1 BG6 Design Framework for Building Services Why? What? How? Martin Ronceray 01 Oct 2018
2 BSRIA Values 2
3 BSRIA Sustainable Construction Group 3
4 Why? The purpose 4
5 Purpose of BG6 Details of limitations not always explicit in contracts in specifications in drawings Several parties (stakeholders) involved at different times during the project Different deliverables Client Consultant Contractor 5
6 Purpose of BG6 Enable more profitable, effective and efficient project delivery Greater clarity of each designer s role Reduced conflict within the project team How Why Team design deliverables from each project stage Tighter definition of who designs what Defining who produces which drawing 6
7 History From a Technical Note to a BSRIA Guide 7
8 History of BG TN BG6 (1 st ) 2012 BG6 (3 rd ) 2018 BG6 (5 th ) 1997 TN21 TN BG6 (2 nd ) 2014 BG6 (4 th ) Allocation of Design Responsibilities a code of conduct to avoid conflict Allocation of Design Responsibilities + example drawings A Design Framework for Building Services 8
9 Changes 4 th to 5 th edition 9
10 BG6/2014 (4 th edition) Figure 1 Changes in BG6 Before 5 th edition, co-ordination of services within delivered outputs were sub-divided at Stage 3a, 3b and Stage 4a, 4b, 4c for handover points 10
11 Changes in BG6 The key changes between the 4 th & 5 th edition Stage 3 stands as only one stage Stage 4 stands as only one (long) stage with technical design division Feasible design using generic objects Coordinated design using generic objects Coordinated design using specific objects 11
12 Changes in BG6 The key changes between the 4 th & 5 th edition (cont.) Defining, understanding and categorising clashes Critical Moderate Allowable clash Two distinct elements occupying the same space. Stage 4: Small pipework clash where space is proven to be sufficient 12
13 Changes in BG6 The key changes between the 4 th & 5 th edition (cont.) Appendix B extended to cover a large scope of deliverables New Appendix C to present examples Examples for different design responsibility scenarios Aim at presenting some particularities in the pro-formas when consultant and contractor have to interact Some variations when the consultant is appointed by the client or by the main contractor 13
14 What? The structure 14
15 Structure of BG6 Alignment with stages of RIBA PoW Broadly in line with ACE Schedule of Services Focus on MEP aspects (not structural or civil eng.) Publication Front-end sections Appendices 15
16 Structure of BG6 Front-end sections Design process on building projects Design coordination of building services Building Information Modelling (BIM) Level of details and information (LOD/LOI) Contractors designed portion (CDP) Process of using BG6 16
17 Structure of BG6 Appendices Appendix A Pro-formas Definitions Illustrations Appendix B Appendix C (new in 5 th edition) 17
18 Structure of BG6 Appendix A Pro-formas One pro-forma for each stage Pro-forma acts as checklist for design activities Segmentation of activities General obligations Client and team liaisons Plant & specialist design MEP designs Commissioning Deliverables 18
19 Structure of BG6 Appendix A Definitions Definitions for the illustrations Concept, Developed, Technical, Installation, Builders work, Manufacturers, As-built Based on outcome to be shown Typical use at the stage 19
20 Structure of BG6 Appendix A Illustrations 3D views from a model Plant room & distribution Layout drawings MEP services Schematic drawings Mechanical and electrical 20
21 Structure of BG6 Appendix B Allocating information production Link with App. A pro-formas to identify deliverables Different classifications available BSRIA system list Uniclass 2015 NRM3 Non-exhaustive list of deliverables illustrations (models, drawings) information (specifications, reports) 21
22 Structure of BG6 Appendix B Matrix of deliverables List of stages List of services List of who is responsible to deliver what and when 22
23 Structure of BG6 Appendix C Examples for different design responsibility scenarios Aim at presenting some activities in the pro-formas when consultant and contractor have to interact Some variations when the consultant is appointed by the client or by the main contractor 23
24 Structure of BG6 Appendix C Example 1 24
25 Structure of BG6 Appendix C Example 1 MEP consultant (lead) 25
26 How? The process 26
27 Process of BG6 Step 1 Complete App. A Step 2 Complete App. B Step 3 Issue App. A & B Step 4 Review & update 27
28 Process of BG6 Step 1 Complete pro-formas in Appendix A 28
29 Process of BG6 Complete the pro-forma for each required stage 29
30 Process of BG6 Identify the party who is going to undertake each design activity and assign a letter to them A B C D E F Client Architect MEP design consultant Main contractor MEP contractor MEP specialists (lift, fire) 30
31 Process of BG6 Allocate responsibility per party Lead/Review/Support but only one lead/activity Stakeholders L R S L L L L L S S S R S S 31
32 Process of BG6 Add comments to clarify the scope Remove activities not relevant to the project L L L S S Consider inputs from utility providers and underground services survey R L S Client to approach local fire brigade for review S L L R S S 32
33 Process of BG6 Insert additional activities at the end of the proforma Include final asset numbers in 3D-model R L S R FM contractor to review Provide list of final assets and associated numbers R L S R FM contractor to review 33
34 Process of BG6 Step 2 Complete associated matrix in Appendix B 34
35 Process of BG6 Decide which classification to use for the services BSRIA Systems List Uniclass 2015 Systems NRM3 Systems 35
36 Process of BG6 Decide which illustrations and other deliverables are required Building information models: 3D model Drawing layouts and schematics Non-graphical information Reports, studies, analyses Data sheets, specification Programmes, plans, schedules 36
37 Process of BG6 Decide which engineering services are included in the project Assign the name of the team member who will be delivering them Add programme dates to produce a task information delivery plan (BIM Level 2) 37
38 Process of BG6 Step 3 Issue the completed pro-formas as part of the contractual requirements Step 4 Review and update Appendix B as deliverables are issued by the project team 38
39 Thank you Martin Ronceray Principal Consultant - Construction Process martin.ronceray@bsria.co.uk 39
Government Soft Landings (GSL) An Overview 29 th October 2013
Government Soft Landings (GSL) An Overview 29 th October 2013 1 WWW.BENTLEY.COM Customers not getting the assets & outcomes they need / want? Dropping the baton at key stages 2 WWW.BENTLEY.COM Have greater
More informationMEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology
SBS5411 Building Information Modelling for BSE http://ibse.hk/sbs5411/ MEP Coordination Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2018 Contents Introduction Clash
More informationBuilding Information Modelling HMG Strategic Overview. Mark Bew
Building Information Modelling HMG Strategic Overview Mark Bew Chairman HMG BIM Working Group Chairman BuildingSMART UK Director ECS Ltd 1 WWW.BENTLEY.COM Introduction HMG BIM Strategy Where are we? Progress
More informationTHE DESIGN PROCESS. for an interior design project
THE DESIGN PROCESS for an interior design project STAGE 1 Preliminary meeting The client brief The business proposal and client s agreement to proposal THE DESIGN PROCESS for an interior design project
More informationAddendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers
Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building
More informationReview of Technology Level 3 achievement and Level 3 and 4 unit standards. Graphics Design Graphic Communication
Page 1 of 18 Fields Engineering and and Sciences Review of Level 3 achievement and Level 3 and 4 unit standards Unit standards Field Subfield Domain ID Engineering and Design Design Computer 19355 Graphics
More informationEstates Development & Projects
Estates Development & Projects Production Guidelines for the Building Fabric Manual (incorporating Health & Safety File) Guidance for the Technical Author REVISION 10.2 Issue Date 09/2017 Contents Part
More informationWhite paper The Quality of Design Documents in Denmark
White paper The Quality of Design Documents in Denmark Vers. 2 May 2018 MT Højgaard A/S Knud Højgaards Vej 7 2860 Søborg Denmark +45 7012 2400 mth.com Reg. no. 12562233 Page 2/13 The Quality of Design
More informationUsing BIM to follow up milestones in a project plan during the design phase
Building Information Modelling (BIM) in Design, Construction and Operations 97 Using BIM to follow up milestones in a project plan during the design phase Ø. Mejlænder-Larsen Norwegian University of Science
More informationBIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos
BIM Introduction Building Information Management Definitions, Applications and general information Betty Bezos betty@bezos.com 9/1/2017 1 9/1/2017 2 Innovations in BIM 3D Design: 3D visualizations allow
More informationStandard of Knowledge, Skill and Competence for Practice as an Architectural Technologist
Standard of Knowledge, Skill and Competence for Practice as an Architectural Technologist RIAI 2010 Contents Foreword 2 Background 3 Development of the Standard.4 Use of the Standard..5 Reading and interpreting
More informationCompetency Standard for Registration as a Professional Engineer
ENGINEERING COUNCIL OF SOUTH AFRICA Standards and Procedures System Competency Standard for Registration as a Professional Engineer Status: Approved by Council Document : R-02-PE Rev-1.3 24 November 2012
More informationAutodesk Navisworks: Using Autodesk Navisworks in a BIM Workflow
Autodesk Navisworks: Using Autodesk Navisworks in a BIM Workflow Course Length: 2 days The Autodesk Navisworks Using Autodesk Navisworks in a BIM Workflow learning guide teaches you how to better predict
More informationBIM4Water case study template
BIM4Water case study template Section 1: Project Details Project name Minworth Thermal Hydrolysis Plant (THP) Client Project Scope and Outcomes What are the project timescales? Minworth is Severn Trent
More informationBIM-MEP AUS ROAD MAP Parliamentary Launch
BIM-MEP AUS ROAD MAP 2012 Parliamentary Launch CONTENTS 1 DRIVING PRODUCTIVITY IMPROVEMENTS IN THE BUILDING AND CONSTRUCTION INDUSTRY 2 DRIVING INDUSTRY CHANGE 3 PROACTIVE INDUSTRY LEADERSHIP AND ACTION
More informationCHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT
Approval Amendment Record Approval Date Version Description 30/05/2014 1 Initial issue under MTM. This procedure supersedes the Overlapping Design Agreement, Application and Transfer Log documents L2-SIG-PRO-007,
More informationWelcome / COBie Help Desk Mechanics COBie Fact or Fiction! Life-Cycle information exchange COBie Calculator
0900-0901 Welcome / COBie Help Desk Mechanics 0901-0910 COBie Fact or Fiction! 0910-0920 Life-Cycle information exchange 0920-0935 COBie Calculator (Penn State) 0935-0950 Case Study 1 (Tokmo/EcoDomus)
More informationMP BIM at the Heart of the MEP Subcontractor Business
MP4229 - BIM at the Heart of the MEP Subcontractor Business Damien Legrand Sophie Montenot BIM Business Development Executive MEP BIM Manager 1 Class Summary Dive into the heart of an MEP subcontractor
More informationLevel 1 before Level 2 - an Irish BIM mandate
Level 1 before Level 2 - an Irish BIM mandate Robert Moore, Msc (Hons) Construction Informatics RICS Certified BIM Manager Client BIM/Information Manager Grangegorman Development Agency Agenda GCCC position
More informationThis specification describes the general requirements for Engineering Services provided to Vale.
1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred
More informationOur Corporate Responsibility pages 2016
UNITED UTILITIES Our Corporate Responsibility pages 2016 Assurance statement and commentary AUGUST 2016 Our Corporate Responsibility pages 2016: Assurance statement and commentary Assurance statement United
More informationRecent Advances in BIM in Geotechnics
Recent Advances in BIM in Geotechnics Jim De Waele Managing Director Keller Limited Ryton-on-Dunsmore, Coventry United Kingdom ABSTRACT The use of Building Information Modelling (BIM) is becoming more
More informationA. BACKGROUND B. GENERAL TERMS OF REFERENCE
Page 1 of 7 A. BACKGROUND National Oil Corporation of Kenya (NOC) is a company wholly owned by the Government of Kenya which is charged with the mandate to participate in all aspects of petroleum business
More informationTuning-CALOHEE Assessment Frameworks for the Subject Area of CIVIL ENGINEERING The Tuning-CALOHEE Assessment Frameworks for Civil Engineering offers
Tuning-CALOHEE Assessment Frameworks for the Subject Area of CIVIL ENGINEERING The Tuning-CALOHEE Assessment Frameworks for Civil Engineering offers an important and novel tool for understanding, defining
More informationlearning progression diagrams
Technological literacy: implications for Teaching and learning learning progression diagrams The connections in these Learning Progression Diagrams show how learning progresses between the indicators within
More informationSTRABAG ZÜBLIN 5D Initiative, BIM, 5D Design Konstantinos Kessoudis
www.zueblin.de 5D @ STRABAG ZÜBLIN 5D Initiative, BIM, 5D Design Konstantinos Kessoudis STRABAG SE GROUP Building Construction and Civil Engineering Transportation infrastructures Special Divisions & Concessions
More informationBIM FOR INFRASTRUCTURE THE IMPACT OF TODAY S TECHNOLOGY ON BIM
BIM for Infrastructure The Impact of Today s Technology on BIM 1 BIM FOR INFRASTRUCTURE THE IMPACT OF TODAY S TECHNOLOGY ON BIM How Technology can Transform Business Processes and Deliver Innovation 8
More informationUNIT-III LIFE-CYCLE PHASES
INTRODUCTION: UNIT-III LIFE-CYCLE PHASES - If there is a well defined separation between research and development activities and production activities then the software is said to be in successful development
More informationMANuFACturers industry QuALity statement.
MANuFACturers industry QuALity statement Precast New Zealand Inc. (PCNZ) was established in 1999 and is a national industry association of precast concrete manufacturers representing over 90% of the off
More informationTECHNOLOGY QUALIFICATION MANAGEMENT
OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property
More informationUtilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes
Utilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes Allbban H. Khalid Southern Polytechnic State University, 1100 South Marietta Parkway, Marietta GA 30067
More informationDEVELOPMENT EVALUATION CAPABILITIES
ABOUT US MOURJAN MARINAS IGY is a leading luxury marina and yachting lifestyle development and operations company. Through our relationship with Island Global Yachting IGY we offer a distinguished international
More informationExhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule
Exhibit A Project Identification Exhibit B Project Charter / Project Intent Exhibit C Project Scope Exhibit C Project Schedule Exhibit D Project Budget Exhibit E Owner Supplied Documents Exhibit F Sample
More informationBIM Won t Work as a Deliverable, Will It? Dace A. Campbell, AIA, LEED AP (Moderator)
BIM Won t Work as a Deliverable, Spring BIMForum San Diego, CA Hilton San Diego Bayfront April 29-30, 2015 Will It? Dace A. Campbell, AIA, LEED AP (Moderator) @DaceCampbell Learning Objectives 1. Gain
More informationDFI Europe Chapter Digitalisation Working Group
DFI Europe Chapter Digitalisation Working Group Jason Boddy, Arup jason.boddy@arup.com Definitions Digitalisation - Creating and using digital geotechnical data to make better use of digital technology
More informationBIM Design Services/ Introduction. T: E:
Introduction At Godfrey Syrett, Revit is now our default software, we have embraced its capabilities to enhance our design process and add value to it by utilising all its benefits. It is the integration
More informationUser Experience Specialist
User Experience Specialist Location London Department Supporter and Community Partnerships Reports to (Job Title) Digital Supporter Engagement Lead (tbc) Salary Band D Matrix manager (if applicable) Role
More informationUK Film Council Strategic Development Invitation to Tender. The Cultural Contribution of Film: Phase 2
UK Film Council Strategic Development Invitation to Tender The Cultural Contribution of Film: Phase 2 1. Summary This is an Invitation to Tender from the UK Film Council to produce a report on the cultural
More informationGuidance on TRL for renewable energy technologies
Guidance on TRL for renewable energy technologies Guidance on TRL for renewable energy technologies - Ref: PP-03583-2015 Webinar for C-energy2020 project 16/11/2018 The presentation today Topic Discussion
More informationPRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS
PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 Scope This Practice Note is intended to identify responsibilities and contractual arrangements for precast elements used in buildings. Such
More informationBrad Luke. Director Peddle Thorp Auckland
Brad Luke Director Peddle Thorp Auckland Site Observation and Practical Completion Preparation PEDDLE THORP Introduction Architects Agreement for Services. Observation Work Plans. Auckland Council Quality
More informationOVERCOMING BARRIERS THAT HINDERS THE ADOPTION AND IMPLEMENTATION OF BUILDING INFORMATION MODELLING IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY
OVERCOMING BARRIERS THAT HINDERS THE ADOPTION AND IMPLEMENTATION OF BUILDING INFORMATION MODELLING IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY George Kekana 1, Clinton Aigbavboa 2 and Wellington Thwala
More informationFind out more about Confluence and The Big Map here:
ARTIST BRIEF: Contemporary Art Installation for Haverfordwest Budget: 80,000 Project Duration: 1 January 2017 31 October 2017 Context Confluence are inviting applications from artists/designers /architects
More informationCertificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.
INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationBIM: The UK Government Value Proposition
BIM: The UK Government Value Proposition David Philp Head of BIM Implementation Cabinet Office, UK Government UK Government Strategy Task Group Arrival of BIM in the UK: An industry awoken We need To talk
More informationFIT-OUT PERMIT REQUEST (GENERAL WORKS)
Dubai Maritime City P.O. Box 8988 Dubai, UAE T +97143450626 F +97143450116 www.dubaimaritimecity.com FIT-OUT PERMIT REQUEST (GENERAL WORKS) PROJECT DETAILS Project Name: Plot Number: TENANT DETAILS Contact
More informationIt all starts here. Format fermé : 9" x 12" Format ouvert : 18 x 12 Marges : 0,125" Couleurs : CMYK
It all starts here 4521, rue clark, montréal (québec) H2T 2T3 t. 514.286.9696 f. 514.284.9152 espressocommunication.com Date : 3 septembre 2010 Client : Ultragen Projet : ULT1001_Brochure EN Numéro d épreuve:
More informationWe look closer. LONDON FRANKFURT MEXICO CITY NEW YORK CLAIMS OFFERS CONTRACT MANAGEMENT TECHNICAL EXPERTS CONTROVERSIES TRAINING
LONDON FRANKFURT MEXICO CITY NEW YORK CLAIMS OFFERS CONTRACT MANAGEMENT TECHNICAL EXPERTS CONTROVERSIES TRAINING We look closer. Contract Administration Associates TIME. BUDGET. QUALITY. FOR THESE REASONS
More informationMINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY
MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY KENYA MARINE FISHERIES AND SOCIO-ECONOMIC DEVELOPMENT PROJECT (KEMFSED) TERMS OF REFERENCE For an Individual
More informationSPICE: IS A CAPABILITY MATURITY MODEL APPLICABLE IN THE CONSTRUCTION INDUSTRY? Spice: A mature model
SPICE: IS A CAPABILITY MATURITY MODEL APPLICABLE IN THE CONSTRUCTION INDUSTRY? Spice: A mature model M. SARSHAR, M. FINNEMORE, R.HAIGH, J.GOULDING Department of Surveying, University of Salford, Salford,
More informationOUR CLIENT BASE. Canada Norway. UAE Singapore. Germany. Netherlands USA. Hawaii. Australia. Qatar Oman. Belgium. New Zealand.
WHOWE ARE We help construction companies, general contractors, architects & engineers, integrate BIM into their projects seamlessly within their predefined timelines and budget, bridging the gap between
More informationUK Government Building A New World
CONSTRUCTION 4.0 CONFERENCE CONSTRUCTION DIGITALIZATION CHALLENGE AND CIVIL ENGINEERING IN THE CONTEXT OF INDUSTRY 4.0 UK Government Building A New World Digital Built Britain Sector Digitalisation March
More informationTERMS OF REFERENCE FOR CONSULTANTS
Strengthening Systems for Promoting Science, Technology, and Innovation (KSTA MON 51123) TERMS OF REFERENCE FOR CONSULTANTS 1. The Asian Development Bank (ADB) will engage 77 person-months of consulting
More informationCR BIM at the Heart of the MEP Subcontractor Business
CR4224 - BIM at the Heart of the MEP Subcontractor Business Damien Legrand BIM Solutions Centre Sophie Montenot BYME Engineering Hub (Singapore) Class Description Dive into the heart of an MEP subcontractor
More informationBIM EXECUTION PLAN IN CZECH REPUBLIC
Abstract BIM EXECUTION PLAN IN CZECH REPUBLIC Otmar Hrdina* 1, Petr Matějka 2 1 Faculty of Civil Engineering, Czech Technical University in Prague, Thakurova 7/2077 166 29 Prague 6 - Dejvice, Czech Republic,
More informationArrangements for: National Progression Award in Food Manufacture (SCQF level 6) Group Award Code: GF4N 46. Validation date: July 2012
Arrangements for: National Progression Award in Manufacture (SCQF level 6) Group Award Code: GF4N 46 Validation date: July 2012 Date of original publication: Version: 03 Acknowledgement SQA acknowledges
More informationBIM/VDC on TAA Projects:
2018 Logan International Airport BIM/VDC on TAA Projects: Direct Tenant TAA Projects Third Party Development Properties Massachusetts Port Authority Capital Programs & Environmental Affairs Preface Massport
More informationAGENDA: BIM Introduction. Large-Scale Value. Value for Architects. Conceptual BIM / Small BIM. All-Out BIM. BIM Introduction
From Conceptual BIM to All-Out BIM Brent Mauti, Architect BARCH, OAA, MAA, SAA, AAA, MRAIC, NCARB, AIA, LEED-AP CH2M HILL CANADA ARCHITECTS INC. brent.mauti@ch2m.com Member of the Manitoba Association
More informationNational BIM Standard - United States Version 3
National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation
More informationFall 2014 SEI Research Review Aligning Acquisition Strategy and Software Architecture
Fall 2014 SEI Research Review Aligning Acquisition Strategy and Software Architecture Software Engineering Institute Carnegie Mellon University Pittsburgh, PA 15213 Brownsword, Place, Albert, Carney October
More informationUsing Foresight and Scenarios for Anticipation of Skill Needs
Using Foresight and Scenarios for Anticipation of Skill Needs Martin Bakule National Training Fund National Observatory for Employment and Training Methods in Skills Needs Anticipation: A Guide on Foresights,
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 5 GEOTECHNICAL SUBMISSION GUIDELINES Geotechnical Bulletin GB5 was developed
More informationAfrican Development Bank Group
African Development Bank Group African Development Bank's Field Office in Abuja, Nigeria LOT4: VOL2-1 - SPECIFICATIONS FOR THE INSTALLATION OF ELEVATOR WORKS: PRELIMINARIES Prepared by Interstate Architects
More informationMIL-STD-882E: Implementation Challenges. Jeff Walker, Booz Allen Hamilton NDIA Systems Engineering Conference Arlington, VA
16267 - MIL-STD-882E: Implementation Challenges Jeff Walker, Booz Allen Hamilton NDIA Systems Engineering Conference Arlington, VA October 30, 2013 Agenda Introduction MIL-STD-882 Background Implementation
More informationHigher National Unit specification: general information
Higher National Unit specification: general information Unit code: H17R 35 Superclass: CB Publication date: March 2012 Source: Scottish Qualifications Authority Version: 01 Unit purpose This Unit is designed
More information-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION AUGUST
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4670968 -Unit title- -Superclass category- -Date of publication- (month and year) -Originating
More informationConstructing our future. Product Improvement and Innovation Strategy
Constructing our future Product Improvement and Innovation Strategy 2018-2020 Context Construction is historically inefficient. We rarely build the same thing twice, instead reinventing the wheel time
More informationDrawing Management Standard
Record Number: R0000393979 Version Number: 1.0 Date: December 2015 Authorisations Action Name and title Date Prepared by TasNetworks 23/12/2015 Reviewed by David King With input from Rick Stevens, Jeshua
More information3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources
3D DESIGN IN ALTERNATIVE DELIVERY Innovation, Savings, and Supplementing TxDOT Resources Brief History 2 Conveying the Design Old Way Reviewing Changes Schematic Intent Design Change 3 4 Conveying the
More informationFINAL proposal for Scope, Business Plan and initial Work Programme
. FINAL proposal for Scope, Business Plan and initial Work Programme CEN/TC XXX Building Information Modelling (BIM) CEN/TC XXX Business Plan Date:2014-12-10 Version: Final proposal Page: 1 Proposal developed
More informationBIM & Emerging Technologies. Disrupting Design process & Construction
BIM & Emerging Technologies Disrupting Design process & Construction Introduction Introduction - BIM Disrupting the Construction Introduction Design Major disruption already in various parts of the World
More informationInstitutional Contract
Florence, 2 Dec 2014 UNICEF Office of Research Innocenti Institutional Contract Producing digital multi-media (video, photo and text) documentation of innovative cash transfer social protection programmes
More informationBIM Diffusion Policies at Country Level:
BIM Diffusion Policies at Country Level: De-risking and Guiding Policy Development Mohamad Kassem, PhD Associate Professor, Teesside University m.kassem@tees.ac.uk Novotel Amsterdam City, Amsterdam, The
More informationAbout Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP
BIM Case Study About Hensel Phelps - Thai Nguyen About the project Rob Muellner BIM on the project Rob Muellner 3D Lift Drawing Production Rob Muellner MEP Coordination Rob Muellner MEP Fabrication Chad
More informationCONSULTANT PROCEDURE MANUAL FOR DESIGN CONSULTANCY SERVICES. Version 2.0
CONSULTANT PROCEDURE MANUAL FOR Version 2.0 November 2014 Consultant Procedure Manual for Design Consultancy Services Version 2.0 November 2014 Abu Dhabi City Municipality PO Box 263 Abu Dhabi, United
More informationAPPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue J Nov 17. Appendix C
APPENDIX C APPROVAL PROCESS SUBMISSION FORMS STEP 2A CONCEPT DESIGN SUBMISSION To: Edward Utteridge From: Bristol BS1 6AL Retailer: c.c. Piers Gorman piers.gorman@landsecurities.com Jonathan Everitt jeveritt@oriumdesign.co.uk
More informationSECTION PROJECT COORDINATION VIA BIM
SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationIntegrating Design using BIM and IFC
Integrating Design using BIM and IFC Thomas Liebich AEC3, Munich, Germany tl@aec3.de www.aec3.com Company overview Founded 1997 7 employees established in 2 countries Main activities information modeling
More informationIFE/HR/E-2017/002. Human factors in the design of control rooms for ESS
IFE/HR/E-2017/002 Human factors in the design of control rooms for ESS Report number ISSN Revision number Date IFE/HR/E-2017/002 0333-2039 2017-05-11 Client/ Client reference: ISBN Number of issues Number
More informationUNIT Fundamental Electronics (SCQF level 6)
National Unit Specification: general information CODE F5DB 12 SUMMARY This Unit introduces candidates to the principal devices used in electronics and to the principles of their operation, function and
More informationCompetency Report to Support Application for ACIBSE David Hawkins
Competency Report to Support Application for ACIBSE David Hawkins Introduction In 20011 started my engineering career by joining the Royal Navy as an engineering apprentice. During my engineering apprenticeship
More informationNZQA unit standard version 3 Page 1 of 5. Install and maintain telecommunications radio frequency systems
Page 1 of 5 Title Install and maintain telecommunications radio frequency systems Level 4 Credits 25 Purpose This unit standard covers installation and maintenance of telecommunications radio frequency
More informationopenbim/cobie field Trials
Digital Engineering COBie Feedback from Phase 2 Trial November 2013 openbim/cobie field Trials Introduction A bit about LOR A bit about IFC and our Information Challenges A bit about the trial Thoughts
More informationLevel 1 Before Level 2 The Irish BIM Mandate
Dublin Institute of Technology ARROW@DIT Conference papers School of Multidisciplinary Technologies 2017-11-23 Level 1 Before Level 2 The Irish BIM Mandate Robert Moore Grangegorman Development Agency,
More informationCCG Improvement and Assessment Framework 2016/17. Briefing Document
CCG Improvement and Assessment Framework 2016/17 Briefing Document 4 th April 2016 Executive Summary NHS England has launched a new Improvement and Assessment Framework for Clinical Commissioning Groups
More informationStanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines
SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents
More informationFunding excellence in innovation. Eurostars Application Assessment Guidelines. Version 2.0 March 2012
The Eurostars TM Programme Funding excellence in innovation Eurostars Application Assessment Guidelines March 2012 The Eurostars Programme is a joint initiative of EUREKA and the European Community This
More informationThe PRESCO Guidelines for Sustainable Buildings Ir. J. Desmyter, Ir. Arch. Katrien Putzeys and Ir. W. Adams Belgian Building Research Institute
The PRESCO Guidelines for Sustainable Buildings Ir. J. Desmyter, Ir. Arch. Katrien Putzeys and Ir. W. Adams Belgian Building Research Institute Abstract PRESCO, the European Thematic Network on Practical
More informationSteven M. Hunt BIM/CAD Manager - Dee Cramer, Inc. in Holly, Michigan. Estimating Manager Dee Cramer, Inc. 24 Years of Experience in Sheet Metal
ADVANCED BIM PART II Communication and Meetings Presenter: Steve Hunt Dee Cramer, Inc. Presenter BIO Steven M. Hunt BIM/CAD Manager - Dee Cramer, Inc. in Holly, Michigan. Estimating Manager Dee Cramer,
More informationTurning the wheels of your success
INDUSTRIAL SERVICES Turning the wheels of your success A comprehensive package of integrated services combining traditional certification and inspection with innovative business solutions based on the
More informationBrussels 18/12/2018. Level(s) pilot project Experience Center in Slovenia Vincent Briard, Sustainability and Product Regulatory Affairs Director
Brussels 18/12/2018 Level(s) pilot project Experience Center in Slovenia Vincent Briard, Sustainability and Product Regulatory Affairs Director Knauf Insulation supports Level(s) Part of Knauf Insulation
More informationBritish Club Renovation, Bangkok, Thailand Proposal for Full Scope Architectural & Engineering Services Submission Date:
INTERNATIONAL ARCHITECTS MASTERPLANNERS DESIGNERS British Club Renovation, Bangkok, Thailand Proposal for Full Scope Architectural & Engineering Services Submission Date: 21.07.2016 Att: Ali Adam Chapman
More informationSummary Report BIM Knowledge Sharing Event MAY 2016
Summary Report BIM Knowledge Sharing Event MAY 2016 Executive Summary The following document provides an overview of the BIM Knowledge Sharing Event hosted by Scottish Futures Trust and held on the 3rd
More informationTechnology qualification management and verification
SERVICE SPECIFICATION DNVGL-SE-0160 Edition December 2015 Technology qualification management and verification The electronic pdf version of this document found through http://www.dnvgl.com is the officially
More informationNZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture
Page 1 of 6 Title Demonstrate knowledge of structural precast concrete element manufacture Level 3 Credits 25 Purpose People credited with this unit standard are able to demonstrate knowledge of: preparation,
More informationDIGITAL CONSTRUCTION IN SAINT-GOBAIN
DIGITAL CONSTRUCTION IN SAINT-GOBAIN WHO IS NICOLAJ HVID? DIGITAL CONSTRUCTION DIRECTOR IN SG NORDIC & BALTIC SINCE AUGUST 2015 ARCHITECT & DESIGNER SINCE 1990, 56 YEARS FIRST BIM USER IN DENMARK PREVIOUSLY
More informationACCREDITATION. This is a translation of the official Italian version; In case of conflicts Italian version prevails.
Via P.A. Saccardo,9 I-20134 MILANO Tel.: + 39 022100961 Fax: + 39 0221009637 Sito Internet: www.sincert.it E-mail: sincert@sincert.it C.F./P.IVA 10540660155 Title GENERAL CRITERIA FOR SINCERT ASSESSMENT
More informationGuidelines for the avoidance of vibration induced fatigue failure in process pipework
ERRATA for Guidelines for the avoidance of vibration induced fatigue failure in process pipework Errata 1: Pg 61: Feed in from Flowchart T2-5 should be Errata 2: Pg 68: The peak force calculation in Flowchart
More informationSpecification For. Asset Information Pr8701
Specification For Asset Pr8701 Written Direction Control Document Sponsor Document Owner Subject Matter Expert References Infrastructure Technical Standards Committee Manager, Capital Delivery, SIS Network
More information