Chapter 15 Integration and (De-)installation

Size: px
Start display at page:

Download "Chapter 15 Integration and (De-)installation"

Transcription

1 Chapter 15 Integratin and (De-)installatin P. Fessia and S. Weisz CERN, Acceleratr & Technlgy Sectr, Geneva, Switzerland 15 Integratin and (de-)installatin 15.1 Gegraphical distributin f HL-LHC upgrade interventins The HL-LHC will require mdifying the machine and infrastructure installatins f the LHC in several pints alng the ring, in particular P1, P2, P4, P5, P6 and P7. While the equipment in P1, P5, and P6 are meant t be installed during Lng Shutdwn 3 (LS3), the mdificatins and imprvement in P4, P7 (as far as the supercnducting links are cncerned), and P2 shall be cmpleted during LS2 and be peratinal fr LHC Run 3. Belw we list the activities required pint by pint accrding t the presently freseen chrnlgical rder. P8 will have minr mdificatins during LS2, which are nt cnsidered here Pint 4 P4 will be equipped with a new crygenic plant dedicated t the RF systems (and ther crygenic equipment that might be installed in IR4) (Chapter 9 Sectin 9.5). The installatin will require: - surface: installatin f the warm cmpressrs systems in SU4; - junctin surface t the undergrund cavern via PX46; - undergrund: installatin f the cld bx in TX46 (see Figure 15-1); - cnnectin between the cld bx and QRL via UX45; - QRL mdificatin between 25 m and +25 m arund IP4. Figure 15-1: Vlume reserved fr the installatin f the new cld bx unit dedicated t RF system cling (light blue). Crrespnding authr: Pal.Fessia@cern.ch 229

2 The slutins presently adpted make the maximum use f existing vlumes, requiring very limited civil engineering wrk, mainly devted t the ruting f the piping frm SU4 t SX4 and t the vertical wall f PX46. The whle system installatin shall be cmpleted fr the end f LS2. Figure 15-2 prvides a schematic f the P4 buildings Pint The hrizntal supercnducting links Figure 15-2: View f the LHC civil wrks at P4 In P7 tw hrizntal SC links will be installed in rder t electrically feed the 600 A circuits cnnected t the tw DFBAs (DFBAM and DFBAN). The related pwer cnverters will be installed in TZ76 and via shrt warm cables will be cnnected t the supercnducting link. The tw supercnducting links will then run fr abut 220 m in TZ76 and then enter the LHC machine tunnel via UJ76. They will then be ruted fr abut 250 m in the LHC tunnel in rder t be cnnected t DFBAM and DFBAN (Figure 15-3). The whle installatin shall take place during LS2; n lng access perid is available befre that time. Pssibilities t advance part f the interventins in the year end technical stp (YETS) shall be evaluated, and the time fr radilgical cling will be used fr the preparatin f the interventins in the LHC tunnel. Sme preparatry wrk has been perfrmed already during LS, in particular the remval f the chill water pipes. This system was nt f use in P7 and its dismantling has made space available fr the SC link installatin. Figure 15-3: View f the freseen installatin f the supercnducting link system at P7. Pwer cnverters in TZ76, ruting f the link frm TZ76, via UJ76 t RR

3 In rder t perfrm the installatin f the SC links in the LHC tunnel the need fr de-installing part f the present equipment (as a precautin fr aviding pssible damage) still needs t be fully assessed New cllimatrs in the dispersin suppressr In rder t prtect the supercnducting magnets (excess heat depsitin) frm ff-mmentum prtn leakage frm the main cllimatr system itself, sme special cllimatrs must be installed in the dispersin suppressin regin, i.e. in the cntinuus crystat. The evaluatin f the real need fr this mdificatin will be cmpleted based upn the first results f LHC Run 2. Unless Run 2 shws dramatic and unexpected results, the installatin will eventually take place during LS3. In rder t cpe with the prtn lsses in the dispersin suppressr area it has been decided t install tw cllimatrs n each side f the IP. In rder t d s it will be necessary t: - de-install MB.B8L7 plus MB.B10L7 and the symmetric MB.B8L7 plus MB. B10L7; - substitute each remved diple with a unit cmpsed f tw 11 T diples (Chapter 11) separated by a crygenic bypass; - install the cllimatr n the tp f the crygenic bypass (Chapter 5). The magnet installatin will als prbably require a new dedicated quench prtectin system and a trim circuit with its wn pwer cnverter. The lcatin and the installatin apprach fr this equipment are still under evaluatin, but very prbably it will be lcated in the nearby RR Pint 2 In rder t limit the heat depsitin frm cllisin debris in the supercnducting magnets during the in run, cllimatrs in the dispersin suppressr will als be installed in P2 (Chapter 5). In this case the installatin will take place nly in ne slt n each side f the IP replacing MB.A10L2 and MB.A10R2. This equipment is necessary fr LHC Run 3 with ins, t allw Alice t fully prfit frm the upgrade carried ut during LS2. Therefre, the installatin f the unit cmprising the 11 T diples and the cry-bypass needs t be cmpleted during LS2. The cllimatr itself can be assembled at the same time r later in a shrt technical stp r in a YETS. All the ther issues listed in Sectin are applicable, but the prximity services will prbably be installed in the UAs Pint 6 In P6 the tw Q5 quadruple magnets will be mdified in rder t fulfil the needs f the new HL-LHC ATS ptics. Tw ptins are presently under evaluatin leading either t the exchange f the present Q5 with a new Q5 r the installatin f Q5-bis near the currently perated Q5. Bth ptins will require the lcal reshuffling f the vacuum layut and pssible mdificatins t QRL. The interventin in P6 is required t be cmpleted in LS3, but ptins t anticipate it in LS2, bth t limit the amunt f wrk during LS3 and t reduce persnnel expsure t radiatin due t the prximity t the beam dump line, are under study Pint 1 and Pint 5 The largest part f the new equipment required by the HL-LHC perfrmance bjectives will be installed in P1 and P5. The items t be installed and actins t be carried ut are listed belw, and are applicable t bth pints if nt therwise specified. The list is rganized by gegraphical areas LHC machine tunnel De-installatin. 231

4 - All the machine equipment frm the interface with the experimental cavern (TAS included) until the DFBA (included) requires remval. - The present QRL will be remved frm the same area. A new return mdule will be installed in the ex- DFBA area in rder t allw separatin f the clant flws cming frm the LHC QRL and ne f the new HL-LHC QRLs that will feed part f the machine frm Q1 t Q6. This return mdule shuld als prvide the pssibility, if required, t cnnect the LHC QRL with the newly installed ne, ensuring an increased level f redundancy in the system. - Services linked t the abve de-installed equipment will be remved and new nes shall be installed: Preparatin fr re-installatin. - Minr wrks culd be necessary in rder t prepare the tunnel flr and wall t receive the installatin f the new equipment (fr larger and dedicated civil engineering wrks as described belw). Installatin f the new equipment, prbably in the fllwing sequence: - TAXS; - services; - QRL with related valve and service mdules; - hrizntal supercnducting links frm the DFM t the magnets t be fed; - Magnets and crab cavity supprt system; - magnets and crab cavity; - distributin feedbxes (DFX) fr the Q1 t D1 magnet system and distributin feedbxes (DFM) fr the D2 t Q6 magnet system. The sequence f installatin f the vertical supercnducting links t be cnnected t the DFX and DFM still need t be assessed accrding t the ptins retained fr their ruting. In additin t the interventins described abve, it may be necessary t strengthen the cllimatin system with new cllimatrs in the dispersin suppressr as described fr P7 in Sectin Existing LHC tunnel service areas The RRs n bth sides f P1 and P5 will need t be re-rganized, and in particular the fllwing will be necessary. - T de-install the pwer cnverter and ther related systems (e.g. the quench detectin system) linked t the pwering f the remved LHC matching sectin. - T re-rganize the remaining equipment in rder t have the mst efficient space ccupatin, increase if necessary the radiatin shielding, and place the mst radiatin-sensitive equipment in the mst prtected areas. Pssible equipment replacement with new radiatin-hard elements can be envisaged. At present n civil wrk interventins are freseen in the RRs areas New HL-LHC tunnel service areas The installatin f the new crygenic plant in P1 and P5 will have tw bjectives: - t prvide independent and redundant cling capacity t feed the final fcus and matching sectins left and right f each f the tw high luminsity insertins fr the LHC; - t prvide redundancy t the crygenic plant installed t cl the experimental systems. 232

5 The cld bxes shall be installed in undergrund areas. At present the required vlume des nt exist. Therefre cnceptual studies have started in rder t identify the best ptins fr building new undergrund caverns t install this equipment and the related service and cntrl system. Figure 15-4, Figure 15-5, and Figure 15-6 crrespnd t slutins with pwer cnverters in the undergrund areas while Figure 15-7 crrespnds t a slutin with magnet pwer cnverters n the surface (baseline). Figure 15-4: Pssible ptin fr undergrund wrk at P5 including links t the LHC tunnel. This slutin is withut an independent shaft t access t the surface. New structures are in light red, and znes f the LHC tunnel t be impacted by cnstructin the new structures are in green. Figure 15-5: Pssible ptin fr undergrund wrk at P5 including links t the LHC tunnel. This slutin has an independent shaft fr access t the surface. New structures are in light red and yellw, and znes f the LHC tunnel t be impacted by cnstructin f the new structures are in green. Figure 15-6: Pssible ptin fr undergrund wrk at P5 including links t the LHC tunnel. This slutin has an independent shaft fr access t the surface, and a larger cnnectin tunnel fr pssible pwer cnverter undergrund installatin. New structures are in light red and yellw, and znes f the LHC tunnel t be impacted by cnstructin f the new structures are in green. 233

6 Figure 15-7: Pssible ptin fr undergrund wrk at P5 including links t the LHC tunnel. This slutin has an independent shaft fr access t the surface. A crss-sectin thrugh the crygenic equipment is shwn. New structures are in light red and yellw New cnnectin frm the LHC tunnel and HL-LHC service areas t the surface The fllwing cnnectins between the surface and the undergrund installatin shall be made available. - LHC tunnel and crab cavity area t the surface. The crab cavities need t be cnnected t the dedicated RF pwer system and their cntrl system. The present preferred chice is t install these services in dedicated surface buildings (see belw). The undergrund t surface cnnectin will need t huse eight RF caxial cables (each abut 300 mm in diameter), plus the required cntrl cables. Tw ptins are being studied. The cnstructin f eight ducts ver each crab mdule, linking directly the tunnel vault with the surface crab service building. The cnstructin f a shaft where all the previusly listed cables can be hsted tgether. In this case a lcal enlargement f the LHC tunnel will be necessary. Alternatively there will be a need fr the cnstructin f a separate small cavern where the shaft will end. The extra undergrund wrk is necessary t take int accunt that the minimum shaft dimensin is larger than the LHC tunnel diameter. - New HL-LHC service area t the surface. These cnnectins are necessary t link the surface part f the crygenic plant with the cld bx installed in the new undergrund HL-LHC service areas. - Vertical ruting f the supercnducting links. In each pint at least fur supercnducting links will need t be ruted frm the surface t the undergrund areas. Three ptins are pssible and they are listed frm mst t least cnvenient: installatin f the supercnducting links in the same vertical duct linking the crygenic plant t the surface; installatin f the supercnducting links in the same vertical duct linking the crab cavity t the surface; installatin f the supercnducting links in new dedicated vertical ducts New surface installatin The fllwing installatins shall find space n the surface fr P1 and P5 installatins. 234

7 - Crab cavity RF pwer and services hsted in tw ad hc surface buildings (yellw bxes in Figure 15 8). They shall be psitined n the surface, directly abve the tunnel psitin where the crab cavities will be installed. There will be tw surface buildings fr each pint, ne n the lefthand part f the machine and ne n the righthand part. The surface extremities f the ducts/shaft fr the crab cavity caxial leads r shaft shall be hused inside this building. The part f the building with the cntrls system shall be electrmagnetic shielded. - Crygenic installatin. The warm cmpressrs and the ther parts f the crygenic plant shall be installed n the surface. - Pwer cnverters, upper extremities f the supercnducting links, prtectin systems, and energy extractin system related t the circuits fed via the supercnducting link. This area may pssibly be lcated near the surface part f the crygenic plant and in any event n tp f the surface ruting f the vertical supercnducting link. Currently it lks very difficult t find the required space in existing buildings; therefre the cnstructin f new structures t hst the systems listed abve is prbably necessary (Figure 15-9). Figure 15-8: Surface psitin f the tw new crab cavity service buildings (in yellw) at P5 235

8 Figure 15-9: Preliminary study f the LHC P5 building ftprint. Building 1: pwer cnverters and SC link terminals; Building 2: crygenic surface equipment; Building 3: access t shaft. Pssible technical galleries are in light blue. In additin t the abve mentined ptins, a slutin, where the pwer cnvertrs and the crab cavity ancillaries wuld als be installed undergrund, is under study. Such an ptin wuld lead t an undergrund structure f much larger vlume, but the increase in cst culd be partially balanced by a reductin in the number f cres frm the surface t the tunnel, a reductin in the numbers f surface structures t be built, and the simplificatin f the surface wrksite Activity sequence cnsideratins While the sequence f interventin n the undergrund LHC installed equipment (machine and RR) is quite clear and linked t the end f the LHC Run 3, the sequence fr the ther installatin and civil wrk activities is still under evaluatin. The wrksite rganizatin will depend upn the ptins chsen. This is why, in the evaluatin f the selectin f the final slutins fr the undergrund caverns, the cnnectin tunnel t the surface, and the surface building, three main parameters shall be taken int accunt. These are cst, the pssibility f perfrming the wrk in advance with respect t the LS3 start date, and the ease f installatin and cnnectin, since sme ptins culd lead t very cmplex and crss-cnnected installatin wrksites, making LS3 unacceptably lng. 236

Connection tariffs

Connection tariffs Cnnectin tariffs 2016-2019 A. TARIFF CONDITIONS FOR GRID USERS DIRECTLY CONNECTED TO THE ELIA GRID AND FOR DISTRIBUTION GRID OPERATORS, EXCEPTED FOR DISTRIBUTION GRID OPERATORS CONNECTED AT TRANSFORMER

More information

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules Lw-Lss Supplies fr Line Pwered EnOcean Mdules A line pwer supply has t ffer the required energy t supply the actuatr electrnic and t supply the EnOcean TCM/RCM radi cntrl mdule. This paper cntains sme

More information

MPE main activities planned for YETS

MPE main activities planned for YETS MPE main activities planned fr YETS 2017-18 Machine Interlck J. Uythven Electrnic fr Prtectin (QPS) Machine prtectin Sftware J. Uythven Perfrmance Evaluatin Electrical Engineering Girgi n behalf f MPE

More information

Acceptance and verification PCI tests according to MIL-STD

Acceptance and verification PCI tests according to MIL-STD Acceptance and verificatin PCI tests accrding t MIL-STD-188-125 Bertrand Daut, mntena technlgy V1 - August 2013 CONTENTS 1. INTRODUCTION... 1 2. DEFINITIONS... 1 3. SCHEMATIC OF THE TEST SETUP WITH USE

More information

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE

MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE 23rd Wrld Gas Cnference, Amsterdam 2006 MUELLER CO. MAGIC BOX IN-SERVICE POLYETHYLENE INSERTION MACHINE B. KORTTE USA ABSTRACT This paper details the features, functins and benefits f the Mueller C. MAGIC

More information

NATF CIP Requirement R1 Guideline

NATF CIP Requirement R1 Guideline Open Distributin NATF CIP 014-2 Requirement R1 Guideline Disclaimer This dcument was created by the Nrth American Transmissin Frum (NATF) t facilitate industry wrk t imprve physical security. NATF reserves

More information

5. Experimental Results

5. Experimental Results 5. xperimental Results Prttype mdels f the duble spherical helix the hemispherical helix studied in Sectins 4.3.2 4.4 were cnstructed measured. Fabricatin f these antennas measurement f their radiatin

More information

LED wdali MC Switch Input Modul Set - User Manual

LED wdali MC Switch Input Modul Set - User Manual LED wli MC Switch Input Mdul Set - User Manual Buttn mdul (Transmitter) 1. Prduct Descriptin Item N.: LC-004-302 Receive mdul (Receiver) The wli MC Switch Input Mdul Set is a cmpact wireless Multi Cntrl

More information

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements AccuBuild Versin 9.3 Release 05/11/2015 Dcument Management Speed Perfrmance Imprvements The entire dcument management system and security system design was retled which shuld result in majr speed imprvements

More information

DynaRound Hatch Guard System Installation Instructions

DynaRound Hatch Guard System Installation Instructions DynaRund Hatch Guard System Installatin Instructins Estimated Installatin Time: Man Crew, 0-90 Minutes The DynaRund Hatch Guard System is designed t prtect all rftp hatch entry and exit pints. This nn-penetrating

More information

SVT Tab and Service Visibility Tool Job Aid

SVT Tab and Service Visibility Tool Job Aid Summary This Jb Aid cvers: SVT Tab Overview Service Visibility Tl (SVT) Area Overview SVT Area: Satellite Mdem Status (Frm Mdem) Clumn SVT Area: Satellite Mdem Status (Frm SMTS) Clumn SVT Area: Prvisining

More information

Puget Sound Company Overview. Purpose of the Project. Solution Overview

Puget Sound Company Overview. Purpose of the Project. Solution Overview Puget Sund Cmpany Overview Puget Sund Energy is Washingtn State s largest and ldest energy utility, serving nearly 1 millin electric custmers and mre than 650,000 natural gas custmers, primarily within

More information

Design of a test cryomodule for the high energy section of the Eurotrans linac

Design of a test cryomodule for the high energy section of the Eurotrans linac Design f a test crymdule fr the high energy sectin f the Eurtrans linac Ml, May, 6-9, 2007 INFN Milan, LASA Serena Barbantti Outline Crymdule task in EUROTRANS Deliver an peratinal prttype crymdule t be

More information

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014 SnTek, a Xylem brand 9940 Summers Ridge Rad, San Dieg, CA 92121-3091 USA Telephne (858) 546-8327 Fax (858) 546-8150 E-mail: inquiry@sntek.cm Internet: http://www.sntek.cm RiverSurveyr S5/M9 & HydrSurveyr

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad with min. 5 kg 405000090 405070090 INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main dimensins. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

SENSOR AND MEASUREMENT TECHNOLOGY

SENSOR AND MEASUREMENT TECHNOLOGY SENSOR AND MEASUREMENT TECHNOLOGY FOR SENSOR MANUFACTURERS The perfect wireless system FOR MACHINE MANUFACTURERS Transferring sensr data directly int the cntrl unit Using the Wireless Sensr Gateway DATAEAGLE

More information

idcv Isolated Digital Voltmeter User Manual

idcv Isolated Digital Voltmeter User Manual www.akcp.cm idcv Islated Digital Vltmeter User Manual Help Versin updated till firmware SP446 Cpyright 2011, AKCess Pr Limited Prvided by fficial AKCP-Distributr Didactum https://www.didactum-security.cm/en/

More information

Flux Bender Equalizer

Flux Bender Equalizer Lightning By Audi Flux Bender Equalizer Users Guide 2014 Revised 2015 Cngratulatins n an excellent purchase! This guide was put tgether t help yu get the mst ut f yur investment. Please read this thrughly

More information

Airfield Lighting Product Description SAGA. System of Azimuthal Guidance for Approach (SAGA)

Airfield Lighting Product Description SAGA. System of Azimuthal Guidance for Approach (SAGA) SAGA System f Azimuthal Guidance fr Apprach (SAGA) Nte: This page is blank fr cnvenient duble-sided printing. 1. INTRODUCTION Utilisatin Apprach Azimuth Guidance. The SAGA (System f Azimuth Guidance fr

More information

C&E Mobility Policy (Standard)

C&E Mobility Policy (Standard) C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment

More information

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner

PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE. Gary L. Burkhardt and R.E. Beissner PROBABILITY OF DETECTION OF FLAWS IN A GAS TURBINE ENGINE COMPONENT USING ELECTRIC CURRENT PERTURBATION Gary L. Burkhardt and R.E. Beissner Suthwest Research Institute 6220 CUlebra Rad San Antni, Texas

More information

Insertion Loss (db)

Insertion Loss (db) Optical Interleavers Optplex s Optical Interleaver prducts are based n ur patented Step-Phase Interfermeter design. Used as a DeMux (r Mux) device, an ptical interleaver separates (r cmbines) the Even

More information

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server. Autmatic impsitin Page 1/8 Autmatic impsitin Descriptin Autmatic impsitin will d the mst cmmn impsitins fr yur digital printer. It will autmatically d flders fr A5, A4 r US Letter page sizes in either

More information

Installing a Squeak-Free Nascor Floor System

Installing a Squeak-Free Nascor Floor System Nascr s precise manufacturing tlerances deliver a prduct that resists shrinking, warping and twisting the mst cmmn causes f squeaks in flr systems built with dimensinal lumber. Ensuring a squeak-free flr,

More information

Wonder Tree Video Slot Introduction. How to Bet. Gamble Feature

Wonder Tree Video Slot Introduction. How to Bet. Gamble Feature Wnder Tree Vide Slt Intrductin Wnder Tree vide slt is a 5-reel, 20-line game. The slt cnsists f 11 cards - 1 f which is Wild, and 1 is Scatter. All winning cmbinatins are paid left t right, except fr the

More information

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden Internet:

SARAD GmbH Tel.: 0351 / Wiesbadener Straße 10 FAX: 0351 / Dresden   Internet: SARAD GmbH Tel.: 0351 / 6580712 Wiesbadener Straße 10 FAX: 0351 / 6580718 01159 Dresden e-mail: supprt@sarad.de GERMANY Internet: www.sarad.de APPLICATION NOTE AN-001_EN The Installatin f autnmus instrumentatin

More information

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics Martel LC-110H Lp Calibratr and HART Cmmunicatins/Diagnstics Abstract Martel Electrnics Crpratin This white paper describes the basic functins f HART cmmunicatins and the diagnstic capability f the Martel

More information

Study of New architecture needs for AOCS / Avionics Abstract. Abstract

Study of New architecture needs for AOCS / Avionics Abstract. Abstract The ESA "Study f New architecture needs fr AOCS / Avinics" was perfrmed in parallel t the study Attitude estimatin systems, Requirements n sensr suite. Bth studies have the cmmn bjective t derive a develpment

More information

SISTEMA ELEVATÓRIO ETV 460A

SISTEMA ELEVATÓRIO ETV 460A Parts included with yur Flat Lift Lift unit ( #1 ) Pwer supply ( #2 ) R.F. Mdule ( #3 ) Rcker switch ( #4 ) Remte Cntrl ( #5 ) Lift unit ( #1 ) Remte Cntrl ( #5 ) Pwer supply ( #2 ) Rcker switch ( #4 )

More information

Models 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Connectors, dc to 40.0 GHz

Models 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Connectors, dc to 40.0 GHz Mdels 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Cnnectrs, dc t 40.0 GHz Threadless Cnnectr System / S pace Saving / L ng Life Features Threadless Cnnectr Mating - This blind-mate cnnectr series

More information

Hands-Free Music Tablet

Hands-Free Music Tablet Hands-Free Music Tablet Steven Tmer Nate Decker Grup Website: steve@wasatch.cm milamberftheassembly@yah.cm http://www.cs.utah.edu/~ndecker/ce3992/ Abstract The typical musician handles a great deal f sheet

More information

Maxon Motor & Motor Controller Manual

Maxon Motor & Motor Controller Manual Maxn Mtr & Mtr Cntrller Manual Nte: This manual is nly fr use fr the Maxn mtr and cntrller utlined belw. This infrmatin is based upn the tutrial vides fund nline and thrugh testing. NOTE: Maximum Permitted

More information

EE 3323 Electromagnetics Laboratory

EE 3323 Electromagnetics Laboratory EE 3323 Electrmagnetics Labratry Experiment #1 Waveguides and Waveguide Measurements 1. Objective The bjective f Experiment #1 is t investigate waveguides and their use in micrwave systems. Yu will use

More information

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION PS 430 FOUR CHANNEL REMOTE SPEAKER STATION USER MANUAL August 2016 This prduct is designed and manufactured by: ASL Intercm BV Znnebaan 42 3542 EG Utrecht The Netherlands Phne: +31 (0)30 2411901 Fax: +31

More information

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range Remte Sensing & Zning Installatin Guide Pr Technlgies P.O. Bx 3377 Springfield, MO 65804 Tll ree : 888-776-47 Web: www.priaq.cm Hurs f Operatin: M- 9AM - 6PM Eastern Table f Cntents Table f Cntents Quick

More information

CUSTOMER PORTAL. Floorplan Management

CUSTOMER PORTAL. Floorplan Management CUSTOMER PORTAL Flrplan Management FLOORPLAN ANALYTICS The flrplan analytics area displays flrplans yu have uplad t the prtal (if yu haven t yet upladed a flrplan please cntact ur supprt department). Frm

More information

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments

Processors with Sub-Microsecond Response Times Control a Variety of I/O. *Adapted from PID Control with ADwin, by Doug Rathburn, Keithley Instruments PID Cntrl with ADwin Prcessrs with Sub-Micrsecnd Respnse Times Cntrl a Variety f I/O CHESTERLAND OH March 9, 2015 *Adapted frm PID Cntrl with ADwin, by Dug Rathburn, Keithley Instruments By Terry Nagy,

More information

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017

ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 ECE 3829: Advanced Digital System Design with FPGAs A Term 2017 Lab 2- VGA display and Light Sensr interface Reprt due at start f class Friday September 15 th Use the prvided Ambient Light Sensr mdule

More information

Dice High Video Slot. Introduction. How to Bet. Gamble Feature

Dice High Video Slot. Introduction. How to Bet. Gamble Feature Dice High Vide Slt Intrductin Hw t Bet Gamble Feature Game Cntrls Rules Dice Feature Jackpt Cards Bnus Game Interruptins Return t Player Intrductin Dice High vide slt is a 5-reel, 20-line fixed game. The

More information

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5 Prduct Specificatin Prduct specificatin. February 2007 ByVac 2007 ByVac Page 1 f 5 Prduct Specificatin Cntents 1. Dcument Versins... 2 2. Intrductin... 2 3. Features... 2 4. Battery Life... 2 5. Blck Diagram...

More information

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL Issue February 2011 ASL Intercm BV DESIGNED AND MANUFACTURED BY: ASL INTERCOM BV ZONNEBAAN 42 3542 EG UTRECHT THE NETHERLANDS

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL Yu will learn the fllwing in this lab: The UNIVERSITY f NORTH CAROLINA at CHAPEL HILL Cmp 541 Digital Lgic and Cmputer Design Prf. Mntek Singh Fall 2016 Lab Prject (PART A): Attaching a Display t the Prcessr

More information

Consolidated Edison Company of New York. Developer Welcome Kit

Consolidated Edison Company of New York. Developer Welcome Kit Cnslidated Edisn Cmpany f New Yrk Develper Welcme Kit Cn Edisn: Develper Welcme Kit Legal Disclaimer This dcument is fr infrmatinal purpses nly. Cnslidated Edisn Cmpany f New Yrk shall nt be held liable

More information

Security Exercise 12

Security Exercise 12 Security Exercise 12 Asynchrnus Serial Digital Baseband Transmissin Discussin: In this chapter, yu learned that bits are transmitted ver a cpper wire as a series f vltage pulses (a prcess referred t as

More information

LED DALI MC+ Switch Input Module - User Manual

LED DALI MC+ Switch Input Module - User Manual LED MC+ Switch Input Mdule - User Manual Item n.: LC-004-301 1. Prduct Descriptin The MC+ is a Cmpact Multi Cntrl mdule with 4 freely prgramable swithcing inputs (ptential-free clsing cntacts). The supply

More information

Photoshop Elements: Color and Tonal Correction Basics

Photoshop Elements: Color and Tonal Correction Basics Phtshp Elements: Clr and Tnal Crrectin Basics Cntrast Lighten Phtshp Elements: Clr and Tnal Crrectin Basics 1 Sharpen Expsure Phtshp Elements: Clr and Tnal Crrectin Basics 2 Highlights and Shadws All key

More information

BENZINGER. obliged to precision BENZINGER PRÄZISIONSMASCHINEN TNI. Precise Fast Compact PRECI CNC-PRECISION- TURNING-MILLING CENTRE

BENZINGER. obliged to precision BENZINGER PRÄZISIONSMASCHINEN TNI. Precise Fast Compact PRECI CNC-PRECISION- TURNING-MILLING CENTRE BENZINGER PRÄZISIONSMASCHINEN BENZINGER bliged t precisin Precise Fast Cmpact TNI CNC-SION- TURNING-MILLING CENTRE Precise Fast Cmpact TNI PreciLine - Everything is abut the custmer s need, cmplete machining

More information

Standard Authorization Request Form

Standard Authorization Request Form When cmpleted, email t: gerry.cauley@nerc.net Standard Authrizatin Request Frm Title f Prpsed Standard Frequency Respnse, versin 1 Request Date 4/1/06 SAR Requestr Infrmatin Name Dn McInnis (Terry Bilke

More information

PhotoVu Digital Picture Frame Service & Repair Guide

PhotoVu Digital Picture Frame Service & Repair Guide PhtVu Digital Picture Frame Service & Repair Guide PhtVu, LLC 2450 Central Ave, #G1 Bulder, CO 80301 USA www.phtvu.cm/supprt Versin: 1.0 Table f Cntents Getting Started... 3 Determine Yur Generatin f PhtVu

More information

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System VIP-200 Vide ver IP Extender and Matrix System Pint t Pint Extensin Cnfiguratin Quick Start Guide PureLink TM 535 East Crescent Avenue Ramsey, NJ 07446 USA Cntents What is in the bx... 3 Transmitter kit

More information

A2: Aperture, DOF, & Focus

A2: Aperture, DOF, & Focus Art 205 A2: Aperture, DOF, & Fcus Original RAW Shts Due: Crit Date: Requires 2 Ink Jet Prints (50 pints) Objectives: 1. T understand hw apertures like f-16 & f-22 have a large DOF r range f fcus. 2. T

More information

VLBA Electronics Memo No. 737

VLBA Electronics Memo No. 737 VLBA Electrnics Mem N. 737 U S I N G PULSECAL A M P L I T U D E S TO D E T E R M I N E SYSTEM T E M P E R A T U R E D.S.Bagri 1993Mar05 INTRODUCTION System temperature is nrmally measured using mdulated

More information

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines

BASIC SAFETY AND FABRICATION GUIDE. Safety Guidelines BASIC SAFETY AND FABRICATION GUIDE Safety Guidelines These manuals are designed t give basic guidelines t help ensure that Century Quartz Stne Surfaces prducts are t be handled, stred, fabricated, and

More information

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions TC 60 prg start stp THERMOCOMPUTER TC 60 h C/h C Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing Curve...2 Checing

More information

1.12 Equipment Manager

1.12 Equipment Manager Mdule 1 Categry 1 1.12 Equipment Manager Functin f the windw The windw is the central data file fr the Kntrl Pr and cllects the main data fr fees f an bject that t be used in this prject. The Equipment

More information

Desktop Teller Exception User Guide

Desktop Teller Exception User Guide Desktp Teller Exceptin User Guide Jammed Dcuments If a dcument jams during the scanning prcess, the scanner will stp, and a message bx will display a Device Errr Message, as shwn belw: Click OK t allw

More information

SPACE-BASED ADS-B SURVEILLANCE DATA AND ITS DISTRIBUTION VIA REDDIG II. (Working paper presented by AIREON) SUMMARY

SPACE-BASED ADS-B SURVEILLANCE DATA AND ITS DISTRIBUTION VIA REDDIG II. (Working paper presented by AIREON) SUMMARY RCC/20-WP/07 13/03/2017 Internatinal Civil Aviatin Organizatin Suth American Reginal Office - Reginal Prject RLA/03/901 REDDIG Management System and Satellite Segment Administratin Twentieth Meeting f

More information

E-Jobsheet Tablet Application Functionality

E-Jobsheet Tablet Application Functionality E-Jbsheet Tablet Applicatin Functinality The e-jbsheet applicatin has been created fr Truck Service Prviders (TSP) in rder fr their admin staff and fitters t handle all types f wrk via a mbile platfrm

More information

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed. Intrductin Dry Cntact Sensr The Dry Cntact sensr is a simple cnnectin t burglar alarms, fire alarms r any applicatin that requires mnitring by the unit. Dry cntact sensrs are user definable and can be

More information

USER MANUAL HIGH INTERCEPT LOW NOISE AMPLIFIER (HILNA TM ) V1

USER MANUAL HIGH INTERCEPT LOW NOISE AMPLIFIER (HILNA TM ) V1 USER MANUAL HIGH INTERCEPT LOW NOISE AMPLIFIER (HILNA TM ) V1 PART NUMBERS: HILNA-V1 HILNA-V1-M/F RF, Wireless, and Embedded Systems Engineering NuWaves Engineering 132 Edisn Drive Middletwn, Ohi 45044

More information

Coaxial Needles for electrospinning

Coaxial Needles for electrospinning Caxial Needles fr electrspinning ELECTROSPINNING FROM THE LABORATORY Prduced by the Bimedical Divisin f Linari Engineering S.r.l.. Visit the website www.linaribimedical.cm t discver the ther prducts CaxNd.0EN

More information

BIG TAJFUN 1000 INSTRUCTION MANUAL

BIG TAJFUN 1000 INSTRUCTION MANUAL BIG TAJFUN 1000 INSTRUCTION MANUAL www.italab.sk www.kenwd.sk Acknwledgment Thank yu fr purchasing Pwer linear amplifier BIG TAJFUN 1000 432 frm VH Electrnics. During its prductin, we used the latest knwledge

More information

Transmission Substation Field Instructions

Transmission Substation Field Instructions 4.14 Substatin Permits Purpse This instructin deals with the use f permits t wrk in Hrizn Pwer s, and must be read in cnjunctin with FI 4.4 Secndary Islatins. Scpe The persnnel cvered by this instructin

More information

Operating Instructions

Operating Instructions TC 60/8 THERMOCOMPUTER TC 60/8 temp / time s s temp / time k start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing

More information

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION

EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Streamer AG INMR Wrld Cngress 2017 EASYQUENCH TECHNOLOGY: 20 YEARS OF INNOVATION IN LIGHTNING PROTECTION Authrs: Jens Bthe, Etienne Cuisinier SUMMARY: Fr nw mre than 20 years, Streamer has dedicated its

More information

Pool & Hot Tub Guide

Pool & Hot Tub Guide Pl & Ht Tub Guide PERMIT(S) FOR POOLS/HOT TUBS WITH SIDE WALLS > 24 ***** ALL FEES DUE AT TIME OF APPLICATION ***** Building Permit Applicatin. Be aware f any subdivisin restrictins prir t applicatin.

More information

GANTOM iq AND iqx USER GUIDE

GANTOM iq AND iqx USER GUIDE GANTOM iq AND iqx USER GUIDE The Gantm iq is the wrld s smallest gb prjectr with zm and fcus fr prfessinal lighting applicatins. The Gantm iqx features the same amazing ptics f the Gantm iq but adds integrated

More information

OBSERVATIONS OF GALACTIC RADIATION AT 4 7 Mcjs By G. R. A. ELLIS,* R. J. GREEN,* and P. A. HAMILTON* [Manuscript received June 3, 1963]

OBSERVATIONS OF GALACTIC RADIATION AT 4 7 Mcjs By G. R. A. ELLIS,* R. J. GREEN,* and P. A. HAMILTON* [Manuscript received June 3, 1963] OBSERVATIONS OF GALACTIC RADIATION AT 4 7 Mcjs By G. R. A. ELLIS,* R. J. GREEN,* and P. A. HAMILTON* [Manuscript received June 3, 1963] Summary This paper describes bservatins f galactic radiatin at 4

More information

100 Super Hot Video Slot Introduction. How to Bet. Gamble Feature

100 Super Hot Video Slot Introduction. How to Bet. Gamble Feature 100 Super Ht Vide Slt Intrductin 100 Super Ht vide slt is a 5-reel, 100-line fixed game. The slt cnsists f 8 cards - 1 f which is Wild, and 1 is Scatter. All winning cmbinatins are paid left t right, except

More information

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS DT0069 Design tip Enabling the Bluetth Lw Energy Direct Test Mde (DTM) with BlueNRG-MS By Salv Bnina Main cmpnents BlueNRG-MS Upgradable Bluetth Lw Energy netwrk prcessr SPBTLE-RF Very lw pwer mdule fr

More information

NanoScan v2 Readme Version 2.7. Change log. v2.7 - Added information for new product Pyro/9/5-MIR.

NanoScan v2 Readme Version 2.7. Change log. v2.7 - Added information for new product Pyro/9/5-MIR. NanScan v2 Readme Versin 2.7 Change lg v2.7 - Added infrmatin fr new prduct Pyr/9/5-MIR. v2.6 - Redesigned Messages windw. Imprved readability and ease f use. Mves almst all pp up message bxes int the

More information

Transmission is reliable and safe when antennas are managed by Movicon

Transmission is reliable and safe when antennas are managed by Movicon Transmissin is reliable and safe when antennas are managed by Mvicn Simetel Spa and Sigma Cnsulting have engineered an interesting supervisin system fr mnitring and security f the NATO VLF transceiver

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Lad: Min. 5 kg Max. 100 kg TS1000A TS700A INSTALLATION INSTRUCTIONS CONTENT: 1. Imprtant safety instructins. 2. Specificatins and main measures. 3. Parts included. 4. Installatin. 5. Adjusting the strke

More information

Variable Attenuators (Step & Continuously)

Variable Attenuators (Step & Continuously) Variable Attenuatrs (Step & Cntinuusly) Wide Chice f Attenuatin & Frequency Ranges. High Reliability & Lng Life Rugged Cnstructin & Cnnectrs Rtatinal Stps Included n mst mdels Lw Cst Designs - Mdel 3033

More information

Ten-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467

Ten-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467 Ten-Tec Mdel RX-366 Subreceiver 565/566 Subreceiver Installatin and Operatin Manual-74467 Tls required: Sldering irn r heat gun (fr shrinking heat shrink tubing) Number 1 Phillips screw driver Number 2

More information

IntesisBox IS-IR-KNX-1i v1.0. User's Manual Issue Date: 06/2017 r1.0 eng

IntesisBox IS-IR-KNX-1i v1.0. User's Manual Issue Date: 06/2017 r1.0 eng IntesisBx IS-IR-KNX-1i v1.0 User's Manual Issue Date: 06/2017 r1.0 eng IntesisBx KNX IR Universal AC Intesis Sftware S.L.U. 2017 All Rights Reserved. Infrmatin in this dcument is subject t change withut

More information

Archi-take on Laboratory Furniture

Archi-take on Laboratory Furniture Archi-take n Labratry Furniture Published In: Express Pharma, July 1-15, 2011 Link: Archi-take n labratry furniture - Express Pharma The labratry envirnment is the place where creative and practical wrk

More information

American Association of State Highway and Transportation Officials

American Association of State Highway and Transportation Officials American Assciatin f State Highway and Transprtatin Officials Please save and send as a wrd file. Yu can attach a map in PDF r JPG with the applicatin t usrutes@aasht.rg (M.Vitale) An Applicatin frm the

More information

GANTOM iq AND iqx USER GUIDE

GANTOM iq AND iqx USER GUIDE GANTOM iq AND iqx USER GUIDE The Gantm iq is the wrld s smallest gb prjectr with zm and fcus fr prfessinal lighting applicatins. The Gantm iqx features the same amazing ptics f the Gantm iq but adds integrated

More information

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS PURPOSE AND SCOPE The intent f this primary standard is t utline the requirements fr the effective islatin f static and mbile plant and equipment prir t the wrk

More information

POWERSLED CIRCUIT INTRODUCTION GAME COMPONENTS

POWERSLED CIRCUIT INTRODUCTION GAME COMPONENTS POWERSLED CIRCUIT WRITTEN & DESIGNED BY Kevin Smith GRAPHIC DESIGN & EDITING Daniel Kast Eric Rennie PLAYTESTING Tm Akerman Rbert Flaharty Keith Hudsn Chris McArthur Glenn Mchn Demian Rse Tm Warhurst Cpyright

More information

KELOX room thermostats - KM690D Digital-Standard/ KM690U Digital-Control

KELOX room thermostats - KM690D Digital-Standard/ KM690U Digital-Control KELOX rm thermstats - KM690D Digital-Standard/ KM690U Digital-Cntrl The KELOX rm thermstats are high-quality rm temperature cntrllers fr recrding and cntrlling the required rm temperature fr a maximum

More information

Upgrading to PlanetPress Suite Version 5

Upgrading to PlanetPress Suite Version 5 Upgrading t PlanetPress Suite Versin 5 Creatin date: September 2, 2005 Revisin date: June 14, 2006 Table f Cntents System Requirements... 4 Imprtant Cnsideratins... 4 Knwn Issues... 6 Prcedure t imprt

More information

Wireless Bridge Module for DXR2.E

Wireless Bridge Module for DXR2.E Technical Specificatin Sheet Dcument N. A6V11470500 July 31, 2018 Wireless Bridge Mdule fr DXR2.E Descriptin A wireless bridge cnnects tw wired netwrks tgether ver Wi-Fi utilizing a Wireless Access Pint.

More information

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter .,Plc..d,~t l~ucji PA300 DIGITAL BASS PROCESSOR Cngratulatins n yur purchase f a Planet Audi signal prcessr. It has been designed, engineered and manufactured t bring yu the highest level f perfrmance

More information

Operating Instructions

Operating Instructions TC 40 THERMOCOMPUTER TC 40 start stp Operating Instructins Cntents General Infrmatin...1 Security Advice...1 Firing Curves...1 Typical Firing Curves...2 Entering a Firing Curve...2 Checing the Prgramme

More information

TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE

TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE Cadence Virtus Schematic editing prvides a design envirnment cmprising tls t create schematics, symbls and run simulatins. This tutrial will

More information

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys) 1 Octber 2016 Inaccessible Electrical Facilities Phase 2 Primary Lines (Lwer Keys) Revised Oct 20 th 2016 2 Executive Summary Flrida Public Service Cmmissin In 2006, fllwing the 2004 and 2005 hurricane

More information

Developed By: Firefighter Alex Chapin August 2017

Developed By: Firefighter Alex Chapin August 2017 F O G N A I L O P E R A T I O N S 1. 1 Develped By: Firefighter Alex Chapin August 2017 T A S K S K I L L D E S C R I P T I O N A N D D E T A I L The fgnail, when deplyed in a timely and accurate manner

More information

E-Learning, DC drives DCS800 Hardware Options, part 1 Size D1 D4. ABB Group February 2, 2010 Slide 1 DCS800_HARDWARE_OPTIONS_01R0101

E-Learning, DC drives DCS800 Hardware Options, part 1 Size D1 D4. ABB Group February 2, 2010 Slide 1 DCS800_HARDWARE_OPTIONS_01R0101 E-Learning, DC drives DCS800 Hardware Optins, part 1 Size D1 D4 February 2, 2010 Slide 1 Objectives This training mdule cvers: Lcatin fr plug-in ptins Types f plug-in ptins Fiber ptic cnnectin bard DCS800

More information

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732 Prgram Infrmatin 1 DXF2DAT 3.0 Prfessinal Designed Cmputing Systems 848 W. Brtn Rad Essexville, Michigan 48732 Cntact: (989) 892-4376 website: http://www.famwrk.net General Infrmatin: inf@famwrk.net Technical

More information

RIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities.

RIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities. ... a. Ul -'" '" c / RIG SOLAR FILM Fr ver 25 years, Thusand Oak Optical has manufactured the mst ppular white lightfilters in the wrld. Nw with the intrductin f the R-G slar film, ur traditin f excellence

More information

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY

HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY HIGH POWER UPS SELECTION METHODOLOGY AND INSTALLATION GUIDELINE FOR HIGH RELIABILITY POWER SUPPLY A. Sudrià 1, E. Jaureguialz 2, A. Sumper 1, R. Villafáfila 1 and J. Rull 1 1 Centre fr Technlgical Innvatin

More information

Study of Dipole Antenna Height for Radio Telescope According to Baghdad Location

Study of Dipole Antenna Height for Radio Telescope According to Baghdad Location Study f Diple Antenna Height fr Radi Telescpe Accrding t Baghdad Lcatin Kamal M. Abd 1, Mretadha J. Kadhim and Zinah F. Kadhim 3 1 Department f Astrnmy and Space, Cllege f Science, University f Baghdad,

More information

RF MONO 8.2MHz RF MONO HIGH FREQUENCY PCB CONNECTION. Please see the last section in this document. FOREWARDS

RF MONO 8.2MHz RF MONO HIGH FREQUENCY PCB CONNECTION. Please see the last section in this document. FOREWARDS RF MONO 8.2MHz PCB CONNECTION Please see the last sectin in this dcument. FOREWARDS This user guide cntains basic infrmatin n hw t adjust ur RF Mn Antenna System SP82 and btain its best perfrmance pssible.

More information

Input-Series Two-Stage DC-DC Converter with Inductor Coupling

Input-Series Two-Stage DC-DC Converter with Inductor Coupling Input-Series w-stage DC-DC Cnverter with Inductr Cupling ing Qian Wei Sng Brad Lehman Nrtheastern University Dept. Electrical & Cmputer Engineering Bstn MA 0 USA Abstract: his paper presents an input-series

More information

Big Kahuna Assembly Instructions

Big Kahuna Assembly Instructions Big Kahuna Assembly Instructins Thank yu fr purchasing a d-it-yurself pergla kit frm Average Je s Pergla Dept. We appreciate yur business, and we are here t help yu in any way pssible. Read this entire

More information

Spectracom GSG ecall Test Suite

Spectracom GSG ecall Test Suite 18-Dec-2017 GSG App Nte Spectracm GSG ecall Test Suite Table f Cntents 1. Intrductin... 1 2. Befre Starting the Test... 2 3. Running the ecall Test Suite... 4 4. Psitin Errr Tests 2.2.2-2.2.4... 10 5.

More information

Nordic ID AR85 User Guide Version 1.4 NORDIC ID AR85 RAIN RFID OVERHEAD READER USER GUIDE

Nordic ID AR85 User Guide Version 1.4 NORDIC ID AR85 RAIN RFID OVERHEAD READER USER GUIDE NORDIC ID AR85 RAIN RFID OVERHEAD READER USER GUIDE TABLE OF CONTENTS GETTING STARTED... 4 1.1. GENERAL... 4 1.2. AVAILABLE VARIANTS... 4 1.3. AVAILABLE ACCESSORIES... 4 1.4. PACKAGE CONTENT... 4 1.5.

More information