. About this Manual 3 1.1. Symbols Glossary 3 2. Safe Use 3 3. Introduction to the Mag648 & Mag649

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

Effective Implementation of Subsea Integrity Management

Effective Implementation of Subsea Integrity Management Effective Implementation of Subsea Integrity Management Himanshu Maheshwari Engineering Specialist 2H Offshore Inc Houston, TX, USA Peter Falconer Global Subsea IM Business Manager 2H Offshore Inc Houston,

More information

ARE HARMONICS STILL A PROBLEM IN DATA CENTERS? by Mohammad Al Rawashdeh, Lead Consultant, Data Center Engineering Services

ARE HARMONICS STILL A PROBLEM IN DATA CENTERS? by Mohammad Al Rawashdeh, Lead Consultant, Data Center Engineering Services ARE HARMONICS STILL A PROBLEM IN DATA CENTERS? by Mohammad Al Rawashdeh, Lead Consultant, Data Center Engineering Services edarat group INTRODUCTION Harmonics are a mathematical way of describing distortion

More information

The Design of E-band MMIC Amplifiers

The Design of E-band MMIC Amplifiers The Design of E-band MMIC Amplifiers Liam Devlin, Stuart Glynn, Graham Pearson, Andy Dearn * Plextek Ltd, London Road, Great Chesterford, Essex, CB10 1NY, UK; (lmd@plextek.co.uk) Abstract The worldwide

More information

Fixed Series Compensation

Fixed Series Compensation Fixed Series Compensation High-reliable turnkey services for fixed series compensation NR Electric Corporation The Fixed Series Compensation (FSC) solution is composed of NR's PCS-9570 FSC control and

More information

Busbars and lines are important elements

Busbars and lines are important elements CHAPTER CHAPTER 23 Protection of Busbars and Lines 23.1 Busbar Protection 23.2 Protection of Lines 23.3 Time-Graded Overcurrent Protection 23.4 Differential Pilot-Wire Protection 23.5 Distance Protection

More information

The silicon controlled rectifier (SCR)

The silicon controlled rectifier (SCR) The silicon controlled rectifier (SCR) Shockley diodes are curious devices, but rather limited in application. Their usefulness may be expanded, however, by equipping them with another means of latching.

More information

GFL-1000 User Manual Ground Fault Locator

GFL-1000 User Manual Ground Fault Locator GFL-Series User Manual V1.1 GFL-1000 User Manual Ground Fault Locator Contents Contents... 1 1 Declaration of Conformity... 3 2 Introduction... 3 3 Equipment Information... 3 3.1 Safety Precautions...

More information

Cathodic Protection & Monitoring

Cathodic Protection & Monitoring Cathodic Protection & Monitoring THE COMPLETE SOLUTION MEASUREMENT COMMUNICATION INSIGHT Contents Cathodic Protection Services 2 Consultancy 3 Systems 5 Monitoring 8 Insight 10 1 Aquatec was founded by

More information

Predictive Subsea Integrity Management: Effective Tools and Techniques

Predictive Subsea Integrity Management: Effective Tools and Techniques Predictive Subsea Integrity Management: Effective Tools and Techniques The Leading Edge of Value-Based Subsea Inspection 1 st November Aberdeen 2017 www.astrimar.com Background Low oil price having major

More information

Measuring Reflected Voltage Spikes in VFD Motor Applications

Measuring Reflected Voltage Spikes in VFD Motor Applications Keywords: VFD, ASD, impedance mismatch, high frequency, reflected voltage, spikes, over voltage, ringing, cable length, inverter rated motor, turn to turn voltage, electric motor testing, oscilloscope,

More information

New Report Indicates AC Inductance/Electrodynamic Dust Detectors May Be Hazardous. Ron Dechene Auburn Systems, LLC Danvers MA 01923

New Report Indicates AC Inductance/Electrodynamic Dust Detectors May Be Hazardous. Ron Dechene Auburn Systems, LLC Danvers MA 01923 New Report Indicates AC Inductance/Electrodynamic Dust Detectors May Be Hazardous Ron Dechene Auburn Systems, LLC Danvers MA 01923 Summary An independent study has concluded that polymer jacketed, or coated,

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application 2 Virtus Subsea Connectors Delivering Long-Lasting Reliability at Each Subsea Connection Subsea production

More information

6 Tips for Successful Logic Analyzer Probing

6 Tips for Successful Logic Analyzer Probing 6 Tips for Successful Logic Analyzer Probing Application Note 1501 By Brock J. LaMeres and Kenneth Johnson, Agilent Technologies Tip1 Tip2 Tip3 Tip4 Tip5 Probing form factor Probe loading Signal quality

More information

Low voltage circuit breakers

Low voltage circuit breakers Comprehensive Catalogue 2006 Super Solution Low voltage circuit breakers A-4. Technical information TD & TS MCCB Index Temperature derating Power dissipation / Resistance Application Primary use of transformer

More information

Teledyne Marine Oil and Gas.

Teledyne Marine Oil and Gas. Oil and Gas www.teledynemarine.com/energy Applications in Oil and Gas Teledyne Marine encompasses over 20 brands that offer innovative, highly reliable technology spanning the life cycle of an oil field,

More information

INTRINSIC SAFETY BASIC PRINCIPLES

INTRINSIC SAFETY BASIC PRINCIPLES INTRINSIC SAFETY BASIC PRINCIPLES IGNITION TRIANGLE Ignition Energy In many industrial processes, the presence of flammable materials (gases, vapours, liquids, dusts, fibres and flyings) requires the adoption

More information

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,

More information

Power Frequency Withstand Voltage On-site testing of 400 kv GIS

Power Frequency Withstand Voltage On-site testing of 400 kv GIS Power Frequency Withstand Voltage On-site testing of 400 kv GIS D. Anaraki Ardakani, A. Omidkhoda, M. Solati High Voltage Engineering Center ACECR Tehran, Iran Da_ardakani@yahoo.com Paper Reference Number:

More information

MC450/MC650 (MC750) OPERATING INSTRUCTIONS

MC450/MC650 (MC750) OPERATING INSTRUCTIONS MC450/MC650 (MC750) OPERATING INSTRUCTIONS MC 2 AUDIO Ltd., Units 6 & 7 Kingsgate, Heathpark Industrial Estate, HONITON, Devon EX14 1YG England Tel: ++(0)1404.44633 Fax: ++(0)1404.44660 www.mc2-audio.co.uk

More information

Fiber Bragg Grating Dispersion Compensation Enables Cost-Efficient Submarine Optical Transport

Fiber Bragg Grating Dispersion Compensation Enables Cost-Efficient Submarine Optical Transport Fiber Bragg Grating Dispersion Compensation Enables Cost-Efficient Submarine Optical Transport By Fredrik Sjostrom, Proximion Fiber Systems Undersea optical transport is an important part of the infrastructure

More information

Insulation Testing Preventing Equipment Breakdown and Plant Shutdowns

Insulation Testing Preventing Equipment Breakdown and Plant Shutdowns Test&Measurement Insulation Testing Preventing Equipment Breakdown and Plant Shutdowns By Ronit Mukerji, Product Manager General Measuring and Portable Test Instruments, Yokogawa Corporation of America

More information

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE

PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE PERMANENT ON-LINE MONITORING OF MV POWER CABLES BASED ON PARTIAL DISCHARGE DETECTION AND LOCALISATION AN UPDATE Fred STEENNIS, KEMA, (the Netherlands), fred.steennis@kema.com Peter VAN DER WIELEN, KEMA,

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

Com-Trol ADV-6000 Trouble Shooting Guide Click on red text to go to that page in guide

Com-Trol ADV-6000 Trouble Shooting Guide Click on red text to go to that page in guide Com-Trol ADV-6000 Trouble Shooting Guide Click on red text to go to that page in guide Topic Introduction 1 Tool Requirements 1 Trouble Shooting Check List 1 Page(s) Lost communications to controller(s)

More information

Understanding Star Switching the star of the switching is often overlooked

Understanding Star Switching the star of the switching is often overlooked A Giga-tronics White Paper AN-GT110A Understanding Star Switching the star of the switching is often overlooked Written by: Walt Strickler V.P. of Business Development, Switching Giga tronics Incorporated

More information

Beyond Unit Cost: Minimising the overall cost of new high power subsea electrical connector systems

Beyond Unit Cost: Minimising the overall cost of new high power subsea electrical connector systems Chris Plant, Subsea Expo, February 2016 Beyond Unit Cost: Minimising the overall cost of new high power subsea electrical connector systems Answers for energy. Table of content Introduction 3 What is the

More information

EEE 432 Measurement and Instrumentation

EEE 432 Measurement and Instrumentation EEE 432 Measurement and Instrumentation Lecture 6 Measurement noise and signal processing Prof. Dr. Murat Aşkar İzmir University of Economics Dept. of Electrical and Electronics Engineering Measurement

More information

CHAPTER 2 EQUIVALENT CIRCUIT MODELING OF CONDUCTED EMI BASED ON NOISE SOURCES AND IMPEDANCES

CHAPTER 2 EQUIVALENT CIRCUIT MODELING OF CONDUCTED EMI BASED ON NOISE SOURCES AND IMPEDANCES 29 CHAPTER 2 EQUIVALENT CIRCUIT MODELING OF CONDUCTED EMI BASED ON NOISE SOURCES AND IMPEDANCES A simple equivalent circuit modeling approach to describe Conducted EMI coupling system for the SPC is described

More information

PSSI 27 Work or Testing On or Near to High Voltage Direct Current (HVDC) Plant and Apparatus

PSSI 27 Work or Testing On or Near to High Voltage Direct Current (HVDC) Plant and Apparatus 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical) and the Company Safety Instructions to achieve Safety from the System for

More information

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our

More information

SUBSEA CONTROLS & COMMUNICATIONS SOLUTIONS

SUBSEA CONTROLS & COMMUNICATIONS SOLUTIONS SUBSEA CONTROLS & COMMUNICATIONS SOLUTIONS Proserv is the fresh alternative in global energy services. Combining technical ingenuity with design, engineering, manufacturing and field services expertise,

More information

High Speed Digital Systems Require Advanced Probing Techniques for Logic Analyzer Debug

High Speed Digital Systems Require Advanced Probing Techniques for Logic Analyzer Debug JEDEX 2003 Memory Futures (Track 2) High Speed Digital Systems Require Advanced Probing Techniques for Logic Analyzer Debug Brock J. LaMeres Agilent Technologies Abstract Digital systems are turning out

More information

Grounding System Theory and Practice

Grounding System Theory and Practice Grounding System Theory and Practice Course No. E-3046 Credit: 3 PDH Grounding System Theory and Practice Velimir Lackovic, Electrical Engineer System grounding has been used since electrical power systems

More information

(2) New Standard IEEE P (3) Core : (4) Windings :

(2) New Standard IEEE P (3) Core : (4) Windings : (d) Electrical characteristics (such as short-circuit withstand, commutating reactance, more number of windings, etc); (e) Longer life expectancy; (f) Energy efficiency; (g) more demanding environment.

More information

Partial Discharge Theory, Modeling and Applications To Electrical Machines

Partial Discharge Theory, Modeling and Applications To Electrical Machines Partial Discharge Theory, Modeling and Applications To Electrical Machines V. Vahidinasab, A. Mosallanejad, A. Gholami Department of Electrical Engineering Iran University of Science and Technology (IUST)

More information

Focusing Software Education on Engineering

Focusing Software Education on Engineering Introduction Focusing Software Education on Engineering John C. Knight Department of Computer Science University of Virginia We must decide we want to be engineers not blacksmiths. Peter Amey, Praxis Critical

More information

HorizontalBore SUBSEA TREE

HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.

More information

REQUIRED SKILLS AND KNOWLEDGE UEENEEE104A. Topic and Description NIDA Lesson CARD #

REQUIRED SKILLS AND KNOWLEDGE UEENEEE104A. Topic and Description NIDA Lesson CARD # REQUIRED SKILLS AND KNOWLEDGE UEENEEE104A KS01-EE104A Direct current circuits T1 Topic and Description NIDA Lesson CARD # Basic electrical concepts encompassing: electrotechnology industry static and current

More information

The Problem of Interference

The Problem of Interference The Problem of Interference Unfortunately not everything is resolved just because we have succeeded in finding the right transmission methods and the right interface. The largest irritant to data communications

More information

2kVA EARTH TESTING CURRENT INJECTION SYSTEM 4046 / 4047 DATASHEET REDPHASE INSTRUMENTS

2kVA EARTH TESTING CURRENT INJECTION SYSTEM 4046 / 4047 DATASHEET REDPHASE INSTRUMENTS 2kVA EARTH TESTING CURRENT INJECTION SYSTEM 4046 / 4047 DATASHEET REDPHASE INSTRUMENTS Contents Section Brief Description... 1 Where and why it is used... 1.1 Induced Measureable Parameters... 1.2 Hardware

More information

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE Z.Liu, B.T.Phung, T.R.Blackburn and R.E.James School of Electrical Engineering and Telecommuniications University of New South Wales

More information

Author - Brian Steeves Component Engineering Systems, LLC

Author - Brian Steeves Component Engineering Systems, LLC PASSIVE COMPONENTS Author - Brian Steeves Component Engineering Systems, LLC DEFINITION: A resistor is a device used to restrict the flow of electrons (current). Fixed resistors have two connections per

More information

AIM & THURLBY THANDAR INSTRUMENTS

AIM & THURLBY THANDAR INSTRUMENTS AIM & THURLBY THANDAR INSTRUMENTS I-prober 520 positional current probe Unique technology enabling current measurement in PCB tracks bandwidth of DC to 5MHz, dynamic range of 10mA to 20A pk-pk useable

More information

OPEN-PHASE DETECTION TECHNIQUES FOR CRITICAL STANDBY SUPPLIES

OPEN-PHASE DETECTION TECHNIQUES FOR CRITICAL STANDBY SUPPLIES OPEN-PHASE DETECTION TECHNIQUES FOR CRITICAL STANDBY SUPPLIES U AJMAL, GE Grid Solutions UK Ltd, usman.ajmal@ge.com S SUBRAMANIAN, GE Grid Solutions UK Ltd, sankara.subramanian@ge.com H Ha GE Grid Solutions

More information

AIM & THURLBY THANDAR INSTRUMENTS

AIM & THURLBY THANDAR INSTRUMENTS AIM & THURLBY THANDAR INSTRUMENTS I-prober 520 positional current probe Unique technology enabling current measurement in PCB tracks bandwidth of DC to 5MHz, dynamic range of 10mA to 20A pk-pk useable

More information