|
|
- Kristin Norton
- 5 years ago
- Views:
Transcription
1 PICNIC TABLE SCALE: 1 /2" = 1' BILL OF MATERIAL 4 PIECES OF 1 1 /2" PIPE 30 1 /4" LONG 2 PIECES OF 1 1 /2" PIPE 5' 10 1 /4" LONG 2 PIECES OF 1 1 /4" PIPE 5' 9" LONG 2 PIECES OF 1 1 /4" PIPE 2' 10" LONG 3 BOARDS 2" X 10" X 8' 2 BOARDS 2" X 10" X 6' 26 BOLTS AND NUTS 3 1 /2" X 1 /4" 3-2" X 12" 1-2" X 10" PINE 8" RADIUS 14" 8" ROD OR PIPE BRACE TO PREVENT 1 1 /2" PIPE FROM BENDING 69" 8' 14" 33" 12" 19"
2 Tractor Tools and Equipment Three-Point Hoist Adjustable Tractor Holding Jack Hose Reel Land Leveler Tractor Carry-All Tractor Scraper Blade Shop Tools and Equipment Acetylene Welding Table Angle Iron Saw Horse Barrel Holder Drawbar Pin Fly Wheel Wrench/Fly Wheel Holder Oxyacetylene Cart Portable Engine Stand Portable Extension Outlet Round Stock Welding Jig Shop Cart Stack Scaffolding Weld Tester and Breaker Welding Positioner Workbench Livestock Feeding, Care, and Control Barrel Feeder Branding Iron Heater Calf Cradle Calf Puller Car Ramp Cattle Fan Cage Cattle Grooming Chute Cattle Guard Farrowing Crate Feed Lot Layout Folding Sheep Blocking Stand Folding Sorting Gate Gates Hay Feeder Hay Ring Headgate Lambing Pen Panels Loading Chute Mineral Feeders Portable Alleyway Post Driver Salt and Mineral Feeder Side Sow Breeding Support Single Fan Stand Slip-In Small Livestock Rack Sow Feeder Reversible Headgate and Squeeze Machine Stile Landscape and Yard Signs Barrel Dog House Dog-Proof Garbage Cans/Jig for Marking Pipe Picnic Table I Picnic Table II Picnic Table III Rose Trellis Steel Wheel Swing Windmill Wood Rack/Trash Can Rack Crafts and Hobbies Beef Sign Cutout Charcoaler/Smoker Disk Clock Plow Yard Sign Pork Sign Cutout A-Frame Truck and Trailer Related All-Purpose Trailer 8 Flat Truck Bed Gooseneck Trailer and Slide-In Racks Headache Rack Livestock Rack for Utility Trailer Pickup Stock Racks Small Trailer Stock Trailer Tilting Golf Cart Trailer Trailer Bow Bender Trailer Jack Ramp Wire Bender Wire Splicer
3 3-POINT HOIST SCALE: 3 /4" = 1' BILL OF MATERIAL 1 PIECE OF 2 3 /8" OR 2 1 /2" DOUBLE STRENGTH PIPE 98" LONG 1 PIECE OF 2 3 /8" OR 2 1 /2" DOUBLE STRENGTH PIPE 27" LONG 1 PIECE OF 2 3 /8" OR 2 1 /2"PIPE FOR BRACES 40 1 /2" LONG 1 PIECE OF 3 /4" ROD FOR TOP BRACE 6' 7" LONG 1 PIECE OF STEEL PLATE 1 /4" X 4' X 6" 2 PIECES OF STEEL PLATE 3 /4" X 3" X 6" 2 PIECES OF 3 /4" ROD FOR BOTTOM HOOKS 7" LONG 1 PIECE OF 3 /4" ROD 31 1 /2" LONG 2 GRADE 8 CATEGORY 1 PIN 2 1 /4" GRADE 8 CATEGORY 1 PIN 6' 4" 31 1 /2" 27" 40 1 /2" 2 1 /4" 15/16" DRILL 1/4" X 4" X 6" 22" 12" RADIUS 3/4" ROD 18" 6" 4"
4
5
6 5 1 /4" 3/4" STOCK 4 1 /4" X 7" BRACE 1 3 /4" 2" X 3 1 /2" BRACE 1 1 /4" 8 1 /2" 5" X 3 /4" CHANNEL NOTE: BRACKET HOLES MUST BE 20" APART WHEN WHEELS ARE UP 56" 1" PIN 7 1 /2" LONG 12 1 /2" X 79" X 1 /4" STOCK 2" X 3" ANGLE 24" BRACE 1/4" STOCK 2" WIDE 1/4" STOCK HYDRAULIC CYLINDER BRACKETS 1 1 /2" X 1 1 /2" ANGLE 2" X 3" ANGLE 79" LONG 18" 28 1 /2" 7" 14" 1/4" STOCK 4" PIPE 1/2" STOCK 4" 33" 3" X 3" X 3 /16" ANGLE 11" 4" 9 1 /2" COUPLING 5" 10" 1" PIPE LAND LEVELER SCALE: 3 /4" = 1' BILL OF MATERIAL 2 PIECES OF 1 /4" METAL STOCK 28 1 /2" SQUARE 2 PIECES OF 1 1 /2" X 1 1 /2" ANGLE IRON 30 1 /2" LONG 2 PIECES OF 1 /4" STOCK 2" WIDE AND 25" LONG 1 PIECE OF 4" PIPE 79" LONG 1 PIECE OF 4" PIPE 76" LONG 2 PIECES OF 3" X 3" X 3 /16" ANGLE IRON 33" LONG 1 PIECE OF 1 /4" STOCK 14" X 15" X 15" 2 PIECES OF 1 /4" STOCK 11" X 10" X 15" 1 PIECE OF 1 /4" STOCK 6" WIDE AND 24" LONG 1 PIECE OF 2" X 3" ANGLE IRON 79" LONG 1 PIECE OF 1 /4" STOCK 12 1 /2" X 79" LONG 1 PIECE OF 1 /2" STOCK 4" X 10" 1 PIECE OF 1 /2" STOCK 5" X 10" 1 PIECE OF 1 /2" STOCK 6" X 11" 1 PIECE OF 1 /2" STOCK 4" X 19" LONG 1 PIECE OF 1" PIPE 4" LONG 1/2 OF A MAINTAINER BLADE 79" LONG 2 PIECES OF 1" PIPE 7 1 /2" LONG 2 PIECES OF CHANNEL IRON 18" LONG 2 PIECES OF 5" X 3 /4" CHANNEL IRON 18" LONG /8" UPSET DRILL STEM 56" LONG 2 WHEEL HUBS 1 PIECE OF 3 /4" STOCK 56" SQUARE 1 PIECE OF 3 /4" STOCK APPROX. 20" SQUARE 2 PIECES OF 1 /4" STOCK 20" X 30" 76" 3" AXLE IS 2 5 /8" UPSET DRILL STEM 5" BRACE 11" 15" HOSE RING 5 1 /2" DIAMETER 1/2 OF A MAINTAINER BLADE 4" PIPE 30 1 /2" 28 1 /2" 19" 1/4" STOCK 13" 16" 79" 25"
7 30" TRACTOR CARRY-ALL SCALE: 1" = 1' BACK VIEW 26" 4" X 3" X 3 /8" ANGLE 2 1 /2" LONG 2" X 3" X 1 /4" 2" X 2" X 11 GAUGE 25" 84" 3" X 3" X 3 /8" ANGLE 6" LONG CORNER BRACE EXPANDED METAL 2" X 3" X 1 /4" BILL OF MATERIALS 2" X 3 1 /4" ANGLE IRON - 24' 2" X 2" 11 GAUGE ANGLE IRON - 10' 2" 2" X 3" X 1 /4" CHANNEL IRON - 10' 2" 25" X 72" EXPANDED METAL 2' X 2' PLATE FOR BRACES STAKE POCKETS ARE OPTIONAL 36" X 84" X 1 /8" FLOOR PLATE 3/4" HOLE 36" TOP VIEW OPTIONAL 4" STAKE POCKETS 45" 3/4" HOLE 48" 25 5 /16" 25 5 /16" 25 5 /16" 2" X 3" X 1 /4" 21" 36" 26" 84" SIDE VIEW
8 16" 1 3 /8" DIAMETER HOLE FOR 1" SLEEVE 2 7 /8" DIAMETER HOLE FOR 2 1 /2" PLATE DRILL 14 HOLES - 1" DIAMETER 1/2" PLATE 3" CHANNEL 1/4" X 3" X 4" FLAT 20 1 /2" 7/8" X 5" HITCH PIN 18" 1 1 /2" 6" 4" 8" 22" 16" 3" 3" 4" 7 1 /4" 3 3 /4" TOP VIEW 19" 18" 1/2" X 3" FLAT I BEAM 9" 4" 26" TRACTOR SCRAPER BLADE SCALE: 1" = 1' 3" BILL OF MATERIAL 1 PIECE OF I BEAM 4" X 26" 1 PIECE OF I BEAM 6" X 54" 1 PIECE OF 6" CHANNEL IRON 54" LONG 1 PIECE OF 3" CHANNEL IRON 30" LONG 2 PIECES OF 3" CHANNEL IRON 19" LONG 2 PIECES OF 1 /2" FLAT 3" X 27" 2 PIECES OF 1 /2" FLAT 3" X 20 1 /2" 2 PIECES OF 1 /4" FLAT 3" X 4" 1 PIECE OF 1 /2" FLAT 3" X 4" 2 PIECES OF 1 /4" FLAT 3" X 8 1 /2" 2 PIECES OF 1 /4" FLAT 4" X 5 3 /8" 1 PIECE OF 1 /2" PLATE 16" X 22" 1 PIECE OF 2 1 /2" PIPE 6" LONG 1 PIECE OF 1" PIPE 6" LONG 1 PIECE OF 2" PIPE 16" LONG 1 PIECE OF 1 1 /2" PIPE 16" LONG 1 PIECE OF 1" PIPE 16" LONG 1 PIECE OF SHAFTING 24" LONG 1 PIECE OF 3" CHANNEL 76" LONG 1 PIECE OF 2 1 /2" PIPE 1 1 /2" LONG 1 1 /2" X 3" MACHINE BOLT 1-1 /2" X 3" MACHINE BOLT 4-7 /8" HITCH PINS 1-3 /8" OF 1 /2" SCRAPER BLADE 84" LONG 76" 84" FRONT VIEW 3/4" DIAMETER HOLE 1/2" X 3" FLAT 1/4" X 3" FLAT CUT ON 45 ANGLE 8 1 /2" 3" CHANNEL 1/2" X 3" BOLT 36" 2 1 /2" PIPE COLUMN BUILT UP OUT PIPES AND SHAFT DRAWBAR PIN 7/8" DIAMETER 7/8" DIAMETER HOLE SIDE VIEW 54" 2" DEFLECTION 2 1 /2" SLEEVE 2" PIPE 3" CHANNEL 3/8" TO 1 /2" BLADE 1" SLEEVE WELD 6" CHANNEL TO 6" I BEAM
9
10
11
12
13 9 1 /2" 1" 1 3 /4" 1 1 /4" 1/4" DIAMETER 13" RADIUS 1 3 /4" 1 1 /4" 1 1 /2" FLY WHEEL WRENCH SCALE: 1" = 1" 1/2" 1 1 /2" 2 1 /2" 3" BILL OF MATERIAL 1 PIECE OF 5 /16" MILD STEEL 13" LONG 1 PIECE OF 3" PIPE SLEEVE 5/16" FLY WHEEL HOLDER SCALE: 1 /2" = 1" 2 1 /4" /2" 3 1 /2" 2 1 /4" RADIUS 3/4" RADIUS 1" BILL OF MATERIAL 1 PIECE OF 5 /16" MILD STEEL 18" LONG 1" 4 1 /4" 4 3 /8" 9 3 /8" 18"
14 OXYACETYLENE CART SCALE: 1 /8" = 1' 11" 1" SQUARE TUBING 1 1 /2" X 2" FLAT STRAP 2" 3" 2" 23" BASE 10" WHEEL MOUNT 1/2" FLAT METAL BILL OF MATERIAL 1 PIECE OF 1 /2" PIPE 100" LONG 2 PIECES OF 1 /2" PIPE 36" LONG 2 PIECES OF 1 /2" PIPE 3 1 /2" LONG 2 PIECES OF 1 /2" FLAT STEEL 10" LONG 2 PIECES OF 1" SQUARE TUBING 23" LONG 3 PIECES OF 1" SQUARE TUBING 21" LONG 2 PIECES OF 1" SQUARE TUBING 11" LONG 2 PIECES OF 1 /2" PIPE 21" LONG 1 PIECE OF 1 3 /4" FLAT 19" LONG 1 PIECE OF 1 /2" ROD 6" LONG 2 PIECES OF 1 /2" ROD 6" LONG 1 PIECE OF 1 /2" ROD 13" LONG CHAIN AND CLAMP 2 WHEELS, 2 RODS, AND 4 NUTS 1/4" 6" 6" THIS ALLOWS FOR LARGE OR SMALL WHEELS TO BE USED 1ST NUT WELDED TO FRAME 2ND NUT LOOSE 3" 19" 6" 38" TO BEND 1 3 /4" X 19" TRAY 21" 7" 1/2" PIPE TO HOLD WELDING RODS 15" 1/2" ROD TO HANG HOSE, ETC. 5" 4" 2" 5" 3" 13 1 /2" 1 1 /2" X 1 1 /4" BRACKET 6" 29 1 /2" TO BEND 3 1 /2" CLOSE BOTTOM 15" WHEEL MOUNT HEIGHT DEPENDS ON WHEEL SIZE BAR TO SEPARATE TANKS 3/4" HOLE
15
16
17
18
19 STACK SCAFFOLDING SCALE: 3/4" = 1' 2" X 12" PLANKING SCAFFOLDS STACKED BY PLACING TUBING OVER ROD INSERTS 1" SQUARE TUBING ROD INSERT 5' 7/16" ROD WITH HOLES FOR COTTER KEY 2' 5" 2' 4" 3" 2' 6" 2' 6" BILL OF MATERIAL 4 PIECES OF 1" SQUARE TUBING 5' LONG 4 PIECES OF 7 /16" ROD 6" LONG 4 PIECES OF 1" SQUARE TUBING 4' 11" LONG 2 PIECES OF 1" SQUARE TUBING 2' 2" 4 PIECES OF 5 /8" SUCKER ROD 5' 3" 4 PIECES OF 1 /2" PIPE 10' LONG 4 PIECES OF 5 /8" ROD 1' LONG 5/8" SUCKER ROD 5' END 1/2" PIPE HOLES SLIP OVER 7 /16" ROD PIPES HINGED WITH BOLTS 10' LENGTH SIDE
20
21
22
23 BILL OF MATERIALS 2 PIECES OF 1 1 /2" ANGLEIRON 9'8 1 /2" LONG 2 PIECES OF 1 1 /2" ANGLEIRON 4' LONG 9 PIECES OF 1 1 /2" PIPE 24" LONG 3-55 GALLON BARREL HALVES 2 PIECES OF 1 1 /2" PIPE 13'8 1 /2" LONG 11'8 1 /2" 9'8 1 /2" 1' 13'8 1 /2" 24" BARREL FEEDER SCALE: 1 /2" = 1' 24" 24"
24 24" BRANDING IRON HEATER SCALE: 3 /16" = 1" 14" 4" CHANNEL 16" 1/4" X 2" X 2" ANGLE BASE 30" BILL OF MATERIAL 2 PIECES OF 2" PIPE COLLAR 2" LONG 1 PIECE OF 2" THREADED PIPE 23" LONG 1 PIECE OF 2" PIPE 4 1 /2" LONG 1 PIECE OF 8" PIPE 30" LONG 1 PIECE OF 1 /8" FLAT METAL 8" DIAMETER 1 PIECE OF 4" CHANNEL 18" LONG 1 PIECE OF 4" CHANNEL 24" LONG 2 PIECES OF 1 /4" X 2" X 2" ANGLE 30" LONG 1 PIECE OF 1 /2" OR 5 /8" ROD 52" LONG 1 PIECE OF 1 /2" PIPE TO HOSE GAS CONNECTER 1 PIECE OF 1 /2" X 1 /4" REDUCER 1 PIECE OF 1 /4" X 1 /8" REDUCER 1 GREASE ZERK WITH SPRING & BALL REMOVER 30" 2" PIPE GREASE FITTING 4 1 /2" 6" 18" THIS END OPEN WELD HANDLE REST 2" 8" PIPE 2" PIPE COLLAR 14" BRANDING IRON HANDLE REST 24" LONG SIDE OF BASE TO FRONT 24" 5/8" OR 1 /2" ROD 24"
25 41" 59" CALF CRADLE SCALE 3 /4" = 1' BOLT TO TABLE 1/4" X 1 1 /2" STRAP BOLT TO BASE 5 8 " SUCKER ROD 30" LONG 18" / 2" X 2" X 1 8 " ANGLE / TABLE FRAME 45 28" 1" PIPE FLOOR 6 1 /4" 4" 3/8" X 2" STRAP HOLES TO HANG SQUEEZE GATE 51" 2" X 3" X 3 /16" ANGLE STRAP 7" LONG 6" FROM TOP 1 1 /2" STRAP HOLES FOR PINS TO HOLD LEGS INSERT 3/4" ROD 55" 3/4" BOLT HOLE 1" PIPE 1 " X 1 /4" STRAP 27 1 /2"LONG 16 GAUGE SHEET METAL 1 1 /2" X 1 1 /2" ANGLE FORMS FLOOR STOP OF 2" CHANNEL 4" LONG 4" 9 1 /2" 29" 12" STRAP 10" 1" X 1 /4"STRAP 40" LONG SIDE 1 1 /4" STRAP OUTSIDE 50 1 /2" 2" 25" 10" 29" 1 1 /4" STRAP BOLTS TO TABLE 3/8" X 2" STRAP 10" METAL STRAP 14" HEADGATE FRAME FOR BOTH ENDS 1 1 /2" X 1 1 /2" ANGLE 1 1 /2" X 1 1 /2" CHANNEL 45" OVERALL 6" 45" 30" 55 1 /2" 1 1 /2" X 1 /4" STRAP 7" LONG STRAP 4 1 /2" 11" 3/4" PIPE 1 1 /2" 4" 3/4" BOLT HOLE 6 1 /2" BACK 41 1 /2" 1 1 /2" X 1 1 /2" ANGLE 16 GAUGE METAL 9" INSIDE SIDE 1" PIPE TACK CLEATS FLOOR AS SEEN FROM BELOW
26
27
28 5" 5" CATTLE FAN CAGE NOTE: TOP RAIL IS CUT 8 WITH ENDS BEING PARALLEL WITH EACH OTHER /4" 40" 10" 1" 92" 1 3 /4" x 1 3 /4" x 4" LONG FRONT TIE RAIL 46" 24" 1 3 /4" x /4" x 4" LONG 3 /4" x 1 3 /4" x 92" LONG 5" 30" BILL OF MATERIAL 4-2" X 2" 14 GAUGE - 92" LONG 2-2" X 2" 14 GAUGE /4" LONG 2-2" X 2" 14 GAUGE - 40" LONG 2-2" X 2" 14 GAUGE - 30" LONG 4-2" X 2" - 48" 2-2" X 2" - 52" 2-2" X 2" - 42" /4" X 1 3 /4"- 96" /4" X 1 3 /4"- 12" /4" X 2" FLAT STRAP - 12" /4" X 1 3 /4" EXTRA- 4" 2-1 /4" ROD FOR TIE LOOP 14 - BOLTS FAN HOLDER BRACKET 1/4" x 2" FLAT STRAP 3" 48" BACK RAIL 12" 24" 2" x 2" 14 GAUGE 52" 1 3 /4" x 1 3 /4" x 96" LONG 11 OR 14 GAUGE 5" 7" 48" 45 ANGLE BOTH ENDS 24" 12" 2" x 2" -14 GAUGE 1/2" ROD TIE LOOP FRONT RAIL 42" 5" 1 3 /4" x 1 3 /4" x 96" LONG 11 OR 14 GAUGE NOTE: THIS PIECE MUST SLIDE FREELY IN TOP RAIL 7"
29 53 1 /2" END VIEW 10pcs 1x1x 1 /8" ANGLE /4" LONG 3" FRONT VIEW 26" 55" 72" 70" 7" 10" 6 1 /4"x 2" x 1 /4" INSIDE PIECES 30" 1 1 /2"x1 1 /2"x 1 /4" 3" 10" SIDE VIEW 84" 26" 26" 2" LOOPS OUT OF 1 /2" ROD 15 ANGLE CUT 72" 6 1 /2" x 2" x 1 /4" FLAT STRAP 84" 1 1 /2" x 1 1 /2" x 1 /4" ANGLE 4 1 /2" 21" Cattle Grooming Chute 1/2" HOLE 3/4" 2" 1" 1/2" FLAT WASHER 9" HANDLE 70" BILL OF MATERIALS 2 1 /8" 1 1 /2" X 1 1 /2" X 1 /4" ANGLE IRON - 228" 2" X 2" X 1 /4"1 SQUARE TUBING /2" 1 1 /2" X 1 1 /2" 1 /4" SQUARE TUBING - 18" 2 X 1 /4" FLAT STRAP /2" 1/2" ROD - 59" FOR HANDLES 1" X 1" 1 /8" ANGLE IRON /2" 12-1 /2" FLAT WASHERS 1/2" ROD 5" LONG 1/2" FLAT WASHER FLAPPER 2 INCHES LONG, 1 1 /2" WIDE, AND 1 /4" THICK 2" x 1 /4" FLAT STRAP
30 CATTLE GUARD SCALE: 1 /2" = 1' 46" CENTER PIPE LENGTH BRACE 2 1 /2" PIPE 17' LONG PICTORIAL VIEW OF ONE END BILL OF MATERIAL 5 PIECES OF 4" PIPE 72" LONG 8 PIECES OF 2 1 /2" PIPE 12' LONG 1 PIECE OF 2 1 /2" PIPE 17' LONG 4 PIECES OF 2 1 /2" PIPE 52" LONG 2 PIECES OF 2 1 /2" PIPE 47" LONG 2 PIECES OF 2 1 /2" PIPE 38" LONG 20 PIECES OF 2" X 4" STRAP METAL 70 PIECES OF 1 1 /2" X 3" STRAP METAL 8 PIECES OF OVAL SHAPED RINGS 38" 16" FENCE CONNECTS TO OVAL RINGS 2 1 /2" PIPE 52" LONG 2" X 4" STRAP BRACES OPTIONAL 33" 12' 31" 31" 31" 31" 33" 2 1 /2" PIPE 52" 6' 4" PIPE STRAP BRACES
31
32 LAYOUT DESIGNED FOR MAXIMUM USE OF SPACE AND MINIMUM LABOR DEMANDS ALL-WEATHER WORK AREA AND EASY HANDLING PENS CHUTES, CATCH PEN AND GATE EITHER CUSTOM OR FACTORY BUILT OF METAL OR POURED CONCRETE SOLID METAL PANELS CATWALK WORK AREA HYDRAULIC SQUEEZE CHUTE HOSPITAL OR RECEIVING PENS ALLEY METAL GATE CLOSES BEHIND CATTLE CATCH PENS MEDICINE ROOM ALLEY POLE TYPE BARN ROAD LOADING AND UNLOADING CHUTES FEED LOT LAYOUT POLE SHADES AND WIND BREAKS LOTS BUILT OF WIRE AND CREOSOTE POSTS SLOPES FEED LOT AREA ONE MAN CAN EMPTY LOTS ALL METAL GATES SELF FEEDERS AND HAY BUNKS FEED BUNKS ALONG OUTSIDE FENCE POSSIBLE ROAD
33 FOLDING SHEEP BLOCKING STAND SCALE: 3 /32" = 1' HEAVY CLOSE WEAVE WIRE MESH 48" 1" X 1 /4" FLAT 26" LONG SHOWN IN FOLDED 24" POSITION PLACE 11 1 /2" 12" 12" 11 1 /2" OPPOSITE BRACE ON SET SCREW FIRST LEG IN FOLDED 1 1 /4" CHANNEL IRON POSITION 23 1 /2" LONG BILL OF MATERIAL 2 PIECES OF 1 1 /2" X 1 1 /2" ANGLE IRON 48" LONG 1 PIECE OF HEAVY MESH WIRE 24" X 48" 1 PIECE OF 1 1 /4" SQUARE TUBING 10" LONG 1 PIECE OF 1" SQUARE TUBING 33" LONG 2 PIECES OF 3 /8" ROD 8" LONG 4 PIECES OF 1" X 1" X 1 /8" ANGLE IRON 1 1 /2" LONG 4 PIECES OF 1 /2" PIPE 16 1 /2" LONG 2 PIECES OF 1 /2" PIPE 19 1 /2" LONG 2 PIECES OF 1 /2" PIPE 22" LONG 3 PIECES OF 1 1 /4" CHANNEL IRON 23 1 /2" LONG 2 PIECES OF 1 /4" X 1" FLAT METAL 26" LONG 2 PIECES OF 5 /32" ROD 10" LONG 1 WASHER, 2 SET OF SCREWS, & 2 BRACE SCREWS 5/32" ROD CHAIN LINK 3/8" ROD 10" 30" 3" 1" SQUARE TUBING 1 1 /4" SQUARE TUBING WELD WASHER 14 1 /4" FROM END WELD HANDLE TO SET SCREW 10" 22" 19 1 /2" 1" X 1" X 1 /8" ANGLE 1 1 /2" LONG 16 1 /2" BRACE RING 1/2" PIPE
34 FOLDING SORTING GATE SCALE: 1" = 1' BILL OF MATERIAL 4 PIECES OF 1 /2" PIPE 36" LONG 4 PIECES OF 1 /2" PIPE 28" LONG 2 PIECES OF 1 /2" PIPE 16" LONG 3 PIECES OF 1 /2" PIPE 2" LONG 4 PIECES OF 1 /2" PIPE COLLAR 2" LONG 12 PIECES OF 1 /2" PIPE 15" LONG 1 PIECE OF 1 /2" PIPE 38" LONG 1 PIECE OF 1 /2" PIPE 40" LONG 1 PIECE OF 1 /2" PIPE 28" LONG 1 PIECE OF 1 /2" PIPE 30" LONG 4 PIECES OF 3 /8" ROD 6" LONG GATES 15" 10" 28" GATE 1 GATE 2 FRAME FOLDED OUT 28" 1/2" 28" 16" 1/2" PIPE COLLAR GATE 2 GATE 12 17" 36" 2" 1/2" PIPE POSITION OF GATES WHEN HUNG PLACE GATE AT HEAD OF CHUTE OR ON FENCE ROW BETWEEN PENS 3/8" ROD 3" LONG
35 GATES SCALE: 3 /4" - 1' (FLATMETAL WELDED ON BOTH SIDES) 1 1 /2" GAP BETWEEN 3 /4" PIPE 3" LONG AND GATE BILL OF MATERIAL 2 PIECES OF 1 1 /2" PIPE 11' 9 1 /2" LONG 2 PIECES OF 1 1 /2" PIPE 50" LONG 5 PIECES OF 5 /8" ROD 11' 6" LONG 3 PIECES OF 5 /8" ROD 47" LONG 2 PIECES OF 3 /4" PIPE 3" LONG 4 PIECES OF FLATMETAL 1 /4" X 2 1 /2" X 3" 6" 8" 2' 10 1 /2" 50" 6" 8" 12' BILL OF MATERIAL (FLATMETAL WELDED ON BOTH SIDES) 1 1 /2" GAP BETWEEN 3 /4" PIPE 3" LONG AND GATE 2 PIECES OF 1 1 /2" SQ. TUBING 9' 9 1 /2" LONG 2 PIECES OF 1 1 /2" SQ. TUBING 50" LONG 5 PIECES OF 1" SQ. TUBING 9' 6 1 /2" LONG 9 PIECES OF 1" SQ. TUBING 7 1 /4" LONG 2 PIECES OF 3 /4" PIPE 3" LONG 4 PIECES OF FLATMETAL 1 /4" X 3" X 3" 6" 8" 4' 8" 2' 3 1 /2" 8" 6" 10'
36 HAY FEEDER SCALE: 1 /2" = 1' BILL OF MATERIAL 2 PIECES OF 2" PIPE 13' LONG 3 PIECES OF 2" PIPE 12' LONG 2 PIECES OF 2" PIPE 11' 8" LONG 3 PIECES OF 2" PIPE 4' LONG 2 PIECES OF 2" PIPE 15" LONG 4 PIECES OF 1 1 /2" ANGLEIRON 4' LONG 48 PIECES 5 /8" ROD 3'6" LONG 4 PIECES 5 /8" ROD 9" LONG 2 PIECES 5 /8" ROD 2' 10" LONG 4 PIECES 5 /8" ROD 2' 1" LONG 4 PIECES 5 /8" ROD 1' 5" LONG 4 PIECES 5 /8" ROD 10" LONG 4-55 GALLON DRUMS 5/8" SUCKER ROD 5" APART 8" 8" 8" 6" 4-55 GALLON DRUMS 6' 12' 6' 4' 6" 35" 1/8" X 1 1 /2" X 1 1 /2" ANGLEIRON 19" 52" 26"
37 HAY FEEDER SCALE: 3 /8" = 1' BILL OF MATERIAL 24" 3' 7" 13" 6" 15" 4' 4 PIECES OF 2" PIPE 19' 8" LONG 2 PIECES OF 2" PIPE 20' 10" LONG 4 PIECES OF 2" PIPE 3' 5" LONG 2 PIECES OF 2" PIPE 22 1 /4" LONG 2 PIECES OF 2" PIPE 15 1 /4" LONG 8 PIECES OF 2" PIPE 3' 8" LONG 4 LANDING MATS 10' X 16" 2 LANDING MATS 3' 8" LONG 32 PIECES OF 5 /8" OR 3 /4" SUCKER ROD 22" LONG 20' 10' 10' 15" 26" 17" 10"
38 HAY RING 20 CUT 32" 8 PCS 8' HAY RING 24" 16 PCS 8' x 1" SQUARE TUBING HAY RING PURCHASED AT WHEELER METAL MUSKOGEE, OK. WELD 4" x 1 1 /4" SQUARE TUBING OVER WELD JOINT BILL OF MATERIALS 16-24" X 1" SQUARE TUBING 3-8' X 1" SQUARE TUBING RINGS 3-4" X 1 1 /4" SQUARE TUBING 8-1" SQUARE TUBING - 32" TALL
39 HEADGATE SCALE 3 /32" = 1" 3/8" FLAT 2" PIPE COLLAR ONE SIDE OF GATE IS ADJUSTABLE, FLAT IS HINGED FOR ADJUSTING 27 1 /2" PIN FLAT HINGED TO CHANNEL WASHERS 29" 21/2" 1/2" ROD STOP 3" 3" 4 1 /2" CUT 1 1 /2" DEEP 2" FROM EDGE 8" 1" SOLID SUCKER ROD 3/8" FLAT 21 1 /2" 6" 1" HOLES 6" CENTERS 7 1 /2" 3/4" ROD 2" PIPE O.D. 8 1 /2" 64" 62" 5" OUTSIDE FRAME 2 1 /2" X 3 /8" ANGLE IRON 4" PLATE 2" PIPE COLLAR 3/4" ROD 2" LONG 15" 2" PIPE 30" FRONT SIDE BILL OF MATERIAL 8" 10 3 /4" 30" 3" HOLE FOR ADJUSTMENT TOP 6" 8" 2 PIECES OF 2" O.D. PIPE 54" LONG 2 PIECES OF 2" O.D. PIPE 62" LONG 4 PIECES OF 2" PIPE COLLAR 2 1 /2" LONG 2 PIECES OF 3 /4" ROD 56" LONG 4 PIECES OF 3 /8" FLAT 3 1 /2" X 12" 2 PIECES OF 3 /4" ROD 57" LONG 1 PIECE OF 1 /2" ROD 27 1 /2" LONG 2 PIECES OF 3 /8" X 2 1 /2" ANGLE IRON 62" LONG 2 PIECES OF 3 /8" X 2 1 /2" ANGLE IRON 30" LONG 4 PIECES OF 3 /8"X 2 1 /2" ANGLE IRON 10" LONG 2 PIECES OF 3 /8" X 3 1 /2" FLAT 8" IRON 1 PIECE OF 3 /8" X 3" FLAT 30" LONG 1 PIECE OF SUCKER ROD END 8" LONG 1 PIECE OF 3 /8" X 2" FLAT 13 1 /2" LONG 1 PIECE OF 2" CHANNEL 5" LONG 1 PIECE OF 1" CHANNEL 5" LONG 2 PIECES OF 3 /8" FLAT 2 1 /2" X 3"
40 LAMBING PEN PANELS 46" 8 1 /4" 38" 1" X 1 /4" FLAT STRAP 1" X 1" X 14 GAGE SQUARE TUBING 1" 1/2" ROD AROUND EDGE 11 GAGE METAL 9" 6" 90 20" 6" BILL OF MATERIALS 1 PIECE 1" X 1 /4" FLAT STRAP 38" LONG 5 PIECES OF 1" X 1" 14 GAUGE SQUARE TUBING 46" LONG 2 PIECES OF 1" X 1" 14 GAUGE SQUARE TUBING 38" LONG 6 PIECES 3 /4" ROUND TUBING 1" LONG (HINGES) 1 PIECE 1 /4" ROD 38" LONG 11 GAUGE SHEET METAL TO FIT LENGTH IN DIAGRAM
41 4' 6' 6" LOADING CHUTE SCALE: 1 /2" = 1' 28 1 /2" 2' 7' 3" AXLE BILL OF MATERIAL 10 PIECES OF 1" SQ. TUBING 10' LONG 6 PIECES OF 1 1 /4" SQ. TUBING 5' LONG 8 PIECES OF 1" SQ. TUBING 26" LONG 1 PIECE OF 2 1 /2" PIPE 7' 3" LONG 5 PIECES OF 2 7 /8" PIPE 4" LONG 2 PIECES OF 2 3 /8" PIPE 4" LONG 1 PIECE OF 2 1 /2" PIPE 9' LONG 4 PIECES OF 2" X 1 1 /2" ANGLEIRON 10' LONG 2 PIECES OF 2" X 1 1 /2" ANGLEIRON 6' 7" LONG 4 PIECES OF 2" X 1 1 /2" ANGLEIRON 2' LONG 2 PIECES OF 2" X 1 /2" ANGLEIRON 8" LONG 4 PIECES OF FLAT IRON 4" X 3" X 1 /2" 4 PIECES OF FLAT IRON 4" X 4" X 1 /2" 4 BOARDS 2" X 10" - 10' LONG 24-1 /4" CARRIAGE BOLTS 2 1 /2" LONG 2-1 /4" MACHINE BOLTS 2 1 /2" LONG 1-1 /2" MACHINE BOLTS 3 1 /2" LONG HITCH IS 2 1 /2" PIPE 9' LONG WITH 1 /2" DRILL ADJUSTABLE STANDS OF 2 3 /8" PIPE 4' LONG WITH 6-1 /2" HOLES 1" APART STAND HOLDER IS 2 7 /8" PIPE 4" LONG 4" X 1 /2" X 3" WITH 1 /2" DRILL
42 MINERAL FEEDERS SCALE: 3/4" = 1' 16" BILL OF MATERIAL 3" RADIUS 16" 5" 18" 3' 6" 1-55 GALLON BARREL 1 PIECE OF 1 1 /2" ROD APPROX. 5" LONG 1 PIECE OF 1 3 /4" ROD APPROX. 4" LONG 1 WHEEL AND TIRE CEMENTED 1 PIECE OF SHEETMETAL 18" X 12" 3 WEATHER VAIN BRACES 16" LONG 1 PIECE OF 1 /4" X 15" X 15" FLATMETAL 19" 15" 1/4" X 15" X 15" FLATMETAL BOLTED TO BARREL WITH 1 3 /4" PIPE WELDED TO FLATMETAL TO FIT OVER 1 1 /2" ROD FOR SWIVEL 9" 12" 18" BILL OF MATERIAL 2 PIECES OF 2 1 /2" ANGLE IRON 5' LONG 4 PIECES OF 2 1 /2" ANGLE IRON 4' 6" LONG 4 PIECES OF 2 1 /2" ANGLE IRON 32" LONG 4-2" X 6" BOARDS 3' 9" LONG 2-2" X 6" BOARDS APPROX. 22" LONG 2-2" X 4" BOARDS 4' LONG 2-2" X 4" BOARDS 19 1 /2" LONG 6-2" X 4" BOARDS 22" LONG 2-2" X 4" BOARDS 12" LONG 5" 22 1 /2" 22" 32" 4' 6" 6" 4' 6" 7" 12"
43 10' 20' 10' PORTABLE ALLEYWAY SCALE: 3 /8" = 1' 6" 12" 9" 6'1" 4'1" BILL OF MATERIALS 12 PIECES OF 1 1 /2" SQUARE TUBING 10' LONG 16 PIECES OF 1 1 /4" SQUARE TUBING 10' LONG 6 PIECES OF 1 1 /2" SQUARE TUBING 4' LONG 6 PIECES OF 1 1 /2" SQUARE TUBING 6' LONG 3 PIECES OF 1 1 /2" SQUARE TUBING 4' LONG 3 PIECES OF 1 1 /2" SQUARE TUBING 33" LONG 6 PIECES OF 1 1 /2" PIPE 12" LONG WITH 11-3 /8" DRILL HOLES 6 PIECES OF 1 1 /2" PIPE 8" LONG WITH 11-3 /8" DRILL HOLES 1" APART 6-2" PIPE COLLARS 2" LONG WITH 3 /8" DRILL HOLE 6-2" PIPE COLLARS 2" LONG WITH 1 /2" PIPE 2" LONG WELDED AT RIGHT ANGLE WITH 3 /8" DRILL HOLE 6-3 /8" BOLTS 4 1 /2" LONG WITH NUTS 8 PIECES 3 /4" PIPE 3" LONG 4-1 /2" PINS 33" 1 1 /2" PIPE 12" LONG WITH 11-3 /8" DRILL HOLES 1" APART PIPE COLLAR 2" LONG WITH 3 /8" DRILL HOLE 1 1 /2" PIPE 8" LONG WITH 7-3 /8" DRILL HOLES 1" APART 2" PIPE COLLAR 2" LONG WITH 3 /8" DRILL HOLE 3/8" DRILL 1/2" PIPE 2" LONG WELDED AT A RIGHT ANGLE TO 2" PIPE COLLAR 2" LONG WITH 3 /8" DRILL HOLE 4'
44
45 SLEEVE CAP 1/2" D STEEL BALL WELDED ON 3 /8" FLAT WASHER 1 SALT AND MINERAL FEEDER SCALE: 3 /32" = 1" 12" 13" BILL OF MATERIALS 1-1 /2" PIPE 10' LONG 1-1" PIPE 5' LONG /4" PIPE 1' LONG 24' FLAT METAL 1 /4" X 1 1 /2" 3' ANGLE 1 1 /2" X 1 1 /2" X 3 /16" 2' ANGLE 1 1 /2" X 1 1 /2" X 1 /8" 1' ANGLE 1" X 1" X 1 /8" 1 PC. FLAT METAL 1 /4" X 1" - 2' LONG 1 PC. 22 GA. GALVANIZED SHEET METAL 36" X 40" 1 PC. 22 GA. GALVANIZED SHEET METAL 20" X 28" 1-3 /8" FLAT WASHER 1-1 /2" BALL BEARING 12-1 /4" X 1 /2" SHEET METAL BOLTS 12 - POP RIVETS, 1 /8" X 3 /8" 1 - RUBBER TUB, 50 LB. CAPACITY 3-1 /4" X 1" SHEET METAL BOLTS TUB RIM /4" 45% SAW SETTING 67 1 /2 3 1 /2" 22" 36" TROUGH SUPPORTS NO. 5 (SIDE VIEW) PIPE, 1 /2" STRUCTURAL 115" LONG BEND TO 36" I.D. TUB RIM, FLAT METAL 1 /4" X 1 1 /2" 58 1 /2" LONG, BEND COLD 18 1 /2" I.D. LEGS 3 FLAT 1 /4" X 1 1 /2" 22" LONG, WELD LEG AND ROOF SUPPORT AND TROUGH SUPPORTS (2) 1 /4" X 1 1 /2", MEASURE TO FIT. 26" 6"R 6" GIRDER BEND 1/4" DRILL 1/8" DRILL 3/4" 5" " 5 3 /4" /2" 16" 15 1 /2" 31" 3/4" ROOF SUPPORT & GIRDER ASSEMBLY NO " 1/4" AND 1 /2" 180 BEND WELD TO TOP OF SLEEVE LEG AND ROOF SUPPORT NO. 4 NOTE: USE LEVEL TO INSURE CENTERPOST PLUMB ANGLE 1" X 1" X 1 /8" - 12" 10 1 /8" 7 1 /4" 10" 12" 24" 28" VANE BASE 1 1 /2" X 1 1 /2" X 1 /8" - 23" VASE AND BASE NO. 1 21" 18" 40" 2 3 /8" 1 1 /2" ROOF DETAIL NO. 2 BEND TO FIT GIRDER BEND 36"
46 IMPLEMENT LEVER FROM OLD CULTIVATOR FLAT STOCK BENT REAR CHANNEL SIDE SOW BREEDING SUPPORT ROD CONNECTS PLATFORM PLUG PIPE END SIDE 42" CHANNEL WELDED TO FRAME HINGED 9" 11" STRAP CATCHES ON CLEATS PLACE OTHER SQUEEZE HERE SLED CAN BE CHANNEL OR PIPE SQUEEZE SLIDING 2" X 4" BOARD 30" 5" HINGED 18" 5" 22" NOTCHED 8" 5" ANGLE IRON ATTACHES TO FLOORING 2 1 /2" FROM EDGE BOLT HINGES 7" 7" 7" PLACE SOW SUPPORT HINGED AT FRONT 30" FRONT GATE DETAIL
47 SINGLE FAN STAND 1 1 /4" SLEEVE 1 1 /4" x 1 1 /4" x 5" 1" FRONT VIEW 5" 30" 40" DRILL 1 /8" HOLE WHEEL 18" 30" SIDE VIEW 1/2" ROD 4" LONG 8" 4" PIECE CUT ON A 40 ANGLE WELD NUT 3/8" ALL THREAD 7" LONG HEAD PIECE 4" 12" 4" 30 CUT 1/4" x 1 1 /2" FLAT STRAP 3" 1/2" HOLE FLAT WASHER 5" BILL OF MATERIALS 2-1 /2" ROD 4" LONG /4" X 1 1 /4" X 5"SQUARE TUBING 4" ON A 40 ANGLE 1-1 /4" X 1 1 /2" FLAT STRAP - 3" 2-1 /8" COTTERKEY 1 - SQUARE TUBING - 12" 1-3 /8" ALL THREAD BOLT - 7" 1 - WELD NUT 1 - FLAT WASHER 2 - WHEELS
48 SLIP-IN SMALL LIVESTOCK RACK SCALE: 1 /2" = 1' TOP GAUGE FLAT METAL 1" X 1" X 84" TUBING RISER GIVES ROOF PITCH FOR DRAINAGE SIDE PIECES 1" X 1" SQUARE TUBING BRACE BILL OF MATERIALS 1" X 1" SQUARE TUBING /6' 1/2" X 1 /2" 1 /8" ANGLE IRON - 28' 2 PIECES - 4 X4 WELDED WIRE - 82" X 8" GAUGE FLAT METAL 2-33" X 84" GAUGE FLAT METAL 1-42" X 48" GAUGE FLAT METAL 2-12" X 33" GAUGE FLAT METAL 1-10" X 48" GAUGE FLAT METAL 1-29" X 21" GAUGE FLAT METAL 1-48" X 84" 2 PIECES 4X4 WELDED WIRE 82" X 8" FRONT COVERED WITH GAUGE FLAT METAL 46" 48" 8" FRONT 1/2" X 1 /2" X 1 /8" ANGLE IRON 84" LONG USED TO MAKE TRACK FOR 1 /4" PLYWOOD OR PLEXIGLAS 21" 10" 10" 46" 48" 84" REAR VIEW 8" 4 X 4 WELDED WIRE 40" GAUGE METAL 33" X 84" VENTS ARE OPTIONAL SIDES
49 SOW FEEDER SCALE: 1 /2" = 1' BILL OF MATERIAL 550 FT. OF 3 /4" ROUND TUBING OR 1" SQUARE TUBING 30 FT. OF 2" PIPE 12 FT. 10 IN. OF 13" TROUGHS (EITHER PIPE OR HOT WATER HEATER LINERS) 20 FT. OF 1 /2" SUCKER ROD - GATE LEVER OVER-ALL VIEW 15' 45 SLANT TROUGH LIP TROUGH GATE LEVER 19 3 /4" 16 1 /2" 14" 10" 36" 1' 1" 12' 10" FRONT GATE LEVER SLEEVES ARE FEMALE SUCKER ROD FITTINGS 36" 2" 12" 36 1 /2" BRACES CAN BE CENTERED OR 24" APART GATE IN DARK LINE BACK WITH GATE CLOSED EXTEND PIPE BEYOND 3/4" PIPE OR ROUND TUBING CATCH 12" 36 1 /2" 36" 14" 5' 30" 25 1 /2" 19" 6' 10" SIDE 6' 12 1 /2" 19 1/2" 13" 16 1/2" 14" TROUGH BENT ROD GATE LEVER (CLOSE-UP)
50
51 STILE SCALE: 3 /4" = 1' BILL OF MATERIAL 4 PIECES OF 2" PIPE 6' LONG 2 PIECES OF 2" PIPE 17 1 /2" LONG 4 PIECES OF 1" PIPE 7' LONG 8 PIECES OF 1" PIPE 27' LONG 2 PIECES OF 1" PIPE 17 1 /2" LONG 9 PIECES OF 24" X 16" X 1 /4" FLAT METAL 16" 17 1 /2" 29" 7' 10" 7' 5' 5" 14" 6' 12" 90 27" 6' 10"
52 BARREL DOG HOUSE SCALE: 1 1 /2" = 1' BILL OF MATERIAL 1-55 GALLON BARREL 1 PIECE OF SHEET METAL 9 1 /2" X 11 1 /2" 1 PIECE OF 1 /2" PIPE 2" LONG 1 PIECE OF 3 /8" ROD 4" LONG 1 PIECE OF STRAP METAL 18" X 1 1 /2" X 1 /2" 12" R 6" NOTE: LIP MADE OF LIGHT GAUGE SHEET METAL OR HALF TOP OF BARREL NOTE: ROLL A PIECE OF CARDBOARD 30" X 48" AND PLACE INSIDE BARREL. ADD COTTON SEED HULLS FOR BEDDING 1/2" PIPE 2" LONG 3/8" ROD 4" LONG SWING DOORS 9 1 /2" X 11 1 /2" SHEET METAL STRAP METAL 18" X 1 1 /2" X 1 /2" 11 1 /2" 9 1 /2" 10" 12"
53 24" CHAIN SNAP 1/2" ROD 3" DIAMETER 1/2" ROD DOG-PROOF GARBAGE CANS SCALE: 1" = 1' BILL OF MATERIAL 1 PIECE OF 3" PIPE 5' LONG 2 PIECES OF CHAIN WITH SNAPS 24" LONG 2 PIECES OF 1 /2" ROUND STOCK 6" LONG 1 PIECE OF 1 /2" ROUND STOCK 6" LONG 2 PIECES OF 1 /2" ROUND STOCK 36" LONG 4 PIECES OF 1 /2" GARDEN HOSE 3" LONG 1/2" ROD 3" DIAMETER 1 1 /2' RUBBER HOSE 3 1 /2' DIAMETER TO MATCH GARBAGE CANS HINGE END 2 7 /8" JIG FOR MARKING PIPE SCALE: 1/2" = 1" BILL OF MATERIAL 1 PIECE OF 3" PIPE 6 3 /4" LONG 2 PIECES OF 1" LONG HINGES 1" HINGE 6 3 /4" WELD 45 SIDE 3 3 /4" ANGLE FOR 45 CUTS GROOVE FOR MARKING SADDLES OPEN
54 PICNIC TABLE SCALE: 1 /2" = 1' BILL OF MATERIAL 4 PIECES OF 1 1 /2" PIPE 30 1 /4" LONG 2 PIECES OF 1 1 /2" PIPE 5' 10 1 /4" LONG 2 PIECES OF 1 1 /4" PIPE 5' 9" LONG 2 PIECES OF 1 1 /4" PIPE 2' 10" LONG 3 BOARDS 2" X 10" X 8' 2 BOARDS 2" X 10" X 6' 26 BOLTS AND NUTS 3 1 /2" X 1 /4" 3-2" X 12" 1-2" X 10" PINE 8" RADIUS 14" 8" ROD OR PIPE BRACE TO PREVENT 1 1 /2" PIPE FROM BENDING 69" 8' 12" 14" 33" 19"
55 LOCATION OF DRILL HOLES 3/4" GAP PICNIC TABLE SCALE: 3 /4" = 1" 11 1 /2" 11 1 /2" 3 1 /2" 15" 3 1 /2" 15" BILL OF MATERIAL 2 PIECES OF 1" SQ. TUBING 66" LONG 4 PIECES OF 1" SQ. TUBING 28" LONG 6 PIECES OF 1" SQ. TUBING 17" LONG 4 PIECES OF 1" SQ. TUBING 36" LONG 2 PIECES OF 1" SQ. TUBING 30" LONG 6 PIECES OF 1" SQ. TUBING 4' LONG 4-2" X 12" BOARDS 6' LONG 1-2" X 8" BOARD 6' LONG 2-1" X 8" BOARDS 6' LONG 2' 6" 17" 17" 28" 10" 7" 36" 6" BACK REST BRACE 3" FROM TOP DRILL HOLES 1 1 /2" FROM TOP AND 4 1 /2" FROM TOP DRILL HOLES 9" FROM FRONT AND 1" FROM FRONT FOOT REST 7" 3"
56 15" PICNIC TABLE BILL OF MATERIALS 32" 40' - 2"x2"x14 GAUGE SQ. TUBING 15' - 2"x2"x 1 /8" ANGLE IRON 2-2"x12"x12' #2 YELLOW PINE /2" TRAILER FLOOR SCREWS 18" CUT LIST - 2" SQ. TUBING 18" 54" 2 ENDS 10" ANGLE IRON 18" 1-24" - 90 CUT BOTH ENDS 2-54" - 45 CUT BOTH ENDS 4-18" - 45 CUT BOTH ENDS 8-18" - 45 CUT ONE END 2-15" - 90 CUT BOTH ENDS, THEN CUT 90 BIRDS MOUTH OUT OF ONE END. 4-20" - 45 CUT ONE END CUT LIST - 2" ANGLE IRON 2-32" 45 BOTH ENDS 8-10" 45 BOTH ENDS 18" 20" 4 PIECES WELD 2 PIECES 1' FROM CENTER ON EACH END 3-2"x12"x4' LONG 4-2"x12"x3' LONG CUT LIST - WOOD
57 1" x 1" - 8' HAY RING CUT IN HALF 1" x 1" x 48" SQUARE TUBING WELDED TO CUT ENDS OF HAY RING ROSE TRELLIS 33" 33" 33" 46" 48" 1/4" ROD OR FLAT STRAP FORMED IN VARIOUS DESIGNS
58 STEEL WHEEL SWING BILL OF MATERIALS 2 - STEEL GRAIN DRILL WHEELS 6' - PIPE TO FIT HUB OF WHEELS 26' - 1"x 1"x 14 GA. SQ. TUBING 8-1 /2"x 3" BOLTS 16-1 /2" NUTS 8' - 4"x 3 /16" STRAP WHEEL SECTION OFF THE BOTTOM OF THE WHEEL SO THE HUB IS 14" OFF THE GROUND. WELD ENDS OF WHEEL AND SPOKES TO 4" STRAP METAL TO MAKE BASE. WELD 6' OF PIPE BETWEEN THE HUBS. SEAT FRAME CUT 2 PIECES OF 1" TUBING - 5'6" LONG CUT 1 PIECES OF 1" TUBING - 5'6" LONG CUT 4 PIECES OF 1" TUBING - 18" LONG WITH 40 ANGLE ON ONE EDGE MAKE 2 ENDS - WELD 5'6" PIECES BETWEEN THEM. CUT 2 - APPROXIMATELY 16" PIECES FOR CENTER BRACES ON BACK SEAT. OPTION 1 - CUT 4 EQUAL LENGTHS OF CHAIN - WELD 1 LINK TO THE UNDER SIDE OF THE SEAT OF EACH CORNER OF THE BENCH. THEN WELD THE OTHER ENDS OF CHAIN TO THE TOP OF THE WHEEL. OPTION 2 - CUT 4-2' PIECES OF 2" STRAP, CLAMP THEM TOGETHER AND DRILL 1 /2" HOLE IN EACH END - CUT HEADS OFF OF 1 /2" BOLTS AND WELD A BOLT TO THE UNDERSIDE OF THE BENCH ON EACH CORNER LEAVING 1 1 /2" OF THREADED END STICKING OUT. PUT ONE NUT ON EACH BOLT. PUT 2" STRAP ON, THEN TIGHTEN THE STRAPS IN PLACE WITH ANOTHER NUT PARALLEL TO EACH OTHER. PUT ANOTHER BOLT IN THE OTHER END OF THE STRAP AND TIGHTEN. HANG BENCH ON WAGON WHEEL FRAME AND WELD ENDS OF BOLT TO THE WHEEL.
59 78" 3/4" PIPE 19 1 /2" 3" 1" WELD 1 X 1 X 1 /8" ANGLE IRON 19 1 /2" 1 X 1 X 1 /8" ANGLE IRON 19 1 /2" 1/4" ROD OPTIONAL 19 1 /2" 24" 24" SIDE VIEW BASE 1 X 1 X 1 /8" ANGLE IRON 24" WINDMILL SCALE 3 /8" = 1' BILL OF MATERIAL 4 7 /8" 19 1 /2" 4 PIECES OF 3" PIPE 21'9" LONG 4 PIECES OF 3" PIPE 60" LONG 3 PIECES OF 3" PIPE 44" LONG 3 PIECES OF 3" PIPE 28" LONG 3 PIECES OF 3" PIPE 13" LONG 3 PIECES OF 3" PIPE 8" LONG 2 PIECES OF 2" X 2" ANGLE IRON 30" LONG 2 PIECES OF 2" X 2" ANGLE IRON 40" LONG OPTIONAL LADDER OPTIONAL LADDER 2 PIECES OF 1" PIPE 17'7" LONG 12 PIECES OF 1" PIPE 16" LONG MAKE 12 PIECES AND SPACE EVENLY AROUND 3" PIPE HUB WELD WITH A 30 DEGREE ANGLE 18 OR 20 4" GAUGE 2" METAL 9 1 /2" 1/2" ROD 3/4" PIPE 2" LONG 3" PIPE 2" LONG 8" NOTCH TAIL FIN 9 1 /2" 4" 1/2" ROD 18" LONG FLAT WASHERS 3/4" PIPE 2" 1/2" ROD 3" LONG FLAT WASHERS
60 WOOD RACK SCALE: 3 /4" = 1' TRASH CAN RACK BILL OF MATERIAL 2 PIECES OF 1" SQ. TUBING 4'6" LONG 4 PIECES OF 1" SQ. TUBING 4' LONG 2 PIECES OF 1" SQ. TUBING 12" LONG 3 PIECES OF 1" SQ. TUBING 12" LONG 2 PIECES OF 1" SQ. TUBING 6" LONG TOP SPACER 3 /4" ROD 12" LONG 2" 54" 54" 48" 12" 6" BILL OF MATERIAL 2 PIECES OF 5 /8" ROD 5'5" LONG FOR CIRCLES 2 PIECES OF 5 /8" ROAD 43 1 /2" LONG FOR CROSS PIECES 4 PIECES OF 5 /8" ROD 2" LONG FOR LEGS 1 PIECE OF 5 /8" ROD 16 3 /4" LONG 1 PIECE OF 5 /8" ROD 6" LONG 13" 2' 96" 4' 4' 96" 2" X 2" X 14 GAUGE SQUARE TUBING 6" 4' CIRCLES HAVE 1'9" OUTSIDE DIAMETER 1'6" 3" 6"
61 BEEF SIGN CUTOUT 1/4" - 3 /8" FLAT METAL CUT TO SCALE
62 CHARCOALER / SMOKER 36" 20" ALL DOOR CUTS ARE TRIMMED WITH 1" X 1 /8" FLAT STRAP 18" 2 3 /8" PIPE 1/4" PIN CONTINUOUS HINGE 16" 6" OFF SET TRAY 30" LONG 1" SQUARE TUBING 30 1 /2" 1" TUBING OR ROD 18" LONG 1 1 /4"x 14" GAUGE SQUARE TUBING 18" 16" PIPE.250 WALL WHEEL MADE FROM 8 1 /2" PIPE SMOKE DAMPER 2 3 /8" x 18" DOOR CUT 13" X 30" BILL OF MATERIALS /8" X 18" PIPE 1-1 /4" PIN CONTINUOUS HINGE - 30" HANDMADE 1" PIPE - 26" 11" X 30" TRAY 1" PIPE " 11" X 30" EXPANDED METAL HANDLE MADE 1" PIPE 1 1 /4" SQUARE TUBING 30 1 /2" LONG 14" BRACE 1" SQUARE TUBING CUT TO FIT 11" WIDE x 30" LONG TRAY COVERED BY EXPANDED METAL 7" ROUND PLATE 1 /4" THICK 1 /2" HOLE DRILLED IN CENTER 2 SECTIONS CUT OUT TO MATCH CUTS IN CHARCOALER END FOR VENT AND CLEAN OUT. BILL OF MATERIALS 16" CYLINDER PIPE - 36" 16" CYLINDER PIPE - (.250 MATL.) 20" 7 1 /2' FLAT STRAP 7" ROUND PLATE FOR VENTS AND CLEAN OUT /4" SQUARE TUBING 14 GAUGE-30 1 /2" BRACE - 1" SQUARE TUBING- CUT TO FIT 2-1" TUBING - 18" 2 - WHEELS FROM 8 1 /2 PIPE
63 DISK CLOCK BILL OF MATERIALS 1 - USED DISK 1 - CLOCK MOTOR 1 - SET OF STICK ON NUMBERS (MOTOR AND NUMBERS AVAILABLE AT MOST WAL-MARTS) LAY SILHOUETTE OF CHOICE ON DISK AND TRACE. LEAVE 1" TO 2" AROUND EDGE OF DISK. CUT OUT WITH PLASMA CUTTER. MOST DISKS HAVE A LARGE HOLE IN THE CENTER. USE A PIECE OF THE SCRAP DISK TO CUT OUT AND FILL THE HOLE. CUT 3 /8" HOLE IN THE CENTER FOR CLOCK MOTOR.
64 PLOW YARD SIGN SCALE: 1 /2" = 1' BILL OF MATERIAL 1 PIECE OF 1" SQUARE TUBING 41" LONG 1 PIECE OF 1" SQUARE TUBING 24" LONG 1 PIECE OF 1" SQUARE TUBING 26" LONG 1 OLD ONE BOTTOM PLOW 1 TRUCK WHEEL OLD ONE BOTTOM PLOW 24" 41" 26" OLD TRUCK WHEEL
65 PORK SIGN CUTOUT 1/4" - 3 /8" FLAT METAL CUT TO SCALE
66
67 24" ALL PURPOSE TRAILER SCALE: 1 /2" = 1' NOTE: CENTER OF AXELS ARE LOCATED 1/2" BACK OF CENTER FOR EVERY FOOT OF LENGTH TOTAL LENGTH: 12' TOTAL WIDTH: 7'6" NOTE: 1/8" SHEET METAL SIDES 1/8" SHEET METAL FENDERS 18" 45 2' 4" BILL OF MATERIAL 4 PIECES OF 3" ANGLE IRON 10'1" LONG 4 PIECES OF 3" ANGLE IRON 3' LONG 2 PIECES OF 3" ANGLE IRON 2" LONG 4 PIECES OF 3" ANGLE IRON 6' 2" LONG 1 PIECE OF 3" ANGLE IRON 6' LONG 10 PIECES OF 3" ANGLE IRON 17' 1 /2" LONG 2 PIECES OF 3" ANGLE IRON 2' 4" LONG 2 PIECES OF 1 /8" SHEETMETAL 7' X 8 1 /2" LONG 2 PIECES OF 1 /8" SHEETMETAL 2' 4" X 8 1 /2" LONG 2 PIECES OF 1 /8" SHEETMETAL 1' 11" X 8 1 /2" LONG 6-2" X 12" X 11'9" RUBBER FLOORING 2 PIECES OF 1 /2" SHEETMETAL 7' 9" X 17" 2 PIECES OF 1 /8" SHEETMETAL 3' X 17" 1 PIECE OF 1 /8" SHEETMETAL 2' X 17" SIDE VIEW 5" PIPE WITH RECESSED TAILLIGHT /2" 9' 9" 6-2" X 12" RUBBER FLOORING 7' 21" 15 1 /2" 2'7" 2'7" 2'3" 5'10" 3' TOP VIEW BOTTOM FRAME VIEW NOTE: ALL FRAME WORK - 3" ANGLE IRON
68 34 1 /4" 8' FLAT TRUCK BED 5" 42" 5" 1" x 1" x 14 GAUGE 54" LONG REAR VIEW 61 1 /2" 1 1 /2" x 14 GAUGE SQ. TUBING 42" LONG 17 3 /8" RUNNER 4" CHANNEL 96" LONG 12" 24" PINBOX DOOR 18" x 14" TOP VIEW 24" CROSSMEMBER 3" CHANNEL 79 1 /2" LONG 24" 24" 8" x 8" EXPANDED METAL 54" 69 1 /2" 34 1 /4" 4" CHANNEL 5.4 LB 34 1 /4" BACK PLATE 1 /8" AND 1/4" TREAD PLATE 80" x 15" 6" PINBOX DOOR HINGE 8" LONG 17 1 /2" 34 1 /4" 6 1 /2" X 6 1 /2" HOLE BACK OF HEADACHE RACK 79" x 18" GAUGE 4 1 /2" 4 1 /2" PINBOX CHANNEL 8" x 22" 55" 22" C L TOP STEP PLATE 96" x 80" x 1 /8" 13" PINBOX RUNNER 4" CHANNEL 3O" LONG 23" SIDE VIEW 22" 22" GUSSET 1 /8" TO 1 /4" - 5" x 7" STAKE POCKET 4" CHANNEL IRON 3" LONG 31 1 /2" 20 1 /2" RUBRAIL 3 /8" x 2" - 96" LONG GUSSET 1 /4" STEP PLATE 6" x 11" STEP BRACE 4"CHANNEL 23" LONG
69 GOOSENECK TRAILER AND SLIDE-IN RACKS SCALE: 3 /16" = 1' REFORMED CAP 3' X 72" CHROME AND SHEET METAL LAP STANDARD COUPLER 3" X 3" X 1 /4" FORMS NECK PIECE 27' BOWS 1 3' 7' 1 /4" CHANNEL 20' FACTORY DOME TONGUE IS 5" CHANNEL 5" CHANNEL 42" 3" X 3" X 1 /4" ANGLE IRON 26" WELD 1 X 3 TUBING INSIDE FOR SUPPORT 40" LIGHT SLIDE DOOR 24"X 50" STANDARDS ARE 3" X 3" X 1 /4" ANGLE 60" LONG LIGHT 12" 24" 24" 24" 2" FLAT BRACE 16 GAUGE SHEET METAL ALLOW FOR HINGE SPACE ON DOOR 4" 4" 4" 31" FROM BOLT TO CENTER SHACKLE TOP METAL LAPS OVER TUBING 6" 3"X 3" 24" 6' 4' 24" 6' 2" PIPE 1" x 3" TUBING 24' LONG 1" X 2" TUBING 5" CHANNEL 4" CHANNEL 3" X 3" 1 /4" ANGLE 10 1 /4" CIRCLE OF SHEET METAL FITS IN ANGLE TO FORM FLOOR OF NECK 3' 2' 2' ALL MAIN FRAME 3" X 3" X 1 /4" ANGLE IRON CENTER SHACKLE 7' FROM REAR 72" 92 1 /2" COUPLER 7' 40" 10' OVERALL BOX 20' X 6' BOLT BOARD FLOOR TO ANGLE IRON FLOOR BRACES 4" CHANNEL
70 5' 10" 4' 2" 2' 5' 10" 8' 2' 8" HEADACHE RACK SCALE: 3 /4" = 1' STOP TAIL SIGNAL LIGHTS OPTIONAL EXPANDED METAL 1/2" ROD BRACE BILL OF MATERIAL 2 PIECES OF 1 1 /2" SQ. TUBING 8' LONG 1 PIECE OF 1 1 /2" SQ. TUBING 5' 10" LONG 9 PIECES OF 1" SQ. TUBING 1' 10" LONG 2 PIECES OF 1" SQ. TUBING 2' 8" LONG 1 PIECE OF 1" SQ. TUBING 4' 2" LONG 4 PIECES OF 1 1 /2" SQ. TUBING 4" LONG 8' 1 1 /2" X 1 /8" FLAT STRAP 2 1 /2" SPACING 35 ANGLE
71 Livestock Rack for Utility Trailer 23" 6" 2' 9" 45 9' 8 1 /2" NOTE: RACKS ARE HELD IN WITH SPRING LOADED BOOMERS 5" 5" 5" 5" 5" 5" 5' 1" 5" 4' 10" 4' 10" 17" BILL OF MATERIAL 8 PIECES OF 1" PIPE 5" LONG 2 PIECES OF 1" PIPE 4' 1" LONG 2 PIECES OF 1" PIPE 4' 6" LONG 6 PIECES OF 1" PIPE 17" LONG 5 PIECES OF 1" PIPE 1' 2" LONG 9 PIECES OF 1" PIPE 23" LONG 18 PIECES OF 1" PIPE 2' 9" LONG 36 PIECES OF 1" PIPE 4' 9" LONG 2 PIECES OF 1" PIPE 5' 10" LONG 2 PIECES OF 1" PIPE 2' 7" LONG 14 PIECES OF 1" PIPE 17" LONG 6 PIECES OF 1" PIPE 2' 5" LONG 1 PIECE OF 1" PIPE 8 1 /2" LONG 2 PIECES OF 1" PIPE 37" LONG 2 PIECES OF 1" PIPE 4" LONG 1 PIECE OF 1" PIPE 7" LONG 3 PIECES OF 1 1 /2" PIPE 3" LONG 4 PIECES OF 1 1 /2" PIPE 1 1 /2" LONG 8 1 /2" GAP 17" 2' 5" 17" GATE OUTSIDE MEASUREMENTS 4' 6" X 2' 7"
72 55 3 /4" 6 1 /2" 5 1 /2" WIRE MESH 10 1 /4" 3 " 2" WIRE MESH 49" 7' 11" 6 1 /2" 5 1 /2" 5 1 /2" 3 1 /2" 3" 2" 35 1 /2" 34 1 /2" 3 1 /4" 14 3 /4" PICKUP STOCK RACKS SCALE: 3 /4" = 1' BILL OF MATERIALS 4 SQ. FEET OF EXPANSION STEEL 4 SQ. FEET OF 18 GAUGE SHEETMETAL 8' OF 1" STRAP IRON /2" ROUND HEAD STOVE BOLTS 24' OF 1" X 6" FENCING LUMBER 7' OF 1 /4" PIPE 265' OF 3 /4" PIPE 2 1 /2" 6" 1 1 /2" 7 1 /2" 19" 52 1 /2" 22" 19" 18" 44 1 /2" 3" 30 1 /2" 6" 5" 4" 4" 3" 3" 2 1 /2" 2" 2" 2" ANGLE IRON WELDED TOGETHER TO MAKE RUN 34 1 /2" 24 3 /4" 3 1 /2" 2 1 /2" 2 1 /2" 3 1 /2" 48 1 /2"
73 SIDE VIEW BULLDOG FORGED COUPLER CHANNEL STYLE FOR 3" SQUARE TUBING JACK CAN BE TOP WIND OR SIDEWIND STRAIGHT WELD ON OR SWIVEL STYLE SPACE BRACES AFTER YOU DETERMINE WHERE FENDER WILL BE LOCATED (RECOMMENDED THAT YOU USE A 3500 LB TUBULAR AXLE) APSI 93X REAR HANGER 28-5 FRONT HANGER LINK 9/16 X 3 BOLT AND NUT 59 3 /8" 84" 72" SPRING CENTER USE STRAIGHT OR DROP AXLE WITH 58" SPRING CENTERS AND A 74" TRACK. LOCATE FENDER 4" ABOVE TIRE WITH WEIGHT OF TRAILER SITTING ON TIRE AND AXLE. TOP FLOOR PLATE 60" x 120" x 3 /16" 120" TONGUE 3" x 4" x 1 /4" 48" 60" 44" 27 1 /2" 27 1 /2" 27 1 /2" 27 1 /2" BILL OF MATERIALS 1 - TOP FLOOR PLATE - 60" X 120" X 3 /16" 1 - TONGUE - 3" X 4" X 1 /4" - 48" 5-60" BRACES 2-120" BRACES 2-44" BRACES 1 - BULLDOG HITCH FOR 3" SQUARE TUBING 3500 TUBULAR AXLE APSI BOX
74 STOCK TRAILER SCALE: 1 /2" = 1' PREFAB TOPS AVAILABLE 14' UPRIGHTS 2" X 2" X 3 /16" ANGLEIRON 5' X 10'-16 GAUGE SHEETMETAL VENT 60 1 /2" 1" X 2" SQUARE TUBING 18 GAUGE VENT OUTSIDE MEASURE- MENT OF DOOR 25" X 50" 22" 24" 5" 5" 4" 4" 22" 19" 31 1 /2" 46" 76" 7' 10" 30" 30" 6' 2' 2 PIECES OF 3" ANGLEIRON 11' 6" LONG 3 PIECES OF 3" ANGLEIRON 81 1 /2" LONG 2 PIECES OF 3" ANGLEIRON 103" LONG 2 PIECES OF 3" ANGLEIRON 54" LONG 2 PIECES OF 2" ANGLEIRON 54" LONG 1 PIECES OF 1 1 /2" ANGLEIRON 15' 8 1 /2" LONG 1 PIECE OF 3" PIPE 81 1 /2" LONG 2 PIECES OF 2 1 /2" ANGLEIRON 6' 1" LONG 1 PREFAB TOP 8 PIECES OF 2" ANGLEIRON 5' LONG 4 PIECES OF 2" ANGLEIRON 3' 5" LONG 2 PIECES OF 2" ANGLEIRON 6' LONG 6 PIECES OF 1" SQ. TUBING 4' LONG 2 PIECES OF 1" X 2" SQ. TUBING 4' 9" LONG 2 PIECES OF 1" X 2" SQ. TUBING 4' 7" LONG 2 PIECES OF 1" X 2" SQ. TUBING 4' 6" LONG 2 PIECES OF 1" X 2" SQ. TUBING 2' 2" LONG 1 PIECE OF 1" X 2" SQ. TUBING 4' 5" LONG 6 PIECES OF 1" X 2" SQ. TUBING 1' 10" LONG 8 BOARDS 2" X 8" BILL OF MATERIALS 2 PIECES OF 1 1 /4" PIPE 4' 9" LONG 4 PIECES OF 1 1 /2" PIPE 1 1 /2" LONG 4 PIECES OF STRAPIRON 1 1 /2" X 4" X 3 /8" 12 PIECES OF 3 /4" PIPE 1 1 /2" LONG 2-1 /2" PINS 5" LONG 1-1 /2" ROD 4" LONG 4 PIECES OF FLATMETAL 2 1 /2" X 2 1 /2" 2 PIECES OF 1" X 2" SQ. TUBING 4' 7" LONG 4 PIECES OF 1" X 2" SQ. TUBING 47" LONG 1 PIECES OF 1" X 2" SQ. TUBING 43" LONG 7 PIECES OF 1" X 2" SQ. TUBING 25" LONG 2 PIECES OF 1" X 2" SQ. TUBING 26 1 /2" LONG 7 PIECES OF 1" X 2" SQ. TUBING 22 1 /2" LONG 2 PIECES OF 1" X 2" SQ. TUBING 25 1 /2" LONG 2 PIECES OF 1" X 2" SQ. TUBING 50" LONG 2 PIECES OF 1" X 2" SQ. TUBING 21 1 /2" LONG 3 PIECES OF SHEETMETAL 2' X 2' 6" 1 PIECE OF SHEETMETAL 2' X 2' 4" 2 PIECES OF SHEETMETAL 8' 6" X 31 1 /2" 1 PIECE OF SHEETMETAL 5'X 10'
75 RAILING IS 1 1 /4" SQUARE TUBING 20" TILTING GOLF CART TRAILER SIDE VIEW 20" 29" 22" FENDER BACKING PLATE 31 1 /2" x 9 1 /2" x 16 GAUGE 22" 44" 49 1 /2" TRAILER FRAME IS 2" x 3"x 3 /16" REC. TUBING TOP VIEW C L OF AXLE 55 1 /2" 58" TOP COVERED WITH 1/8" FLOOR PLATE 49" 24 1 /2" 31" 31" 24 1 /2" 20" 20" 29" SINGLE AXLE FENDER 121" 22" STEP IS 8" x 8" 22" 2" x 2" x 1 /4" ANGLE 4" LONG TIPPER LATCH 1/4" SAFETY CHAIN PLATES 6 1 /2" X 3" X 3 /8" 12" TONGUE PIVOTS OFF THE FRONT SPRING HANGER FRONT HANGER 12" TIPPER LATCH 2" WELD ON COUPLER TOP WIND SWIVEL JACK 80" 3" x 3" x 3 /16" ANGLE SQ TUBING 47 1/2"
76
77
78
79
Hardware and Components:
Hardware and Components: (A) 4X 5/16 x 1 Carriage Bolt (B) 2X 5/16 x 2-1/4 Carriage Bolt (C) 2X 5/16 x 3-1/4 Hex Bolt (D) 2X 5/16 x 3/4 Hex Bolt (E) 2X 5/16 x 1-1/4 Hex Bolt (F) 5/16 x 2-1/4 Hex Bolt (G)
More informationOWNERS MANUAL. Model No UTILITY CART
OWNERS MANUAL Model No. 45-00 UTILITY CART CAUTION: Read Rules for Safe Operation and Instructions Carefully Assembly Operation Maintenance Repair Parts PRINTED IN USA FORM NO. 46274 LOOSE PARTS IN CARTON
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationHardware and Components:
Hardware and Components: (A) 5/16 x 2 Hex Bolt (B) 5/16 x 2-1/4 Hex Bolt (C) 5/16 x 2-1/2 Hex Bolt (D) 4X 5/16 x 3/4 Hex Bolt (E) 4X 5/16 x 1-1/4 Hex Bolt (F) 11X 5/16 Flat Washer (G) 12X 5/16 Nylock Nut
More informationAgri-Fab. Model No "ATV" DUMP CART H.D. 17 CU. FT. CAUTION: Read Rules for Safe Operation and Instructions Carefully
Agri-Fab owners manual Model No. 45-02172 190-521-100 "ATV" DUMP CART H.D. 17 CU. FT. CAUTION: Read Rules for Safe Operation and Instructions Carefully Assembly Operation Maintenance Repair Parts the fastest
More informationowners manual CAUTION: Read Rules for Safe Operation and Instructions Carefully Safety Assembly Operation Maintenance Parts
owners manual Model No. 45-0350 (ATV) 45-0351 (FARM) (45-0350 SHOWN) TANDEM AXLE CART CAUTION: Read Rules for Safe Operation and Instructions Carefully IMPORTANT! The wheel bearings are not pre lubricated.
More informationClassic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Classic Roll Tarp Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationN. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Dump Body tarping system. With tarping systems
More informationTABLE OF CONTENTS DESCRIPTION. Safety Instructions Assembly Operation... 7
TABLE OF CONTENTS DESCRIPTION PAGE Warranty... 1 Safety Instructions... 2 Assembly... 3 Operation... 7 #360 Grain Cleaner Drawings... 8 #360 Grain Cleaner Parts List... 10 Utility Auger Option Drawing...
More informationTABLE OF CONTENTS DESCRIPTION. Safety Instructions Assembly Operation... 7
TABLE OF CONTENTS DESCRIPTION PAGE Warranty... 1 Safety Instructions... 2 Assembly... 3 Operation... 7 #360 Grain Cleaner Drawings... 8 #360 Grain Cleaner Parts List... 10 Utility Auger Option Drawing...
More informationBehlen Mfg. Spring 2016 Auction 04/08/2016 Revised 04/03/2016
Start Of Row A Start of Auction Ring #1 East to West 1. John Deere Lawn Mower & Parts 2. (7) 14 ft. Gates 3. (6) 14 ft. Gates 4. Red Jig 5. Disc Frames 6. 4 ft. Galvanized Tank w/ Galvanized Clips 7. Small
More informationPowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 PowerLock Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com Indianapolis,
More informationParts list Instruction guide Warnings Please read carefully before assembling and using product.
Parts list Instruction guide Warnings Please read carefully before assembling and using product. Jet Rail XL Part Number 27377 Tools required for assembly Hammer 9/16 Wrench 3/4 Wrench Ratchet 9/16 Socket
More informationKentucky 4H Wood Science Plans Notebook. Plans Level 4
Kentucky 4H Wood Science Plans Notebook Plans Level 4 MATERIALS NEEDED: Note: 1" wood may be 3/4" thick and 2" x 2" may be 1 1/2" x 1 1/2" 2 pieces wood 1 x 3 x 17 1 piece wood 1 x 3 x 14 3/4" 2 pieces
More information1949 to 1954 Chevrolet Dual Master Cylinder Conversion
1949 to 1954 Chevrolet Dual Master Cylinder Conversion This document is a one stop shop to getting your brake system updated on your old Chevy. Whether you re going with a disc conversion or just sticking
More informationClassic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Classic Roll Tarp Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationKwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Installation Instructions Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationEMB MANUFACTURING INC.
TRAILER WOOD PROCESSOR MODELS WP865, WP835, WP635 ASSEMBLY INSTRUCTION MANUAL Please review and understand the operators manual before attempting to operate this machinery. EMB MANUFACTURING INC. 4144
More informationOxford Stalls Installation Instructions
Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or
More informationE-Z GROW HOBBY GREENHOUSE. I n s t r u c t i o n M a n u a l & D i s c l a i m e r s
E-Z GROW HOBBY GREENHOUSE I n s t r u c t i o n M a n u a l & D i s c l a i m e r s Contractors/Installers Note: This manual is the property of the customer. Please leave it in the possession of the customer.
More informationPowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 FOR Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com Indianapolis,
More informationCRYSTEEL S. this manual must be included with the vehicle after completing the installation.
Website: www.tbei.com E-mail: sales@tbei.com CRYSTEEL S Grain Tipper mounting and operating instructions this manual must be included with the vehicle after completing the installation. Web Site E-Mail
More informationFINNEY7 SR 5500G TENDER IN ORIGINAL CONDITION
IN ORIGINAL CONDITION Fig 1. Original Appearance Side raves Sanding gear TIA Water treatment system 5500G - 3 5500G TENDER IN REBUILT CONDITION Fig 2. Rebuilt Condition Cut down side raves with fire iron
More informationKentucky 4H Wood Science Plans Notebook. Plans Level 3
Kentucky 4H Wood Science Plans Notebook Plans Level 3 MATERIALS: 2 pieces wood 3/4 x 10 x 4 1 piece wood 3/4 x 12 x 4 2 pieces wood 3/4 x 3 x 2 5 1/2" 2 pieces wood 3/4 x 3 x 1 8 1 piece wood 2 x 4 x
More information1822-I. Spindle Assembly. Pipe and Bolt Threading Machine. Ridge Tool Company/Elyria, Ohio, U.S.A. 2* 3 4 5* * *
-I Pipe and Bolt Threading Machine Spindle Assembly * * * 0 * * * 0 * * 0* * * Rear Cover * Screw () * Washer () Top Cover w/clips (Includes,, ) * J Clip () Front Cover * Screw () Pivot Rod Support ()
More informationHR24TS Rotary Rake. Serial Numbers less than Illustrated Parts Breakdown. Curtain & Guards, Front
HRTS Rotary Rake Serial Numbers less than 00 Illustrated Parts Breakdown Page Page Page Page Page Page Page Page Page Page Page Page Tongue Front Frame Front Axle Curtain & Guards, Front Front Pivot Bridge
More informationInstallation Instructions for Vista Air Vertically Folding Walls
Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.
More informationGeneral Prisoner Transport Install Instructions PT-2-INST
General Prisoner Transport Install Instructions PT-2-INST 50 or 60 high x 80, 100 & 120 inch long / Double Compartment Inserts Also refer to PT-A-3XX instructions for vehicle specific mounting measurements
More informationCoolant Tank Screen Leg Idle End Lockwasher 64 B-015B Leg Drive End Machine Screw 1/4-20 x 3/4 Round Head
Always give model number, serial number and part number when ordering repair parts. BED, COOLANT & DASH POT PARTS LIST (Cont'd.) REF NO. PART NUMBER DESCRIPTION 19 B-077 Vise Slide Block 20 B-045 Vise
More informationFINNEY7 4500G May17 SR 4500G TENDER. Fig 1. Original Appearance. Side raves Sanding gear Front water fillers TIA Water treatment system
Fig 1. Original Appearance Side raves Sanding gear Front water fillers TIA Water treatment system 4500G - 3 Fig 2. Rebuilt Condition Cut down side raves with fire iron tunnels# TIA removed and replaced
More informationHEARNE STEEL CO., INC.
HEARNE STEEL CO., INC. INDUSTRIAL PARK 1011 VAUGHN LANE HEARNE, TEXAS 77859 Leading Manufacturers Of Chain Link Fence Fittings J.C. AMOS, (1921-2008) OFFICE ADDRESS: R.W. AMOS, President P. O. BOX 1239
More informationMobile Weapons Storage System Specifications
Mobile Weapons Storage System Specifications Whatever your weapon storage needs, Hi-Density s customized Weapons Storage System will be designed to fit your unique specifications. We recognize that security
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More information6a. Eight Steps to Chain-Link Fence Installation
6a. Eight Steps to Chain-Link Fence Installation Before You Start You will need the following tools to install your chain-link fence: Post hole digger Wheelbarrow, shovel and hoe for mixing concrete Tape
More information1. Layout. Step 1. Step 2. Step 3. Fig. 1
1-3/8 Panel Clamp Tools You Will Need: Tape Measure, Mason s String, Stakes, Hole Digger, Shovel, Level, Wheelbarrow, Wrenches or Adjustable Wrench, Hacksaw, Pliers, Cutting Pliers, Fence Stretcher and
More informationSUT-1000CLC ASSEMBLY REQUIREMENTS
SUT-1000CLC Torque wrench, carpenters square, wire cutters, Phillips screwdriver, 7/16, 9/16, and 3/4 combination wrenches, ratchet, 9/16, 3/4, 13/16, and 7/8 sockets. ASSEMBLY REQUIREMENTS *Torque all
More informationFLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Trailer system.
More informationCongratulations! Your dog is going to love you!
DIY INSTRUCTIONS Congratulations! Your dog is going to love you! Thank you for ordering your non-electric dog fence kit from Pet Playgrounds. In less than a day you will have your very own personal dog
More information8.5 Ton Assembly Instructions
8.5 Ton Assembly Instructions Parts list for assembly. 6- Legs 2 1/2 Angle X 92 Long 6- Cone Supports 2 Angle X 60 Long 6-1 1/4 Angle X 27 1/4 Long. 12-1 1/4 Angles X 42 Long 6-1 Flat Straps 23 3/4 Long
More informationAPPENDIX FENCE GENERAL NOTES
APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.
More informationUltra Space Saver American Bicycle Security Company
The Ultra Space Saver is userfriendly and allows easy access to bikes. It provides convenient space for u-lock security on nearly any bike, including bikes with fenders and fork shocks. The double-sided
More informationIIHS Side Impact Outrigger
IIHS Side Impact Outrigger Assembly Procedure Base Assembly (14.3 lbs) The base assembly consists of a ¼ thick steel plate, a ¼ thick piece of polyethylene, and mounting fixtures for the upper and lower
More informationPowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 FOR Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com Indianapolis,
More informationFord Pick Up Rear leaf Spring Kit Installation Instructions
1948-1956 Ford Pick Up Rear leaf Spring Kit Installation Instructions 1-800-984-6259 www.totalcostinvolved.com Parts 48 inch leaf (2) springs (4) U-bolts 3/8-24 x l 1/4bolts (16) & nuts (2) 1/2-20 x 4
More informationModel No.'s B
owners manual Model No.'s 45-01012 190-653B UTILITY CARTS (SEE SPECIFICATIONS ON PAGE 7) CAUTION: Read Rules for Safe Operation and Instructions Carefully Assembly Operation Maintenance Repair Parts the
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationWAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence
MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised
More informationModular XP Ramp Assembly Manual
Modular XP Manual 1 Contents Overview... 2-5 Section 1: 1.1 Tools required...6 1.2 Hardware list...6 Ramp & Platform Standard Parts 2.1 Ramp Parts...7 2.2 Platform Parts...8 2.3 Standard Platform Configurations...
More informationtable of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops
table of contents Square Track & Accessories Pages 4-7 Square Track Options Page 4 Light Duty Track Page 4 Square Track Brackets Page 5 Square Track Accessories Page 5 Square Track Trolleys Page 6-7 Offset
More informationHYDRAULIC CONTROL DETAILS PARTS LIST
Always give model number, serial number and part number when ordering repair parts. HYDRAULIC CONTROL DETAILS PARTS LIST REF NO. PART NUMBER DESCRIPTION 1 101939 Hydraulic Tank 2 101940 Hydraulic Tank
More informationPlease read these Installation Instructions in their entirety prior to installing or operating this equipment.
2014-2017 Ram 2500 (All beds) Please read these in their entirety prior to installing or operating this equipment. This hitch is rated to 30,000 lbs. Gross Towing Weight and 7,500 lbs. Tongue Weight Bolt
More informationObtained from Omarshauntedtrail.com
DaveintheGrave's Halloween Props Animated Crawling Skeleton Build a life-size skeleton torso that realistically crawls across the lawn one arm at a time. 1. Motor Base and Linkage Assembly BASE - I used
More information8" PIVOT. Model 8000 Pivot - Prior to Feb 2002
" PIVOT Model 000 Pivot - Prior to Feb 00 " Pivot Table of Contents Description Rev. # Pg. # Overall Assembled View... 0-0... Legs & Braces... 0-0... Ladder... 0-0... Collector Ring "J" Tube... 0-0...
More informationMotorcycle Lift Assembly Instructions
Motorcycle Lift Assembly Instructions Copyright JCS 2009 Rev1M Page 1 Lift Table Assembly Instructions The following pages will assist you in the construction of your Motorcycle Lift Table. You will find
More informationInstallation Instructions Universal Crossmember Kit - 60 Track Width BEFORE Measure Twice, Weld Once! II
Installation Instructions Universal Crossmember Kit - 60 Track Width Please read these instructions completely BEFORE starting your installation. Remember the basic rule for a successful installation:
More informationPivot-Door Downdraft Cabinet Plans
Pivot-Door Downdraft Cabinet Plans Finished Cabinet Closed Open Exploded View Introduction This simple downdraft-style dust collection cabinet is a great way to keep your shop cleaner and keep your router
More informationThis go-round puts kids in orbit
This go-round puts kids in orbit By DAVID A. GATTIS You DON'T NEED NASA to put your kids in orbit. They'll really get a blast out of this attachment that adds whiz-around variety to the backand-forth motion
More informationPotter s Wheel Plans. Flywheel is poured in form made by tacking tar paper to plywood disk. Partly set concrete is broom-finished.
Potter s Wheel Plans Flywheel is poured in form made by tacking tar paper to plywood disk. Partly set concrete is broom-finished. Throwing Pottery on a wheel is the most challenging form of pottery making
More informationEZ-HAUL GARDEN CRATE WAGON
099 EZ-HAUL GARDEN CRATE WAGON 855 00 FarmTek All Rights Reserved. Reproduction is prohibited without permission. STK# Description 099 Garden Wagon Revision date: 09.0.0 CARE AND MAINTENANCE READ THIS
More informationINSTALLATION GUIDE TOYOTA 4 RUNNER (2013+) REAR BUMPER
INSTALLATION GUIDE TOYOTA 4 RUNNER (2013+) REAR BUMPER CONTENTS CONTENTS Rear Bumper (base or dual arm) Installation...................................... 2 Dual Swing Installation..........................................................
More informationParts Manual 881 Hay Hiker
Parts Manual 881 Hay Hiker Part Number K20393P-06 IMPORTANT: ALL ITEMS ARE IDENTIFIED WITH A PART NUMBER. Some of the smaller parts such as bolts, nuts, washers, etc. are not all shown, however, the quantity
More informationModular XP Ramp Assembly Manual
Modular XP Manual 1 Contents Overview... 2-5 1.1 Tools required...6 1.2 Hardware list...6 Ramp & Platform Standard Parts 2.1 Ramp Parts...7 2.2 Platform Parts...8 2.3 Standard Platform Configurations...
More informationHollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide
Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide Tools Required: two adjustable wrenches, pliers, ¾ socket wrench recommended Note: please do assembly near your vehicle as you Can
More informationInstallation for Full Size Polaris Ranger Crew Doors
Installation for Full Size Polaris Ranger Crew Doors Order of Installation: Heater Doors Wiper on to Windshield Windshield Top & Back Panel Note: Most of the steps in these instructions need to be repeated
More informationInstallation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts
Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox
More informationParts Manual for MODELS: ZKH52222 ZKH52252 ZKH61252
Parts Manual for MODELS: ZKH52222 ZKH52252 ZKH61252 Professional Quality Lawn Care Equipment since 1945 THIS MANUAL INCLUDES UPDATES ON PAGES 6,10, & 20. Yazoo/Kees Power Equipment policy is to improve
More informationFRAME. Pull Type Rigid Frame, Lift Rotate INNER HITCH
Pull Type Rigid Frame, Lift Rotate INNER HITCH The hitch length can be adjusted in 15" increments to accommodate the tractor tire options (single or dual tires) being used and attachments installed on
More informationPost & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS
Post & Rail Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail STAGGER RAIL ENDS FOR GREATER STRENGTH ALLOW 1-1/2" GAP ON HINGE SIDE OF GATE AND 1-1/4" ON LATCH SIDE OF GATE HARDWARE DIG HOLES 30" MINIMUM
More informationMulchmaker for gardening buffs
Mulchmaker for gardening buffs By MANLY BANISTER ANY GARDENING BUFF knows the best way to fertilize the garden is with organic material and that the cheapest organic material is homegrown compost. Mulches
More informationPlease read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.
Assembly and Owner s Manual OnBoard Timpani Cart Performance Position Towing Position CONTENTS Important User Information...........................2 General......................................2 Manufacturer.................................2
More informationParts Manual for: MODELS / I.D. : / ZTH5223A / ZTH5225A / ZTH6125A
Parts Manual for: MODELS / I.D. : 968999153 / ZTH5223A 968999154 / ZTH5225A 969999155 / ZTH6125A Husqvarna policy is to improve its products whenever it is possible and practical to do so. In an effort
More informationBuild Your Own Feeders Double-sided or Single-sided using Premier s panels!
Build Your Own Feeders Double-sided or Single-sided using Premier s panels! 800-282-6631 premier1supplies.com Premier s Double-Sided Feeder For large sheep and rams Material List 1. From Premier a. Four
More informationPost & Rail Crossbuck
Post & Rail Crossbuck 1. Getting Started 6. Crossbuck Be sure to call underground prior to digging Assemble gates (if necessary) and decide where they will be located Stake out the fence line Space and
More informationHow to Build Your Custom Teardrop Camper. 5 x 10 Trailer. 5 Tall Cabin
How to Build Your Custom Teardrop Camper 5 x 10 Trailer 5 Tall Cabin Contact: hennesseystealth@bigteardrop.com http://www.bigteardrop.com ebay Seller ID: hennesseystealth1957 United States Copyright TXu
More informationBABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms
BABY WOLF LOOM Assembly Instructions for Knocked-Down Looms BEFORE YOU BEGIN Please read through the directions before beginning to assemble your loom. Unpack the loom parts carefully. Do not throw away
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 19, 2016 the Meadowbrook-R 12' x 10' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is
More informationINSTALLATION MANUAL WEEKENDER STEEL LADDER RACK
TRUCK STORAGE SOLUTIONS SECURING YOUR REPUTATION INSTALLATION MANUAL WEEKENDER STEEL LADDER RACK STEEL & ALUMINUM SIDE BOX WITH PACK RAT DRAWER UNITS MODELS ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS
More informationPRO Series Brakes Operating Instructions
PRO Series Brakes Operating Instructions Tapco Products Company PRO Brake System PRO Cut Off Gauge Simplifies cutting. PRO Cut-Off Quickly, safely, and easily makes factory quality cuts in coil stock,
More informationImportant Note. Tools Required: Welder capable of fully welding 10 GA.135 steel
INSTALLATION INSTRUCTIONS Frame Reinforcement Kit 11100 (Patent Pending) 1968-72 GM A-Body Coupe/Sedan Read Instructions FULLY before starting Installation Important Note Installation of this kit requires
More informationDowntown Rack. Custom logo option available
Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking
More informationEND FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"
END FRAMES End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 23" 17 1/2" (B) (B) Measure from the bottom of your stone to 1" below the lip to get your measurement. 17 1/2"(B) 36" 34" 1/2" flat
More informationSAVVY OFF ROAD GAS TANK SKID INSTALLATION INSTRUCTIONS
It is best to work with a fuel tank that has the least amount of fuel in it as possible. Thank you for purchasing the best skid on the market. Please follow these instructions and your installation should
More informationCertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High
CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS Fence Installation Guide 3', 4' & 6' High INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers
More informationRech-Marbaker Co., Philadelphia, Pennsylvania RECH-MARBAKER COMPANY, PHILADELPHIA, PENNSYLVANIA.
RECH-MARBAKER COMPANY, PHILADELPHIA, PENNSYLVANIA. Plate No. 978. PHILADEL- PHIA RAPID TRANSIT CO S PAY WAGON. Built by Rech-Marbaker Co., Philadelphia, Pennsylvania. Carriage Monthly June 1906. WORKING
More information18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL
18000 HDL FOUR POST LIFT 18000 LB CAPACITY INSTALLATION AND OWNER'S MANUAL WARNING! Do not raise a vehicle unless the front stops are in place, the parking brake is set, and the wheels are chocked. Stay
More informationSpiral Slide
IMPORTANT Page 1 PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY. All equipment must be installed in accordance with these instructions. Check your shipment against Bill of Lading and Parts list.
More informationParts List for Type 1
1 422190430001 FENCE BODY 1 2 901010600677 CAP SCREW 2 3 904010331451 WASHER 3 4 901010600605 CAP SCREW 2 5 904010101604S STEEL WASHER 2 6 422040105002 REAR SLIDE BLOCK 1 7 905040714459 STEEL PIN 1 8 928010414118
More informationDublin Stalls Installation Instructions
Dublin Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 9/13/17 Part Identification Round Track Bracket (4) (Not Painted) Round
More informationG0513X2 Main -87- G0513 Series Bandsaws 82V V2 82-6V2 95A V2 82-5V2 82-1V2 82-4V V A
G0513X2 Main 23 55 22 48 17 17-1 17-2 21 7 17-3 17-2 17-4 24 17-5 18-5 22 24 21 55A 50 8 9 49 11 12 13 14 15 47 16 10 46 45 3 44 43 39 38 37 39 40 32 33 36 42 34 35 2 25 28 18-4 18-2 18-3 31 30 29 18-1
More informationSystem 3000 specifications
System 3000 specifications Scope: Materials: Type of Bookstack: This specification covers delivery and installation of steel library shelving of the bracket type. Height, depth and accessories shall be
More informationGared Pro-S Portable Backstop
Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION
More informationMAG-CONV Basic, 48, 48R & Midline Front Mount
Parts Required: Tools Used: Mag Wheels Brakes Brake Rods Mounting Bracket Anti Tippers 7/16" Wrench Screw Driver Rubber Mallet 5/8 Wrench 5mm Allen Wrench Step Execution Figures 1 Remove front 5" total
More informationAssembly Book. the Fairview. Building Size 12'x12' Revised July 25, 2012
Assembly Book Revised July 25, 2012 the Fairview Building Size 12'x12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationCOMMERCIAL MOWERS PARTS MANUAL FOR: MODELS: ZKH52221 ZKH52251 ZKH61221 ZKH61251
PARTS MANUAL FOR: COMMERCIAL MOWERS MODELS: ZKH52221 ZKH52251 ZKH61221 ZKH61251 FD KEES POWER EQUIPMENT, L.L.C. 700-800 PARK AVENUE BEATRICE, NEBRASKA, U.S.A. 68310 PRINTED IN USA MANUAL NO.-102935 REV.
More informationParts Manual 2200 Bale Hiker
Parts Manual 2200 Bale Hiker Part Number K56202-02B IMPORTANT: ALL ITEMS ARE IDENTIFIED WITH A PART NUMBER. Some of the smaller parts such as bolts, nuts, washers, etc. are not all shown, however, the
More informationLow/High Tunnel Greenhouse Plans
Low/High Tunnel Greenhouse Plans Tools Needed (See the complete list of Greenhouse Tools) Hacksaw or Reciprocating Saw Socket Wrench, Adjustable Wrench or Nut Drivers Electric Drill with Drill Bits Sledge
More informationAssembly Book. 10' x 12' the Cambridge II. revised June 13, 2014
Assembly Book revised June 13, 2014 the Cambridge II 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the
More informationBEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches
Copyright (c) 2007 J D SQUARED INC. www.jd2.com THE BEAST Tube and Pipe Notcher Operating Instructions Notches In Bends Straight Notches Angled Notches PATENT PENDING Offset Notches Assembly After unpacking
More informationSpring Loaded All Season Roll-Up Doors
Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More informationPrecision Steel Car s 100 T Steel Coil Car
Precision Steel Car s 100 T Steel Coil Car Precision Steel Car www.precisionsteelcar.com info@precisionsteelcar.com Paul Vernon: (513) 571-5739 Revised 4/30/2009 Contents of Kit Main Tube Side Frame 2
More information