CONCRETE & REINFORCING STEEL NOTES. MATERIAL PROPERTIES (U.N.O.) COMPRESSIVE STRENGTH - F'c = 4 KSI CONCRETE REINFORCEMENT - Fy = 60 KSI (A615 GR 60)

Size: px
Start display at page:

Download "CONCRETE & REINFORCING STEEL NOTES. MATERIAL PROPERTIES (U.N.O.) COMPRESSIVE STRENGTH - F'c = 4 KSI CONCRETE REINFORCEMENT - Fy = 60 KSI (A615 GR 60)"

Transcription

1 STRUTURL DESIGN RITERI FOUNDTION NOTES ONRETE & REINFORING STEEL NOTES ERTHWORK NOTES STRUTURL SYMBOLOGY 3//0 :: PM :\Revit Local\ S-entral_8mjb.rvt. GOVERNING ODE: 00 IB. FLOOR LIVE LOD (03..) N/ 3. ROOF LIVE LOD (03..) MINIMUM ROOF LIVE LOD:. ROOF SNOW LOD (03..3) 0 PSF GROUND SNOW LOD: PG = PSF FLT-ROOF SNOW LOD: PF =. PSF SNOW EPOSURE FOR: E =.0 SNOW LOD IMPORTNE FOR: IS =.0 THERML FOR: T =.0. WIND DESIGN DT (03..) BSI WIND SPEED (3-SEOND GUST): V3S = 0 MPH OUPNY TEGORY: II WIND IMPORTNE FOR: IW = (VLUE) WIND EPOSURE: INTERNL PRESSURE OEFFIIENT: GPI = +/- 0.. ERTHQUKE DESIGN DT (03..) OUPNY TEGORY: II IMPORTNE FOR: IE =.0 MPPED, ME, % DMPED, SPETRL ELERTIONS: T SHORT PERIODS: Ss = 0.3 G T PERIOD OF SEOND: S = 0.0 G SITE LSS: DESIGN ERTHQUKE SPETRL ELERTIONS T SHORT PERIODS: SDS = 0. G T PERIOD OF SEOND: SD = 0.0 G SEISMI DESIGN TEGORY: BSI SEISMI-FORE-RESISTING-SYSTEM:. FLOOD DESIGN DT (03..) SD = B SFRS = PER ONTROR BUILDING IS NOT LOTED IN FLOOD HZRD RE; THEREFORE FLOOD DESIGN DT IS NOT REQUIRED 8. SPEIL LODS (03..) SPEIL LODING ONDITIONS RE NOT PPLIBLE TO THE DESIGN OF THIS BUILDING; THEREFORE SPEIL LODS RE NOT REQUIRED. SPEIL INSPETIONS FOR SEISMI RESISTNE (03..8) BUILDING IS DESIGNTED SEISMI DESIGN TEGORY B; THEREFORE SPEILINSPETIONS FOR SEISMI RESISTNE RE NOT REQUIRED. GENERL NOTES G-. G-. G-3. G-. G-. G-. G-. G-8. FIELD VERIFY LL DIMENSIONS ND EISTING ONDITIONS PRIOR TO STRT OF ONSTRUTION - RESOLVE NY DISREPNY WITH RHITET/ENGINEER.!!!! FOR LRITY, LL ETERIOR SLBS ND SIDEWLKS MY NOT BE SHOWN. FOR E DIMENSIONS, LOTIONS, JOINTS ND SORE LINES, SEE RHITETURL ND/OR IVIL DRWINGS. VERIFY LL SIZES, WEIGHTS ND LOTIONS OF MEHNIL ND ELETRIL EQUIPMENT, ROOF PENETRTIONS, DUTS, ET. WITH MEHNIL ND ELETRIL ONTRORS ND FIELD ONDITIONS. DETILS MRKED "" MY OR MY NOT BE UT ON PLNS, BUT SHLL PPLY UNLESS NOTED OTHERWISE. STRUTURL SYSTEM IS DESIGNED TO WORK S OMPLETED SYSTEM, NY SHORING OR BRING NEESSRY DURING ONSTRUTION SHLL BE THE RESPONSIBILITY OF THE GENERL ONTROR. SEE RHITETURL, MEHNIL, ELETRIL, ND PLUMBING PLNS FOR SLEEVES, INSERTS, ET. NOT SHOWN ON STRUTURL PLNS. NO PIPES OR SLEEVES FOR MEHNIL TRDES SHLL PSS THROUGH STRUTURL MEMBERS WITHOUT PPROVL OF THE STRUTURL ENGINEER. THE ONTROR IS SOLELY RESPONSIBLE FOR LL SITE SFETY ND LL IDENTS WHIH RESULT IN DETH, PERSONL INJURY, OR DMGE TO PROPERTY RISING OUT OF OR IN ONNETION WITH THE PERFORMNE OF THE WORK. G-. IT IS THE OWNER'S RESPONSIBILITY TO POST LIVE LODS PER SETION 03.3 OF THE GOVERNING ODE. G-0. SETIONS, DETILS, ND NOTES SHOWN ON THE DRWINGS RE INTENDED TO BE ND SHLL PPLY TO SIMILR ONDITIONS ELSEWHERE, UNLESS OTHERWISE SHOWN. NET LLOWBLE SOIL BERING PRESSURE = 3000 PSF PER GEOTEHNIL REPORT. F-. F-. F-3. F-. F-. F-. F-. F-8. F-. LL OLUMN S RE TO BE ENTERED UNDER OLUMN ENTERLINES, UNLESS NOTED OR DETILED OTHERWISE. THE FOUNDTION ONTROR SHLL FULLY REVIEW UNDER-GROUND PLUMBING DRWINGS ND SHLL OORDINTE WITH THE UNDER-GROUND PLUMBING ONTROR TO DEPRESS S ND PROVIDE PIPE SLEEVES THROUGH FOUNDTION S S NEESSRY TO OMMODTE PLUMBING LINES OR TRPS WHIH PENETRTE ONRETE S OR FOUNDTIONS. PROVIDE PV SLEEVES THROUGH FOUNDTION S/S FOR PIPE, ONDUIT, ND BLE PENETRTIONS, INLUDING ELETRIL GROUNDING SYSTEM BLES. SEE PPROPRITE DRWINGS FOR LOTIONS/SIZES. PLE SLEEVES IN LOTIONS TO VOID DISPLING REINFORING STEEL. SUBGRDES SHLL BE LEN ND FREE OF DEBRIS, STNDING WTER, ND LOOSE SOIL. OORDINTE WITH RHITETURL ND IVIL DRWINGS FOR MISELLNEOUS FOUNDTIONS NOT SHOWN ON STRUTURL DRWINGS. ONTROL JOINTS IN THE ST-IN-PLE ONRETE FOUNDTION S SHLL BE PLED T SPING NOT TO EEED 0' O.. OR S LOTED PER DRWINGS ND SHOULD LIGN WITH MSONRY ONTROL JOINTS WHERE PPLIBLE. SEE DETIL SHEETS FOR ONTROL JOINT DETILS. PROVIDE VERTIL "V" GROOVE T LL ONSTRUTION ND ONTROL JOINTS. ONTROR SHLL SUBMIT PLNS OF JOINT LOTIONS FOR PPROVL. SEE SLB-ON-GRDE DETILS FOR SLB ND SUB-BSE REQUIREMENTS. THESE WILL BE THROUGHOUT UNLESS NOTED OTHERWISE. LEN ONRETE MUD SLB TO 3" THIK SHLL BE USED IN THE EVTION IF THE BOTTOM OF THE EVTION TENDS TO BEOME MUDDY ND SOFT DUE TO ONSTRUTION IVITY. LEN ONRETE SHLL HVE MINIMUM 8 DY OMPRESSIVE STRENGTH OF 000 PSI. OORDINTE GROUNDING REQUIREMENTS FOR FOUNDTION/ REINFORING STEEL WITH ELETRIL DRWINGS. OORDINTE INSTLLTION OF GROUNDING WIRES/EQUIPMENT WITH ELETRIL ONTROR PRIOR TO STING ONRETE. MTERIL PROPERTIES (U.N.O.) OMPRESSIVE STRENGTH - F'c = KSI ONRETE REINFOREMENT - Fy = 0 KSI ( GR 0) R-. R-. R-3. R-. PROVIDE ONE () HOOKED REINFORING BR IN ONRETE TO SERVE S ONRETE ENSED ELETRODE IN ORDNE WITH THE NTIONL ELETRI ODE. OORDINTE WITH ELETRIL ONTROR FOR E LOTION. HOOKED REINFORING BR SHLL ONFORM TO THE FOLLOWING:. UNOTED, LOW-LLOY STEEL, ONFORMING TO STM 0. B. BR SIZE NUMBER.. HOOKED T ONE END ONLY. D. MINIMUM HORIZONTL LENGTH OF REINFORING BR ENSED IN SHLL BE 0-0. E. MINIMUM VERTIL PROJETION OF REINFORING BR HOOK BOVE SHLL BE -8. F. MINIMUM OVER LL ROUND REINFORING BR SHLL BE. LL BR LPS SHLL ONFORM TO I 38 LSS "B" SPLIE RITERI. USE TOP BR LP LENGTHS FOR TOP BRS IN SLBS ND BEMS OVER " DEEP. MINIMUM BR LPS S FOLLOWS U.N.O.: #3: '-" #: '-" #: '-0" #: '-" #: '- #8: '- #: '-" #0: '- #: '-0" FOR EPOY OTED BRS, PROVIDE. TIMES THE INDITED LP LENGTH. FOR TOP BRS PROVIDE.3 TIMES THE INDITED LP LENGTH. LP LENGTH SHLL BE SPEIFILLY NOTED ON SHOP DRWINGS WHERE MORE THN ONE BR MKES UP ONTINUOUS STRING. HORIZONTL BRS SHLL BE DETILED TO SHOW THE DISTNE FROM T LEST ONE END OF THE BR TO THE NEREST BUILDING GRID LINE OR. R-. REINFORING SHLL BE DETILED IN ORDNE WITH I 3. R-. R-. R-8. R-. LL REINFOREMENT BRS SHLL BE FBRITED IN ORDNE WITH THE LTEST RSI MNUL OF STNDRD PRIE ND SHLL BE LEN ND FREE OF GRESE ND SLING RUST. ONTINUOUS TOP ND BOTTOM BRS, WHEN SHOWN IN TRNSVERSE SETION ONLY, SHLL BE LPPED S FOLLOWS: TOP BRS NER MID-SPNS; BOTTOM BRS DIRETLY OVER SUPPORTS, U.N.O. HOOK HORIZONTL ND BEM REINFORING BRS T DISONTINUOUS ENDS, U.N.O. ETEND REINFOREMENT TO FR FE OF PIERS/PEDESTLS ND/OR OLUMNS U.N.O. PROVIDE HOT/OLD WETHER PROEDURES ND PROTETION IN ORDNE WITH I REOMMENDTIONS ND PROJET SPEIFITIONS. R-0. ONRETE REINFOREMENT PROTETION/LER OVER, U.N.O.: S: BOTTOM & SIDES 3" TOP S: ETERIOR EPOSURE INTERIOR EPOSURE " BEMS/OLUMNS: OVER TIES OR STIRRUPS / ELEVTED SLBS: " R-. PROVIDE DDITIONL # BRS T '-0" LONG 3" BELOW TOP OF SLB T TO LL REENTRNT ORNERS ND OPENINGS IN S ND S SHOWN. R-. LL ONRETE FOUNDTION S SHLL HVE MINIMUM OF () # BRS ONTINUOUS TOP ND BOTTOM, UNLESS NOTED OR DETILED OTHERWISE. R-3. ETEND LL PIER STEEL TO PROVIDE STD. HOOK UNDER REINFOREMENT, UNLESS NOTED OTHERWISE. R-. LL ONRETE DESIGN ND ONSTRUTION SHLL ONFORM WITH THE LOL BUILDING ODE REQUIREMENTS ND THOSE OF THE FOLLOWING STNDRDS (LTEST EDITION): "I 38, BUILDING ODE REQUIREMENTS FOR REINFORED ON." "I 3, DETILS ND DETILING OF ONRETE REINFOREMENT" "I 30, SPEIFITIONS FOR STRUTURL ONRETE FOR BLDGS." "I 30, REOMMENDED PRIE FOR ONRETE FORM WORK" R-. SEE SETION OF SPEIFITIONS FOR INFORMTION REGRDING ONRETE MI DESIGN, TESTING, MTERILS, ND DMITURES. R-. LUMINUM ONDUIT IS NOT PERMITTED TO BE EMBEDDED IN ONRETE. R-. REFER TO FLTWORK DRWINGS ND/OR SPEIFITIONS FOR SLB-ON-GRDE FINISH ES ND DEPRESSIONS REQUIRED FOR MTS, TILE, ND OTHER FINISH MTERILS. R-8. PROVIDE DOWELS TO MTH VERTIL REINFORING. WHERE REINFORING IS NOT INDITED, DOWEL TO FOUNDTION S WITH # REBR T " O.. BY 3'-0" LONG, WITH STNDRD HOOKS EMBEDDED MINIMUM OF INTO. R-. LL PIER S TO HVE DOWELS WITH STNDRD HOOKS OF SME SIZE ND QUNTITY S PIER STEEL. DOWELS TO LP PIER STEEL S REQUIRED FOR LSS "B" TENSION SPLIE. R-0. LL OPENINGS IN ONRETE FOUNDTION S RE TO HVE () # DIGONL BRS EH FE OF THE UNLESS OTHERWISE NOTED. BRS SHLL ETEND FEET BEYOND OPENING ON EH SIDE. R-. UNLESS NOTED OTHERWISE, THIKEN THE SLB-ON-GRDE BENETH INTERIOR MSONRY PRTITIONS 8 INHES BELOW BOTTOM OF SLB ON GRDE. THIKENED PORTION TO ETEND 8 INHES BEYOND THE FE OF THE ON EH SIDE. REINFORE THE THIKENED PORTION WITH (3) # ONTINUOUS LONGITUDINL REINFORING BRS ND # TRNSVERSE BRS T " O.., U.N.O. R-. PITH ONRETE TO FLOOR DRINS. OORDINTE WITH PLUMBING ND RHITETURL DRWINGS. R-3. UNLESS NOTED OTHERWISE, PROVIDE ONTROL OR ONSTRUTION JOINTS IN SLBS-ON-GRDE T FOOT MIMUM ENTERS EH DIRETION. ONTROR SHLL SUBMIT PLNS OF JOINT LOTIONS TO THE RHITET/ENGINEER FOR PPROVL PRIOR TO STING SLBS-ON GRDE. OORDINTE WITH RHITETURL DRWINGS ND FLOOR FINISHES SUH S TILE ND TERRZZO. EW-. EW-. EW-3. EW-. EW-. EW-. EW-. EW-8. SEE GEOTEHNIL REPORT ND SPEIFITIONS FOR DEFINITION OF MTERILS ND OMPION REQUIREMENTS. U.N.O., THE ONTROR SHLL RETIN N INDEPENDENT, QULIFIED GEOTEHNIL ENGINEERING FIRM/TESTING GENY TO IDENTIFY RES OF POOR SOILS, TO MONITOR PROPER SUBGRDE PREPRTIONS ND TO OVERSEE ND TEST THE PLEMENT OF OMPED FILL MTERIL. LL SUBTERRNEN STRUTURES, UTILITIES, PIPING, ET. IIN THE RE OF EVTIONS TO BE LOTED ND MRKED BY ONTROR PRIOR TO ERTH REMOVL WORK. ONTROR TO MINTIN MRKERS UNTIL EVTION IVITIES HVE ESED. IF UNDERGROUND UTILITY ONFLITS RE DISOVERED BEFORE OR ENOUNTERED DURING EVTION, NOTIFY THE RHITET/ENGINEER IMMEDITELY. BEFORE PLING S, FOUNDTIONS OR SLB-ON-GRDE, THE SUB-GRDE SHLL BE PREPRED ND INSPETED S REQUIRED BY THE SPEIFITIONS. REFERENE THE GEOTEHNIL REPORT INLUDED IN PROJET MNUL FOR REQUIREMENTS FOR EVTION ND ONTROL OF GROUND WTER DURING ONSTRUTION. EISTING SOILS MY EPERIENE LOSS OF STRENGTH IF SURFE WTER IS LLOWED TO UMULTE IN THE EVTIONS; DO NOT LLOW SURFE WTER TO UMULTE IN THE BOTTOM OF EVTIONS. WHERE STRUTURES DERIVE SUPPORT FROM FILL-SUPPORTED FOUNDTIONS ND T SLB-ON-GRDE, FILL SHLL BE OMPED TO % OF MODIFIED PROTOR MIMUM DRY DENSITY U.N.O. NO FILL SHLL BE PLED OVER FROZEN, MUDDY, OR OTHER DELETERIOUS MTERIL. NO FILL SHLL BE PLED OVER PREVIOUS LIFT THT HS NOT BEEN DEQUTELY OMPED PER SPEIFITIONS. BKFILL GINST FOUNDTION S SHLL BE PLED EVENLY ON LL SIDES IN ORDER TO HIEVE GENERLLY BLNED LODINGS. BBREVITIONS B.O. = BOTTOM OF BP# = BSE PLTE E BRG = BERING TO = ENTER TO ENTER = ONSTRUTION ONTROL JOINT = ONTROL JOINT LSM = ONTROLLED LOW STRENGTH MTERIL ("FLOWBLE FILL") ONT = ONTINUOUS DBLT = DOUBLE-TEE DI = DIMETER DTB = DOUBLE-TEE BERING EF = EH FE EL = ELEVTION EW = EH WY F# = SPRED E FDTN = FOUNDTION FV = FIELD VERIFY GLV = GLVNIZED HP = HIGH PERFORMNE OTING JB = JOIST BERING LLH = LONG LEG HORIZONTL LLV = LONG LEG VERTIL MBS = METL BUILDING SUPPLIER NI = NOT IN ONTR NTS = NOT TO SLE O = ON ENTER P# = PIER E PB = PREST BERING (ELEVTION) PRST = PREST Rxn = REION SF# = STRIP E SIM = SIMILR SST = STINLESS STEEL STL = STEEL T.O. = TOP OF TBD = TO BE DETERMINED TO = TOP OF ONRETE TOF = TOP OF TOL = TOP OF LEDGE TOP = TOS = TOP OF STEEL TOW = TOP OF TP = TOP OF PREST = TOP OF SLB = UNO = UNLESS NOTED OTHERWISE WWF = WELDED WIRE FBRI/REINFOREMENT FOUNDTION PLN F GENERL SYMBOLS SLB # S-0 P SW# S-0 # TOF '-0" TOW 00'-0" SF FRMING PLN #.### L# Wx3 k (0.) (000'-0") [] FW08 KEYED NOTE STRUTURL E ELEVTION DEK SPN STRUTURL SLB E STRUTURL ELEVTION DETIL OR SETION LINTEL DESIGNTION MSONRY (MU) ON ONRETE ONRETE ONRETE FOUNDTION ON ONRETE TOP OF ELEVTION TOP OF ELEVTION STEP STRIP DESIGNTION DENOTES DEPRESSION FOR /DOOR OPENING (- U.N.O.) INDITES PIER MRK INDITES PIER INDITES OLUMN INDITES ONRETE INDITES SPRED MRK INDITES NEW GRID DESIGNTION (HEGON SHPE T EISTING GRID) INDITES BEM FRMING OVER HOLLOW STRUTURL SETION (HSS) OLUMN INDITES BEM FRMING OVER WIDE FLNGE (WF) OLUMN INDITES BRING ONNETED TO BEM (BELOW FRMING MEMBER) INDITES BEM FRMING INTO SIDE OF OLUMN INDITES MOMENT ONNETION INDITES REQUIRED UPWRD MBER IN BEM (INHES) INDITES BEM SIZE FOUNDTION DESIGNTION INDITES KNEE BRING ONNETED TO BEM (BELOW FRMING MEMBER) INDITES TOP OF STEEL ELEVTION INDITES NUMBER OF 3/" x " SHER STUDS FULLY WELDED TO TOP OF BEM PER /-SPN INDITES ONNETION DESIGNED BY FBRITOR TO DELIVER k VERTIL LOD TO ENTERLINE OF OLUMN OR ONNETION MEMBER INDITES BEM SHER SPLIE INDITES BEM FRMING INTO SIDE OF BEM INDITES BEM FRMING OVER BEM opyright 0 0 Watts Road Madison, WI 3 phone: NGB PN.: W0FYQ-0-D-000-E0 REHB + DDITION TO JOLIET FMS 008 S W JEFFERSON STREET 03// E B-3 FINL // STRUTURL NOTES

2 STRUTURL TESTING ND INSPETION TI-.IT IS THE ONTROR'S RESPONSIBILITY TO INSPET LL STRUTURL WORK FOR ONFORMNE WITH THE ONTR DOUMENTS. NY STRUTURL INSPETION PROVIDED BY OTHERS DOES NOT RELIEVE THE ONTROR OF THIS RESPONSIBILITY. NY STRUTURL DEVITIONS FROM THE ONTR DOUMENTS THT RE FOUND T LTER DTE ND RE DELRED TO BE SIGNIFINT BY THE STRUTURL ENGINEER SHLL BE ORRETED BY THE ONTROR WITHOUT OST OR NY DELY TO THE PROJET SHEDULE. TI-.THE ONTROR SHLL RETIN N INDEPENDENT TESTING GENY TO PROVIDE FIELD ND LB TESTING OF ONSTRUTION MTERILS ND TO PROVIDE ONSTRUTION INSPETIONS. THE ONSTRUTION INSPETION SHLL BE DONE BY QULIFIED INSPETORS THT RE STISFORY TO THE RHITET ND ENGINEER. TI-3.THE ONTROR SHLL PROVIDE THE TESTING ND INSPETING GENY ESS TO LL PLES WHERE THE WORK IS BEING PERFORMED. MINIMUM OF HOURS NOTIFITION SHLL BE GIVEN TO THE TESTING GENY ND RHITET/ENGINEER PRIOR TO THE OMMENEMENT OF WORK REQUIRING TESTING OR INSPETION. TI-.THE TESTING GENY IS NOT UTHORIZED TO DIRET OR PPROVE NY HNGES FROM THE ONTR DOUMENTS. IF THE ONTROR WISHES TO QUESTION THE TESTING GENY'S INTERPRETTION OF THE ONTR DOUMENTS, HE MY DO SO DIRETLY WITH THE RHITET OR STRUTURL ENGINEER. TI-.THE TESTING GENY IS NOT UTHORIZED TO STOP OR DELY THE WORK. IF THE ONTROR ELETS TO ONTINUE WITH ERTIN PORTION OF WORK FTER BEING NOTIFIED BY THE TESTING GENY THT SUH WORK IS NOT IN ORDNE WITH THE ONSTRUTION DOUMENTS, THE ONTROR DOES SO T THEIR OWN RISK ND MY BE REQUIRED TO ORRET THE WORK T LTER DTE. TI-.THE TESTING ND INSPETING GENY IS NOT INSPETING FOR O.S.H.. OMPLINE OR REQUIRED TO INSPET TEMPORRY ONSTRUTION, SUH S TEMPORRY BRING. TEMPORRY ONSTRUTION IS THE ONTROR'S SOLE RESPONSIBILITY. TI-8.TESTING ND INSPETION IS NOT REQUIRED FOR WORK PERFORMED T N OFF-SITE FBRITION SHOP, UNLESS SPEIFILLY NOTED OR SPEIFIED OTHERWISE. TI-.THE PROJET SPEIFITIONS LY INDITE THE FREQUENY OF ONSTRUTION TESTING ND INSPETIONS. WHERE THE FREQUENY IS NOT INDITED, THE TESTING GENY SHLL SUBMIT PROPOSL OF INSPETION INTERVLS TO THE RHITET/ENGINEER. TI-0. THE TESTING ND INSPETING GENY SHLL ISSUE ONGOING REPORTS OF INSPETIONS ND TESTS TO THE ONTROR, ENGINEER, ND RHITET OF REORD. LL DISREPNIES SHLL BE BROUGHT TO THE IMMEDITE TTENTION OF THE ONTROR FOR ORRETION, THEN IF UNORRETED, TO THE ENGINEER ND RHITET OF REORD. TI-. INSPETION GENY SHLL INSPET FOR ONFORMNE TO SPEIFIED REQUIREMENTS FOR PROTETING NEW ONRETE ND MSONRY FROM THE DVERSE EFFETS OF WETHER, HETING EQUIPMENT ND OTHER POTENTILLY HRMFUL ONDITIONS. TI-. ONSTRUTION TESTING ND INSPETION BY THE TESTING ND INSPETING GENY IS REQUIRED S FOLLOWS:. ONRETE TESTING PER THE SPEIFITIONS. B. ONRETE INSPETION SHLL INLUDE THE PLEMENT OF REINFOREMENT. REINFORING BR SIZES, SPING, TIES, LPS, ND OVER.. MSONRY TESTING PER THE SPEIFITIONS. D. MSONRY INSPETION SHLL INLUDE THE PLEMENT OF REINFOREMENT. REINFORING BR SIZES, SPING, ND LPS. E. INSPETION OF FIELD WELDED MOMENT ONNETIONS SHLL INLUDE VISUL ND/OR ULTRSONI TESTING, T THE TESTING GENY'S OPTION. LL OTHER FIELD WELDED ONNETIONS SHLL BE VISULLY INSPETED T MINIMUM. THE WELDER'S ERTIFITION SHLL LSO BE VERIFIED. F. FIELD BOLTING INSPETIONS SHLL INLUDE VISUL INSPETION OF LL THE ONNETIONS RELTED TO STRUTURL STEEL. THE SIZE, E, ND QUNTITY OF BOLTS ND THEIR INSTLLTION SHLL BE INSPETED. WHERE SLIP-RITIL OR PRE-TENSIONED BOLTS RE SPEIFIED, PRE-TENSIONING OF BOLTS SHLL BE VERIFIED BY TESTING. METL BUILDING MB-. STRUTURL REQUIREMENTS FOR THE METL BUILDING RE SHOWN ON THE S SHEETS ND ELSEWHERE. IT IS THE ONTROR'S RESPONSIBILITY TO OORDINTE ND INLUDE LL REQUIREMENTS ON THE ENTIRE PROJET. SEE 8/-0 FOR LOW ROOF SUPPORT ONEPT. SEE, /-30 FOR RNE BRKET. SEE /-30 FOR FRME LERNE T HUNH. MB-. THIS IS RNE BUILDING. SEE SPEIFITION 33 FOR RNE DT INFORMTION. MB-3. ON LOW ROOF, ROOF DEK WILL BE FSTENED TO TOP FLNGE OF PURLINS S DESRIBED UNDER METL DEK NOTES. THIS WILL PROVIDE FULL LTERL BRING TO THE TOP FLNGE OF THE PURLINS ON THE LOW ROOF. MB-. SEE RHITETURL FOR FRME LERNES ND RNE BRKET PLEMENT. MB-. THE LOW ROOF IS DIPHRGM NTILEVERED FROM THE HIGHER NEW BUILDING. DESIGN BY METL BUILDING MNUFURER. DO NOT PUT ROD BRING NER LINE. MB-. DESIGN ROD BRING ONNETIONS SO THT BRING HRDWRE IS BOVE ONRETE FLOOR. METL DEK MTERIL PROPERTIES (U.N.0) ROOF DEK:.B0, GLVNIZED, Fy = 33 KSI MD-. FSTEN ROOF DEK TO PURLINS WITH # SREWS IN 3/3 PTTERN ND () #0 SREWS IN SIDELP. MD-. U.N.O., LL MISELLNEOUS OPENINGS IN METL ROOF DEK RE TO BE FRMED BY x3x3/ NGLES. LONG LEG OF NGLES SHLL BE VERTIL. NGLES SHLL BE WELDED TO THE TOP HORD/FLNGE OF ROOF FRMING ND EH OTHER. MD-3. U.N.O., METL DEKING SHLL BE ONTINUOUS OVER 3 SPNS ND HVE JOINTS OVER SUPPORTING MEMBERS. MD-. ONTROR IS RESPONSIBLE FOR PROVIDING POUR STOPS T EDGES OF METL DEK PER SDI POUR STOP SELETION TBLE/REOMMENDTIONS OR BENT PLTE POUR STOPS S REQUIRED TO FORM THE SLB EDGE. MD-. MIMUM PURLIN SPING EQULS '-0". PURLIN DESIGN BY METL BUILDING SUPPLIER. SHOP DRWINGS SD-. SHOP DRWINGS SHLL BE SUBMITTED FOR STRUTURL ITEMS S REQUIRED BY THE SPEIFITIONS. ONSTRUTION DOUMENTS SHLL NOT BE REPRODUED FOR USE S SHOP DRWINGS. SD-. THE GENERL ONTROR SHLL REVIEW LL SHOP DRWINGS ND PRODUT DT FOR ONFORMNE WITH THE ONSTRUTION DOUMENTS PRIOR TO. REVIEWED S SHLL BE STMPED BY THE ONTROR. NY SHOP DRWING OR PRODUT DT NOT REVIEWED ND STMPED BY THE GENERL ONTROR WILL BE REJETED. GENERL ONTROR SHLL LOUD OR FLG LL ITEMS NOT IN ORDNE WITH THE ONTR DOUMENTS ND SHLL VERIFY LL DIMENSIONS. SD-3. NY HNGES, SUBSTITUTIONS OR DEVITIONS FROM THE ORIGINL ONTR DRWINGS SHLL BE LOUDED BY THE MNUFURER OR FBRITOR. NY HNGES, SUBSTITUTIONS, OR DEVITIONS WHIH RE LOUDED OR FLGGED BY SUBMITTING PRTIES SHLL NOT BE ONSIDERED PPROVED FTER THE ENGINEER'S REVIEW, UNLESS SPEIFILLY NOTED ORDINGLY BY THE ENGINEER. SD-. THE PPROVED SHOP DRWINGS DO NOT REPLE THE ORIGINL ONTR DRWINGS. ITEMS OMITTED OR SHOWN INORRETLY RE NOT TO BE ONSIDERED HNGES TO THE ORIGINL ONTR DRWINGS. IT IS THE ONTROR'S RESPONSIBILITY TO ENSURE THT ITEMS OMITTED OR SHOWN INORRETLY RE ONSTRUTED IN ORDNE WITH THE ONTR DRWINGS. SD-. SHOP DRWING REVIEW IS INTENDED ONLY FOR GENERL ONFORMNE TO THE DESIGN ONEPT ND ONSTRUTION DOUMENTS. SD-. SHOP DRWINGS WILL BE RETURNED FOR RE IF MJOR ERRORS RE FOUND DURING REVIEW. SD-. LLOW MINIMUM OF (0) WORKING DYS FOR REVIEW OF SHOP DRWINGS BY THE STRUTURL ENGINEER. 0 Watts Road Madison, WI 3 phone: opyright 0 REHB + DDITION TO JOLIET FMS 00 W JEFFERSON STREET 03// E B-3 FINL 3//0 :: PM :\Revit Local\ S-entral_8mjb.rvt NGB PN.: W0FYQ-0-D-000-E // STRUTURL NOTES S-00

3 00' - " ' - 38' - " ' - " ' - " 0' - 0" ' - " ' - ' - 0" ' - 0" ' - " ' - S- 3 3 F F P P P8 P8 83' - 0" ' - " ' - ' - 0" ' - 0" ' - 0" ' - 0" ' - 0" ' - ' - 0" ' ' - " ' - " S- 3.0 OF () 3.0. S-0 S-0 P F3. TOW T DOOR TOW 3.03 F3 P ' - 0" ' - 0" S-0 3' - " ' - " S P8 F3 P ' - 0" 3.0 ' - 0" ' - " F F3 P P8 P. TOW T DOOR TOW 3.0 S-0 S-0 P F 3.0 S- 3.0 OF () ' - " ' - 0" ' - " 0' - 0" ' - " ' - ' - ' - ' - 00' - " FOUNDTION PLN GENERL NOTES. SITE DTUM OF FINISHED FIRST FLOOR INDITED ON IVIL SITE PLN = ELEVTION 00'-0" ON STRUTURL DRWINGS.. FIELD VERIFY LL DIMENSIONS, BRING NY DISREPNIES TO THE TTENTION OF THE RHITET/ENGINEER FOR FINL DEISION. 3. NOT USED.. REFER TO SHEET S-00 FOR STRUTURL LEGENDS, BBREVITIONS, ND SYMBOLOGY.. REFER TO SHEETS S-0 ND S-0 FOR DETILS NOT REFERENED ON THIS SHEET.. TOP OF ELEVTION = '-" UNLESS NOTED OTHERWISE.. REFER TO DETILS OF SHEET S-0 FOR ELEVTIONS. 8. TOP OF FOUNDTION ELEVTION = 00'- UNLESS NOTED OTHERWISE.. STRIP S SHLL BE ENTERED UNDER FOUNDTION/MSONRY S UNLESS NOTED OTHERWISE. 0. PIER SIZES RE MINIMUM REQUIRED FOR FOUNDTION STRENGTH. PIERS MUST BE T LEST INHES LRGER THN METL BUILDING BSE PLTES. IF NEESSRY, INRESE PIER SIZES TO OMODTE METL BUILDING BSE PLTES.. SEE RHITETURL FOR DDITIONL LINTELS, FRMING ND METL DEK. KEYED NOTES 3.0 EISTING FOUNDTION TO REMIN PROVIDE () LYERS OF BUILDING FELT BETWEEN NEW ND EISTING FOUNDTIONS. 3.0 NEW FOUNDTION T EISTING, SEE DETIL /S BOLLRD, SEE RHITETURL. 0 Watts Road Madison, WI 3 phone: opyright 0 REHB + DDITION TO JOLIET FMS 00 W JEFFERSON STREET 03// E B-3 FINL 3//0 :0:0 PM :\Revit Local\ S-entral_8mjb.rvt ONRETE SPRED SHEDULE SIZE BOTTOM REINFOREMENT TOP REINFOREMENT MRK LENGTH THIKNESS LONGITUDINL TRNSVERSE LONGITUDINL TRNSVERSE REMRKS F3 3' - 0" 3' - 0" ' - 0" # T " O.. # T " O.. # T " O.. # T " O.. F3 3' - 0" ' - 0" ' - 0" # T " O.. # T " O.. # T " O.. # T " O.. F ' - 0" ' - 0" ' - " () # () # () # () # 8' - 0" 8' - 0" ' - " (8) # (8) # (8) # (8) # ONRETE SPRED SHEDULE GENERL NOTES. SEE NOTE SHEET S-00 FOR BERING SOILS PREPRTION REQUIREMENTS.. EMBED DOWELS INTO, 3" LER OVER FROM BOTTOM OF. ONRETE SPRED SHEDULE REMRKS. BOTTOM OF TO MTH BOTTOM OF EISTING. P8 ' - 0" 0' - 0" 3' - 0" 0' - 0" ' - 0" D NORTH P8 S-0 / = '-0" 0' - 3" 3' - " P8 ' - 0" ' - 0" B 3' - " FOUNDTION PLN - OVERLL P8 ONRETE STRIP SHEDULE SIZE TOP REINFOREMENT BOTTOM REINFOREMENT MRK HEIGHT "H" LONG. TRNS. LONG. TRNS. REMRKS SF. ' - " ' - " () # ' - 0" ' - 0" () #. ' - ' - 0" () # ONRETE STRIP SHEDULE NOTES. SEE NOTE SHEET S-00 FOR BERING SOILS PREPRTION REQUIREMENTS.. SEE /S-0 FOR INTERSETION REINFORING. 3. EMBED DOWELS INTO, 3" LER OVER FROM BOTTOM OF.. EEPT WHERE SPEIFILLY NOTED, E "" DOWELS SHLL BE TIED IN PLE PRIOR TO ONRETE PLEMENT. 0 8 NGB PN.: W0FYQ-0-D-000-E // FOUNDTION PLN S-0

4 FLTWORK PLN GENERL NOTES 83' - 0" ' - 0" ' - " ' SITE DTUM OF FINISHED FIRST FLOOR INDITED ON IVIL SITE PLN = ELEVTION 00'-0" ON STRUTURL DRWINGS.. FIELD VERIFY LL DIMENSIONS, BRING NY DISREPNIES TO THE TTENTION OF THE RHITET/ENGINEER FOR FINL DEISION. 3. NOT USED.. REFER TO SHEET S-00 FOR STRUTURL LEGENDS, BBREVITIONS, ND SYMBOLOGY.. REFER TO SHEET S- FOR DETILS NOT REFERENED ON THIS SHEET. 0 Watts Road Madison, WI 3 phone: REFER TO DETIL /S- FOR STRUTURL SLB ES. 3//0 :0:3 PM :\Revit Local\ S-entral_8mjb.rvt 00' - " ' - 38' - " ' - " ' - ' - ' - 3' - ' - 3' - 0" 3' - 0" ' - " ' - 0" 3 3 0' - 0" ' - " S- D 0' - 0' - ' - " ' - " 0' - 0' - SLB08 SLB0 B 0' - 0" 0' - 0" 3.0 OF () 3.0 ' - 0" S- S- 00' - 0" 00' - 0" 00' - 0" FD RIM S- 00' - 0" SLB0 0' - 0' - ' - " ' - " 0' - 0' - ' - 0" 00' - 0" FD RIM 00' - 0" 00' - 0" 00' - 0" ' - 0" 0' - 0" 3' - 0" 0' - 0" ' - 0" NORTH S S- 3 S- S- 3.0 S- 0 S- ' - 0" S OF () FLTWORK PLN - OVERLL / = '-0" ' - 0" 3' - ' - 3' - 0" 3' - 0" ' - " 0' - 0" ' - " ' - ' - ' - ' - 00' - ". FLOOR FINISH : ROOMS 0, 0, 0 FLOT, TROWEL ND SEL. ROOMS 0, 0 08 FLOT ND FINISH PER FLOORING MNUFURER'S REOMMENDTIONS. 8. () DSHED LINES INDITE () DDITIONL # BRS ('-0" LONG) DIGONL " FROM ORNER IN SLB, LER FROM TOP OF SLB.. SEE RHITETURL FOR DDITIONL LINTELS, FRMING ND METL DEK. KEYED NOTES 3.0 BOLLRD, SEE RHITETURL. 3.0 PROVIDE () LYERS OF BUILDING PPER BETWEEN ONRETE STOOP ND OH DOOR PRON. 3.0 REMOVE EISTING ONRETE FLOOR IN THIS ROOM. REPLE WITH SLB E SLB0, SEE DETIL /S HIRPIN IN SLB, SEE DETIL /S SLB-ON-GRDE ONRETE EQUIPMENT PD (SEE DETIL /S-). OORDINTE E SIZE ND LOTION WITH MEHNIL EQUIPMENT ONTROR. 3.0 PTH WITH SLB E SLB0. DOWEL PTH TO SURROUNDING ONRETE WITH # T LL ROUND, ENTERED IN SLB THIKNESS. opyright 0 NGB PN.: W0FYQ-0-D-000-E0 REHB + DDITION TO JOLIET FMS 008 S- 00 W JEFFERSON STREET 03// E B-3 FINL // FLTWORK PLN

5 L ONSTRUTION JOINT L ONSTRUTION JOINT 0'-0" M. SPING LSS "B" LP 0'-0" M. SPING REINFORING ONTINUOUS THROUGH JOINTS, 3" ' - 0" MIN ST IRON PIPE SLEEVE. VERIFY OPENING ND LOTION OF OPENING ND PIPE SLEEVE WITH TRDE OR SUB- ONTROR.. SEE FOUNDTION PLNS FOR VERTIL ND HORIZONTL REINFORING. DIGONL BRS: () # BRS, EH FE 0'-0" M. SPING LSS "B" LP 0'-0" M. SPING NOTE: SIMILR T S WHERE REINFOREMENT IS PLED EH FE. REINFORING ONTINUOUS THROUGH JOINTS NT STRIP (EH SIDE) (SEE FLTWORK PLN) EQ EQ 00' - 00' - 0" / RIGID INSULTION WITH SELNT T SURFE ONRETE WITH # BRS T O.. EH WY, ENTERED DOWEL, MTH STEEL SIZE ND SPING (SEE FNDN PLN) 0 Watts Road Madison, WI 3 phone: ONSTRUTION JOINT " = '-0" 8 FOUNDTION PENETRTION / = '-0" FOUNDTION ONSTRUTION JOINT " = '-0" FOUNDTION 3/" = '-0" opyright 0 LSS B LP BENT BR T ORNERS SHLL MTH REINFORING ONTINUOUS STRIP REINFORING, SEE SHEDULE, PROVIDE STNDRD HOOK T BR ENDS S SHOWN LSS B LP INTERSETIONS / = '-0" LSS B LP RETNGULR OPENING IN ST IN PLE ONRETE B 3" M 3" M IRULR OPENING IN ST IN PLE ONRETE () # BRS x '-0" LONG EH FE, () # BRS EH FE,. PPLIES TO LL OPENINGS WHERE '' OR 'B' IS GRETER THN OR EQUL TO ST IN PLE ONRETE THIKNESS.. VERIFY SIZE ND LOTION OF OPENINGS WITH TRDE OR SUB- ONTROR REQUIRING OPENINGS. () # BRS x '-0" LONG EH FE, () # BRS EH FE,. PPLIES TO LL HOLES WHERE DIMETER IS GRETER THN OR EQUL TO ST IN PLE ONRETE THIKNESS.. VERIFY SIZE ND LOTION OF OPENINGS WITH TRDE OR SUB- ONTROR REQUIRING OPENINGS. 3. '-0" MIMUM OPENING UNLESS NOTED OTHERWISE. ONRETE PENETRTION REINFOREMENT /" = '-0" ' - 0" BR LP 0'-0" M. SPING ' - 0" BR LP ORNER BRS TO MTH REINFORING OPTIONL ONSTRUTION JOINT HORIZONTL REINFORING L ONTROL JOINT FOUNDTION ONTROL JOINT " = '-0" 0'-0" M. SPING REINFOREMENT EH FE NOTE: SIMILR T S WHERE REINFOREMENT IS PLED EH FE. NOTE: WHEN MSONRY IS BOVE LIGN MSONRY ND ONRETE ONTROL JOINTS. REINFORING ONTINUOUS THROUGH JOINTS NT STRIP (EH SIDE) ' - 0" BR LP S- EQ ' - " EQ S- ' - 0" " FOUNDTION BEYOND BEYOND 00' - 00' - 0" " ONRETE WITH () # BRS TOP ND BOTTOM # DOWEL T O.. (SEE FNDN PLN) FOUNDTION T PRON 3/" = '-0" FOUNDTION BEYOND BEYOND 00' - 00' - 0" ONRETE WITH () # BRS TOP ND BOTTOM # DOWEL T O.. (SEE FNDN PLN) REHB + DDITION TO JOLIET FMS 00 W JEFFERSON STREET 03// E B-3 FINL ' - 0" BR LP ' - 0" BR LP 3 FOUNDTION T STOOP 3/" = '-0" NEW FOUNDTION 3//0 :0: PM :\Revit Local\ S-entral_8mjb.rvt 0 ENGINEERED FILL (SETION 300) GRDE PREPRED SUB-GRDE (SETION 300) BKFILL REQUIREMENTS T ETERIOR FOUNDTION / = '-0" ' - 0" BR LP ORNER BRS TO MTH REINFORING OPTIONL ONSTRUTION JOINT HORIZONTL REINFORING REINFOREMENT ENTERED. VERTIL REINFORING NOT SHOWN FOR LRITY.. FOUNDTION LEDGE NOT SHOWN FOR LRITY. 3. = FOUNDTION. FOUNDTION INTERSETIONS " = '-0" T.O. EISTING 00' - 0" NEW MU INFILL T.O. NEW 00' - () LYERS BUILDING PPER EISTING FOUNDTION LIGN NEW TO EISTING FOUNDTION ONNETION 3/" = '-0" T.O. EISTING ' - " (VERIFY) () # BRS x " LONG. DRILL ND GROUT INTO EISTING ( EMBED) NGB PN.: W0FYQ-0-D-000-E // FOUNDTION DETILS S-0

6 ONRETE PIER SHEDULE TIES MRK SIZE VERTIL REINFOREMENT E # ND SPING REMRKS P " x " () # D (3) # P " x " () # D (3) # P8 x " () # D (3) # ONRETE PIER SHEDULE GENERL NOTES. SEE PIER DETILS ON S-0 FOR ELEVTIONS.. REFERENE TIE DETILS FOR ROSS-TIE REQUIREMENTS. 3. WHEN PIERS RE INTEGRL WITH S, PIER DIMENSIONS RE INDITED FOR THE PURPOSE OF DIMENSIONING PIER TIES, SETTING VERTIL REINFORING, DEFINING ETENT OF REESS OR PROJETION FROM TOP OF. ENTER PIER REINFORING GE BELOW OLUMN ND ORIENT LONG DIMENSION OF PIER WITH IS OF UNLESS NOTED OR DETILED OTHERWISE. ONTINUE REINFORING THROUGH PIERS WITH LPS S REQUIRED.. E - ONRETE PIER SHEDULE REMRKS TIE DETILS E - B E - OLUMN + OLUMN OLUMN + OLUMN / THIK BSE PLTE HSS OLUMN () / HSS OLUMN BSE PLTE / = '-0" OLUMN + / () BOLT HOLES, HOLE DIMETER = NHOR BOLT DI. + /" (SEE OLUMN SHEDULE) ' - " 8 / 8 / / ' - " 8 / 8 / 3/" = '-0" EISTING FOUNDTION T.O. EISTING 00' - 0" (VERIFY) ' - " STEEL OLUMN PER MBS HSS M BSE PLTE DESIGN OMPLETE BY MED & HUNT (SEE DETIL /S-0) PIER P (SEE PIER SHEDULE) ' - " 8 / 8 / / 8 / ' - 0" " 3/" = '-0" T.O. EISTING 00' - 0" (VERIFY) EISTING FOUNDTION MU INFILL (SEE DETIL /S-0) ' - " 00' - STEEL OLUMN PER MBS. HSS M BSE PLTE DESIGN OMPLETE BY MED & HUNT (SEE DETIL 0/S-0) FOUNDTION FW08 (SEE DETIL /S-0) 0 Watts Road Madison, WI 3 phone: opyright 0 " OLUMN / / THIK BSE PLTE ' - " ' - 0" E - D E - E E - F OLUMN + / 3" ' - OLUMN 0 LER / HSS OLUMN () / HSS OLUMN BSE PLTE / = '-0" PIER SETION 3/" = '-0" () BOLT HOLES, HOLE DIMETER = NHOR BOLT DI. + /" (SEE OLUMN SHEDULE) OLUMN ND BSE PLTE BY METL BUILDING SUPPLIER 00' - 0" ' - " VERTIL REINFOREMENT WITH STNDRD HOOK (SEE SHEDULE) LOOP ONTINUOUS OVER TOP TIES (SEE SHEDULE) (BY METL BUILDING SUPPLIER) ' - 0" / ' - " 8 ROD DIMETER 3/" = '-0" (MINIMUM '-0" ) " PIER P8 (SEE PIER SHEDULE) METL BUILDING OLUMN WELDED PLTE WSHER WHERE REQUIRED, SEE SPE. (xx/" T 3/" NHORS, 3x3x/ T /" NHORS) OLUMN BSE PLTE (SEE OLUMN SHEDULE) /" LEVELING PLTE, REMOVE FTER LEVELING NUTS HVE BEEN SET GROUT BED LEVELING NUT BSE PLTE NHORGE / = '-0" NHOR RODS SHLL BE ( PER BSE PLTE) 3/" DI F GR MINIMUM. IF NEESSRY, INRESE SIZE REQUIRED BY METL BUILDING SUPPLIER. ' - 0" ' - ' - " ' - 0" ' - " " " DOOR OPENING 3 S-0 ' - 0" " 3/" = '-0" ' - 0" METL BUILDING OLUMN 00' - FOUNDTION FW08 (SEE DETIL /S-0) FOUNDTION FW08 (SEE DETIL /S-0) 00' - OLUMN ND BSE PLTE " " 3/" = '-0" HOLD JMB POST BK DEPTH OF IMP REHB + DDITION TO JOLIET FMS 00 W JEFFERSON STREET 03// E B-3 FINL SEOND SLB POUR 3//0 ::8 PM :\Revit Local\ S-entral_8mjb.rvt 00' - T.O. SLB 00' - 0" / BLOK-OUT OF IF NEESSRY ' - " / 0" 3" LER 3' - " ' - " RIGID FRME PIER SETION 3/" = '-0" HIRPIN (SEE DETIL /S-) SLB ON GRDE ONRETE PIER NHOR RODS (DESIGNED ND SUPPLIED BY METL BUILDING SUPPLIER) VERTIL REINFOREMENT WITH STNDRD HOOK (SEE SHEDULE) LOOP ONTINUOUS OVER TOP SPRED ' - 0" ' - " # BR T BLOK-OUT. ETEND MINIMUM PST BLOK-OUT. 8 3/" = '-0" PIER (SEE DETIL) METL BUILDING OLUMN 00' - FOUNDTION FW08 (SEE DETIL /S-0) / BLOK-OUT OF IF NEESSRY ' - 0" ' - " # BENT BR T BLOK-OUT. ETEND MINIMUM PST BLOK-OUT. 3/" = '-0" " ' - 0" METL BUILDING OLUMN 00' - FOUNDTION FW08 (SEE DETIL /S-0) / BLOK-OUT OF IF NEESSRY NGB PN.: W0FYQ-0-D-000-E // MJE FOUNDTION DETILS S-0

7 30 HIRPINS IN SLB / = '-0" 30 HIRPINS T ENDS # HIRPIN 8'-0" LONG EH LEG ENTERED IN SLB FOUNDTION HIRPINS T ORNERS ' - 8 / 8 / 8 / HSS OLUMNS LONG GRID EISTING / ISOLTION JOINT MTERIL FINL SLB POUR HSS OLUMN ETENT OF PIER BELOW ONTROL JOINTS SLB08 (SEE DETIL /S-) PROVIDE () LYERS OF BUILDING PPER BETWEEN SLB POURS TO PREVENT BOND /" /" WIDE JOINT ( BLDES). SW UT TO HOURS FTER ONRETE IS PLED. FILL WITH FLOOR ONTROL JOINT FILLER SLB0 (SEE DETIL /S-) JOINT T SLB08 TO SLB0 TRNSITION / = '-0" 3" " S REQ. E SLB0 WITH x - W.xW. WWF, T LER FROM TOP OF SLB FINE-GRDED GRNULR VPOR BRRIER (SETION ) ENGINEERED FILL PREPRED SUB-GRDE (SETION ) 0 Watts Road Madison, WI 3 phone: opyright 0 OVERHED DOOR (SEE RHITETURL) EISTING MU BEYOND / ISOLTION JOINT MTERIL NEW SLB SLB0 (SEE DETIL /S-) EISTING MU BEYOND EISTING " SLB / ISOLTION JOINT MTERIL NEW SLB SLB0 (SEE DETIL /S-) SLB0 SLB08 S- FINL SLB POUR / FOUNDTION BEYOND ONRETE PRON (SEE IVIL DRWINGS) 3" S REQ. WITH # BRS T " O.. EH WY, T LER FROM TOP OF SLB FINE-GRDED GRNULR ENGINEERED FILL 3 TD RIM EISTING FOUNDTION, REMOVE TOP " FOR NEW EISTING " SLB NEW SLB T EISTING BUILDING / = '-0" SEE FLTWORK PLN ' - TRENH DRIN (SEE PLUMBING) NEW SLB IN EISTING BUILDING / = '-0" EISTING ETERIOR MU BEYOND NEW SLB SLB0 (SEE DETIL /S-) DRILL ND GROUT (3) # BENT BRS INTO EISTING FOUNDTION FINL SLB POUR RIGID FRME LONG GRID / ISOLTION JOINT MTERIL ETENT OF PIER BELOW ONTROL JOINTS ONTROL JOINTS / ISOLTION JOINT MTERIL ETENT OF PIER BELOW FOUNDTION # DOWELS T O.. /" # DOWELS T O.. " RIGID INSULTION WITH SELNT T SURFE (LIGN WITH OVERHED DOOR) FOUNDTION PRON T OVERHED DOOR / = '-0" PSS DOOR (SEE RHITETURL) STOOP SLB (SEE DETIL /S-) / / '-0" " RIGID INSULTION WITH SELNT T SURFE, LIGN WITH PSS DOOR. E SLB08 STRUTURL SLB ES " = '-0" / SLB THIKNESS ( /" MINIMUM) EQUL ONSTRUTION JOINT L PREPRED SUB-GRDE (SETION ) /" WIDE JOINT ( BLDES). SW UT TO HOURS FTER ONRETE IS PLED. FILL WITH FLOOR ONTROL JOINT FILLER EQUL REHB + DDITION TO JOLIET FMS 00 W JEFFERSON STREET # BENT BRS T " O.. ' - 0" ' - 0" () # BRS ONTINUOUS THIKENED SLB T TRENH DRIN " = '-0" 0 REMOVE EISTING " SLB EISTING FOUNDTION NEW SLB IN EISTING BUILDING / = '-0" 8 ' - " ' - " RIGID FRME LONG GRID SLB JOINTS T ISOLTED OLUMN 3/" = '-0" SLB T PSS DOOR / = '-0" RIGID INSULTION, ETEND DOWN TO TOP OF BUILDING FOUNDTION # DOWEL (3'-0" LONG) T 3" O.. ENTERED ON JOINT (ENTERED IN SLB) ONSTRUTION JOINT () / = '-0" 03// E B-3 FINL 3//0 ::0 PM :\Revit Local\ S-entral_8mjb.rvt " " T.O. GRDE FIELD VERIFY LER ISOLTED EQUIPMENT PD # BENT BRS T O.. LL ROUND x LENGTH STEEL TROWEL ND SEL # BRS T O.. EH WY TOP & BTM VRIES TOOL EDGES / ISOLTION JOINT MTERIL WTIH / FLEIBLE JOINT SELNT DJENT SLB ND/OR SPHLT ISOLTED EQUIPMENT PDS " = '-0" /" EISTING " BR T " O.. ( LONG, " EMBED) " WITH x-w.0xw.0 WWF SLB SHLL REEIVE BROOM FINISH / / FOOT OMPED GRNULR FILL FROM BOTTOM OF SLB TO TOP OF ' - 0" EISTING BUILDING FOUNDTION ND NEW STOOP T EISTING 3/" = '-0" STOOP FOUNDTION WITH ONTINUOUS # BR TOP ND BOTTOM. # DOWELS T " O.., SF. (SEE SHEDULE) # DOWELS T " O.. T.O. STOOP ' - MTH BLDG S- 3/" = '-0" ' - 0" " " STOOP SETION " WITH x-w.0xw.0 WWF SLB SHLL REEIVE BROOM FINISH / / FOOT OMPED GRNULR FILL FROM BOTTOM OF SLB TO TOP OF FOUNDTION WITH # TOP ND BOTTOM ND # DOWELS T O.. (SEE STRIP SHEDULE) # DOWELS T " O.. T.O. STOOP ' - STOOP FOUNDTION WITH ONTINUOUS # BR TOP ND BOTTOM. # DOWELS T " O.. MTH BLDG SF. (SEE STRIP SHEDULE) 3 / SLB THIKNESS ( /" MINIMUM) / = '-0" ONTROL JOINT L / WIDE JOINT. SW UT TO HOURS FTER ONRETE IS PLED. FILL WITH FLOOR ONTROL JOINT FILLER ONTROL JOINT "" () NGB PN.: W0FYQ-0-D-000-E // FLTWORK DETILS S-

A '-4" 10'-10" 16'-6" 7'-0" 23'-0" 10 3/4" 9'-6" 5 1/4" 2'-11 1/2" 2'-6" 3'-2 3/4" 3'-1" 4'-8 3/4" 2'-5 3/4" 2'-6" 7'-2" R.O. HD 7'-3" R.O.

A '-4 10'-10 16'-6 7'-0 23'-0 10 3/4 9'-6 5 1/4 2'-11 1/2 2'-6 3'-2 3/4 3'-1 4'-8 3/4 2'-5 3/4 2'-6 7'-2 R.O. HD 7'-3 R.O. Name of Trust, First Floor Plan -. -. 7'-" 0'-0" '-" 7'-0" '-0" -. N '-0" 9'-0" 7'-" 7'-" '-0" '-" " 0" '- /" '-0" '- /" 9" '-0" 9" '-0" 0 /" '-" '- /" '-" '-" '-0" '-" 0 /" 9'-" /" '- /" '-" '- /" '-"

More information

GENERAL NOTES / TYPICAL DETAILS

GENERAL NOTES / TYPICAL DETAILS GENERL NOTES / TYPIL DETILS x [RH] GENERL THE GENERL NOTES ND TYPIL DETILS RE PPLILE TO LL STRUTURL ONDITIONS NOT SPEIFILLY DETILED OR REFERENED ON STRUTURL DRWINGS THESE NOTES, DETILS ND DRWINGS RE TO

More information

GENERAL NOTES USE OF DESIGN DATA SHEETS:

GENERAL NOTES USE OF DESIGN DATA SHEETS: GENERL DT: TE FOLLOWING DT IS SSUMED: USE OF DT SEETS: ED REVIEWED INTERNL NGLE OF FRITION OF KFILL SOIL, = 30 TOTL UNIT WEIGT OF KFILL SOIL = 20 PF bf. LULTE TE REQUIRED EIGT "" PER TE "STEM EIGT" NOTE

More information

-Scope of Work Drawings to Follow-

-Scope of Work Drawings to Follow- -Scope of Work Drawings to Follow- Bid #99- onstruction Services for Veterans Memorial Park Pool House Page 0 INDEX TO DRWINGS RHITETURL -0. TITLE SHEET -. FLOOR PLN -. ELEVTIONS -. WLL SETIONS -. WLL

More information

PENINSULA - TYPE 1 3/8"=1'-0" ADA PENINSULA - TYPE 3 3/8"=1'-0" PENINSULA - TYPE 2 3/8"=1'-0" VANITY TYPES - NOTES 3/8"=1'-0"

PENINSULA - TYPE 1 3/8=1'-0 ADA PENINSULA - TYPE 3 3/8=1'-0 PENINSULA - TYPE 2 3/8=1'-0 VANITY TYPES - NOTES 3/8=1'-0 " ". 7'- " ". '-0" " " '-0". LR 5" '-" LER. '-0" M PENINSUL - E PENINSUL - E D PENINSUL - E. VNITY WIDTHS VRY. SEE 5/ ND 6/ FOR STNDRD WIDTHS.. STNDRD VNITY INET HS LEGS. ONTRTOR TO SEURE INET ND OUNTERTOP

More information

GENERAL NOTES USE OF DESIGN DATA SHEETS:

GENERAL NOTES USE OF DESIGN DATA SHEETS: GENERL DT: TE FOLLOWING DT IS SSUMED: USE OF DT SEETS: ED INTERNL NGLE OF FRITION OF KFILL SOIL, = 0 TOTL UNIT WEIGT OF KFILL SOIL = 0 PF bf. LULTE TE REQUIRED EIGT "" PER TE "STEM EIGT" NOTE ON TIS SEET.

More information

MODEL 351 POWERGLIDE SERIES INSTRUCTIONS FOR INSTALLING SARGENT DOOR CLOSERS WITH "H" HOLDER ARMS

MODEL 351 POWERGLIDE SERIES INSTRUCTIONS FOR INSTALLING SARGENT DOOR CLOSERS WITH H HOLDER ARMS MODEL POWERGLIDE SERIES INSTRUTIONS FOR INSTLLING SRGENT LOSERS WITH "H" HOLDER S SERIES NON SIZED DJUSTLE SIZES THRU 6 UTION: FILURE TO INSTLL OR DJUST PROPERLY MY RESULT IN INJURY OR DMGE. FOR SSISTNE,

More information

7. CONTINUOUS HORIZONTAL BARS AND CORNER BARS IN SLABS SHALL BE LAPPED AS FOLLOWS AT SPLICES. SPLICE LOCATION SHALL BE STAGGERED WHERE POSSIBLE.

7. CONTINUOUS HORIZONTAL BARS AND CORNER BARS IN SLABS SHALL BE LAPPED AS FOLLOWS AT SPLICES. SPLICE LOCATION SHALL BE STAGGERED WHERE POSSIBLE. GENERL NOTE: DEIGN RITERI ONRETE (ONT.): TRUTURL TEEL:. DEIGN LIVE LOD RE IN ORDNE WITH THE INTERNTIONL UILDING ODE, 00 EDITION, WITH THE FOLLOWING MINIMUM RITERI: FLOOR LOD: OUPNY OR UE: LIVE LOD: EXIT

More information

METAL CONCRETE CONCRETE BATT INSULATION, SOUND ATTENUATION BLANKET MASONRY UNIT RIGID INSULATION WOOD BITUMINOUS PAVING PLYWOOD EARTH

METAL CONCRETE CONCRETE BATT INSULATION, SOUND ATTENUATION BLANKET MASONRY UNIT RIGID INSULATION WOOD BITUMINOUS PAVING PLYWOOD EARTH GENERL NOTES N SPEIFITIONS: MISELLNEOUS BY ESRIPTION ESIGN N LOING BBREVITIONS: SWN LUMBER LMINTE VENEER LUMBER (LVL) SYMBOLS: ONRETE METL STEEL STU PRTITION ONRETE MSONRY UNIT BTT INSULTION, SOUN TTENUTION

More information

Basis of Design - Performance-Based Design

Basis of Design - Performance-Based Design asis of Design - Performance-ased Design March th 07 KPFF onsulting Engineers SW Fifth venue, Suite 00 Portland, OR 970 (0) 7- INTRODUTION ND KGROUND This document outlines the basis of design for the

More information

Whapmagoostui Warehouse Expansion/ FOR COORDINATION

Whapmagoostui Warehouse Expansion/ FOR COORDINATION OORDINTION SYMOLS ND REFERENES GRID NUMER GENERL NOTES. GENERL ONTRTOR MUST INFORM THE RHITET OF LL SPEIFI ONDITIONS OF THE PROJET THT MY FFET, HRM, OR STOP THE EEUTION OR OMPLETION OF THE WORK DEMNDED

More information

WHEAT RIDGE STORAGE BUILDING

WHEAT RIDGE STORAGE BUILDING WHET RIDGE STORGE UILDING S9999 0 WEST VE WHET RIDGE, O UILDING ODE INFORMTION PROJET INFORMTION SHEET INDEX GOVERNING ODES: 0 INTERNTIONL UILDING ODE (I) 0 INTERNTIONL MEHNIL ODE (IM) 0 INTERNTIONL FIRE

More information

ISSUED FOR CONSTRUCTION - VOLUME 1

ISSUED FOR CONSTRUCTION - VOLUME 1 TERMINL ISSUED FOR ONSTRUTION - VOLUME DRWING SHEET LIST T- Title Sheet - dministration uilding Stairs & Elevators T- TITLE SHEET - Enlarged Plans - Proposed Utility Plans of - Interior Elevations - -

More information

* * 98/9949WDC. 1-Point Latch (LBL) 2-Point Latch includes these additional parts. Customer Service

* * 98/9949WDC. 1-Point Latch (LBL) 2-Point Latch includes these additional parts. Customer Service *24017501* 24017501 Coneled Vertil Devie for Wood Doors 98/9949WDC Instlltion Instrutions 1-Point Lth (LBL) 2-Point Lth inludes these dditionl prts NOTE: If door does not hve utout for ling inside lok

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PGE INTENTIONLLY LEFT LNK Summary of hanges Standard Plan -9. ridge pproach Panel Layout (oncrete arrier on Wingwall) Transmittal Letter No. (-0) General. oncrete mix designations have been updated

More information

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF PROJECT DELIVERY

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF PROJECT DELIVERY GENERL NOTES. PROVIE 3-INH ONRETE OVER ON REINFOREMENT RS, EXEPT S NOTE. USE LSS EMENT ONRETE f'c = 3000 PSI IN PEESTLS, FOOTINGS N S. PROVIE GRE 60 REINFORING STEEL RS THT MEET THE REQUIREMENTS OF STM

More information

DETAIL A SCALE 1 : 85

DETAIL A SCALE 1 : 85 ISIONS ZONE LTR. ESRIPTION TE PP - INITIL RELESE PER N NORTH.0 0 EST ISOLTE P (0" X.") 0 9 0 X FOOKE # 0 ENTER ISOLTE P (" X 9") WEST ISOLTE P (0" X.") FOOKE # 0. RWING ONTENTS SHEET : OVERLL LYOUT SHEET

More information

EARL GREY SCHOOL GYM CONSTRUCTION: 845 HILLCREST AVENUE SW, CALGARY, ALBERTA CONSULTANTS: ARCHITECTURAL: STRUCTURAL: MECHANICAL: ELECTRICAL:

EARL GREY SCHOOL GYM CONSTRUCTION: 845 HILLCREST AVENUE SW, CALGARY, ALBERTA CONSULTANTS: ARCHITECTURAL: STRUCTURAL: MECHANICAL: ELECTRICAL: ONSTRUTION: 845 HILLREST VENUE SW, LGRY, LERT ONSULTNTS: RHITETURL: STRUTURL: MEHNIL: ELETRIL: #00, 000-9th VE. S.W. LGRY, LERT. PHONE: (403) 6-85 F: (403) 37-639 RESS RWING INE RWING REFERENE RHITETURL

More information

LAYOUT OF STONE PILE SCALE=1:100 SECTION OF PILE FOUNDATION SCALE=1:100 BUILDING LINE TRENCH LINE

LAYOUT OF STONE PILE SCALE=1:100 SECTION OF PILE FOUNDATION SCALE=1:100 BUILDING LINE TRENCH LINE 22120 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2120 2000 1500 1500 2000 1500 REV. ESRIPTION TE 2000 UILING LINE TRENH LINE 2000 2000 2000 16175 GROUN LEVEL 2000 (STONE PILE) GGREGTE N SN (1:4)

More information

SLOVAK UNIVERSITY OF TECHNOLOGY Faculty of Material Science and Technology in Trnava. ELECTRICAL ENGINEERING AND ELECTRONICS Laboratory exercises

SLOVAK UNIVERSITY OF TECHNOLOGY Faculty of Material Science and Technology in Trnava. ELECTRICAL ENGINEERING AND ELECTRONICS Laboratory exercises SLOVAK UNIVERSITY OF TECHNOLOGY Fulty of Mteril Siene nd Tehnology in Trnv ELECTRICAL ENGINEERING AND ELECTRONICS Lbortory exerises Róbert Riedlmjer TRNAVA 00 ELECTRICAL ENGINEERING AND ELECTRONICS Lbortory

More information

MOE FLEXIBLE LEARNING SPACE NELSON 2-STOREY BLOCK WELLINGTON AND CHRISTCHURCH - OPTION 1

MOE FLEXIBLE LEARNING SPACE NELSON 2-STOREY BLOCK WELLINGTON AND CHRISTCHURCH - OPTION 1 MOE FLEXILE LERNING SPE NELSON 2-STOREY LOK WELLINGTON N HRISTHURH - Plot ate: Office: Filename: 19/08/201 :18:4 a.m. -MOE-NELSON LOK ENTRL FILE 201 - ONRETE-_detached.rvt 1 TE N: 54 005 19 87 person using

More information

For installation help please visit Please Do Not Return Product to Store!

For installation help please visit   Please Do Not Return Product to Store! Instlltion Guide Replement Sreen Housing for ndersen Luminire Retrtle Inset Sreen Door For instlltion help plese visit www.ndersenluminire.om/instll Plese Do Not Return Produt to Store PLESE ll the Storm

More information

Technical Note 7. General Introduction. Holy Stone

Technical Note 7. General Introduction. Holy Stone Generl Introdution Tehnil Note 7 The Multilyer Cermi Chip Cpitors supplied in bulk, ssette or tped & reel pkge re idelly suitble for thik-film Hybrid iruits nd utomti surfe mounting on printed iruit bords.

More information

* TURNING SPACE ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * TURNING SPACE ** RAMP

* TURNING SPACE ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * TURNING SPACE ** RAMP * MXIMUM TURNING SPCE IS 2.0% IN ECH DIRECTION OF TRVEL. MINIMUM DIMENSIONS 5' x 5'. SEE NOTES. ** MXIMUM RMP CROSS IS 2.0%, RUNNING 5% - 7% (8.3% MXIMUM). SEE NOTES. "NON-WLKING" RE * TURNING SPCE 24"

More information

ALUMINUM PEDESTRIAN/BICYCLE RAILING

ALUMINUM PEDESTRIAN/BICYCLE RAILING MEMBER s (Type "" & "B") s (Type "") Top Plate (Type "") End Hoops Joint/Splice Sleeves Intermediate & Int. & onnection Sleeve Handrail Joint/Splice Sleeves Handrails Handrail Support Bar Pickets (Type

More information

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF PROJECT DELIVERY

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION BUREAU OF PROJECT DELIVERY MIN. MX. LP SPLIE S REQUIRED Y DESIN TOP ND OTTOM S REQUIRED Y DESIN PREST PREST MODULR EMEDMENT LP THIKNESS SPLIE EPOXY OTED x ROUTED SPLIE MIN. HMER OUPLER SPN (S) ROUT PORT DETIL, SEE DESIN NOTE 6 SEE

More information

GENERAL NOTES 1600 SYSTEM NOTES STRUCTURAL SEAL NOTES 1 - HANDLING, STORING AND PROTECTING ALUMINUM MATERIAL. 2 - GENERAL RULES

GENERAL NOTES 1600 SYSTEM NOTES STRUCTURAL SEAL NOTES 1 - HANDLING, STORING AND PROTECTING ALUMINUM MATERIAL. 2 - GENERAL RULES GENERL NOTES 162-971 1 OF 12 THESE INSTLLTION INSTRUCTIONS RE SUPPLEMENT TO THE PPROVED SHOP DRWINGS. USE IN CONJUNCTION WITH THOSE DRWINGS. 1 - HNDLING, STORING ND PROTECTING LUMINUM MTERIL. THE FOLLOWING

More information

Abdominal Wound Closure Forceps

Abdominal Wound Closure Forceps Inventor: Crlson, Mrk A. My 25, 2007 Adominl Wound Closure Foreps Astrt. The devie is modifition of stndrd tissue foreps for use during losure of dominl wounds mde for surgil proedure. The modifition onsists

More information

HARDWARE REMARKS TRIPLE PAIN - OR EQ R=10 OR BETTER, R=14 PREF. 189 Warburton Avenue Hastings-Upon-Hudson NY B T.B.D.

HARDWARE REMARKS TRIPLE PAIN - OR EQ R=10 OR BETTER, R=14 PREF. 189 Warburton Avenue Hastings-Upon-Hudson NY B T.B.D. 0F LIST OF RHITETURL DRWINGS Ms. Soon Ja Kim River View Room dditon E -0 over Sheet with List of Drawings N/ E -0 rchitectural Symbols N/ -0-D Primary Section Detail Energy Notes @ Typ Walls, Fl, Roof

More information

660 Freestyle/Style Door with Double In-Line Panels

660 Freestyle/Style Door with Double In-Line Panels 660 Freestyle/Style Door with Doule In-Line Pnels (CUH or MG) Style Series Option M Metl HK87 Slide MGNTIC PULL HNDL KIT with Mgnet Vinyl 989 MGNTIC DOOR STOP 716 HDR / SILL INSRT O V678 VINYL DOOR SL

More information

Macroscopic and Microscopic Springs Procedure

Macroscopic and Microscopic Springs Procedure Mrosopi nd Mirosopi Springs Proedure OBJECTIVE Purpose In this l you will: investigte the spring-like properties of stright wire, disover the strethiness of mteril, independent of the size nd shpe of n

More information

STONE FLOORING: FOYER. INSTALL FLUSH WOODEN FLOOR GRILLES PER MECHANICAL REQUIREMENTS. VERIFY LOCATION OF GRILLES W/OWNER.

STONE FLOORING: FOYER. INSTALL FLUSH WOODEN FLOOR GRILLES PER MECHANICAL REQUIREMENTS. VERIFY LOCATION OF GRILLES W/OWNER. DIVISION - GENERL REQUIREMENTS: THE GENERL ONTRTOR SHLL REVIEW THE ONSTRUTION DOUMENTS TO OMPLETE THE WOR ND NOTIFY THE OF RESOLUTION FOR LL DISREPNIES ETWEEN URL DRWINGS, STRUTURL DRWINGS ND IVIL DRWINGS

More information

NORTH STAR 2-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

NORTH STAR 2-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS 40684 Talbot Line, St. Thomas, Ont., N5P 3T2 Phone: (59) 637-7899 Toll Free: (800) 265-570 Fax: (59) 637-3403 Web Site: www.northstarwindows.com NORTH STR 2-PNEL PTIO DOOR SSEMBLY INSTRUCTIONS I:\PDssembly\2Panel\CovPg.doc

More information

RWM4400UH High Performance Hand Held Wireless Microphone System

RWM4400UH High Performance Hand Held Wireless Microphone System CH 1 CH 2 CH 3 CH 4 UHF QUAD VOLUME MAX VOLUME MAX VOLUME MAX VOLUME RWM 4400UH MIN MIN MIN CHANNEL 1 CHANNEL 2 CHANNEL 3 CHANNEL 4 RWM4400UH High Performne Hnd Held Wireless Mirophone System OWNER S MANUAL

More information

LORING THE SMARTER WAY TO ROAST PROPRIETARY ITEM:

LORING THE SMARTER WAY TO ROAST PROPRIETARY ITEM: TLE, MXIMUM WEIGHTS, L (KG) ROSTER (.) JOS TUING +. (.) ZONE.. 9.. 0.. 9. WLL TO L 0F STK 9.9 MINIMUM ROSTER LERNES R9.. ELETRIL ENLOSURE OOR OPENING EXHUST VENT JOS TUING EN ISION HISTORY ESRIPTION INITIL

More information

Aluminium Roof Outlets - Introduction to Detail Outlets

Aluminium Roof Outlets - Introduction to Detail Outlets Aluminium Roof Outlets - Introution to Detil Outlets The Hrmer Roof Detil rnge inlues outlets to over ll the wkwr etiling situtions tht our in uiling esign n in refurishment. Min Chrteristis Hrmer Roof

More information

LORING THE SMARTER WAY TO ROAST PROPRIETARY ITEM:

LORING THE SMARTER WAY TO ROAST PROPRIETARY ITEM: TLE, MXIMUM WEIGHTS, L (KG) ROSTER (9) JOS TUING + (9.) GREEN EN RT + (.) EXHUST STK VENT UTO HOPPER.9.. 9.. ZONE TRIER UTO ISHRGE OOR PPROVE J HUTTON. 0....0 9. WLL TO. 0..0 0. REOMMENE LERNE.0. REOMMENE

More information

INSTALLATION & OPERATION INSTRUCTIONS LEVER HANDLE LOCKSETS.

INSTALLATION & OPERATION INSTRUCTIONS LEVER HANDLE LOCKSETS. INSTALLATION & OPERATION INSTRUCTIONS FOR LEVER HANDLE LOCKSETS 999-00333E_EN FOR BRINKS HOME SECURITY INTERIOR LOCKING & NON-LOCKING LEVER HANDLE LOCKSETS. FITS DOORS 1-3/8" (35 mm) TO 1-3/4" (45 mm)

More information

INSTALLATION GUIDE SPACE SAVER PARTITION CURRENT F DOOR. pro-gard.com STRONG RELIABLE SECURE

INSTALLATION GUIDE SPACE SAVER PARTITION CURRENT F DOOR. pro-gard.com STRONG RELIABLE SECURE INSTLLTION GUIDE SPE SVER PRTITION 0 - URRENT F-0 - DOOR STRONG RELILE SEURE pro-gard.com.0.0 THESE OMPONENTS RE REQUIRED TO INSTLL THE PRTITION PRTS LIST REV SHEET UTHOR DTE QTY PRT NUMER X /-0 x / RRIGE

More information

NOTES. 3D VIEW OF RAILING WITH TYPE 1 - PICKET INFILL PANEL (42" Height shown, 54" Height Similar) TABLE 1 - RAILING MEMBERS

NOTES. 3D VIEW OF RAILING WITH TYPE 1 - PICKET INFILL PANEL (42 Height shown, 54 Height Similar) TABLE 1 - RAILING MEMBERS NOTES :\d\projects\standards\structures\current\ready4release\20book\00852-of8.dgn 5/2/202 0:09:4 M D VIEW OF RILING WITH TYPE - PIKET INFILL PNEL (4 Height shown, 54" Height Similar) TLE - RILING MEMERS

More information

SAMPLE GENERAL NOTES FOR REPAIR METHODS:

SAMPLE GENERAL NOTES FOR REPAIR METHODS: GUIELINES FOR EVELOPING ETILS FOR REPIR OF MSE WLL FING THESE SMPLE ETILS N NOTES PROVIE GUINE ON REPIR METHOS FOR MGE PORTIONS OF MEHNILLY STILIZE ERTH (MSE) WLLS WITH PREST ONRETE PNELS N STEEL OR GEOSYNTHETI

More information

(1) Primary Trigonometric Ratios (SOH CAH TOA): Given a right triangle OPQ with acute angle, we have the following trig ratios: ADJ

(1) Primary Trigonometric Ratios (SOH CAH TOA): Given a right triangle OPQ with acute angle, we have the following trig ratios: ADJ Tringles nd Trigonometry Prepred y: S diyy Hendrikson Nme: Dte: Suppose we were sked to solve the following tringles: Notie tht eh tringle hs missing informtion, whih inludes side lengths nd ngles. When

More information

Analog Input Modules

Analog Input Modules 7 922 nlog Input odules G56... nlog input modules for the ontrol of SQ5... ir dmper tutors y ontinuous nlog ontrol signls, suh s 4...20 m, nd ontinuous nlog position feedk signls. For supplementry Dt Sheets,

More information

AGA56... Analog Input Modules. Siemens Building Technologies HVAC Products

AGA56... Analog Input Modules. Siemens Building Technologies HVAC Products 7 922 nlog Input odules G56... nlog input modules for the ontrol of SQ5... ir dmper tutors y ontinuous nlog ontrol signls, suh s 4...20 m, nd ontinuous nlog position feedk signls. For supplementry Dt Sheets,

More information

7 8 9 0 OFFIE ROOF,000 SF /.7 RES VLLO TOWN ENTER OWNER - VLLO PROPERTY OWNER LL. 9 PGE MILL ROD, PLO LTO, 90 T. 0--00 RHITETURE - RFEL VINOLY RHITETS 0 VNDM STREET, NEW YORK, NY 00 T. -9-00 LOK 0 - PRIVTE

More information

3/8" Square Multi-Turn Cermet Trimmer

3/8 Square Multi-Turn Cermet Trimmer www.vishy.om 3/8" Squre Multi-Turn Cermet Trimmer Vishy Sfernie ermet element. FEATURES Industril grde The is smll size trimmer - 3/8" x 3/8" x 3/16" - nswering PC ord mounting requirements. Five versions

More information

REVIEW QUESTIONS TOPIC 5 TRIGONOMETRY I FLUENCY

REVIEW QUESTIONS TOPIC 5 TRIGONOMETRY I FLUENCY TOPIC 5 TRIGONOMETRY I REVIEW QUESTIONS FLUENCY The most urte mesure for the length of the third side in the tringle elow is: A 4.83 m B 23.3 m C 3.94 m D 2330 mm E 4826 mm 2 Wht is the vlue of x in this

More information

BIKE DEPOT Parts List B UPRIGHT BACK WELDMENT B (12) 1/4 SELF-DRILL SCREWS (4) 1/2 BOLTS TRUSS WELDMENT C

BIKE DEPOT Parts List B UPRIGHT BACK WELDMENT B (12) 1/4 SELF-DRILL SCREWS (4) 1/2 BOLTS TRUSS WELDMENT C Parts List B 5 D () / SELF-DRILL SREWS UPRIGHT BK WELDMENT B () / BOLTS TRUSS WELDMENT () / BOLTS UPRIGHT FRONT WELDMENT D () / DI. SIMPSON STRONG BOLT NHORS.5 MIN. EMBEDMENT 5 PURLIN WELDMENT TYPE S DEK.5

More information

3/8" Square Multi-Turn Cermet Trimmer

3/8 Square Multi-Turn Cermet Trimmer Vishy Sfernie 3/8" Squre Multi-Turn Cermet Trimmer FEATURES Industril grde W t 70 C The T93 is smll size trimmer - 3/8" x 3/8" x 3/16" - nswering PC ord mounting requirements. Five versions re ville whih

More information

X O X HORIZONTAL SLIDER - LARGE MISSILE IMPACT 8200 PVC HORZ. SLIDER IMPACT

X O X HORIZONTAL SLIDER - LARGE MISSILE IMPACT 8200 PVC HORZ. SLIDER IMPACT HORIZONTL SLIER - LRGE MISSILE GENERL NOTES: 1. THE PROUT SHOWN HEREIN IS ESIGNE N MNUFTURE TO OMPLY WITH THE FLORI UILING OE (F), URRENT EITION INLUING THE HIGH VELOITY HURRINE ZONE (HVHZ) N IS RTE FOR

More information

SIGNAGE ANCHOR SIGN 2200 DISCHER STREET CHARLESTON, SC PHONE: (800) FAX: (845) CONTACT: SCOTT FEDEWA

SIGNAGE ANCHOR SIGN 2200 DISCHER STREET CHARLESTON, SC PHONE: (800) FAX: (845) CONTACT: SCOTT FEDEWA D DEMOLITION PLN 0 DETILS & SHEDULES FLOORING: EXISTING ONRETE FLOOR TO REMIN ND E POLISHED. DIMENSION PLN FIXTURE PLN REFLETED EILING PLN INTERIOR & EXTERIOR ELEVTIONS. INTERIOR ELEVTIONS & DETILS DETILS

More information

ISSUED FOR CONSTRUCTION 06/03/2016

ISSUED FOR CONSTRUCTION 06/03/2016 NK OF TENNESSEE No. REVISED OVER SHEET THIS IS DESIGN/UILD. GENERL ONTRTOR SHLL PROVIDE MEHNIL, ELETRIL ND PLUMING DRWINGS S NEEDED FOR NEESSRY ODES OMPLINE. 00 0 EXTERIOR ELEVTION TRGETS 0 INTERIOR ELEVTION

More information

TOWNSHIP OF NEWTOWN PHASE I RENOVATION PROJECT 209 BISHOP HOLLOW RD. NEWTOWN SQUARE, PA 19073

TOWNSHIP OF NEWTOWN PHASE I RENOVATION PROJECT 209 BISHOP HOLLOW RD. NEWTOWN SQUARE, PA 19073 PHSE I RENOVTION PROJET 0 ISHOP HOLLOW RD. SQURE, P 0 REVITIONS LOTION MP SHEET LIST GENERL NOTES V. bove FF bove Finished Floor P ccess Panel T coustical eiling Tile DJ. djustable L. luminum NOD. nodized

More information

Resistors, Current and Voltage measurements, Ohm s law, Kirchhoff s first and second law. Kirchhoff s first Objectives:

Resistors, Current and Voltage measurements, Ohm s law, Kirchhoff s first and second law. Kirchhoff s first Objectives: EE -050 Ciruit L Experiment # esistors, Current nd Voltge mesurements, Ohm s lw, Kirhhoff s first nd seond lw. Kirhhoff s first Ojetives: Slmn in Adul Aziz University Eletril Engineering Deprtment. Fmiliriztion

More information

SECTION 4 - REINFORCED CONCRETE MASONRY UNITS (CMU)

SECTION 4 - REINFORCED CONCRETE MASONRY UNITS (CMU) SECTION CST IN PLCE CONCRETE J. VPOR BRRIER SECTION - FRMING LUMBER V. WOOD SHETHING I. DRWINGS RE PRELIMINRY ND NOT FOR CONSTRUCTION UNLESS STRUCTURL ENGINEER'S STMP IS FFIXED TO DRWINGS. I IV. NY DISCREPNCIES

More information

OCCUPANCY CONSTRUCTION TYPE TOTAL AREA NO. OF STORIES HEIGHT RESIDENTIAL (GROUP R-1) V-B 1,800 SF 1 ± 23' - 0"

OCCUPANCY CONSTRUCTION TYPE TOTAL AREA NO. OF STORIES HEIGHT RESIDENTIAL (GROUP R-1) V-B 1,800 SF 1 ± 23' - 0 rchitect Trinity ounty Redding, 900 T. 50..707 REVITIONS @ T & ND Ø DIMETER # POUND, NUMER / IR ONDITIONING NHOR OLT V OVE D RE DRIN DJ DJUSTLE FF OVE FINISHED FLOOR GG GGREGTE LT LTERNTE LUM LUMINUM N

More information

DESIGN CRITERIA FASTENERS 20 PSF 100 PSF 40 PSF 100 PSF 85 PSF 25 PSF 120 MPH 93 MPH 45 FT III ENCLOSED ± PER CODE 30 PSF 23.1 PSF

DESIGN CRITERIA FASTENERS 20 PSF 100 PSF 40 PSF 100 PSF 85 PSF 25 PSF 120 MPH 93 MPH 45 FT III ENCLOSED ± PER CODE 30 PSF 23.1 PSF STRUTURL REVITIONS ESIGN RITERI FSTENERS /0/0 ::0 PM IM 0://00 Embry Riddle Prescott/08_Structural_0.rvt # ø & @ LUM R RH SS / ETWN OT M LG PL RG TO NT J L LR MU OL ON ONN ONST ONT ONTR TR TR EFL ET IG

More information

1/4" Multi-Turn Fully Sealed Container Cermet Trimmer

1/4 Multi-Turn Fully Sealed Container Cermet Trimmer www.vishy.om Vishy Sfernie 1/4" Multi-Turn Fully Seled Continer Cermet Trimmer Due to their squre shpe nd smll size (6.8 mm x 6.8 mm x 5 mm), the multi-turn trimmers of the series re idelly suited for

More information

1/4" Multi-Turn Fully Sealed Container Cermet Trimmer

1/4 Multi-Turn Fully Sealed Container Cermet Trimmer 1/4" Multi-Turn Fully Seled Continer Cermet Trimmer Due to their squre shpe nd smll size (6.8 mm x 6.8 mm x 5 mm), the multi-turn trimmers of the series re idelly suited for PCB use, enling high density

More information

WESTERN RUN 30 WF 108. P L12"+ x 5/8 "+ x 36-0"+ 30 WF WF ^00-00"+ 30 WF WF WF 108 P L7"+ x 5/8 "+ x 28-0"

WESTERN RUN 30 WF 108. P L12+ x 5/8 + x 36-0+ 30 WF WF ^00-00+ 30 WF WF WF 108 P L7+ x 5/8 + x 28-0 N 0 1/2 "+ PRPET GIRDER NOS. BERING BUTMENT 41 10"+ BERING 52 4"+ 9"+ 9"+ 41 1"+ SPN 1 50 10"+ SPN 2 9"+ 9"+ 41 1"+ SPN BENT NO. 1 BENT NO. 2 BERING BUTMENT B BERING WESTERN RUN BERING BERING 7 P 7"+ x

More information

Probability and Statistics P(A) Mathletics Instant Workbooks. Copyright

Probability and Statistics P(A) Mathletics Instant Workbooks. Copyright Proility nd Sttistis Student Book - Series K- P(A) Mthletis Instnt Workooks Copyright Student Book - Series K Contents Topis Topi - Review of simple proility Topi - Tree digrms Topi - Proility trees Topi

More information

PLAN COMMISSION MEETING STAFF REPORT

PLAN COMMISSION MEETING STAFF REPORT Meeting Date: /8/6 genda Item: #7 Mission Statement To provide our residents with a safe, friendly, attractive and active community by aggressively pursuing innovative ways to deliver valuable services.

More information

EDUCATION GRADE 12 JUNE EXAMINATION 2013 UMLAZI / ILEMBE / UGU ENGINEERING GRAPHICS AND DESIGN PAPER 1 MANUFACTURING ENGINEERING & TECHNOLOGY

EDUCATION GRADE 12 JUNE EXAMINATION 2013 UMLAZI / ILEMBE / UGU ENGINEERING GRAPHICS AND DESIGN PAPER 1 MANUFACTURING ENGINEERING & TECHNOLOGY ENGINEERING GRPHICS ND DESIGN GRDE 12 JUNE 201 INSTRUCTIONS ND INFORMTION GRDE 12 EDUCTION UMLZI / ILEMBE / UGU MNUFCTURING ENGINEERING & TECHNOLOGY 1. The question paper consists of THREE questions. 2.

More information

DPS HILLTOP SERVICE CENTER ARCHIVES RENOVATION

DPS HILLTOP SERVICE CENTER ARCHIVES RENOVATION DPS RHIVES RENOVTION GENERL G00 OVER SHEET PHSE G00 SSEMBLY TYPES/FITURE LEGEND PHSE DRWING INDE :\Usrs\jcconnll\Dsktop\0DPS Hilltop Srvic ntrjas.rvt //0 ::9 M Rout Rout Rout B Rout D.F. OPEN RE F RHIVES

More information

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2017 REVISIONS

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2017 REVISIONS UNIFORM STNDRD DRWINGS CLRK COUNTY RE, NEVD YER 2017 REVISIONS DWG NO. TITLE ND REVISIONS SUMMRY EFFECTIVE DTE 206.S1 Local Residential Urban rea Street Sections 1/1/2017 Drawing revised to prohibit the

More information

STEED CREEK CLUBHOUSE WASHINGTON CO, OREGON

STEED CREEK CLUBHOUSE WASHINGTON CO, OREGON 0 SW rd venue, Suite 00 Portland, Oregon 90 t 0..000 f 0..00 www.myhregroup.com STEE REEK LUHOUSE WSHINGTON O, OREGON MYHRE GROUP RHITETS, IN. THESE RWINGS RE THE PROPERTY OF MYHRE GROUP RHITETS N RE NOT

More information

Sample Plan RETAINING WALL DETAILS NARRATIVE. Sample Plan RETAINING WALL DETAILS CHECKLIST

Sample Plan RETAINING WALL DETAILS NARRATIVE. Sample Plan RETAINING WALL DETAILS CHECKLIST Sample Plan RETINING WLL DETILS --------- NRRTIVE REVISION DTE 05// References: Design Scene: Chapter - Walls Miscellaneous: Metro District's Electronic Details Library Standards Office's Electronic Details

More information

So Many Possibilities page 1 of 2

So Many Possibilities page 1 of 2 Otober Solving Problems Ativities & So Mny Possibilities pge of Use the blnk spe to solve eh problem. Show ll your work inluding numbers, words, or lbeled skethes. Write omplete sentene below your work

More information

UTMDA - R8 LEUKEMIA LAB RENOVATION CONSTRUCTION. Copyright 2018 Perkins+Will

UTMDA - R8 LEUKEMIA LAB RENOVATION CONSTRUCTION. Copyright 2018 Perkins+Will UTM - R8 LEUKEMI L RENOVTION ONSTRUTION 04//08 04/6/08 opyright 08 Perkins+Will 4//08 0:7: M :\Temp\RH-UTM-R8_Leukemia_Lab_Reno_kangor.rvt UTM - R8 LEUKEMI L RENOVTION 04/6/08 PW PROJET #858.005 OWNER

More information

FOR DEVICES SOLD PRIOR TO

FOR DEVICES SOLD PRIOR TO 23970734 98/9949 CS 98/9949 FOR DEVICES SOLD PRIOR TO 8-10-16 This instruction covers new instlltion of the 98/9949 conceled verticl device for hollow metl nd luminum doors. RF Instlltion Instructions

More information

S.R. 32 AT GRADE CROSSING

S.R. 32 AT GRADE CROSSING DESIGNTION CONTRCT THE CITY OF NOBLESVILLE RILROD PLNS S.R. 3 T GRDE CROSSING The Noblesville 8th Street railroad crossing replacement from south of S.R. 3 to Logan Street will GROSS LENGTH:- 0.03 mi.

More information

GLONASS PhaseRange biases in RTK processing

GLONASS PhaseRange biases in RTK processing ASS PhseRnge ises in RTK proessing Gle Zyrynov Ashteh Workshop on GSS Bises 202 Bern Switzerlnd Jnury 8-9 202 Sope Simplified oservtion models for Simplified oservtion models for ASS FDMA speifi: lok nd

More information

The Cottage Beach Design

The Cottage Beach Design GENERL NOTES ND SPECIFICTIONS The Design THE GENERL CONTRCTOR SHLL FULLY COMPLY WITH LL STTE ND LOCL CODE REQUIREMENTS. THE CONTRCTOR SHLL SSUME FULL RESPONSIILITY FOR NY WORK KNOWINGLY PERFORMED CONTRRY

More information

Water Street Apartments

Water Street Apartments 9//5, :8 PM: /Volumes/H/DESIGN/LIENTS/_TIVE PROJETS/MFM--Multifamily-IslandHousingTrust-MV/H--MFM-05-RHID/MFM- -050909.pln 9//5 Water Street partments PROJET INFORMTION lient: Designer: uilder/ontractor:

More information

* * 33/3549A CS 33/3549A. 2-Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions

* * 33/3549A CS 33/3549A. 2-Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions *23970726* 23970726 33/3549A CS 33/3549A Instlltion Instructions This instruction covers new instlltion of the 33/3549A conceled verticl device for luminum nd hollow metl doors. RF Also covered is the

More information

Cairns Field MOBILE, ALABAMA MOBILE DISTRICT S.D.MCDAVID W.KNAPP. US Army Corps of. Mobile District US ARMY CORPS OF ENGINEERS DESCRIPTION DATE APPR

Cairns Field MOBILE, ALABAMA MOBILE DISTRICT S.D.MCDAVID W.KNAPP. US Army Corps of. Mobile District US ARMY CORPS OF ENGINEERS DESCRIPTION DATE APPR 5 US rmy orps of Mobile istrict airns Field TE: SOLIITTION NO.: ONTRT NO.: ESIGN Y: S..MVI RWN Y: K Y: S..M. J.L.LONG SMT Y: PLOT TE: W.KNPP PLOT SLE: SIZE: FILE NME: " " US RMY ORPS ENGINEERS MRK NO.

More information

SERVICE MANUAL 9940/20/10

SERVICE MANUAL 9940/20/10 9940/0/0 9/0/00 Tle of ontents REMOVING THE EXTERIOR PARTS... A. Light Cover... B. Bse... C. Top Cover (Flp)... 4 D. Hinge Cover... 4 E. Thred Tension Cover... 4 F. Side Enlosure... 5 G. Hndle nd Unit

More information

ASI #2 DATE: 10/26/17 ARCHITECT S PROJECT NUMBER: CONTRACT DATE: CONTRACT FOR: Anchorage Hyatt Place

ASI #2 DATE: 10/26/17 ARCHITECT S PROJECT NUMBER: CONTRACT DATE: CONTRACT FOR: Anchorage Hyatt Place RHITET S SUPPLEMTL INSTRUTIONS SI # PROJET: nchorage Hyatt Place 0 Tudor Road nchorage, K 9950 TO ONTRTOR: on arroll RV 50 South 600 East Salt Lake ity, UT 80 TE: 0/6/ RHITET S PROJET NUMER: 80.506 ONTRT

More information

A001 RUE JEANNE-MANCE RUE OLMSTEAD AVENUE MCARTHUR SITE PLAN A002 1:500 NEW TWO STOREY ELEMENTARY SCHOOL

A001 RUE JEANNE-MANCE RUE OLMSTEAD AVENUE MCARTHUR SITE PLAN A002 1:500 NEW TWO STOREY ELEMENTARY SCHOOL RUE JEANNE-MANE RUE OLMSTEAD NEW TWO STOREY ELEMENTARY SHOOL NOUVELLE ÉOLE ÉLÉMENTAIRE À DEUX ÉTAGES ÉLÉVATION DU REZ-DE-HAUSSÉE : 64,91 m EXISTING SHOOL TO BE RENOVATED EXISTING GYMNASIUM EXISTING TRAINING

More information

Staff Review Date: September 13, 2017 HDC PID#

Staff Review Date: September 13, 2017 HDC PID# harlotte Historic istrict ommission pplication for a ertificate of ppropriateness Staff Review ate: September, 07 H 07-6 PI# 087 LOL HISTORI ISTRIT: PROPERTY RESS: SUMMRY OF REQUEST: PPLINT: ilworth 60

More information

NOTES 3D VIEW OF RAILING WITH TYPE 1 - PICKET INFILL PANEL. (42" Height shown, 54" Height Similar) TABLE 1 - RAILING MEMBERS ALTERNATIVE BOTTOM &

NOTES 3D VIEW OF RAILING WITH TYPE 1 - PICKET INFILL PANEL. (42 Height shown, 54 Height Similar) TABLE 1 - RAILING MEMBERS ALTERNATIVE BOTTOM & NOTES C:\d\projects\standards\structures\current\ready4release\20book\00862-of8.dgn 5/2/202 0:0:6 M 0.2 MEMBER s Joint/Splice Sleeves Intermediate & Int. & Connection Sleeve Handrail Joint/Splice Sleeves

More information

STANDARD CONSTRUCTION DETAILS PAVING REVISED -MAY 2017 DEPARTMENT OF ENGINEERING

STANDARD CONSTRUCTION DETAILS PAVING REVISED -MAY 2017 DEPARTMENT OF ENGINEERING STNDRD CONSTRUCTION DETILS REVISED -MY 2017 TBLE OF CONTENTS GENERL NOTES REINFORCED CONCRETE PVEMENT PRBOLIC PVEMENT CROWN M4D PVEMENT M4D, M6D PVEMENT CURB ND GUTTER SPHLT CROSS SECTION GENERL NOTES

More information

drill press Table The tables that come with most A large worksurface adjustable fence 10 ShopNotes No. 57

drill press Table The tables that come with most A large worksurface adjustable fence 10 ShopNotes No. 57 Drill Press Table large worksurface and adjustable fence make this an outstanding drill press The tables that come with most drill presses might be fine for metalworking. But for woodworking, they just

More information

Multivariable integration. Multivariable integration. Iterated integration

Multivariable integration. Multivariable integration. Iterated integration Multivrible integrtion Multivrible integrtion Integrtion is ment to nswer the question how muh, depending on the problem nd how we set up the integrl we n be finding how muh volume, how muh surfe re, how

More information

From Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your

From Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your From Off-The-Shelf to Market-Ready New ge Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your end-use. visit newageenclosures.com/services or call 855-4N-ENCL

More information

Patterns and Algebra

Patterns and Algebra Student Book Series D Mthletis Instnt Workooks Copyright Series D Contents Topi Ptterns nd funtions identifying nd reting ptterns skip ounting ompleting nd desriing ptterns numer ptterns in tles growing

More information

Operation Manual Sewing Machine

Operation Manual Sewing Machine Opertion Mnul Sewing Mhine Produt Code: 888-S33/S36 KNOWING YOUR SEWING MACHINE SEWING BASICS UTILITY STITCHES APPENDIX Be sure to red this doument efore using the mhine. We reommend tht you keep this

More information

Fitting & User Instructions

Fitting & User Instructions Issue 03 Alexnder Universl Furniture Risers Note: These frmes require the ddition of n ttchment. (See pges 4 - ) Bse Frme Mrk Bse Frme Mrk Fitting & User Instructions These instructions pply to the rising

More information

SCIENCE BUILDING OFFICE RENOVATION C

SCIENCE BUILDING OFFICE RENOVATION C HV Plumbing Fire Protection 0 th Street ugusta, G 090 (706) 77-00 THIS OUMENT IS THE PROPERTY OF ING ONSULTING, IN. THE UNUTHORIZE REPROUTION, OPYING, OR OTHERWISE USE OF THIS OUMENT IS STRITLY PROHIITE

More information

Installation manual. Daikin Altherma LAN adapter BRP069A61 BRP069A62. Installation manual Daikin Altherma LAN adapter. English

Installation manual. Daikin Altherma LAN adapter BRP069A61 BRP069A62. Installation manual Daikin Altherma LAN adapter. English Instlltion mnul Dikin Altherm LAN dpter BRP069A6 BRP069A6 Instlltion mnul Dikin Altherm LAN dpter English Tle of ontents Tle of ontents Aout the doumenttion. Aout this doument... Aout the produt. Comptiility....

More information

Lecture 16. Double integrals. Dan Nichols MATH 233, Spring 2018 University of Massachusetts.

Lecture 16. Double integrals. Dan Nichols MATH 233, Spring 2018 University of Massachusetts. Leture 16 Double integrls Dn Nihols nihols@mth.umss.edu MATH 233, Spring 218 University of Msshusetts Mrh 27, 218 (2) iemnn sums for funtions of one vrible Let f(x) on [, b]. We n estimte the re under

More information

Tubing Spacers. Backing Plate. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a a. a a. a a

Tubing Spacers. Backing Plate. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a a. a a. a a Grnd Slm Instlltion Instructions TACO Metls Inc., 98 NE 179th Street Mimi, Florid 33162 hndyhnk@tcomrine.com tcomrine.com This Box Contins: 1- Port side Grnd Slm 1- Strbord side Grnd Slm 4-5/16 x 1 stinless

More information

POWER TRIM. Table of Contents. Section 5C - Dual Power Trim System

POWER TRIM. Table of Contents. Section 5C - Dual Power Trim System SERVICE MANUAL NUMBER 28 Tle of Contents POWER TRIM Setion 5C - Dul Power Trim System DUAL POWER TRIM SYSTEM Lurints / Selnts / Adhesives..... 5C-2 Importnt Informtion................ 5C-2 Testing Dul

More information

Pearson Education Limited Edinburgh Gate Harlow Essex CM20 2JE England and Associated Companies throughout the world

Pearson Education Limited Edinburgh Gate Harlow Essex CM20 2JE England and Associated Companies throughout the world Person Edution Limited Edinurgh Gte Hrlow Essex M20 2JE Englnd nd ssoited ompnies throughout the world Visit us on the World Wide We t: www.personed.o.uk Person Edution Limited 2014 ll rights reserved.

More information

EBU KNOCKOUT COMPETITIONS

EBU KNOCKOUT COMPETITIONS EBU KNOCKOUT COMPETITIONS GENERAL REGULATIONS 1 INTRODUCTION Vrious regultions pply to ll English Bridge Union ompetitions tht involve mthes plyed privtely. These ompetitions omprise: The knokout stges

More information

Code Review The following is a review of selected portions of the International Building Code 2015 (IBC2015) which apply to this project.

Code Review The following is a review of selected portions of the International Building Code 2015 (IBC2015) which apply to this project. ESIGNE Y: RWN Y: HEKE Y: TE: SLE: //07 /" = '-0" OVER SHEET Hoover Metal uildings, Inc. PROJET FOR: PPROVLS: TE REVISIONS: Y: UILING "" P.O. ox 99 Lexington, S 907 (80)9-98 ode Review The following is

More information

VARNA TINY TIMBERS DRYDEN ROAD - N.Y.S. ROUTE 366 PRELIMINARY NOT FOR CONSTRUCTION NICK BELLASARIO & BUZZ DOLPH L100 JR. R/W TOWN OF DRYDEN, NY

VARNA TINY TIMBERS DRYDEN ROAD - N.Y.S. ROUTE 366 PRELIMINARY NOT FOR CONSTRUCTION NICK BELLASARIO & BUZZ DOLPH L100 JR. R/W TOWN OF DRYDEN, NY THO RESURVEYE 1 / JR. (.59') OUN 7 (11.00') 7 PIPE FOUN 75 79 78 SILT FENE 78 77 79 77 80 76 86 85 81 N 6 18'05" 7.' (01.75' P TO P) 8 8 8 98 98 T OLT ELEV. 87 99 R ITH OF Y 116 & PHILLIPS GRVEL RIVE 89

More information

Operation Manual GETTING READY SEWING BASICS UTILITY STITCHES APPENDIX. Computerized Sewing Machine Product Code: 888-V12/V13/V15

Operation Manual GETTING READY SEWING BASICS UTILITY STITCHES APPENDIX. Computerized Sewing Machine Product Code: 888-V12/V13/V15 GETTING READY SEWING BASICS UTILITY STITCHES APPENDIX Opertion Mnul Computerized Sewing Mhine Produt Code: 888-V12/V13/V15 Be sure to red this doument efore using the mhine. We reommend tht you keep this

More information

Section 6.1 Law of Sines. Notes. Oblique Triangles - triangles that have no right angles. A c. A is acute. A is obtuse

Section 6.1 Law of Sines. Notes. Oblique Triangles - triangles that have no right angles. A c. A is acute. A is obtuse Setion 6.1 Lw of Sines Notes. Olique Tringles - tringles tht hve no right ngles h is ute h is otuse Lw of Sines - If is tringle with sides,, nd, then sin = sin = sin or sin = sin = sin The miguous se (SS)