DASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work
|
|
- Betty Blake
- 5 years ago
- Views:
Transcription
1 DASD Loganville Springfield Elementary School Site Feasibility Review Prepared by: Site Design Concepts, Inc. March 30, 2016 Background For This Work No architectural programming or investigation was completed as part of this work; goal of this work is to determine if a modern educational facility will fit on this site. Layout of the interior generally considered but needs programming 650 students, 190 s.f. per student = 123,500 total s.f. building area 900 s.f. /per classroom 6 7 classes deep (5 grades = Pre K 3 rd ); total classrooms School includes: Specials, Gym/Multi Purpose Room, Cafe. and Kitchen, Library w/ Project Space, Large Group Instruction, Counselor Area, Nurse Area, Front Office (Principal, Asst. Principal, Staff, Waiting), Mechanical, Restrooms, Halls/Foyers 1
2 Background For This Work (Cont.) Partial 2 story construction Courtyard desirable for more than light, but not necessary for teaching or use Car parking spaces and Bus loading spaces Site Amenities Outdoor playground area and retain ball fields Site Related Investigations Zoning Project will require a Special Exception in the RU zone. Public Buildings Sanitary Sewer Currently analyzing DASD s existing usage vs. future needs vs. Springfield Township Sewer Authority capacity Water YWC appears to have capacity; They thought the existing 3 service line will be adequate, but will need a fixture count to verify PNDI Hit from Fish & Boat Commission; need more info on the site; likely no impact 2
3 Site Related Investigations (Cont.) Downstream watershed designation appears to be clear Retaining walls may be req d Stormwater Management above grade if possible; some below grade likely; will depend upon final site layout North South orientation for building, entrances, and rec. areas should be considered Site Related Discussion Topics *New drive will require a medium volume PennDOT entrance *Potential/Need to keep private drive access to Loucks Road open * * * *Potential new entrance will be medium volume PennDOT access drive *Potential to keep existing parking * * *Potential additional ingress/egress over existing 50 easement 3
4 Addl. Site Related Discussion Topics Full building and parking demolition/re construction vs. partial building demolition w/ re constructed expansion Bus and Car separation Visitor parking in front of building/separate from staff and special events Separate entrances: buses, office, events, parent pick up/drop off Addl. detail and research needed for location and design of access drives onto Susq. Trail and/or North St. Addl. Site Related Discussion Topics (Cont.) Turn lanes, traffic signal or modifications to existing light, sight distances, alignment with other drives Option to keep existing school online during construction Pedestrian/Student circulation Existing site grades/stormwater management facility location (above ground or subsurface) Future expansion potential 4
5 Existing Conditions The following slides represent various showing how different configurations of a 123,500 sq. ft. educational facility and required site amenities can fit on the existing property of the Loganville Springfield Elementary School. These schematic plans are not to be interpreted as being final or as the only possible layouts. Additional programming both internal and on the site will be required to develop a complete and final design which may be altogether different from what is depicted in this presentation. 5
6 Sketch 1 Sketch 2 6
7 Sketch 3 Sketch 4 7
8 Sketch 5 Sketch 6 8
9 Sketch 7 Sketch 8 9
10 Sketch 9 10
PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic
GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable
More informationWEST HOLLYWOOD PARK MASTER PLAN 2004
WEST HOLLYWOOD PARK MASTER PLAN 2004 Total of 5.23 acres of uninterrupted grass and trees including playground areas and tree-lined promenades compared with only 1.86 acres of park open space in the existing
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationAshby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update
Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013 AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR)
More informationOperating Standards Attachment to Development Application
Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS
More informationASSIGNMENT 04: Library Massing + Program
ASSIGNMENT 04: Library Massing + Program THE IMPORTANCE OF PROGRAM AND MASSING DIAGRAMMING: Program and Massing diagrams are critical tools used to visually describe the relationship between the way a
More informationDESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD
ALBANY UNIFIED SCHOOL DISTRICT DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD BOARD OF EDUCATION PRESENTATION JANUARY 22, 2019 DOUG ESPLAND Sr. Precon Manager & Project Director
More informationTOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE
TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist
More informationSt. John Paul II Catholic Parish
St. John Paul II Catholic Parish 167th & Ridgeview Road Olathe, Kansas Master Plan Town Hall October 30, 2018 Purpose [ The Church s ] mission consists essentially in offering people an opportunity not
More informationTHE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:
4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver
More informationAMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY
Exhibit D-4 AMES COMMUNIY SCHOOL DISRIC SAWYER ELEMENARY Schematic Development Project Manual June 25th 2014 RDG Planning & Design 301 Grand Avenue Des Moines, Iowa 50309 architectural narrative Summarized
More informationHarding Senior High School
1540 Sixth Street East Project Summary:, located in the Eastview area of St. Paul, offers students in grades 9 through 12 a wide range of curriculum options ranging from International Baccalaureate to
More informationPRELIMINARY PLAT CHECK LIST
Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report
More informationMinor Site Plan Review Process
Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice
More informationCherokee Heights Elementary School
694 Charlton Street Project Summary: Cherokee Heights Elementary is about to start its exciting transition to a Montessori learning model. The school is connected to the Baker Center which is currently
More informationPAR AG presentation. May ROCKVILLE PIKE ELEMENTARY & PRESCHOOL BUILDING
PAR AG presentation May 8 2018 agenda 1 project scope 2 site design 3 building design 4 budget and schedule 5 questions & answers A beautiful site project key data o o o o Capacity: 700 students Class
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationB.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST
B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary
More informationItem 2. September 28, 2017
September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project
More informationCS2.0 COVER SHEET VOL. 2
ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:
More informationTo: Holly J. Godard Meeting Date: September 4, 2014 City of Seattle
MEETING MINUTES To: Holly J. Godard Meeting Date: City of Seattle Seattle Project No. 3018266 700 Fifth Avenue, Suite 1800 Project No.: PO Box 34019 Task No.: 11/31/41 Seattle, WA 98124-4019 holly.godard@seattle.gov
More informationPlanning and Zoning Application & Checklist
City of Driggs, Idaho Planning & Zoning 60 S. Main Street PO Box 48 Driggs, ID 83422 Ph: (208) 354-2362 Fax: (208) 354-8522 www.driggs.govoffice.com Planning and Zoning Application & Checklist DESIGN REVIEW
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationCHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS
CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05
More informationTown of Rotterdam Office of the Planning Commission
Town of Rotterdam Office of the Planning Commission SITE PLAN/SPECIAL USE PERMIT APPLICATION AND PROCEDURES Site Plan: Application $150 Final Site Plan $150 Application Fees Special Use Permit (IF REQUIRED):
More informationCLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES September 11, 2017
CLAY TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING MINUTES September 11, 2017 The Supervisors of Clay Township met on a regularly scheduled meeting date of September 11, 2017, at the Clay Township Municipal
More informationEssential Skills: Reading and Interpreting Maps and Plans
Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /
More informationHorace Mann Elementary
2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are
More informationExhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule
Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationCAC MEETING, FEB. 28 TH, 2017 NADAAA
ADAMS STREET BRANCH LIBRARY PROGRAMMING STUDY FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT CAC MEETING, FEB. 28 TH, 2017 NADAAA 1 AGENDA 1.0 SCHEDULE 2.0 SUMMARY OF PROJECT GOAL
More informationTEC634 Architectural CAD I (formerly Architectural Drawing I) A Course Outline for Architectural CAD I
Parsippany-Troy Hills School District TEC634 Architectural CAD I (formerly Architectural Drawing I) A Course Outline for Architectural CAD I Developed: June 2004 Revised: October 2012 June 2016 Approved
More informationAmerican Institute of Architects New Hampshire Chapter High School Design Competition Program
American Institute of Architects New Hampshire Chapter 2009 2010 High School Design Competition Program Educational Objectives To increase your awareness of the relationships between space, human scale
More informationLocation of World Shooting Complex
Location of World Shooting Complex Overall Site Plan World Shooting Complex Facilities Project Bid 11/04 120 trap field over 3.5 miles in length 48 skeet overlay fields ( Houses not done) 2 sporting clay
More informationClair Creek Meadows 30T Blocks 47, 48 & 49 Zone Change Functional Servicing and Stormwater Management Brief
Stantec Consulting Ltd. 49 Frederick Street Kitchener ON N2H 6M7 November 11, 2011 File: 603-10620/29 Stantec Consulting 49 Frederick Street Kitchener ON N2H 6M7 Attention: Mr. Douglas Stewart, MCIP, RPP
More informationCITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET
CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES
More informationAPPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please
More informationMEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013
Seattle World School SWS SDAT Workshop 3 2 December 203 SPS SWS at TT Minor TCF Architecture Project Number: 203 002 MEETING MINUTES Attendance: Name Representing Role Paul Wight Seattle Public Schools
More informationCVUSD Facilities Master Plan
CVUSD Facilities Master Plan CVUSD - WESTLAKE CLUSTER NAC Architecture 837 North Spring Street, 3 rd Floor Los Angeles, CA 90012 Contact: 323.475.8075 E-mail: lochoa@nacarchitecture.com Website: www.nacarchitecture.com
More informationRESOLUTION NO. R VILLAGE OF SHOREWOOD HILLS A RESOLUTION APPROVING A SPECIFIC DEVELOPMENT PLAN FOR PROPERTY LOCATED AT 2801 MARSHALL COURT
RESOLUTION NO. R-2018-8 VILLAGE OF SHOREWOOD HILLS A RESOLUTION APPROVING A SPECIFIC DEVELOPMENT PLAN FOR PROPERTY LOCATED AT 2801 MARSHALL COURT RECITALS 1. The Village of Shorewood Hills ("Village")
More informationTexas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan
Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-4 Section 4(f) Mitigation Master Plan IH 35E Managed Lanes Project Book 2 - Technical Provisions
More informationCITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:
CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of
More informationWhat Plans Do I Need for a Building Permit?
What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure
More informationMASTER PLAN PHASE: MINOR SUBDIVISION APPLICATION COVER SHEET
TOWN OF CLAYTON Planning Department 111 E. Second St., P.O. Box 879 Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720 MASTER PLAN PHASE: MINOR SUBDIVISION APPLICATION COVER SHEET Name of Project:
More informationJohn A Johnson Elementary School
740 York Avenue Project Summary: An Acheivement Plus school John A Johnson is located adjacent to the East Side YMCA, jointly serving their communities educational, recreation, and wellness needs. The
More informationConcept Plan. Application Upload Checklist & Submission Requirements
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION Concept Plan Application Upload Checklist & Submission Requirements Rev. 2017-09-01 Application Upload Checklist
More informationSMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)
REVIEW TYPE: PRELIMINARY FINAL LANDSCAPE ABBREVIATED ADDITION COLOR BOARD Application Form* X X X X X Design Review Fee* X X X Registered Survey** X Site Plan X X X X X Floor Plans X X X Elevations X X
More informationTown of Skowhegan Application For Development Review
Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:
More informationCHAPTER 26 SITE PLAN REVIEW
CHAPTER 26 SITE PLAN REVIEW Section 26.1. Committee. The Planning Commission shall appoint three members of the Planning Commission to the site plan review committee which shall be responsible for site
More informationKatrina Cottage Clay Street Cottage
The Clay Street Cottage, designed by Bill Allison consists of 918 sq. feet. This cottage may be turned with either end facing the street depending on whether the smaller bedroom is used as a den or a bedroom.
More informationApplication for Site Plan Review
Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission
More informationSUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT
SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationCentral High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015
275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated.
More informationUNIT A 879 SQ. FT. FLOORS 1 TO 4 REVERSE 879 SQ. FT. FLOORS 1 TO SQ. FT.
UNIT A 879 SQ. FT. 879 SQ. FT. REVERSE 879 SQ. FT. THE DEVELOPER AND BUILDER RESERVE THE RIGHT TO MAKE MODIFICATIONS AND CHANGES TO THE BUILDING, ANY UNIT, PARKING AREA AND STORAGE AREA DESIGN, SPECIFICATIONS,
More informationAdams Spanish Immersion 615 Chatsworth Street South
Project Summary: Adams Spanish Immersion is an international education without the travel expense. Our school is a place where families and staff value the opportunities gained from learning a second language.
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationARCHITECTURE CADD Course Syllabus
6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 ARCHITECTURE CADD Course Syllabus Course Number: TTC-0880 OHLAP Credit: Yes OCAS Code: 8903 Course Length: 120 Hours Career Cluster: Manufacturing
More informationSPRINKLER SF. Stair 190 SF WOMEN SF LOBBY SF MECH/ELEC CONCESSIONS SF 225 SF STORAGE SF
1JACKSON MSC TEMPSTAR W/DT-3-LR TABLE PACKAGE WAREWASHER, DOOR TYPE W/ DISHTABLES ARCHITECTURE & INTERIOR DESIGN Montgomery Dothan WWW.SSLARCH.COM (M) 334. 263. 5162 (D) 334. 791. 5248 No. Revision Date
More informationThe GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.
Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More informationClear Creek County Site Development
Clear Creek County Annex Community Development Clear Creek County Site Development The Clear Creek Board of County Commissioners has adopted design standards for the construction of driveways. These design
More informationROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL
ROBERT TURER COLLEGE AD CAREER HIGH SCHOOL SCHEMATIC DESIG PRESETATIO 23 MAY 2017 Project Milestones Schematic Design..... March May 2017 SD Presentation to Board of Trustees...... 23 May, 2017 Design
More informationPBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017
PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017 ARCHITECTURE \\ ENGINEERING \\ PLANNING \\ INTERIORS \\ TECHNOLOGY
More informationOffice/Medical For Lease in an Expansive Campus Setting 8950 La Jolla Village Drive, La Jolla, CA 92037
Office/Medical For Lease in an Expansive Campus Setting 8950 La Jolla Village Drive, La Jolla, CA 92037 FEATURES A THREE-BUILDING PROFESSIONAL CENTER WITH AN UNRIVALED LOCATIONAL ADVANTAGE The Campus at
More informationGREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study
GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study New Lebanon School (K-5) 25 Mead Avenue, Greenwich, CT 20 March 2014 KSQ Architects PC 20 March 2014 GREENWICH PUBLIC SCHOOLS NEW LEBANON
More informationPurple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018
Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018 1 Agenda Environmental Updates UCLA Station Advance Utility Relocation VA Station Advance Utility Relocation Underground
More informationMajor Site Plan Application
Procedure Section 496-11.3.7 of the City Code: Major Site Plan Review allows for the discretionary review of the site configuration and architectural design of projects which, due to their magnitude, are
More informationDEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION
DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay
More informationCity of Romulus Administrative Review Committee (ARC) Sketch Plan Submittal Checklist and Review Process
Administrative Review Committee (ARC) Sketch Plan Submittal Checklist and Review Process SUBMISSION CHECKLIST For submission of all ARC Sketch Plan projects the following must be provided: Signed ARC Sketch
More informationCURRICULUM MAP. Course/ Subject: Multimedia (Visual) Communication Grade: 8th. Month: Phase 1 of 3. Enduring Understanding
CURRICULUM MAP Course/ Subject: Multimedia (Visual) Communication Grade: 8th Month: Phase 1 of 3 Enduring Understanding Technology is not an object or artifact but a process by which we solve problems.
More informationIrvin L. Young Memorial Library Expansion Project. Frequently Asked Questions
Irvin L. Young Memorial Library Expansion Project Frequently Asked Questions We ve been asked many questions about the proposed expansion of the library. It has been our intent to explore many different
More information6'' W 8'' W 8'' W 4'' SAN 4'' SAN 2'' W 6'' W 6'' W INSTALL C.U. PAD (SEE MECHANICAL). M FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM TOP OF TOP OF SW
More informationProject Affordable Housing Design Rubric
Project 2.3.1 Affordable Housing Design Rubric Elements Weight 5 Points 4 Points 3 Points 2 Points 1 0 Points Title Page Table of Contents Project Description Bubble Diagrams Design Sketches The title
More informationPresentation for. Raymond E. Shaw Elementary School Building Committee
Presentation for Raymond E. Shaw Elementary School Building Committee 11.01.2018 AGENDA 1. School Tour Penn Brook School 2. Design Options with Cost 3. Schedule School Tour Penn Brook School, Georgetown,
More informationSECTION SITE SURVEYS
SECTION 02 21 13 SITE SURVEYS SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section to specify survey required before design
More informationArticle 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW
Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall
More information5.7 Plan Documentation and Supporting Information.
5.7 and Supporting Information. In any case where the and Supporting Information for a Development Plan requires the submission of a Site Plan, Overall Plan, Landscape Plan, Building Elevations, Sign Plan
More informationOil-Water Separator Design Checklist
CHECKLIST C3 Revised 5/2/2016 Oil-Water Separator Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private oil-water
More informationChecklist for Tentative Subdivision Map
Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationGREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM
Date of Meeting: March 20, 2014 GREENWICH PUBLIC SCHOOLS Greenwich, Connecticut Title of Item: New Lebanon School Pre-Feasibility Study Policy Reference: E - 051 REQUEST FOR BOARD ACTION OR PRESENTATION
More informationHAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review
HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.
More informationSUBMITTAL REQUIREMENTS RCV D REJECT PENDING
1 of 5 SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1. General Information. 1.1 Applicant s name, address and contact numbers. 1.2 Project name, type, address and legal description of the property. 1.3
More informationCHAPTER 18 Lighting Regulations
CHAPTER 18 Lighting Regulations Section 18.1 Purpose The purpose of this Chapter is to regulate certain outdoor lighting in order to reduce or prevent light pollution. These regulations are intended to
More informationGE Lighting. control. Aware Occupancy and Photo Sensors
GE Lighting control Aware Occupancy and Photo Sensors efficiency meets intelligence In addition to switches and scheduling, you can further increase efficiency and save money on energy with Aware Occupancy
More informationC o n t a c t : J e r r y F e n n e l l y, P a t r i c k D i n t r o n e
The information contained herein has been given to us by the owner of the property or other sources we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it. All information
More informationMODULE 4 Planning your house continued
MODULE 4 Planning your house continued Planning Entrances Identify the purpose, uses and activities at the main entrance in a residence. Describe possible moods or feelings that a designer may try to convey/evoke
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationNEW LEBANON ELEMENTARY SCHOOL
NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL
More informationCOURSE OF STUDY UNIT PLANNING GUIDE COMPUTER AIDED DESIGN (CAD) 2 GRADE LEVEL: MICHAEL WEBER, ASST PRINCIPAL ENGINEERING/TECHNOLOGY SUPERVISOR
COURSE OF STUDY UNIT PLANNING GUIDE FOR: COMPUTER AIDED DESIGN (CAD) 2 GRADE LEVEL: 10 12 PREPARED BY: 5 CREDITS CURT BANICKI 1 FULL YEAR MICHAEL WEBER, ASST PRINCIPAL ENGINEERING/TECHNOLOGY SUPERVISOR
More informationCREATIVE SPACES AVAILABLE WITH ROOM TO GROW
CREATIVE SPACES AVAILABLE WITH ROOM TO GROW A BEST-IN-CLASS CREATIVE OFFICE CAMPUS Leasing Inquiries: Valerie James 310.315.4858 valerie.james@cbre.com Jeff Brown 310.315.4700 jeff.brown2@cbre.com AVAILABILITIES
More informationMinor Site Plan Application
Section 496-11.3.6 of the City Code: Minor Site Plan Review allows for review of the site design of routine development applications that are eligible to be processed administratively. Procedure 1. If
More informationA BEST IN CLASS OFFICE CENTER CAMPUS CREATIVE SPACES AVAILABLE WITH ROOM TO GROW
A BEST IN CLASS OFFICE CENTER CAMPUS CREATIVE SPACES AVAILABLE WITH ROOM TO GROW AVAILABILITIES A VARIETY OF CREATIVE SPACES WITH ROOM TO GROW UP TO 195,000 SF Planned New Cafe & Fitness Center Expo Line
More informationCASE STUDY DOORS AND HARDWARE SEPTEMBER 2006
CASE STUDY Main entrance to Forest Hills Eastern Middle/High School centers on the Great Hall area that forms the hub of school activity and traffic flow. double doors open from classrooms into spacious
More informationDOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES
DOCUMENT 00 0115 LIST OF DRAWINGS, TABLES AND SCHEDULES DRAWINGS GENERAL A0.0 COVER SHEET ADDENDUM #2 revised A0.01 TITLE SHEET ADDENDUM #2 revised CIVIL C1.0 TOPO C2.0 DEMOLITION C3.0 TEMPORARY STREET
More information3100 WEST LAKE STREET APARTMENTS 3100 WEST LAKE STREET MINNEAPOLIS, MN TITLE SHEET W Lake St 3100 MSP, LLC
3100 WEST LAKE STREET APARTMENTS 3100 WEST LAKE STREET MINNEAPOLIS, MN SYMBOLS LEGEND SECTION AND ELEVATION REF ETERIOR ELEVATION KEYNOTE REF A. INTERIOR ELEVATION REF DETAIL REF ROOM ROOM NAME AND NUMBER
More informationCHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.
14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic
More informationGUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)
GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) TO ARLINGTON COUNTY GOVERNMENT (ACG) Effective Date: February 15, 2016 Prepared by: Arlington
More informationAuthorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:
CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT
More information