BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

Similar documents
ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

ADDENDUM #1. April 29, 2009

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

ADDENDUM NO. 4 November 15, Page 1

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

Addendum No. 1 page 1

ADDENDUM TO RFP DOCUMENTS

Answer: Only to ChurchWoods, LLC.

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

State College of Florida, Manatee-Sarasota

Bid No. B14-02 Building 100 HVAC Improvements

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

SUPPLEMENTARY INSTALLATION INSTRUCTIONS Ventilating Fan (Contractor Pack)

SECTION EQUIPMENT WIRING

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

SECTION MECHANICAL IDENTIFICATION

TO: All Recipients Date: March 20, 2015

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

M1.0 MECHNANICAL FLOOR PLAN

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

1.01 NOTICE TO BIDDERS

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.

MONROE COUNTY BOARD OF EDUCATION ABC PROJECT NO ADDENDUM NUMBER 4. Thursday, May 8, 2014

RENOVATION OF THE FARMERS MARKET Reference Number:

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

SECTION MECHANICAL IDENTIFICATION

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1

ADDENDUM NO. 1 November 10, 2016

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may disqualify Bidder.

BUILDING PLAN REVIEW REQUIREMENTS

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

ADDENDUM #2 September 12, 2018

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

ADDENDUM NO. 3. Ellis County Elections Building

744 Kent Minh, Project Engineer

SECTION PROJECT MANAGEMENT AND COORDINATION

State College Area School District

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

Addition and Renovations to Upper Bucks County Technical School

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

PROCUREMENT SERVICES th St, SW Calgary, AB T2R 0L4 Telephone: (403) Fax: (403)

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

10930 W. Sam Houston Parkway N., Suite 900

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

CHAPTER 5 ARCHITECTURE

OCPS Submittal Register for Product Data and Shop Drawing Reviews

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

SECTION PROJECT COORDINATION VIA BIM

TELEPHONE: (215) Addendum No. 1

ADDENDUM NO: 1 IFB/RFP No: NKU Commodity: Kentucky Hall Renovation Date: 12/7/2017 Due Date: 12/18/2017

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

City of Thousand Oaks

A/E REVIEW CHECKLIST HVAC

Notre Dame High Addition/Renovation Addendum 3 Page 1

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Symphony II Adaptable Table System

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

St. Monica Food Pantry

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

UNIFIED FACILITIES GUIDE SPECIFICATIONS

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

(Larry D. Svitak, PE) License No

Specifications: Other: sign in sheet

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT.

B. Manufacturers: Square-D, G.E. or Westinghosue.

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

9. Pay for the power consumed until the project has been accepted as substantially complete.

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

Addendum #1 - Bid Package #

Transcription:

HOSKINS ARCHITECTURE, LLC 1721 4 th AVENUE NORTH, SUITE 101 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 7 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE No.: 1405 DATE: AUGUST 27, 2015 TO: BIDDERS Acknowledge receipt of this Addendum by inserting its number in the Proposal Form. Failure to do so may subject Bidder to disqualification. This Addendum forms a part of the Contract Documents and modifies them as follows: GENERAL: The date for receipt of bids has been changed from a date to be determined to Wednesday, September 02, 2015 at 2pm. Bids will be received by Birmingham City Schools at the office of Edward McMullen, Director of Purchasing, 2015 Park Place North, room 202 CLARIFICATION: Question: Will you let me know if a gate is required for the fence that replaced the composite fencing? If so will the gate be rolling or swing? Response: Not required. Question: We requested information on the air piping & systems components (e.g. filter regulator, brass female coupler, etc.) referenced in Drawing Keynotes 1 4. Addendum 3 answered the part about the piping, but they still did not provide specifications for the components (filter regulator, brass female coupler, ball valves, flexible connector, etc.) in keynotes 1 4. Please provide the needed information. Response: Keynote 2 the new filter regulator, gauge, and water drain shall match the existing (field coordinate with existing equipment) HA 1405 ADDENDUM NO. 7 PAGE 1 of 4

Keynote 3 the brass female connector to be quick release type. Provide compatible male connector and flexible, braided stainless steel hose for connection to the existing equipment. Field coordinate hose length with existing equipment. Keynote 4 Provide compatible male connector and flexible, braided stainless steel hose for connection to the existing equipment. Field coordinate hose length with existing equipment. DRAWINGS: Architectural SHEET AS 003: New Work: Site Plan 1. Delete detail C1 New Brick Wall @ 1 st North Alt #1 in its entirety and replace with new detail per attached sketch A SK1 dated 2015.08.28. Mechanical SHEET M 201B: Maintenance Floor Plan 1. Provide an inline exhaust fan (equal to Cook DBX 8; 920 cfm; 1/4hp motor; 0.4 ESP; accessories: backdraft damper, belt guard, insulated housing, vibration isolators) located above the ceiling of the IBS Room with an exhaust grille (EG1) located above the air compressor in the Carpentry Shop with a 16x14 duct connected to the exhaust fan; the exhaust fan to connect to a 16x14 duct and extend to a 16x16 exhaust louver (equal to Ruskin ELF6375). Provide a transfer grille (RG2) near the south wall of the Carpentry Shop connected a 24x8 duct. 24x8 duct to be located in the above ceiling plenum space, extend over the south wall of the Carpentry shop, turn west similar to detail 8/M 002. Interlock the operation (start/stop) with RTU 1B s occupancy schedule. Electrical SHEET E 002: Lighting Fixture Schedule 1. Add Fixture S2 to the fixture schedule. Fixture shall be a surface mounted fluorescent fixture with 1 lamp, 277 Volt, 0 degree ballast, and a vandal resistant housing. Provide remote battery pack to operate lamp in fixture. Color to be selected by the architect. VISA #OW1345 1FS54 ** VR ELR or Approved Equal by Kennall. 2. Add Fixture FL1 to the fixture schedule. Fixture shall be a ground stanchion mounted flood light with 1 lamp, high power factor ballast, wide distribution, with barn doors. Fixture shall be UL listed for wet location. KIM #AFL11 100PMH DB HDS SM18 BD or Approved Equal by Hydrel and Gardco. 3. Add the following Manufacturers as Approved Equals for the following Fixtures: Fixture Type Manufacturer P1 / P1E P2 R2 R4 / R4E R5 R7 HA 1405 ADDENDUM NO. 7 PAGE 2 of 4

R8 R9 S2 W1 X1 X2 G Lighting Isolite, Exitronix Isolite, Exitronix SHEET E 003: Electrical Details 1. Add Electrical Nameplate Detail to the drawing. See attached Supplemental Drawing E SK1. SHEET E 004: Single Line Diagram 1. Revise General Note A to read as follows: All new and existing panel boards requiring modification shall be field marked to warn qualified persons od potential arch flash hazards per NEC 110.6. SHEET E 102: Enlarged Entry Plaza Electrical 1. Delete Plan Note #3. SHEET E 201: Overall Building B Floor Plan Demolition 1. Add Fixture Type S2, relocate existing light indicated by Note 13, and add Plan Note #13 and #19. See Supplemental Drawings E SK7 and E SK8. SHEET E 301 A.1 Maintenance & Transportation Floor Plan Lighting 1. Revise Lighting Layout in Maintenance and Transportation Parts area. See Supplemental Drawing E SK2. 2. Added Occupancy Sensors in Bus Driver Waiting. See Supplemental Drawing E SK2. 3. Change Note 1 to Note 3 in Men s 01, Women s 01, Jan 01, and Storage 01. SHEET E 301 A.2 Maintenance & Transportation Floor Plan Power 1. Delete Equipment Connections and Plan Notes Referenced by Plan Notes #6, #7, #8, #9, #10, and #11. Required Equipment Connections have been removed from the scope of work. SHEET E 301 A.3 Maintenance & Transportation Floor Plan Auxiliary 1. Add connections to motorized roll up doors. See Supplemental Drawing E SK3. 2. Delete Plan Note #2. Note is not used. SHEET E 302 B.1 Building B Partial Floor Plan Lighting 1. Add directional chevron pointing towards Corridor B.4 to exit sign at the intersection of Corridor B.3 and B.4. 2. Add Exit Sign X2 at north end of Corridor B.3 adjacent to Fixture R8. 3. Add Fixture FL1 and Plan Notes #9 and #10. Fixture shall illuminate building mounted signage. See Supplemental Drawing E SK4. SHEET E 302 B.3 Building B Partial Floor Plan Auxiliary 1. Add door security rough in at exterior door from Corridor B.4. See Supplemental Drawing E SK5. 2. Change Note 4 to Note 6 in Carpentry Shop Area. See Supplemental Drawing E SK5. 3. Add connection to Exhaust Fan and Plan Note #7 in Instructional Broadcasting Services room. See Supplemental Drawing E SK5. HA 1405 ADDENDUM NO. 7 PAGE 3 of 4

SHEET E 401 B.1 Building B Partial Floor Plan Alternate #1 Lighting 1. Change reference from Panel LP1 to Panel LP3 at Plan Note #1. 2. Add Plan Note 5. Note to read as follows: Existing wall mounted flood light to remain. Electrical contractor to repair, clean, and re lamp fixture as required. 3. Add fixture XD at exterior door of Corridor B.1. Connect to exit sign with 2#12, 1#12G 3/4 C. SHEET E 402 B.1 Building B Partial Floor Plan Alternate #2 Lighting 1. Add exit sign at south end exterior door. See Supplemental Drawing E SK6. 2. Add exit discharge light XD at north end of exit corridor. Connect to exit sign with 2#12, 1#12G 3/4 C. SHEET E 402 B.2 Building B Partial Floor Plan Alternate #2 Power 1. Change one (1) duplex receptacle serving refrigerator in Science area to a GFCI type. 2. Add door security rough in at north end of Science Prep Storage Palette area. Drawing Attachments: Architectural Drawings: SKETCH A SK1 dated 2015.08.28 Electrical Drawings: SKETCH E SK1, E SK2, E SK3, E SK4, E SK5, E SK6, E SK7 and E SK8 dated 2015.08.28 END OF ADDENDUM NO. 7 HA 1405 ADDENDUM NO. 7 PAGE 4 of 4