PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS
|
|
- Ilene Campbell
- 5 years ago
- Views:
Transcription
1 PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS Del Valle High School July 25, 2018
2 Hearing Information Purpose of the Public Hearing: to solicit feedback from the community regarding proposed enhancements to Loop 375 from North Loop Drive to Zaragoza Port of Entry (POE) Options for Commenting: 1) Verbal comments for the official record will commence after the presentation 2) Written comments can be placed in the comment box 3) comments to: 4) Mail comments to: Blanton & Associates Attn: Loop 375 Frontage Roads 5 Lakeway Centre Court, Suite 200 Austin, TX Deadline for Comments: Thursday, August 9, 2018 ** Public Hearing Report will be posted at when analysis is complete. 2
3 Public Hearing Notice 3
4 Introductions Elected Officials Project Team Members 4
5 Agenda for Tonight s Public Hearing Welcome Project Overview Environmental Overview Intermission Public Comments Adjourn Public Hearing 5
6 Project Location Map 6
7 Purpose and Need Project Purpose The purpose of the project is to improve mobility and reduce congestion on Loop 375 by extending frontage roads across the Union Pacific railroad and reconfiguring ramps. Need The project is needed to address increased traffic congestion from current and anticipated growth in the project area. 7
8 Project Description Extend frontage roads over the Union Pacific railroad just north of SH 20 (Alameda Avenue) and Loop 375 intersection Reconfigure ramps in both the north and southbound directions Project Length: 2.4 miles Permanent Drainage Easements: 6.03 acres Temporary Construction Easements: 2.51 acres No displacements or relocations 8
9 Ramp Layouts Ramps between S. Americas Avenue and Pan American Drive Replace northbound entrance ramp from S. Americas Avenue with a new entrance ramp from S. Americas Avenue braided with an exit ramp to Pan American Drive Replace southbound exit ramp to S. Americas Avenue with a new exit ramp from S. Americas Ave braided with an entrance ramp from Pan American Drive 9
10 Ramp Layouts Ramps between Pan American Drive and Socorro Road Remove northbound exit ramp to Socorro Road and place a new entrance ramp from Pan American Drive Remove southbound entrance ramp from Socorro Road and place a new exit ramp to Pan American Drive 10
11 Ramp Layouts Ramps between Alameda Avenue and North Loop Drive Replace northbound entrance ramp from Alameda Avenue and exit ramp to North Loop Drive with ramps from the frontage road extension Replace southbound exit ramp to Alameda Avenue with a ramp from the frontage road extension 11
12 Existing Typical Sections Loop 375 frontage roads from North Loop to Zaragoza POE Each frontage road consists of three travel lanes with two 14-foot-wide lanes and a 12-foot-wide lane 12
13 Proposed Typical Section near Pan American Drive Loop 375 frontage roads and ramps near Pan American Drive Each frontage road consists of three travel lanes with two 14-foot-wide lanes and a 12-foot-wide lane Ramps would consist of a 14-foot-wide travel lane with 4-foot-wide inside shoulders and 6-foot-wide outside shoulders 13
14 Proposed Typical Section at Union Pacific Railroad Loop 375 frontage roads at the Union Pacific Railroad Southbound: one 12-foot-wide travel lane, one 14-foot-wide shared lane, and a 5-footwide sidewalk Northbound: one 12-foot-wide auxiliary lane, one 12-foot-wide travel lane, one 14- foot-wide shared lane, and a 5-foot-wide sidewalk 14
15 Project Planning and Funding Total Estimated Construction Cost: approximately $31.1 Million Funding Source: Federal and State funds 15
16 Environmental Overview The project was processed as a categorical exclusion (CE) Technical reports evaluated impacts to the human and natural environment Potential habitat for one state-threatened species and three species of greatest conservation need - Coordination with TPWD for New Mexico garter snake No anticipated impacts to archeological resources, community features, traffic noise, or water resources Access would be maintained to adjacent businesses throughout the project area 16
17 Section 4(f) and Chapter 26 Drainage easements and work adjacent to and above NRHPlisted Franklin Canal and other contributing features of the El Paso County Water Improvement District #1 (Water District) De minimis 4(f): project activities would not adversely affect the activities, features, or attributes that make the properties eligible for Section 4(f) of the DOT Act Project would comply with Chapter 26 of the Texas Parks and Wildlife Code No adverse effects to historic properties are anticipated 17
18 Air Quality Project located in a PM 10 air quality non-attainment area Air quality conformity consultation process was conducted On June 11, 2018, the Consultation Partners determined that the project is not of local air quality concern in accordance with 40 CFR (a) 18
19 Reviewing Project Information Project plans and the environmental documents are available for viewing tonight These documents can also be viewed at the TxDOT El Paso District Office at Gateway West, El Paso, TX until Thursday, August 9,
20 Next Steps Review and consider public hearing comments Finalize design Anticipated environmental clearance Summer 2018 Easement agreements Anticipated construction start
21 Intermission Intermission: A 15-minute intermission will begin Options for Commenting: 1) Verbal comments for the official record will commence after the presentation 2) Written comments can be placed in the comment box 3) comments to: kjohnson@blantonassociates.com 4) Mail comments to: Blanton & Associates Attn: Loop 375 Frontage Roads 5 Lakeway Centre Court, Suite 200 Austin, TX Deadline for Comments: Thursday, August 9, 2018 ** Public Hearing Report will be posted at when analysis is complete. 21
22 Verbal Comments 22
23 3:00 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52 2:51 2:50 2:49 2:48 2:47 2:46 2:45 2:44 2:43 2:42 2:41 2:40 2:39 2:38 2:37 2:36 2:35 2:34 2:33 2:32 2:31 2:30 2:29 2:28 2:27 2:26 2:25 2:24 2:23 2:22 2:21 2:20 2:19 2:18 2:17 2:16 2:15 2:14 2:13 2:12 2:11 2:10 2:09 2:08 2:07 2:06 2:05 2:04 2:03 2:02 2:01 2:00 1:59 1:58 1:57 1:56 1:55 1:54 1:53 1:52 1:51 1:50 1:49 1:48 1:47 1:46 1:45 1:44 1:43 1:42 1:41 1:40 1:39 1:38 1:37 1:36 1:35 1:34 1:33 1:32 1:31 1:30 1:29 1:28 1:27 1:26 1:25 1:24 1:23 1:22 1:21 1:20 1:19 1:18 1:17 1:16 1:15 1:14 1:13 1:12 1:11 1:10 1:09 1:08 1:07 1:06 1:05 1:04 1:03 1:02 1:01 1:00 0:59 0:58 0:57 0:56 0:55 0:54 0:53 0:52 0:51 0:50 0:49 0:48 0:47 0:46 0:45 0:44 0:43 0:42 0:41 0:40 0:39 0:38 0:37 0:36 0:35 0:34 0:33 0:32 0:31 0:30 0:29 0:28 0:27 0:26 0:25 0:24 0:23 0:22 0:21 0:20 0:19 0:18 0:17 0:16 0:15 0:14 0:13 0:12 0:11 0:10 0:09 0:08 0:07 0:06 0:05 0:04 0:03 0:02 0:01 0:00
24 Thank You for Attending Options for Commenting: 1) Verbal comments for the official record will commence after the presentation 2) Written comments can be placed in the comment box 3) comments to: 4) Mail comments to: Blanton & Associates Attn: Loop 375 Frontage Roads 5 Lakeway Centre Court, Suite 200 Austin, TX Deadline for Comments: Thursday, August 9,
FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr
FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING March 29, 2016 FM 1103 FROM: I-35 TO: RODEO DR COMAL & GUADALUPE COUNTY OPEN HOUSE PUBLIC MEETING March 29, 2016 5:00 p.m. 7:00 p.m. Barbara C Jordan Intermediate
More informationCharlton/Oxford Route 20 Reconstruction Project
Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting
More informationUpdated: April 7, 2016
Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace
More informationFM 691 CORRIDOR STUDY
FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008 Agenda Project Overview US 75/FM 691 Interchange US 75 Ramping Alternatives FM 691 Corridor Typical Sections Extension to SH 289
More informationI-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median
I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median
More informationThe Shoppes at Forney Crossings
F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"
More informationTexas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan
Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-4 Section 4(f) Mitigation Master Plan IH 35E Managed Lanes Project Book 2 - Technical Provisions
More informationSECTION 3 IMPROVEMENT PLAN REQUIREMENTS
SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,
More informationHwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise
Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction
More informationDemolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)
I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project
More informationPurple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018
Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018 1 Agenda Environmental Updates UCLA Station Advance Utility Relocation VA Station Advance Utility Relocation Underground
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationDIVISION PAVEMENT MARKINGS AND MARKERS
DIVISION 61 66 PAVEMENT MARKINGS AND MARKERS 66.01 SCOPE: The purpose of these specifications is to describe the minimum requirements of the City of Chesapeake for pavement markings and shall be in addition
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationLocate Request Information
Locate Request Information NOTE: DO NOT USE any apostrophes ( )or quotation marks ( ) in Web Ticket Entry. Doing so may hamper the transmission of tickets to the utilities and locators. Limit per Ticket
More informationUpdate on Traffic Results and Findings
Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes
More informationCHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2
SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW
More informationAugust 21, Luis E. Ramírez Thomas, President, RAI-N. June Activity Report
Page 1 of 11 TO: FROM: SUBJECT: MR. GUILLERMO VALENCIA, CHAIRMAN, GNSCCPA Luis E. Ramírez Thomas, President, RAI-N June Activity Report On behalf of Ramirez Advisors Inter-National, LLC ( RAI-N ) allow
More informationCLINTON CLOSURE DETOURS
S W Princen Ave Southbound Hwy off ramp at Shields Ave Ave: Exit Southbound Hwy at Shields, proceed south on Marks Ave Ave Southbound Hwy on ramp at Shields Ave from Ave: Ave Marks Ave north. Proceed north
More informationPurple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018
Purple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018 1 Agenda Westwood/UCLA Map and Schedule Advance Utility Relocation Bus Stop Relocations Westwood/VA Hospital Map Advance
More informationStudy Description. November 29, Overpass Road Alternatives Public Workshop
Overpass Road Alternatives Public Workshop November 29, 2012 Welcome to the Alternatives Public Workshop for proposed improvements to Overpass Road in Pasco County. Pasco County (the County), in coordination
More informationState Road A1A North Bridge over ICWW Bridge
Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida
More informationHAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review
HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.
More informationAgenda Item No. August 28, Honorable Mayor and City Council Attention: David Van Kirk, City Manager. Dale I. Pfeiffer, Director of Public Works
Agenda Item No. August 28, 2007 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: David Van Kirk, City Manager Dale I. Pfeiffer, Director of Public Works RESOLUTION TO ADOPT A MITIGATED NEGATIVE
More informationDE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008
DE 8 Concept Plan and Operations Study City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 Purpose Develop a concept plan describing the aesthetic qualities of the corridor
More informationUsing Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County
Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101
More informationAPPLICATION FOR SITE PREPARATION PERMIT
Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision/Plat Name: Location Description/ Nearest Intersection: Acreage: APPLICATION FOR SITE PREPARATION PERMIT No.
More informationMinutes of the Planning & Projects Committee Meeting - Gulf Coast Freight Rail District March 3, 2009
Minutes of the Planning & Projects Committee Meeting - Gulf Coast Freight Rail District March 3, 2009 A meeting of the Planning & Projects Committee of the Gulf Coast Freight Rail District was held at
More information2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment
2.8 NOISE 2.8.1 CONSTRUCTION NOISE The noise impacts are not adequately addressed or studied in the DEIR, as there appears to be no analysis at all of potential noise level increases as measured from locations
More informationPHASE II FOR LEASE PROJECT FEATURES. Phase I - 100% Leased to FedEx Ground
ARCADIA LOGISTICS CENTER ARCADIA, CALIFORNIA PHASE II FOR LEASE 3 BUILDINGS +-150,672 SF TO +- 529,179 SF STATE OF THE ART DEVELOPMENT ˑ ADJACENT TO I-605, BETWEEN I-10 AND I-210 ˑ LEED SILVER DEVELOPMENT
More informationWHEREAS, the Board has given consideration to the public comment entered into the public record upon said project; and
FARMINGTON PLANNING BOARD RESOLUTION FINAL SITE PLAN PB #0506-18 APPLICANT: B&B Builders, 2913 County Road 47, Canandaigua, NY 14424 ACTION: Final Site Plan Amendment Application for the construction of
More informationTYPICAL SECTION OF IMPROVEMENT
TYPICAL CTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC MARION 7.0658A I-7 NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE OR END TREATMENT IS REQUIRED FOR 8 8 BRIDGE APOACH, ADD.5
More informationthere are no known Critical Environmental Area(s) on the site which will be impaired as the result of the proposed Actions; and
TOWN OF FARMINGTON PLANNING BOARD PB 0501-18 & 0502-18 SEQR Resolution Determination of Non-Significance Preliminary Subdivision Plat & Preliminary Site Plan, James Brenchley, 5106 Rushmore Road Whereas,
More informationOperating Standards Attachment to Development Application
Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS
More informationCotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning
Cotton Belt Corridor Area Focus Group (AFG) Carrollton/Addison August 29, 2017 John Hoppie, Capital Planning 0 Agenda Design Update Alignment/Cross-section/Stations/Facilities Environmental Update Documentation
More informationPLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material
PLANNING DEPARTMENT 970.668.4200 0037 Peak One Dr. PO Box 5660 www.summitcountyco.gov Frisco, CO 80443 SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS Per the provisions
More informationTRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey
TRAFFIC IMPACT STUDY PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey Prepared For: The Valley Hospital 223 North Van Dien Avenue Ridgewood, New Jersey 07450
More informationKing Mill Lambert DRI# 2035 Henry County, Georgia
Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.
More informationMnDOT Contract Exhibit A- Scope of Services. Project Information -
Detail Design For Pedestrian Improvements on Trunk Highways 23, 59, and 68 In the Marshall Area Introduction and Project Information Introduction The purpose of this contract is to provide the State with
More informationAppendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation
Appendix D Traffic Noise Analysis Report I-94 St. Michael to Albertville Minnesota Department of Transportation Traffic Noise Analysis Report I-94 St. Michael to Albertville Project SP 8680-172 Report
More informationCHAPTER 26 SITE PLAN REVIEW
CHAPTER 26 SITE PLAN REVIEW Section 26.1. Committee. The Planning Commission shall appoint three members of the Planning Commission to the site plan review committee which shall be responsible for site
More informationDESIGN PUBLIC HEARING
DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55
More informationBOARD OF DIRECTORS MEETING MINUTES
Board Voting Members Present: BOARD OF DIRECTORS MEETING MINUTES Osage Centre Cape Girardeau, MO Mr. Drew Christian, Southeast Missouri Regional Planning & Economic Development Commission (SEMO RPC) (alternate
More informationTHE PLANNING BOARD OF EFFINGHAM COUNTY, GA May 22, 2017
THE PLANNING BOARD OF EFFINGHAM COUNTY, GA May 22, 2017 I. CALL TO ORDER Chairman Dave Burns called the meeting to order at 6:01 p.m. II. INVOCATION Board Member Alan Zipperer gave the invocation. III.
More informationATTENDING THE MEETING Robert Balogh, Chairman Marcus Staley, Vice-Chairman Bob Ross, Supervisor Harold Close, Supervisor Neil Kelly, Supervisor
LEGISLATIVE MEETING-TUESDAY, AUGUST 28, 2018 PAGE 1 The North Strabane Township Board of Supervisors held its Legislative Meeting, Tuesday, August 28, 2018, at 7:00 P.M., at the Township Municipal Building,
More informationCITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:
CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?
More informationConceptual, Preliminary and Final Site Plan Review in Holladay City
Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made
More informationExit 61 I-90 Interchange Modification Justification Study
Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.
More informationPacificans for Highway 1 Alternatives c/o Hal Bohner
Pacificans for Highway 1 Alternatives c/o Hal Bohner 1 1 5 A n g e l i t a A v e n u e P a c i f i c a, C A 9 4 0 4 4 phone 650-359-4257 hbohner@earthlink.net Via Email September 6, 2012 Mr. Bijan Sartipi
More informationFlorida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3
Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationRail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets
Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets By: Marty Amundson, PE, TE, PTOE Eugene Bachtinov, P.E. Jonathan Hofert, PE, TE, PTOE Metro Provides Excellence in Service
More informationItem 2. September 28, 2017
September 28, 2017 Item 2 Applicant: Georgetown Development Location: 190 N 1100 W Prepared by: Sean Conroy, Community Development Director Public Hearing: No Zone: PRD-1 Attachments: 1. Findings. 2. Project
More informationMINUTES OF REGULAR MEETING OF THE CITY PLANNING AND ZONING COMMISSION OF THE CITY OF LUFKIN, TEXAS, HELD ON THE 10TH DAY OF AUGUST, 1981, AT 5:00 P.M.
MINUTES OF REGULAR MEETING OF THE CITY PLANNING AND ZONING COMMISSION OF THE CITY OF LUFKIN, TEXAS, HELD ON THE 10TH DAY OF AUGUST, 1981, AT 5:00 P.M. On the 10th day of August, 1981, the City Planning
More informationIncreasing Pace of Utility Accommodations
Increasing Pace of Utility Accommodations Session Right of Way 2011 Transportation Short Course October 11, 2011 Jesse Cooper, RPLS ROW Division, Map, Survey, and Utility Section Director Ryan Bonner Waco
More informationWelcome Public Open House
Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases
More information9-11 Commission to Address Emergency Preparedness
MEDIA ADVISORY 9-11 Commission to Address Emergency Preparedness November 10, 2003 The National Commission on Terrorist Attacks Upon the United States (also known as the 9-11 Commission) will hold its
More informationEAST BRANDYWINE TOWNSHIP PLANNING COMMISSION REGULAR SESSION Wednesday, December 6, 2017
EAST BRANDYWINE TOWNSHIP PLANNING COMMISSION REGULAR SESSION Wednesday, Those in Attendance: Mr. Bruce Rawlings, Chairman Mr. Ronald Fanelli, Vice-Chairman Mr. Jim Buczala, Member Mr. Michael Corbin, Member
More informationMemorandum. Dear Ms. Allen,
RhoadesPlanningGroup Memorandum To: Shannon Allen, AICP, Principal Planner From: Rhoades Planning Group Date: June 10, 2015 Re: Response to Incomplete Letter, 1900 Fourth Street Dear Ms. Allen, This letter
More informationSDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses
FINAL SDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses SCH# 2016121025 Prepared for: 5500 Campanile Drive San Diego, California 92182-1624 Contact: Laura Shinn
More informationMINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on
MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on September 24, 2014, at 4 p.m., in the Council Chambers of the Municipal
More informationDESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please
More informationSite Plan/Building Permit Review
Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required
More informationCITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET
CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES
More information[LLUTC L ER0000-LVRWJ10J4080; UTU ] Notice of Intent to Prepare an Environmental Assessment for the Proposed
This document is scheduled to be published in the Federal Register on 08/24/2012 and available online at http://federalregister.gov/a/2012-20892, and on FDsys.gov 4310-DQ-P DEPARTMENT OF THE INTERIOR Bureau
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 AMARILLO DISTRICT MARCH 20 TH OUT- OF - CYCLE REVISIONS 3-16-2009 file://d:\documents and Settings\LMOREL\Local Settings\Temp\XPgrpwise\49BE6199RS1H...
More informationTown of Greenport Planning Board Meeting Minutes for September 26, 2017
The Planning Board meeting of September 26, 2017 was called to order at 7:30 pm by Chairman Stiffler. We then proceeded with the Pledge of Allegiance. There were 25 people in attendance. Present: X Edward
More informationCommunity & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS
Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project
More informationNovember 6, The Board of Public Works and Safety met in regular session in the Council Chambers on Tuesday November 6, 2018 at 9:00am.
November 6, 2018 The Board of Public Works and Safety met in regular session in the Council Chambers on Tuesday November 6, 2018 at 9:00am. Present: Mayor Krentz, Clay Turner and Mitch Feikes Absent: None
More informationColumbus Board of Education October 1, 2013
Columbus Board of Education October 1, 2013 The Board of Education of the City School District of Columbus, Ohio, met in a regular session on Tuesday, October 1, 2013, at 5:46 p.m. in the Assembly Room
More informationIOWA ORNITHOLOGISTS' UNION - Birding Sites in Story County
IOWA ORNITHOLOGISTS' UNION - Birding Sites in Story County Printed on 3/15/2019 Ada Hayden Park (ebird Hotspot) (Important Bird Area) GPS Coordinates: 42.0728262,-93.6245656 (Formerly Hallett s Quarry)
More informationAPPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT
209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT
More informationSUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV
COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS
More informationTechnical Memorandum ECO-7
To: Woody Frossard, TRWD From: Bob Brashear, CDM This document is released for the purpose of interim review under the authority of Robert Brashear, P.E., TX license 80771 on 21-Mar-2005. It is not to
More informationAppendix G. Visual Simulations and Illustrations
Appendix G Visual Simulations and Illustrations 5TH AVE AV E N View ewshe ed 5 SHORELINE N 185TH ST egment B gment A 26 NE 185th Street Station (A1, A3, A5, A7, A10, A11) 25 24 23 22 21 NE 180TH ST 99
More informationSummerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011
Summerland Planning Advisory Committee SunPAC Meeting #31 April 28, 2011 1 SunPAC Meeting Agenda Call to Order Item 1: Pledge of allegiance and roll call Agenda Item: 1 Item 2: Public comment period Item
More informationArticle 4.0 Measurements and Exceptions
This Article identifies and explains some of the more common forms of measurement used throughout this Ordinance. It also specifies exceptions to certain requirements of this Ordinance. Sec. 4.1 Measurements
More informationDEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3
DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 Unified Development Code (UDC) Article 2, Applications, Procedures and Criteria provides the steps for applying the Unified Development Code standards to
More informationZONING BOARD OF APPEALS VILLAGE OF ROSEMONT AGENDA FEBRUARY 6, 2018 MEETING 3:00 P.M DEVON AVENUE, 2 ND FLOOR ROSEMONT, IL
ZONING BOARD OF APPEALS VILLAGE OF ROSEMONT AGENDA FEBRUARY 6, 2018 MEETING 3:00 P.M. 9501 DEVON AVENUE, 2 ND FLOOR ROSEMONT, IL I. Call to Order and Roll Call II. Approval of minutes of November 7, 2018
More informationACEC OC February 22, 2017
ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationMARCH 7, The invocation was given by Reverend Leland Nelson from Calvary Baptist Church.
MARCH 7, 2016 The regular Council meeting was held at the M.S. Bailey Municipal Center at 6:00 PM with Mayor Bob McLean presiding with Councilmembers Byrd, Cook, Jenkins, Kuykendall, Scarborough, and Young.
More informationCity of Surrey Adaptive Signal Control Pilot Project
City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors
More informationAdopt-A-Trail Project FAQs
Adopt-A-Trail Project FAQs 1. Do we have to visit all sites on all loops that we adopt 4 times per year or is there some flexibility? Yes, there is some flexibility. The layout of each loop of the VBWT
More informationAPPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please
More informationOil Spill Funds and the Opportunities they Present for Galveston Bay
Oil Spill Funds and the Opportunities they Present for Galveston Bay A presentation to Texas Environmental Grantmakers Group By Bob Stokes, President, Galveston Bay Foundation Friday, October 31, 2014
More informationStraight Line Diagram. Lawrence 37. January 2010
Straight Line Diagram Lawrence 37 January 2010 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is
More informationAPC REGULATORY UPDATE NOVEMBER 16, PennDOT AND
APC REGULATORY UPDATE PennDOT AND NOVEMBER 16, 2017 WELCOME TO THE APC Regulatory Overview Threatened and Endangered Bats & Bridges PA DEP Functional Assessments & NPDES Waters of the United States Mitigation
More informationNEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST
NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be
More informationAlameda Corridor-East Construction Authority THE ACE REPORT. ACE Board Chair s Message. Dear Friends:
Alameda Corridor-East Construction Authority THE ACE REPORT www.theaceproject.org Summer 2012 / Volume 3, Issue 4 Inside this issue: Contract OKed for Trench Children Dig ACE Project Chair Thanks Sen.
More informationSCOPE OF WORK AND DELIVERABLES T.H.
Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. s 27, 73 and 289 in Moose Lake S.P. 8821-200 PROJECT OVERVIEW The project is located in Moose Lake, Carlton County s on TH 27, 73, and 289. TH 27 RP 245.044
More informationLCRA TRANSMISSION SERVICES CORPORATION
UCRA ENEtGY WATER COMMUNfnf SEEVICES LCRA TRANSMISSION SERVICES CORPORATION April 28, 2016 «FirstName» «LastName» «Suffix» «SecondName» «Address1» «Address2» «Address3» «City», «State» «Zip» RE: Application
More informationTown of Rotterdam Office of the Planning Commission
Town of Rotterdam Office of the Planning Commission SITE PLAN/SPECIAL USE PERMIT APPLICATION AND PROCEDURES Site Plan: Application $150 Final Site Plan $150 Application Fees Special Use Permit (IF REQUIRED):
More informationAbilene District Traffic Signal Timing and Capacity Analysis
Abilene District Traffic Signal Timing and Capacity Analysis 2017 IAC Report Task-45 TransTech Lab, TechMRT Hongchao Liu, Ph.D., P.E. Jason (Bo) Pang, Ph.D. Ariel Castillo-Rodriguez, E.I.T. I Table of
More informationPrecast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001
Precast Concrete Pavement Background Concepts Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001 Project Background CTR contracted by FHWA/TxDOT to investigate the feasibility of using precast
More informationPublic School Facilities Element
Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL
More informationMINUTES OF THE SPECIAL MEETING OF THE PLANNING BOARD HELD ON WEDNESDAY, NOVEMBER 12, 2014
MINUTES OF THE SPECIAL MEETING OF THE PLANNING BOARD HELD ON WEDNESDAY, NOVEMBER 12, 2014 Meeting called to order at 7:30 P.M. Present: William Brown, Tom Freeman, Councilman Ryan, Paul Mathewson, Lawrence
More informationDEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA
DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 10117 PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA 33610 REPLY TO ATTENTION OF October 12, 2012 Tampa Permits Section SAJ-2011-00551 (IP-TEH)
More informationSan Antonio Wrong Way Driver Initiative
San Antonio Wrong Way Driver Initiative Brian G. Fariello, P.E. Traffic Management Engineer- TransGuide San Antonio District- TxDOT brian.fariello@txdot.gov The San Antonio Wrong Way Driver Task Force
More information