1 Offshore marine operations. Heavy lifts Finn Gunnar Nielsen Norsk Hydro O&E Bergen, Norway & NTNU, Department of Marine Technology

2 Content Examples on Offshore lifting operations Module lifting Jacket installation Installation of sub-sea equipment Overview of important issues. Lift in air versus sub-sea operations Dynamics Weather windows statistics fgn - Date: Page: 3

3 Grane jacket, Apr fgn - Date: Page: 4

4 Grane process module installation, Apr Lift-off from barge. fgn - Date: Page: 5

5 Grane process module installation, Apr Approaching jacket. fgn - Date: Page: 6

6 Grane process module installation, Apr Landing on jacket. fgn - Date: Page: 7

7 Grane process module installation, Apr Living quarter. fgn - Date: Page: 8

8 Building-blocks of a process platform fgn - Date: Page: 9

9 Jacket installation, Self-floater and launching from barge fgn - Date: Page: 10

10 Crane assisted jacket installation fgn - Date: Page: 11

11 Crane assisted jacket installation, side view fgn - Date: Page: 12

12 Crane assisted jacket installation, plane view. fgn - Date: Page: 13

13 Tandem lift from barge fgn - Date: Page: 14

14 Fram module lift. Model test setup fgn - Date: Page: 15

15 Fram module. Model testing fgn - Date: Page: 16

16 Installation of Fram West module The Fram West module (900 tons) lifted onboard Troll C. May 2003 fgn - Date: Page: 17

17 Simulation of Fram module installation fgn - Date: Page: 18

18 Heavy versus light lifts Heavy lifts: Coupled dynamics, No heave compensation, W > 1000 tonnes) Light lifts: (Minor coupling, Heave compensation possible, W <100 tonnes) fgn - Date: Page: 19

19 Example: Saipem7000 Semisubmersible crane and pipelaying (J-lay) DP vessel Dimensions: Length: 198 m Breadth: 87 m Depth to main deck: 45 m Transit draft: 10.5 m Operational draft: 27.5 m Ballast system: Computer controlled system comprising 4 x 6,000 t/h ballast pumps, fully redundant. Lifting facilities main crane: Fully revolving. Main blocks tandem lift: 14,000 t Main block single lift: 7,000 t revolving at 40 m Aux.1 block: 2,500 t revolving at 74 m rad. Aux. 2 block: 900 t revolving at 115 m rad. Lowering capability to 450 m below sea level Whip hook: 120 t revolving at 150 m rad. fgn - Date: Page: 20

20 Examples on heavy lifts, modules Module Hook weight (t) Lift date Vessel Kittiwake deck May 90 DB102 (Shell) Miller M7 (BP) July 91 DB102 Piper PUD Mar 92 DB102 (EEC) Gannet deck ( Apr 92 DB102 Shell) Piper WM/DSM Apr 92 DB102 (EEC) Bruce P10 (BP) Aug 92 M7000 Bruce P20 (BP) Aug 92 M7000 Bruce drill deck Aug 92 M7000 (BP) Saltire deck Sept 92 DB102 (EEC) Tiffany M Nov 92 M7000 (Agip) Tiffany M Nov 92 M7000 (Agip) North Everest Nov 92 DB102 (Amoco) Lomond Dec 92 DB102 (Amoco) Scott P Apr 93 DB102 (Amarada) Scott UQ Apr 93 DB102 (Amarada) East Brae Spr. 93 DB102 (Marathon) Nelson (Shell) Aug 93 DB102 Dunbar (Total) Mid 94 DB102 fgn - Date: Page: 21

21 Crane assisted jacket installations Jacket Water depth Hook weight (t) Lift date Vessel (m) Veslefrikk May89 M7000 (Statoil) Gyda (BP) Sept 89 M7000 Kittiwake (Shell) May 90 DB102 Gannet (Shell) June 91 DB102 Bruce PUQ (BP) May 92 M7000 Bruce D (BP) May 92 M7000 Unity (BP) Jul 92 DB102 Beryl riser Jul 92 DB102 (Mobil) Scott JU Mar 93 DB102 (Amerada) Nelson (Shell) Spr. 93 DB102 East Brae May 93 DB102 (Marathon) Dunbar (Total) Mid 94 DB102 fgn - Date: Page: 22

22 Installation of subsea equipment, TOGI 1989 fgn - Date: Page: 23

23 Installation of subsea equipment, Troll pilot fgn - Date: Page: 24

24 Installation of subsea equipment, Oseberg sør template, fgn - Date: Page: 25

25 Offshore wind farms 20 x 2MW fgn - Date: Page: 26

26 Offshore wind farms fgn - Date: Page: 27

27 Environmental conditions Water Depth 1000m fgn - Date: Page: 28

28 Significant wave height, Hmo(m) Environmental conditions Approximate 100yr contourlines Faroe area Haltenbanken Norte rn North S e a GOM WOA Wave peak period, Tp(s) -500 Njord Troll Norne Schiehallion Foinhaven Water Depth (m) Girassol Dalia Marlin 4 Increasing challenges Ram Pow el Ursa Hoover/Diana Orm en Lange Marlin Sul WA 8 Brazil Roncador 12 GoM Crazy Horse 18 Hs(m) fgn - Date: NNS/AM - Page: 29

29 Weather windows 3.5 Me a s ure d H s 3 H' s 2.5 H s (m ) t 1 t 2 t 3 t 4 t Tim e (ho urs ) fgn - Date: Page: 30

TMR4225 MARINE OPERATIONS. SPRING 2005 Introduction

TMR4225 MARINE OPERATIONS. SPRING 2005 Introduction TMR4225 MARINE OPERATIONS SPRING 2005 Introduction Introductory issues Aim Schedule for lectures Time and topics Monologue versus dialogue Written material Language Exercises Plan and assistance Exam General

More information

TMR4225 MARINE OPERATIONS. SPRING 2004 Introduction

TMR4225 MARINE OPERATIONS. SPRING 2004 Introduction TMR4225 MARINE OPERATIONS SPRING 2004 Introduction Introductory issues Aim Schedule for lectures Time and topics Monologue versus dialogue Written material Language Exercises Plan and assistance Exam General

More information

privacy and settings ( page. ACCEPT ()

privacy and settings (  page. ACCEPT () ! We use cookies to provide the best possible experience for you. By closing this message you agree to use of cookies. You can learn more on our privacy and settings (http://www.statoil.com/en/about/siteinfo/pages/privacypolicy.aspx)

More information

Technip Floating Production: A Comprehensive Portfolio

Technip Floating Production: A Comprehensive Portfolio Technip Floating Production: A Comprehensive Portfolio Fortis Bank Floating Production Luncheon Ivan Replumaz - CEO Offshore Branch ISIN FR0000131708 I. II. III. IV. V. FLOATER BRIEF INTRODUCTION TECHNIP

More information

NORMAND MERMAID - LIGHT OFFSHORE CONSTRUCTION VESSEL RELIABLE COMPETENT DEMANDING COLLABORATIVE

NORMAND MERMAID - LIGHT OFFSHORE CONSTRUCTION VESSEL RELIABLE COMPETENT DEMANDING COLLABORATIVE NORMAND MERMAID - LIGHT OFFSHORE CONSTRUCTION VESSEL OCEAN INSTALLER s business model rests in essence on a tailor made approach and close cooperation with clients. We know that speed, timely deliveries

More information

Dry trees for cost effective solution with the Wellhead Barge: WHB

Dry trees for cost effective solution with the Wellhead Barge: WHB Dry trees for cost effective solution with the Wellhead Barge: WHB Benjamin MAURIES SAIPEM PAU, FRANCE 5 7 APRIL 2016 Dry Tree Solution for Mild Environments Dry Tree solutions have been developed and

More information

Offshore. Christian Tribout Senior Vice President, Offshore. Investor Presentation Paris, October 17, New York, October 19, 2007

Offshore. Christian Tribout Senior Vice President, Offshore. Investor Presentation Paris, October 17, New York, October 19, 2007 Offshore Christian Tribout Senior Vice President, Offshore Investor Presentation Paris, October 17, 2007 - New York, October 19, 2007 Good morning ladies and gentlemen, my name is Christian TRIBOUT. I

More information

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America RPSEA 09121-3300 3300-05 05 Autonomous Inspection of Subsea Facilities Phase I Final Presentation / Phase II Status Report UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July

More information

Overview of Global Decommissioning

Overview of Global Decommissioning Overview of Global Decommissioning Presented by Dr. Brian Twomey twomeybg@gmail.com Mobile: +44 7831 355837 CCOP & EPPM Workshop on End of Concession & Decommissioning Guidelines Bangkok, 13 th June 2012

More information

Reducing Risk and Improving Weather Window in Offshore Lifting Operation

Reducing Risk and Improving Weather Window in Offshore Lifting Operation Reducing Risk and Improving Weather Window in Offshore Lifting Operation Cranemaster Technology Kristian Helland Product Manager Cranemaster Functionality Cranemaster company Main office Stathelle, Norway

More information

Richard Rickett, General Manager Engineering and Procurement - March Case Study

Richard Rickett, General Manager Engineering and Procurement - March Case Study Richard Rickett, General Manager Engineering and Procurement - March 2015 Case Study Case Study : Diverless Fast Track Repair of Mooring System Introduction ~ 300 floating production units in use around

More information

Title of Presentation

Title of Presentation Title of Presentation Energy Demand and the Marine and Offshore Industry A. K. Seah VP, Environmental Solutions Group Singapore 3 April 2012 SMI - NUS Workshop Energy demand 2005 and 2030 (10 15 BTUs)

More information

Statoil Supplier Days

Statoil Supplier Days Statoil Supplier Days 2017 2012-10-24 Shaping competitive solutions together Margareth Øvrum, EVP Technology, projects and drilling 2012-10-24 Lifting weights all summer! Aasta Hansteen Njord Cat J Oseberg

More information

Nils J. Vågen Framo Engineering

Nils J. Vågen Framo Engineering First World Wide Subsea Raw Seawater Injection System in Operation on CNR s Columba E Field Nils J. Vågen Framo Engineering Columba E First Raw Seawater Injection System PROTECTIVE STRUCTURE & FRAMO DUAL

More information

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow MAERSK SUPPLY SERVICE Actively taking part in solving the energy challenges of tomorrow Utilising our marine capabilities, Expanding to new industries At Maersk Supply Service, we use our marine expertise

More information

UTILIZATION OF AN ACTIVE AND/OR PASSIVE HEAVE COMPENSATION IN THE EQUIPMENT OF DYNAMIC POSITIONING VESSELS

UTILIZATION OF AN ACTIVE AND/OR PASSIVE HEAVE COMPENSATION IN THE EQUIPMENT OF DYNAMIC POSITIONING VESSELS Journal of KONES Powertrain and Transport, Vol. 21, No. 2 2014 ISSN: 1231-4005 e-issn: 2354-0133 ICID: 1133875 DOI: 10.5604/12314005.1133875 UTILIZATION OF AN ACTIVE AND/OR PASSIVE HEAVE COMPENSATION IN

More information

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Offshore Development Concepts: Capabilities and Limitations Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Outline Platforms Floating Structures Semi-Submersible/ Floating Production

More information

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine Vincent/Enfield Conductor and Flowbase Installation Review Roy Grant, TSMarine Project scope Offshore installation Mobilised in Dampier (KBSB) on 10 October TSMarine scope is onshore project management

More information

Low Cost Field Development using Hybrid Risers. Learn more at

Low Cost Field Development using Hybrid Risers. Learn more at Low Cost Field Development using Hybrid Risers Prahlad Enuganti Technical Manager 2H Offshore Engineering Ltd., Aberdeen 1 Typical Field Development Options Fixed Structure Shallow Water Platform Wells

More information

The Partnership Between Solution Providers and Oil Companies

The Partnership Between Solution Providers and Oil Companies The Partnership Between Solution Providers and Oil Companies Morten Wiencke Director DEMO 2000 OTC 18576 Offshore Technology Conference,, Houston May 2007 Vision 1999 = Reality 2007 Yesterday Today Tomorrow

More information

Statoil Supplier Days

Statoil Supplier Days Statoil Supplier Days 2017 2012-10-24 Welcome Harald Minge, Adm.dir. Stavanger Næringsforening 2012-10-24 3 Agenda 08.00 08.30 Registration 08.30 08.35 Welcome 08.35 08.55 Shaping competitive solutions

More information

12Future developments

12Future developments eng_fakta_2005_kap11_15 12-04-05 15:34 Side 148 12Future developments Subsea template eng_fakta_2005_kap11_15 12-04-05 15:34 Side 149 Discoveries in the planning phase Excludes discoveries included under

More information

Overview of Liwan 3-1 Deepwater Subsea Tieback Gas Development

Overview of Liwan 3-1 Deepwater Subsea Tieback Gas Development Overview of Liwan 3-1 Deepwater Subsea Tieback Gas Development Weiqiang Liu, Chief Engineer South China Sea Deep Water Gas Development PMT CNOOC Limited CONTENTS Introduction to Liwan 3-1 Deepwater Gas

More information

Marine Subsea AS presentation Pareto Conference, Oslo

Marine Subsea AS presentation Pareto Conference, Oslo Marine Subsea AS presentation Pareto Conference, Oslo August 29-30, 2007 Christian Nygaard, Managing Director 1 Content Confidential Background History Vessel Fleet Financial Target Summary 2 Vision Our

More information

Offshore Energy Solutions. Technologies and products

Offshore Energy Solutions. Technologies and products Offshore Energy Solutions Technologies and products Technip Profile A world leader in engineering, project management and technologies, serving the oil & gas industry for more than 50 years A regular workforce

More information

FMC CUSTOMER SUPPORT. Ingmar Westervik Operations Manager Operations Norway

FMC CUSTOMER SUPPORT. Ingmar Westervik Operations Manager Operations Norway FMC CUSTOMER SUPPORT Ingmar Westervik Operations Manager Operations Norway FMC Technologies Named World's Most Admired Oil and Gas Equipment, Services Company, 2010 FMC has been named the 2010 World's

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

OFFSHORE EQUIPMENT. Pipelay Umbilical lay flex lay cable lay. Fpso-Flng-Frsu Wind Turbine FPU-TlP-SEMI-SPAR INSTALLATION & CONSTRUCTION PLATFORM

OFFSHORE EQUIPMENT. Pipelay Umbilical lay flex lay cable lay. Fpso-Flng-Frsu Wind Turbine FPU-TlP-SEMI-SPAR INSTALLATION & CONSTRUCTION PLATFORM INSTALLATION & CONSTRUCTION Pipelay Umbilical lay flex lay cable lay Fpso-Flng-Frsu Wind Turbine FPU-TlP-SEMI-SPAR OFFSHORE EQUIPMENT Drilling UNIT PLATFORM SUBSEA NEWBUILD, Upgrade And Maintenance Lift

More information

Floating Production, Storage and Offloading (FPSO) Facilities

Floating Production, Storage and Offloading (FPSO) Facilities Floating Production, Storage and Offloading (FPSO) Facilities Presentation Content History of Floating Production Systems Introduction to Field Layouts What is an FPSO..? Advantages of an FPSO Types of

More information

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor Innovation in Action InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor is an Acteon Company linking subsea services 3 InterMoor Services MOORINGS Rig Moves Permanent

More information

Moving Boundaries Within Offshore Drilling Pareto's 18th annual Oil & Offshore Conference, Oslo, 31 th August 2011

Moving Boundaries Within Offshore Drilling Pareto's 18th annual Oil & Offshore Conference, Oslo, 31 th August 2011 Moving Boundaries Within Offshore Drilling Pareto's 18th annual Oil & Offshore Conference, Oslo, 31 th August 2011 Michael Boysen Nielsen Maersk Drilling Maersk Drilling s Strategy Maersk Drilling will

More information

SWS Ultra deepwater drillship

SWS Ultra deepwater drillship SWS 12000 Ultra deepwater drillship SWS 12000 DP ultra deepwater drillship DRILLING FEATURES The SWS 12000 is designed for maximum flexibility for drilling operations in water depth up to 3,650 m. Focus

More information

Perenco UK Ltd. SNS Decommissioning

Perenco UK Ltd. SNS Decommissioning Perenco UK Ltd. SNS Decommissioning EEEGr / Decom North Sea Decommissioning Special Interest Group Event 22 nd November 2012 SNS Decommissioning PUK Assets and Decommissioning Strategy Welland Case Study

More information

MODUs as MOPUs: Low cost field development using hybrid risers

MODUs as MOPUs: Low cost field development using hybrid risers MODUs as MOPUs: Low cost field development using hybrid risers Pedro Viana 2H Offshore Contents Objectives Background Typical Arrangements for FPU / Riser Free Standing Hybrid Risers key aspects Proposed

More information

subsea partner of choice

subsea partner of choice Decommissioning of Flexible Flowlines Using Reeled Pipelay Vessels Michael O Donnell Engineer Subsea 7 Introduction Introduction to Reeled Rigid Pipelay Spooling pipelines Installing pipelines SAL Flowline

More information

Extreme quality with the highest level of flexibility Paul Charles Redfern CEO, Norvalves

Extreme quality with the highest level of flexibility Paul Charles Redfern CEO, Norvalves Extreme quality with the highest level of flexibility Paul Charles Redfern CEO, Norvalves Fast-Track & Bespoke valves HISTORY Long life time, short lead time Located at Ågotnes, Bergen 1,940 sqm of modern

More information

A Subsea Structural Deflection Monitoring System designed by RTS AS, Norway. 51st Marine Measurement Forum Adil Ali Seatronics Limited

A Subsea Structural Deflection Monitoring System designed by RTS AS, Norway. 51st Marine Measurement Forum Adil Ali Seatronics Limited A Subsea Structural Deflection Monitoring System designed by RTS AS, Norway. 51st Marine Measurement Forum Adil Ali Seatronics Limited Seatronics and RTS Seatronics Limited : Established: 1978, Aberdeen-based

More information

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager Status på Dvalin-prosjektet Roy Padget, Topside Host Manager Kristiansund, 31. mai 2018 A brief history of DEA in Norway 1973 1979 1980ies 1990 1991 1991 2010 2015 2016 2017 2018 Company established as

More information

IMR in Subsea 7 for Statoil, past and future, the new IMR vessel Seven Viking

IMR in Subsea 7 for Statoil, past and future, the new IMR vessel Seven Viking IMR in Subsea 7 for Statoil, past and future, the new IMR vessel Seven Viking th March 20 Bjørn Serck-Hanssen Agenda Agenda IMR Scope of Work Asset Development Drivers for 365 days operation Past - Future

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

Energy Transition Partner. Created and produced by

Energy Transition Partner. Created and produced by Energy Transition Partner Diamond Sponsor Supported by Created and produced by Energy Transition Partner Diamond Sponsor Supported by Created and produced by CREATING NEW HORIZONS IN OFFSHORE ENERGY A

More information

Next generation WTG foundation and WTG installation. WindDays Rotterdam, 14 June 2018 Arnoud Bosch Engineering Director

Next generation WTG foundation and WTG installation. WindDays Rotterdam, 14 June 2018 Arnoud Bosch Engineering Director Next generation WTG foundation and WTG installation WindDays Rotterdam, 14 June 2018 Arnoud Bosch Engineering Director 18 June 2018 Subsea 7 Business Units Seaway Heavy Lifting Siem Offshore Contractors

More information

OPTICAL FIBER AND CONNECTORS: CRITICAL COMPONENTS OF MANY ADVANCED SUBSEA SYSTEMS. Perry Wright: Fiber-optics Technology Manager, Ocean Design Inc,

OPTICAL FIBER AND CONNECTORS: CRITICAL COMPONENTS OF MANY ADVANCED SUBSEA SYSTEMS. Perry Wright: Fiber-optics Technology Manager, Ocean Design Inc, OPTICAL FIBER AND CONNECTORS: CRITICAL COMPONENTS OF MANY ADVANCED SUBSEA SYSTEMS Abstract Perry Wright: Fiber-optics Technology Manager, Ocean Design Inc, Since the first connectorized, subsea fiber-optic

More information

Dimensional Survey Company

Dimensional Survey Company Dimensional Survey Company Services Anko Bluepix was founded in 2016 by experienced engineers, each a specialist within different segments of the survey business. Even though Anko Bluepix is a young company

More information

5.1 Optimal integrated combination of foundation concept and installation method

5.1 Optimal integrated combination of foundation concept and installation method WE@SEA 5.1 Optimal integrated combination of foundation concept and installation method Results of We@Sea research in perspective December 1 2, Den Helder, The Netherlands Goal and Partners The project

More information

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management Subsea Production Market and Industry Teaming Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management February 28, 2017 Worldwide Progression of Water Depth Capabilities

More information

Passion at work. Renewables

Passion at work. Renewables Passion at work Renewables Our profile Driven by Our profile challenges Seaway Heavy Lifting is a leading offshore contractor in the global Oil & Gas and Renewables industry, offering tailored T&I and

More information

Swiber Holdings Limited 1Q FY08 Results Briefing

Swiber Holdings Limited 1Q FY08 Results Briefing Swiber Holdings Limited 1Q FY08 Results Briefing 15 May 2008 Page 1 Financial Highlights 1Q 2008 Page 2 Key highlights a record quarter Revenue (US$ m) Net Profit (US$ m) 160 1Q Y-O-Y: 266.9% 1Q Y-O-Y:

More information

A niche service provider to the offshore oil and gas industry. Swiber Holdings Limited Corporate Presentation

A niche service provider to the offshore oil and gas industry. Swiber Holdings Limited Corporate Presentation A niche service provider to the offshore oil and gas industry Swiber Holdings Limited Corporate Presentation by Raymond Goh, CEO 21 April 2007 A niche service provider to the offshore oil and gas industry

More information

HPHT Case Study: Kristin Field, North Sea

HPHT Case Study: Kristin Field, North Sea HPHT Case Study: Kristin Field, North Sea Craig Newman Senior Engineer, Subsea Systems NOV Texas Oil Tools 1 Personal info 2010 BSME Texas Tech University Joined TOT as Mechanical Engineer Worked with

More information

Apache Subsea Projects NORTH SEA REGION. Richard Stark Paul Williams

Apache Subsea Projects NORTH SEA REGION. Richard Stark Paul Williams Apache Subsea Projects NORTH SEA REGION Richard Stark Paul Williams INTRODUCTION TO APACHE Presenters Richard Stark, Project Services Manager, Apache North Sea Paul Williams, Subsea Projects Manager, Apache

More information

Deepwater Asset Optimization using Performance Forecasting

Deepwater Asset Optimization using Performance Forecasting Deepwater Asset Optimization using Performance Forecasting PETRONAS-PETRAD-INSTOK-CCOP Deepwater Workshop Alex Tan PERFORMANCE FORECASTING 2 What is Performance Forecasting? Reliability Equipment performance

More information

FLNG in Harsh Environment - Disconnectable and Relocatable Riser System

FLNG in Harsh Environment - Disconnectable and Relocatable Riser System FLNG in Harsh Environment - Disconnectable and Relocatable Riser System 2H Offshore Engineering Overview Riser design requirements Flexible and steel riser system challenges Design features of Single Line

More information

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates

Offshore Engineering. Design, Fabrication, Installation, Hook-up and Commissioning September 2017 Dubai, United Arab Emirates Offshore Engineering Design, Fabrication, Installation, Hook-up and Commissioning 17-NOV-16 This course is Designed, Developed, and will be Delivered under ISO Quality Standards 24-28 September 2017 Dubai,

More information

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa 1 SAFER, SMARTER, GREENER Content Going Deeper Scale/Size of Deepwater Mega

More information

SBI VOL. 8 ISSUE ShipBuilding MARINE PROPULSION. EDT Jane. German Production TAILORED INNOVATION. Ndurance & Ndeavor

SBI VOL. 8 ISSUE ShipBuilding MARINE PROPULSION. EDT Jane. German Production TAILORED INNOVATION. Ndurance & Ndeavor SBI VOL. 8 ISSUE 1 2014 MARINE PROPULSION ShipBuilding i n d u s t r y EDT Jane ready to roll German Production TAILORED INNOVATION Ndurance & Ndeavor versatile twins 16 SBI 2014 Volume 8 Issue 1 www.shipbuilding-industry.eu

More information

Offshore Wind Risks - Issues and Mitigations

Offshore Wind Risks - Issues and Mitigations DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years

More information

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Bevan Morrison, VP Global Subsea Intervention Solutions Agenda Subsea well intervention introduction Economic

More information

Subsea 7 Inc. Presentation

Subsea 7 Inc. Presentation Subsea 7 Inc. Presentation Mel Fitzgerald, Chief Executive Officer, Subsea 7 Lehman Brothers - CEO Energy/Power Conference September 4, 2007 Forward looking statement Certain statements contained in this

More information

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions Lett Brønnintervensjon Hans J Lindland FMC Kongsberg Subsea Why Light Well Intervention? Reservoir recovery is significantly lower (oil) for subsea wells than for platform wells Cost for drilling units

More information

Topaz Tangaroa Multipurpose Field and ROV Support Vessel. Vessel Specifications

Topaz Tangaroa Multipurpose Field and ROV Support Vessel. Vessel Specifications Topaz Tangaroa Multipurpose Field and ROV Support Vessel Vessel Specifications Vessel Specification DP2 IMR VESSEL WITH 120T CRANE, 82 POB AND 1,000M² DECK Length overall: Breadth moulded: Depth to main

More information

INS for life of field

INS for life of field INS for life of field Mark Carter Business Development Manager : Inertial Oceanology 2012 Positioning Requirements Drilling Construction Pipe Lay IRM Decommissioning Rig DP (Dual Redundant) Site Survey

More information

Development of Floating Exploration & Production Solutions for Remote and Arctic Environments

Development of Floating Exploration & Production Solutions for Remote and Arctic Environments Development of Floating Exploration & Production Solutions for Remote and Arctic Environments Intsok Seminar Recent Advances in Offshore Technology St. John s, Canada 1 October 2014 Jan Korsnes, VP Floating

More information

HELIX ENERGY SOLUTIONS

HELIX ENERGY SOLUTIONS HELIX ENERGY SOLUTIONS OFFSHORE CAPABILITIES www.helixesg.com About Us WELL OPERATIONS SUBSEA WELL INTERVENTION PRODUCTION FACILITIES The purpose-built vessels of our Well Operations business units serve

More information

Lessons Learned From Template Installation in Harsh Environments. T.Jacobsen, T.Næss Subsea 7

Lessons Learned From Template Installation in Harsh Environments. T.Jacobsen, T.Næss Subsea 7 Lessons Learned From Template Installation in Harsh Environments T.Jacobsen, T.Næss Subsea 7 1. ABSTRACT Subsea templates are traditionally transported to the relevant installation site either on the deck

More information

Dimensional Survey Company

Dimensional Survey Company Dimensional Survey Company AnkoBluepix was founded in 2016 by experienced engineers, each a specialist within different segments of the survey business. Even though AnkoBluepix is a young company Our Mother

More information

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer Subsea Asia 2008 - Subsea Processing June 2008 Dennis Lim Senior Field Development Engineer Agenda Overview of FMC Subsea processing projects History and on-going projects Recent development within subsea

More information

Contents. 1. Brief presentation of Eni. 2. General field information. 3. Challenges pre project sanctioning. 4. Development solution

Contents. 1. Brief presentation of Eni. 2. General field information. 3. Challenges pre project sanctioning. 4. Development solution Contents 1. Brief presentation of Eni 2. General field information 3. Challenges pre project sanctioning 4. Development solution 5. Status of the project execution 6. Challenges ahead Orkangerkonferansen

More information

Table of contents TEMPORARY WORKS DESIGN BV 1

Table of contents TEMPORARY WORKS DESIGN BV 1 Table of contents Table of contents... 1 1 Company... 2 2 Overview of offshore wind design services... 3 2.1 Naval architecture: motion, stability and mooring analyses... 3 2.2 Seafastening equipment...

More information

A WORLD-LEADING SEABED-TO-SURFACE PARTNER

A WORLD-LEADING SEABED-TO-SURFACE PARTNER A WORLD-LEADING SEABED-TO-SURFACE PARTNER 4 What we do 6 Why choose Subsea 7? 7 Project management and engineering expertise 8 A selection of our key projects 10 High-quality, fully integrated offshore

More information

Company Update. Spill Containment Fast Response to GOM Subsea Oil Spills. Changing the way you succeed.

Company Update. Spill Containment Fast Response to GOM Subsea Oil Spills. Changing the way you succeed. Company Update Spill Containment Fast Response to GOM Subsea Oil Spills Changing the way you succeed. Helix Deepwater Scope of Operations Changing the way you succeed. 2 Vessel selection Working in Gulf

More information

Click to edit Master title style

Click to edit Master title style Wellhead platforms, financing schemes and contracting strategies Finding Petroleum, 21 st February 2018 Rob Gill Wellhead platforms Setting the scene Wellhead platforms worldwide Wellhead platforms in

More information

Oil and gas fields in norway Industrial Heritage plan

Oil and gas fields in norway Industrial Heritage plan survey of all the areas, fields and installations on the Norwegian continental shelf. It also describes developments in these waters since the 1960s, including why Norway was able to become an oil nation,

More information

Shell Exploration & Production. New Shell Developments in the Gulf of Mexico

Shell Exploration & Production. New Shell Developments in the Gulf of Mexico New Shell Developments in the Gulf of Mexico Shell Exploration and Production- Global Operating Model Shell Exploration & Production EP Russia EP Europe EP Americas Growth Areas EP Africa EP Middle East

More information

Pelastar TLP Floating Wind Turbine Foundation

Pelastar TLP Floating Wind Turbine Foundation Pelastar TLP Floating Wind Turbine Foundation William Hurley Glosten Associates 2017 Energy Technologies Institute LLP - Subject to notes on page 1 PRESENTED AT TEN YEARS OF INNOVATION THE ETI AND THE

More information

Brian Roberts Jim O Sullivan

Brian Roberts Jim O Sullivan Brian Roberts +33 1 47 78 25 37 +44 7710 54 92 39 brian.roberts@external.technipfmc.com Jim O Sullivan +1 281 249 7511 jim.osullivan@technipfmc.com TechnipFMC.com Copyright TechnipFMC 2017. All rights

More information

Offshore Construction Management Services. Capability & Experience

Offshore Construction Management Services. Capability & Experience Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by

More information

Subsea Capability Profile

Subsea Capability Profile Subsea Capability Profile 2009 Subsea Asia Conference 11 June 2009 1 Strength and Depth Our Company 2 Strength and Depth Who We Are Established through equal ownership between SapuraCrest Petroleum Bhd

More information

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA Dagang Zhang COTEC Offshore Engineering Solutions China Offshore Oil Engineering Company 2011 China-America Frontiers of Engineering Symposium San Diego, USA Presentation Outline Current Status of Deepwater

More information

MOBILISATION SUPPORT. Joint Competency Statement

MOBILISATION SUPPORT. Joint Competency Statement MOBILISATION SUPPORT Joint Competency Statement OVERVIEW Orca Subsea and CoreMarine have combined resources and competencies to provide a novel approach to logistical and engineering support. The venture

More information

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA Table of content 1. INTRODUCTION... 2 1.1. Purpose of document... 2 1.2. Det norske oljeselskap... 2 1.3. HSE... 2 2. ABOUT THE IVAR AASEN FIELD... 2 2.1.

More information

marine, construction, drilling, floating production, decommissioning and renewables industries.

marine, construction, drilling, floating production, decommissioning and renewables industries. Maritime Assurance & Consulting Ltd (MAC), a Bureau Veritas Group Company, is a UK-based company with a global reach, offering a comprehensive range of support services to the Dynamic Positioning Assurance

More information

Capital Marked Presentation. Dof Subsea Atlantic Region

Capital Marked Presentation. Dof Subsea Atlantic Region Capital Marked Presentation Dof Subsea Atlantic Region Agenda Atlantic Business and Area of Operation Clients & Some Ongoing Contracts Our Capabilities Market Outlook DOF Subsea 2 Atlantic Business and

More information

Engineering Procurement Construction Installation. Company Profile.

Engineering Procurement Construction Installation. Company Profile. Engineering Procurement Construction Installation Company Profile www.ariosh.com info@ariosh.com at a Glance 400+ Employees Established 1997 Engineering & Construction World Class Offices ariosh Fabrication

More information

What made Norway a deepwater hub

What made Norway a deepwater hub What made Norway a deepwater hub Technology mapping, Importance of field trials for accelerated deployment of new technology by Anders J. Steensen, Programme Coordinator, DEMO 2000 The Research Council

More information

MPF1000 Multi Purpose Floater. 24 April 2007

MPF1000 Multi Purpose Floater. 24 April 2007 MPF1000 Multi Purpose Floater 24 April 2007 MPF History & Status The Multi Purpose Floater (MPF) concept was developed over several years, with feasibility studies and technical case studies performed

More information

POWERING SUBSEA LOADS OVER LONG DISTANCES

POWERING SUBSEA LOADS OVER LONG DISTANCES Space optimiced multidirve Solutions PETRONAS - PETRAD - INTSOK CCOP DEEPWATER SUBSEA TIE-BACK POWERING SUBSEA LOADS OVER LONG DISTANCES January 26, 2011 Slide 1 Presentation Overview History Typical Subsea

More information

saipem limited Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014

saipem limited Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014 Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014 Presentation of the Removal of the Statoil 2/4 S Platforms Introduction of the Scope of Saipem Work

More information

Summary of Changes and Current Document Status

Summary of Changes and Current Document Status DNV SERVICE DOCUMENTS Summary of Changes and Current Document Status FEBRUARY 2012 FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life,

More information

Offshore Decommissioning Conference Fairmont Hotel, St Andrews 8 th October 2014

Offshore Decommissioning Conference Fairmont Hotel, St Andrews 8 th October 2014 Offshore Decommissioning Conference Fairmont Hotel, St Andrews 8 th October 2014 Delivering the Future Together Delivering The Future Together: Nigel Jenkins CEO Decom North Sea Nigel Jenkins, Chief Executive

More information

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE Project Discipline Technology Product Line TECHNOLOGY DEVELOPMENT Technology WITHIN SBM OFFSHORE TECHNOLOGY CREATING VALUE 1959 1960 1972 1973 1977 1981 1985 1985 1986 CALM Buoy Drilling Jack-up DP Drillship

More information

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible Mærsk Deliverer Ultra deepwater drilling and development semi-submersible Maersk Drilling Mærsk Deliverer TYPE DPS2/M, Column stabilised dynamically positioned semisubmersible drilling rig with capability

More information

Title of Presentation. Presenter s Name Date of Presentation

Title of Presentation. Presenter s Name Date of Presentation Title of Presentation Presenter s Name Date of Presentation Offshore Oil Production: Early Innovations 1947: Kerr-McGee goes offshore beyond piers and begins era of offshore oil and gas. Prior Ocean Energy

More information

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates Managing Offshore Field Development & Marine Asset 22-26 October 2017 Dubai, United Arab Emirates This course is Designed, Developed, and will be Delivered under ISO Quality Standards Managing Offshore

More information

Floating Systems. Capability & Experience

Floating Systems. Capability & Experience Floating Systems Capability & Experience Capability Overview INTECSEA has more than 30 years of extensive experience with all types of floating systems: TLPs, spars, monohulls and semi-submersibles. Key

More information

ROV/IMR - OFFSHORE SUPPORT VESSEL

ROV/IMR - OFFSHORE SUPPORT VESSEL ROV/IMR - OFFSHORE SUPPORT VESSEL FUJIAN MAWEI DESIGN, 86.0M X 20.0M, 100T AHC CRANE, MOONPOOL, ABS +A1 (E), SPS, DPS 2, FIFI 1, ENVIRO, OIL REC Manager NORTRANS OFFSHORE II PTE LTD Class/Notation ABS

More information

Strategic performance in the toughest environments

Strategic performance in the toughest environments Strategic performance in the toughest environments April 2016 Floating Structures a heerema company The challenges of floating structures The unique environment of deep-water offshore developments often

More information

Sponsored by. Created and produced by

Sponsored by. Created and produced by Sponsored by Diamond Sponsor Supported by Created and produced by CREATING NEW HORIZONS IN OFFSHORE ENERGY BOSKALIS OFFSHORE ENERGY- FLEET DEVELOPMENTS OFFSHORE ENERGY 2018- RAI AMSTERDAM JACK SPAAN 23

More information

Matrix Composites & Engineering Ltd

Matrix Composites & Engineering Ltd Matrix Composites & Engineering Ltd Euroz 2015 Industrials Tour 10 June 2015 Overview Introduction to Matrix Business Operations and Outlook Plant Tour 2 Introduction to Matrix WHO WE ARE AND WHAT WE DO

More information

Murchison and Beyond. John Allan Development and Decommissioning Projects Manager CNR International. Late Life and Decommissioning

Murchison and Beyond. John Allan Development and Decommissioning Projects Manager CNR International. Late Life and Decommissioning Murchison and Beyond John Allan Development and Decommissioning Projects Manager CNR International Late Life and Decommissioning Murchison Decommissioning Update John Allan Development and Decommissioning

More information