1 CONSTRUCTION OF A NEW BIRD OBSERVATORY AT HEUGH LIGHTHOUSE, HARTLEPOOL HEADLAND BRIEF TO CONSULTANTS FOR THE PREPARATION OF A FEASIBILITY STUDY HEUGH LIGHTHOUSE, HARTLEPOOL HEADLAND May 2006 TBC COMMITTEE/ RPT009(REV A)/ECP _ Page No 1
2 1.0 INTRODUCTION 1.1 Since 1960 the (TBC) has used the old First World War lookout post within the Heugh Battery compound on Hartlepool Headland as a seawatching observatory for the study and recording of migratory seabirds. The lookout, known as Hartlepool Observatory, has become nationally famous for the variety and number of seabirds that pass along this section of the UK s coastline. The Observatory features in all the nationally published site guides and attracts significant numbers of birdwatchers at certain times of the year. Birders have an excellent rapport with the local Headlanders. 1.2 Heugh Battery is owned by Hartlepool Borough Council and the Observatory was leased to the TBC, for which it paid rent and rates. Unfortunately, following the establishment of the Heugh Gun Battery Trust (HGBT) in recent years, the Council terminated TBC s lease in 2004 and reassigned this to the Trust, whose aim is to restore the Battery compound as a First World War visitor attraction. This ended the TBC s long association with Hartlepool Observatory and created significant local press and TV coverage. 1.3 Negotiations with PD Teesport (formerly the Tees and Hartlepool Port Authority) have resulted in the offer of a new site in the adjacent Heugh Lighthouse compound, which it owns. HEUGH BATTERY WITH THE FORMER HARTLEPOOL OBSERVATORY LOOKOUT ON THE RIGHT BIRDERS NOW HAVE TO BRAVE THE ELEMENTS OUT IN THE OPEN 2.0 PURPOSE OF THIS BRIEF 2.1 The Purpose of this Brief to outline the requirements of the Feasibility Study and the desired outputs. 3.0 THE BRIEF Feasibility Study 3.1 TBC wishes to commission architectural consultants to provide appropriate information to progress a scheme for the building a new bird observatory at Heugh Lighthouse, Hartlepool Headland. 3.2 The Feasibility Study will include: (i) An appraisal of the feasibility of the proposed project as set out in this Brief, including the identification of any opportunities for or constraints to development. _ Page No 2
3 (ii) (iii) (iv) A measured site survey sufficient for the preparation of Outline Designs. Outline Design drawings, broadly showing the external appearance and internal layout of the building, which shall be agreed with ourselves, PD Teesport and Hartlepool Borough Council. A broad estimate of costs to see the project through to Final Completion, including: (i) (ii) (iii) estimated design fees for the preparation of detailed designs/working drawings, cost estimates, tendering, supervision of construction on site (the level of the latter shall be determined by the Consultant) and Planning Supervisor s duties; estimated contractor s construction and maintenance costs, and costs associated with obtaining detailed Planning and any other approvals post-feasibility. (v) (vi) A meeting with the Local Planning Authority and PD Teesport to secure broad agreement to the Outline Design proposals. Identification of possible sources of funding for the project. 3.3 The information provided will enable the TBC to apply for funding and sponsorship. 4.0 DESIGN REQUIREMENTS The Site 4.1 The proposed site for the new Observatory lies within the Headland Conservation Area and the Outline Design will need to take account of this. A traditional or more contemporary design approach can be considered, provided that it meets the approval of the Local Planning Authority and PD Teesport. Building Location 4.2 The Observatory is to be built on to the existing Coastguard Lookout, which will be extended seawards to a point just behind the existing fence line (see site photographs in Appendix 2). The width and height of the new building should be increased if necessary to maximise the accommodation space. Accommodation Required 4.3 The accommodation shall consist of 2 storeys, each providing elevated, uninterrupted, panoramic views of the sea to the front and sides of the building, similar to the old Observatory. The viewing openings must be secured with strong metal shutters, with only one central, vertical support, if possible, in order to avoid obstructing views of the sea. The shutters shall be of the electronically-operated roller type, or similar, or, alternatively, easy-to-open manual shutters. Electronic shutters must incorporate a manual override facility should the motor or power supply fail. All steelwork must be resistant to the highly corrosive effects of salt spray and galvanised, polyester powder-coated steelwork should be considered, costs permitting. The lowest viewing opening should be at least 3m above ground level to deter vandals and to reduce spray from the sea. The openings should have sloping sills to shed water when the shutters are closed. _ Page No 3
4 4.4 Each of the 2 upper storeys will have two tiered rows of fixed or adjustable/movable benches, covered with thick, durable, waterproof cushioning for comfort. The back row will be higher than the front, to enable those at the rear views out over the sea above the heads of those in front. Footrests will be required for both rows and there must be sufficient space between the rows to accommodate telescopes on tripods. Indeed, the ergonomics of the seating is critical, as observers spend long periods seawatching during peak migration times in spring and autumn and comfort must be maximised. The ground floor area will be used for general storage, noticeboards and incidental seating and to get occasional respite during cold weather conditions. Disabled Access 4.5 A ramped access to the lower level should be considered to allow disabled access. Services 4.6 An internal light and single power point should be provided on both upper floors and the entrance area at ground floor level will require a light and a double power point as part of the internal design. No other internal services are required. External and Internal Access 4.7 Access to the new Observatory building will be via the gate to the existing Heugh Lighthouse. A separate door into the new building will be required, which should be in heavy duty steel, with a highly secure locking mechanism and access by key. A safe, internal staircase should be provided to give access to the first and second storeys from ground floor level. An external staircase can be considered, if the designers consider this to be more appropriate, though this will require separate entrances to each floor. Form and Appearance 4.8 The form and appearance of the building and the construction materials must respect the historic nature of this site. The existing Coastguard Lookout is constructed out of brick, which has been painted white. More modern materials can be considered, provided that these meet with the approval of the Local Planning Authority and PD Teesport. Further Information 4.09 PD Teesport holds information on the current services on site and will confirm these on request. As this site is locked, site visits for the purpose of tendering can be arranged by contacting Andrew Ridley of PD Teesport (see paragraph 7.2). Costs 4.11 The costs of the project will be of paramount importance and must reflect the fact that the TBC is a small, registered charity. Levering funds from sponsors will, therefore, be critical to the success of this scheme. 5.0 TIMESCALE FOR THE FEASIBILITY STUDY 5.1 The timescale for the completion of the Feasibility Study will be 10 weeks from the date of appointment. The start date will be agreed with the successful consultant. _ Page No 4
5 6.0 SERVICES AND FEES 6.1 A lump sum fee is required for undertaking the services set out in this Brief for the preparation of the Feasibility Study. This shall be inclusive of all normal out-of-pocket expenses. Consultants are required to complete the pricing document in Appendix CONTACTS 7.1 The client contact for this Feasibility Study is Ted Parker, Chairman,, at 9 Morton Carr Lane, Nunthorpe, Middlesbrough, TS7 0JU (Tel: ; ecparker@supanet.com). 7.2 Further information on the site can be obtained from Andrew Ridley, Conservancy Operations Manager, PD Teesport, Vulcan Street, Middlesbrough, TS2 1LX (Tel: ; andrew.ridley@pdports.co.uk). 7.3 The contact for Hartlepool Borough Council is: Sarah Scarr, Landscape and Conservation Manager (Tel: ). All outline designs must be acceptable to the Local Planning Authority. 8.0 INFORMATION REQUIRED UNDER THIS TENDER 8.1 In addition to their priced tender in Appendix 1, the consultants should also provide the following: HARTLEPOOL HEADLAND SHOWING THE LOCATION OF HEUGH LIGHTHOUSE Brief details of their Practice. Relevant experience (including examples of some past similar projects). A brief outline of their approach to this Feasibility Study. Any in-house or associated specialist skills. It is stressed that only brief details are required to reduce the time and cost to consultants in responding to this Brief. _ Page No 5
6 APPENDIX 1 CONSULTANT S TENDER PRICE FOR THE FEASIBILITY STUDY Name of Firm: Address:.... Contact Name:.. Tel: I/We undertake to carry out all services (inclusive of normal out-of pocket expenses and VAT) in connection with this Feasibility for the Sum of (WHICH SHALL CONSTITUTE A FIXED AND FIRM PRICE) Signed Date. On behalf of:. Please Note: The receipt of tenders by the does not guarantee acceptance of one, or any, of the tenders for this Feasibility Study. Tenders shall remain open and valid for a period of 6 months from the date of receipt. _ Page No 6
7 New Observatory at Heugh Lighthouse, Hartlepool Headland May 2006 APPENDIX 2 SITE PHOTOGRAPHS Existing Coastguard Lookout HEUGH LIGHTHOUSE LOOKING NORTH Coastguard Lookout HEUGH LIGHTHOUSE LOOKING EAST HEUGH LIGHTHOUSE SHOWING COASTGUARD LOOKOUT: It is proposed to build the new Observatory in front of this building, to which it may be attached. COASTGUARD LOOKOUT LOOKING SOUTH _ Page No 7
REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY (COUNCILLOR RAMESH PATEL)
CITY OF CARDIFF COUNCIL CYNGOR DINAS CAERDYDD CABINET MEETING: 14 JULY 2016 CARDIFF STATUE AND MONUMENT PROTOCOL REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY
More informationUCL CULTURE. Artist Brief 1. Permanent commission for public access areas Destination artwork
UCL CULTURE Artist Brief 1 Permanent commission for public access areas Destination artwork Introduction UCL would like to invite an artist to develop a permanent public art work for the New Student Centre
More informationIt is envisaged that the artwork commissioned for the exterior of the APT will:
JAMES STREET AUTOMATIC PUBLIC TOILET MURAL ARTIST BRIEF INTRODUCTION The City of Perth will be installing a new Automatic Public Toilet (APT) on the corner of James Street and Milligan Street in Northbridge
More informationTEES TIDAL FLOOD RISK MANAGEMENT STRATEGY COMMENTS BY THE TEESMOUTH BIRD CLUB ON THE ENVIRONMENT AGENCY S SCOPING REPORT
Tees Tidal Flood Risk Management Strategy Scoping Report April 2004 TEES TIDAL FLOOD RISK MANAGEMENT STRATEGY COMMENTS BY THE TEESMOUTH BIRD CLUB ON THE ENVIRONMENT AGENCY S SCOPING REPORT TEES ESTUARY
More informationDESIGN & INNOVATION SINCE 1946 RIBBON SEATING & TABLES
DESIGN & INNOVATION SINCE 1946 e-brochure REF:E-001-07-18 RIBBON SEATING & TABLES RIBBON SEATING RANGE Ref: S-007-04-18 Wherever you see our UK Made logo you can be assured that the product is manufactured
More informationThis Call for Qualifications does not require the preparation of a design proposal.
EDMS# 211137 I. Introduction This Call for Qualifications invites professional artists, or artist team, to participate in a two-stage selection process to develop an original, public art work for Port
More informationFIT-OUT PERMIT REQUEST (GENERAL WORKS)
Dubai Maritime City P.O. Box 8988 Dubai, UAE T +97143450626 F +97143450116 www.dubaimaritimecity.com FIT-OUT PERMIT REQUEST (GENERAL WORKS) PROJECT DETAILS Project Name: Plot Number: TENANT DETAILS Contact
More informationRadiocommunication Facility Review Protocol
Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within
More information2.0 Ergonomics. 2.1 General. 2.2 Disabled Access
2.0 Ergonomics 2.1 General All facilities shall be designed and built in such a way that patients, staff, visitors and maintenance personnel are not exposed to avoidable risks of injury. Badly designed
More information-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;
THIS AGREEMENT made in triplicate this th day of, 200 BETWEEN: CITY OF OTTAWA (the City -and- (the Artist WHEREAS the Council of the former City of Ottawa, an old municipality as defined in the City of
More informationUlltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.
Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction
More informationSeptember 29 October 1, 2013 Indiana Convention Center 100 South Capitol, Indianapolis, Indiana 46225
RAILWAY INTERCHANGE 2013 RSI APPLICATION & CONTRACT FOR EXHIBIT SPACE September 29 October 1, 2013 Indiana Convention Center 100 South Capitol, Indianapolis, Indiana 46225 A. Application The company and
More informationACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES WIRE MESH PARTITION FOLDING GATE
acorn WIRE ACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES 10 22 13 WIRE MESH PARTITION 10 22 16 FOLDING GATE GUIDE Page 4 / 5 No. 130A All wire type for normal industrial use. 7, 8, 9, 10 and
More informationEMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL
EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid
More informationCity of Boynton Beach Art in Public Places Artwork by Artist Name Final Artwork Information
Art in Public Places Artwork by Artist Name Final Artwork Information Completed by Owner Building Name Building Permit Number Public Art Name Building Street Address Building Owner s Name Owner s Contact
More informationPacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC
Design Rationale On behalf of our client, Necessary Homes Inc, we have prepared a Development Permit application for a unit rental multi-family building at The site area of the property is 9 SM and is
More informationDocuments: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.
GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationCITY OF FOLSOM SUBMITTAL REQUIREMENTS FOR INSTALLATION OF A COMMERCIAL REFUSE OR CARDBOARD COMPACTOR FOR AN EXISTING BUILDING
CITY OF FOLSOM SUBMITTAL REQUIREMENTS FOR INSTALLATION OF A COMMERCIAL REFUSE OR CARDBOARD COMPACTOR FOR AN EXISTING BUILDING Before installation of a commercial refuse or cardboard compactor in or near
More informationMondrian CWA-20 Updated April 2018 Product Information Sheet
Glass Single or double glazed Glass thickness up to 21mm Available on request Low Iron Glass, Low Maintenance Coatings, Solar Control Coatings, IQ Heated Glass, Privacy Glass, Coloured/ Decorative Interlayer,
More informationPUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE
Multilift PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: ASME A17.1 ASME A18.1 CSA B613 CSA B355-09 Part No. 000790 07-m03-2016 Copyright 2016 Savaria Concord Lifts, Inc. All Rights Reserved
More informationINDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION
INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION I/We hereby request approval by the Architectural Review Committee for the modification shown below of Lot #: Street Address: Phone
More informationPUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE
Multilift PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: ASME A17.1 ASME A18.1 CSA B613 CSA B355-09 Part No. 000790 16-m02-2017 Copyright 2017 Savaria Concord Lifts, Inc. All Rights Reserved
More informationEYDON PARISH COUNCIL
EYDON PARISH COUNCIL Minutes of the Meeting of Eydon Parish Council held from 7.30pm, Tuesday 14 th of February 2017 in the Village Hall, High Street, Eydon. 1. Councillors present: Cllrs K Simmons (Chairman),
More informationRecreational Disturbance Study in relation to roosting and breeding wildfowl, waders and seabirds
Consultants Brief Recreational Disturbance Study in relation to roosting and breeding wildfowl, waders and seabirds for 700 Days Scheme - Morecambe Bay s Coastal Communities Scheme. 1. Aim 1.1. Morecambe
More informationOwner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review
Step 1: Request for Conditional Approval, page 1 of 5 Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review I,, the Property Owner, or Owner
More informationTown of Los Altos Hills Art in Public Places Committee and Policy
Supplemental 5.A Distributed: 6/19/13 I PURPOSE Town of Los Altos Hills Art in Public Places Committee and Policy Since public art is a cultural reflection of a community and its people, it is important
More informationGARDEN BUILDINGS BESPOKE AS STANDARD. garden log cabins summerhouses garden offices YOUR LOG CABIN THE WAY YOU WANT IT
GARDEN BUILDINGS BESPOKE AS STANDARD garden log cabins summerhouses garden offices YOUR LOG CABIN THE WAY YOU WANT IT 2018-19 Outdoor Living Titan manufacture a range of Summerhouses and Cabins Our friendly
More informationArchitectural Design Process
Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation
More informationFORTIS RANGE. Modular concrete & timber seating. Combinations + configurations. tel:
Modular concrete & timber seating Fortis is a new seating product designed to offer an adaptable range of configuration options from a limited number of standard components. The concrete plinth is the
More informationAnglia Ruskin University Science Centre: Artist s Brief. Perspective View from Broad Street Richard Murphy Architects
Anglia Ruskin University Science Centre: Artist s Brief Perspective View from Broad Street Richard Murphy Architects Science Centre Anglia Ruskin University, Cambridge 1. Introduction Expressions of interest
More informationBristol Archives Access policy
Bristol Archives Access policy Contents Page 1 Background 2 2 Aim of policy 2 3 Customer service 2 4 Onsite access to collections 3 5 Remote access to collections: enquiries and search service 3 6 Remote
More informationBERNINI PANIC DEVICES
BERNINI PANIC DEVICES With EC mark, in compliance with standard EN 25:2008 Exclusive Pininfarina design Complete application adaptability Fast and easy installation Functional safety and reliability Also
More informationUK Film Council Strategic Development Invitation to Tender. The Cultural Contribution of Film: Phase 2
UK Film Council Strategic Development Invitation to Tender The Cultural Contribution of Film: Phase 2 1. Summary This is an Invitation to Tender from the UK Film Council to produce a report on the cultural
More informationPUBLIC ART PROGRAM Guidelines for Site Plan Projects
PUBLIC ART PROGRAM Guidelines for Site Plan Projects I. Purpose II. Public Art Policy Goals III. Developer s Options for Public Art IV. Administrative Regulation 4.1 V. Contributing to the Public Art Fund
More informationCity of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST
City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST One 11 x 17 signed and sealed original set and 11 copies must be submitted to the Planning and Zoning Department inclusive of all
More informationREVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty
HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to
More informationHeavy Civils and Bespoke Precast Specialists
Heavy Civils and Bespoke Precast Specialists Croom Concrete Ltd, Off Church Road, Croom, Co. Limerick, Ireland. Tel: +353 61 397479 Fax: +353 61 600719 UK Why Croom? Croom has long been acknowledged as
More informationPage 1. ultimatesupport.com
Stop Dreaming. Start Doing. Page 1 Main Menu click on category links Studio Desk 3 Keyboard Stands 4 Benches 4 Amplifier Stands 5 Guitar Stands ( Accessories) 5-6 Pedalboard 6 Guitar Hangers 6 Speaker
More informationCertificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.
INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing
More informationApplication for electricity connections Housing development for up to four dwellings
Electricity Thank you for considering Western Power Distribution for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information
More informationAQA GCSE Design and Technology 8552
AQA GCSE Design and Technology 8552 Investigation, primary and secondary data Unit 6 Designing principles 1 Objectives Understand how primary and secondary data can be collected to assist the understanding
More informationShipbuilding Principles: Planning, Production and Assembly
Higher National Unit Specification General information for centres Unit title: Shipbuilding Principles: Planning, Production and Assembly Unit code: DR2F 34 Unit purpose: This Unit is designed to enable
More informationMultilift (B613 & B355)
Multilift (B613 & B355) VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: CSA B613 CSA B355-09 13-m03-2014 Part No. 000790 Copyright 2014 Savaria Corporation All rights reserved. Printed in Canada
More informationArtist Guidelines & Requirements
Leadership Morgan Hill, 2018 Class Project: Art & Inspiration Artist Guidelines & Requirements 1) Eligibility New and established artists are encouraged to apply. Entries must be the original design and
More informationPublic Art Accession, Selection Criteria and Gift Policy
CITY POLICY REFERENCE: C458B Percent for Art to Provide and Encourage Art in Public Areas C459 Statuary Policy C547 Public Art Administration, Registration and Outreach C549 Public Art Conservation, De-accession
More informationGeneral Layout. Eng. Maha Moddather
General Layout Eng. Maha Moddather mahamoddather@eng.cu.edu.eg Introduction Concrete Beam subjected to Bending Moment around Major Axis M x Compression d Concrete tensile strength is neglected A S Tension
More informationCommunity & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS
Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project
More informationPosition Description: BirdLife Australia Great Barrier Reef Wetlands Bird Monitoring Project Coordinator
Position Description: BirdLife Australia Great Barrier Reef Wetlands Bird Monitoring Project Coordinator The Organisation BirdLife Australia is a member-based not-for-profit company with over 10,000 members
More informationCITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS
DEVELOPMENT APPLICATION PROCESS Development Applications are reviewed by the El Mirage Technical Advisory Committee (TAC) to ensure Building, Engineering and Zoning compliance before scheduling public
More informationFeasibility Study To Define Costs & General Conditions For Construction of Improved Entrance Structure
Feasibility Study To Define Costs & General Conditions For Construction of Improved Entrance Structure From Lake Michigan Into Mona Lake Muskegon County, Michigan Muskegon Chronicle, August 2007 Prepared
More informationSectional Doors and Insulated Roller Doors. 2010/11 Range Guide. a member of the Sanwa Shutter family
Sectional Doors and Insulated Roller Doors 2010/11 Range Guide a member of the Sanwa Shutter family Steel Sectional Garage Doors horizontal rib iso 20/45 The narrow horizontal rib is instantly recognisable
More informationMukund Overseas.
+91-8048719142 Mukund Overseas https://www.magnumhardware.com/ We are one of the distinguished manufacturers, exporters, importers and suppliers of a massive compilation of Architectural Hardware. Our
More informationChecklist for Minor Plan Modification
Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationBUILDING DESIGN STANDARDS FACILITIES MANAGEMENT AND ANCILLARY SERVICES EXTERIOR IMPROVEMENTS DIVISION 32 Exterior Site Furnishings
PART 1 GENERAL 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying exterior site furnishings. These standards are not intended to restrict or replace professional judgment.
More informationPlanning and Zoning Application & Checklist
City of Driggs, Idaho Planning & Zoning 60 S. Main Street PO Box 48 Driggs, ID 83422 Ph: (208) 354-2362 Fax: (208) 354-8522 www.driggs.govoffice.com Planning and Zoning Application & Checklist DESIGN REVIEW
More informationCITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS
DEVELOPMENT APPLICATION PROCESS I. Technical Advisory Committee (TAC) 1. Submit TAC Review Application (See Page 3 for TAC Review Application Requirements) 2. Review of TAC Review Application by Technical
More informationFlipchart Easels and Rail Systems
Flipchart Easels and Rail Systems 94 Tripod Easels 95 Mobile Easels 96-97 Coloured Ultimate Easels 98 Conference Pro Easel 99 Combi Mobile Easel 100-101 BusyRail 102 Trapease Flipchart Hanger 102 Flipchart
More informationLOCKER SPECIFIERS GUIDE. The standard of excellence for business, industry and institutions. Lockers Cabinets Shelving
LOCKER SPECIFIERS GUIDE Lockers Cabinets Shelving The standard of excellence for business, industry and institutions FINISH GUIDE NANO METAL ROLLER LATCHING SYSTEM For unmatched security, nano metal roller
More informationNSPE Spring 2009 Ethics Forum
NSPE Spring 2009 Ethics Forum Meeting Ethical Challenges in Difficult Times Keeping Finance and Marketing on Course in an Economic Downturn May 6, 2009 MODERATOR Arthur E. Schwartz, Esq. NSPE Deputy Executive
More informationSection 7 Wooden Door Locks
Section 7 Wooden Door Locks file:///l /CATALOGUES/General J an 2009/c us tom er/purdue/catalog/pic ture Library /Wooden Door/Leggelatc h.jpg SASH LOCKS COMMERCIAL VERSION- CxC 57mm Specification Technical
More information2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.
General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings
More informationTufftec Lockers Specifications & Drawings SPECIFICATIONS & DRAWINGS
Tufftec Lockers Specifications & Drawings SPECIFICATIONS & DRAWINGS Tufftec Lockers Specifications Tufftec Lockers Specifications & Drawings TUFFTEC LOCKERS Solid Plastic Lockers Specifications - Section
More informationSEI Certification Program Manual
Safety Equipment Institute SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Program 0 of 6 SEI Certification Program Manual Section 29: Industrial Protective Clothing
More informationPublic Report. Community Services. The purpose of this report is to present and obtain approval of the Public Art Policy.
Public Report To: From: Community Services Committee Jag Sharma, Commissioner, Community Services Report Number: CS-15-54 Date of Report: February 2, 2015 Date of Meeting: February 26, 2015 Subject: Public
More informationTHIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2)
THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2) Building Control Acts 1990 and 2007 Application for a Revised Disability Access Certificate Building Control
More informationSheds Tanalised Tool Tidys & Kennels. Summerhouses. Playhouses. Quality Timber Products
Sheds Tanalised Tool Tidys & Kennels Summerhouses Playhouses Welcome Shaws for Sheds was set up in the year 2000 and is a family run business. We pride ourselves on quality and care on every product made
More informationExhibit Display Rules and Regulations
Exhibit Display Rules and Regulations TCEA Exhibit Display Rules and Regulations function on the principle that all exhibitors should be given an equal opportunity to present their product in the most
More informationSATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007
BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission
More informationInstallation Manual for Metal Emperor Lockers
P a g e 1 Table of Contents Page General Notes and Tools Required 2-3 Assemble Shelves with Coat Hooks/Coat Rods 4 Fastening Chart 5 Knock Down Locker Assembly (Banks of Three) 6-12 Appendix A: Dress End
More informationQUOTATION FOR THE INTERIOR FURNISHING WORK OF BANK OF INDIA, BALARAMAPURAM BRANCH.
QUOTATION FOR THE INTERIOR FURNISHING WORK OF BANK OF INDIA, BALARAMAPURAM BRANCH. Date:- Si.No. Description of work Qty Units Rate Amount I DOORS & PARTITIONS :- 1 FULLY GLAZED FULL HEIGHT PARTITION WITH
More informationVinyl Windows Manufactured by VPI Quality Windows
Vinyl Windows Manufactured by VPI Quality Windows Part Number: 531&591 Installation 531 & 591 SERIES SLIDING AND HUNG WINDOW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction.
More informationAPPENDIX A See rule 3(1) þþ APPLICATION UNDER SECTION 217-C OF THE TAMIL NADU DISTRICT MUNICIPALITIES ACT 1920 TAMIL NADU ACT V OF 1920.
APPENDIX A See rule 3(1) þþ APPLICATION UNDER SECTION 217-C OF THE TAMIL NADU DISTRICT MUNICIPALITIES ACT 1920 TAMIL NADU ACT V OF 1920. From To Sir I intend to construct/reconstruct a building or to put
More informationMailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:
/ Department of Community Development ARCHITECTURAL REVIEW APPLICATION 73-510 Fred Waring Drive Palm Desert California 92260 (760) 346-0611 Fax (760) 776-6417 Applicant: Telephone: Mailing Address: Fax
More informationPEAK VIEW RANCH HOMEOWNERS ASSOCIATION Architectural & Design Review Request Form
P a g e 1 Please be aware that approvals and declines will be based on the Covenants, Conditions & Restrictions (CC&R s) and the Peak View Ranch Design Guidelines. These documents would have been given
More informationUNIVERSITY OF ENGINEERING AND TECHNOLOGY, TAXILA (PROCUREMENT CELL)
UNIVERSITY OF ENGINEERING AND TECHNOLOGY, TAXILA (PROCUREMENT CELL) SCHEDULE OF REQUIREMENTS FOR PURCHASE OF PURCHASE OF FURNITURE FOR VARIOUS OFFICES The delivery of services and supply will be made in
More informationUniversal Top 3 Rail, Flush Bottom Rail - Black
Create a stylish space for entertaining and relaxing. Add curb appeal and charm to your home. Gain peace-of-mind by keeping children and pets safe. Independence offers fencing to meet your every need.
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationClark County Fire Prevention Las Vegas Nevada
Clark County Fire Prevention Las Vegas Nevada PUBLIC SAFETY/FIRST RESPONDER RADIO AMPLIFICATION SYSTEMS SCOPE: This guideline sets forth requirements for the design, installation and testing of Public
More informationPublic Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application
Public Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application Goal: an image and metaphor that represents: Weaving Communities Together
More informationMANUFACTURING INC. Specifications
Page 1 of 4 GENERAL 11 Aluminum security screen doors must be tested by a recognized testing laboratory to conform to SMA 6001-2002 Proposed American National Standard Specifications for Metal Protection
More informationCOMPILATION OF TENDER DOCUMENTS
COMPILATION OF TENDER DOCUMENTS Arc. Ibrahim A. Haruna, FNIA, PNIA, mni. -the familiar question!- Mr. Architect, after these your beautiful drawings, what next? ARCHITECT S PROCEDURE: -drawing board to
More informationBLAYDON TRADE PARK I & II, BLAYDON, NEWCASTLE UPON TYNE, NE21 5AB. Trade Park Investment Opportunity
INVESTMENT SUMMARY Two prominent trade parks located next to the A1 Western Bypass. The property comprises two trade estates totalling 61,464 sq ft (5,710.2 sq m) Gross Internal Area across five terraces.
More informationSLIDING SYSTEMS. Product catalog 2017
SLIDING SYSTEMS Product catalog 2017 Grafipro Oy Product catalog 2017 Table of contents: 3 Areas of use 4 C rails C-30 is a company specialising in aluminium and plastic composite materials. Our expertise
More informationCity of Oshawa Public Art Policy
City of Oshawa Public Art Policy Table of Contents 1.0 Introduction... 4 1.1 Policy Context Oshawa Strategic Plan and Corporate Plans 1.2 What is Public Art and its Value? 1.3 Purpose of the Public Art
More information2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.
Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:
More informationResearch Ecologist British Trust for Ornithology
Research Ecologist British Trust for Ornithology ABOUT THE BRITISH TRUST FOR ORNITHOLOGY BRITISH TRUST FOR ORNITHOLOGY a world inspired by birds and informed by science BTO harnesses the skills and passion
More informationSection 7 Wooden Door Locks
Section 7 Wooden Door Locks SASH LOCKS COMMERCIAL VERSION- CxC 57mm Specification Technical Features Bolt Tested: Robust construction for high level durability... - 500 kg side push resistant...and security
More informationThe Bonded Warehouse ManChesTer s InnoVaTIon district
The Bonded Warehouse MANCHESTER S INNOVATION DISTRICT WORK @ OLD GRANADA STUDIOS Granada, a true icon that has dominated the skyline of Manchester for over 50 years. A landmark that was the first significant
More informationProcedure for Obtaining Design Review Committee Approval
Procedure for Obtaining Design Review Committee Approval The Declarations, Restrictions & Covenants of Hallbrook require that approval of the HOA DRC Committee must be obtained prior to commencing certain
More informationMITCHELL FURNITURE SYSTEMS, INC.
MITCHELL FURNITURE SYSTEMS, INC. MITCHELL WALL MOUNTED TABLE/BENCH SYSTEM: ARCHITECTURAL DATA Laminate, Backer & Adhesive GREENGUARD Certified Components PART I. - ATTENTION: SPECIFIER AND/OR ARCHITECT
More informationWinchcombe Town Council
Winchcombe Town Council Clerk: Mrs. T. L. Willett Tel: 01242 604087 Fax: 01242 604087 E-mail: info@winchcombetowncouncil.co.uk Abbey Fields Community Centre, Back Lane, Winchcombe, Gloucestershire, GL54
More informationTOWN OF MORAGA ART IN PUBLIC SPACES POLICY
TOWN OF MORAGA ART IN PUBLIC SPACES POLICY I PURPOSE Since public art is a cultural reflection of a community and its people, it is important that procedures be in place for the acquisition and acceptance
More informationKEY FINDINGS FROM OUR ENGAGEMENT AND RESEARCH EXERCISES:
PORT TALBOT INTRODUCTION The Port Talbot community area includes the electoral divisions of Bryn and Cwmavon, Baglan, Aberavon, Sandfields East, Sandfields West, Port Talbot, Margam and Taibach. The Port
More informationAPPLICATION FORM FOR INFRASTRUCTURE NOC
APPLICATION FORM FOR INFRASTRUCTURE NOC Submission Type New Resubmission (Previous Reference No): Arch. Str. HVAC EHS Others Revision /Amendment (Infrastructure NOC Reference No): Arch. Str. HVAC EHS Others
More informationTERMS OF SALE. Quotations & Orders
Quotations & Orders 1. Quotation is in USD unless otherwise indicated and is based on information provided to SolarPath Inc. at time of quotation, i.e. location, application, operating profile, etc., and
More informationPLANNED SIGN PROGRAM CHECKLIST
Planning and Building Agency Planning Division 20 Civic Center Plaza P.O. Box 1988 (M-20) Santa Ana, CA 92702 (714) 647-5804 PLANNED SIGN PROGRAM CHECKLIST Applicant, please return this checklist with
More information7100(F) series. A conventional exit device for single swing doors or pairs of doors of metal, wood or composite construction.
Page Revised Electronically 12/12 7000 series architectural exit devices introduction Yale 7000 series exit devices deliver an unparalleled combination of durability, breadth of line, innovation and aesthetics.
More informationCrowdTuff Loop Top Pedestrian Barrier Fencing
Product outline As part of our CrowdTuff powder coated tubular steel fencing range we manufacture a Loop Top style for pedestrian barrier and safety fencing applications. This range of tubular fencing
More information21. HOT-DIP GALVANIZED COATING GUARANTEES
21. HOT-DIP GALVANIZED COATING GUARANTEES INTRODUCTION Asset owners are becoming increasingly aware of the need to prolong the maintenance-free life of their buildings, plant and equipment. This has led
More information