1 Installation Instructions for Icopal Guttering System. Cutting & Handling (1) Where it is necessary to cut or trim the components of the rainwater system tin snips or hacksaws should be used, the use of angle grinders or power saws is strictly prohibited. (2) Care should be taken to de-burr any cuts made in the Icopal guttering system and any filings or swarf should be removed before installation of rainwater system. (3) Care should be taken to avoid any accidental damage to the coating during installation. Any scratches or handling damage should be repaired by cleaning and touching up (touch up paint available from Decra Roof Systems Ltd). (4) Storage of the material outdoors should be avoided. However, if such storage is unavoidable, the material should be satisfactorily covered and should be stored in a manner that will ensure good air circulation in order to avoid the accumulation of moisture. Position the Gutter Correctly Icopal 125mm half round eaves gutters, Install to a recommended rate of fall of 1 in 350 (equivalent to a 28mm drop over a 10m length of gutter). Tips: Guttering should be set at the right height to prevent rainwater overshooting the gutter. Too steep a fall should be avoided, as this will lead to a too bigger gap between the lowest edge of the roof and the top of the gutter. Gutter lengths longer than 10m should slope from the centre to the outlets at either end. Highest point of fall should be at a stop end or the centre point of gutter between two outlets In all cases, roof felting should be extended to drape into the gutter. The roof covering should not extend so far into the gutter as to prevent easy cleaning and maintenance. Gutters should be adequately supported to prevent sagging and ponding. Care should be taken to ensure that there is no sideways tilt of the gutter as this reduces the gutter capacity. Fixing the Gutter to a Fascia Fascia brackets should be fastened with 4no galvanised or bright zinc plated screws of an appropriate size. Fascia brackets should be fitted not more than 1000mm apart or in areas prone to heavy rainfall no more than 800mm apart. Where roof eaves ventilation systems are top mounted on fascia boards an additional Icopal gutter spacer should be installed between the gutter fascia bracket and the fascia board. Icopal gutter spacer 10 & gutter spacer 25 are available to complement 10,000mm 2 ventilation and 25,000mm 2 systems, if you need these spacers you will also need longer fixing screws. Additional Icopal fascia brackets should be fitted to angles and outlets to prevent potential risk of sagging.
2 Fixing the Gutter to Open Rafter Feet Icopal eaves gutters to be supported by means of Icopal rafter brackets. Rafter brackets should be fastened with 3no galvanised or bright zinc plated screws of minimum size 25 mm long x 6 mm, and fitted not more than 600mm apart. Additional Icopal rafter brackets should be fitted to or near angles and outlets to prevent sagging. Bending Rafter Brackets To establish where to bend the first gutter hook is to be bent you will need to measure the roof gradient. The easiest way to do this is to use a folding rule. Lay the rule B along the roof and allow to fall perpendicularly. (fig. B). Transfer the angle to a sheet of paper and extend the line of the roof (fig. C). Place a gutter hook on the sheet. The back of the gutter hook is to be lain against the vertical line while the point on the gutter hook is to be 30 mm beneath the desired roof line. The intersection point thus obtained on the gutter hook from the extended roof line is now your first bending mark (zero point) (fig. D). Then place the other Rafter Brackets in line after the first gutter hook (fig. D:1). Draw a horizontal line from the first bend mark (zero point) to the last gutter hook (fig. D:2). Mark the bend mark on the last gutter hook the number of mm the gutter is to be angled above the first bend mark (fig, D:3). The line you have drawn will indicate all the bending points on the row of Rafter Brackets. (fig. D:4). Roof lengths in excess of 10 metres require two drainpipes. In which case your gutter will reach its highest point in the centre of the roof line, falling away to the drainpipes. Bending Icopal Rafter Brackets The best way to accurately bend rafter brackets is to use a rafter bracket bending tool available from Decra Roof Systems. Compensating for a roof base which is not horizontal Use a spirit level to find out the gradient in mm/metre of the base of the roof in relation to the horizontal line. Any roof base gradient against the horizontal line is compensated by bending the Rafter Brackets so that the gradient is added to or subtracted from the 3mm/metre the gutter is to be angled against the horizontal line. If the roof base gradient is towards the drainpipe the angle is subtracted from the 3 mm, if the roof base gradient is from the drainpipe the angle is added. The gutter gradient the length of the gutter x (3mm + the roof base gradient against the horizontal line)
3 Joining Gutters Together Joining Gutters Together Each length of gutter should be joined together using Icopal gutter unions and each joint should be supported with an Icopal fascia or rafter brackets fixed at not more than 150 mm from the union joint. Gutter union should be installed by (1) Hooking the back edge of the gutter union over the top back edge of gutter (see fig.1). (2) Hook the front edge over the front rolled lip of the gutter (see fig.2 & 3). (3) The hinged angle clip of the gutter union is then to be pressed down into its closed position (see fig.4 & 5). (4) Finally lock the hinged angle clip securely into position by folding the locking tab upwards over the hinged angle clip (see fig.6). Additional Icopal fascia or rafter brackets should be fitted to or near angles and outlets to prevent sagging. (fig.3) (fig.4) (fig.5) (fig.6) Form a Running Outlet Running outlets can be placed anywhere along the gutter without the need to create a break in the gutter. (1) Prior to installation the gutter should be measured and marked with the centre line position of where the down pipe is to be fitted. Using a hacksaw cut two angled slots at a 45 o angle 50mm away from the marked centreline position (see fig.1) (cutting tip: start the cut at 90 degrees and the angle the blade to 45 degrees). This forms a 100mm V shaped opening into the sole of the gutter. For your assistance we have included a cutting template on the last page of this installation guide. Crimp cut edge down into outlet by approximately 5mm. Care should be taken to de-burr any cuts made in the Icopal guttering system and any filings or swarf should be wiped clean before installation of rainwater system. (2) Install Icopal Running Outlet, hooking the front edge of the running outlet under the top front rolled edge of gutter and then placing the back edge over the back edge of the gutter (see fig.2). (3) Tabs on back edge of running outlet are then folded over small lip at back of gutter into the gutter (see fig.3). (fig.3)
4 Fixing Stop Ends At the end of gutter Icopal Universal Stop Ends must be used and each stop end should be supported with a Icopal fascia or rafter brackets fixed not more than 150 mm from the stop end. 1. A bead of silicon sealant should be used at end of gutter to provide a secure watertight joint between the gutter and the stop end unit. All faces to be jointed should be clean and dry (see fig.1). 2. Line up Stop End with gutter and break off rear superfluous rolled lip of the stop end unit along its scribed fracture line (see fig.2). 3. Stop Ends should be installed by inverting stop end unit by 180 o (see fig.3) and slide rolled lip of stop end unit 12mm into the front rolled lip of the gutter. 4. Stop end is then turned through 180 o into a level position and pushed down into sole of gutter (see fig.4). 5. When in this position the internal overlap of the stop end will lock under the small lip at the back edge of the gutter (see fig.5). 6. Push stop end fully into the body of the gutter (see fig.6). 7. Projecting vertical locking tab is then folded over the back edge of the gutter (see fig.7). (fig.3) (fig.5) (fig.4) (fig.6) (fig.7) Fixing External & Internal Angles Angles should be joined to Icopal eaves gutter using Icopal gutter unions and each angle should be supported with two Icopal fascia or rafter brackets fixed to the external or internal angle.
5 Joining Down Pipes Together Each down pipe is joined together via an internal socket arrangement. Care must be taken during installation to ensure that the internal socket is always at the lower end of the pipe. Socket end always at bottom If down pipes need to be cut to a short length additional Icopal Down Pipe Connectors are available to form a successful watertight joint. Each down pipe connector joint should be supported with Icopal Down Pipe Brackets fixed at not more than 150 mm from the joint. Fixing Down Pipes to Walls Fix down pipe to wall with Icopal Down pipe brackets at top and bottom of pipe. Fasten pipe brackets with 2no galvanised or bright zinc plated screws of an appropriate size into suitable wall plugs (see fig.1). If the down pipe is longer than 2m, use additional down pipe brackets. After installation of down pipe bracket slot snap lock clasp into open front of down pipe bracket and tap into locked position (see fig.2). Which way is the right way up for pipe brackets? Pipe brackets should be fixed with the wider metal band of the bracket to the top and the chamfered edge of the clasp lip to the top. Bottom Ends of Down Pipes Rainwater Shoes are available to divert water away from the building (see fig.1). Overlap the shoe with a down pipe bracket to provide additional security. Icopal Down Pipes can be directly connected to drainage systems (see fig.2) by use of the Icopal Extension Sliding Pipe (see fig.2, A ), Icopal Drain Bowl Strainer (see fig.2, B ), and Icopal Drain Bowl Strainer Sleeve connector (see fig.2, C ). Down Pipe Connector Down Pipe Branches 60 o Icopal Rainwater Branch Pipes are available designed to be flush fitted together to provide an unimpeded drainage flow. Each Icopal Branch Pipe is joined to down pipes via an internal socket arrangement. Each branch pipe joint should be supported with Icopal Down Pipe Brackets fixed at not more than 150 mm from the joint.
6 Form an Offset Bend Offset bends (swan necks) can be formed using 2no 75 o Offset Bends. Icopal Offset Bends are tapered and are designed to be interference fitted to each other or to outlets and down pipes, care must be taken during installation to ensure that the narrowest end of the offset bend is always at the lower end of the pipe. By combining Icopal Offset Bends with a Icopal Middle Section Pipe (0.5m short length of pipe) a wide variety of angles and soffit overhangs can be formed, see fig. M to right and chart below. The middle piece section can be also be formed from a section of sawn off drainpipe. Relationship Between Icopal Offset Bend 75 o & Icopal Middle Section PROJ (Length of Projection, distance from wall to rear base of outlet) MS Length of Icopal Middle Section Pipe required to bridge gap H Vertical height from base of gutter to bottom end of lower offset bend 200mm Not Required 380mm 300mm 160mm 420mm 400mm 270mm 460mm 500mm 370mm 510mm 600mm 470mm 560mm 700mm 580mm 610mm 800mm 690mm 660mm This table shows the lengths of middle pieces for Icopal Offset Bend 75 o and different roof soffit projections On Completion On completion of installation, all rainwater pipes should be inspected to ensure that no obstructions are present. Rainwater system should be tested to ensure the free flow of rainwater drainage throughout the system. Maintenance In accordance with good practice, gutters, rainwater pipes, outlets and gratings should be inspected and thoroughly cleaned once a year, or more often if the building is in or near an industrial area, or is near trees.
7 Running Outlet Template Centre line of base of gutter This Edge of Template is tucked into rolled lip of front edge of gutter Cut shaded area out After cutting hole in guttering crimp cut edge down into outlet by approximately 5mm following along the position of the oval shaped dotted line Centre line of base of gutter This Edge of Template is tucked into rolled lip of front edge of gutter
Roof drainage system
Kroftman storage building Roof drainage system (E and H Models) Installation manuel V0.00KR 180501 HANG GUTTER Hang gutters are available in dimensions 125mm and in 2 different. HANG GUTTER GUTTER JOINT
More informationINSTALLATION AN EXPLODED VIEW OF A TYPICAL BRETT MARTIN RAINWATER INSTALLATION RAINWATER PRODUCT GUIDE
AN EXPLODED VIEW OF A TYPICAL BRETT MARTIN RAINWATER HANDLING Brett Martin Rainwater systems are light in weight and are therefore easy to handle. As with all other quality materials, Rainwater components
More informationINSTALL GUTTERING. 2 - Planning the work. Care is needed in setting out the guttering accurately, but actually fitting it is relatively easy.
INSTALL GUTTERING Care is needed in setting out the guttering accurately, but actually fitting it is relatively easy. Before you climb a ladder, make sure it is stable and fixed securely to the structure
More informationROOF Drainage System Creating Waterfall. Made in Sweden
ROOF Drainage System Made in Sweden ULTRA MODERN PRODUCTION CARACOL. A new star in the sky. CARACOL rainwater system is designed to integrate aesthetically and functionally with the rest of the roof.
More informationCOMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE
INTRODUCING THE CLICKFAST FASCIA AND GUTTER SYSTEM The Clickfast Fascia and Gutter System was originally designed by Stratco and has proven to be the most successful fascia and gutter system in Australia
More informationINSTALLATION GIUDE.
INSTALLATION GIUDE INTRODUCTION The instructions and drawings included here are intended only as a guide for the installation of ECO Roofing Systems Spanish and Modern profiles. The materials and methods
More informationTable of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1
Table of Contents DECRA Tile & Shake Roof Overview... 2 Introduction... 3 Safety... 3 Tools.... 3 Estimating Sheets... 4 Codes & Requirements... 4 Roof Slope... 4 Underlayment... 4 Deck Preparation....
More informationTerrabella Shake & Shingle Znap Ver. 2.0
Terrabella Shake Znap Actual length = 52.6 Actual Width = 16.33 Coverage length = 49.7 Coverage width = 14 Terrabella Shingle Znap Actual Length = 52.375 Actual Width = 15.25 Coverage Length = 49.375 Coverage
More informationStep 1: Planning the project
Step 1: Planning the project 1 of 1 Completed gutter Evaluate and plan the project Professionally installed continuous gutters using strip miters or the box style corners, remember to add 5 for each outside
More informationYUKON PATIO COVER INSTALLATION INSTRUCTIONS
YUKON PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin: Consult your local building department for any required permits You may be required to obtain a building permit for this structure. Contact
More informationINSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS
INSTALLATION GUIDE Outback VERAnDAHS PATIOS CARPORTS Flat Attached BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback
More informationOUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS
BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Outback Flat Verandah. It is the builder s responsibility to ensure any
More informationTABLE OF CONTENTS + PRODUCT CHART
Installation Guide TABLE OF CONTENTS + PRODUCT CHART Installation of New Gutters with Combo Hanger...1 Installation on Flat Hangers or Spike/Ferrule...2 Installation on Zip Hangers...4 Installation on
More informationREGAL. Installation Manual
REGAL Installation Manual General Information The details shown on the following pages are suggestions or guidelines for installing the Regal system. The installation details shown here are proven methods
More informationSeries 1500 Aluminum Door Canopy
Series 500 Aluminum Door Canopy with Sidewings It is our recommendation that you read instructions carefully prior to assembly and installation. Series 500 with Sidewings mounting bar (A) top trim (B)
More informationInstallation Guide Simplicity Alfresco. V1.9 Lu070318
0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless
More informationInstallation Guidelines
Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and
More informationROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION
ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION ROOF FRAMING INFORMATION It is the responsibility or roofers, building
More informationXenon 05 Installation Instructions & Parts List
Xenon 05 Installation Instructions & Parts List Illustration Xenon 05, H1 Handle Left Hand: Open Out 26/05/2016 Revision 2.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed by suitably
More informationInstallation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation
Step 7. Transition s and Accessories Step 3. Valley Step 6. Hip and Ridge Installation Step 2. Rake Trim Step 5. Installing the Shingles Step 1. Eave Starter Installation Step 4. Endwall s Installation
More informationCurium 19.4H Installation Instructions & Parts List
Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationinstallation guide Villa
installation guide Villa Table of Contents Introduction............................. 2 Safety................................... 2 Tools.................................... 2 Codes & Requirements....................
More informationShingle Installation Guide
Installation Guide Roof Framing Information Installation Installation Accessory Installation Estimating Data General Information Roof Framing Information It is the responsibility or roofers, building contractors
More informationStratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE
INSTALLATION GUIDE Stratco Sanctuary Verandahs, Patios and Carports BEFORE YOU START It is important to check with your Local Government Authority prior to the installation of your new Stratco Sanctuary
More informationGallium 03 Installation Instructions & Parts List
Gallium 03 Installation Instructions & Parts List Illustration Gallium 03, H1 Handle Left Hand: Open Out 04/05/2016 Revision 1.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed
More informationINSTALLATION INSTRUCTIONS FOR ULTRA LATTICE AND ALUMAWOOD ARBORS
INSTALLATION INSTRUCTIONS FOR ULTRA LATTICE AND ALUMAWOOD ARBORS GENERAL INFORMATION: Lattice arbors are designed to be freestanding or attached. They are designed to resist a 10 lb. to 30 lb. per square
More informationEnsure there is reasonable access for materials and working space, ensure the shed site is level and consider the disposal of run-off water.
INSTALLATION GUIDE TM Flat Roof Homesheds THE POTTER BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Potter Flat Roof
More informationGuide to steel rainwater system components
Guide to steel rainwater system components Gutters & fittings Gutters R Half Round Gutter Roll formed 0.6mm steel with bead stiffened fronts Can be joined using RSK gutter joint or roll joint method Supplied
More informationPlayaway Swiss Cottage Assembly Instructions
Playaway Swiss Cottage Assembly Instructions English SS288C IMPORTANT SAFETY INFORMATION Adult assembly is required. Checks and maintenance needs to be carried out on the main parts (fixings etc.) at regular
More informationInstallation guide. Step-by-step instructions
Installation guide Step-by-step instructions Contents Tools Required to Install p1 Screws & Fixings p2 Injection Moulded Solid Components p3 Components p4 Georgian Hips & Ancillaries p5 Fixing Eaves Beam
More informationScratch Build a Water Tower
Here s some Prototype details Photos Courtesy of Rodney Doster Water Spout and Discharge Pipe Tank Bands Here s some more Prototype details Photos Courtesy of Rodney Doster Weather Vane as a Finial Using
More informationDESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS
DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS GENERAL DESCRIPTION: The Designer Series Gutter System is a specially designed roof edge drainage product for industrial, commercial, and high end
More informationInstallation Instructions
Installation Instructions ROLL VENT STANDARD / METRIC Page Installation Considerations 3 Roll Vent Standard General Installation 4 Roll Vent Metric General Installation 5 Steep Pitch Guidelines 6 Asphalt
More informationInstallation Guide Simplicity 6. v3.5 lu171117
0845 869 6006 www.canoports.co.uk Installation Guide Simplicity 6 v3.5 lu171117 Tools Required Below is a list of tools that you will require to install the Simplicity 6 Canopy or Carport. Cordless Drill
More informationCurium 19H Installation Instructions & Parts List
Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationInstallation Manual. Future Roof Shingle / Slate Products
Installation Manual Future Roof Shingle / Slate Products REVISED 14/09/2010 Future Roof Shingle Installation Manual is a component of Future Roof, Inc. and as such is intended to be used with Future Roof
More informationBest Buy Metals Toll Free / Phone / Fax
DETAIL MANUAL for Vertical Seam Best Buy Metals Toll Free 1-800-728-4010 / Phone 423-479-6382 / Fax 423-728-3066 www.bestbuymetals.com Vertical Seam Roofing Panels Fig. 2 Vertical Seam Has 1-3/4" high
More informationInstallation Guide 2016
Installation Guide 2016 BUILDERS EDGE INSTALLATION GUIDE This guide will show you the products of the Builders Edge family. It provides specific installation steps and application details. Our main goal
More informationSiding Components. Installation Guide
Siding Components Installation Guide 2016 MID-AMERICA SIDING COMPONENTS INSTALLATION GUIDE This guide will show you the products of the Mid-America Siding Components family. It provides specific installation
More informationCURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START
ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction
More informationINSTALLATION GUIDE. Flat Roof Homesheds TM BEFORE YOU START TOOLS REQUIRED
INSTALLATION GUIDE Flat Roof Homesheds TM BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Flat Roof Homeshed. Read these
More informationDUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL
DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 4 Step 2a Footing Set-Out for Concrete
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationTable of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...
Table of Contents DECRA Shake XD Roof Overview.... 2 DECRA Shingle XD Roof Overview.... 3 Introduction... 4 Safety... 4 Tools.... 4 Estimating Sheet... 4 Codes & Requirements... 4 Roof Slope... 4 Underlayment...
More informationInstallation Guide Contemporary Alfresco V1.3 LU
Installation Guide Contemporary Alfresco V1.3 LU 010818 Tools Required Below is a list of tools that you will require to install you're the Contemporary Alfresco System. Cordless Drill Mastic Gun Spirit
More information1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS
1200 SERIES 2 PANEL DOOR 10.2013 rev.1 DETAILED INSTALLATION INTRUCTIONS GENERAL: Door elevations shown in these instructions are as viewed from the outside. X denotes the active or moving panel(s). O
More informationRadon 07 Installation Instructions & Parts List
Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by
More informationInstallation Manual. Future Shingle Products
Installation Manual Future Shingle Products TITLE REVISED 7/4/2011 Future Shingle Installation Manual is a component of Future Roof, Inc. and as such is intended to be used with Future Roof products only.
More informationINSTALLATION GUIDE LEARN MORE AT DECRA.COM
Villa Tile INSTALLATION GUIDE LEARN MORE AT DECRA.COM Table of Contents DECRA Villa Tile Roof Overview... 2 Introduction... 3 Safety... 3 Tools.... 3 Estimating Sheet... 3 Codes & Requirements... 3 Roof
More informationDubnium 11 Installation Instructions & Parts List
Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.
More informationXL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS
XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT
More informationInstallation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes
Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional
More informationSIDING-MASTER VINYL SIDING ATTACHMENT & ALIGNMENT SYSTEM & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS
Patent Pending SIDING-MASTER & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS Overview... SIDING-MASTER Strip Diagram... How to cut strips for length... Accessory Diagrams... How to (and
More informationALUMA-VENT AWNING REGULAR END STYLE INSTALLATION INSTRUCTIONS
ALUMA-VENT AWNING REGULAR END STYLE INSTALLATION INSTRUCTIONS Contact us at: 1-888-442-2928 or www.americana.com Options in your kit: A. Splice Pg 16 B. Column Pg 17 C. C-Channel Brace Pg 19 D. Runner
More informationINTRODUCTION. EqunioxRoof.com. Pro Tip
INSTALLATION MANUAL INTRODUCTION The Equinox Louvered Roof System is designed to be installed in an aluminum frame. All these sections are 1/8" thick extruded aluminum. All engineering for this system
More informationINSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED
INSTALLATION GUIDE Flat Roof Homesheds TM Onto Concrete BEFORE YOU START It is important to check your Local Government Authority requirements before the installation of your new Stratco Flat Roof Homeshed.
More informationFRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274
FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 QCI0274 QCI5274 REV. Rev. 1 0 Page Page 1 1 Date Certified: Certified 06/16/2016 10/01/10 Parts List with wall mount hinges ITEM NO. Part # DESCRIPTION
More informationBathroom Installation Guide
Bathroom Installation Guide Please read instructions carefully and check products before starting. Products should be fitted/installed by an experienced and competent fitter, failure to do so may invalidate
More informationInstallation Guidelines
Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and
More informationFrameless Inline Door With Return QCI5263
INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges
More informationSeries 1100 Aluminum Door Canopy
Series 00 Aluminum Door Canopy with Support Arms It is our recommendation that you read instructions carefully prior to assembly and installation. Series 00 with Support Arms MOUNTING BAR (A) TOP TRIM
More informationhargreaves cast iron installation guide
Jointing Methods for Rainwater Pipes Vertical rainwater pipes would not normally be sealed. Only seal joints between gutter outlet and rainwater pipe or offset plus any joints in a horizontal position
More informationFrameless Inline Door QCI5254
INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5254 FRAMELESS DOOR / PANEL QCI5254 REV. 0 Page 1 Cer fied 06/16/2016 Parts List with wall mount hinges *Quanes may vary QCI5254 REV. 0 Page 2 Cer fied
More informationInstallation Manual for Metal Emperor Lockers
P a g e 1 Table of Contents Page General Notes and Tools Required 2-3 Assemble Shelves with Coat Hooks/Coat Rods 4 Fastening Chart 5 Knock Down Locker Assembly (Banks of Three) 6-12 Appendix A: Dress End
More informationGABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 3 Step 2a Footing Set-Out for Concrete
More informationRoofs. Installation instructions Models Classic C and D
Roofs Installation instructions Models Classic C and D A complete roof includes a lot more than just the roofin g sheets. A combination of lead-ins, water removal systems, ladders, roof bridges and snow
More informationShed Assembly Instructions
Shed Kit Contents The shed kit includes all the parts needed to assemble your shed except for tools and fasteners such as screws and nails. The various pieces are pre-cut and many are marked to indicate
More informationSiding Systems NOVIKSTONETM FS FIELDSTONE INSTALLATION GUIDE
Siding Systems NOVIKSTONETM FS FIELDSTONE GENERAL INFORMATION CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION/CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS WILL ALLOW FOR
More informationMULTISPAN GABLE WITH HIP END ATTACHED PATIO
MULTISPAN GABLE WITH HIP END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your supplementary guide to building an ATTACHED MULTISPAN GABLE VERANDAH or PATIO WITH HIP END This set of instructions
More informationRecommended Slating Tools
Recommended Slating Tools Product Size L Sketch of Article No. Description 60-070 Scriber 60-00 Slater s Hammer 60-00 Slater Ripper 60-080 Parallel Shears 60-0 Slate Cutter Kwiksnip Slate Guuillotine Slate
More informationGreenhouse Assembly Instructions
Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free 7 days a week on 0800
More informationSUPREME WALL GARDEN ASSEMBLY INSTRUCTIONS 24/08/16 www.hallsgreenhouses.com Please refer to website for the most up to date instructions. SAFETY WARNING 1. Always wear protective glasses, shoes, gloves
More informationStone coated steel roof tile INSTALLATION GUIDE
Stone coated steel roof tile INSTALLATION GUIDE Ⅰ. Introduction These installation details are provided to demonstrate recommended installation methods for KD One roof products and accessories. Consult
More informationGIRTS ON BACK OF BUILDING
GIRTS ON BACK OF BUILDING ALL GIRTS ARE 1 1/2 SQUARE TUBE. GIRT LENGTHS FOR 12, 20, 24, AND 30 WIDE BUILDINGS: ON 12 WIDE BUILDINGS GIRTS ARE 67 3/4 LONG ON 20 WIDE BUILDINGS GIRTS ARE 56 3/4 LONG ON 24
More informationDECRA Shingle Installation Guidelines
Installation Guide DECRA Shingle Installation Guidelines General Instructions Failure to use these guidelines may void the product warranty. Local building codes may require additional application techniques
More informationLUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February
LUX Panel V Groove Installation Installation Guide February 2017 www.luxpanel.ca LUX Panel V Groove Installation LUX panel steel cladding is designed to be installed vertically, horizontally, diagonally
More informationTOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill
DEVICES COVERED IN THIS DOCUMENT: 4700S Surface Vertical Rod Device 4700SF Fire Exit Surface Vertical Rod Device TOOLS REQUIRED Metal Wood Wood and Metal Screws Sex Bolts #7 Drill ¼ -20 Tap #16 Drill #12-24
More informationINSTALLATION AND CARE INSTRUCTIONS
INSTALLATION AND CARE INSTRUCTIONS Vertical Applications Honeycomb Shades 52 C8-10-3401 Rev 2/14 CONTENTS Introduction...2 Before You Begin...3 Vertical Application Parts Overview...4 Materials Required...5
More informationCONSERVATORY ROOF INSTALLATION GUIDE Issue
CONSERVATORY ROOF INSTALLATION GUIDE Issue 3 CONTENTS 1. Statements 2. General assemblies 3. Victorian / Edwardian roof installation 4. Jack rafter installation 5. P-shaped roof installation 6. Lean-to
More informationInsolroll Clutch Operated Shades Installation Instructions Installation Instructions
All clutch operated shades are shipped fully assembled and ready for installation. Mounting screws are not provided. Screws for chain guide installation to meet the child safety standards are provided.
More informationHeavy Wall Applied Stop Tube Frame and Door Installation
INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation Read all instructions before beginning installation. These instructions are provided to help prevent installation problems
More informationInstallation Guidelines
Installation Guidelines Exteria Building Products provides these instructions as general guidelines only. Exteria Building Products neither installs siding nor has any control over any installation. The
More informationICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450)
ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) 565-6336 FAX: (450)565-6519 www.icc-rsf.com INSTALLATION AND OPERATION INSTRUCTIONS "Model VIP" CHIMNEY TYPE: FACTORY BUILT
More informationFrameless Inline Door QCI5248
INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5248 FRAMELESS PANEL / DOOR / PANEL QCI5248 REV. 0 Page 1 Certified 06/16/2016 Parts List with glass to glass hinges *Quantities may vary. **Support Bar
More informationChapter 11. Siding and Soffit
Chapter 11. Siding and Soffit 11.1 SIDING PREP 11.2 INSTALLING HOUSE SIDING 11.3 INSTALLING SHED SIDING 11.4 INSTALLING SOFFIT 11.5 INSTALLING FASCIA 11.6 INSTALLING SHUTTERS 11.7 SITE CLEANUP Tools needed
More informationEurocell conservatory roof system. Installation manual Issue 3
Eurocell conservatory roof system Installation manual Contents Statement General Assemblies Cross Sections Victorian/ Edwardian Roof Installation Jack Rafter Installation P Shape Roof Installation 15-45
More informationINSTALLATION PROCEDURE
Vinyl Siding INSTALLATION PROCEDURE Tools Needed and Preparation MOST ESSENTIAL TOOLS The proper tools, materials and equipment can make the installation of Durabuilt Vinyl Siding much easier. Here are
More informationCONTENTS. Transitions Board and Batten Vertical Installation... 10,11
INSTALLATION MANUAL CONTENTS Important Notes... 2-4 Weather Protective Barriers... 2 Storage and Transportation... 2 Tools and Equipment... 2 Fastener Choices... 3 Wall Preparation... 3,4 Flashing... 4
More informationSafety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set
BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS FURNITURE VALENCIA Vanity Floor Standing Models Contemporary design and quality construction, providing affordable storage for bathrooms of any size or style. It s the details
More informationInstallation Instructions
Installation Instructions XTRACTOR VENT X18 / X18 XTRA / XLP Page Installation Considerations 3 X18 and X18 Xtra General Installation 4 XLP General Installation 5 Steep Pitch Guidelines 6 Asphalt Shingles
More informationE-Z BUILD STEEL BARN 12' 12' 12' 16' 12' 20'
E-Z BUILD STEEL BARN 12' 12' 12' 16' 12' 20' BUILD You can construct your own E-Z frame barn with the help of this step by step guide. North American softwood dimensional lumber sizes: Nominal Actual in
More informationTuff-Rib Install Guide
Install Guide bestbuymetalroof.com Page 2 of 27 Page 3 of 27 1. Page 4 2. a. Installation Guide b. Panel Squaring Pages 5, 6 Pages 7, 8 3. Pages 9, 10 4. a. Fascia (optional) b. Eave / 1.5x3.5 Angle c.
More informationTIOGA Table of Contents
Table of Contents TABLE OF CONTENTS Product Data Sheet...2 Engineering Data...3 General Information...4 Handling...5 Roof Preparation...5 Fastening Recommendations...6 Field Cutting...7 Touch-up Paint...7
More informationWith Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans
With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,
More informationInstallation Manual 0318
Installation Manual 0318 DOUBLE 7 CEDAR SHINGLE INSTALLATION GUIDE General Information CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION / CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS
More informationStraight Rib Series Metal Roofing Panel Installation Guide
D-Rib G-Rib C-Rib Straight Rib Series Metal Roofing Panel Installation Guide 7000 AIRPORT LINE R.R., BOX 7 HENSALL, ONTARIO N0M X0 EASY BUILDING PRODUCTS TEL. : 5-6-07 TOLL FREE : -888-76-777 FAX: 5-6-08
More informationPacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation
Pacifica Pool House Assembly Manual Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST Package ships as shown Simpson Hurricane Straps Double Insulated Raised-Panel Door in back wall (71 x71 Total opening)
More information8 x 10 Timber-frame Garden Shed
8 x 10 Timber-frame Garden Shed Includes: Step-By-Step Instructions, Complete Details & Materials Lists Timber-framing is a traditional building method that uses a simple framework of heavy timber posts
More informationDETAIL MANUAL for Standing Seam / Image II
DETAIL MANUAL for Standing Seam / Image II Best Buy Metals Toll Free 1-800-728-4010 / Phone 423-479-6382 / Fax 423-728-3066 www.bestbuymetals.com Best Buy Metals Standing Seam Roofing Panels Fig. 2 Standing
More information