Jabiru Aircraft. Fit Ailerons
|
|
- Elijah Paul
- 5 years ago
- Views:
Transcription
1 Fit Ailerons Reference: Drawings and 20210K1 Photos Parts Required: Wing LS N Wing RS Aileron LS N Aileron RS Aileron reinforcement Left N Aileron Reinforcement Right Aileron Reinforcement Centre (4) Hinge Leaf 3/16 A1 (6) N Aileron Attachment Plate Reo (2) PH0409N 2-Lug Anchor Nut (6) TAPK 3-3 Rivet (12) TAPK 6-6 Rivet (48) Material Required: LC3600 LC3600 AF303 Resin Hardener Fibber Flock Glass Cloth Procedure: 1. Ensure peel cloth has been removed from Aileron attachment area. Fit Aileron Attachment plate into joggle recess. Drill & screw a self tapping screw into each end of the plate. Fit Aileron attachment plate into joggle 2. Trim fiberglass plate to fit around the flap & sit flush in the joggle. Fit Ailerons to wing Page 1 2/16/04
2 3. Attached glass plate to a large piece of plywood or chipboard with some 5 min araldite. You will need to put a layer of packaging tape onto Peel Cloth removed from aileron attachment area on Wing the glass plate so the 5 min araldite does not stick to it. Ensure you have the plate flat against the board as this is how the finished product will turn out like. 4. Place board onto wing & check that the plate is sitting the recess. You should see a 2-3mm gap (1/8 ) This is filled with epoxy & flock. 5. Measure in 38mm from each end of the Aileron & mark. From the opposite end to the Aileron Horn measure in 810mm & mark. This will be the hinge position. See Aileron Drawing below. 6. Position Hinges onto the top of the Aileron & mark each end of the hinge on the aileron. 7. Position Aileron onto wing & transfer marks onto Aileron pre-mould plate. On each wing you will need a left (for the Left wing) or right (for the ring wing) Two x Centers Fit Aileron to Wing Page 2 2/16/04
3 8. Insert Aileron Reo s into channel. To determine which reinforcement goes where, there should be four reo s that have curled ends (this is call Centre ) & 2 that have a curled end at one end only ( Left & Right ). The straight edge buts up against the wing tip end. 9. Sand Reo s to shape to ensure it sits against the glass plate. On each wing you will need a left (for the Left wing) or right (for the ring wing) Two x Centers Position Aileron reinforcement into marked position. Aileron Reo s in Right hand wing positioned where Aileron hinges locate. Fit Aileron to Wing Page 3 2/16/04
4 Position the hinges as per Drawing 20270K2 and drill the rivet holes Fit Aileron to Wing Page 4 2/16/04
5 10. Mix Epoxy Resin & divide into two portions. 11. Wet all bonding surfaces with Epoxy resin. 12. Apply Flock to Aileron Pre-mould joggle Joint, this will require about 2mm (1/8 ) of flock to fill the void. 13. Position Aileron Pre mould Plate onto wing into joggle. Let the Flock squash out, then scrape of the excess. Smooth flock with you epoxy resin brush. 14. Apply Flock to Aileron reinforcement plates & insert into channel in correct positions. 15. Lay 2 x (AF303) 220 x 160 AF303 over each hinge reinforcement over each reinforcement, making sure the cloth has been evenly spaced over reo. 16. Lay 1 x (AF303) 1250 x 160 over the full length of the channel. Let glass hang over edge, as this will be trimmed when cured. Fit Aileron to Wing Page 5 2/16/04
6 17. Remove peel cloth from hinge Reo (reinforcement) and flap attachment areas. Rivet the hinge leaves in place, prior to curing. Turn the wind upside down 18. AF303 glass cloth being applied to Aileron pre-mould strip. 19. Allow to cure. 20. Fit Aileron to pre-mould strip, line the edge of the aileron with the wing tip & the trailing edge of the flap to form a straight line. Note: The aileron will have to sit above the pre-mould strip & might need sanding at each end for this to fit between the wing tip & Flap. 21. Mark the edge of the aileron onto the pre-mould strip to form a cutting line. 22. Using a jigsaw of hand hacksaw, cut along marked line. Sand with a straight sanding block. 23. Position the aileron hinges to Aileron only and mark the rivet holes. Note: This is best done by positioning the hinge on top of the surface & allowing the thickness of the hinge pin between aileron & the Aileron pre mould plate. (The hinge leaf where the pin goes through will need to be lifted half way over the skin). 24. Mark all holes using the hinge as your template & only drill the two outer holes for the rivet to 5/ Attach the hinge leaf to the aileron using M4 x 12 machined screws. Fit Aileron to Wing Page 6 2/16/04
7 26. Centrally Position Aileron onto wing & line the edge of the aileron with the wing tip & the trailing edge of the flap to form a straight line. Allow a hinge pin thickness between the aileron & the pre-mould strip. 27. Repeat procedure #24 & #25. Note: If the aileron is not flush with the wing skin, you may need to cut a thin shim to put between the hinge & the skin of the aileron or wing. 28. Check for full deflection using the Aileron Template. 29. Remove screws from wing & aileron & drill rivets holes to 3/16. Countersink holes enough so the rivet head sits below the Drilling Jig for Retained nuts Fit Aileron to Wing Page 7 2/16/04
8 surfacof the skin. 30. Screw MS screw into a lug anchor nut from top to make a drilling jig. Refer to Photos. 31. Drill the holes for the anchor lug nut. 32. Sand back all bonding surfaces of Aluminum hinge & pre-mould strip. Clean with acetone. 33. Bond the hinges with Epoxy/flock & rivet into place with TAPK 6-6 or 6-4 countersunk rivets. Rivet the hinge on the aileron first & then rivet hinge leaf to Aileron pre-mould strip with aileron still attached. This way your will be assured that the alignment will be correct. 34. Remove aileron from wing after finish riveting & clean excess flock off with a small about of Acetone. 35. Rivet the 2-lug anchor nut for the hinge pin retainer into place. 36. Allow to cure, then assemble aileron to check movement. Fit Aileron to Wing Page 8 2/16/04
12. Wings, Flaps, Ailerons and Struts
12. Wings, Flaps, Ailerons and Struts Fit Aileron Hinges Reference: Drawing 20270K2 Photo 12.1 Parts Required: 2007092 Aileron LS 200809N Aileron RS 2001394 Hinge 3/16 A1 (4) 2001694 Hinge Pin (4) PH0059N
More informationPre-Paint>Wings>Fit ailerons. Objectives of this task: Materials and equipment required: Size the ailerons and pre-mould strips
Pre-Paint>Wings>Fit ailerons Objectives of this task: In this task the ailerons and the pre-mould strips will be sized and trimmed, then flocked onto the wings and glassed in place, and the next day the
More informationPre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator
Pre-Paint>Fuselage>Empennage>Fit elevator Objectives of this task: To fit the elevator to the horizontal stabiliser, to fit the trim tabs to the elevator and the end caps to the elevator and the horizontal
More information10. Wing prep and subassembly
Date Section Objective: Construct and fabricate the sub-assemblies of the wing panel. Required Parts: Wing left 11gal PN104-300, Wing right 1gal PN104-400, Wing left 15 gal option PN104-322, Wing right
More informationGlass Cloth (supplied pre cut) Fibre Flock
Fitting Horizontal stabiliser:- Reference: Parts required: Drawing Photos Upper & Lower Fuselage Assy Horizontal Stabiliser Material required; LC 3600 LC 3600 AF 244 Resin Hardener Glass Cloth (supplied
More informationWING ASSEMBLY 23.5 (Continued)
A VERY IMPORTANT NOTE found on many wing drawings states Do not drill any unspecified holes into spar. This is extremely important as any extra holes may, under extreme conditions, WEAKEN THE SPAR. Note;
More information7. Ailerons. Overview.
7. Ailerons Overview. The ailerons are made in much the same way as the rudder. The only difference being that the ends are not rounded but have close-out ribs instead and the aileron cores are supplied
More information11) Chromate the mating surfaces of the Leading edge Root Rib, Doubler and Root Rib Stiffeners. Rivet together with 1/8 rivets (RV-1410).
11) Chromate the mating surfaces of the Leading edge Root Rib, Doubler and Root Rib Stiffeners. Rivet together with 1/8 rivets (RV-1410). 12) Chromate the Root Rib Attach Bracket and rivet to the Root
More informationPITTS S2S CONSTRUCTION
PITTS S2S CONSTRUCTION FUSELAGE CONSTRUCTION 1) Place the right fuselage side over the plan and mark the former positions. Place the left side over the right side and mark the former positions. Glue F1
More informationAfter the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue
Written by: Sean Cole September 19, 2008 When fitting the stiffener use 3/32 clecos to hold it in place, it makes a smaller hole and is easier to work with. Only use the amount needed to hold the stiffener
More informationHORIZONTAL STABILIZER AND ELEVATOR
HORIZONTAL STABILIZER AND ELEVATOR CONSTRUCTION OF THE HORIZONTALSTABILIZER Inspect the pre-molded top and bottom horizontal tail skins. Note that each skin consists of a horizontal stabilizer skin and
More informationSZD-10 bis CZAPLA ASSEMBLY MANUAL IN PICTURES
1 RUDDER Plan and parts: 2 Assembly steps: Photo above: glue together rudder spar, ribs and trailing edge. Clamp spar to a flat surface (chipboard on the photo) and make sure the straight aligment of the
More informationSPUNKY ASSEMBLY MANUAL
SPUNKY ASSEMBLY MANUAL Please read the tips section at the back of this manual regarding the use of laser cut parts. The proper removal and preparation of these parts is important. When laser cut, some
More informationStream NXT - assembly instructions
Stream NXT - assembly instructions Recommended settings CG (measured from root leading edge): Speed/launch camber (+down, near the wing root): Cruise camber (+down, near the wing root): Thermal camber
More informationPiper Cherokee /3 scale. Construction Manual
Piper Cherokee 140 1/3 scale Construction Manual STAB CONSTRUCTION 1. Remove foam cores from cradle and place on flat surface. Inspect pieces before you epoxy halves together making sure leading and trailing
More information4. Instrument Panel Support
Instrument Panel installation for serial numbers 52 to current Section Objective: Installation of the instrument panel pod. Installation of all the accessories including; vents gas strut supports, engine
More informationChapter 2. Section 3- Ailerons
Chapter 2 Section 3- Ailerons Material: Hangar 9 servo arms - 8 4-40 x ¼ button head screws - 16 Dubro ¼ scale hinges - 2 pckgs The ailerons are built using 3/32 x 4 x48 balsa sheet. Cut the sheets to
More information2.1 Parts List Tool requirement Before you start assembling the Stabiliser Front Spar Center Doublers...
Stabilizer Assembly 2.0 Exploded View...Error! Bookmark not defined. 2.1 Parts List...3 2.2 Tool requirement...5 2.3 Before you start assembling the Stabiliser...6 2.4 Front Spar...6 2.5 Center Doublers...7
More information35. Fitting doors. Overview
35. Fitting doors Overview In this chapter you will be trimming your doors to fit the openings in the fuselage top, attaching hinges, rubber seal and door latches, bonding the perspex side and front screens
More informationRESolution V2 Manual
RESolution V2 Manual Note for the German Manual: Yellow Bottle thick CA Pink Bottle Med CA Blue tube 5 minute Epoxy Green tube 90 Minute Epoxy Construction of the Fuselage Step 1: Cover the plan with a
More informationTANDY WALKER'S A 2nd CLASS BOMBER 10 to 20. FW:10 Class A Bomber LG. FW:11 Class A Bomber Pylon Primary Sructure
TANDY WALKER'S A 2nd CLASS BOMBER 10 to 20 FW:10 Class A Bomber LG I finished up the landing gear (LG) this morning and shot a couple of pictures for you to see. The first picture shows the LG with 3/32"
More informationFLITZEBOGEN-2 Assembly instructions
FLITZEBOGEN-2 Assembly instructions Trim the end of the fuselage to the length of 925mm from the nose. Be careful to avoid splitting the carbon fibers. Sand the base of the stab mount in preparation for
More informationMaking your Rudder Cassette
Making your Rudder Cassette A list of the stuff you ll need The row of materials below is laid out in the order of application. The foam blank shown on the right is available from Bob at www.flyingfoam.com
More informationCitabria Pro. Aerobatic Parkflyer. by Joel Dirnberger
Citabria Pro Aerobatic Parkflyer by Joel Dirnberger Revision C: December 21, 2004 Citabria Pro Building Instructions Length: Wingspan: Wing Area: Flying Weight: Wing Loading: Functions: Specifications:
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationNanton Grain Mill Assembly
( 1 ) Nanton Grain Mill Assembly Locate package for assembling storage building. These are cut from 1/8 masonite. Inspect and lightly sand edges where it will be bonded. Use white glue or CA glue to bond.
More information9T Updated January 2012
9T Updated January 2012 9T. Fitting ail erons & flaps to wing - trigear Mass bala nce horn slots Before you can install the aileron to the wing, slots in the wing s bottom skin are required. Closing these
More informationSeries 9000 Panel Door; In-Line, Corner and Permanent Wall Application
Series 9000 Panel Door; In-Line, Corner and Permanent Wall Application 5/32" Drill Bit In-Line Corner Permanent Wall 3/16" Allen Wrench If you have a problem, question, or request, call your local dealer,
More informationPROJECT PLAN TRAVEL CRIBBAGE BOARD
BUILD IT WITH ROCKLER PROJECT PLAN TRAVEL CRIBBAGE BOARD BUILD Stock # Item Stock # Item 59160 Small Cribbage Board Template, 2-Player, Straight Track 90638 3/4" Dia. Straight Router Bit (1/2" shank) 21026
More informationFUSELAGE CONSTRUCTION
FUSELAGE CONSTRUCTION Note: prior to building and gluing on the work surface use protective covering on your building surface. (wax paper or clear wrap) Fit the laser cut Fuselage Front and Fuselage Rear
More information4. Bevel the LE face of HS1-HS11 to match the horizontal stab leading edge sweep angle.
BEFORE YOU BUILD 1. Unroll each sheet of the plans. Roll them inside out so that they will lie flat on the building surface. 2. Assemble the tools that you will need to build each section so that they
More informationNORMAN SHUTTERS INSTALLATION INSTRUCTIONS. Direct Mount. Getting Started
NORMAN SHUTTERS INSTALLATION INSTRUCTIONS Direct Mount Getting Started Recommended Tools: Drill (Cordless), Tape Measure, Box knife, #2 Phillips drill tip, #6 Countersink drill bit (for light block) if
More information07 - Landing Gear. Landing Gear. February EGF Page 7-1
Landing Gear February 2003 07-EGF Page 7-1 This Page Intentionally Left Blank Page 7-2 07-EGF February 2003 Contents 7.0 - Chapter Preface...7-4 7.0.1 - Parts List...7-4 7.0.2 - Tools List...7-4 7.0.3
More informationHow to build a Javelin Skiff
How to build a Javelin Skiff This is not your grandfather s plywood boat! The Javelin involves a high-tech type construction, called composite. The hull can be constructed with foam or plywood; these materials
More informationHobby Lobby Zip Supplementary instructions Please refer to the included drawings while using these assembly instructions
Materials needed: 15 or 30 minute epoxy Medium CA Masking tape Scotch tape Servo Tape Wax paper Tools Needed: Pencil or marker Flat building surface Hobby knife or razor blade 7/64" or 3mm drill bit 3/16"
More informationLARK. Classic Legal Precision Stunter RSM DISTRIBUTION. presents. Charles Mackey. Wing Area 570sq. Wingspan 52.
RSM DISTRIBUTION presents LARK By Charles Mackey Photo _ Bob Hunt Classic Legal Precision Stunter Wingspan 52 Length 39.5 Wing Area 570sq Motor 35-46 www.rsmdistribution.com Page 2 Thank you for purchasing
More informationBuilding Tips This model can be built using the following types of adhesives:
Page 1 Building Tips This model can be built using the following types of adhesives: Epoxy (with or without microballons) Odorless cyanoacrylate (CA) with accelerator UHU Creativ for Styrofoam (or UHU
More informationSURFACE CASTING METHOD: For Molds & Core Boxes. Presented by: Hapco Inc.
SURFACE CASTING METHOD: For Molds & Core Boxes Presented by: Hapco Inc. RAPIDFIL Detailed Specifications STEP 1 SPACER LAYER Apply a layer of ¼ foam to create a uniform ¼ thickness around the pattern.
More informationWALL MOUNT LOCKER ASSEMBLY. 208 Chestnut St, Reading, PA (610)
WALL MOUNT LOCKER ASSEMBLY 208 Chestnut St, Reading, PA 19602 (610)376-2666 Locker Assembly Wall Mount: locker Installation Introduction: Before beginning, check to ensure the floor is level, and the wall
More information1 ¼-inch Pocket Screws Brad Nailer or Hammer 1 ¼-inch Brad Nails Clamps
MATERIALS: TOOLS: (4) 2 x 6 x 8 Ft. Boards Tape Measure (2) 2 x 4 x 8 Ft. Boards Carpenter s Square (7) 1 x 4 x 8 Ft. Boards Pencil (2) 1 x 3 x 8 Ft. Boards Drill (1) Half Sheet of ¾-inch Thick Plywood
More informationKam Aero 43% Extra 300.
Stab Sheeting Kam Aero 43% Extra 300. Stabs / Elevator: Make your skins using the same method as you did for the fuselage foam parts. The stabs require 8 sheets (4 per stab) of 4 x 48 A grain sheeting.
More informationMUTINEER AND BUCCANEER TOP-MOUNTED CENTERBOARD HANGERS. Note, drawing not to scale Bob DeRoeck May 31, 05
MUTINEER AND BUCCANEER TOP-MOUNTED CENTERBOARD HANGERS Note, drawing not to scale Bob DeRoeck May 31, 05 Holes for #10 selftapping SS screws (pan head). 5.75 1 Bend line Aluminum plate, series 5000 or
More informationC-180 Builder s Manual
C-180 Builder s Manual. May 20, 2002 Last revised July 11, 2002 Copyright! 2002 Douglas Binder, Mountain Models www.mountainmodels.com sales@mountainmodels.com (719) 630-3186 1 Required Equipment! Xacto
More informationHow to fit an Internal Door
How to fit an Internal Door How to fit an Internal Door The following instructions are for installing a internal door only. If you have any queries please contact Cheshire Mouldings technical helpline
More informationSTOL CH H3-3SP Center Hinge Bracket. IMPORTANT: The Bracket 7H5-3SP is not symmetrical
7H3-3SP Center Hinge Bracket IMPORTANT: The Bracket 7H5-3SP is not symmetrical Using a square helps layout and mark the perpendicular and the hinge hole. Note: Position of 1/4 hinge hole is 115.5mm from
More informationFree Standing Frame and Canopy
Patriot Docks Free Standing Frame and Canopy Required Tools: Cordless Drill, 3/8 drill bit, 17mm wrench, 18mm wrench, 6mm hex key (included), 8mm hex key (included) Helpful Tips: Assembling and installing
More informationNORMAN SHUTTERS INSTALLATION INSTRUCTIONS. Hang Strip. (Inside Mount 2 Panel) Getting Started
NORMAN SHUTTERS INSTALLATION INSTRUCTIONS Hang Strip (Inside Mount 2 Panel) Getting Started Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6 Philips head driver Make sure
More information(Build Instructions)
(Build Instructions) Specifications * Wingspan: 58cm * Length: 50cm * Flying Weight: 59 grams * Channels: 3 (Rudder Elevator Throttle) * Suggested Receiver: 4Ch Micro * Motor: 8mm GearDrive * Prop: GWS
More informationCowper From Steve Wolverton on the T&TTT forum, Feb 2005 For Reference Only Do not use to build a trailer. Check on Teardrop and Tiny Travel Trailers
Cowper From Steve Wolverton on the T&TTT forum, Feb 2005 For Reference Only Do not use to build a trailer. Check on Teardrop and Tiny Travel Trailers for up to date building information; http://www.mikenchell.com/forums
More information75-TA-4. Elevator Skins
75-TA-4 This manual has been prepared for assembly of the. This photo assembly manual is intended as a supplement to the drawings. If there is any discrepancy between this manual and the drawings, the
More informationCurium 19.4H Installation Instructions & Parts List
Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More information1/6 PA-25 PAWNEE. *Specifications are subject to change without notice.*
1/6 PA-25 PAWNEE INSTRUCTION MANUAL [ A335 Kit ] Wing Span : 72 in / 1830 mm Wing Area : 736 sq in / 47.5 sq dm Flying Weight : 6.6 lbs / 3000 g Fuselage Length : 48 in / 1220 mm Requires : "Glow Power"
More informationSection 75-ZA-2. Rudder Mounting
Section 75-ZA-2 This manual has been prepared for installation of the Rudder. This photo assembly manual is intended as a supplement to the drawings. If there is any discrepancy between this manual and
More informationDesigned in 2005 by Bernard Burton. Assembly manual Bernard Burton DRAFT 1
Designed in 2005 by Bernard Burton Assembly manual 2005 - Bernard Burton DRAFT 1 The plans can be requested via this link http://www.gundersonaerodesign.com/m12plansreq.htm The laser kit is available here
More informationIntroducing The Cloud Models Westland Whirlwind
Produced by Cloud Models,Deopham Road,Morley,Wymondham, Norfolk,NR18 9AA E-mail sales@cloudmodels.com web site cloudmodels.com Introducing The Cloud Models Westland Whirlwind By Tricks Thank you for purchasing
More informationTools: Drill/Driver Kreg Jig Miter Saw Jigsaw Circular Saw Adjustable Square Tape Measure Veneer Trimmer Sandpaper and Sander
R PROJECT PLANS DROP-FRONT DESK Create a workspace almost anywhere with this drop-front desk. Mounted to a wall, it doesn t take up any floor space, which means you can hang it wherever you need to work.
More informationPrior to servicing the vehicle, refer to Knowledge Center for the most up to date version of your shop manual.
December 4, 2013 Subject:SPARK - Fixing Scratches and Repairing the Hull No. 2014-7 Prior to servicing the vehicle, refer to Knowledge Center for the most up to date version of your shop manual. MODEL
More informationFigure #1 - VSNEO Shower Door Assembly
Figure #1 - VSNEO Shower Door Assembly Figure #2 - VSNEO - Top View Figure #3 - VSNEO - Side View Figure #4 - Foam Curb Plug Figure #5 - Magnet Strip Figure #6 - VSNEO - Drip Deflector Preparation VSNEO
More informationTools and Tips: ( 1 )
Tools and Tips: As you build instructions will show in my many picture manual how to assemble. You can use your own methods as you desire, my results are very good. A smooth, flat work surface is very
More informationNORMAN SHUTTERS INSTALLATION INSTRUCTIONS. 4 sided Deco Frame. (Outside Mount - 2 Panel) Getting Started
NORMAN SHUTTERS INSTALLATION INSTRUCTIONS 4 sided Deco Frame (Outside Mount - 2 Panel) Getting Started Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6 Philips head driver
More information03 - Canard / Elevators. Canard / Elevators. April XLG Page 3-1
03 - Canard / Elevators Canard / Elevators April 2006 03-XLG Page 3-1 03 - Canard / Elevators This Page Intentionally Left Blank Page 3-2 03-XLG April 2006 03 - Canard / Elevators Contents 3.0 - Chapter
More informationReplacing worn out MS hinges
Replacing worn out MS hinges C. Zavatson, 4-3-2014, rev A For the hinging of ailerons, flaps, inboard gear doors and the elevators of the small tail, Lancair utilized MS20001 hinge material. Unfortunately
More informationwoodworkersjournal.com MATERIAL LIST
MATERIAL LIST T x W x L 1 Legs (2) 1 1 2" x 3 1 2" x 36 7 16" 2 End Uprights (2) 1 1 2" x 3 1 2" x 32 1 2" 3 Stringers (4) 1 1 2" x 3 1 2" x 42" 4 Top Cladding, Long (2) 3/4" x 7 1 4" x 65 3 4" 5 Side
More information96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED
96 WING SPAN SPITFIRE (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED GENERAL INSTRUCTIONS Should you elect to use the recommended Door Skin, which is 1/8 mahogany plywood measuring 36 x 88. Have it cut
More informationEXPRESS ASSEMBLY MANUAL SECTION 3 F5-RG/FT WING ASSEMBLY. Procedure 3.155A WING CLOSE-OUT PROCEDURES
Procedure 3.155A WING CLOSE-OUT PROCEDURES In this procedure The lower wing skin will be bonded to the upper wing For this procedure, the following parts will be required: Part Number Description Qty 111-11-060-01
More informationInstallation Instructions. Oakmont Folding Doors
Before You Start For quick and easy installation of your Oakmont folding door, read these instructions thoroughly. A few minutes of prior planning will make the job easier and ensure years of trouble-free
More informationSeries 1500 Aluminum Door Canopy
Series 500 Aluminum Door Canopy with Sidewings It is our recommendation that you read instructions carefully prior to assembly and installation. Series 500 with Sidewings mounting bar (A) top trim (B)
More informationMGB Warpath Rigger Building Instructions (Rev )
MGB Warpath Rigger Building Instructions (Rev. 2012-05-01) Thank you for choosing the Warpath Rigger. We have worked hard to make this kit as easy as possible to assemble while maintaining a high level
More informationTHE APOGEE A 100-INCH AMA DURATION SAILPLANE FROM DYNAFLITE
THE APOGEE A 100-INCH AMA DURATION SAILPLANE FROM DYNAFLITE Apogee is the intermediate sailplane designed to be competitive in AMA duration contests. Effective spoilers, rudder and full flying stabilizer
More informationThank you for your purchase of the Lee Ulinger, FoamtanaS, Yak-55, or Extra 330 3D Depron foam, Aerobatic airplane.
Thank you for your purchase of the Lee Ulinger, FoamtanaS, Yak-55, or Extra 330 3D Depron foam, Aerobatic airplane. Tools you will need to build Recommended additional items: #11 hobby knife Motor: Hacker
More informationDubnium 11 Installation Instructions & Parts List
Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationBumper Sign INSTALLATION INSTRUCTIONS
Bumper Sign INSTALLATION INSTRUCTIONS BUMPERSIGN TOOL CHECKLIST SDS MAX Rotary Hammer Drill Marker/Pencil SDS MAX 1 Carbide Drill Bit Tape Measure Torque Wrench with ½ Drive Power Source Vacuum ½ Drive
More informationMetal Aircraft Landing Light Installation Instructions
Metal Aircraft Landing Light Installation Instructions This landing light kit was designed for the Thorp T-18 as a method of installing a halogen landing light in the leading edge of the outer bay of the
More informationSection 75-FA-2 Top Fuselage Skin & Rear Fuselage Assembly
Section 75-FA-2 Top Fuselage Skin & Rear Fuselage This manual has been prepared for assembly of the rear fuselage supplied with match drilled parts. This photo assembly manual is intended as a supplement
More informationRSM DISTRIBUTION Presents
RSM DISTRIBUTION Presents MOSQUITO By Jack Sheeks Photo _ Jack Sheeks Semi Scale Twin Stunter Wing Span: 58" Length: 37-3/4 Area: 579 sq. in. Engine: Two.35 -.40 www.rsmdistribution.com Call (951) 678
More informationNORMAN SHUTTERS INSTALLATION INSTRUCTIONS. 4 Sided Z Frame. (Inside Mount - 2 panel) Getting Started
NORMAN SHUTTERS INSTALLATION INSTRUCTIONS 4 Sided Z Frame (Inside Mount - 2 panel) Getting Started Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6 Philips head driver Make
More informationSeries 1100 Aluminum Door Canopy
Series 00 Aluminum Door Canopy with Support Arms It is our recommendation that you read instructions carefully prior to assembly and installation. Series 00 with Support Arms MOUNTING BAR (A) TOP TRIM
More informationDeauville Installation Guide
vjul16 (for 17 or 24 mm Surface Wall Profiles) DO NOT ASSEMBLE WITHOUT FULLY READING THESE INSTRUCTIONS Page 2 Thank you for purchasing this Deauville shower enclosure. Please study these instructions
More informationINSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233
INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 QCI5233 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay
More informationWoodline USA Woodline Spacer Fence System
Woodline USA Woodline Spacer Fence System MADE IN THE USA Includes: (1) ¼ Spacer Fence (1) 3/8 Spacer Fence (1) ½ Spacer Fence (1) Hardware Package (1) 3 Piece Brass bar set (2) Setup Blocks Visit Us Online
More informationStair Parts Installation. Tricks
Stair Parts Installation Tips & Tricks Introduction Your DIY staircase guide Welcome to the Stairpart home installation guide. Your stairway is both a functional and focal point in your home, so keeping
More informationThe easy way to an affordable kitchen
quality, affordable, pre-assembled The easy way to an affordable kitchen In association with All Insta-Cupboard carcass units are supplied pre-assembled to simplify installation Choose the colour of your
More informationCurium 19H Installation Instructions & Parts List
Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationInstallation - Sub Cills
Installation - Sub Cills Fitting of Subcill Drainage paths through the sub-cill can be seen on the illustration alongside so care must be taken to ensure they are not obstructed and that screw fixings
More informationRadon 07 Installation Instructions & Parts List
Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by
More informationChapter # 002 : Creating Threaded Metal Anchoring Points in Fiberglass Foam Structures
Chapter # 002 : Creating Threaded Metal Anchoring Points in Fiberglass Foam Structures The following is a method of creating permanent, threaded, metal anchor point in a foam & fiberglass structure. The
More informationHow to Install Decklids and Tailbases
All decklids and tailbases are installed in the same general way. Follow these step by step instructions to hang them the way the pros do. 1. Open the shipping containor and check for any damage to the
More informationDeauville Installation Guide
vjul16 (for Recessed Wall Profiles) DO NOT ASSEMBLE WITHOUT FULLY READING THESE INSTRUCTIONS Page 2 Thank you for purchasing this Deauville shower enclosure. Please study these instructions carefully before
More information84 WING SPAN MESSERSCHMITT BF-109
84 WING SPAN MESSERSCHMITT BF-109 (COPYRIGHT PROTECTED 2014) ALL RIGHTS RESERVED MEISTER 84 ME-109 SIERRA GEAR UPDATE PLEASE NOTE: THE MAIN GEAR MOUNTING PLATE FROM SIERRA IS NOT SQUARE. YOU HAVE TO ROUND
More informationBalustrade Systems / Installation Instructions
A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column
More informationChapter 22 - Cabinets & Vanities
Chapter 22 - Cabinets & Vanities Contents Chapter 22 - Cabinets & Vanities... 22-1 Timing & Prerequisites... 22-2 Cabinets... 22-3 Cabinet Layout... 22-3 Wall Cabinets... 22-4 Assemble the Wall Units...
More informationRV ENTRY DOOR REMOVAL AND SHIPPING BLOCK INSTALLATION AND ALIGNMENT
RV ENTRY DOOR REMOVL ND SHIPPING BLOCK INSTLLTION ND LIGNMENT Purpose This document provides the steps to remove, reinstall and align an RV entry door for motorized and towable units. Moving parts can
More informationInstalling your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)
Installing your new Bevella Top L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls) Bevella RTI Countertops are engineered and manufactured to the highest quality standards, built
More information9/16" (14mm) 1/2" (12mm)
Deluxe Header Kit Deluxe Header Kit Cat. No. SDH660-66" (1676mm) Length Cat. No. SDH980-98" (2489mm) Length Cat. No. SDH144-144" (3657mm) Length Each Deluxe Header Kit Contains: 66" (1676mm), 98" (2489mm)
More informationIMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE
INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER NOTE: Acrylic wall, tray and tapware not included. Supplied handles may differ from image. SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied)
More informationBuilding an Unfeathered Paddle with a Wood Shaft and Carbon Fiber Blades
Building an Unfeathered Paddle with a Wood Shaft and Carbon Fiber Blades by Duane Strosaker Choosing the Wood Two 3/4" pieces of Sitka spruce laminated with epoxy for an unfeathered one-piece paddle. For
More information9.3 FUSELAGE ASSEMBLY 14/03/02
9.3 MATING THE TAIL CONE TO THE CABIN 1) Trim the bottom flange of both FUS-339 side skins on the tailcone assembly as in Figure 1. 2) Remove the bottom two RBULK 2A s of bulkhead A on the tailcone. 3)
More informationINSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height
INSTALLATION GUIDE Please take a few minutes to read through this guide before getting started. 1. Overview A Typical Sliding Wardrobe Door Layout A Frame - Top Liner (optional) B Top Track C Frame - Strike
More informationAluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement
Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement 1 Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement The following instructions are a supplement
More information