PAR AG presentation. May ROCKVILLE PIKE ELEMENTARY & PRESCHOOL BUILDING
|
|
- Juniper Booker
- 5 years ago
- Views:
Transcription
1 PAR AG presentation May
2 agenda 1 project scope 2 site design 3 building design 4 budget and schedule 5 questions & answers
3 A beautiful site
4 project key data o o o o Capacity: 700 students Class structure Nursery school TPS- 2 year olds- 2 x12 students PS- 3 year olds 3 x18 students MS 4 year olds- 4 x18 students GS- 5 year olds 4 x18 students Elementary school CP- CM2 (grades 1-5): 5 x 20 students Total Program space New campus= 71,000 sqft Currently BRD + RWD = 32,000sqft 4 lunch rooms available for students lunch Hours of operations: 7am to 7pm School program from 8:30 am to 3:30pm Morning Daycare from 7am to 8:30am Afterschool activities from 3:30pm to 5:30pm Afternoon Daycare from 5:30 to 7pm New campus- The new bus hub Where bus park overnight Where all 13 routes leave from and get back to Staff- overall at full capacity with all hourly personnel: about 200 staff including the administration team currently in FRD
5 project status On March 20 th, the zoning application was filed with Park and Planning, o Review process has started based on a proposed site plan, statement of operations and traffic impact survey The financing process is in progress- the RFP was just sent to banks o Objective is a closing in September 2018 Next phase: o review of our application by Park and Planning teams by Summer 2018 o Sale of the two properties purchased on Old Georgetown Rd and the Nursery school
6 site design
7
8 design
9 4 th 3 rd 2 nd Elementary School car drop-off 2 nd flr Elementary School bus drop-off 1 st flr 1 st elementary school entrances
10 nursery school
11 pre-school entrance from garage car drop-off entrance Option A- 2 nd floor plan
12 Option A- 1 st floor plan
13 elementary school
14 Elementary School stair 752 sf 708 sf 781 sf 744 sf 745 sf 2084 sf Elementary School bus drop-off 1 st flr Option A- 2 nd floor plan
15 888 sf 928 sf 839 sf 747 sf 712 sf 781 sf 744 sf 863 sf 872 sf 752 sf 3 rd grade classrooms (5) 2 nd grade classrooms (5) Option A- 3 rd floor plan
16 886 sf 920 sf 839 sf 824 sf 710 sf 781 sf 859 sf 744 sf 752 sf 868 sf 5 th grade classrooms (5) 4 th grade classrooms (5) Option A- 4 th floor plan
17 896 sf 392 sf 393 sf Option A- lower level plan
18 Option A- 5 th floor plan
19 Rochambeau - The French International School Comparative Analysis Bradley Campus Rollingwood Campus Total Program SF 71,068 SF 11,176 SF 20,992 SF Minimum Class Size 708 SF 370 SF 268 SF Maximum Class Size 1,165 SF 980 SF 925 SF Gymnasium SF 2,084 SF - 2,440 SF** Multipurpose SF 6,000 SF 1,386 SF - Toilet Fixture Count* Toilets 27 Toilets Notes: * The toilet fixture count total includes both student and adult toilets. ** The stage is not included in the gymnasium square footage.
20 Budget and schedule
21 Description Project Target Budget Number of students Gross property Area Gross Program Area acres 111,364 sqft Total Land Costs $24,590,000 Total Hard costs $18,588,359 Total Soft Costs $3,410,234 Contingency (hard and soft) $2,200,568 TOTAL DEVELOPMENT COSTS $48,789,000
22
23 questions & answers
Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference
Campus Circulation Improvements Thursday, March 17, 2016 Pre-Proposal Conference Meeting Agenda Part I: General, Part II: Submittal, Part III: Project I. General Welcome Introductions Questions: efrere@uncc.edu
More informationSt. John Paul II Catholic Parish
St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not
More informationGREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study
GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON
More informationOLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN
KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12
More informationGREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM
Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION
More informationRECORD OF BOARD PROCEEDINGS (MINUTES) Lee County Board of Education Regular Meeting
RECORD OF BOARD PROCEEDINGS (MINUTES) Lee County Board of Education Regular Meeting The Lee County Board of Education met in Regular Session in the Lee County Board of Education Board Room Board Room at
More informationHuntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y
Huntington Beach City School District M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y 0 1 7 Agenda 1. Where are we in the process?. Measure Q Bond Program
More information3647 N SOUTHPORT AVE CHICAGO, IL 60613
DEVELOPER P.O. BOX 1041 EVANSTON, ILLINOIS 60204 P: (773) 529-3700 P: (773) 977-8072 C O P Y R I G H T 2 0 1 7, S U L L I V A N G O U L E T T E W I L S O N, L T D. ARCHITECT SULLIVAN GOULETTE & WILSON,
More informationCheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT
Cheney Building & Bennet Academy own of Manchester Phase 1 Study Presentation - April 10, 2013 Schools Modernization & Reinvestment eam Revisited Board of Directors Board of Education DRAF ai Soo Kim Partners
More informationARMSTRONG ELEMENTARY S PTA POSTIONS
ARMSTRONG ELEMENTARY S PTA POSTIONS EXECUTIVE PTA BOARD POSITIONS: President: Preside at all meetings of the Executive Board and the General PTA, oversee Executive Committee, appoint committee chairmen
More informationRFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017
#Question & Answer: #1 The RFP states that there is one week to complete all survey work. Please confirm this duration and that no other time will be allowed for survey work. The week identified in the
More informationDASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work
DASD Loganville Springfield Elementary School Site Feasibility Review Prepared by: Site Design Concepts, Inc. March 30, 2016 Background For This Work No architectural programming or investigation was completed
More informationPROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationPROPOSAL FOR REVIEW AND COMMENT
PROPOSAL FOR REVIEW AND COMMENT September 18, 2017 SUBMITTED TO: MINNESOTA DEPARTMENT OF EDUCATION SUBMITTED BY: INDEPENDENT SCHOOL DISTRICT #518 WORTHINGTON SCHOOL DISTRICT 1117 MARINE AVENUE WORTHINGTON,
More informationHorace Mann Elementary
2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are
More informationHarding Senior High School
1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to
More informationGUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS
Updated: June 2018 GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS 1. Formal Presentations are made to the University's Board of Trustees in February,
More informationPresentation for. Raymond E. Shaw Elementary School Building Committee
Presentation for Raymond E. Shaw Elementary School Building Committee 11.01.2018 AGENDA 1. School Tour Penn Brook School 2. Design Options with Cost 3. Schedule School Tour Penn Brook School, Georgetown,
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2015 - Fall School: UNO Charter School - PFC Omar E. Torres Campus Oracle Unit: 66396 Building ID: 3345 Address: 4248 W 47th St. Region: 04 Mail Room: 44 Surveyor:
More informationouglas Intermediate School
ouglas Intermediate School DOUGLAS INTERMEDIATE/ELEMENTARY SCHOOL Board of Selectmen / Finance Committee February 15, 2011 DiNisco Design www.dinisco.com Site Discussion Site Discussion Site Discussion
More informationWILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305
WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal
More information1001 Feehanville Drive Phone Mt. Prospect, IL Fax
NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 November 29, 2016 Community Unit School District 200 130 West Park Avenue Wheaton, IL 60189
More informationCROW ISLAND SCHOOL AT A LOCATION IN A MODALITY 59% TOP 5 TAKE-AWAYS AREA COMPARISON ENROLLMENT HISTORY
CROW ISLAND SCHOOL Crow Isl School opened 9 with an addition 95 on a 7.-acre site. The school s gross square footage 66,75, with an optimal capacity 6 s. % FACILITATED % LECTURE % PRESENTATIONENTATION
More informationThe purpose of this Supplemental Report is to provide City Commission and Staff updated metrics related to the Center s summer programming.
A Supplemental Report to the City of Sunrise Commission Prepared: August 16, 2017 INTRODUCTION: On June 26, 2017, The Sunrise Center for Excellence in Chess ( the Center ) prepared an interim report to
More informationScotland County Board of Commissioners regular meeting June 5, 2017, A.B. Gibson Center, 322 South Main Street, Laurinburg, NC
Commissioners in attendance: Chair Carol McCall, Vice Chair Whit Gibson and Commissioners John Alford, Bob Davis, Betty Blue Gholston, and Guy McCook. Not in attendance: Clarence McPhatter. Staff in attendance:
More informationMELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma.
MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma. Hoover, Winthrop and Horace Mann Elementary Schools September 27, 2016 Tappe Architects Inc. HOOVER ELEMENTARY SCHOOL - SITE PLAN REMOVE EXISITNG
More informationSummerland Planning Advisory Committee
Summerland Planning Advisory Committee SunPAC Meeting #32 May 10, 2011 1 SunPAC Meeting Agenda Call to Order Agenda Item: 1 Item 1: Pledge of allegiance and roll call Item 2: Public comment period Item
More informationAUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes
AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes Meeting No. 4 Date: 5/12/2018 Job No. Meeting Location: AVS Conference Room The following notes were taken during a meeting on
More informationFUTURE ACTION ITEM #6 WSU Pullman, Troy Hall Renovation - Schematic Design and Construction (Olivia Yang)
FUTURE ACTION ITEM #6 WSU Pullman, - Schematic Design and Construction (Olivia Yang) TO ALL MEMBERS OF THE BOARD OF REGENTS SUBJECT: PROPOSED: SUBMITTED BY: SUPPORTING INFORMATION: WSU Pullman,, Schematic
More informationADDENDUM #2 September 12, 2018
Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications
More informationSMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)
REVIEW TYPE: PRELIMINARY FINAL LANDSCAPE ABBREVIATED ADDITION COLOR BOARD Application Form* X X X X X Design Review Fee* X X X Registered Survey** X Site Plan X X X X X Floor Plans X X X Elevations X X
More information100,000± SF OFFICE FOR LEASE AT FORMER MACY S SITE
100,000± SF FOR LEASE AT FORMER MACY S SITE SOUTH RIVER ROAD 100,000± SF 175 Canal Street, Suite 401 Manchester, NH 03101 MAIN +1 603 623 0100 www.colliers.com/newhampshire PROJECT OVERVIEW SOUTH RIVER
More informationCherokee Heights Elementary School
694 Charlton Street Project Summary: Cherokee Heights Elementary is about to start its exciting transition to a Montessori learning model. The school is connected to the Baker Center which is currently
More informationThe Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011
The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee Clinton Town Hall January 20, 2011 Tonight s Agenda History of Morgan School and of the Building
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationVILLAS LARGE SQ.FT. ( SQ.MTR.) ROLLER SHUTTER ABOVE COURTYARD VERANDAH 9 X 8-3 GARAGE 22-6 X 8-3 OUTDOOR INFINITY POOL 23 X 8-3 RAMP
PLANS LARGE - 8500 SQ.FT. (789.67 SQ.MTR.) WATER FEATURE COURTYARD VERANDAH 9 X 8-3 GARAGE 22-6 X 8-3 ROLLER SHUTTER ABOVE OUTDOOR INFINITY POOL 23 X 8-3 6-6 WIDE RAMP BAR 13 X 14-3 STORE DECK 5-6 WIDE
More informationTrustees Present: Chairman Abrego, Vice-Chair Binion, Trustee Donahue, Trustee Monasterio, Trustee Knox
9730 Mountain Home School District No. 193 SCHOOL BOARD MEETING FEBRUARY 20, 2018 SCHOOL ADMINISTRATION OFFICE I. CALL MEETING TO ORDER Chairperson/Vice-chairperson. Chairman Abrego convened the regular
More informationCITY OF NORWALK PUBLIC LIBRARY BOARD OF DIRECTORS MEETING NOVEMBER 8, ATTENDANCE: Alex Knopp, Chairman; Jannie Williams; Mary Mann; Moina Noor;
CITY OF NORWALK PUBLIC LIBRARY BOARD OF DIRECTORS MEETING NOVEMBER 8, 2018 ATTENDANCE: Alex Knopp, Chairman; Jannie Williams; Mary Mann; Moina Noor; Thomas Cullen; Ralph Bloom; Taber Hamilton; Tyrone McClain
More informationCAC MEETING, FEB. 28 TH, 2017 NADAAA
ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL
More informationSan Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning. September 27, Raoul Wallenberg High School
San Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning September 27, 2011 Raoul Wallenberg High School Summer of 2011 Continuing the task to fix, repair, make
More informationWhere To Start: Collegiate Space Needs & Planning Standards
Where To Start: Collegiate Space Needs & Planning Standards Where To Start: Space Needs & Planning Standards Stephen E. DeHekker, AIA, LEED AP BD+C Senior Vice President James Gabel, AIA, LEED AP Senior
More informationRECORD GROUP NUMBER 156
DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services
More informationGUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)
GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) TO ARLINGTON COUNTY GOVERNMENT (ACG) Effective Date: February 15, 2016 Prepared by: Arlington
More informationAshby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update
Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR)
More informationCircle the right answer for each question. 1) Ratio tells us the size of two or more amounts compared to each other. True or false?
Quiz Ratio and proportion Level A Circle the right answer for each question. 1) Ratio tells us the size of two or more amounts compared to each other. True or false? A) True B) False 2) There are 5 women
More informationMoorhead / Dilworth Fixed Route Expansion Study
Moorhead / Dilworth Fixed Route Expansion Study Prepared for: MATBUS Prepared by: Fargo Moorhead Metropolitan Council of Governments April 2014 Introduction With growth in southeast Moorhead and Dilworth,
More informationJohn A Johnson Elementary School
740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The
More informationMarcus Moziah Garvey Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCentral High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015
275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.
More informationJackie Robinson Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNOTTINGHAM II E L E V A T ION 9
NOTTINGHAM II E L E V A T ION 9 ELEVATION 1 ELEVATION 2 ELEVATION 3 ELEVATION 5 ELEVATION 6 ELEVATION 8 R3-06-16-17 NOTTINGHAM II Approximate Sq.Ft. 2,112 to 3,815 4 Bedrooms, 2.5 to 3.5 s 2 to 3 Car Garage
More informationCOTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC
GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION
More informationName: Letter: B.E.E. Binder BRING EVERYTHING EVERY DAY. Miss Gillis Room #12
Name: Letter: B.E.E. Binder BRING EVERYTHING EVERY DAY Miss Gillis Room #12 2010-2011 B.E.E. Binder Questions & Answers Question: What is a B.E.E. Binder? Answer: No, it is not for a real bee B.E.E. stands
More informationINTERIOR SIGNAGE MANUAL
INTERIOR SIGNAGE MANUAL ➊ Purpose ➋ Procedures ➌ ADA Requirements INTERIOR SIGNAGE MANUAL ➍ Text, Braille, Pictograms and Color ➎ Families of Interior Signage ➏ Mounting Guidelines ➐ Signage Diagrams ➑
More informationPRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.
MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD
More informationArnolfini Access Statement
Arnolfini Access Statement Image 1: Arnolfini from the water About Arnolfini In a fantastic waterside location at the heart of Bristol s harbourside, Arnolfini is one of Europe s leading centres for the
More informationSummerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011
Summerland Planning Advisory Committee SunPAC Meeting #31 April 28, 2011 1 SunPAC Meeting Agenda Call to Order Item 1: Pledge of allegiance and roll call Agenda Item: 1 Item 2: Public comment period Item
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationThe Coffee County Board of Education met in regular session on September 9, 2010 at the Coffee County Board of Education.
The Coffee County Board of Education met in regular session on September 9, 2010 at the Coffee County Board of Education. Ms. Esther J. Sims, Vice-Chair led the meeting in the pledge of allegiance and
More informationCAPITAL IMPROVEMENT PROGRAM
CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:
More informationCone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference
Cone HVAC Modernization Thursday, September 1, 2016 Pre Proposal Conference Meeting Agenda Part I: General Part II: Submittal Part III: Project Overview Part IV: Questions General Welcome Introductions
More informationPlanning and Zoning Application & Checklist
City of Driggs, Idaho Planning & Zoning 60 S. Main Street PO Box 48 Driggs, ID 83422 Ph: (208) 354-2362 Fax: (208) 354-8522 www.driggs.govoffice.com Planning and Zoning Application & Checklist DESIGN REVIEW
More informationAdams Spanish Immersion 615 Chatsworth Street South
Project Summary: Adams Spanish Immersion is an international education without the travel expense. Our school is a place where families and staff value the opportunities gained from learning a second language.
More informationExhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule
Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample
More informationAREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 1 BERRY PLACE LONDON EC1V
AREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 1 BERRY PLACE LONDON EC1V 1 BERRY PLACE LONDON EC1V Project Number 36889 Contents Report Issue Status Survey Report Summary of Areas Reference
More informationSTEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationSCARSDALE PUBLIC SCHOOLS. Greenacres Feasibility Study
SCARSDALE PUBLIC SCHOOLS Greenacres - 2015 Feasibility Study Committee List Lee Maude Scott Silberfein Stuart Mattey John Trenholm Liz Marrinan Sharon Hill Paul Berger Karen Guardino Carole Phillips Joan
More informationSienna Plantation 100' lots. copeland B. sheet index cover sheet. first floor
Sienna Plantation 100' lots 0 1 2 3 4 5 7 sheet index cover sheet first floor plan second floor plan elevations - front, left elevations - rear, right first floor electrical plan second floor electrical
More informationOak Park and River Forest High School District North Scoville Avenue Oak Park, IL
Oak Park and River Forest High School District 200 201 North Scoville Avenue Oak Park, IL 60302-2296 To: Board of Education From: Tod Altenburg, CSBO Phil Prale, ASCI Date: August 16, 2016 Re: Requested
More informationSummer Prince George s Community College at Joint Base Andrews Center Schedule of Credit Classes
Summer 2018 Prince George s Community College at Joint Base Andrews Center Schedule of Credit Classes 1st- h a l f s u m m e r c l a s s e s ( J u n e 4 J u l y 8 ) 2 n d - h a l f s u m m e r c l a s
More informationPLAN A at Gulfstream Preserve Workforce Housing
PLAN A 788 sq. ft. 1 Bedroom 1 Bathroom Lanai Plan A Gulfstream Preserve Plans and elevations are artist s renderings and may not accurately represent the actual condition of a home as constructed, and
More informationCharles N Holden Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationArchitectural Design Process
Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation
More informationThe meeting began with the Pledge of Allegiance and a short sectarian prayer led by Willard Stafford, Reno County Police/Sheriff Chaplain.
February 9, 2016 Reno County Courthouse Hutchinson, Kansas The Board of Reno County Commissioners met in agenda session with, Chairman Dan Deming, Commissioners James Schlickau and Brad Dillon, County
More informationSouthern Oregon University
Southern Oregon University Public Meeting Notice August 5, 05 TO: FROM: RE: Southern Oregon University Board of Trustees, Finance Committee Sabrina Prud homme, University Board Secretary Notice of special
More informationItem 2. September 28, 2017
September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project
More informationTHE COMMUTER GUIDE. Sponsored by Student Development Services, a unit of the Office of the Vice Chancellor for Student Affairs
THE COMMUTER GUIDE Sponsored by Student Development Services, a unit of the Office of the Vice Chancellor for Student Affairs WELCOME & TABLE OF CONTENTS The Commuter Student Resource Center (CSRC) at
More informationEagle Run. 132nd & W. Maple, Omaha, NE Agent: Rick Quinlevan Phone:
Eagle Run Agent: Lindsay Banks Phone: 402-502-4708 Email: lbanks@lernerco.com Agent: Rick Quinlevan Phone: 402-502-4711 Email: rquinlevan@lernerco.com 10855 W. Dodge Rd., Ste 270 Omaha, NE 68154 402-330-5480
More informationConstruction Services Architect / Engineers Guidelines
Construction Services 2016 Architect / Engineers Guidelines TL Architect/Engineer Fee Proposal Format Fee proposals should be formatted in the following content order: Client Information: Project Name:
More informationDisney II Magnet School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationElementary Campus Board Meeting
Elementary Campus - McFarland, WI Elementary Campus Board Meeting April 17, 2017 2017 Plunkett Raysich Architects, LLP 13 April 2017 # 140062-05 891.46 890.98 891.10 891.82 892.91 892.29 892.08 891.39
More informationBAYCARE BLOOMINGDALE HEALTH CENTER Bloomingdale Ave. Valrico, FL RETAIL SPACE FOR LEASE
PROPERTY HIGHLIGHTS Retail Space Available: 876 SF -,000 SF Located on Bloomingdale Ave. just east of the signalized intersection of Bloomingdale Ave. and Lithia Pinecrest Rd. Brand new state-of-the-art
More informationBoard Minutes Westover, Maryland June 19, 2007 Page 1
Board Minutes Westover, Maryland June 19, 2007 Page 1 The Somerset County Board of Education met at the J. M. Tawes Technology & Career Center, Tuesday June 19, 2007 at 6:00 p.m. to review the SIS Tawes
More informationMichael Coughenour Lockheed Martin Rotary & Mission Systems (RMS) System Engineering Technologist
A Systems Engineering approach to applying Risk Management Framework (RMF) for a successful program and a secure system a case study RMF is Not a 4-Letter Word Craig Covak Lockheed Martin Rotary & Mission
More informationMEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013
Seattle World School SWS SDAT Workshop 3 2 December 203 SPS SWS at TT Minor TCF Architecture Project Number: 203 002 MEETING MINUTES Attendance: Name Representing Role Paul Wight Seattle Public Schools
More informationJohn Spry Elementary Community School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationFAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN
KBE APPROVAL DATE: APRIL 2017 FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN DFP REVISIONS FINDING. NO. 1: APRIL 2018 BOLD NEXT DFP DUE: APRIL 2021 PLAN OF SCHOOL ORGANIZATION 1. Current Plan P, P-5, K-5,
More informationBETHLEHEM PARKING AUTHORITY BOARD OF DIRECTORS MINUTES
Joseph Hoffmeier Chairman Dino Cantelmi Vice Chairman Lynn Cunningham Treasurer Diana Morganelli Secretary Billy Kounoupis Member Bryan Callahan City Counsel Liaison Kevin Livingston Executive Director
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2015 - Fall School: UNO Charter School - SPC Daniel Zizumbo Campus Oracle Unit: 66395 Building ID: 3344 Address: 4248 W 47th St. Region: 04 Mail Room: 44 Surveyor:
More informationProcedure to Petition for Plat Review and Site Plan Review
Economic Development Department (734) 676-7104 or (734) 676-7109 Procedure to Petition for Plat Review and Site Plan Review All site plans shall be submitted to the Economic Development Department to be
More informationWWRC, Inc W. 7th Clovis, NM (575) Fax (575) SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST.
WWRC, Inc. 1716 W. 7th Clovis, NM 88101 (575)769-2618 Fax (575)742-3209 November 10, 2008 SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST. MEETING MINUTES DATE OF MEETING: Tuesday
More informationMARCH 7, The invocation was given by Reverend Leland Nelson from Calvary Baptist Church.
MARCH 7, 2016 The regular Council meeting was held at the M.S. Bailey Municipal Center at 6:00 PM with Mayor Bob McLean presiding with Councilmembers Byrd, Cook, Jenkins, Kuykendall, Scarborough, and Young.
More informationC o n t a c t : J e r r y F e n n e l l y, P a t r i c k D i n t r o n e
The information contained herein has been given to us by the owner of the property or other sources we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it. All information
More informationRegular Board Meeting Pittsboro Primary School 7:00 p.m. December 17, Mrs. Connie Bowman, President, called the meeting to order at 7:01 p.m.
Regular Board Meeting Pittsboro Primary School 7:00 p.m. December 17, 2014 Mrs. Connie Bowman, President, called the meeting to order at 7:01 p.m. Roll Call Connie Bowman President Steve Sprecher Vice
More informationKIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationOFFICIAL. CROOK COUNTY SCHOOL BOARD Regular School Board Meeting Minutes. Monday, September 12, 2016
CROOK COUNTY SCHOOL BOARD Regular School Board Meeting Minutes Monday, September 12, 2016 Board Members Present: Patti Norris, Scott Cooper, Gwen Carr, Walt Wagner, Doug Smith Administrators Present: Duane
More informationEverett McKinley Dirksen Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationBRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB
BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS
More informationESPLANADE DRIVE VINEYARD AVENUE OXNARD, CALIFORNIA. LISA FRIEDMAN Vice President Lic
300-500 ESPLANADE DRIVE 2340-2350 VINEYARD AVENUE OXNARD, CALIFORNIA BILL CLARK JOHN LA SPADA LISA FRIEDMAN Vice President Lic. 01315127 805.288.4677 bill.clark@cbre.com Vice President Lic. 01415299 805.288.4678
More information