PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

VISTA DEL PARAISO LOT 7 SPEC BY:

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

PL-3 1,6. PL-2 or PL-3 1,2,3,6,7. PL-1, PL-4 or NS-1. PL-1 or PL-2. PL-1 or PL-4 PT-1 1,2,3,6,11 PT-1 NS-1 PL-3 ACT-1 WF CB-1

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

Bovard Studios Inc. Section April 6, 2004 Page 1

VISTA DEL PARAISO 2515 LOT 2 SPEC SPEC BY:

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

16 JUL 2013 Project #:

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Kevin O'Connor Design Kevin O'Connor CKD, CBD, CID

CHAPTER 5 ARCHITECTURE

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

A101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN

HOENER ASSOCIATES INC. ARCHITECTS

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

Punch List Checklist EXTERIOR LANDSCAPING. COMMON LIVING SPACES and HALLS

DRAFT FOR INTERNAL DISCUSSION ONLY

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

Inclusions Brochure Stages 3 and 4

Quote Request Form Solar Innovations, Inc. Folding Glass Wall Unit Please fax to or Form Completed By:

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

BASEBALL PLAYER FACILITIES CLEMSON, SOUTH CAROLINA

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

Single-Family Dwelling Submittal Requirements

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

SECOND FLOOR 960 sq. ft.


FLOOR PLAN FLOOR PLAN: UNIT B. Unit B. First Floor. 2 Bed / 2 Bath 1,310 sf + 68 sf balcony

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SECTION WOOD DOORS

"Live...Work...Play With Your Toes Exposed!" LOCATION MAP REVISION ISSUE LOG OWNER & CONSULTANTS MECHANICAL, & ELECTRICAL ENGINEER

222 Edgewood Crescent (Strata Lot 48) The Sequoia. 226 Edgewood Crescent (Strata Lot 49) The Douglas

Elite. PLANNING GUIDE builder & architect edition. AmeriGlide Accessibility Solutions RESIDENTIAL ELEVATOR. ASME A17.1, Part V, Section 5.

PLAN SUBMITTAL REQUIREMENTS

SLIDING DOOR SYSTEM_ S34 PRODUCT LIST. System description Accessories

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

SECOND FLOOR 832 sq. ft.

1. Name the horizontal member that rests on the foundation wall to support other wood members.

Installation Instruction 3-D Model 3D 03/01/17. 0 Flush Siding Horizontal System N/C WPS, Inc.

Project No: Date: 02 September To: The Des Plaines Public Library Issued by: Lisa Schmidt

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

ACME 50 Application Guide

Hall of Waters List of Historic Drawings

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

Raydoor designs and manufactures beautifully innovative interior dividing solutions. Our products are a result of 12+ years dedicated to pursuing the

1907 Grayson Street North Charleston, SC TMS: FRANKLIN DESIGN

SECOND FLOOR 1159 sq. ft.

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Patterson Sauna Installation & Owner s Manual

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

The School District of Palm Beach County Project Name SDPBC Project No. SECTION ( ) SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS

St. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

Grade Level Benchmarks and Components

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

National Association of Women in Construction Education Foundation CADIDESIGNIDRAFTING COMPETITION HIGH SCHOOL STUDENTS

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

*********************************************************************************************************

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

YES 45 TU Thermal Storefront System Installation Manual

실내디자인스튜디오 1. 11Elevation

SPORT MAT FLOORING. The Rubber Surfacing Specialists. FITNESS CENTERS ICE ARENAS GOLF COURSES SKI RESORTS RECREATION FACILITIES

Cabinet Planning Guide

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

in Midtown EXCEL HOMES LOCKEPORT SECOND FLOOR 762 sq. ft. MAIN FLOOR 762 sq. ft. LANED DUPLEX TWO STOREY excelhomes.ca Nook 12'11" x 9'0"

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative.

Material List for Log Complete Packages

Revision Date: April 01, Paramount Enclosure

Staybridge Suites Standardized Room Decor Vista, Spice, Chocolate, Sage Schemes Guestroom

FACILITIES MANAGEMENT. AutoCAD Guidelines & Standards May 2015

Space #2: Science Room 1

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE

Photos feature Avenue One Sidewalk 18" x 18" on the floor and Legacy Glass Celedon 1" x 1" Mosaic shown on the wall. Cover photo features Avenue One

SECTION SIGNAGE

Introducing Main Street by Crossville Essential line provides excellent design foundation

Transcription:

ARCHITECT S SUPPLEMENTAL INSTRUCTIONS PROJECT: OWNER: Brookridge golf // fitness 8338 W. 103 St. Overland Park, KS Scott Claster brookridge golf // fitness c (913) 271-7712 Scott.Claster@brookridgegf.com ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 14 DATE OF ISSUANCE: 01/13/11 CONTRACT FOR: ARCHITECTS PROJECT NO.: General Construction 10013 TO: Chris Martin Project Manager McCownGordon Construction d (816) 877-0663 m (816) 365-0314 cmartin@mccowngordon.com ARCHITECT: Ken Kleffner Guy Gronberg Architects, P.C. 113 SE 3 rd St. Lee s Summit, MO 64063 (816) 524-0878 ken@guygronberg.com The work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. If a change in the Contract Sum or Contract Time is justified contractor shall submit a Change Order for approval prior to proceeding with the work. Description: The following modifications are to be made; 1. Bar has been updated. Plumbing for bar to be issued at later date. 2. Finishes for Bar added to finish legend of finish schedule attached. 3. Moved south wall of Office 104 south 2-0. 4. Added insulation, drywall and ceiling in Storage 105 and Copy 106. 5. Added door opening 105. 6. Deleted south door to storage 157. 7. Changed opening 143 back to a pair of doors exiting west. 8. Added power to televisions per previous architectural ASI. 9. Added power and data layout for fitness room and mech and storage areas. 10. Added fire rated poke thru flush service for 2nd row of exercise equipment 11. Added power/data along south wall of fitness. Indicated devices to be mounted in switch boxes horizontally on front vertical face with extension for mounting with carpet installation. 12. RTU-1 changed from a 40 amp breaker to a 35 amp breaker. 40 amp breaker is adequate if existing fusing at disconnect at rooftop unit is correct. 13. Added light fixture type N and control to copy 106 14. Added two light fixture type A3 and control to storage 105 15. Removed fixture type B2-EM at entry and added two type EM3 emergency lights (exterior emergency light to be selected) 16. Removed light fixture type B3-EM in lounge and added type EM emergency light 17. Relocated light fixture type EM2 to west side of lobby, mounted on soffit. 18. Add 2 light fixture type U and control to mech 141 19. Removed fluorescent and LED lighting from bar 110. Type T specification and quantity of fixtures revised. 20. Replacement fluorescent strips type DD in existing panel ceiling has been revised to indicate as a dimmed circuit. 21. Added Exit type X and two type EM emergency lights at desk 115 Continued on next page

INTERIOR FINISH SCHEDULE & SPECIFICATIONS Project: Hawks Ridge Architect: Guy Gronberg Architects, PC Date Issued: 11.18.2010 Date Revised: 1.13.2011 Debbie Morrissey, Arch Companies 913-599-5565 Finish: Contract Merchandising Specialists, Inc. 913-492-9232 Walls Room # Floor Base N S E W Laminates Notes 100 Lobby TL1/ TL1-A TB1 Bench Top: QZ-4 Planter Interior: PL-3 101 Check-In CP1 RB4 Transaction Top: QZ-4 Work Top: PL-4 102 Hall CP1 RB4 103 Office CP2 RB5 104 Office CP2 RB5 105 Storage CP2 RB5 106 Copy CP1 RB4 107 Flex Space CP1 RB4 108 Restaurant CP1 RB4 109 Deck EX1-110 Bar SC1* RB4 TBD *Continue Epoxy South of Bar to Extend to Vestibule 111 111 Vestibule SC1 RB5 112 Ante EX1-113 Closet EX1-114 Storage EX1-115 Desk CP3 RB4 116 Cardio CP3 RB4 117 Fitness Center CP3/ TL3/ RBT1 RB4/ TB5 118 Spin Classroom CP3 RB4 119 West Fitness CP3 RB4 1

INTERIOR FINISH SCHEDULE & SPECIFICATIONS Project: Hawks Ridge Architect: Guy Gronberg Architects, PC Date Issued: 11.18.2010 Date Revised: 1.13.2011 Debbie Morrissey, Arch Companies 913-599-5565 Finish: Contract Merchandising Specialists, Inc. 913-492-9232 Walls Room # Floor Base N S E W Laminates Notes 120 Storage EX1 EX1 121 Mechanical/Janitor EX1-122 Storage CP3 RB5 123 Fitness Classroom WF2 RB4 124 Men s Vestibule TL3 TB5 125 Men s Lounge CP3 RB4 Carpet tile to have special adhesive 126 Men s Lockers CP3/ TL3/ RB4/ TB3/ Counters: QZ-2 Laundry Counters: QZ-3 Carpet tile to have special adhesive TL1-A TB1 127 Men s Toilet TL3 TB3 128 Men s Showers TL3/ TB3/ Shower Sills: QZ-1 TL4 TB4 129 Men s Steam TL4 TB4 130 Men s Sauna SC1 CB1 131 Hall TL3 TB3 132 Women s Showers TL3/ TB3/ Shower Sills: QZ-1 TL4 TB4 133 Women s Steam TL4 TB4 134 Women s Sauna SC1 CB1 135 Women s Lockers CP3/ TL3/ TL1-A RB4/ TB3/ TB1 136 Women s Toilet TL3 TB3 Counters: QZ-2 Laundry Counters: QZ-3 Carpet tile to have special adhesive 2

INTERIOR FINISH SCHEDULE & SPECIFICATIONS Project: Hawks Ridge Architect: Guy Gronberg Architects, PC Date Issued: 11.18.2010 Date Revised: 1.13.2011 Debbie Morrissey, Arch Companies 913-599-5565 Finish: Contract Merchandising Specialists, Inc. 913-492-9232 Walls Room # Floor Base N S E W Laminates Notes 137 Women s Lounge CP3 RB4 Carpet tile to have special adhesive 138 Women s Vestibule TL3 TB5 139 Open Office CP2 RB5 Counters: PL-5 140 Lounge CP1 RB4 Planter Interior: PL-3 141 Mechanical EX1-142 Locker Hall TL1/ TB1 TL1A 143 Grand Hall TL1/ TB1 TL1A 144 Main Stair TL1/ TB1 Cap: QZ-3 TL1-A 145 Mechanical EX1 146 Family Changing TL3 TB3 Counter: QZ-2 147 Closet CP3 RB5 148 Electrical EX1 RB4 149 Office CP3 RB4 150 Kitchen EX1-151 Ante SC1 RB5 152 Office EX1-153 Boardroom CP4 RB4 154 Storage EX1-155 Closet CP1 RB5 156 Server CP1 RB5 157 Storage CP3 RB5 3

MATERIALS: NOTE: NO SUBSTITUTIONS FOR ANY MATERIALS WITHOUT APPROVAL OF OWNER. Flooring EX1: Existing to Remain SC1: Epoxy Floor Finish per Architects Drawing, Color: CP1: Atlas Carpet Mills Broadloom, Carpet Pattern: Sketch, Custom Multi-Tuft, Color: #CMT-261553 CP2: Atlas Popolo LP07 Wind Rock Broadloom Carpet CP3: Milliken Eco360 Star Net Carpet Squares, Pattern: P6721 Links, Color: #501 Birch Bark WF2: Wood Floor TL1: Flor Greis Porcelain Tile, Pattern: Globe/1.0, Size: 23 5/8 X 23 5/8, Finish: Natural, Color: Gray Grout: TEC AccucolorXT 903 Birch TL1-A: Flor Greis Porcelain Tile, Pattern: Globe/1.0, Size: 23 5/8 X 23 5/8, Finish: Polished, Color: Gray Grout: TEC AccucolorXT 903 Birch TL3: American Olean Porcelain Tile, Pattern: St. Germain, Size: 24 X 24, Color: SE67 Gris (Do Not Quarter Turn) Grout: TEC AccucolorXT 933 Standard Gray TL4: American Olean Collection Mosaic, Size 2 X 2, Color: Light Smoke #A43, Unglazed Grout: TEC AccucolorXT 933 Standard Gray RBT1: Rubber Tile: Capri Cork #RT4007 Moon Rocks, 9mm thickness, 36 X 36 Tiles Base Note: All Base to be Confirmed RB4: Johnsonite Millwork Base, Pattern: Mandalay, Color: #63 Burnt Umber (Provide Matching Quarter Round at WF2) 4

RB5: Johnsonite Rubber Base 4 Cove Base, Continuous Coil, Color: #63 Burnt Umber TB1: Large Format Tile (TL1) cut down to 6 height and capped with Schluter Schein Aluminum Edge TB2: Large Format Tile (TL2) cut down to 6 height and capped with Schluter Schein Aluminum Edge TB3: American Olean Porcelain Cove Base to match, Size: 4 ¼ X 8 ½, Color: Designer White #0061 TB4: American Olean 2 X 2 Coved Ceramic Tile to match TL4 TB5: Large Format Tile (TL3) cut down to 6 height and capped with Schluter Schein Aluminum Edge CB1: ¾ x 1½ cedar trim per detail 5/A14. Wall Finishes WT1: American Olean Urban Canvas 4 ¼ X 8 ½, Color: Designer White #0061, Provide Bullnose Tile per Evaluation Grout: TEC AccucolorXT 931 Standard White WT2: American Olean Urban Canvas 4 ¼ X 8 ½, Color: Matte Light Smoke #0004, Provide Bullnose Tile per Evaluation Grout: TEC AccucolorXT 931 Standard White WT3: Canvas Black 6 1/2" x 19 1/4" glazed rectified tile (This comes from Central States.) To be placed horizontally stacked bond on the bar face with the smallest possible grout joint. ST1: Clear Stain on Douglas Fir ST2: Sherwin Williams #SW3135 New Ebony on Douglas Fir Submit Sample for Approval ST3: Custom Stain on Oak to match lockers Submit Sample for Approval Laminates/Solid Surfaces QZ-1: Caesarstone #2141 Blizzard 5

QZ-2: Caesarstone #9260 QZ-3: Caesarstone #4120 Raven QZ-4: Silestone Mountain Mist #08 QZ-5: Cambria "Durham" #2240 PL-1: Wilsonart #6281-419 Satin Brushed Smoke PL-3: Wilsonart #1595-60 Black PL-4: Wilsonart #D96-60 Shadow PL-5: Wilsonart #4783-60 White Tigris PL-6: Wilsonart #6315 Silver Array. This has a linear pattern to run horizontally. Additional Notes 1. Flooring Flooring contractor to seal grout at completion of job All porcelain to carpet transitions to have Schluter satin aluminum trim flush with face of tile All carpet to VCT/sheet vinyl transitions to have rubber transition trim to match B4 base All carpet seams to be sealed to prevent edge ravel Please note flooring diagram for placement and direction 6

22. Added light fixture type A at desk 115. 23. Relocated controls from office 155 to behind fitness desk. 24. Added light fixture type U and control to Elec 148 25. Added 2 light fixture type U and control to storage 157 26. Added 2 light fixture type U and control to mech 121 27. Added light fixture type U and control to storage 120 28. Added power and data to storage 105 and copy 106 29. Added power and data at bar 110 30. Added 2 type N light fixtures to and control to vestibule 124 31. Added type N light fixture to men s locker 32. Added light fixture type N to men s showers. 33. HVAC revised in storage 105 Reference Drawings: A3, A4, A5, A9, A10, E1, E2, E3, E4, and M1 ISSUED BY: Guy Gronberg Architects, P.C. BY Kenneth J. Kleffner