1 2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation District 1 Duluth/Virginia 1 Hwy 1 Location: South of Ely in Lake County, 15 miles Dates: July-Nov 2011 Cost: $8,625,000 s, lane with 2 Hwy 1 Location: Ely to Isabella Description: Install reflective pavement markings Cost: $146,000 Impacts: Temporary lane 3 Hwy 2 Location: At CR 62 in Cohasset Cost: $225,000 impacts 4 Hwy 2, Hwy 169 Location: Hwy 2 and Hwy 169 in Itasca County Description: Install flashing lights Cost: $153,903 Impacts: Lane with 5 I-35 Location: Boundary Ave to 26th Ave East in Duluth, 10 miles Description: Replace and repair bridges and pavements (Duluth I-35 Mega Project) Dates: April 2010-Nov 2011 Total Cost: $66,876, Cost: $28 million, traffic crossovers, lane restrictions aproject/ 6 I-35 Location: At Hwy 33 and Hwy 23 near Cloquet and Sandstone Description: Re-deck bridges over I-35 Dates: April-June 2011 Cost: $1,481,856 Impacts: Bridge overpass and intermittent lane on I-35, short-term detour via Hwy 45 7 I-35 Location: CR 13 near Proctor Description: Repair four bridges Cost: $1,764,761 Impacts: Single lane traffic 8 I-35 Location: Over Willow River in Pine County Description: Repair bridges Cost: $766,000 Impacts: Lane 9 I-35 Location: Moose Lake and Hinckley areas, 30 miles Description: Repair concrete pavement and bridges Dates: May-Nov 2011 Cost: $25,329,529 Impacts: Lane, bypassed traffic will run adjacent to each other s/i35southofduluth/ 10 Hwy 37 Location: Penobscott Creek near Hibbing Dates: June 2010-June 2011 Total Cost: $515, Cost: $12,000 Impacts: Lane with 11 Hwy 53 Location: Miller Mall area in Duluth and Hermantown, one mile connector roads, intersections and s Dates: July 2007-June 2011 Total Cost: $23,499, Cost: $75,000 Impacts: Shoulder 12 Hwy 53 Location: Near Cotton, reconstruct intersection, replace bridge Cost: $3,358,321 Impacts: Bypass, temporary lane 13 Hwy 53, Hwy 169 Location: Near Central Lakes and Hibbing to Virginia Description: Seal surface Cost: $1.5 million Impacts: Temporary lane 14 Hwy 61 Location: Onion River area north of Tofte, four miles and replace bridge Dates: April 2009-May 2011 Total Cost: $12,223, Cost: $50,000 Impacts: Daytime shoulder 15 Hwy 61 Location: Mount Josephine rest area near Grand Marais rest area Dates: Aug 2010-Aug 2011 Total Cost: $637, Cost: $461, Hwy 61 Location: Cascade River wayside near Grand Marais Description: Rehabilitate stone masonry wall Dates: Sept 2010-June 2011 Total Cost: $395, Cost: $33, Hwy 61 Location: Split Rock River to Chapins Curve south of Beaver Bay, four miles and replace bridge Dates: April 2010-July 2011 Total Cost: $10,706, Cost: $3.9 million Impacts: Lane with s/hwy61_split_rock/index.html 18 Hwy 61 Location: Lester River in Duluth Description: Repair and restore historic bridge Dates: May 2010-July 2011 Total Cost: $1,460, Cost: $50,000 Impacts: Shoulder 19 Hwy 61 Location: Gooseberry Park, Schroeder, and Cutface Creek rest areas accessibility improvements Cost: $350, Hwy 61 Location: Baptism River rest area turn lanes, reconfigure parking lot, remodel building -Aug 2012 Total Cost: $6,829, Cost: $2,732,000 Hwy 61 impacts, rest area closed 21 Hwy 61 Location: Near Grand Portage turn lanes Cost: $136,272 Impacts: Lane with 22 Hwy 65 Location: Nashwauk to Hwy 1, 32 miles and Total Cost: $10,478, Cost: $2 million 1

2 Impacts: Lane with 23 Hwy 65 Location: Near Silverdale in Koochiching County Dates: July 2007-July 2011 Total Cost: $4,411, Cost: $60,000 Impacts: Lane with 24 Hwy 65, Hwy 73 Location: Aitkin County Description: Install rumble strips Cost: $278, Hwy 70 Location: Hwy 107 to Hwy 361, nine miles, Cost: $3,384,818 Impacts: Lane with, detour 26 Hwy 73 Location: Hwy 73 in Floodwood deck Cost: $1,072,217 Impacts: Single lane traffic 27 Hwy 169 Location: Taconite to Nashwauk, 15 miles and Total Cost: $7,678, Cost: $100, Hwy 169 Location: From Grand Rapids to Coleraine, five miles and Dates: June 2010-June 2011 Total Cost: $1,790, Cost: $30, Hwy 169 Location: Hibbing and Grand Rapids accessibility improvements Cost: $489,000 Impacts: Temporary lane 30 Hwy 169 Location: West of Chisholm, one mile Description: Replace and strengthen pavement Dates: June 2009-July 2011 Total Cost: $7,408, Cost: $325, Various Highways Location: Hwys 1, 2, 70, 169, 200, 332 in northeast Minnesota Description: Replace culverts Dates: June-Nov 2011 Cost: $1,263,092 Impacts: Lane with 32 Various Highways Location: Hwys 1, 6, 135, 217 in northeast Minnesota Description: Replace culverts Dates: June 2010-July 2011 Total Cost: $2,192, Cost: $50,000 Impacts: Lane 33 Various Highways Location: Hwys 23, 53, 61, I-35 in northeast Minnesota Description: Seal cracks Total Cost: $1,558, Cost: $800,000 Impacts: Lane with 34 Various Highways Location: Hwys 23, 65, 210 in Aitkin and Carlton Description: Install reflective pavement markings Cost: $366,885 Impacts: Mobile lane with 35 Various Highways Location: Hwys 53, 61,169 in northeast Minnesota Description: Install intersection lighting Cost: $150,000 traffic impacts District 2 Bemidji/Crookston 36 Hwy 1 Location: West of Clearwater County line in Red Lake (2010), paint, clean, landscape Dates: April-May 2011 Total Cost: $2.1 million 2011 Cost: $40, Hwy 1 Location: Oslo to Warren and Cost: $2.5 million 38 Hwy 2 Location: East of Crookston Total Cost: $6.6 million 2011 Cost: $10, Hwy 2 Location: Crookston curb ramps, install signals Cost: $500, Hwy 9 Location: South of Borup Description: Replace culvert Cost: $200, Hwy 9 Location: Polk/Norman county line to Hwy 2, Cost: $4.56 million 42 Hwy 11 Location: Hwy 72 to Clementson, widen shoulders, -Aug 2012 Cost: $7.5 million 43 Hwy 11 Location: Clementson bridge deck, turf and erosion control Total Cost: $2.95 million 2011 Cost: $80,000 Impacts: Lane 44 Hwy 34 Location: Park Rapids to Akeley, Hwy 226 to Dorset, install turn lanes, Cost: $7.95 million 45 Hwy 64 Location: South junction to north junction of Hwy 87 Cost: $550,000 Impacts: Lane with pilot car 46 Hwy 71 Location: CR 9 to CR 404 south of Bemidji, install turn lanes and traffic signal, construct bridge Cost: $3.3 million Impacts: Temporary bypass and minor lane 47 Hwy 71 Location: Northome to Margie, replace culvert Cost: $5.5 million Impacts: Lane with pilot car 48 Hwy 72 Location: Waskish to 11.4 miles north, Cost: $4.06 million Impacts: Lane with and pilot car 49 Hwy 75 Location: Stephen to Donaldson Cost: $1.1 million Impacts: Single lane 50 Hwy 75 Location: Hwy 75 bypass at Crookston Description: Railroad crossing upgrade Cost: $150, Hwy 75 Location: Climax to Crookston, install turn lanes, replace culverts Cost: $3.4 million 2

3 52 Hwy 75 Location: South of Shelly (2010), apply final surface on bridge deck, paint, landscape, Total Cost: $1.5 million 2011 Cost: $25, Hwy 89 Location: Grygla to eight miles west of Fourtown Dates: TBD Cost: $750,000 Impacts: Lane 54 Hwy 220 Location: Hwy 1 to Hwy 11 and Hwy 317, Cost: $5.6 million Impacts: Lane restriction, detour 55 Various Highways Location: Multiple Description: Install intersection lighting Cost: $325,000 lane restrictions 56 Various Highways Location: Multiple Description: Upgrade signing Cost: $30,000 lane restrictions District 3 Baxter/St. Cloud 57 Hwy 10 Location: St. Cloud to Clear Lake Description: Landscaping on WB lanes Dates: June 2010-May 2011 Total Cost: $14 million 2011 Cost: $20,000 Impacts: Periodic lane 58 Hwy 10 Location: Wadena, install turn lanes, pedestrian access improvements Cost: $1.5 million, 59 Hwy 10 Locations: East of Little Falls to south of Royalton (11 miles); Hwy Golf Course Rd to 3rd St NW in Brainerd Description: Micro-surfacing Cost: $1.2 million Impacts: Intermittent weekday lane, reduced speeds 60 Hwy 10 Location: 4.5 miles north of Hwy 115 to east end of Little Falls bypass, construct/extend turn lanes, install or repair culverts Cost: $9.7 million Impacts: Lane, reduced speeds 61 Hwy 10 Location: Big Lake to Elk River Description: Landscape Dates: Aug 2010-May 2011 Cost: $6.8 million 2011 Cost: $75, Hwy 10 Location: Clear Lake to Big Lake Description: Install temporary bypass lanes for 2012 pavement replacement -Nov 2012 Cost: $10.6 million 63 Hwy 10 Location: Hwy 10 / Hwy 25 intersection in Big Lake Description: Widen and resurface Hwy 10; realign and reconstruct Hwy 25 to the RR tracks; replace traffic signal /lighting Dates: May-Oct 2011 Cost: $2.1 million ($618,000 Mn/DOT share), detours 64 Hwy 23 Location: East of Wilson Ave in St. Cloud Description: Replace pedestrian bridge Cost: $1.3 million s, lane 65 Hwy 23 Location: Hwy 95 east of St. Cloud to Foley fourlane highway, access roads, bridge, frontage roads, install utilities, resurface Hwy 25 in Foley -Oct 2012 Total Cost: $28.5 million 2011 Cost: $14.5 million Impacts: Lane,, detour ndex.html 66 Hwy 23/Hwy 70 Location: Hwy 55 in Paynesville to Richmond; Hwy 70 Hwy 65 to Hwy 107 Description: Seal coat road surface Cost: $481,180 Impacts: Lane,, pilot car 67 Hwy 25 Locations: Intersections at Sherburne CR 11 / CR 14 and Sherburne CR 17 east of Monticello Description: Widen intersections, install turn lanes Cost: $3.3 million,, detour 68 Hwy 28 Location: North of Swanville Description: Replace Swan River bridge Cost: $641, Hwy 47 Location: North of Bradford at 317th Ave Description: Repair frostdamaged pavement Cost: $400, Hwy 55 Location: Stearns CR 66 / CR 181 in Paynesville to east of Hwy 4, shoulders Cost: $1.2 million Impacts: Periodic lane,, reduced speeds 71 Hwy 65 Location: Anoka CR 24 to Hwy 23 in Mora Cost: $250, Hwy 65 Location: Mora Lake to Hwy 27 in Woodland Description: Road repairs, landscape Cost: $7.2 million 2011 Cost: $20,000, 73 Hwy 71 Location: Owens Street to Hwy 55 in Belgrade Description: Replace drainage Cost: $183,000 (Mn/DOT share) Impacts: Shoulder 74 Hwy 71 Location: Stearns CR 186 in Sauk Centre Cost: $210, I-94 Location: Wright and Stearns ; Hwy 10 St. Cloud to Little Falls; Hwy 15 in Benton County Dates: Sept-Nov 2011 Cost: $850,000 Impacts: Intermittent lane/shoulder 76 I-94 Location: East of Albany to Stearns CR 159 at Collegeville Dates: Aug-Nov 2011 Cost: $5.3 million 77 I-94 Location: Stearns CR 2 at St. Joseph Description: Install lighting Dates: May 2011 Cost: $350,000 3

4 78 I-94 Location: Wright CR 75 in Monticello Description: Paint overpasses, landscape Dates: July 2009-May 2011 Cost: $11.1 million 2011 Cost: $100, I-94 Location: St. Augusta to St. Joseph; Hwy 24 - Clearwater to Clear Lake; Hwy 25 - Buffalo to Monticello Cost: $1.3 million Impacts: Lane,, pilot car 80 I-94 Location: Stearns and Wright Description: Upgrade guardrail Cost: $360, I-94 Location: Wright CR 137 to Wright CR 19 in Albertville Description: Install interchange access improvements -Spring 2012 Cost: $5.7 million (Mn/DOT share) 82 Hwy 95 Location: Isanti CR 14/CR 70 in Cambridge Cost: $70, Hwy 95 Location: Mille Lacs CR 29 in Princeton Description: Paint bridges, landscape Dates: June 2010-June 2011 Cost: $5.9 million 2011 cost: $100, Hwy 107 Location: Kanabec/Isanti county line in Braham to Hwy 23 west of Brook Park, shoulders, repair or replace culverts Cost: $3.6 million,, pilot car, detour 85 Hwy 169 Location: Garrison Concourse at Mille Lacs Lake Description: Restore historical masonry wall Dates: Oct 2010-Nov 2011 Cost: $851,000 (Mn/DOT share) Impacts: Overlook wall closed; parking and walleye statue open to public 86 Hwy 169 Location: SB Hwy 169/ Hwy Hwy 10 in Elk River bridge deck and upgrade railings Cost: $600,000 Impacts: Lane, bridge closure, detours 87 Hwy 227 Location: Seven miles east of Sebeka Description: Replace Cat River bridge Cost: $357,802 Impacts: Road closure, detour 88 Hwy 241 Location: EB I-94 ramp at St. Michael Cost: $160, Hwy 371 Location: Baxter to Nisswa, upgrade traffic signals, construct turn lanes, improve pedestrian access Cost: $8.4 million Impacts: Periodic lane,, access, night work baxter-nisswa/ 90 Various Highways Location: Multiple Description: Install rumble strips and chevron Cost: $400,000, District 4 Detroit Lakes/Morris 91 Hwy 9 Location: Norman/Clay county line to Hwy 10, replace three bridges Cost: $6,094,108, lane 92 Hwy 9 Location: Morris to Stevens/Pope county line, Hwy 329, repair culverts Cost: $3,127,019 Impacts: Lane, detour 93 Hwy 10 Location: 1.5 miles west of Glyndon Description: Install weigh-inmotion Cost: $132,000 Impacts: Lane 94 Hwy 10 EB Location: Hawley to Detroit Lakes Cost: $1,944,054 Impacts: Lane 95 Hwy 10 WB Location: Frazee to Detroit Lakes Cost: $800,000 Impacts: Lane 96 Hwy 10 EB, I-94 WB Location: Detroit Lakes to Frazee and from Douglas CR 17 to Hwy 27 Dates: Aug 2011 Cost: $1.6 million Impacts: Lane 97 Hwy 27 Location: Herman to Hoffman Cost: $5,163,972 Impacts: Lane, detour 98 Hwy 28 Location: West state line through Beardsley Cost: $1.1 million Impacts: Lane 99 Hwy 29 Location: Hwy 71 in Wadena to Hwy 210, Cost: $6,791,600 Impacts: Lane, detour 100 Hwy 29 Location: McKay Ave to 3rd Ave in Alexandria, add northbound lane Cost: $1 million Impacts: Lane 101 Hwy 29, Hwy 12 Location: Hwy 210 to Carlos and Hwy 59 to Benson Description: Sealcoat shoulder Cost: $1.5 million Impacts: Lane 102 Hwy 32 Location: Hwy 10 to Hwy 34 Description: Replace guardrail Dates: Fall 2011 Cost: $320,000 Impacts: Lane 103 Hwy 59 Location: Sand Lake to Prairie Lake outlet Dates: April-Sept 2011 Cost: $750,000 Impacts: Shoulder 104 Hwy 75 Location: 7th Ave S in Moorhead Description: Replace signal, improve accessibility Dates: Mid-summer 2011 Cost: $260,000 Impacts: Lane 105 Hwy 75 Location: Clay CR 12 (60th Ave South) roundabout 4

5 Cost: $2.2 million 106 I-94 WB Location: Hwy 34 in Barnesville to Downer exit Cost: $5,762,850 Impacts: Lane, crossover 107 I-94 Location: Lake Iverson rest area Description: Demolish building Cost: $300,000 Impacts: Rest area permanently closed 108 I-94 Location: Over Douglas CR 1 and paint bridges Dates: May-Oct 2011 Cost: $1 million Impacts: Lane 109 I-94 EB, Hwy 210 Location: Rothsay to Hwy 59 and from I-94 to Otter Tail CR 82 (Pebble Lake Rd) Dates: Fall 2011 Cost: $4,317,716 Impacts: Lane 110 Various Highways Location: Hwys 9, 27, 28, 75 Description: Instlal rumble strips and pavement markings Cost: $500,000 Impacts: Lane 111 Various Highways Location: Hwys 55, 108, Description: Seal coat, resurface road Dates: Late summer 2011 Cost: $2.5 million Impacts: Lane 112 Various Highways Location: Hwys 7, 12, 28, 54 Description: Replace, repair culverts Cost: $1 million District 6 Rochester/Owatonna /Winona 113 Hwy 14 Location: Hwy 52 to Marion Rd in Rochester Cost: $5,965,824 Impacts: Long-term lane s/hwy14inrochester/ 114 Hwy 14 Location: Kasson to Byron Description: Repair concrete Cost: $2,595,978 Impacts: Long-term lane 115 Hwy 14 Location: Winona County ramps for accessibility Cost: $99, Hwy 14 Location: Waseca CR 5 to Steele CR 7 I- 35/Hwy 14 interchange Dates: July 2009-June 2012 Cost: $51,744, Cost: $23,284,985 Impacts: lane, traffic delays, intermittent lane s/i35owatonna/index.html 117 Hwy 16 Location: Rushford to Houston Cost: $4,840,500 Impacts: Lane, 118 Hwy 30 Location: Steele and Waseca, Hwy 13 to Twp Rd 50 Cost: $2,512,025 Impacts: Lane, 119 I-35 Location: Various locations in Freeborn, Rice and Steele Description: Install Intelligent Transportation System devices Cost: $1.1 million 120 I-35 Location: Various locations in Freeborn, Rice and Steele Description: Clearing trees Cost: $97, I-35 Location: I-35/I-90 interchange Description: Install tower lighting Cost: $410, Hwy 43 Location: Rushford to I-90 Cost: $2,381,130 Impacts: Daily lane with 123 Hwy 43 Location: Franklin St and Hwy 43 (Sarnia St) in Winona Cost: $127, Hwy 43 Location: Fillmore County ramps for accessibility Cost: $143, Hwy 44 Location: Spring Grove to Caledonia, culvert replacement. Dates: May-Oct 2011 Cost: $5,415,097 Impacts: Lane with, detour 126 Hwy 52 Location: Willow Creek and Olmsted CR 1 bridges, bridge deck Cost: $2,487,402 Impacts: Lane 127 Hwy 52 Location: Olmsted County, 65th St NW to Pine Island Description: Install cable median barrier Cost: $872, Hwy 52 Location: Olmsted County, 85th St NW to Vintage Rd NW Description: Landscape Dates: Spring 2011 Cost: $125, Hwy 52 Location: Olmsted County, Hwy 63 to I-90 Description: Upgrade Dates: April 2011 Cost: $70, Hwy 52 Location: Near Pine Island new interchange and frontage road Dates: Cost: $34.3 million 2011 Cost: $20 million Impacts: Lane Hwy 60 Location: Stream near Wabasha and approach road Cost: $1,269,284 Impacts: Road closure, detour 132 Hwy 61 Location: Gilbert Creek in Lake City Dates: April-Sept 2011 Cost: $3,485, Hwy 63 Location: Hwy 63/6th St intersection in Stewartville Description: Intersection safety improvements and traffic signal revisions Dates: April-July 2011 Cost: $472,679 5

6 134 Hwy 63 Location: Wabasha CR 78 to Hwy 61 Cost: $1,820,384 Impacts: Lane, 135 Hwy 76 Location: Houston County, Hwy 44 to Hwy 16, culvert replacements Cost: Include in Project 125 Impacts: Road closed, detour 136 Hwy 76 Location: Houston and Winona, Hwy 16 to I-90 Cost: Included in Project 117 Impacts: Daily lane with 137 I-90 Location: Hwy 63 to Olmsted CR 19 WB lanes Cost: $3,042,331 Impacts: Lane, 138 I-90 Location: Winona County, Hwy 43 to Hwy 76 EB lanes Cost: $8,667,467 Impacts: Long-term lane, interchange closure 139 Hwy 218 Location: Mower County, IA/MN state line to I-90 Cost: $3,533,598 Impacts: Lane, 140 Hwy 246 Location: Northfield to Nerstrand Cost: $3,092,248 Impacts: Lane,, pilot car 141 Hwy 247 Location: Wabasha County ramps for accessibility Cost: $87, Hwy 248 Location: Altura to Hwy 61 Cost: $4,114,897 Impacts: Road closed, detour 143 Various Highways Location: Fillmore, Houston and Wabasha Description: Install guardrail Cost: $262, Various Highways Location: Dodge, Fillmore, Freeborn, Goodhue, Mower, Olmsted, Rice, Wabasha and Winona Description: Seal cracks Cost: $473,273 Impacts: Lane, 145 Various Highways Location: Dodge, Goodhue, Mower, Olmsted and Steele Description: Seal coat Cost: $1,424,424 Impacts: Lane, District 7 Mankato/Windom 146 Hwy 4 Location: South of Sleepy Eye over the Little Cottonwood River Cost: $1,763, Hwy 14 Location: Waseca bypass Description: Grading, construct bridges and four-lane expansion Dates: April-Sept 2011 Total Cost: $56 million 2011 Cost: $8 million s/14owatonna/ 148 Hwy 14 Location: Lookout Drive in North Mankato to Nicollet CR 6 interchange with Nicollet CR 41 and two miles of expansion (Design-build) Dates: Aug 2011-Aug 2012 Cost: $15-18 million ($3 million local share) 2011 Cost: $3 million Impacts: TBD s/14northmankato/ 149 Hwy 19 Location: New Prague by Hwy 13 north Dates: Oct 2011 Cost: $125,000 delays, pilot car 150 Hwy 22 Location: Gaylord to Hwy 212 Cost: $2,989,000 delays, pilot car 151 Hwy 22 Location: LeSueur River Description: Bank stabilization Cost: $568,000 Impacts: Lane restrictions 152 Hwy 22 Location: New Auburn and Hwy 30 in Darfur ramps Cost: $160,000 Impacts: Brief sidewalk 153 Hwy 25 Location: Belle Plaine bridge railing Dates: April-May 2011 Cost: N/A Impacts: Lane restrictions 154 Hwy 30 Location: Amboy to Mapleton Description: Restore pavement Cost: $5,629,000 Impacts: Two-stage detour to local roads 155 Hwy 30 Location: Watonwan River west of Darfur Cost: $860, Hwy 30 Location: Westbrook and Hwy 62 by Fulda Cost: $340,000 delays, pilot cars 157 Hwy 60 Location: Bigelow to Worthington Description: Expand to fourlanes, replace railroad bridge Dates: March 2011-March 2013 Cost: $45 million 2011 Cost: $8 million s s/hwy60/ 158 Hwy 83 Location: Hwy 30 to Hwy 22 Description: Restore pavement, resurface road Cost: $9,989, Hwy I-90 Location: West of Hwy 71, approximately one mile Cost: $200,000 Impacts: Lane restrictions 160 Hwy I-90 Location: Rest areas at Adrian and Jackson Description: Plant prairies (continuation of Prairie Passage) Dates: Cost: $405,000 District 8 Willmar/Marshall/ Hutchinson 161 Hwy 9 Location: Hwy 23 to 1st Ave North in New London, install accessible pedestrian ramps and sidewalk Cost: $550,000 6

7 162 Hwy 12 Location: 6th St E to 24th St in Willmar Dates: May 2011 Cost: $389, Hwy 19 Location: Bruce St to jct of Hwy 23 in Marshall sidewalk and trail, install accessible pedestrian signals Cost: $225, Hwy 19 Location: West jct of Hwy 71/Hwy 67 Description: Restore historic retaining wall and guardrail Cost: $300,904 delays 165 Hwy 23 Location: West of Kandiyohi CR 6, west of 263rd Ave, east of Paynesville fourlane 7.7 mile divided highway bypass around Paynesville Dates: April 2010-Aug 2012 Total Cost: $32,204, Cost: $12,570,000 impacts, detour s/paynesvillebypass/ 166 Hwy 23 Location: Hwy 71 to Kandiyohi CR 31 near New London Description: Seal coat Dates: Aug 2011 Cost: $441, Hwy 23 Location: Spicer Description: Refurbish light poles Dates: June-Nov 2011 Cost: $117, Hwy 23 Location: East jct of Hwy 212 to Hwy 7 in Clara City Description: Repair concrete pavement Cost: $2,147, Hwy 59 Location: South of Clarkfield to Yellow Medicine CR 3 Description: Widen shoulders and line culverts Cost: $1,051,279 delays 170 Hwy 59 Location: North of Lyon CR 33 to Yellow Medicine CR 3 Cost: $1,419, Hwy 67 Location: Hwy 23 to Yellow Medicine River Bridge Dates: Summer 2011 Cost: $2.9 million 172 Hwy 212 Location: Renville CR 16 near Hector to Hwy 22 near Glencoe Description: Grade, resurface, construct turn lanes Dates: May-Nov 2011 Cost: $14,379,112 s/hwy212hectorglencoe/index.ht ml 173 Various Highways Location: Hwys 23, 71, and 212 in Kandiyohi, Lincoln, Lyon and Pipestone Description: Install pavement markings Dates: April-Aug 2011 Cost: $353,583 delays 174 Various Highways Location: Bird Island, Lyon, Marshall, Olivia and Renville Description: Install accessible pedestrian signals Cost: $225,759 delays 175 Various Highways Location: Hwys 22, 59, 91, 212 and 275 in Lac qui Parle, Lyon, McLeod, Meeker, Murray and Yellow Medicine Dates: April-June 2011 Cost: $211,886 Impacts: Intermittent shoulder 176 Various Highways Location: Hwys 14, 15, 59 and 274 in Lincoln, Lyon, Meeker, McLeod, Murray and Yellow Medicine Dates: June-September 2011 Cost: $313, Various Highways Location: Hwys 4, 9, 14, 19, 24, 40, 59, 67, 68, 119, 275 Description: Install enhanced curve delineation and chevrons at 47 locations Cost: $80,000 Impacts: Intermittent shoulder 178 Various Highways Location: Southwestern Minnesota Description: Install lighting at 22 locations and flasher at Marshall High School Cost: $330,000 delays Legend: CR County Road Jct Junction SB Southbound NB Northbound WB Westbound EB Eastbound Contact Info: District 1 - John Bray District 2 - Karen Bedeau District 3 - Judy Jacobs District 4 - Dana Hanson District 6 - Kristin Kammueller District 7 - Rebecca Arndt District 8 - Diane Beck

Minnesota Department of Transportation 2011 Greater Minnesota Construction Projects

Minnesota Department of Transportation 2011 Greater Minnesota Construction Projects Minnesota Department of Transportation 0 Greater Minnesota Construction Projects Warroad 4 Baudette 43 49 54 53 37 Thief River Falls 48 53 47 East Grand Forks 39 Crookston 38 50 3 5 4 46 94 06 0 03 94

More information

2012 MnDOT Greater Minnesota Construction Projects

2012 MnDOT Greater Minnesota Construction Projects 2012 MnDOT Greater Construction Projects District 1 Duluth/Virginia 1 Hwy 1 Location: Itasca County Description: Reconstruct Hwy 1 in Effie Total Cost: $1,565,000 2 Hwy 1 Location: Forest Rd 553 to Forest

More information

2018 District 1 Highway Construction Program

2018 District 1 Highway Construction Program District 1 Highway Construction Program For additional information contact: Stephanie Christensen MnDOT District 1, Public Affairs Office: 218-725-2700 Email: Stephanie.smith-christensen@state.mn.us Last

More information

Future Projects. District 3 Central Minnesota. mndot.gov/d3

Future Projects. District 3 Central Minnesota. mndot.gov/d3 Future Projects District 3 Central Minnesota 2019 2022 mndot.gov/d3 Lake 371 2019-2022 Construction 200 Walker 34 CASS 200 Remer 6 Central Minnesota MnDOT District 3 Hackensack 371 84 Longville 6 Hill

More information

MINNESOTA OFFICE OF THE STATE AUDITOR JUDITH H. DUTCHER RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996

MINNESOTA OFFICE OF THE STATE AUDITOR JUDITH H. DUTCHER RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996 MINNESOTA OFFICE OF THE STATE AUDITOR RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996 JUDITH H. DUTCHER STATE AUDITOR Ranking of County Expenditures October 27, 1998 Government Information

More information

2007 Construction Information/Season Notes

2007 Construction Information/Season Notes 2007 Construction Information/Season Notes Metro I-35 W Bridge On August 1, 2007 the I-35 W Bridge over the Mississippi River in Minneapolis collapsed. This had major impacts on traffic patterns in the

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part One Grant County Courthouse (2012). Elbow Lake, Minnesota. Building constructed in 1906. Source: Gobonobo, photographer

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part One Grant County Courthouse (2012). Elbow Lake, Minnesota. Building constructed in 1906. It is on the National Register

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part Two McLeod County Court House Glencoe, Minnesota Date photograph taken: 1909 Source: LakesnWoods.com McLeod County Court

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part Two McLeod County Court House Glencoe, Minnesota Date photograph taken: 1909 Source: LakesnWoods.com McLeod County Court

More information

Updated: April 7, 2016

Updated: April 7, 2016 Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace

More information

Metro - Let me know about major weekend traffic impacts

Metro - Let me know about major weekend traffic impacts Highway 100 Construction Traffic Impacts Dates may change due to weather. West 36th St to Hwy 62 Currently April 4-mid Aug 50th St. ramp to NB Hwy 100 will close. The ramp will reopen in mid-august. Upcoming

More information

Currently Future Agency Used for Use for Classification Property

Currently Future Agency Used for Use for Classification Property Page 1 This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Records for

More information

Minnesota Department of Transportation State Highway Capital Improvement Program (CIP)

Minnesota Department of Transportation State Highway Capital Improvement Program (CIP) Minnesota Department of Transportation 2017-2020 State High (CIP) MnDOT s State Fiscal 2017-2020 State High (CIP) Table of Contents 1. Introduction Pg. 1 2. CIP Format...Pg. 2 3. Planned Information Pg.

More information

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction

More information

Minnesota. County Assessor. Directory

Minnesota. County Assessor. Directory Minnesota County Assessor Directory PDF generated from MemberClicks database on October 29, 2012 http://www.mnmaao.org/ ALBERTSEN, A KEITH, CAE Membership: Regular Joined: 1982 DOUGLAS COUNTY DOUGLAS COUNTY

More information

Minnesota High School Baseball Records Team Hitting Records Updated 10/25/12

Minnesota High School Baseball Records Team Hitting Records Updated 10/25/12 Games Played Season 1. 33 Goodhue 2004 2. 32 Brainerd 2003 2. 32 St. Michael-Albertville 2009 4. 31 Rochester Mayo 1999 4. 31 St. Cloud Tech 1997 4. 31 Springfield 1994 4. 31 Wabasso 2008 4. 31 St. Anthony

More information

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways. WELCOME RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways Open House meeting is downstairs in the Foot Room November 2016 Plum/3rd Street Traffic Control Change Signal to All-Way Stop Plum

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins February

More information

County Assessor Membership Directory. County Assessor Directory

County Assessor Membership Directory. County Assessor Directory County Assessor Membership Directory County Assessor Directory PDF generated from Memberclicks database on September 21, 2010 ALBERTSEN, A KEITH, CAE Membership: Regular Joined: 1982 DOUGLAS COUNTY DOUGLAS

More information

Charlton/Oxford Route 20 Reconstruction Project

Charlton/Oxford Route 20 Reconstruction Project Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting

More information

APPENDIX A Map Exhibits

APPENDIX A Map Exhibits APPENDIX A Map Exhibits (See attached) County Rd 0 County Rd 7 County Rd Map Document: (P:\007\gis\permit\Final\SPA_Exhibits\007doq0B_ex.mxd) 0//00 -- 0::7 AM 00 Westwood Professional Services, Inc. Section

More information

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2) Reprioritized Projects in the 2006-2010 Highway and Bridge Construction Schedule Introduction The information in this section is in accordance with the highlighted portion in the following section of the

More information

TYPICAL SECTION OF IMPROVEMENT

TYPICAL SECTION OF IMPROVEMENT ...\plans\0_prelim\07c_sh0.dgn /8/009 DIV. STATE COUNTY FILE OJECT TYPICAL CTION OF IMOVEMENT SC 7.0658A8 I-7 NORTHBOUND I7 SOUTHBOUND I7 8 8 0 8 VARIABLE (E CROSS CTIONS) : CONST..5.5 CONST. (

More information

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 The Asphalt Indexes for the Month of August 2016 are: ACI -

More information

AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division

AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division Arlington 1, 2, 3 and Paul Antonich Memorial Field -- 601 South Arlington Ave. Duluth, 55811.

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work PROGRAM/PROJT NAME (COUNTY) ADA Curb Ramp Implementation (Various) STP $1,000,000 Airport Improvement Program (Various) STATE $4,000,000 Betterments, Dams (Various) Betterments, Roadway Preservation (Various)

More information

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018 SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic

More information

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median

More information

MAINTENANCE OF TRAFFIC &

MAINTENANCE OF TRAFFIC & 2/28/2015 5:05:15 PM d106136001k(01).dgn MANAGER Dave Covington, P.E. (540) 292-3802 VA. 29 1K(1) TRANSPORTATION OPERATIONS (TO) PLAN A). THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: 1. POST A LIST

More information

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen

More information

News from the Bench. Submitted by Kim Buechel Mesun, Minneapolis Public Schools

News from the Bench. Submitted by Kim Buechel Mesun, Minneapolis Public Schools News from the Bench Submitted by Kim Buechel Mesun, Minneapolis Public Schools Governor Dayton appointed Carol M. Hanks as a District Court Judge in Minnesota s Third Judicial District. This vacancy was

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

Arrowhead Youth Soccer Association Fields Directory

Arrowhead Youth Soccer Association Fields Directory Name of Field Address Directions/Notes Arlington Fields 601 South Arlington Avenue On South Arlington Avenue between Trinity Road and Central Entrance in Duluth.Via Mesaba-Central Entrance: I-35N to Exit

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT 200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'

More information

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa 2016 MINNESOTA SPRING GROUSE SURVEYS Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 10 June 2016 SUMMARY OF FINDINGS Each

More information

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013 Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November

More information

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C. August 18, 2016 FS-1604A US 70 Improvements, Johnston County VHB Engineering NC, P.C. Agenda Project Description and Location Purpose and Need Background Plans Local Plans Legislation Adjacent STIP Projects

More information

2015 MINNESOTA SPRING GROUSE SURVEYS

2015 MINNESOTA SPRING GROUSE SURVEYS SUMMARY OF FINDINGS 2015 MINNESOTA SPRING GROUSE SURVEYS Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 17 June 2015 Each

More information

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY. BELCHER RD 66TH ST N DRAFT 05-08-14 61 60 40 39 52 38 53 37 EAST LAKE RD KEYSTONE RD Pinellas County Proposed Roadway s for the 2040 LRTP Legend GULF BLVD 67 Gulf of Mexico WEST BAY DR WALSINGHAM RD µ

More information

Environmental Consultants List Guidance Document 22

Environmental Consultants List Guidance Document 22 Environmental Consultants List Guidance Document 22 The Minnesota Department of Agriculture (MDA), Incident Response Unit provides the following listing of consultants solely as a service to Minnesota.

More information

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY 2009 Produced by The Green Hills Regional Planning Commission 1 County: Caldwell Source: RTP Needs Assessment 06 Rt: US

More information

Single Point Urban Interchange (SPUI) with Signals

Single Point Urban Interchange (SPUI) with Signals 1 Single Point Urban Interchange (SPUI) with Signals Allows for concurrent left turns on Wurzbach Parkway and on NW Military Traffic Signal added on NW Military Hwy at Fairfield Bend/ Turnberry Way Large

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa 2014 MINNESOTA SPRING GROUSE SURVEYS Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 19 June 2014 SUMMARY OF FINDINGS Each

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia PROJECT OVERVIEW S.P. 6935-89 is on T.H. 169 from 0.07 miles west of CR 109 in Mt. Iron to Hoover Road in Virginia

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

TYPICAL SECTION OF IMPROVEMENT

TYPICAL SECTION OF IMPROVEMENT TYPICAL CTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC MARION 7.0658A I-7 NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE OR END TREATMENT IS REQUIRED FOR 8 8 BRIDGE APOACH, ADD.5

More information

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT Case ID: MI Date of Investigation Respondent Employer Information 1. Is the employer the primary contractor or a subcontractor working at the site? Victim Information

More information

2018 High School Overall Team Results

2018 High School Overall Team Results Division 1 Austin rules apply: Best 4 scores count toward season point total. There are no High School team scores from Austin race. Place Team Points Count? 1 Stillwater HS 16,509 3-Gamehaven Trail, Rochester

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

Minnesota State Chief Academic Affairs Officers Updated

Minnesota State Chief Academic Affairs Officers Updated Alexandria Technical and Community College Ross Santell Executive Vice President of Academic and Student 1601 Jefferson Street Alexandria, MN 56308 Phone: (320) 762-4404 Fax: (320) 762-4501 E-mail: rosss@alextech.edu

More information

ACEC OC February 22, 2017

ACEC OC February 22, 2017 ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of

More information

In 2017, we continued to focus on CMCU s three core pillars:

In 2017, we continued to focus on CMCU s three core pillars: ANNUAL REPORT 2017 CHAIR & CEO REPORT Dear Members, Another successful year for Central Minnesota Credit Union is in the books. As we continue to grow and strengthen each year, we like to take time to

More information

The Shoppes at Forney Crossings

The Shoppes at Forney Crossings F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"

More information

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML. Wayzata Central Middle School Plymouth 35

CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML. Wayzata Central Middle School Plymouth 35 008-009 CONTEST SCORE REPORT SUMMARY FOR GRADES 6, 7, AND 8 Summary of Results 6th Grade Contests MNML Top 8 s in League 6th Grade (9 s) Team * Wayzata Central Middle Plymouth 8 * Blake Hopkins 67 Roosevelt

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-4 Section 4(f) Mitigation Master Plan IH 35E Managed Lanes Project Book 2 - Technical Provisions

More information

DIVISION PAVEMENT MARKINGS AND MARKERS

DIVISION PAVEMENT MARKINGS AND MARKERS DIVISION 61 66 PAVEMENT MARKINGS AND MARKERS 66.01 SCOPE: The purpose of these specifications is to describe the minimum requirements of the City of Chesapeake for pavement markings and shall be in addition

More information

Lake Henry!( Belgrade!( Mill & Regal. Overlay. Overlay. Mill & Overlay. Mill & Overlay. & Turn Lanes. New London. Conc. Rehab. Spicer 75!

Lake Henry!( Belgrade!( Mill & Regal. Overlay. Overlay. Mill & Overlay. Mill & Overlay. & Turn Lanes. New London. Conc. Rehab. Spicer 75! Hendricks ") 7 Madison ") 40 s Watson 277 ") Montevideo Dawson Clara City Trosky Bellingham Arco Rehab 14 Tyler Taunton Florence Tracy Lamberton Balaton Walnut Grove Garvin 14 Revere Sanborn Ruthton (Hwy330)

More information

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard

More information

BOARD OF DIRECTORS MEETING MINUTES

BOARD OF DIRECTORS MEETING MINUTES Board Voting Members Present: BOARD OF DIRECTORS MEETING MINUTES Osage Centre Cape Girardeau, MO Mr. Drew Christian, Southeast Missouri Regional Planning & Economic Development Commission (SEMO RPC) (alternate

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010 I-405 Sepulveda Pass Improvements Project Community Advisory Committee September 23, 2010 1 Click to edit Master title style Click to edit Master text styles Regional Project Updates Second level Third

More information

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: 2552-03-058 EL PASO COUNTY, TEXAS Del Valle High School July 25, 2018 Hearing Information

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard

More information

SCOPE OF WORK AND DELIVERABLES T.H.

SCOPE OF WORK AND DELIVERABLES T.H. Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. s 27, 73 and 289 in Moose Lake S.P. 8821-200 PROJECT OVERVIEW The project is located in Moose Lake, Carlton County s on TH 27, 73, and 289. TH 27 RP 245.044

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST BOSTON HORIZON WAY ALFORD ST BROADWAY BOSTON CITY LINE CITY LINE MANHOLE #101 (STA 5+00) BOW ST DEXTER ST ST LYNDE ST THORNDIKE ST COURTLAND ST RIVER PROP (TYP) ROBIN ST BETTY ST 50 500 1. BASELINE STATIONING

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard

More information

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation Appendix D Traffic Noise Analysis Report I-94 St. Michael to Albertville Minnesota Department of Transportation Traffic Noise Analysis Report I-94 St. Michael to Albertville Project SP 8680-172 Report

More information

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55

More information

2007 Year Review File: c Date: December Slide Location

2007 Year Review File: c Date: December Slide Location 2007 YEAR REVIEW OF GEOHAZARD SITES TABLE 1: LISTING OF SITES AND RISK ASSESSMENT (2007) Slide Site Name 2007 Active Inactive Site GP1 Hwy 40:42 Wapiti Hill (5 km S. of Wapiti River Bridge) 11 * 4 44 GP2

More information

Welcome Public Open House

Welcome Public Open House Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and

More information

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS 9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a

More information

2018 Minnesota Spring Grouse surveys

2018 Minnesota Spring Grouse surveys 2018 Minnesota Spring Grouse surveys Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 5 June 2018 SUMMARY OF FINDINGS The Minnesota

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

Texas Water Safari Driving Directions

Texas Water Safari Driving Directions Texas Water Safari Driving Directions v4 Revised March 2014 While I try to make sure these directions are accurate and up to date...i make no promises. I try to update this each year so please send any

More information

The Board of County Road Commissioners of the County of Kent met in the. The regular meeting was called to order by Commissioner Rambo, Chairman

The Board of County Road Commissioners of the County of Kent met in the. The regular meeting was called to order by Commissioner Rambo, Chairman 1500 Scribner Avenue, NW Grand Rapids, MI 49504 The Board of County Road Commissioners of the County of Kent met in the Road Commission Offices. The regular meeting was called to order by Commissioner

More information

ZOO INTERCHANGE PROJECT

ZOO INTERCHANGE PROJECT ZOO ITERCHAGE PROJECT GET AROUD GUIDE winter 0/0 - summer 0 TAKE A LOOK ISIDE FOR CLOSURE IFORMATIO, ALTERATE ROUTES, TRASPORTATIO OPTIOS, HOW TO STAY COECTED TO THE ZOO ITERCHAGE PROJECT AD MUCH MORE!

More information

Directions to GMC Middle School Game Sites (updated 8/20/13)

Directions to GMC Middle School Game Sites (updated 8/20/13) Bridgetown Bridgetown Middle School, 3900 Race Rd, Cincinnati I-275 West to 74 East to Rybolt Rd, turn left. At Harrison Avenue, turn right and follow to Race Rd. and turn right. School is on the left.

More information

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

SUPPLEMENTARY STANDARD DETAIL DRAWINGS CITY OF MAPLE RIDGE DESIGN AND CONSTRUCTION DOCUMENTS Part 4 SUPPLEMENTARY STANDARD DETAIL DRAWINGS September 2015 Updated: October 2015 THIS PAGE INTENTIONALLY LEFT BLANK City of Maple Ridge Supplementary

More information

Planarization & Routing Guide

Planarization & Routing Guide Metro Regional Centerlines Collaborative Planarization & Routing Guide Document: Version. Published: July 8, 25 Prepared and edited by: Matt Koukol, MRCC Project Technical Lead Ramsey County GIS Manager

More information

Information for File # RMM

Information for File # RMM Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:

More information

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised

More information

MINNESOTA NAWCA PROJECTS

MINNESOTA NAWCA PROJECTS NAWCA S $40,343,809 $152,258,606 125 270,804 NAWCA GRANT AMOUNT TOTAL PARTNER CONTRIBUTION NUMBER OF S TOTAL ACRES Minnesota currently has 125 NAWCA projects either completed or underway. These projects

More information

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends) MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard

More information

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS

More information