1 2012 MnDOT Greater Construction Projects District 1 Duluth/Virginia 1 Hwy 1 Location: Itasca County Description: Reconstruct Hwy 1 in Effie Total Cost: $1,565,000 2 Hwy 1 Location: Forest Rd 553 to Forest Rd 424 Description: Reconstruct, grade, resurface, 5 miles Total Cost: $7,147, Cost: $6,350,000 Date: Nov 2011-Nov 2012 Impact: Temporary lane restrictions, detour reconstruct/ 3 Hwys 2, 18, 210 Location: Northeastern Description: Replace signs Total Cost: $600,000 Impact: Occasional shoulder closures 4 Hwys 2, 53, 61, 194 Location: Northeastern Description: Seal cracks and chips in road 2012 Cost: 700,000 Date: July 2012-June Hwy 11 Location: East of Rainier, Koochiching County Description: Replace Jackfish Bay and Tilson Creek Bridges Total Cost: $1.3 million 2012 Cost: 1.2 million Date: July 2012-June 2013 Impact: Single-lane across bridges 6 Hwy 23 Location: Prescott St to DMIR RR at Beck's Rd in Gary New Duluth Description: Improve accessibility Total Cost: $262,000 Impact: Brief traffic impacts, shoulder closures 7 Hwy 23 Location: St. Louis River Bridge Description: Control erosion around bridge piers Total Cost: $340,000 8 Hwys 23, 53, 61, 169, I-35 Location: Northeastern Description: Seal cracks and chips in road Total Cost: $1,558, Cost: $700,000 Date: June 2010-June I-35 Location: Near St. Louis CR 13 (Midway Road) Description: Repair 4 bridges Total Cost: $1,764, Cost: $50,000 Date: May 2011-May 2012 Impact: Single-lane, two-way traffic 10 I-35 Location: 0.8 mile south of Sandstone to 0.9 mile north of CR 33 Description: Resurface northbound and southbound lanes, repair culvert, install pedestrian at Kettle River Rest Area Total Cost: $20,659,474 Impact: Single-lane traffic uthofduluth/i35pinecounty/ 11 I-35 Location: Moose Lake to Barnum Description: Resurface 30 miles, repair bridges Total Cost: $25,329, Cost: $5 million Date: May 2011-Aug 2012 Impact: Single-lane, two-way cross-over traffic uthofduluth/mooselake-barnum/ 12 I-35 Location: Scanlon to Carlton CR 61 in Duluth Total Cost: $30,107, Cost: $16.5 million -Oct 2013 Impact: Single-lane traffic uthofduluth/i35carlton/ 13 I-35 Location: Pine City to Duluth Description: Install 7 changeable message signs Total Cost: $319,625 Date: April 2012 Impact: Shoulder closures 14 I-35 Location: Carlton County Description: Replace signs Total Cost: $500,000 Impact: Shoulder closures 15 I-35 Location: Boundary Ave to 26th Ave E in Duluth Description: Install concrete barrier and fiber optic cable, paint bridges Total Cost: $66,876, Cost: $2 million Date: May 2010-June 2012 Impact: Lane restrictions ct/ 16 Hwy 53 Location: St. Louis County Description: Construct new bridge over Hwy 53 at Hwy 33, rehabilitate NB Hwy 53 Bridge over the Cloquet River Total Cost: $1,644,727 Impact: Crossovers, single-lane traffic on bridges 17 Hwy 53 Location: St. Louis County near Cotton Description: Replace Paleface River Bridge, construct reduced conflict intersection, resurface 4 miles on Hwy 53 Total Cost: $3,449, Cost: $3,321,152 Date: Aug 2011-Sept 2012 Impact: Single-lane traffic and other temporary lane restrictions 53paleface/ 18 Hwy 53 Location: 4.5 miles south of Hwy 1 to the south limits of Cook in St. Louis County Description: Reconstruct Hwy 53 to four lanes Total Cost: $42,924, Cost: 2.5 million Date: Oct 2012-Aug 2015 Impact: Single-lane traffic with, crossovers 3-virginia-cook/ 19 Hwys 53, 169 Location: Central Lakes area and Hibbing to Virginia Description: Seal cracks and chips in road Total Cost: $1,071,023 Impact: Temporary lane restrictions 20 Hwys 53, 169 Location: Intersection of Hwy 53, Hwy 169 Description: Demolish buildings Total Cost: $105, Hwy 61 Location: 0.4 miles south of the north boundary of Gooseberry State Park to CR 5 in Lake County, replace culvert Total Cost: $3.5 million 1

2 2012 MnDOT Greater Construction Projects 22 Hwy 61 Location: Lake County Description: Construct new Baptism River Rest Area facility Total Cost: $6.3 million Date: 2012 Impact: Brief impacts to Hwy 61 traffic 23 Hwy 61 Location: 0.3 miles south of Silver Creek Tunnel to Gooseberry River in Lake County Description: Repair concrete joints Total Cost: $675,000, temporary stop lights 24 Hwy 71 Location: Koochiching County Description: Resurface 28 miles Total Cost: $7,297, Cost: $1,641,547 Date: June 2011-June 2012 Impact: Lane restrictions, speed reductions with 25 Hwy 73 Location: St. Louis County Description: Re-deck Floodwood River Bridge Total Cost: $1,072,217 Impact: Single-lane traffic 26 Hwy 169 Location: CR 438 to south end of Pike River Bridge Description: Reconstruct Hwy 169, construct turn lanes Total Cost: $3.3 million Impact: Single-lane traffic with, detour 27 Hwy 169 Location: 3rd St N to 13th St S in Grand Rapids Description: Reconstruct and widen Hwy 169, construct turn lanes, city utilities Total Cost: $6,464, Cost: $6,399,152 Date: Late-April 2012-June 2013 Impact: Traffic reduced to one lane in each direction 169poke/ 28 Hwy 200 Location: Hwy 6 to Hwy 2 and Hill City to the Aitkin/Cass county line, replace culverts, add turn lanes, install accessible pedestrian Total Cost: $11,460,000 Impact: Lane restrictions, speed reductions with 29 Hwy 210 Location: 1 mile east of Hwy 45 over St. Louis River in Carlton County Description: Rehabilitate bridge Total Cost: $1,924,078 Impact: Bridge closed, detour on Hwy 45, CR 61 and CR 1 30 Hwy 210 Location: I-35 to Hwy 65 Description: Resurface 42 miles Total Cost: $7,538, Cost: $6,735,731 Date: Sept 2011-Aug 2012 Impact: Lane restrictions, speed reductions with 31 Hwy 217 Location: Little Fork River Bridge, Koochiching County Description: Control erosion around bridge piers Total Cost: $88, I-535 Location: Blatnik Bridge in St. Louis County Description: Replace expansion joints, repair/replace steel and rail, paint bridge Total Cost: $12,945, Cost: $9 million, May-Oct 2013 s, use Bong Bridge kbridge/ 33 Various Hwys Location: Northeastern Description: Repair culverts and pavement surfaces Total Cost: $1.4 million Impact: Temporary lane closures District 2 Bemidji/Crookston 34 Hwy 1 Location: Over the Blackduck River, east of Redby Total Cost: $1.78 million Date: June-Oct Hwy 1 Location: Over the Mud River in Redby Total Cost: $3.3 million Impact: Single lane closures, two-week detour 36 Hwys 1, 220 Location: East and north of Oslo Description: Resurface 15.5 miles and repair inslopes Total Cost: $900, Hwys 1, 6 Location: Northome to Hwy 6 and Hwy 6 to Hwy 38 and replace culverts Total Cost: $7.3 million 38 Hwy 2 Location: Bemidji bypass Description: Rehabilitate 6 bridges Total Cost: $2.3 million, median crossovers, Short-term closures on CR Hwy 9 Location: City of Ada, install new storm sewer and lighting, pave road Total Cost: $4.6 million 40 Hwy 11 Location: Indus to Loman, widen shoulders, replace culverts Total Cost: $5.2 million 41 Hwy 11 Location: Greenbush to 2.3 miles west of Roseau Description: Resurface 21 miles, replace culverts, add turn lanes Total Cost: $6.5 million 42 Hwy 11 Location: Roosevelt to Williams Total Cost: $670, Hwy 11 Location: East of Baudette to Clementson Description: Resurface 8.7 miles, replace culverts, widen shoulders Total Cost: $7.5 million Date: April-Sept 2012, detour 44 Hwy 32 Location: Greenwood Ave in Thief River Falls Description: Revise intersection and install traffic signal system, concrete median, pedestrian, right turn lanes Total Cost: $1.6 million Impact: Single-lane closures with 45 Hwy 75 Location: 1 mile north of Hallock and guardrail Total Cost: $2.16 million 2

3 2012 MnDOT Greater Construction Projects 46 Hwy 75 Location: Warren to Stephen Description: Resurface 16.6 miles, replace culverts, install pedestrian and lighting Total Cost: $5.4 million, lane closures with 47 Hwy 75 Location: 7.2 miles north of Kittson County line Total Cost: $560, Hwy 200 Location: Zerkel to Long Lake Park Total Cost: $600,000 with 49 Hwy 220 Location: Climax to East Grand Forks Description: Resurface 23.6 miles, replace culverts, repair shoulders, replace signs Total Cost: $4.9 million Impact: Short-term detour, lane closures, 50 Hwy 220 Location: Mallory Bridge over Red Lake River Description: Repair bridge deck Total Cost: $855, Hwy 310 Location: 5 miles north of Roseau Description: Repair bridge over the Roseau River Total Cost: $1.3 million 52 Various highways Location: Northwestern Description: Seal chips and cracks in road surface Total Cost: $1.7 million 53 Various highways Location: Northwestern Description: Stripe lanes on various highways Total Cost: $353,000 District 3 Baxter/St. Cloud 54 Hwy 10 Location: Clear Lake to Big Lake Description: Resurface 14 miles of WB road, extend turn-lanes, pave shoulders, replace culverts Total Cost: $13.1 million 2012 Cost: $10.8 million Date: Oct 2011-Aug 2012 Impact: Two-way traffic on EB Hwy 10, lane closures, delays, reduced speeds with Hwy10clearlaketobiglake.pdf 55 Hwy 10 Location: Main/Jackson St in Elk River Description: Upgrade railroad signals Total Cost: $300,000 with 56 Hwy 10 Location: Airport Rd in Staples Description: Construct overpass (city of Staples project) Total Cost: $7.8 million (MnDOT share: $0) Date: May-Nov Hwys 10, 210 Location: Little Falls to east of Royalton, Baxter and Brainerd Description: Resurface 12 miles Total Cost: $1 million Impact: Weekday lane closures 58 Hwys 10, 27, 238, 371 Location: Motley, Little Falls, Upsala, Brainerd Lakes Welcome Center to Baxter Description: Resurface 12 miles Total Cost: $1.1 million Impact: Daytime lane closures, reduced speeds,, night work in Little Falls 59 Hwy 15 Location: Stearns CR 120 in Sartell and St. Cloud Description: Install temporary accesses to prepare for interchange construction in 2013 Total Cost: $13.5 million (MnDOT share: $12.1 million) 2012 Cost: $1 million Date: July 2012-Nov 2013, reduced speeds, delays 60 Hwys 15, 24, 95 Location: Kimball to I-94; Annandale to Clearwater; Isanti, Mille Lacs, Benton counties Description: Seal coat road surface Impact: Daytime lane closures with / 61 Hwy 18 Location: West of Malmo Description: Replace Seastade Creek Bridge Total Cost: $265,000 Impact: Road closure, onemonth detour Detour Map: etours/hwy18detour2012.pdf 62 Hwy 22 Location: Eden Valley to Richmond Description: Resurface 9 miles, replace culverts, guardrails Total Cost: $3 million Impact: Short-term detours, lane closures with Detour map: etours/hwy22_n_edenvalley_201 2.pdf 63 Hwy 23 Location: Cooper Ave to Park Ave in St. Cloud Description: Resurface 1 mile of road and turn-lanes, upgrade pedestrian accesses Total Cost: $1.1 million Impact: Night/daytime lane closures, delays with 64 Hwy 23 Location: East of Cooper Ave in St. Cloud Description: Replace pedestrian bridge, sidewalks, few night detours Detour map: etours/hwy23detour2011pedbridg e.pdf 65 Hwy 23 Location: East of St. Cloud to Foley Description: Expand 8 miles to four-lane highway, install city improvements in Foley Total Cost: $25.8 million 2012 Cost: $18.2 million Date: July 2011-Nov 2012 Impact: Road closed, detour 66 Hwy 23 Location: EB 25th Ave in St. Cloud Description: Construct right-turn lane (city of St. Cloud project) Total Cost: $285,000 with 67 Hwy 23 Location: Foley to Ogilvie Description: Resurface 26 miles Impact: Daytime lane closures with / 3

4 2012 MnDOT Greater Construction Projects 68 Hwys 24, 25, I-94 Location: Clearwater to Clear Lake, Buffalo to Monticello, St. Augusta to St. Joseph Description: Resurface 28 miles Impact: Nighttime lane closures, 69 Hwy 27 Location: South of Isle to Woodland Description: Resurface 7 miles, replace culverts Total Cost: $2.8 million with, detour Detour map: etours/2012hwy27detour_isle_wo odland.pdf 70 Hwys 27, 169 Location: Mille Lacs CR 154 to Cove, Hwy 27 to Mille Lacs CR 35 Description: Resurface 3 miles Total Cost: $250,000 Impact: Daytime lane closures with 71 Hwy 71, I-94 Location: Overpass in Sauk Centre Description: Resurface bridge deck and approaches, upgrade railings Total Cost: $427,000 with 72 I-94 Location: St. Augusta to Clearwater Description: Install temporary crossovers for resurfacing project in 2013 Total Cost: $12.4 million 2012 Cost: $1 million -Nov 2013 Impact: Periodic lane closures, reduced speeds 73 I-94 Location: Wright CR 37 to CR 19 in Albertville Description: Install access improvements on westbound lanes (city of Albertville project) Total Cost: $7.5 million (MnDOT share: $5.7 million) 74 Hwy 95 Location: Mille Lacs CR 29 in Princeton Description: Landscape roundabout Total Cost: $15, Hwy 95 Location: Hwy 23 to Isanti/Chicago county line Description: Replace signs on 52 miles Total Cost: $400,000 Date: July-Sept Hwys 115, 371 Location: Randall to Hwy 371, Little Falls to Morrison CR 48 Description: Seal coat road surface Total Cost: $609,000 Impact: Daytime lane closures with / on Hwy Hwy 169 Location: Elk River to Zimmerman Description: Resurface 14 miles, replace culverts, upgrade pedestrian accesses Total Cost: $8.9 million with, reduced speeds 78 Hwys 210, 371 Location: Baxter and Brainerd Description: Upgrade pedestrian accesses at traffic signals Total Cost: $250, Hwy 238 Location: Albany Description: Reconstruct road, sidewalks, curbs, gutters, sewers, water main (city of Albany project) Total Cost: $3.2 million (MnDOT share: $1.6 million) with, short-term detours 80 Hwy 371 Location: Nisswa to Pine River Description: Resurface 16 miles, upgrade pedestrian accesses Total Cost: $3.8 million with / in rural areas, reduced speeds, one-month detour in Pine River Detour map: etours/hwy371_pineriver_detour_ 2012.pdf 81 Hwy 371 Location: Nisswa Description: Construct roundabout on Crow Wing CR 18 and upgrade city utilities Total Cost: $7 million (MnDOT share: $4.5 million) 2012 Cost: $1.2 million Date: July 2012-Nov 2013 Impact: Periodic lane closures with a/ 82 Various Hwys Location: Central Description: Install intersection overhead lights Total Cost: $180, Various Hwys Location: Central Description: Replace road signs Total Cost: $238,000 District 4 Detroit Lakes/Morris 84 EB Hwy 10, WB I- 94 Location: Detroit Lakes, Alexandria Description: Resurface EB Hwy 10 from Detroit Lakes to Frazee, and WB I-94 from 1 mile east of Douglas CR 17 to Alexandria Total Cost: $2,012, Hwy 10 Location: Otter Tail CR 34 near Perham Description: Construct interchange Total Cost: $4,531,000 on Hwy 10, 1-month detour on CR Hwys 10, 28, 55, 108, I-94 Location: West central Description: Paint bridges Total Cost: $700, Hwys 10, 75 Location: Moorhead Description: Improve pedestrian accessibility, replace 6 signals, install crosswalk signal at 8th St and 10th Ave, resurface Main Ave from 4th St to 8th St Total Cost: $4,065,000, pedestrian detours 88 Hwy 12 Location: River bridge in Ortonville Total Cost: $2,047,505 4

5 2012 MnDOT Greater Construction Projects 89 Hwys 12, 27, 28, 55, 75, 114, 119 Location: West central Description: Replace and repair culverts Date: Sept-Nov 2012 s 90 Hwys 12, 27, 55, 59 Location: West central Description: Install rumble strips and pavement markings Total Cost: $539, Hwy 28 Location: Hwy 55 in Glenwood to Pope/Stearns county line Description: Resurface 15 miles Total Cost: $3,309,685 with pilot car 92 Hwy 29 Location: 8th Ave to 50th Ave in Alexandria Description: Resurface 3 miles, improve pedestrian accessibility Total Cost: $2 million 93 Hwy 29 Location: Douglas CR 28 to Hwy 55 Description: Resurface 10 miles, replace culverts, build turn lanes, install crossing arms at railroad crossing north of Hwy 55 Total Cost: $3,145,100 Impact: 1-month detour during culvert, turn lane and railroad crossing work; lane closures with 94 Hwy 29 Location: Hwy 28 in Starbuck to Chippewa River bridge north of Benson Description: Resurface 20 miles, replace culverts Total Cost: $5,810,940 Impact: 1-month detour during culvert work, lane closures with 95 Hwy 29 Location: Outlet Creek bridge in Starbuck Total Cost: $894, Hwy 32 Location: Norman/Clay county line to Hwy 10 Description: Resurface 18 miles, replace culverts, repair bridge over Wild Rice River Total Cost: $7,229,144 Impact: 1-month detour during culvert and bridge work, lane closures with 97 Hwy 59 Location: Hwy 28 in Morris to Stevens/Swift county line Description: Resurface 15 miles Total Cost: $3,491, Hwy 59 Location: Becker/Otter Tail county line to Otter Tail CR 9 in Pelican Rapids Description: Resurface 13 miles, replace 2 bridges over Pelican River, replace 2 culverts Total Cost: $7,114,000 from Dunvilla to Pelican Rapids, lane closures 9/ 99 I-94 Location: Main Ave in Moorhead Description: Reconstruct EB exit ramp and WB entrance ramp Total Cost: $2.2 million 100 I-94 Location: Buffalo River bridges Description: Replace EB and WB bridge decks and paint bridges Total Cost: $4,101,205 Date: May-Sept 2012 Impact: Median crossovers, twolane traffic 101 Hwy 104 Location: Hwy 28 in Glenwood to Pope CR 29 Description: Resurface 16 miles, replace culverts Total Cost: $2,550,000 Impact: 3-week detour during culvert work, lane closures with 102 Hwy 113 Location: Hwy 59 in Waubun to Mahnomen CR 4 Description: Resurface 12 miles, replace culverts Total Cost: $3,623, Hwy 210 Location: Otter Tail CR 82/Pebble Lake Rd in Fergus Falls Description: Install traffic signal Total Cost: $500,000 District 6 Rochester/ Owatonna/Winona 104 Hwy 13 Location: Hwy 69 to I-90 Description: Resurface 3 miles Total Cost: $2.8 million 105 Hwy 14 Location: Over stream near Dodge Center Total Cost: $1 million 106 Hwy 14 Location: Kasson to Byron Description: Conduct concrete pavement maintenance on 6 miles Total Cost: $2,595, Hwy 14 Location: Waseca CR 5 to Steele CR 7 Description: Realign Hwy 14 and construct the new I-35/Hwy 14 interchange Total Cost: $51,744, Cost: $7.35 million Date: July Hwy 14 Location: St. Charles to Winona Description: Resurface 23 miles, replace culverts Total Cost: $7,497,040, 2 short-term detours during culvert replacements 109 Hwy 14 Location: Byron to Hwy 52 Description: Resurface 8 miles Total Cost: $8,153,618 flagger and 110 Hwy 19 Location: Lonsdale to I-35 Description: Resurface 7 miles Total Cost: $2,186, Hwy 19 Location: Cannon Falls to Hwy 61 Description: Reconstruct pavement on 16 miles Total Cost: $7,546,814 Date: May-Sept

6 2012 MnDOT Greater Construction Projects 112 Hwy 30 Location: Steele CR 45 to Hwy 218 Description: Resurface 8 miles Total Cost: $1,509, I-35 Location: Rice CR 9 to Heath Creek Rest Area Description: Complete preventive pavement maintenance on 6 miles Total Cost: $2,819, I-35 Location: Various locations in Rice and Steele counties Description: Install Intelligent Transportation System devices Total Cost: $823, Cost: $325,000 Date: Aug 2011-June Hwy 42 Location: Over White Water River near Elgin with a temporary signal 116 Hwy 43 Location: Over South Fork of Root River near Choice and repair approaches Total Cost: $1,007, Hwy 44 Location: Caledonia to Hokah Description: Resurface 13 miles, replace culvert Total Cost: $7,124,449, short-term detour during culvert replacement 118 Hwy 52 Location: Near Pine Island Description: Construct new interchange and frontage road system Total Cost: $ Cost: $12 million Date: impacts during Hwy 52 Location: Rochester to Zumbrota Description: Complete preventive pavement maintenance on 12 miles Total Cost: $4,352,956 Date: July-Sept Hwy 52 Location: 85th St NW to Vintage Rd NW Description: Landscape along Hwy 52 Total Cost: $91, Hwy 52 Location: Preston Description: Restore historic overlook Total Cost: $987, Hwy 56 Location: Hwy 63 to LeRoy Description: Resurface 6 miles Total Cost: $1,510, Hwy 56 Location: West Concord to Kenyon Description: Reconstruct pavement on 9 miles and replace bridge over the Middle Fork of the Root River near West Concord Total Cost: $6,291, Hwy 57 Location: Goodhue CR 30 to Hwy 52 Description: Resurface 4 miles Total Cost: $1,257, Hwy 60 Location: Kenyon Description: Install predestiran Total Cost: $140, Hwy 60 Location: Goodhue CR 12 to Hwy 56 Description: Resurface 1/2 mile Total Cost: $150, Hwy 60 Location: Buchman Coulee Description: Repair flood damage Total Cost: $20, Hwy 61 Location: East Indian Creek near Weaver on NB Hwy 61 Total Cost: $1.4 million Date: May-Sept 2012 with single-lane traffic on SB lanes 129 Hwy 61 Location: Red Wing Description: Improve traffic signal at the Hwy 58, 61 and 63 intersection Total Cost: $116, Hwy 63 Location: Wabasha CR 78 to Hwy 61 Description: Resurface 6 miles Total Cost: $1,820, Hwy 63 Location: Rochester Description: Construct roundabout at Olmsted CR 14 and Hwy 63 intersection Impact: Intersection closed with detour 132 Hwy 63 Location: Rochester Description: Repair sinkhole on Hwy 63 near Dresser Dr Total Cost: $137, Hwy 76 Location: Over South Fork of Root River near Houston deck and railing Total Cost: $750, I-90 Location: Near Dresbach Description: Replace the Dresbach Bridge over the Mississippi River Total Cost: $190.5 million 2012 Cost: $10 million Date: impacts during dresbachbridge/ 135 I-90, Hwy 61 Location: Winona County Description: Paint bridge at interchange Total Cost: $200,000, shortterm detour on SB Hwy Various hwys Location: Kasson, Hayfield, Hollandale, Glenville Description: Install pedestrian Total Cost: $339,000 6

7 2012 MnDOT Greater Construction Projects 137 Various hwys Location: Nerstrand, Blooming Prairie, Ellendale Description: Install pedestrian Total Cost: $348, Various hwys Location: Freeborn, Mower, Olmsted, Steele, Wabasha, Winona counties Description: Seal coat bridge decks Total Cost: $420,005 Date: July-Sept Various hwys Location: Dodge, Fillmore, Freeborn, Mower, Olmsted, Rice, Steele and Winona counties Description: Seal cracks in road surface Total Cost: $482,695 Date: Various hwys Location: Freeborn, Mower, Olmsted, Rice, Steele and Winona counties Description: Install rumble strips and striping Total Cost: $655,556 Date: 2012 District 7 Mankato/Windom 141 Hwy 4 Location: South of Sleepy Eye Description: Replace 3 bridges Total Cost: $1.6 million 142 Hwy 13 Location: Montgomery Description: Add two-way left turn lane Total Cost: $600,000 Impact: Brief delays 143 Hwy 14 Location: Lookout Drive to CR 6 in North Mankato Description: Expand to four lanes, build new interchange at CR 41 Total Cost: $18 million 2012 Cost: $9,375,090 -Nov 2013 to local roads rthmankato/ 144 Hwy 14 Location: Waseca south bypass Description: Expand to four lanes on new route, add interchanges Total Cost: $56 million 2012 Cost: $650,000 Date: July 2008-July atonna/ 145 Hwy 14 Location: Blue Earth CR 12 Description: Build interchange Total Cost: $6.2 million 2012 Cost: $1 million Date: Spring-Fall 2012 Impact: Brief lane closures 146 Hwy 15 Location: New Ulm to Winthrop Total Cost: $6.4 million Impact: Brief delays/ 147 Hwy 22 Location: LeSueur River valley Description: Stabilize river bank Total Cost: $600,000 Date: Fall 2012 Impact: Lane restrictions 148 Hwy 23 Location: I-90 to Jasper Description: Reconstruct road Total Cost: $10 million 149 Hwy 30 Location: Hwy 15 to Hwy 169 Total Cost: $2,084, Hwy 59 Location: Worthington Description: Complete economic development project (city of Worthington) Total Cost: $100, Hwy 60 Location: Bigelow to Worthington Description: Expand to fourlanes, replace UP Railroad bridge Total Cost: $45 million 2012 Cost: $21 million Date: March 2012-Nov 2013 s 0/ 152 Hwy 60 Location: Hwy 15 to Madelia Description: Reconstruct road Total Cost: $6,161,000 Impact: Lane restrictions 153 Hwy 60 Location: Lake Crystal Total Cost: $750,000 Impact: Lane restrictions 154 Hwys 60, 169 Location: South of Mankato to North Star Bridge Total Cost: $5,443,653 Impact: Lane and ramp restrictions 155 Hwy 109 Location: Winnebago to Delevan Description: Reconstruct road Total Cost: $7.8 million Date: July-Sept Hwy 169 Location: At Hwy 14 interchange in North Mankato Description: Construct median and acceleration lane Total Cost: $450,000 Impact: Ramp detours 157 Hwy 258 Location: North of Comfrey Total Cost: $1,498,395 Date: May-Sept 2012 District 8 Willmar/Marshall/ Hutchinson 158 Hwy 19 Location: Swan St to Quality Dr in Redwood Falls Description: Resurface 1 mile of road, install accessible pedestrian Total Cost: $462,141 with 159 Hwy 23 Location: Kandiyohi CR 6 to 263rd Ave Description: Construct 7.7 mile four-lane bypass east of Paynesville Total Cost: $32.2 million 2012 Cost: $5 million Date: April 2010-Aug 2012 Impact: Temporary lanes, 1- month detour esvillebypass/ 160 Hwy 29 Location: Hwy 212 to bridge over N Parkway Dr in Montevideo Description: Resurface 1 mile of road, install accessible pedestrian, replace storm sewer and revise signals Total Cost: $784,188 with 161 Hwy 59 Location: North jct of Hwy 30 to Hwy 14 Description: Repair cracks and chips in concrete on 12 miles of road Total Cost: $2.02 million 9/index.html 7

8 2012 MnDOT Greater Construction Projects 162 Hwy 59 Location: Slayton to north jct of Hwy 30 Description: Resurface 6 miles, reconstruct s-curve at the N jct with Hwy 30 Total Cost: $4.8 million 9/index.html 163 Hwy 68 Location: Minneota to Porter Description: Resurface 10 miles, resuface road in Taunton and Porter, install accessible pedestrian Total Cost: $1.06 million Date: May-Aug Hwy 68 Location: Jct with Hwy 71 to Morgan Description: Resurface 10 miles, resurface road in Morgan, install accessible pedestrian Total Cost: $1.09 million Date: Sep-Oct Hwy 68 Location: Marshall to Minneota Description: Resurface and sealcoat 12 miles Total Cost: $3.18 million 166 Hwy 75 Location: Pipestone Creek to Lake Benton Description: Resurface 13 miles and ADA improvements in Lake Benton Total Cost: $1.38 million 167 Hwy 212 Location: Glencoe Description: Install wet-reflective pavement markings Total Cost: $200,000 Impact: Brief delays 168 Hwy 212 Location: Montevideo to Lac Qui Parle CR 35 Description: Resurface 4 miles, grade Hwy 59 intersection Total Cost: $5.8 million 169 Hwy 212 Location: Dawson to Hwy 75 including 1 mile N and S on Hwy 75 Description: Resurface 8 miles Total Cost: $6.21 million until Sept Various Hwys Location: West central and southwestern Description: Improve traffic signals by adding red light confirmation lights (15 Locations) and emergency vehicle preemption lights (10 Locations) Total Cost: $190,000 Impact: Brief delays 171 Various Hwys Location: West central and southwestern Description: Replace road signs Total Cost: $342,320 Impact: Brief delays Legend: CR County Road Jct Junction SB Southbound NB Northbound WB Westbound EB Eastbound Contact Info: District 1 Beth Petrowske District 2 - Karen Bedeau District 3 Judy Jacobs District 4 - Dana Hanson District 6 - Kristin Kammueller District 7 - Rebecca Arndt District 8 TJ Melcher

2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation

2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation 2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation District 1 Duluth/Virginia 1 Hwy 1 Location: South of Ely in Lake County, 15 miles Dates: July-Nov 2011

More information

Minnesota Department of Transportation 2011 Greater Minnesota Construction Projects

Minnesota Department of Transportation 2011 Greater Minnesota Construction Projects Minnesota Department of Transportation 0 Greater Minnesota Construction Projects Warroad 4 Baudette 43 49 54 53 37 Thief River Falls 48 53 47 East Grand Forks 39 Crookston 38 50 3 5 4 46 94 06 0 03 94

More information

2018 District 1 Highway Construction Program

2018 District 1 Highway Construction Program District 1 Highway Construction Program For additional information contact: Stephanie Christensen MnDOT District 1, Public Affairs Office: 218-725-2700 Email: Stephanie.smith-christensen@state.mn.us Last

More information

Future Projects. District 3 Central Minnesota. mndot.gov/d3

Future Projects. District 3 Central Minnesota. mndot.gov/d3 Future Projects District 3 Central Minnesota 2019 2022 mndot.gov/d3 Lake 371 2019-2022 Construction 200 Walker 34 CASS 200 Remer 6 Central Minnesota MnDOT District 3 Hackensack 371 84 Longville 6 Hill

More information

MINNESOTA OFFICE OF THE STATE AUDITOR JUDITH H. DUTCHER RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996

MINNESOTA OFFICE OF THE STATE AUDITOR JUDITH H. DUTCHER RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996 MINNESOTA OFFICE OF THE STATE AUDITOR RANKING OF COUNTY EXPENDITURES FOR THE YEAR ENDED DECEMBER 31, 1996 JUDITH H. DUTCHER STATE AUDITOR Ranking of County Expenditures October 27, 1998 Government Information

More information

2007 Construction Information/Season Notes

2007 Construction Information/Season Notes 2007 Construction Information/Season Notes Metro I-35 W Bridge On August 1, 2007 the I-35 W Bridge over the Mississippi River in Minneapolis collapsed. This had major impacts on traffic patterns in the

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

Updated: April 7, 2016

Updated: April 7, 2016 Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part One Grant County Courthouse (2012). Elbow Lake, Minnesota. Building constructed in 1906. Source: Gobonobo, photographer

More information

Minnesota High School Baseball Records Team Hitting Records Updated 10/25/12

Minnesota High School Baseball Records Team Hitting Records Updated 10/25/12 Games Played Season 1. 33 Goodhue 2004 2. 32 Brainerd 2003 2. 32 St. Michael-Albertville 2009 4. 31 Rochester Mayo 1999 4. 31 St. Cloud Tech 1997 4. 31 Springfield 1994 4. 31 Wabasso 2008 4. 31 St. Anthony

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part One Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part One Grant County Courthouse (2012). Elbow Lake, Minnesota. Building constructed in 1906. It is on the National Register

More information

Metro - Let me know about major weekend traffic impacts

Metro - Let me know about major weekend traffic impacts Highway 100 Construction Traffic Impacts Dates may change due to weather. West 36th St to Hwy 62 Currently April 4-mid Aug 50th St. ramp to NB Hwy 100 will close. The ramp will reopen in mid-august. Upcoming

More information

Minnesota Department of Transportation State Highway Capital Improvement Program (CIP)

Minnesota Department of Transportation State Highway Capital Improvement Program (CIP) Minnesota Department of Transportation 2017-2020 State High (CIP) MnDOT s State Fiscal 2017-2020 State High (CIP) Table of Contents 1. Introduction Pg. 1 2. CIP Format...Pg. 2 3. Planned Information Pg.

More information

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways. WELCOME RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways Open House meeting is downstairs in the Foot Room November 2016 Plum/3rd Street Traffic Control Change Signal to All-Way Stop Plum

More information

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part Two McLeod County Court House Glencoe, Minnesota Date photograph taken: 1909 Source: LakesnWoods.com McLeod County Court

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins February

More information

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016 The Asphalt Indexes for the Month of August 2016 are: ACI -

More information

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen

More information

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two

Photographs, Prints and Postcards. Historic County Courthouses. Minnesota. Part Two Photographs, Prints and Postcards of Historic County Courthouses in Minnesota Part Two McLeod County Court House Glencoe, Minnesota Date photograph taken: 1909 Source: LakesnWoods.com McLeod County Court

More information

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2) Reprioritized Projects in the 2006-2010 Highway and Bridge Construction Schedule Introduction The information in this section is in accordance with the highlighted portion in the following section of the

More information

Minnesota. County Assessor. Directory

Minnesota. County Assessor. Directory Minnesota County Assessor Directory PDF generated from MemberClicks database on October 29, 2012 http://www.mnmaao.org/ ALBERTSEN, A KEITH, CAE Membership: Regular Joined: 1982 DOUGLAS COUNTY DOUGLAS COUNTY

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

Charlton/Oxford Route 20 Reconstruction Project

Charlton/Oxford Route 20 Reconstruction Project Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting

More information

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018 SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic

More information

County Assessor Membership Directory. County Assessor Directory

County Assessor Membership Directory. County Assessor Directory County Assessor Membership Directory County Assessor Directory PDF generated from Memberclicks database on September 21, 2010 ALBERTSEN, A KEITH, CAE Membership: Regular Joined: 1982 DOUGLAS COUNTY DOUGLAS

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work PROGRAM/PROJT NAME (COUNTY) ADA Curb Ramp Implementation (Various) STP $1,000,000 Airport Improvement Program (Various) STATE $4,000,000 Betterments, Dams (Various) Betterments, Roadway Preservation (Various)

More information

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT 200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'

More information

MINNESOTA NAWCA PROJECTS

MINNESOTA NAWCA PROJECTS NAWCA S $40,343,809 $152,258,606 125 270,804 NAWCA GRANT AMOUNT TOTAL PARTNER CONTRIBUTION NUMBER OF S TOTAL ACRES Minnesota currently has 125 NAWCA projects either completed or underway. These projects

More information

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa 2014 MINNESOTA SPRING GROUSE SURVEYS Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 19 June 2014 SUMMARY OF FINDINGS Each

More information

SCOPE OF WORK AND DELIVERABLES T.H.

SCOPE OF WORK AND DELIVERABLES T.H. Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. s 27, 73 and 289 in Moose Lake S.P. 8821-200 PROJECT OVERVIEW The project is located in Moose Lake, Carlton County s on TH 27, 73, and 289. TH 27 RP 245.044

More information

TYPICAL SECTION OF IMPROVEMENT

TYPICAL SECTION OF IMPROVEMENT ...\plans\0_prelim\07c_sh0.dgn /8/009 DIV. STATE COUNTY FILE OJECT TYPICAL CTION OF IMOVEMENT SC 7.0658A8 I-7 NORTHBOUND I7 SOUTHBOUND I7 8 8 0 8 VARIABLE (E CROSS CTIONS) : CONST..5.5 CONST. (

More information

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT

HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT Case ID: MI Date of Investigation Respondent Employer Information 1. Is the employer the primary contractor or a subcontractor working at the site? Victim Information

More information

2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast

2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast 2015 and 2016 Grand Traverse County Road Commission Progress Report and Forecast Our Mission is to upgrade and maintain a safe and efficient road system We are making a difference! Miles of roads in GT

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia PROJECT OVERVIEW S.P. 6935-89 is on T.H. 169 from 0.07 miles west of CR 109 in Mt. Iron to Hoover Road in Virginia

More information

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa

Each spring, the Minnesota DNR coordinates statewide ruffed grouse (Bonasa 2016 MINNESOTA SPRING GROUSE SURVEYS Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 10 June 2016 SUMMARY OF FINDINGS Each

More information

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY. BELCHER RD 66TH ST N DRAFT 05-08-14 61 60 40 39 52 38 53 37 EAST LAKE RD KEYSTONE RD Pinellas County Proposed Roadway s for the 2040 LRTP Legend GULF BLVD 67 Gulf of Mexico WEST BAY DR WALSINGHAM RD µ

More information

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............

More information

CITY OF DANA POINT DEVELOPMENT REVIEW

CITY OF DANA POINT DEVELOPMENT REVIEW Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...

More information

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY 2009 Produced by The Green Hills Regional Planning Commission 1 County: Caldwell Source: RTP Needs Assessment 06 Rt: US

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

ACEC OC February 22, 2017

ACEC OC February 22, 2017 ACEC OC February 22, 2017 I-405 Freeway 1958 I-405 Freeway Today Measure R Highway Projects Study Area Highway Program Project Status Summary (Measure R Funded) # Project Current Phase Estimated Cost of

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

2015 MINNESOTA SPRING GROUSE SURVEYS

2015 MINNESOTA SPRING GROUSE SURVEYS SUMMARY OF FINDINGS 2015 MINNESOTA SPRING GROUSE SURVEYS Charlotte Roy Forest Wildlife Populations and Research Group Minnesota Department of Natural Resources Grand Rapids, Minnesota 17 June 2015 Each

More information

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

Appendix G. Visual Simulations and Illustrations

Appendix G. Visual Simulations and Illustrations Appendix G Visual Simulations and Illustrations 5TH AVE AV E N View ewshe ed 5 SHORELINE N 185TH ST egment B gment A 26 NE 185th Street Station (A1, A3, A5, A7, A10, A11) 25 24 23 22 21 NE 180TH ST 99

More information

Single Point Urban Interchange (SPUI) with Signals

Single Point Urban Interchange (SPUI) with Signals 1 Single Point Urban Interchange (SPUI) with Signals Allows for concurrent left turns on Wurzbach Parkway and on NW Military Traffic Signal added on NW Military Hwy at Fairfield Bend/ Turnberry Way Large

More information

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013 Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document) Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained

More information

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST BOSTON HORIZON WAY ALFORD ST BROADWAY BOSTON CITY LINE CITY LINE MANHOLE #101 (STA 5+00) BOW ST DEXTER ST ST LYNDE ST THORNDIKE ST COURTLAND ST RIVER PROP (TYP) ROBIN ST BETTY ST 50 500 1. BASELINE STATIONING

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS

PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS EVANS DREXEL DREXEL ELLIS ELLIS PROPOSED FIBER OPTIC CONDUIT INSTALLATION E. 50TH ST. AND S. COTTAGE GROVE AV. CHICAGO, ILLINOIS SHEETS INDEX TO SHEETS DESCRIPTION 90 294 94 LANGLEY EVANS 48TH COTTAGE

More information

2018 High School Overall Team Results

2018 High School Overall Team Results Division 1 Austin rules apply: Best 4 scores count toward season point total. There are no High School team scores from Austin race. Place Team Points Count? 1 Stillwater HS 16,509 3-Gamehaven Trail, Rochester

More information

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised

More information

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2 TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL January 2018 May 2, 2018 Addendum #1 Introduction As part of the Turnpike s continuing

More information

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C.

August 18, 2016 FS-1604A US 70 Improvements, Johnston County. VHB Engineering NC, P.C. August 18, 2016 FS-1604A US 70 Improvements, Johnston County VHB Engineering NC, P.C. Agenda Project Description and Location Purpose and Need Background Plans Local Plans Legislation Adjacent STIP Projects

More information

AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division

AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division AYSA SOCCER FIELD LOCATIONS Field locations are also listed in the Coaches Manuals for Upper and Lower Division Arlington 1, 2, 3 and Paul Antonich Memorial Field -- 601 South Arlington Ave. Duluth, 55811.

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

STANDARD BID ITEM NUMBERS

STANDARD BID ITEM NUMBERS 10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation

More information

Arrowhead Youth Soccer Association Fields Directory

Arrowhead Youth Soccer Association Fields Directory Name of Field Address Directions/Notes Arlington Fields 601 South Arlington Avenue On South Arlington Avenue between Trinity Road and Central Entrance in Duluth.Via Mesaba-Central Entrance: I-35N to Exit

More information

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-4 Section 4(f) Mitigation Master Plan IH 35E Managed Lanes Project Book 2 - Technical Provisions

More information

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard

More information

MoDOT ACEC St. Louis Partnering Meeting. September 14, 2017

MoDOT ACEC St. Louis Partnering Meeting. September 14, 2017 MoDOT ACEC St. Louis Partnering Meeting September 14, 2017 Agenda Introductions & Department Update Bill Schnell Design/Planning Updates Tom Evers STL City Jeff Bohler STL North County Lisa Kuntz I-270

More information

Currently Future Agency Used for Use for Classification Property

Currently Future Agency Used for Use for Classification Property Page 1 This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Records for

More information

The Shoppes at Forney Crossings

The Shoppes at Forney Crossings F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"

More information

Directions to GMC Middle School Game Sites (updated 8/20/13)

Directions to GMC Middle School Game Sites (updated 8/20/13) Bridgetown Bridgetown Middle School, 3900 Race Rd, Cincinnati I-275 West to 74 East to Rybolt Rd, turn left. At Harrison Avenue, turn right and follow to Race Rd. and turn right. School is on the left.

More information

MARQUETTE GREENWAY TRAIL

MARQUETTE GREENWAY TRAIL ------ ------ TRAFFIC DATA A.A.D.T. (2010) A.A.D.T. (ED 2022) D.H.V. (2022) DIRECTIONAL DISTRIBUTION TRUCKS N/A N/A N/A N/A N/A DESIGN DATA DESIGN SPEED DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN

More information

MAINTENANCE OF TRAFFIC &

MAINTENANCE OF TRAFFIC & 2/28/2015 5:05:15 PM d106136001k(01).dgn MANAGER Dave Covington, P.E. (540) 292-3802 VA. 29 1K(1) TRANSPORTATION OPERATIONS (TO) PLAN A). THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: 1. POST A LIST

More information

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual. MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September

More information

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16 City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact

More information

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

Allowable Lane Closure Hours. for the. State Highway System. Hampton Roads District. Virginia Department of Transportation.

Allowable Lane Closure Hours. for the. State Highway System. Hampton Roads District. Virginia Department of Transportation. Allowable Lane Closure Hours for the State Highway System in Hampton Roads District Virginia Department of Transportation June 06 Allowable Lane Closure Hours Hampton Roads District Revisions Date Description

More information

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B General Instructions: Print directions and name of assigned building. Place the name of your residence

More information

CLINTON CLOSURE DETOURS

CLINTON CLOSURE DETOURS S W Princen Ave Southbound Hwy off ramp at Shields Ave Ave: Exit Southbound Hwy at Shields, proceed south on Marks Ave Ave Southbound Hwy on ramp at Shields Ave from Ave: Ave Marks Ave north. Proceed north

More information

Adversity Volleyball Center. Energy Sports Complex

Adversity Volleyball Center. Energy Sports Complex Adversity Volleyball Center is located at: 700-710 Corporate Woods Parkway, Vernon Hills, IL 60061 700 Corporate Woods Parkway, is located just west of Milwaukee Ave (Route 21) midway between Route 22

More information

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM 600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn

More information

Welcome Public Open House

Welcome Public Open House Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and

More information

Survey Control Point Observations

Survey Control Point Observations Level Name SURVEY_CTRL SURVEY_CTRL_CHK_NODE SURVEY_CTRL_NODE SURVEY_CTRL_OBS SURVEY_CTRL_REF_SYM SURVEY_CTRL_SETUPS SURVEY_CTRL_SYM SURVEY_CTRL_TXT SURVEY_DTM_BREAKLINE SURVEY_DTM_BREAKLINE_NODE SURVEY_DTM_CHECK_NODE

More information

SUPPLEMENTARY STANDARD DETAIL DRAWINGS

SUPPLEMENTARY STANDARD DETAIL DRAWINGS CITY OF MAPLE RIDGE DESIGN AND CONSTRUCTION DOCUMENTS Part 4 SUPPLEMENTARY STANDARD DETAIL DRAWINGS September 2015 Updated: October 2015 THIS PAGE INTENTIONALLY LEFT BLANK City of Maple Ridge Supplementary

More information

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER

MARVIN RD SE 31ST I-5 OLD PACIFIC HWY SE STEILACOOM RD SE MULLEN RD SE NISQUALLY INDIAN RESERVATION UV 510 YELM RAINIER RD SE 123RD AVE SE RAINIER P:\Transportation\RTP2030\Maps_Images\Map2-1.mxd Map 2-1: Capacity Projects, Thurston County, WA UV 8 12 LITTLEROCK RD SW HWY 8 173RD AVE SW OLD HWY 99 CONFEDERATED TRIBES OF THE CHEHALIS RESERVATION JAMES

More information

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010 I-405 Sepulveda Pass Improvements Project Community Advisory Committee September 23, 2010 1 Click to edit Master title style Click to edit Master text styles Regional Project Updates Second level Third

More information

BOARD OF DIRECTORS MEETING MINUTES

BOARD OF DIRECTORS MEETING MINUTES Board Voting Members Present: BOARD OF DIRECTORS MEETING MINUTES Osage Centre Cape Girardeau, MO Mr. Drew Christian, Southeast Missouri Regional Planning & Economic Development Commission (SEMO RPC) (alternate

More information

Information for File # RMM

Information for File # RMM Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION 4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of

More information

FM 691 CORRIDOR STUDY

FM 691 CORRIDOR STUDY FM 691 CORRIDOR STUDY Transportation Policy Board Meeting August 13, 2008 Agenda Project Overview US 75/FM 691 Interchange US 75 Ramping Alternatives FM 691 Corridor Typical Sections Extension to SH 289

More information

2007 Year Review File: c Date: December Slide Location

2007 Year Review File: c Date: December Slide Location 2007 YEAR REVIEW OF GEOHAZARD SITES TABLE 1: LISTING OF SITES AND RISK ASSESSMENT (2007) Slide Site Name 2007 Active Inactive Site GP1 Hwy 40:42 Wapiti Hill (5 km S. of Wapiti River Bridge) 11 * 4 44 GP2

More information

Little League District 19 New York District Administrator George Serrano. Directions to Little League Fields

Little League District 19 New York District Administrator George Serrano. Directions to Little League Fields Chester: From 17 east it is exit 126 (New exit). Make a left and then just go straight on to Rte. 94 and then Take this to a T and turn left onto Rte. 94. Follow road and bear right in front of the firehouse.

More information

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details. DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

Amajor transportation infrastructure undertaking, billed

Amajor transportation infrastructure undertaking, billed PART 6 Central Artery/Tunnel Project: Boston s Engineering Marvel Where We Are Now Vijay Chandra, P.E. Senior Vice President Parsons Brinckerhoff Quade & Douglas, Inc. New York, New York This article is

More information