acme 50 installation manual

Size: px
Start display at page:

Download "acme 50 installation manual"

Transcription

1 acme 50 installation manual june 2012

2 Acme 50 Architecturally designed, seamless glass wall Acme 50 is a seamless glass wall that defines space while maximizing daylight. A slim profile coupled with steel construction allows for solid architecture with a minimalist aesthetic. Clean lines enchance any corporate, creative or architectural environment. Features & Benefits: Modern, slimline aesthetic with 1 1/2 profile Seamless butt-joined glass Available with either 3/8 ir 1/2 thick glass Specialty glass options 3-way T condition and corner conditions without posts offer clean, uninterrupted aesthetic Framed glass door available up to 120 high Sliding, hinged and pivot doors are available with framed glass options and matching 1 1/2 stiles and rails Full or half-height locking door pulls Utilizes US-made hardware and cylinders to be compatible with existing master key systems Up to 1 of total adjustability STC rating for glass panels Acme 50 can contribute towards points for LEED projects Manufactured with eco-friendly materials such as high recycled content steel FSC Certified wood veneer doors Manufactured with 500 miles of projects in Chicago, Boston, New York and Washington, DC.

3 Table of Contents Index Statement of Line Required Tool List & Staging of Material Parts Nomenclature Starting the Installation Understanding the Installation Drawings Installing the Ceiling Track Installing the Wall Track Installing the Vertical Posts Assembly of Hinged/Pivot Door Frames Assembly of Sliding Door Frames Installing the Assembled Hinged/Pivot Door Frames Installing the Assembled Sliding Door Frames Installing Hinged Door Frames in Drywall Conditions Installing the Floor Track Installing the Top Rails Installing the Top Rails when opening has (1) pane of glass.. 24 Installing the Top Sliding Companion Rail Installing the Acme Rail for Sliding Doors Installing the Bottom Rails Installing the Top/Bottom Rails using Splices Installing Corners and Tees Completing and Leveling Framing Installing Hinged Doors Installing Frameless Glass Hinged Doors Installing Pivot Door Using (Rixson 117 Pivot ¾ Offset) Installing Sliding Doors Aligning Double Sliding Doors Installing Top Cap on Glass Doors Installing Strikes Installing Locks into Sliding Door Posts Installing Pulls on Glass Installing Locking Pulls on Glass Glass Installation-See video

4 Statement of Line Panel Framing Top & Bottom Framing Finished End Wall Start Corner Condition 3 Way T Condition Bypass Panel Glass: 1/2 or 3/8 (Standard and specialty glass are available.) Door Framing Glass Panel Frameless Glass Corners Frameless 3 Way T Condition Sliding Door Frame, Header & Jam Hinged/Pivot Door Frame, Header & Jam Doors Flush Metal Door (Hinged) Flush Wood Door (Hinged/Pivot) Full-Lite Door with Lock (Hinged/Pivot) Frameless Glass Door (Hinged) Full-Lite Door Pull Thru Glass (Sliding) Hardware Cylindrical Lockset Mortisel Lockset Frameless Hinged Glass Lock Sliding Door Lock 72 Tubular Pull 51 Tubular Pull 4 Acme 50 Installation Manual Inscape smart workspaces

5 Required Tool List Understanding which tools are required and what function they accomplish is critical to a successful installation. One of the most important specialty tools are the Porta-Band Saw. There is field cutting required for the ceiling track, floor track, and all vertical components. If this task is attempted by hand you will find it too time consuming. The porta-band saw offers the best solution and achieves the required professional results. Standard tools require for Acme installation Quantity Porta-Band portable band saw with extra blades(24 tooth) gauge electric shears ½ 18-volt drill/driver foot tapes Open end wreches 1/4, 5/16, and 3/ Rubber mallets, white rubber Flat Bar Channel Locks Plumb Bob Chalk Box with white or yellow chalk Craftsman 3/16 screwdriver #41248LWF (plinth screwdriver) Utility knife with extra blades Step bit 1/4 1 1/ /8 drill bits /16 drill bits foot power cord Left-hand Snips (qty.1) and Right-hand Snips Hammer Drill Deep well socket set (US standard) tri-square Screw driver set Needle-nose vise grip drywall finishing knife Masking Tape foot level foot level File Drill bit case 1/16-1/ Metal scribe Drop Cloth 10 x Ladders Collapsible Saw Horses A-Frame Panel Cart Awl Compound Mitre Saw with non-ferous blade Ram set shotgun with 1 nails Assorted Screws Staging of Material On any installation the staging of materials is critical to the success of the installation. All rails should be stored flat on a clean floor where available. Care must be taken to protect the finished material as well as the building walls. We generally use the packing material that the product is shipped in to accomplish this. The material should be unpacked and verified that all components are received and there are no defects in the product. This can be accomplished by reviewing the packing list and drawings to the product received. Inscape smart workspaces Acme 50 Installation Manual 5

6 Parts & Nomenclature Tracking Components Description Ceiling Channel Floor Channel Ceiling Channel Corner Floor Channel Corner Ceiling Channel T-Connection Product Number INATCC120 INATFC120 INATCCC INATFCC INATCCT Verticle Components Description Vertical Post Assembly Vertical End Post Assembly Bypass Connection Assembly Wall Channel ByPass Wall Channel Product Number INAVP096 INAVP102 INAVP108 INAVP114 INAVP120 INAVEP096 INAVEP102 INAVEP108 INAVEP114 INAVEP120 INAV5BP096 INAV5BP102 INAV5BP108 INAV5BP114 INAV5BP120 INAVWC096 INAVWC102 INAVWC108 INAVWC114 INAVWC120 INAVBWC096 INAVBWC102 INAVBWC108 INAVBWC114 INAVBWC120 Floor Channel T-Channel INATFCT Ceiling Channel Splice INATCCS 6 Acme 50 Installation Manual Inscape smart workspaces

7 Parts & Nomenclature Horizontal Components Description Floor T-Connection Assembly Ceiling T-Connection Assembly Rail Spice Assembly Slide Track Rail Connector Assembly Product Number INAHFTC INAHCTC INAHRS INASTRCR Horizontal Components Description Bottom Rail Assembly Top Rail Assembly Top Open Rail Assembly & Cover Floor Corner Rail Product Number INAHBR024 INAHBR048 INAHBR072 INAHBR096 INAHBR120 INAHTR024 INAHTR048 INAHTR072 INAHTR096 INAHTR120 INAHTORA024 INAHTORA048 INAHTORA072 INAHTORA096 INAHTORA120 INAHFCR Slide Track Rail Connector Assembly INASTRCL Floor Anchor Assembly INAFA Ceiling Corner Rail INAHCCR Inscape smart workspaces Acme 50 Installation Manual 7

8 Parts & Nomenclature Sliding Door Frame Components Description Sliding Door Frame Post Assembly Sliding Door Frame Locking Post Assembly Sliding Door Frame Open Post Assembly Sliding Door Frame Header Rail Assembly Silding Rail Assembly Product Number INASDFP096R/L INASDFP102R/L INASDFP108R/L INASDFP114R/L INASDFP120R/L INASDFLP096R/L INASDFLP102R/L INASDFLP108R/L INASDFLP114R/L INASDFLP120R/L INASDFOP096R/L INASDFOP102R/L INASDFOP108R/L INASDFOP114R/L INASDFOP120R/L INASDFHRR/L INASDFRA38R/L INASDFRA48R/L Sliding Door Frame Components Description Sliding Door Frame Wall Post Assembly Sliding Door Glide Stopper Assembly Sliding Door Glide Plate Product Number INASDFWP096R/L INASDFWP102R/L INASDFWP108R/L INASDFWP114R/L INASDFWP120R/L INASDGS INASDGS Sliding Double Door Frame Header Rail Assembly INASDRDHRR/L 8 Acme 50 Installation Manual Inscape smart workspaces

9 Parts & Nomenclature Hinged Door Frame Components Description Door Frame Hinged Strike Post Assembly Door Frame Hinged Post Assembly Door Frame Wall Hinge Post Assembly Header Rail Hinge Door Assembly-36 Double Header Rail Hinge Door Product Number INAHDFSP096R/L INAHDFSP102R/L INAHDFSP108R/L INAHDFSP114R/L INAHDFSP120R/L INAHDFHP096R/L INAHDFHP102R/L INAHDFHP108R/L INAHDFHP114R/L INAHDFHP120R/L INAHDFWHP096R/L INAHDFWHP102R/L INAHDFWHP108R/L INAHDFWHP114R/L INAHDFWHP120R/L INAHDFHR036 INAHDFHR072 Hinged Door Frame Components Description Door Frame Strike Post Assembly Frameless Glass Hinge Door Door Frame Hinge Post Assembly Frameless Glass Hinge Door Door Frame Wall Post Assembly Frameless Glass Hinge Door Header Rail Frameless Glass Hinge Door-36 Product Number INAFHDFSP096R/L INAFHDFSP102R/L INAFHDFSP108R/L INAFHDFSP114R/L INAFHDFSP120R/L INAFHDFHP096R/L INAFHDFHP102R/L INAFHDFHP108R/L INAFHDFHP114R/L INAFHDFHP120R/L INAFHDFWHP096R/L INAFHDFWHP102R/L INAFHDFWHP108R/L INAFHDFWHP114R/L INAFHDFWHP120R/L INAFHDFHR036 Inscape smart workspaces Acme 50 Installation Manual 9

10 Parts & Nomenclature Pivot Door Frame Components Description Door Frame Pivot Post Assembly Door Frame Pivot Strike Post Assembly Door Frame Wall Pivot Assembly Header Rail Pivot Door 36 W Product Number INAPDFP096R/L INAPDFP102R/L INAPDFP108R/L INAPDFP114R/L INAPDFP120R/L INAPDFSP096R/L INAPDFSP102R/L INAPDFSP108R/L INAPDFSP114R/L INAPDFSP120R/L INAPDFWP096R/L INAPDFWP102R/L INAPDFWP108R/L INAPDFWP114R/L INAPDFWP120R/L INAPDFHR036R/L 10 Acme 50 Installation Manual Inscape smart workspaces

11 Starting the Installation Before starting to install the actual product. The following steps should be taken to ensure that all dimensions match and the correct product is on site. *If for any reasons the dimensions do not match, contact your project manager or Inscape immediately before continuing with the installation. Follow these 5 critical steps BEFORE installing any product: Step 1: The carpenter must begin by reading the shop drawings, read any notes, check details and layouts. Carpenter must check that all bulkheads have proper blocking for installation of the product. Blocking in the bulkhead is critical and must be installed everywhere the product attaches to the ceiling. Step 2: It is critical to check the floor plan dimensions against the actual field dimensions to verify that everything will fit. The system accommodates up to a recommended 1 of adjustment vertically. If the floors deviate by more than 1 in a given span, then there are a couple options: a taller bottom channel or flash patch/level the floor. If the floor deviations are greater than 1, but not within a given span, Inscape will manufacture different post heights to accommodate. Doors with pivot doors may require floor preparation for closer location. Step 3: Locate the field location where the partition will be installed and delineate center line dimensions onto the ceiling using a chalk line, establish post center line locations, door and trimmed opening locations. Step 4: Establish corner, angle, and 3-way condition locations. Verify centerline dimensions in coordination with established shop drawings. Step 5: Transfer the marked lines from the ceiling to the floor to establish centerlines using a laser or plumb lines. Once the 5 steps are completed, the product is now ready to be installed. Inscape smart workspaces Acme 50 Installation Manual 11

12 Understanding the Installation Drawings Floor Plans The floor plans will show all the partition runs and show all the required dimensions to layout the project. For each dimension on the plans, there are two dimensions. A partition type dimension and a daylight dimension. This simplifies the layout process and eliminates the need for the installer to implement a group of rules such as what should be added at a tee or corner. Note: The A dimension is the center to center dimension from the vertical posts. It also signifies the partition type as shown in the partition schedule which is cross referenced in the sectional drawings. The D dimension is the daylight dimension or the clear dimension between the posts. The plans will show the required bill of material, which can be easily cross-referenced to the packing list. The partition and door schedule will be general notes, specifications, and any information that pertains to the project. 12 Acme 50 Installation Manual Inscape smart workspaces

13 Understanding the Installation Drawings Elevations The elevation drawings will show the different glass types and sizes used in your installation. It will also show the door types and any special conditions. They will be a completed set of details to reference as well. A glass and hardware schedule will be provided. Inscape smart workspaces Acme 50 Installation Manual 13

14 Installing the Ceiling Track Step 1: Attach the ceiling track to the ceiling by screwing the ceiling track every 24 inches using 1 5/8 sheetrock screws. Ceiling tracking has pre-punched holes for screws. Pilot holes may need to be drilled as necessary. Wood blocking is installed in the ceiling by others and must be installed everywhere product is located. If blocking is not installed into the ceiling, stop the installation immediately and contact your project manager. It is critical that blocking is in the ceiling especially at the sliding companion panel. Note: *If more than (1) piece of ceiling tracking is needed for an opening, butt (2) pieces of ceiling track together and attach a splice using 4 screws to hold them together and to ensure a tight joint. 14 Acme 50 Installation Manual Inscape smart workspaces

15 Installing the Wall Track Step 2: Install the wall track to any structural element where the wall intersects. Vertical wall tracks are shipped 2 7/8 longer than the verified ceiling height. Measure the ceiling height in the location and cut the bottom of the wall tracks to fit snug. Screw wall track to wall using 1 5/8 sheetrock screws. The wall tracks are notched at the top and will slip inside the ceiling track with the outside legs overlapping the ceiling track. From the ceiling to the top of the wall track should measure 5/8. To calculate the length of wall track, measure the ceiling height in the location to be installed and deduct 5/8 to determine the length needed. Inscape smart workspaces Acme 50 Installation Manual 15

16 Installing the Vertical Posts Step 3: Install the Vertical Posts over the wall tracks. Vertical wall tracks are shipped 2 7/8 longer than the verified ceiling height. Measure the ceiling height in the location and cut the bottom of the vertical post to fit snug. Horizontal rails will secure the vertical posts into place using a friction fit To calculate the length of vertical post, measure the ceiling height in the location to be installed and deduct 5/8 to determine the length needed. Should be the same length as the wall track. *Top Rail shown for clarity* 16 Acme 50 Installation Manual Inscape smart workspaces

17 Assembly of Hinged/Pivot Door Frames Step 4: All door frame head rails must be assembled to the vertical post before installing. Check the ceiling heights where door frame posts occur and trim bottoms to fit, should have a 5/8 reveal. Attach head rail to the jambs with nails, use driving pin and hammer to connect the head rail to the jambs Applies to Single & Double Door Frames Slide the tabs of the head rail into the slots in the vertical post and secure by using cut nails.. Inscape smart workspaces Acme 50 Installation Manual 17

18 Assembly of Sliding Door Frames Step 4A: All door frame head rails must be assembled to the vertical post before installing. Check the ceiling heights where door frame posts occur and trim bottoms to fit, should have a 5/8 reveal. Attach head rail to the jambs with nails, use driving pin and hammer to connect the head rail to the jambs. Applies to Single & Double Door Frames Slide the tabs of the head rail into the slots in the vertical post and secure by using cut nails. 18 Acme 50 Installation Manual Inscape smart workspaces

19 Installing the Assembled Hinged/Pivot Door Frames Step 5: Once all the door frame head rails have been attached to the posts, slide the head of the frame into the ceiling channel and position jambs per the dimensioned drawing. Applies to Single & Double Door Frames *Hinged Door Frame Shown Inscape smart workspaces Acme 50 Installation Manual 19

20 Installing the Assembled Sliding Door Frames Step 5A: Once all the door frame head rails have been attached to the posts, slide the head of the frame into the ceiling channel and position jambs per the dimensioned drawing. The screws for the ceiling and head of the frame must be screwed up and thru the wood blocking above. The weight of the sliding door is supported from above Applies to Single & Double Door Frames Note: The ceiling track and head of the frame must be screwed up and thru the wood blocking above. The weight of the sliding doors is supported from above, so the blocking must be stabilized by attaching to the deck above. If blocking is not secure, the sliding door will not be stable, could be out of plumb and may crack off the rollers if the sliding track is not level from end to end. 20 Acme 50 Installation Manual Inscape smart workspaces

21 Installing the Hinged Door Frames in Drywall Conditions Step 5B: When a single door frame is installed into a drywall openings, there are special steps that need taken. Follow the same steps of installing the ceiling channel and assembling the door frame. See steps below to finish the installation. Cut the J-Channel and Spline the same length as the door frame posts. Step 1: Install the J-Channel Secure the (2) J-Channels to the drywall opening using drywall screws. The J-Channel has factory punched holes for the screws. Step 2: Attach Spline Channel Insert the Spline channel into the door frame. Step 3: Install Door Frame Slip the head of the frame into the ceiling channel and tilt the bottom of the frame until it s plumb and tight against the J-Channel. Sheet metal screws can be installed either through one or more hinges and the back of the strike to the blocking in the drywall. Screws can be installed at the very bottom of each jamb thru the narrow side of the J-Channel through to the Spline Channel, but not all the way through to the outside of the jamb. Note: Apply the J-Channel to the interior of the opening. Inscape smart workspaces Acme 50 Installation Manual 21

22 Installing the Floor Track Step 6: Check the shop drawings to cut and install floor track. The length of the floor track is the same length as the daylight opening which is indicated with a D on the drawings. Secure the floor track to the floor using a Ram set shotgun with 1 nails every Acme 50 Installation Manual Inscape smart workspaces

23 Installing the Top Rails Step 7: Check shop drawings and select top rail to form opening. Insert the top rail over the ceiling track, slide top rail over post brackets. Using vise grips, squeeze the top rail and bracket together to form a tight connection. Screw (2) ¼ x 20 x 1/2 long flathead screws into each bracket. Post Bracket Inscape smart workspaces Acme 50 Installation Manual 23

24 Installing the Top Rails when opening has (1) pane of glass Step 7A: Check shop drawings and select top rail to form opening. When an opening contains only (1) pane of glass, a special 2-piece top rail is required. Insert back of the top rail over the ceiling, slide top rail over post brackets. Using vise grips, squeeze the top rail and bracket together to form a tight connection. Screw (2) ¼ 20 x 1/2 long flathead screws into each bracket. Once the glass is installed in the opening, attach the cover of the top rail. 24 Acme 50 Installation Manual Inscape smart workspaces

25 Installing the Sliding Companion Top Rails Step 7B: A special sliding companion rail is used next to the sliding door frame where the door will be sliding across. Check shop drawings and select sliding companion top rail to form opening. Insert the top rail over the ceiling, slide top rail over post bracket. Using vise grips, squeeze the top rail and bracket together to form a tight connection. Screw (2) ¼ 20 x 1/2 long flathead screws into each bracket. A rail splice will be needed to connect to the sliding companion rail to the standard top rail to complete the opening. Sliding Companion Top Rail will be applied to both sides of the door frame when it s a double sliding door Note: The ceiling track and sliding companion top rail must be screwed up and thru the wood blocking above. The weight of the sliding doors is supported from above, so the blocking must be stabilized by attaching to the deck above. If blocking is not secure, the sliding door will not be stable, could be out of plumb and may crack off the rollers if the sliding track is not level from end to end. Inscape smart workspaces Acme 50 Installation Manual 25

26 Installing the Sliding Hardware Track Step 7C: If sliding doors are on project, insert the 2 glide plates into the Acme rail and then attach to the head and sliding companion top rails. This is the sliding track hardware that is used for the sliding doors. The Acme rail is attached by using ¼ x 20 x ½ flathead screws, place a screw in every pre drilled hole. (2) Acme Rails will be attached when double sliding doors occur Glide Plate Location 26 Acme 50 Installation Manual Inscape smart workspaces

27 Installing the Bottom Rails Step 8: Check shop drawings and select bottom rail to form opening. Insert the bottom rail over the floor track, slide bottom rail over post brackets. Using vise grips, squeeze the bottom rail and bracket together to form a tight connection. Screw (2) ¼ 20 x 1/2 long flathead screws into each bracket. Note: Bottom rails wider than 3-0 require one or more leveling screws for leveling purpose. Insert jack screws where required and level rail before glazing. Inscape smart workspaces Acme 50 Installation Manual 27

28 Installing the Top & Bottom Rails with Splices Step 9: If an opening is longer than 10, a splice will need to be used to combine 2 top/bottom rails to create the opening. Insert the splice inside the rails and pull together using vise grips and screw together to create a tight connection. Top Rail Splice Bottom Rail Splice 28 Acme 50 Installation Manual Inscape smart workspaces

29 Installing the Corners and Tees Step 10: If the project contains corners or 3-way conditions, the rails and floor track are shipped as an assembled unit. The ceiling track will be joined with a straight run using a ceiling channel splice and the rails will be joined using a rail splice. Assembled Corner Rail Assembled Tee Rail Note: Max length of legs for a corner rail and track is 48. Note: Max length of legs for a tee rail and track is 120 x 48. Assembled Corner Track Assembled Tee Track Inscape smart workspaces Acme 50 Installation Manual 29

30 Completing and Leveling Framing Step 11: Once all framing is installed, verify all posts are plumb and level along with the bottom rail. Verify all openings are correct to the drawing to ensure all the glass components will fit accordingly. Note: Use a lever sitting on top of the rail, adjust height with a screwdriver. Turn screw up or down to achieve leveling wherever required. Screws may need to be cut down or install different lengths for leveling. Screw head must be flush inside the seat to avoid interference with the glass. 30 Acme 50 Installation Manual Inscape smart workspaces

31 Installing Wood Hinged Doors The door frames and the doors are factory mortised for the hinges and locks. Step 1: Pre drill doors for hinge screws It will be necessary to pre drill the door for screws, the door will split if you do not pre drill. Step 2: Installing the hinges Install the hinges to the door using the supplied wood screws. Do not separate the hinge at it s pin to install them on the frame. Step 3: Attaching hinges to door frame Attach door hinge to frame with supplied machine screws. Inscape smart workspaces Acme 50 Installation Manual 31

32 Installing Hinged Doors Step 4: Make necessary adjustments After the door is hung and all the screws installed, close the door. Check for: reveals top hinge side strike side Adjust accordingly Step 5: Install locks Install the locks following the lock manufactures instructions. 32 Acme 50 Installation Manual Inscape smart workspaces

33 Installing Frameless Glass Hinged Doors Step 1: Attaching Hinge Hardware Attach the hinge hardware as shown on the left. (Typically 4 per door) Step 2: Attaching Frameless Door to Frame Attach the hinge as shown as shown on the left. Step 3: Attaching Lockset to Frameless Door Attach the lockset as shown as shown on the left. Inscape smart workspaces Acme 50 Installation Manual 33

34 Installing Pivot Door Using (Rixson 117 Pivot ¾ Offset) Step 1: Locate Pivot A. Measure 13/16 from door jamb. B. Allow 1/8 Minimum clearance from door stop to door face. Measure door thickness; add ¾. C. Where lines meet determines centerline of pivot. Step 2: Set Pivot Set A. Prepare floor to receive floor portion. Set anchors provided securely in floor. B. IMPORTANT: Floor portions must be level. Level in both directions per illustration. C. Floor portion should be parallel with face of door. Step 3: Install Top Pivot and Pivot Arm A. Install top pivot in door per template. B. Install top pivot in frame per template. C. Install arm in door per template. D. Centerline of top pivot should line up with centerline of spindle. Use plumb lines as illustrated. E. If side jamb pivot is used, see required template M Acme 50 Installation Manual Inscape smart workspaces

35 Installing Pivot Door Using (Rixson 117 Pivot ¾ Offset) Step 4: Hang Door A. Set door on floor. B. Push top pivot pin (1) up into place and replace cap (2). C. Put arm cap on arm and secure tightly with screw furnished. Inscape smart workspaces Acme 50 Installation Manual 35

36 Installing Sliding Doors Step 1: Attaching Sliding Door Glide Stopper (Typically 2 per door) Align sliding door stopper plate to fit into door bottom groove, push in door stop and tighten nut at desired position. *Door is shown upside down for clarification. 36 Acme 50 Installation Manual Inscape smart workspaces

37 Installing Sliding Doors Step 2: Attaching the Sliding Door to the Acme Rail Lift the door into place over the guide pins and attach the door to the glide plates with the supplied screws. Adjust door to be plumb and level. Inscape smart workspaces Acme 50 Installation Manual 37

38 Aligning Double Sliding Doors To ensure that the double sliding doors align when in the closed position, follow these critical steps that are done prior to glass installation: 1. The walls must be plumb and the guide pins for the doors must be also plumb to the track above. If either of those alignments are off, the doors can easily be out. 2. During manufacturing, shipment and installation, the thin rails can slightly warp the door. Once the doors are hung and prior to glazing, the doors must be test aligned without glass. The rails can gently be bent into alignment. Once the doors are aligned, they will stay true once glass is installed. Note: If the glass is installed and caulked, it is still possible to get the doors to align, though it is more difficult and requires and easy touch. To straighten the doors, place one at a time into the closed position. Block the side with the guide pin and hold the door into place so as to not pull the pin out of the floor. Gently pull the bottom corner of one door at a time at the meeting stile to correct the alignment. If you can bring each door closer to alignment a little bit at a time, this should close the gap without breaking the glass. Do not overly stress the doors while attempting this. 38 Acme 50 Installation Manual Inscape smart workspaces

39 Installing Top Cap on Glass Doors All doors that require glass, a special top cap is used. Once the doors are hung and the glass is inserted into the framing of the door, a special top cap is required to complete the framing of the door. This must be installed before the glazing of the glass in the door begins. This always occurs at the top of the door. Note: Glass must be installed in door before Top Cover is installed Assembled Door Header Top Cover Door Header *Lock Box Hinged Door shown* Inscape smart workspaces Acme 50 Installation Manual 39

40 Installing Strikes Before installing the strikes to the door frame or door rail, install the wrought box into the frame. Wrought Box Strike Applying strikes in strike rail for hinged and pivot doors. Wrought Box Strike Applying strikes in door rail for sliding doors when lock is mounted in the frame rail. 40 Acme 50 Installation Manual Inscape smart workspaces

41 Installing Lock into Sliding Door Post Install the lock body into the factory cut lock post. Unscrew the set screw so that the lock body can accept the cylinder. Slide the ring over the threaded side of the cylinder and screw the cylinder into the lock body. Attach the cover plate to the lock body. Inscape smart workspaces Acme 50 Installation Manual 41

42 Installing Pulls on Glass Type 13 Mounting: Make sure of proper centers of drilled holes. Install bushings in the holes in the glass door. Be sure that the bushings are the proper outside diameter for snug fit and are the proper length so they do not protrude beyond the surface of the glass. (It is acceptable if they are a little short. Locate the cone head machine screw and slip the thin stainless washer onto the screw followed by the plastic washer. Insert the screws through the bushings from the push side of the door to the pull side. Push the screw all the way through so the washers and the shoulder are snug against the door face. Slid the inside pull over the cone heads and hold the inside pull tight to the face of the door while tightening the set screws. Note: It is imperative that the set screws are firmly tightened and that the door pull is tight against the door face so that the set screw properly engages the cone head. If vibration causes set screws to loosen, use a Locktite type material to prevent such action. Slip the other plastic washer over the protruding thread on the outside of the door and tighten the outside pull with the cone head bolt. Make sure the pull is properly tightened and snug to the door face. The cone head bolt should be rigid before proceeding. 42 Acme 50 Installation Manual Inscape smart workspaces

43 Installing Pulls on Glass Type 14 Mounting: Make sure of proper centers of drilled holes. Install bushings in the holes in the glass door. Be sure that the bushings are the proper outside diameter for snug fit and are the proper length so they do not protrude beyond the surface of the glass. (It is acceptable if they are a little short.) Start the right-hand/left-hand threaded rods into one right/hand threaded pull just using enough threads to hold it in place. Take the door pull, which you have started the threaded rods into, and push the bolts through the holes in the door. Slip washers and then the spanner collar over the threaded rods and turn clockwise to start threads into the inside left/hand threaded door pull. Start tightening handles by alternately turning rods about ¼ turn at a time. This can be done by using an open end or adjustable wrench on the flat spot of the bolt. When the handles have been drawn together enough so that there is no longer room for the wrench to be used, then the handles can be tightened the rest of the ways using a spanner wrench or an object such as a nail or drill bit that will fit in the hole in the spanner collar. Continue tightening the spanner collars by alternately turning in ¼ turn increments until pulls are tight against door. Note: This type of mounting makes a very rigid connection but it does require care in the installation. Tolerances are tight and rods can bind easily if turned too much at a time. Inscape smart workspaces Acme 50 Installation Manual 43

44 Installing Locking Pulls on Glass Unpacking instructions: Save all fasteners as they are needed for installations. 1. Rotate turn knob 1/4 turn to allow removal of socket head machine screw. 2. Unscrew the socket head machine screw in the lock housing. Installation instructions (Steps 1-3): Step 1: Install Exterior Pull 1. Verify center to center of mounting holes is correct. 2. Insert clear bushings into 5/8 hole(s) in glass door. 3. Put metal washer followed by plastic washer onto conhead screw and then through the door onto another plastic washer and into the end mounting post(s) of the exterior pull. 4. Place cork washer under the lock housing. 5. Holding the pull in place, tighten conehead machine screw(s) at the end post(s0 completely. 3. Loosen set screws on the side of the mounting post(s) at the end of the pull. 4. Separate interior (turn knob side) pull from exterior pull. 5. Remove conehead machine screw from end mounting post(s). Step 2: Preparing for Interior Pull Installation 1. Rotate the turn knob counter-clockwise to completely retract (unlock) the bolt. 2. Remove key from cylinder of exterior pull. 3. Rotate shaft counter-clockwise until it stops. 44 Acme 50 Installation Manual Inscape smart workspaces

45 Installing Locking Pulls on Glass Step 3: Install Interior Pull 1. Insert garolite bushing into 1-3/16 hole in glass door. 2. Place cork washer under lock housing. 3. Position pull for installation and slide main shaft though door into mating hole on the exterior pull lock housing. 4. At the same time, slide the end mounting post(s) over the conehead head(s). 5. Tighten the set screws in the end mounting post(s). 6. If necessary, rotate the turn knob 1/4 turn to allow access to lock housing mouting screw hole. 7. Insert the socket head maching screw into the turn knock lock housing and tighten completely. 8. Return the turn knob counter-clockwise to the completely retracted position. Bottom Strike Installation 1. Lcoate strike in proper location on floor or threshold as appropriate so that the bolt engages the hold in the strike. 2. Follow mounting instructions for #570 dust proof strike (included with strike). Inscape smart workspaces Acme 50 Installation Manual 45

46 Head Office 67 Toll Road Holland Landing, ON L9N 1H2 Canada T F Inscape Architectural Interiors 221 Lister Avenue Falconer, New York USA T F inscapesolutions.com Inscape Corporation 2012 Trademarks of Inscape Corporation Certain names, words, logos and graphics or designs contained herein including Inscape, Platform, Freeform, Arrivals, Storwal, Nuform, Office Specialty, Inform, Reform, Interval, Scala, Planna, Fronté and Twin-Bin are trademarks or service marks of Inscape Corporation

ACME 50 Application Guide

ACME 50 Application Guide ACME 50 Application Guide p1 CONTENTS Features & Benefits... 2 Product Images... 3-8 TRIM AND CONNECTORS Trim & Connector Diagram.... 9 Partition Profile Section... 10 Adjustability.... 11 Ceiling & Floor

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY. SARGENT Installation Instructions for LP8600 x LR8600 & 12-LP8600 x 12-LR8600 Series Low Profile Panic and Fire Exit Devices on Double Egress & Double Doors or LS8600 & 12-LS8600 Low Profile Exit Device

More information

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING JANUARY, 2014 1 INSTALLATION Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING INSTRUCTIONS 2 FRAME ASSEMBLY JANUARY, 2014 601442 SHEAR BLOCK BALL BEARING NRP BUTT (FACTORY APPLIED

More information

Chapter 9. Windows and Exterior Doors

Chapter 9. Windows and Exterior Doors Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail apron

More information

How To Measure Your Finished Opening

How To Measure Your Finished Opening 3000 Series Bifold Doors How To Measure Your Finished Opening MEASURE FROM RIGHT TO LEFT 2 PLACES (WIDTH) MEASURE FROM TOP TO BOTTOM 2 PLACES (HEIGHT) Tools Required for Assembly: Tools Needed: Phillips

More information

Oxford Stalls Installation Instructions

Oxford Stalls Installation Instructions Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or

More information

*D-1030* 1 PARTS CHECK 8 REVERSING INSTRUCTIONS F-XX-C & XX-C D Customer Service. Installation Instructions. Exit Devices

*D-1030* 1 PARTS CHECK 8 REVERSING INSTRUCTIONS F-XX-C & XX-C D Customer Service. Installation Instructions. Exit Devices *D-1030* D-1030 F-XX-C & XX-C Exit Devices Installation Instructions 8 REVERSING INSTRUCTIONS TO REVERSE THE HANDING OF A (F)XX-C DEVICE NOTE: TO REVERSE TRIM, REFER TO SEPARATE INSTALLATION SHEETS. 1

More information

Frameless Fixed Panel Slider

Frameless Fixed Panel Slider INSTALLATION INSTRUCTIONS Frameless Fixed Panel Slider QCI-5279 SINGLE ROLLER WITH ANTI-JUMP DOUBLE ROLLERS QCI5279 Rev Page Certified 08/09/6 Tools: To install your New Shower Enclosure, you may need

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information on last page. Review

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS HIGH PRESSUE LAMINATE (HPL) TOILET PARTITIONS 1030 TrimLineSeries 1040 DesignerSeries Includes continuous hardware option.65. IMPORTANT: Storage and Handling Information on last

More information

Chapter 9. Windows and Exterior Doors

Chapter 9. Windows and Exterior Doors Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING BASEMENT EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail

More information

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions PRE-ENGINEERED HORSE STALL SYSTEMS 4800 SDFD SLIDING DOOR c/w FOLD-DOWN GRILL & Assembly Installation Instructions 4800 SDFD Sliding Door c/w Fold-Down Grill Components - 1 3 /4" x 2" x 88" channels (2)

More information

Swing Door Installation Manual

Swing Door Installation Manual Manual 20D/35D/50D 20DH/35DH 40M/50M 25FD 35XT 50XT 01-4000-03 2010 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes.......................................

More information

Frameless Inline Door With Return QCI5263

Frameless Inline Door With Return QCI5263 INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges

More information

How to Install Custom Real Wood and Faux Wood Blinds

How to Install Custom Real Wood and Faux Wood Blinds Before you begin your installation: READ ALL INSTALLATION INSTRUCTIONS! Make sure that you have all tools and hardware needed for installation. Check the installation surface (wall, ceiling, or window

More information

ICU TRACKLESS SLIDING DOOR

ICU TRACKLESS SLIDING DOOR Interior View 0 Installation Instructions Tools Required: Screwdrivers Small Straight (Flat Blade) - for Terminal Block wiring # Phillips (Crosspoint) - for various #8, #0, and #4 screws Wrenches / Sockets

More information

ESA-300 Full Breakout

ESA-300 Full Breakout Interior View 0 Installation Instructions For use with ESA II Controler DORMA AUTOMATICS, Inc. 94 Sherwood Drive Toll-Free: 877-67-6 DL844-00 Lake Bluff, IL 60044 Fax: 877-4-7999 Rev. /07 Tools Required:

More information

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL The following information is provided by Plascore, Inc., as a general guideline for the installation of the F5075 Frame Wall System. This information

More information

Installation Instructions For The 8850FL Series Mortise eboss

Installation Instructions For The 8850FL Series Mortise eboss Installation Instructions For The 8850FL Series Mortise eboss Electronic Battery Operated Security Solution FEATURES Battery Operated (Hardwire Capable) Motorized Grade 1 Mortise Lock 94 User Code Capacity

More information

Heavy Wall Applied Stop Tube Frame and Door Installation

Heavy Wall Applied Stop Tube Frame and Door Installation INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation Read all instructions before beginning installation. These instructions are provided to help prevent installation problems

More information

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS Ver.2 1300 SERIES CONCEALED VERTICAL ROD DEVICE Top Strike Latch Screws Strike Screws Release Plunger Top Latch Plunger Screws

More information

a.k.a. casegoods instructions

a.k.a. casegoods instructions a.k.a. casegoods instructions a a.k.a. workwall installation IMPORTANT NOTES Failure to install product according to installation instruction will result in loss of warranty. Tools required for assembly

More information

CONCEALED VERTICAL ROD PANIC EXIT DEVICE

CONCEALED VERTICAL ROD PANIC EXIT DEVICE INSTALLATION INSTRUCTIONS CRL JACKSON 1085-1085P CONCEALED VERTICAL ROD PANIC EXIT DEVICE crlaurence.com Phone: (800) 421-6144 Fax: (866) 921-0531 crlaurence.com usalum.com crl-arch.com 11M0236 ORDER OF

More information

Safety glasses Measuring tape Level Pencil Power drill Center punch Phillips screw driver Saw horse

Safety glasses Measuring tape Level Pencil Power drill Center punch Phillips screw driver Saw horse EX76 Concealed Vertical Rod Exit Device Preparation Guide and Installation Instructions Box Contents EX76 Concealed Vertical Rod Exit Device Back Bar Active Push Bar Filler Plate Door Kit with Templates

More information

INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET

INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET HIGH EDGE 2 1/4"(57mm) 03079400070 INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET IMPORTANT: THIS LOCK IS NON-HANDED. LOCK IS FACTORY PACKED PREADJUSTED FOR 1³ ₄" (45mm)

More information

Sliding Glass Door Assembly and Installation Guide

Sliding Glass Door Assembly and Installation Guide Sliding Glass Door Assembly and Installation Guide Index Door System Components and Hardware The following components are needed to complete the installation of your Sliding Patio Door unit. Check all

More information

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

ICU TRACK SLIDING DOOR

ICU TRACK SLIDING DOOR Interior View 0 Installation Instructions Tools Required: Screwdrivers Small Straight (Flat Blade) - for Terminal Block wiring # Phillips (Crosspoint) - for various #8, #0, and # screws Wrenches / Sockets

More information

Chapter 18. Interior Doors

Chapter 18. Interior Doors Chapter 18. Interior Doors 18.1 SWINGING DOORS 18.2 SLIDING DOORS 18.3 BIFOLD DOORS Tools needed by volunteers: Hammer Nail apron Tape measure Square Pencil Tools and equipment needed: Extension cords

More information

Gared Pro-S Portable Backstop

Gared Pro-S Portable Backstop Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION

More information

Installation Instruction

Installation Instruction Tools Needed for Assembly Stud finder (for wood stud wall) Pencil Mark Electric drill Wood Stud Wall Installation Step 1. Locate the Wood Studs Installation Instruction Drill bit (for wood stud wall) Masonry

More information

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series TM Rough opening width (finished opening width plus 9/16") Notch for top track units (used as frame header) Rough opening height

More information

Entry Mortise Handleset

Entry Mortise Handleset 1. Pencil 2. No. 2 and No. 3 Phillips Head Screwdrivers 3. No. 1 and No. 2 Slotted Screw Drivers 4. 1/8" Allen Head Wrench 5. 3/4" Wood Chisel or Corner Chisel 6. Measuring Device 7. Lock Mortising Tool

More information

INSTALLATION INSTRUCTIONS CRL JACKSON

INSTALLATION INSTRUCTIONS CRL JACKSON INSTALLATION INSTRUCTIONS CRL JACKSON 2085 CONCEALED VERTICAL ROD PANIC EXIT DEVICE crlaurence.com Phone: (800) 421-6144 Fax: (866) 921-0531 crlaurence.com usalum.com crl-arch.com 11M0250 ORDER OF ASSEMBLY

More information

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED INSTALLATION INSTRUCTIONS MAXIMUM PRIVACY COMPACT LAMINATE TOILET PARTITIONS 2080 DuraLineSeries 2180 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS LAMINATED P LASTIC TOILET PArTITIONS 1540 ClassicSeries with Options IMPORTANT: Storage and Handling Information on last page. For faster, easier installation, please review these

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS TOOLS REQUIRED Rechargeable, variable speed drill 3/8 diameter drill bit 3 Robertson bits #0, #1 and #2 Slot screwdriver Non marring hammer with 1 head Level Caulk or sealant

More information

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill DEVICES COVERED IN THIS DOCUMENT: 4700S Surface Vertical Rod Device 4700SF Fire Exit Surface Vertical Rod Device TOOLS REQUIRED Metal Wood Wood and Metal Screws Sex Bolts #7 Drill ¼ -20 Tap #16 Drill #12-24

More information

Privacy Wall Glass Selections - Polished Edge Slider Door

Privacy Wall Glass Selections - Polished Edge Slider Door Privacy Wall Glass Selections - Polished Edge Slider Door 3/6" HEX BIT PUTTY KNIFE #2 ACR BIT SUCTION CUP HOLDERS DOOR LEAF: Satin Tempered Clear Tempered LOCTITE 425 SIDE LIGHT ETCHED GLASS STYLES: Satin

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLine Series 1180 DuraLine Series Class-A Fire Rated IMPORTANT: Review these instructions thoroughly prior to installation. FLOOR ANCHORED

More information

INSTALLATION INSTRUCTIONS REPLACING EXISTING DEADBOLT ASSEMBLY

INSTALLATION INSTRUCTIONS REPLACING EXISTING DEADBOLT ASSEMBLY INSTALLATION INSTRUCTIONS REPLACING EXISTING DEADBOLT ASSEMBLY A B C L M N D E F G O P Q H I J Tools provided in Amesbury installation kit: (A) door router fixture, (B) doorframe router fixture, (C) ½

More information

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MM50 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.

More information

PORTA-FAB Cleanroom Wall Systems

PORTA-FAB Cleanroom Wall Systems PORTA-FAB Cleanroom Wall Systems FABLINE BATTEN 2000 INSTALLATION INSTRUCTIONS IMPORTANT Porta-Fab Advises A Thorough Reading of These Instructions Before Beginning Installation. INTRODUCTION Porta-Fab

More information

INSTALLATION INSTRUCTIONS CRL JACKSON

INSTALLATION INSTRUCTIONS CRL JACKSON INSTALLATION INSTRUCTIONS CRL JACKSON 1285 CONCEALED VERTICAL ROD PANIC EXIT DEVICE crlaurence.com Phone: (800) 421-6144 Fax: (866) 921-0531 crlaurence.com usalum.com crl-arch.com 11M0248 ORDER OF ASSEMBLY

More information

INSTALLATION INSTRUCTIONS CRL JACKSON

INSTALLATION INSTRUCTIONS CRL JACKSON INSTALLATION INSTRUCTIONS CRL JACKSON 3185 MID-PANEL CONCEALED VERTICAL ROD PANIC EXIT DEVICE crlaurence.com Phone: (800) 421-6144 Fax: (866) 921-0531 crlaurence.com usalum.com crl-arch.com 11M0252 ORDER

More information

Semi-Frameless Hinged Door With Panel And Return

Semi-Frameless Hinged Door With Panel And Return 202 Anderson Ave., Belvue, KS 66407 Phone: 800-669-9867 Fax: 800-393-6699 www.onyxcollection.com 800-643-1514 www.alumaxbath.com Semi-Frameless Hinged Door With Panel And Return Full Showers with Return

More information

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

Installation Instructions - Model V4JSD 1

Installation Instructions - Model V4JSD 1 Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. These instructions are intended for use with InPro s standard toilet partitions, which include 58 high doors and wall panels, when deviating from

More information

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 QCI5233 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay

More information

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls

More information

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 QCI0274 QCI5274 REV. Rev. 1 0 Page Page 1 1 Date Certified: Certified 06/16/2016 10/01/10 Parts List with wall mount hinges ITEM NO. Part # DESCRIPTION

More information

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815)

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815) Steel Solutions USA 602 E. Walnut Street Watseka, IL 60970 p: (888) 875-5004 f: (815) 432-3364 sales@steelsolutionsusa.com Published February 2011 2011 Steel Solutions USA. All rights reserved. version

More information

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013 U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -

More information

Shetland Stalls Installation Instructions

Shetland Stalls Installation Instructions Shetland Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 1/9/18 Before you start Kit can accommodate up to 12 wide stall front

More information

INSTRUCTIONS FOR 1431 Door Closer with Hold Open Arms 1431 SERIES ADJUSTABLE FROM SIZE 1 THRU 6

INSTRUCTIONS FOR 1431 Door Closer with Hold Open Arms 1431 SERIES ADJUSTABLE FROM SIZE 1 THRU 6 INSTRUCTIONS FOR Door Closer with Hold Open Arms SERIES ADJUSTABLE FROM SIZE THRU 6 FOR INSTALLATION ASSISTANCE CALL SARGENT AT -800-77-77 / www.sargentlock.com Installation Instructions based on Application

More information

Installation Instructions

Installation Instructions Installation Instructions For Models: Model Number / Description File Name 1540 Classic Series P-Lam Toilet Partitions 1540.pdf 1 INSTALLATION INSTRUCTIONS LAMINATED PLASTIC TOILET PARTITIONS 1540 Classic

More information

Two Panel Frameless Bypass Door

Two Panel Frameless Bypass Door INSTALLATION INSTRUCTIONS Two Frameless Bypass Door Series 00 Please Record Model Number From Carton Label Here Please read these instructions carefully to familiarize yourself with the required tools,

More information

UNIT No FRAMELESS PIVOT SHOWER DOOR

UNIT No FRAMELESS PIVOT SHOWER DOOR INSTALLATION INSTRUCTIONS UNIT No. 3600 FRAMELESS PIVOT SHOWER DOOR NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time QCI0020 Rev. 3 Page 1 of 8

More information

Installing Your Electronic Deadbolt

Installing Your Electronic Deadbolt Ultra Security Plus Electronic Deadbolt Installation Instructions http://www.hberger.com/video-gallery/electronic-deadbolt New Installation Lock Location Preparation (Skip this section if you door has

More information

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY EmagiKit Privacy Pod Plus Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY DIMENSIONS AND COMPONENTS 47 47 Ceiling Unit 2-B 2-L 2-R Glass Door Corner Trim Door Handle 90 Adjustable Height Work Surface 1-B

More information

Congratulations! You are now on your way to enriching your life with! Figure #5. Step 5 Install the Dummy Deadbolt. Step 3 Drill the Door

Congratulations! You are now on your way to enriching your life with! Figure #5. Step 5 Install the Dummy Deadbolt. Step 3 Drill the Door C) Using the base point as your reference, measure up 8-1/32 and mark a horizontal line. Measure in from the edge of the door the distance of your backset and mark where the two lines cross. This will

More information

SIDE FOLDING POST ADJUSTMENTS

SIDE FOLDING POST ADJUSTMENTS SIDE FOLDING POST ADJUSTMENTS TABLE OF CONTENTS WARNINGS AND SAFETY INFORMATION 3 TOOLS REQUIRED 4 GENERAL NOTES 5 POST IDENTIFICATION 6 POST TO CURTAIN CONNECTIONS 8 P01/P03 LOCK PLATE HEIGHT ADJUSTMENT

More information

Heavy Wall Applied Stop Tube Frame and Door Installation

Heavy Wall Applied Stop Tube Frame and Door Installation INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation

More information

Before Assembling the Storage Wall

Before Assembling the Storage Wall Chapter 1 Assembling the Lista Storage Wall Lista provides two types of standard Storage Walls: B251 and B255. The design, construction, assembly, and quality are identical for both types, however, B251

More information

INSTALLATION INSTRUCTION

INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION Soild Phenolic Series contents page 1080 DuraLineSeries...2-21 1180 DuraLineSeries...2-21 2080 DuraLineSeries Maximum Privacy...22-41 2180 DuraLineSeries Maximum Privacy...22-41

More information

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7 FSW Installation instructions Track rail 75 x 72 mm 1. Ceiling substructure and installation of the track rail (Fig. 1): The track rail must be bolted over its entire length (including the stacking track

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS MAXIMUM PRIVACY HIGH PRESSURE LAMINATE (HPL) TOILET PARTITIONS 2030 TrimLineSeries 2040 DesignerSeries IMPORTANT: Storage and Handling Information on last page. Review these instructions

More information

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors) Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors) IMPORTANT: Please read before you begin. Table of Contents

More information

Privacy Wall & Glass Selections Pivot-Hinged Door (For products manufactured after September 14, 2009)

Privacy Wall & Glass Selections Pivot-Hinged Door (For products manufactured after September 14, 2009) Privacy Wall & Glass Selections Pivot-Hinged Door (For products manufactured after September 14, 2009) 3/16" HEX BIT #2 ACR BIT 3/8" HEX SOCKET Full-Height (No Switch) Transom (No Switch) Full-Height (With

More information

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels Phone # 800-440-8785 www.lajolladoors.com La Jolla Doors Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels Thank you for choosing La Jolla Doors In this manual you will

More information

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MantelMount TMA Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS TM Thank you for choosing the MantelMount television wall mount. Please read this entire manual before

More information

Installation Operation Care

Installation Operation Care Installation Operation Care Palm Beach Polysatin Shutters CONTENTS Getting Started Installation Overview...1 Unpacking...1 Tools and Materials Needed...1 Fasteners...2 Frame Assembly Assemble the Frame

More information

ESA-200 Fixed Sidelite

ESA-200 Fixed Sidelite Exterior View Installation Instructions For use with ESA II Controller 1 Tools Required: Suggested Fasteners Required - (Not supplied) Screwdrivers Small Straight (FlatBlade) - for Terminal Block wiring

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

NX7 SERIES 5-1/2 HANDRAIL

NX7 SERIES 5-1/2 HANDRAIL STORAGE & HANDLING The handrails are shipped unassembled. Upon receipt, immediately check all material for any damage that may have occurred in transit and verify that all of the items and quantities are

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:

More information

Frameless Inline Door QCI5254

Frameless Inline Door QCI5254 INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5254 FRAMELESS DOOR / PANEL QCI5254 REV. 0 Page 1 Cer fied 06/16/2016 Parts List with wall mount hinges *Quanes may vary QCI5254 REV. 0 Page 2 Cer fied

More information

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4 VYTEX PREMIUM SLIDING GLASS DOOR Table of Contents Precautions and Safety 2 Tools Required...3 Inspect and Prepare Door...4 Hardware and Parts Check List....4 Master Frame Assembly 5 Master Frame Installation..7

More information

ESA-100 Fixed Sidelite/Non Breakout

ESA-100 Fixed Sidelite/Non Breakout /Non Breakout Exterior View Installation Instructions For use with ESA II Controller 1 Tools Required: Suggested Fasteners Required - (Not supplied) Screwdrivers Small Straight (FlatBlade) - for Terminal

More information

TrendWall Floor-To-Ceiling Panels Installation Instruction

TrendWall Floor-To-Ceiling Panels Installation Instruction TrendWall Floor-To-Ceiling Panels Installation Instruction TrendWall Components Covered by this Instruction: Crown (and accessories) Floor Plate Solid Panel Filler Panel Wall Channel Door Section Pilaster

More information

ED5800 (A) Series. Installation Instructions. Concealed Vertical Rod. Exit Device WARNING

ED5800 (A) Series. Installation Instructions. Concealed Vertical Rod. Exit Device WARNING Strike Shim (2) Supplied Strike Plate (3) 10-24 x 3/4" PFHMS (6) 10-24 x 1/2" PFHMS Top Latch TopTube Concealed Vertical Rod Exit Device Important: For use with metal doors only. Device is packed ready

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS 1350 COMBAT SERIES TOILET PARTITIONS IMPORTANT: Review these instructions thoroughly prior to installation. In the United States: BOBRICK WASHROOM EQUIPMENT INC. 200 Commerce

More information

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply

More information

Assembly Instructions

Assembly Instructions 10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS HIGH PRESSUE LAMINATE (HPL) TOILET PARTITIONS 1030 TrimLineSeries 1040 DesignerSeries Includes continuous hardware option.65. IMPORTANT: Storage and Handling Information on last

More information

Deluxe Frameless ByPass Bath Enclosures. 340 & 350 Series

Deluxe Frameless ByPass Bath Enclosures. 340 & 350 Series 202 Anderson Ave., Belvue, KS 66407 Phone: 800-669-9867 Fax: 800-393-6699 www.onyxcollection.com 800-643-1514 www.alumaxshowerdoor.com 340 & 350 Series Deluxe Frameless ByPass Bath Enclosures 350D-0517

More information

Frameless Inline Door QCI5248

Frameless Inline Door QCI5248 INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5248 FRAMELESS PANEL / DOOR / PANEL QCI5248 REV. 0 Page 1 Certified 06/16/2016 Parts List with glass to glass hinges *Quantities may vary. **Support Bar

More information

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly

More information

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions

More information

InstallatIon InstructIons for 2-lIte PatIo Door unassembled

InstallatIon InstructIons for 2-lIte PatIo Door unassembled InstallatIon InstructIons for -lite PatIo Door unassembled tools & materials You will need: Measuring Tape Pencil Shims Drill & Drill bits: 6", 8", 5 6", 7 6" Utility Knife High-Performance Premium Silicone

More information

Frameless Inline Door QCI5250

Frameless Inline Door QCI5250 INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5250 FRAMELESS PANEL / DOOR / PANEL QCI0249 REV. 3 Page 1 Certified 10/12/12 Parts List with pivot hinges *Quantities may vary. QCI0249 REV. 3 Page 2

More information

Twin-Wall Double Swinging Door Kit

Twin-Wall Double Swinging Door Kit 115021 Twin-Wall Double Swinging Kit READ THIS DOCUMENT BEFORE YOU BEGIN Thank you for purchasing this GrowSpan door kit. When properly assembled and maintained, this product will provide years of reliable

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS COMPACT LAMINATE TOILET PARTITIONS 1080 DuraLineSeries 1180 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information

More information

Spring Loaded All Season Roll-Up Doors

Spring Loaded All Season Roll-Up Doors Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately

More information

Installation And Care Instructions. Vertical Honeycomb Shades

Installation And Care Instructions. Vertical Honeycomb Shades Installation And Care Instructions Vertical Honeycomb Shades Rev 5/2013 Table Of Contents Getting Started... 3 Parts Overview... 4 Materials Required... 5 Tools Required... 6 Outside Mount Installation...

More information

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door ROCKWELL 4 in 1 DOOR Choose between four door styles with this Door Kit. Our versatile Rockwell Door Kit is very easy to assemble. All materials and hardware needed to assemble any of the four styles are

More information

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS AWNING / PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin Read the installation instructions thoroughly before beginning the installation procedure. Perspective In the Awning Instructions, Back means

More information