ORP-R1 Mini/Regular: Basic / J-Connection / M-Connection

Size: px
Start display at page:

Download "ORP-R1 Mini/Regular: Basic / J-Connection / M-Connection"

Transcription

1 ORP-R1 Mini/Regular: Basic / / Construction Manual Thank you for purchasing our product. The indication symbols in this construction manual are for you to construct the product safely and properly and also to protect the owner etc. from damage. Be sure to understand the meaning of each indication symbol and act in accordance with this manual (its instructions). In this construction manual, the following symbols are used. Warning * If not followed, the user may suffer a minor / moderate injury or property damage may occur. Matters you should take particular care with during the construction process. If not followed, construction will fail or failure may occur after the product is constructed. Matters to be noted related to the contents of construction instructions (each instruction). Conditions where limitations apply to construction instructions. Helpful tips complementing construction instructions. * Observe the following items to prevent personal injury or property damage due to damage or collapse of the product. <Before Construction> Warning Constructing the product may be dangerous. Be sure to have a professional contractor construct the product. This product is a simplified carport. Do not carelessly modify or rebuild the product in order to convert it into storage space, playing space or residential space. Do not construct the product in a place where snowfall (fresh snow) of more than 20 cm may happen. Place the product where snow will not slide off the roof of the house directly onto the product. Do not construct the product on a cliff, a roof or in any other place with strong winds. Do not construct the product in a place where waste heat from a hot-water heater or a heating apparatus will build up inside the product. Toxicosis may occur due to exhaust. If constructing the product on a slope, ensure sufficient embedding depth on the lower side. If constructing products of different sizes simultaneously in the same place, be sure not to mix components of each product in order to preserve the original performance. Be sure to read this construction manual before construction for proper construction and assembly. Be sure to construct the product by following this construction manual. Check if all the required components and parts are provided by referring to the package details. Make sure that the product is constructed where waste heat from a hot-water heater or a heating apparatus will not contact the product. Coating deterioration / exfoliation may occur due to exhaust. Check if the product properly fits the size of the construction place. -1-

2 <About Foundation Construction> For cold places where the subsoil may be frozen, build the foundations deeper than the frost line. Otherwise, strength degradation may occur. Be sure to lay crushed stones on the foundations and make water draining holes ( 6) at the base of the pillars and foundations for water drainage inside the pillars. Otherwise the water inside the pillars may freeze and expand, causing damage to the pillars. Do not apply sand containing salt (sea sand) or chlorine-based strongly alkaline concrete admixtures (anti-freezing agents, curing accelerators, accelerators, etc.) to mortar or concrete. Otherwise, metal such as aluminum may be corroded. If required, use chlorine-free or non-alkaline admixtures. Warning If substances such as mortar or concrete have adhered to the product surface, quickly wipe them away. Otherwise the product appearance may be affected with stains or blotches. <Warnings During Construction> If a water pipe is mounted to the pillar labeled "Warnings for Use", it will hide the label and the warnings will not be provided properly. Use on the side where water pipes are not mounted. If aluminum products contact metal other than zinc or stainless steel, implement insulation. Do not modify the product or make holes other than on the specified points. Seal the specified points in order to prevent water leakage. If using silicone sealant, use our specified dealcoholized sealant in order to avoid failure such as cracks in polycarbonate boards. In order to prevent product strength degradation or injury, use the specified number of our genuine bolts and screws and make sure that there is no looseness after fixing them at the following recommended torque. * 4 Screws: 2.5 N m ± 0.5 N m (25 ± 5 kgf cm) * 5 Screws: 3.0 N m ± 0.5 N m (30 ± 5 kgf cm) Warning Sealant Manufacturer Shin-Etsu Chemical Co., Ltd. Momentive Performance Materials Japan LLC Toray / Dow Corning Corporation * M8 Bolts: 20.0N m ± 0.5 N m (200 ± 5 kgf cm) Product Name and Number Sealant 72 TOSSEAL 380 SE960 Work safely during construction. * Wear working clothes properly (safety helmets, safety belts and protective equipment for eyes, hands and feet). * Keep the workplace tidy and ensure safety. Ensuring safety for high place work, preventing collapse, keeping enough illuminance with lighting, etc. are especially important. * Check the functions of equipment, tools, protective equipment, etc. before using them. * Consider each work and process while proceeding with construction. Work which requires a license, skill training or special education must only be done by a qualified person. * Workers should confirm one another's safety. Be sure to check the health of each worker and maintain health management. * If an accident should happen, immediately provide first aid and prioritize rescue over anything else. Remove stains on the product surface. If the product surface is damaged by mistake, repair it with repairing coating. <After Construction> Warning Retighten the bolts and nuts. Give the installation manual to the owner. -2-

3 INDEX Indication Symbols... 3 Construction Process... 3 Package Details... 4 Part Names... 6 Construction of Basic Type... 7 Basic Items to Check Checking Foundation Dimensions Preparation for Pillar Construction Constructing Pillars and Beams Processing Components Mounting Roof Purlins / s Mounting s Mounting Side Frames Checking Diagonal Dimensions Mounting Roof Rafters Mounting PC Roof Panels Mounting Side Frame Covers / Roof Rafter Covers Mounting Water Pipes Construction of Type Items to Check for (L22 / L29) Items to Check for (L50) Processing Connection Part Mounting Components Construction of Type Items to Check for Mounting Connection Part Mounting Connection Ridgepoles Mounting Edge Caps Mounting MY-Connection Covers Indication Symbols Independent Foundations Concrete Slabs on Grade Pillar Moving Snow Wind Optional For Construction with Independent Foundations For Construction with Concrete Slabs on Grade For Construction by Moving Pillar Position For Constructing For Constructing "" For Snow Resistant Construction For Wind Resistant Construction Optional Product Point Construction Process Preparation for Pillar Construction Mounting Brackets and Beams Mounting Caps and Pillar-Beam Covers Marking Foundation Position Mounting s / Mounting Front / 5 Roof Purlins / s 6 Mounting Side Frames Corner Caps 7 8 Checking Diagonals Mounting Roof Rafters Mounting PC Roof Panels / 9 10 Roof Rafter Covers 11 Mounting Water Pipes -3-

4 Package Details * Check if all the required components and parts are provided by referring to the package details prior to construction. [1] Pillar Set Required Quantity Name Sketch 2 Included [7] Parts Set Required Quantity Name Sketch W21 W24 / 27 W30 L22 / 29 L50 L50 Pillar 2 Corner Cap R [2] Bracket Set Required Quantity Name Sketch 2 Included Corner Cap L Bracket 2 Corner Cap R [3] Beam Set Required Quantity Name Sketch 2 Included Corner Cap L Beam 2 Beam Cap [4] Length Set Required Quantity Name Sketch W21 W24 / 27 W30 L22 / 29 L50 L50 Pillar Cap Pillar-Beam Cover Anchor Stick 8 x Roof Purlin Water Pipe 40 L = [5] Width Set Required Quantity Name Sketch 2 Included 3 Included 6 Included Side Frame Side Frame Cover 1 Each for Right and Left 1 Each for Right and Left 1 Each for Right and Left Hole Hiding Sticker Rainwater Pipe Attachment Rainwater Pipe Hole Cover Cap Rainwater Pipe Packing Drain Elbow for Elbow for Rainwater Pipe Holder Adhesive Roof Rafter Panel Cushion Roof Rafter Cover [6] PC Roof Panel Set Required Quantity Name Sketch 3 Included 4 Included PC Roof Panel 3 4 [7-1] M8 x 20 Hex Bolt (with Plain Washer and Loosening Prevention) Self-Tapping Truss Head Screw Class 3 [7-3] 4 x 13 Pan Head Self Drilling Screw Construction Manual (D622) Installation Manual (UD127)

5 [8] Water Pipe Set Required Quantity Name Sketch L = 3 [14] Parts Set Name Sketch Required Quantity Water Pipe 40 1 MY-Connection Cover for R 1 [9] Roof Purlin Reinforcement Set Optional Required Name Sketch Quantity Mounting Bracket for R 1 Roof Purlin Reinforcement (L = 1500) 2 [14-1] 4 x 13 Pan Head Self Drilling Screw 4 [9-1] 5 x 13 Pan Head Self Drilling Screw 8 [10] Connection Component Set Required Quantity Name Sketch W21 W24 27 W30 Sleeve Sleeve [15] Drain Elbow Set Optional Name Sketch Drain Elbow for 40 [16] Elbow Set Optional Name Sketch 92 Elbow for 40 Required Quantity 1 Required Quantity 1 Roof Purlin Sleeve [10-1] 4 x 13 Pan Head Self Drilling Screw [11] Connection Width Set Required Quantity Name Sketch 3 Included 4 Included 7 Included [17] Rainwater Pipe Holder Set Optional Name Sketch Rainwater Pipe Holder Required Quantity [17-1] 4 x 13 Pan Head Self Drilling Screw 2 2 Roof Rafter [18] Rainwater Pipe Attachment Set Optional Name Sketch Required Quantity Roof Rafter Cover [12] Parts Set Required Quantity Name Sketch L22 / 29 L50 Beam Connecting Fitting for R 4 4 Edge Cap for R Fixing Fitting for R Beam Spacer 8 8 [12-1] M8 x 80 Hex Bolt [12-2] M8 Hex Self-Lock Nut [12-3] Plain Washer for M8 [12-4] 4 x 13 Pan Head Self Drilling Screw [12-5] 4 x 20 Self-Tapping Truss Head Screw Class Rainwater Pipe Attachment Rainwater Pipe Hole Cover Cap Rainwater Pipe Packing 2 [18-1] 5 x 12 Self-Tapping Truss Head Screw Class 3 [19] PC Roof Panel Holder Set Optional Required Quantity Mini Regular Name Sketch L22 L29 L50 Panel Stopper PC Roof Panel Holder Spacer [19-1] 5 x 13 Pan Head Self Drilling Screw PC Roof Panel Holder Mounting Manual (D614) [13] MY-Connection Ridgepole Set Name Sketch Required Quantity M/Y-Connection Ridgepole 1-5-

6 Part Names Corner Cap R [Part Number] Self-Tapping Truss Head Screw Class 3 Corner Cap R [Part Number] Panel Cushion Roof Purlin Self-Tapping Truss Head Screw Class 3 Roof Rafter Cover Roof Rafter PC Roof Panel Beam Attachment Packing Rainwater Pipe Hole Cover Cap Self-Tapping Truss Head Screw Class 3 Pillar PC Roof Panel Receiver "Warnings for Use" Label 92 Elbow Anchor Stick Water Pipe Corner Cap L [Part Number] Attachment Packing Rainwater Pipe Attachment Drain Elbow [7-3] 4 x 13 Pan Head Self Drilling Screw Corner Cap L [Part Number] Side Frame Side Frame Cover Rainwater Pipe Holder 92 Elbow Beam Cap Pillar Cap Beam Bracket [7-1] M8 x 20 Hex Bolt (with Plain Washer and Loosening Prevention) Pillar-Beam Cover Pillar -6-

7 Construction of Basic Type Basic Items to Check Drawing Warning For [Pillar Moving], move the pillar within ± mm of the Pillar Moving pillar core-to-core distance dimensions. W1 P.16 P.21 Be sure to lay crushed stones so that the water inside the pillars can be drained. [For L22/L29] For the foundation dimensions of [] and [], refer to this page and relevant pages. L3 [For Long Pillars] Add 364 to the H dimension for W21 and 400 to the H dimension for W24 ~ W30. L1 L2 [Pillar Core-to-Core] A [Roof Rafter Core-to-Core] L3 H H1 H2 GL W2 Foundation Concrete Crushed Stones GL L3 * Pillar Moving Impossible GL Foundation Concrete Crushed Stones 90 Size (Width) W1 W2 H H1 H2 Size (Length) L1 L2 L3 Mini W L W Mini Regular W L W Regular L A This symbol indicates the [Pillar Moving] range. Marking Foundations (1) Determine the embedding position for pillars and then dig foundation holes. W1 DL Refer to the table below on this page for foundation dimensions (DH / DW / DL). DW Carport Main Unit Outer Line L3 L2 L3 L1 1 Checking Foundation Dimensions (*1) is the dimension between the pillar core and the foundation edge on the rear side of the foundation. Size DW DL DH W W W W (1) Check the foundation hole dimensions. For [Construction with Independent Independent Foundations Foundations] DW 300 DH (*1) Side DL Crushed Stones Pillar Side Also refer to the foundation dimensions on this page for [] and []. For [Construction with Concrete Slabs Concrete Slabs on Grade on Grade] 50 DL Side DW The edge distance between the top of the foundation and the concrete slabs on grade must be 200 mm or more. or More Concrete Slabs on Grade Pillar Foundation Concrete Crushed Stones 50 DH Side 200 or More GL Pillar Rebar Lay rebar. Size DW DL DH W W W W

8 2 Preparation for Pillar Construction (1) Insert an anchor stick to the pillar. (2) Make a 6 water drain hole near the G.L. of the pillar (aboveground). [When Constructing Pillars] Construct the pillar so that the "Warnings for Use" label will not be hidden by the water pipe. Warning The pillar may be damaged if there is no water drain hole. Anchor Stick Pillar Level GL 15 Check if the pillar is vertical. 6 Water Drain Hole Crushed Stones 3 Constructing Pillars and Beams 1 Mounting Brackets and Beams (1) Insert a bracket to the pillar and mount it with [7-1]. (2) Insert a beam to the bracket and mount it with [7-1]. Bracket Do not "loosen or tighten" bolts after the loosening prevention agent has cured. Bolts may become easy to loosen. (Cures in about 24 hours after tightening. [7-1] M8 x 20 [7-1] M8 x 20 Hex Bolt (with Plain Washer and Loosening Prevention) Pillar Hex Bolt (with Plain Washer and Loosening Prevention) Bracket Beam -8-

9 2 Mounting Caps / Pillar-Beam Covers P.22 For [], also refer to page 22 prior to work. During this step, pillar caps or pillar-beam covers are slightly unsteady. (1) Put a pillar cap on the pillar. (2) Fit a pillar-beam cover into the notch on the pillar. (3) Mount the pillar-beam cover to the pillar cap with [7-2]. (4) Fill a beam cap with sealant and then put it on the beam. Pillar Cap Pillar Self-Tapping Truss Head Screw Class 3 View from A Beam Cap A Spread Pillar-Beam Cover Press them together Beam Cap Hook Pillar Cap Self-Tapping Truss Head Screw Class 3 Rotate Press them together Spread Pillar-Beam Cover 4 Processing Components For Pillar Moving (processing components to be mounted on moved pillars or beams) Pillar Moving Distance Pillar Moving (1) Process holes on the component. (2) Cover the existing holes with hole hiding stickers. Existing Hole Work required for [Pillar Moving]. 5.5 Additionally Processed Hole Pillar Moving Distance [] 5.5 Processed Hole [Roof Purlin] Pillar Moving Distance 36 Hole Hiding Stickers Rear Frame 5.5 Processed Hole [] 36 Roof Purlin Processed Hole 36

10 For Wind Resistant Construction (processing holes for additional reinforcement screws) Wind Work required for [Wind ]. Process holes on all roof purlins. (1) Process holes on the component. [Roof Purlin] For [W24] and [W30], process 4.5 pilot holes also in the bracket. [] Processed Hole Bracket 4.5 Processed Hole [Beam] 4.5 Processed Hole (Roof Purlin Part) 5.5 Processed 18 Hole 4.5 Processed Hole (Front Frame Part) 18 For Wind or Snow (mounting roof purlin reinforcement) Wind Snow Work required for [Wind ] or [Snow ]. (1) Process 5.5 additional holes on the side of the roof purlin. (8 points) (2) Process 4.5 additional holes on the side of the roof purlin reinforcement. (1 point on each) (3) Insert the roof purlin reinforcement into the roof purlin and mount it with [9-1]. P.18 Refer to page 18 for processing and mounting [J-connection] roof purlin reinforcement. Process holes on the side of the fin side. [Roof Purlin] Fin [Roof Purlin Reinforcement] Processed Hole (8 Points) 4.5 Processed Hole [Roof Purlin Reinforcement] 4.5 Processed Hole Total Length of Roof Purlin Reinforcement: Total Length of Roof Purlin Reinforcement: 1500 Roof Purlin Reinforcement Roof Purlin Roof Purlin Reinforcement [9-1] 5 x 13 Pan Head Self Drilling Screw

11 5 Mounting Roof Purlins / s P.19 For [], also refer to page 19 prior to work. (1) Mount a rear frame to the bracket with [7-2]. (2) Affix a panel cushion to the roof purlin. (3) Mount the roof purlin to the beam with [7-2]. Move the PC roof panel receiver to the position shown in the figure below. Center Wind Between Notches Work required for [Wind ]. Additionally fix to the roof purlin and beam with [19-1]. Self-Tapping Truss Head Screw Class 3 [19-1] 5 x 13 Pan Head Self Drilling Screw Self-Tapping Truss Head Screw Class 3 PC Roof Panel Receiver Panel Cushion Affix the panel cushion to the position shown in the figure below. Panel Cushion Between Holes Between Holes Self-Tapping Truss Head Screw Class 3 Bracket Roof Purlin Panel Cushion Roof Purlin Center Roof Purlin Direct the fin on the roof purlin to the front frame side. Beam Fin Side Side 6 Mounting s P.19 For [], also refer to page 19 prior to work. (1) Mount the front frame to the beam with [7-2]. Self-Tapping Truss Head Screw Class 3 Wind Work required for [Wind ]. Beam Additionally fix to the front frame and beam with [19-1]. Self-Tapping Truss Head Screw Class 3 [19-1] 5 x 13 Pan Head Self Drilling Screw -11-

12 7 Mounting Side Frames 1 Mounting Front / Corner Caps (1) Fill corner caps with sealant. (2) Put corner caps on the side frame. Corner Cap R Side Frame Side Frame Insertion Surface Insertion Surface Insertion Surface Side Frame Insertion Surface Corner Cap R 2 Mounting Side Frames (1) Mount the side frame to the rear frame / roof purlin / front frame with [7-2]. Mount components so that screws do not float or tilt. Front Frame Screw Float Screw Tilt No Screw Float / Tilt Self-Tapping Truss Head Screw Class 3 Rear Frame Side Frame Roof Purlin Roof Purlin -12-

13 8 Checking Diagonal Dimensions (1) Even out the diagonal dimensions around the roof frames. Check diagonal dimensions 9 Mounting Roof Rafters (1) Mount the roof rafter to the rear frame / roof purlin / front frame with [7-2]. Mount components so that screws do not float or tilt. Roof Rafter Screw Float Screw Tilt No Screw Float / Tilt Roof Rafter Self-Tapping Truss Head Screw Class 3 Roof Purlin Roof Rafter Roof Purlin Roof Rafter Direct the notch on the roof rafter to the rear frame -13-

14 10 Mounting PC Roof Panels (1) Insert PC roof panels into the front frame cover and PC roof panel receiver into the rear frame. The embedded length of the roof rafter PC roof panel must be the same on the right and left. Embedded Roof Rafter Embedded Be sure to check the front and back of the PC roof panels and detach their protective sheets before mounting them. Protective Sheet PC Roof Panel PC Roof Panel Cover PC Roof Panel Side Frame Press the PC roof panel against the PC roof panel receiver when mounting. Press PC Roof Panel PC Roof Panel Receiver 11 Mounting Side Frame Covers / Roof Rafter Covers (1) Mount the roof rafter / side frame cover to the roof rafter and side frame with [7-2]. (2) Fill the roof rafter cover and side frame cover with sealant. For [Wind Resistant Type], also refer to [PC Roof Panel Holder Mounting Manual (D614)]. [After Mounting] Check that the roof rafter and the roof rafter cover are properly engaged. Engage [When Mounting] Mount from the front frame side. Mount while pressing against the front frame. Cover Press PC Roof Panel Roof Rafter Cover [7-2] 5 x 12 Self-Tapping Truss Head Screw Class 3 Mount components so that screws do not float or tilt. Screw Float Side Frame Screw Tilt Side Frame Cover No Screw Float / Tilt -14-

15 12 Mounting Water Pipes (1) Cut the water pipe. (2) Mount "Rainwater Pipe Packing" and "Rainwater Pipe Attachment" to the water drain hole on one side of the rear frame with [7-2]. (3) Mount "Rainwater Pipe Holder" to the pillar with [7-3]. (4) Mount a "Drain Elbow", "Water Pipe" and "92 Elbow" with adhesive. (5) Mount "Rainwater Pipe Packing" and "Rainwater Pipe Hole Cover Cap" to the water drain hole on the other side of the rear frame with [7-2]. (6) Fill the screws inside the rear frame with sealant. Water Pipe Side Rainwater Pipe Packing Self-Tapping Truss Head Screw Class 3 Rainwater Pipe Attachment Water Pipe Cut Dimensions Size (Length) L L22 61 Mini L29 61 Regular L Change the length according to the moved distance if the pillar has been moved. Drain Elbow Adhesive Adhesive Water Pipe Water Pipe L Adhesive 92 Elbow Adhesive Rainwater Pipe Holder Cover Side Rainwater Pipe Packing Rainwater Pipe Hole Cover Cap Self-Tapping Truss Head Screw Class 3 [7-3] 4 x 13 Pan Head Self Drilling Screw Pillar 92 Elbow Adhesive -15-

16 Construction of Type Work required for []. Items to Check for (L22 / L29) Drawing W1 L1 L3 L2 [Pillar Core-to-Core] L4 L2 [Pillar Core-to-Core] L3 A [Roof Rafter Core-to-Core] Be sure to lay crushed stones so that the water inside the pillars can be drained. H H1 H2 [For Long Pillars] Add +364 to the height dimension. GL W2 Foundation Concrete Crushed Stones GL Foundation Concrete Crushed Stones Size (Width) W1 W2 H1 H2 H Size (Length) L1 L2 L3 L4 A Mini W Mini L L Marking Foundations (1) Determine the embedding position for pillars and then dig foundation holes. Refer to the table below on this page for foundation dimensions of the connection part. P.7 [Foundation Dimensions for Other than Connection Part] Refer to "Page 7" for foundation dimensions "DW", "DL", and "DH" for other than the connection part. W1 DL Carport Main Unit Outer Line DW L3 L2 L4 L2 L3 L1 Checking Foundation Dimensions (1) Check the foundation hole dimensions. For [Construction with Independent Independent Foundations Foundations] For [Construction with Concrete Slabs Concrete Slabs on Grade on Grade] The edge distance between the top of the foundation and the concrete slabs on grade must be 200 mm or more. (*1) 300 Side DW Side 200 or More GL Pillar 500 Side DL DW 50 DL Side Concrete Slabs on Grade Foundation Concrete Rebar (*1) is the dimension between the pillar core and the foundation edge on the rear side of the foundation. Size DW DL W * The DW / DL center position is the pillar core. Size DW DL W * The DW / DL center position is the pillar core. Crushed Stones Lay rebar. -16-

17 Items to Check for (L50) Drawing Work required for []. Pillar Moving Warning For [Pillar Moving],move the pillar within ± mm of the pillar core-to-core distance dimensions. Be sure to lay crushed stones so that the water inside the pillars can be drained. This symbol indicates the [Pillar Moving] range. [For Long Pillars] Add 400 to the height dimension. W1 L1 L3 L2 [Pillar Core-to-Core] A [Roof Rafter Core-to-Core] L4 L2 [Pillar Core-to-Core] L3 W2 P.7 [About Foundation Dimensions] Refer to "Page 7" for foundation dimensions "DW", "DL" and "DH". Carport Main Unit Outer Line DW Side W1 DL DL DH DW H H1 H2 GL 90 Foundation Concrete Crushed Stones Size (Width) W1 W2 H1 H2 H Size (Length) L1 L2 L3 L4 A W Regular L Regular W W Marking Foundations (1) Determine the embedding position for pillars and then dig foundation holes. Side L3 L2 L4 L2 L3 L1-17-

18 1 Processing Connection Part Processing Holes for Mounting Connecting Sleeves Wind Snow P.18 For [Wind ] and [Snow ], also refer to the table below on this page for processing the roof purlin. (1) Process 4.5 additional holes on the connection side of the front frame / roof purlin / rear frame. [] (View from Bottom) 4.5 Additional Hole 25 [Roof Purlin] (View from Bottom) 4.5 Additional Hole 25 [] (View from Bottom) 4.5 Additional Hole Additional Hole Connection Side 4.5 Additional Hole Connection Side 4.5 Additional Hole Connection Side 4.5 Additional Hole on Connection Part 4.5 Additional Hole on 4.5 Additional Hole on Connection Part 4.5 Additional Hole on 4.5 Additional Hole on Connection Part 4.5 Additional Hole on Additional Hole on 4.5 Additional Hole on 4.5 Additional Hole on 4.5 Additional Hole on 4.5 Additional Hole on Additional Hole on For Snow / Wind : (processing holes for mounting roof purlin reinforcement) and Snow Wind [Snow ] Work required for [Wind ] (1) Process the roof purlin, roof purlin reinforcement and roof purlin sleeves. [Roof Purlin] Fin [Roof Purlin Reinforcement] Processing Hole 4.5 Processed Hole Connection Part Processing Hole [Roof Purlin Sleeve] Processing Hole On the roof purlin, process holes on the side with fin

19 2 Mounting Components 1 Mounting Roof Purlin Reinforcement and Snow [9-1] 5 x 13 Wind Roof Purlin Reinforcement Pan Head Self Drilling Screw [Snow ] Work required for [Wind ] (1) Insert the roof purlin reinforcement to the roof purlin and mount it with [9-1]. Roof Purlin [11-1] 5 x 13 Pan Head Self Drilling Screw Edge Side Edge Side Connection Part -19-

20 2 Connecting Connection Part (1) Fill [10-1] screws for rear frame sleeve mounting with sealant. (2) Mount and connect the corresponding sleeves to the front frame / roof purlin / rear frame with [10-1]. (3) Fill the notch on the rear frame and the connection part of each component with sealant. (4) Mount roof rafters to the connection part with [10-1]. Roof Purlin Sleeve Roof Purlin Sleeve Front Frame Sleeve Roof Purlin [10-1] 4 x 13 Pan Head Self Drilling Screw [10-1] 4 x 13 Pan Head Self Drilling Screw [10-1] 4 x 13 Pan Head Self Drilling Screw Screw [10-1] 4 x 13 Pan Head Self Drilling Screw Roof Purlin Roof Rafter Rear Frame Refer to "Construction Method for Basic Type" for mounting for other than the connection part. Seal the notch on the rear frame -20-

21 Construction of Type Work required for []. Items to Check for Drawing Warning For [Pillar Moving], move the pillar within ± mm of the Pillar Moving pillar core-to-core distance dimensions. Be sure to lay crushed stones so that the water inside the pillars can be drained. This symbol indicates the [Pillar Moving] range. [For Long Pillars] Add 400 to the height dimension. [For Construction on Slope] Construct the product by adjusting the embedding depth of the main unit on the higher side according to the height of the main unit on the lower side so that the pillars are vertical. Otherwise, water leakage may be caused by the water accumulated on the connected ridgepole. Lower Side Vertical Embedding Seal Position (G.L. Standard) Higher Side Vertical Adjusting Embedding Depth W1 W2 [Pillar Core-to-Core] L1 L3 L2 [Pillar Core-to-Core] L3 A [Roof Rafter Core-to-Core] Size (Width) W1 W2 W3 H H1 H2 Size (Length) L1 L2 L3 A Regular W W Regular L W Carport Main Unit Outer Line P.7 [About Foundation Dimensions] Refer to "Page 7" for foundation dimensions "DW", "DL", and "DH". W1 H H2 H1 W3 90 GL GL Foundation Concrete Crushed Stones Foundation Concrete Crushed Stones Marking Foundations (1) Determine the embedding position for pillars and then dig foundation holes. DW Side DL For different sizes (widths), the foundation depth (DH) is as shown in the table below. Side DL DH L3 DW L2 L1 L3 Size (Width) W24-27 W24 Side 550 W W27 Side W30 Side

22 1 Mounting Connection Part 1 Mounting M-connection Metal Fittings (1) Remove the push buttons on the beam. (2) Press the M-connection beam connecting fitting against the beam, mark the hole positions and then drill 9 through holes. (3) Fix beams with M-connection beam connecting fittings for R and beam spacers [12-1] to [12-3]. Beam 9 Processed Hole (Through) Refer to "Construction Method for Basic Type" for mounting for other than the connection part. [12-2] M8 Hex Self-Lock Nut [12-3] Plain Washer for M8 Remove the push button 9 Copy Hole (Through) Beam Existing Hole Push Button Check that the distance between front frames is 15 mm. Beam Connecting Fitting for R Beam Spacer Beam Spacer [12-1] M8 x 80 Hex Bolt [12-3] Plain Washer for M8 15mm Beam 9 Copy Hole (Through) Beam Connecting Fitting for R 2 Mounting Connection Ridgepoles For Independent Construction Be sure to complete "Construction for Basic Type 9 Mounting Roof Rafters" before this process. (1) Insert the M/Y-connection ridgepole between the front frames. (2) Fit an M-connection fixing fitting R to it and then fix it with [12-4]. SS Fixing Fitting for R M/Y-Connection Ridgepole Mount the M-connection fixing fitting for R to the position shown in the figure below. If a beam is at the fixing fitting mounting position, shift it before mounting. Front Frame Approx. A Approx. A Front Frame Fixing Fitting for R A Mounting Number [12-4] 4 x 13 Pan Head Self Drilling Screw

23 For Connecting Construction Work required for []. P.20 Also refer to page 20 prior to work. (1) Connect the front frames with front frame sleeves. (2) Place the M/Y-connection ridgepoles on the position between front frames, and then fix them with an M-connection fixing fitting for R and [14-1]. M/Y-Connection Ridgepole Mounting for other than the connection part is the same as "For Independent Construction". Front Frame Front Frame Sleeve Connection Part Connecting Connecting Fixing Fitting for R Fixing Fitting for R [14-1] 4 x 13 Pan Head Self Drilling Screw 3 Mounting Edge Caps (1) Seal the M-connection edge cap for R and M/Y-connection ridgepole. (2) Mount the M-connection edge cap for R with [12-5]. M/Y-Connection Ridgepole Edge Cap for R [12-5] 4 x 20 Self-Tapping Truss Head Screw Class 2 4 Mounting MY-Connection Covers Work required for []. (1) Mount the MY-connection cover for R to the M/Y-connection ridgepole with [14-1]. (2) Seal the MY-connection cover for R. MY-Connection Connection Cover for R [14-1] 4 x 13 Pan Head Self Drilling Screw M/Y-Connection Ridgepole -23-

24 -24- Manual No. D638 XXX A_ B_1049

ORP-F1 Regular: Basic / J-Connection / M-Connection

ORP-F1 Regular: Basic / J-Connection / M-Connection D636 ORP-F Regular: Basic / J-Connection / M-Connection Construction Manual Thank you for purchasing our product. The indication symbols in this construction manual are for you to construct the product

More information

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do. MODERN PERGOLA INSTALLATION GUIDE When only the best will do. TOOLS LIST Drill(s) 3/8" Magnetic Driver (s) 12" Drill Extension #2 Square Drive bit for Drill or Driver Level Tape Measure Hammer Drill if

More information

Installation Instructions

Installation Instructions Installation Instructions Ceiling Mount Bracket for DLP Based Projectors (for High Ceilings) Model No. ET-PKD100H Contents Important Safety Notice.................. 2 For DLP Based Projector: PT-D10000

More information

NRS Installation Manual

NRS Installation Manual NRS Installation Manual Chair Mount Type Standard / EU Spec. KAZE (AY-KFPLU AY-NRS1 is shown.) OTO (AY-OLL AY-NRS1 is shown.) Separate Type (AY-NRS2B-W is shown.) Installer: Read through this installation

More information

Hip Roof Canopy Instructions

Hip Roof Canopy Instructions Hip Roof Canopy Instructions - PUT SAFETY FIRST. NOT COMPLYING WITH THE PROCEDURES AND PRECAUTIONS OUTLINED IN THIS MANUAL MAY RESULT IN PERSONAL INJURY AND WILL INVALIDATE THE WARRANTY.. Before attempting

More information

CSS Central Mount System

CSS Central Mount System CSS-20 Installation Manual CSS-20 Safety Notifications Below are the installation instructions for the CSS-20-2 Long Span Beam Mounting System. Please read these safety notifications prior to beginning

More information

English/French 06/04

English/French 06/04 E000 PLEASE READ ASSEMBLY INSTRUCTIONS COMPLETELY BEFORE ASSEMBLING YOUR BUILDING CAUTION: Some parts have sharp edges. Care must be taken when handling the various pieces to avoid a mishap. For safety

More information

Model No. EP84-A, EP84AR-A, P84L

Model No. EP84-A, EP84AR-A, P84L E000 Model No. EP84-A, EP84AR-A, P84L PLEASE READ ASSEMBLY INSTRUCTIONS COMPLETELY BEFORE ASSEMBLING YOUR BUILDING CAUTION: Some parts have sharp edges. Care must be taken when handling the various pieces

More information

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series Football Goal Posts MODEL SERIES: FGP400 and FGP600 series Installation and Maintenance Instructions Please read all instructions before attempting installation of these units SAVE THESE INSTRUCTIONS FOR

More information

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions BO01 Owner's Manual & Assembly Instructions PATIO COVER/CARPORT Model No. PC1010 Attached 705221006 UNIT DIMENSIONS *Size rounded off to the nearest foot CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST

More information

Moo-Tel Small Animal Hut

Moo-Tel Small Animal Hut Moo-Tel Small Animal Hut Photo may show a different but similar model. 2010 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 104602 4 6" W x 4' 10" H x 8 2"

More information

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT TRADITIONAL GABLE ATTACHED PATIO AND CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT BEFORE YOU START Carefully read

More information

Clopay Models 835/837 Sliding Door System Installation Guide

Clopay Models 835/837 Sliding Door System Installation Guide Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available

More information

8' x 22' Cash Hut INSTALLATION INSTRUCTIONS

8' x 22' Cash Hut INSTALLATION INSTRUCTIONS PARTS IST J I G A A J I C F D E B B K H A A K H G A Posts w/ Feet (4pcs) J eft End Panels (Front & Back) [4'3"x7'8"] (2pcs) B 22' Peak Trusses (2pcs) K Right End Panels (Front & Back) C 8' Centre Truss

More information

Installation Guidelines

Installation Guidelines Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and

More information

DUTCH GABLE FREESTANDING CARPORT

DUTCH GABLE FREESTANDING CARPORT DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If

More information

GrowSpan Estate Pro I Greenhouse

GrowSpan Estate Pro I Greenhouse GrowSpan Estate Pro I Greenhouse Photo may show a different but similar model. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 104564 11'-8" W x

More information

ClearSpan Attached-Style Awning

ClearSpan Attached-Style Awning ClearSpan Attached-Style Awning Photo may show a different but similar model. 2007 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: July 2007ldg STK# DIMENSIONS

More information

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503) 266-4334

More information

Titan Series Awning Assembly and Installation Instructions

Titan Series Awning Assembly and Installation Instructions Titan Series Awning Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use work gloves to handle them.

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS GARDEN SHED 6X5ft B/C 9400988362649 GARDEN SHED 6X7ft B/C 9400988362656 GARDEN SHED 6X9ft B/C 9400988362663 GARDEN SHED 6X1 B/C 9400988362670 111 ft ASSEMBLY INSTRUCTIONS Product specifications may change

More information

Balustrade Systems / Installation Instructions

Balustrade Systems / Installation Instructions A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET CONCRETE PURLIN BRACKET VERSION MARCH 2015 GENERAL INSTRUCTIONS Safety: Systems may only be installed and operated by properly trained and technically suitable people (i.e. MCS accredited installers).

More information

Sunset Swings By Health in Motion, LLC

Sunset Swings By Health in Motion, LLC Sunset Swings By Health in Motion, LLC Model 421 Lounge Swing Assembly and Operation Manual Record Serial Number Here www.sunsetswings.com by Health In Motion, LLC. 11/6/2009 421 Owners Assembly and Operation

More information

Foot Rail. Nissan Navara_Frontier D23 DC START HERE! READ ME FIRST

Foot Rail. Nissan Navara_Frontier D23 DC START HERE! READ ME FIRST Foot Rail Nissan Navara_Frontier D3 DC ENG FANN00 START HERE! READ ME FIRST Don t be a hero and muscle through this without first reading these fitting instructions! Improper installation of this gear

More information

S H E D A S S E M B L Y I N S T R U C T I O N S

S H E D A S S E M B L Y I N S T R U C T I O N S T I T A N R A N G E S H E D A S S E M B L Y I N S T R U C T I O N S 8 X 10 ft Approx = 2550 x 3140 cm COMPONENT LIST Component illustrations are given as a visual guide only and are not in proportion PART

More information

ALUMINUM FOOTBALL GOALS INSTRUCTIONS WARNING WARNING Upright. Upright. Flag. Flag. Offset Pole.

ALUMINUM FOOTBALL GOALS INSTRUCTIONS WARNING WARNING Upright. Upright. Flag. Flag. Offset Pole. ALUMINUM FOOTBALL GOALS INSTRUCTIONS 800-67-090 Flag Flag Ground Sleeve Anchor Kit WARNING Football goals are shipped unassembled. Read all instructions thoroughly before attempting to assemble this equipment.

More information

Universal flat-panel mount

Universal flat-panel mount I N S T A L L A T I O N M A N U A L Universal flat-panel mount www.christiedigital.com PM 2004/ REV 02 Contents - Assembly drawing - Fine tune tilt adjustments - Parts list - Installing the adapter plate

More information

PMT-L31 (for Low Ceilings) PMT-H35 (for High Ceilings)

PMT-L31 (for Low Ceilings) PMT-H35 (for High Ceilings) English Ceiling Mount Bracket PMT-L31 (for Low Ceilings) PMT-H35 (for High Ceilings) Installation Manual Be sure to read this manual thoroughly before using this bracket. After you have read this manual,

More information

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER ASSEMBLY INSTRUCTIONS FOR 7 X 10 X 6 AND 7 X 16 X 6 ATV SPORT SHELTER ACTUAL FRAME SIZES: 7 X 9-1 1/2 X 6 AND 7 X 13-7 1/2 X 6 AND 12 X 10 X 6 AND 12 X 16 X 6 ATV SPORT SHELTER ACTUAL FRAME SIZES: 12 X

More information

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES WIDTH: 10, 12, 14, 16, 18, 20, 24, AND 30 ON CENTER FRAME SPACING: 4 1/2 FRAME LENGTH: 18 EAVE HEIGHTS: START AT 7 TO 12 1/2. FRAME SIZES: Our

More information

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS FRAME SIZES: WIDTH: 10, 12, 14, 16, 18, 20, 24, AND 30 ON CENTER FRAME SPACING: 4, 4 1/2, AND 5 FRAME LENGTH: 4 ON CENTER 20-2, 4 1/2 ON CENTER 18 AND 5

More information

S H E D A S S E M B L Y I N S T R U C T I O N S

S H E D A S S E M B L Y I N S T R U C T I O N S T I T A N R A N G E S H E D A S S E M B L Y I N S T R U C T I O N S 6 X 4ft = 190 x 150 cm 6 X 6ft = 190 x 190 cm 6 X 8ft = 190 x 255 cm COMPONENT LIST Component illustrations are given as a visual guide

More information

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction... 2 Components... 3 Step 1 Marking out the Perimeter of the Carport... 3 Step 2a Footing Set-Out for Concrete Block Pad

More information

General Array Layout Sketch

General Array Layout Sketch General Array Layout Sketch Cold TO Panels Hot FROM Panels OR Cold TO Panels Hot FROM Panels 1 Introduction This document describes how to install EZ series panels. The EZ series panels are designed to

More information

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES FRAME SIZES: WIDTH: 10, 12, 14, 18, 20, 24, AND 30 ON CENTER FRAME SPACING: 4 1/2 BASIC FRAME LENGTH: 18 CAN BE EXTENDED IN 4 1/2 INCREMENTS

More information

Wall mounting bracket

Wall mounting bracket Install Manual Wall mounting bracket Please read this manual carefully before operating your set and retain it for future reference. OSW200 P/NO : MFL63640578 (1502-REV01) www.lg.com COMPONENT Install

More information

High End Residential In-Ground Basketball System Owners Manual

High End Residential In-Ground Basketball System Owners Manual High End Residential In-Ground Basketball System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI 53089 U.S.A. Write Model Number From Box Here: READ AND UNDERSTAND OPERATOR'S

More information

SUPREME WALL GARDEN ASSEMBLY INSTRUCTIONS 24/08/16 www.hallsgreenhouses.com Please refer to website for the most up to date instructions. SAFETY WARNING 1. Always wear protective glasses, shoes, gloves

More information

SECTION 19: Endwood Fusion Welded Gate Installation Guide

SECTION 19: Endwood Fusion Welded Gate Installation Guide SECTION 19: Endwood Fusion Welded Gate Installation Guide ASSEMBLY AND INSTALLATION FOR: Fusion Welded Gates Gate Frame with Full Size Pickets Privacy & Board on Board California & Shadowbox Gate width

More information

READ ME! IMPORTANT WARNING! ENG. LED Light Bar Rack Mount Brackets

READ ME! IMPORTANT WARNING! ENG. LED Light Bar Rack Mount Brackets LED Light Bar Rack Mount Brackets ENG RRAC124 READ ME! Thank you for purchasing a Front Runner LED Light Bar Rack Mount Brackets. Before you start, take a moment to familiarize yourself with the Fitting

More information

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503)

More information

Installation Guide Simplicity 16. V2.9 Lu171117

Installation Guide Simplicity 16. V2.9 Lu171117 0845 869 6006 www.canoports.co.uk Installation Guide Simplicity 16 V2.9 Lu171117 Tools Required Below is a list of tools that you will require to install the Simplicity 16 Canopy or Carport. Cordless Drill

More information

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503) 266-4334

More information

Double Beam Freestanding Pergola Installation Guide

Double Beam Freestanding Pergola Installation Guide Double Beam Freestanding Pergola Installation Guide Patent Pending. Copyright 2011 USAVinyl, LLC - All Rights Reserved The information contained in these instructions are proprietary to USAVinyl, LLC and

More information

ClearSpan Grab Bag Canopy

ClearSpan Grab Bag Canopy ClearSpan Grab Bag Canopy Photo may show a different but similar model. 2008 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 104385 10 W x 20 L 1 YOU MUST

More information

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A ssembly instructions x Model GH x Model GH7 x8 Model GH0 x0 Model GH Walk-in Greenhouse Statement ear Customer! May we congratulate you on your new Greenhouse. We feel sure that by following the detailed

More information

LAWN AND GARDEN GREENHOUSE

LAWN AND GARDEN GREENHOUSE MODEL# OGAL-66 OGrow Walk-in 6' x ' LAWN AND GARDEN GREENHOUSE With Heavy Duty Aluminium Frame Let'sGrow Together! Thank you for purchasing the OGROW greenhouse Follow the assembly and safety instructions

More information

FORD MOUNT INSTALLATION INSTRUCTIONS

FORD MOUNT INSTALLATION INSTRUCTIONS WESTERN PRODUCTS, P.O. BOX 245038, MILWAUKEE, WI 53224-9538 Lit. No. 64289 June 1, 2003 FORD MOUNT INSTALLATION INSTRUCTIONS Bronco (4X4 only) F-150 (4X4 only), F-250/350 Super Duty 1980 1991 Model No.

More information

GroundControl. Follow instructions contained in this manual. Incorrect installation could result in serious injury or damage to property.

GroundControl. Follow instructions contained in this manual. Incorrect installation could result in serious injury or damage to property. GroundControl TM use supplied hardware Use only hardware supplied in your GroundControl kit or supplied by an authorized YAKIMA dealer. Use of unauthorized parts in the GroundControl system could result

More information

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

ShorePort PWC Lift Instructions  x 138 Sandstone ShorePort  x 138 White ShorePort  x 138 Tan ShorePort ShorePort PWC Lift Instructions 00-8" x 8" Sandstone ShorePort 009-8" x 8" White ShorePort 090-8" x 8" Tan ShorePort....... - PUT SAFETY FIRST To avoid the risk of personal injury or death, study and fully

More information

Installation Instructions (For Dealer or Contractor)

Installation Instructions (For Dealer or Contractor) 9701R870HH9001 HOME USE LOSSNAY TYPE Installation Instructions (For Dealer or Contractor) Before proceeding with the installation work, be sure to read through these instructions. The installation work

More information

FORD RANGER Onwards SLIMLINE II RACK (1255MM x 1358MM)

FORD RANGER Onwards SLIMLINE II RACK (1255MM x 1358MM) FORD RANGER - 2012 Onwards SLIMLINE II RACK (1255MM x 1358MM) FAFR001 / KRFM010T INSTALL TIME: 60 mins READ ME FIRST: Thank you for purchasing a Front Runner Slimline II Rack. This Roof Rack consists of

More information

LAWN AND GARDEN GREENHOUSE

LAWN AND GARDEN GREENHOUSE MODELS# OG0AL8-BKE OGAL-8 OGrow Walk-in ' x 8' LAWN AND GARDEN GREENHOUSE With Heavy Duty Aluminium Frame MANUAL VERSION # Grow r! e h t e g To Let's Thank you for purchasing the OGROW greenhouse Follow

More information

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

YUKON PATIO COVER INSTALLATION INSTRUCTIONS YUKON PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin: Consult your local building department for any required permits You may be required to obtain a building permit for this structure. Contact

More information

ASSEMBLY INSTRUCTIONS FOR "GA" MODULAR BUILDINGS ALL MODELS

ASSEMBLY INSTRUCTIONS FOR GA MODULAR BUILDINGS ALL MODELS ASSEMBLY INSTRUCTIONS FOR "GA" MODULAR BUILDINGS ALL MODELS W01 CAUTION: Some parts have sharp edges. Care must be taken when handling the various pieces to avoid a mishap. For safety sake, please read

More information

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Installation Guide Simplicity Alfresco. V1.9 Lu070318 0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless

More information

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL SB-WM-ART1-M-BL Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL WARNING The maximum weight of this wall mount is 90 lbs (41 kg). Use with heavier than the maximum

More information

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 HERITAGE F-150/250LD 2WD, 97-04, 04 HERITAGE 4WD WD EXPEDITION/ WD EXPEDITION PART INSTALLATION INSTRUCTIONS 3 BULL BAR PART #B-F1971;B-F2971 PARTS LIST: 1 Bull Bar 2 12-1.75mm x 130mm x 40mm Hex Bolts 1 Driver/Left Mounting Bracket 4 12-1.75mm x 35mm Hex Bolts 1 Passenger/Right Mounting

More information

Greenhouse Assembly Instructions

Greenhouse Assembly Instructions Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free 7 days a week on 0800

More information

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS GARDEN SHED Assembly Instructions Suitable for Models 6' Wide 8' Wide 0' Wide WITH VARYING DEPTHS GI0003 November 0 INSTALLATION ADVICE It's Not That Difficult! The construction of your shed isn't as complicated

More information

Installation Guidelines

Installation Guidelines Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and

More information

ClearSpan Mini Cold Frames

ClearSpan Mini Cold Frames ClearSpan Mini Cold Frames Photo may show a different but similar model. 2009 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 105152 6' W x 5' H x 6' L 105153

More information

ClearSpan PolyMax Windbreak Wall

ClearSpan PolyMax Windbreak Wall ClearSpan PolyMax Windbreak Wall Photo may show a different but similar model. 2007 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: February 2007ldg STK# DIMENSIONS

More information

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES FRAME SIZES: WIDTH: 12, 14, 18, 20, 24, AND 30 ON CENTER FRAME SPACING: 4 1/2 FRAME LENGTH: 18 EAVE HEIGHTS: START AT 7 TO 12 1/2. Our unique

More information

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42 ASSEMBLY INSTRUCTIONS FOR STORETTE STA42 A01 CAUTION: Some parts have sharp edges. Care must be taken when handling the various pieces to avoid a mishap. For safety sake, please read the safety information

More information

2010 KIDS CENTER #6 K-06

2010 KIDS CENTER #6 K-06 K-06 INSTALLATION GUIDELINES USER GROUP: 2-5 RECOMMENDED CREW: 2 people TOOLS REQUIRED: Tape measure Level High- speed 3/8 electric drill w/clutch NOTE: Use of any other driver may result in damage to

More information

Portable System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

Portable System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A. Portable System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI 53089 U.S.A. Adult Assembly Required. This manual, accompanied by sales receipt, should be saved and kept

More information

DOCK WEDGE - STANDARD

DOCK WEDGE - STANDARD DOCK WEDGE - STANDARD INSTALLATION INSTRUCTIONS WOOD HEADER READ ALL INSTRUCTIONS BEFORE INSTALLING SEAL. SUPER SEAL MFG. LTD. WILL NOT BE HELD RESPONSIBLE FOR IMPROPER INSTALLATION OF ANCHORING DEVICES,

More information

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible

More information

ASSEMBLY & INSTALLATION MANUAL Trim Kit for Evo Affinity 30G

ASSEMBLY & INSTALLATION MANUAL Trim Kit for Evo Affinity 30G the natural way to cook ASSEMBLY & INSTALLATION MANUAL ( Shown installed to granite topped cabinet ) Copyright 2013 THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE. READ, UNDERSTAND, AND FOLLOW THE INSTRUCTIONS

More information

Be sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible.

Be sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible. Company Name: Spike Power Sports Vehicle Name: Polaris General 2P Product Description: Soft Upper Doors Part Number: 58-1600 Revision: R01 09/19/2018 Contents: 655 Elm Ridge Ave, Canal Fulton OH, 44614

More information

Installation Instructions

Installation Instructions Installation Instructions SOLC 220 SOLC 220 PAG SOLC 220 PAE SOLC 220 BAG SOLC 220 BAE Flat plate collector Basic kit Frankfurt tile Extension kit Frankfurt tile Basic kit plain tile Extension kit plain

More information

FAIRFAX ROUGHING-IN K-12151T=673. UNIT: mm K-12153T K-12156T K-12151T=610 K-12157T K-12161T T01-A -1- INSTALLATION INSTRUCTIONS

FAIRFAX ROUGHING-IN K-12151T=673. UNIT: mm K-12153T K-12156T K-12151T=610 K-12157T K-12161T T01-A -1- INSTALLATION INSTRUCTIONS FAIRFAX INSTALLATION INSTRUCTIONS BATHROOM ACCESSORIES K-12151T/K-12153T/K-12156T/ K-12157T/K-12158T/K-12161T/K-12162T BEFORE YOU BEGIN Congratulation on your purchase of this high quality Bathroom Accessory.

More information

Elite Home-Attached Greenhouse

Elite Home-Attached Greenhouse Elite Home-Attached Greenhouse Photo may show a greenhouse of a different length. Elite Home-Attached Greenhouse Use these instructions for the following greenhouses: #104711 #104713 #104715 2007 ClearSpan

More information

PMT-L11 (for Low Ceilings) PMT-H15 (for High Ceilings)

PMT-L11 (for Low Ceilings) PMT-H15 (for High Ceilings) English Français Deutsch Svenska Italiano Español Nederlands Digital Cinema Projector Ceiling Bracket PMT-L11 (for Low Ceilings) PMT-H15 (for High Ceilings) Installation Manual Be sure to read this manual

More information

Otter Pro XT Cottage Installation and Set-Up Instructions

Otter Pro XT Cottage Installation and Set-Up Instructions Otter Pro XT Cottage Installation and Set-Up Instructions Otter Pro XT Cottage Fits Small Ultra-Wide Otter Pro and Otter II Sled Only Parts Identification and Check List MODEL NUMBERS: Complete Pkg Pro

More information

Installation Instructions

Installation Instructions For Medium (15-18.5K) + Heavy duty (-8.5K) Air Conditioner READ BEFORE INSTALLING UNIT To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges

More information

X 12 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

X 12 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly adlonco@hotmail.com 1212-12 12 X 12 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly Base Dimensions 12 ½ x12 ½, Largest Dimensions 13 6 x13 6 (see pg.1) Overall Height 110 ZZZ-182.1212-12.1030-15.GP.EN.HER

More information

Installation Instructions

Installation Instructions READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step as shown. Observe all local, state, and national electrical codes

More information

HOME GYM Owner s Manual

HOME GYM Owner s Manual HOME GYM Owner s Manual Content Content-------------------------------------------------------------1 Safety precautions----------------------------------------------------2 Assembly instruction-------------------------------------------------3-12

More information

SHOREMASTER CANOPY TABLE OF CONTENTS

SHOREMASTER CANOPY TABLE OF CONTENTS SHOREMASTER CANOPY PAGE TABLE OF CONTENTS SECTION OWNERS MANUAL Canopy Models: 1684, 16108, 2596, 30108, 40108, 40120, 50120, 20855, 30966, 40966,401066, 501066, 701066. All Hydraulic Lifts 2 Introduction

More information

ET-PKL100S. Installation Instructions. Ceiling Mount Bracket (for Low Ceilings) Model No.

ET-PKL100S. Installation Instructions. Ceiling Mount Bracket (for Low Ceilings) Model No. Installation Instructions Ceiling Mount Bracket (for Low Ceilings) Model No. ET-PKL100S Thank you for purchasing this Panasonic Product. JJ To customers The Installation Instructions is intended for use

More information

Panel Guard Installation For Adhesive Attachment

Panel Guard Installation For Adhesive Attachment For Adhesive Attachment 1. Clean roof surface with isopropyl alcohol where snow guard is to be attached-ensure area is completely dry before attaching snow guard 2. Cut tip of adhesive nozzle (Surebond

More information

Pergola Installation Guide. When only the best will do.

Pergola Installation Guide. When only the best will do. Pergola Installation Guide When only the best will do. Tools Needed Installation Tools for assembly Drill(s) Miter or Circular Saw with carbide blade (cut slowly) 5 /8" Drill Bit 5 /16" Magnetic Driver

More information

LCD DISPLAY MOUNT

LCD DISPLAY MOUNT I N S T A L L A T I O N M A N U A L 38-804769-01 LCD DISPLAY MOUNT WWW.CHRISTIEDIGITAL.COM Contents - Assembly drawing - Securing the bottom wall plate - Fine tune adjustments - Marking the top plate mounting

More information

INTRODUCTION. EqunioxRoof.com. Pro Tip

INTRODUCTION. EqunioxRoof.com. Pro Tip INSTALLATION MANUAL INTRODUCTION The Equinox Louvered Roof System is designed to be installed in an aluminum frame. All these sections are 1/8" thick extruded aluminum. All engineering for this system

More information

Elo Touch Solutions Wallmounting Kit for the 7001L IDS Touchmonitors

Elo Touch Solutions Wallmounting Kit for the 7001L IDS Touchmonitors Installation Manual Elo Touch Solutions Wallmounting Kit for the 7001L IDS Touchmonitors SW602083 Rev E Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

12 X 18 SOLARIUM ASSEMBLY INSTRUCTIONS

12 X 18 SOLARIUM ASSEMBLY INSTRUCTIONS adlonco@hotmail.com 1218 12 X 18 SOLARIUM ASSEMBLY INSTRUCTIONS Assembly by more than one person is recommended. Base Dimensions 12 ½ x18 11, Largest Dimensions 13 6 x20 ½ (see pg.1) ZZZ-18.1218.0530-1.GP.EN.HER.doc

More information

ClearSpan Mini Grab Bag Shelters

ClearSpan Mini Grab Bag Shelters ClearSpan Mini Grab Bag Shelters Photo may show a different but similar model. Baseboard is not included. 2008 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS

More information

Fitting Instructions

Fitting Instructions Fitting Instructions = Actions. Red = Notes you must read before continuing. Grey = Only applies to canopies over 4m widths. Overview 1. Tools you will need. 2. What you will need to provide. 3. Description

More information

BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS

BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS Instruction Manual BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS Customer Service (800) 247-7668 P A R T S L I S T Item Qty Description Item Qty Description A 2 GOOSENECK POLE I 4 UPRIGHTS B 2 BAND CLAMP

More information

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS P a g e 1 VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS Shown: 8' x 12' Vinyl Classic Pergola with 12" Top and Main Runner Spacing The design of this pergola is based on all posts being installed

More information

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical

More information

Intex Engineered Pergola System Installation Instructions. NOTE: See Appendix for Foundation Requirements

Intex Engineered Pergola System Installation Instructions. NOTE: See Appendix for Foundation Requirements Intex Engineered Pergola System Installation Instructions NOTE: See Appendix for Foundation Requirements Pergola Installation, Freestanding (If pergola will be attached-to-structure, skip to page 3) 1.

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

Installation Instruction

Installation Instruction Tools Needed for Assembly Stud finder (for wood stud wall) Pencil Mark Electric drill Wood Stud Wall Installation Step 1. Locate the Wood Studs Installation Instruction Drill bit (for wood stud wall) Masonry

More information

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS Post & Rail Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail STAGGER RAIL ENDS FOR GREATER STRENGTH ALLOW 1-1/2" GAP ON HINGE SIDE OF GATE AND 1-1/4" ON LATCH SIDE OF GATE HARDWARE DIG HOLES 30" MINIMUM

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SPORTSMAN WINCH MOUNT GRILLE GUARD APPLICATION: 2016-2018 Toyota Tacoma PART NUMBER: 40-93885, 45-93880, 46-23885 ITEM QUANTITY DESCRIPTION TOOLS NEEDED 1 1 WINCH TRAY 15MM SOCKET

More information