E-Z GROW HOBBY GREENHOUSE. I n s t r u c t i o n M a n u a l & D i s c l a i m e r s
|
|
- Helen Hart
- 5 years ago
- Views:
Transcription
1 E-Z GROW HOBBY GREENHOUSE I n s t r u c t i o n M a n u a l & D i s c l a i m e r s Contractors/Installers Note: This manual is the property of the customer. Please leave it in the possession of the customer.
2
3 Thank you for choosing Atlas Manufacturing, Inc. This Instruction Manual is specifically made for and has been customized for your Greenhouse in accordance with your Order. The "Easy Grow" greenhouse described in this manual is a non-coded structure. It is designed for a limited amount of wind and snow but not designed for typical wind, snow, ice or seismic conditions referred to as "Loads" required by most local building authorities. Atlas Manufacturing, Inc. can not and will not be held liable or responsible for structural failure and/or damages including but not limited to collateral damage resulting in financial losses or personal injury due to this Non-coded Structure not complying with your local code requirements Thank you again for choosing Atlas 14-Dec-09
4
5
6
7
8
9
10
11
12 **NOTICE** ATLAS EXTRUSIONS THAT REQUIRES A SNAP CAP ARE DESIGNED FOR 2 LAYERS OF 6 MIL. POLY IN ORDER TO ADEQUATELY HOLD THE POLY INTO PLACE. THE FOLLOWING ATLAS EXTRUSIONS REQUIRE SNAP CAP: SINGLE WIDE LOCK, DOUBLE WIDE LOCK, CHANNEL LOCK, Z-LOCK, SNOW ARCH, RT, AND PRO-COM GUTTER, WALL AND HINGE EXTRUSION. IF YOU ARE USING ONE OF THE ABOVE MENTIONED EXTRUSIONS AND ARE USING A SINGLE LAYER OF 6 MIL POLY YOU WILL NEED TO SUBSTITUE STAINLESS STEEL WIRE FOR THE SNAP CAP OR SIMPLY FOLD THE POLY CREATING A DOUBLE LAYER AT THE LOCKING POINT. THESE EXTRUSIONS ARE NOT DESIGNED TO LOCK 4 MIL SEASONAL POLY. ATLAS CANNOT AND WILL NOT BE HELD LIABLE FOR LOSS OF OR DAMAGE TO POLY FILM DUE TO A SINGLE LAYER OF POLY SLIPPING THRU THE SNAP CAP.
13 VERY IMPORTANT Our engineering specifications require the posts to be set a full 3 deep in the ground and a maximum of your specific sidewall height above the ground. If the posts are set more than your specific sidewall height above the ground or less than 3 deep in the ground all warranties will be void! NOTICE: Concrete settings in this book are Layout Reference Only. Actual footing/foundation size is based on several factors, soil type, bearing pressure, wind and/or snow loads. We recommend that you should have a local engineer design an appropriate foundation or concrete setting for your structure. CONC.SETTINGS DOC.
14 PARTS DESCRIPTION 1" X 2" GROUND RAIL WITH WELDED STANCHIONS 1 5/8" X 5'1" PURLIN 1 5/8" X 5'1" RAFTER 1" X 2" X 10' RECTANGLE TUBING FOR ENDWALL GROUND RAIL 1 5/8" X 5'1" LEGS 2" X 2" SQUARE TUBING USED FOR STUDS AND ENDWALL FRAMING 3 WAY CONNECTOR 4 WAY CONNECTOR PAGE 1
15
16 Ground Rails NOTE:When setting the width for the E-Z Grow Hobby House theoutside to outside measurement should be 10' 4".Eaxample 10 X 16 is 10' 4" X 16' outside to outside. 1 Square the structure by measuring diagonally from corner to corner. When the diagonal measurements are the same the structure will be square. (see photo 2.) Example: 10'-4" wide x 16' long = 19'-9/16" diagonal measurements. Note: These measurements are approximate, your measurements may be different. 2 Once the ground rails are squared anchor the rails using the 12" spiked provided as shown in photo 3,4&5.. If on ground use12" spike PAGE 3
17 CONCRETE MOUNTING OPTION front/rear ground rail Secure aluminum "z'' bracket onto side groundrails, evenly spaced between welded stanchions, using #14 tek screws. Front & Rear ground rail: place the ''z'' brackets approximately 16'' from each end as shown in diagram to the right. DETAIL A. shows further attachment details. aluminum "z" bracket for anchoring ground rail side ground rails front/rear ground rail welded stanchions DETAIL A. tek screws 1 4'' concrete drive pins ground rail (sides or ends) Page 4
18 ASSEMBLING THE FRAME 1. Identify 3-way & 4-way connectors. 3-way connectors are for the ends and 4-way connectors are for intermediate rafters, legs and at the peak of greenhouse. 2. Assemble frame as shown in below diagram. DO NOT assemble legs at this time, completed frame must be lifted and placed on the legs then onto anchor posts. 4-way connector purlin (5'-1'') 3-way connector Rafter(5'-1") purlin (5'-1'') Leg (5'-1'') 3-way connector ALL PURLIN, RAFTERS AND LEGS ARE THE SAME LENGTH.
19 Page 5 Position 2 men approximately along one side of the greenhouse. Holding legs in one hand, lift up one side of greenhouse and insert legs into connectors. Repeat on the other side.
20
21
22 Note: Slide the legs on top of the welded stanchions of the ground rails. Attach the endwall ground rails using the 3x 3 L-brackets. Use Tekscrews to secure the ground rail to the frame as shown in above picture. Page 9
23 FRAME-OUT MEASUREMENTS FOR EQUIPMENT EQUIPMENT - (FANS) 18'' Box Fan - (Quietaire) WIDTH 24 3/4" HEIGHT 24 3/4" 30" Slant Wall Fan - (Quietaire) 35" 36 1/4" 36" Box Fan - (Quietaire) 40 1/2" 40 1/2" 36" Slant Wall Fan - (Quietaire) 41" 42 1/4" 42" Slant Wall Fan - (Quietaire) 47" 48 1/2" 48" Slant Wall Fan - (Quietaire) 52 3/4" 54 1/4" 56" Slant Wall Fan - (Quietaire) 63" 65" EQUIPMENT - (SHUTTERS) WIDTH HEIGHT 24" Shutter 24 3/4" 24 3/4" 30" Shutter 30 3/4" 30 3/4" 39" Shutter 39 3/4" 39 3/4" 45" Shutter 45 3/4" 45 3/4" 48" Shutter 48 3/4" 48 3/4" 60" Shutter 60 1/2" 60 1/2" EQUIPMENT - (DOORS) WIDTH HEIGHT 42" x 6'-6" Swing out 42 1/2" 78" 4'-0" x 6'-8" Swing out 48 1/2" 80" 3'-0" x 6'-8" Swing out 36" 80" 6'-0" X 6'-8" - "French" Double Door 72" 80" EQUIPMENT - (SLIDING DOORS) WIDTH HEIGHT 4'-0" x 7'-0" Single Slide 46" 82" 8'-0" x 7'-0" Double Slide 96" 82" NOTE: ALL MEASUREMENTS ARE INSIDE TO INSIDE ***If you have purchased an Evaporative Cooling System*** Refer to the Cooling System & Wall Vent Instructions for frame-out measurements M:\Frame-Out Measurements_Equipment_100214
24
25 Frame out the door 30-1/2" wide x 72-1/4" high. 30-1/2" X 72-1/4" 1. Square clamp Round clamp End wall framing attaches to the bow using a round clamp on the bow and a square clamp on the 2"x2" stud. See photo Attach the 2" x 2" studs to the end ground rail using 3" x 3" L-bracket as shown. PAGE11
26 The Shutter opening is 24-1/2"Wide x 24-3/4" High. Attach horizontal 2x2 using L-brackets as shown. Note the L brackets will attach on the outside of any openings. Example: On top of the door header, on bottom of the lower horizontal for shutter and on top of the upper horizontal for shutter. Page 12
27 You must field cut the ridge purlin to exact length of the ground rails. Attach ridge purlin with Tek-screws and two hole clamps. The ridge purlin attaches under all bows. Two hole clamp PAGE 13
28 INSTALLING HEATER HANGER HEATER HANGERS MUST BE INSTALLED BEFORE COVERING END WALLS HEATER HANGER SUPPORT(2''x2'') NUT CHAIN FOR HANGING HEATER BOLT END RAFTER TEK SCREW heater hanger support or welded collar cannot extend past end bow or damage to end wall covering will occur WELDED COLLAR NUT HEATER HANGER SUPPORT(2''x2'') CHAIN FOR HANGING HEATER BOLT TEK SCREW WELDED COLLAR 1. Attach WELDED COLLARS to greenhouse rafters using supplied brace bands, bolts and nuts. 2. Insert HEATER HANGER SUPPORT into welded collars. **The heater hanger support must be flush with the outside of the end rafter. 3. Apply tek screw to the under side of the welded collars to prevent sliding. 4. Bolt chain around heater hanger support. Rear of the heater needs to be approximately 24'' from the end wall. HEATER 1. HEATER HANGER INSTALL DRAWING NO. DATE DRAWN BY heater hanger jtw File Name:
29 HEATER HANGER ASSEMBLY AND INSTRUCTIONS CENTER PURLIN HEATER SUPPORT PIPES (2" X 2") SPAN FIRST THREE BOWS (ONLY ON 4' OR 5' SPACINGS - SEE BELOW) CHAIN HEATER HANGER ASSEMBLY CAN BE LOCATED IN CENTER OF GREENHOUSE OR OFF CENTER AS SHOWN. GROUND Atlas recommends hiring a professional company to install all attachments NOTICE: HEATERS ARE FACTORY SET-UP FOR L.P. GAS; HOWEVER,THERE IS A CONVERSION KIT AVAILABLE FOR NATURAL GAS. WE STOCK L.P. TO NATURAL GAS CONVERSION KITS, BUT WE RECOMMEND THAT YOUR LOCAL GAS COMPANY INSTALL THE L.P. TO NATURAL GAS CONVERSION KIT. NOTE: DEPENDING ON HEATER SIZE HANGER ASSEMBLY MAY ONLY ATTACH TO 2 BOW RATHER THAN 3 AS SHOWN ABOVE. NOTE: FOR 100,000 to 145,000BTU HEATERS, USE A 4" ROUND DOUBLE WALL VENT PIPE. FOR 175,000 TO 300,000 BTU HEATERS, USE A 5" ROUND DOUBLE WALL VENT PIPE. FOR OVER 300,000 BTU HEATERS, USE A 6" DOUBLE WALL VENT PIPE. PIPE KIT TO INCLUDE: 2-1' Pcs. DOUBLE WALL PIPE 2- ADJUSTABLE ELBOWS 2- WALL COLLARS 1- VENT STACK COVER HEATER INSTALL DRAWING NUMBER EZGROW DATE / DRAWN RICK HEATER 2.
30 PARTS GENERALLY REQUIRED VENT PIPE KIT FOR NON-POWER VENTED HEATERS 1- ADAPTER FOR DOUBLE WALL PIPE 2- WALL COLLARS 1- ADJUSTABLE ELBOW 1- VENT STACK LOT- PCS. DOUBLE WALL PIPE 10'- METAL STRAPPING (WALL BANDS) CAP 1' MIN. HEATER HANGER 4' PIECE PIPE ANGLES DOWNWARD 1" TO 2" ADAPTER HEATER 2-PIECE ELBOW DRILL WEEP HOLES IN BOTTOM OF ELBOW 18" MIN. WALL COLLARS END BOW HEATER 3.
31 HEATER VENT PIPE FOR A POWER VENT HEATER PARTS GENERALLY REQUIRED 2- WALL COLLARS 2- ADJUSTABLE ELBOW 1- VENT STACK 2-1'PCS. DOUBLE WALL PIPE With a power vent heater it is not necessary for the vent stack to be above the roofline. HEATER HANGER VENT STACK ADAPTER HEATER PIPE ANGLED DOWNWARD 1" TO 2" ADJUSTABLE ELBOW 18" MIN. DRILL WEEP HOLES IN BOTTOM OF ELBOW WALL COLLARS END BOW HEATER 4.
32 The ridge purlin is connected under all bows using 2-hole clamps. Ridge Purlin 1-5/8" Prepare to attach wire lock base to the top of the end bows, around the openings and around the base of the greenhouse. Side Purlin With Optional OPTIONAL Cutrain will require wire lock on the Side Purlins at the eave. Wire lock at base of greenhouse Page 14
33 If you ordered the optional curtain system, attach the curtain channel approximately 28" above the ground rail. (See photo #1). 1 Approx. 28" from top of groundrail. Curtain Chanel 2 Wire Lock Base When framing is complete, wire lock base will be attached on top of the end bows as shown in pictures 4 & 5. The wire lock base will go from the bottom of the ground rail over the end bow, down to the curtain channel, then from the curtain channel down to the bottom of the ground rail as seen in picture 2. Identify the curtain crank rod. Attach wire lock base along the length of the crank rod Page 15
34 Attach Wire Lock Base over the end bows using Tekscrews. The wire lock base will bend over the curvatures as shown. Place screws approximately 12" to 16" apart. Once the framing is complete attach wire lock base over the top of each end bow from the bottom of the ground rail over to the bottom of the gground rail on the opposite side as shown. Wire lock base also attaches all the way around the base of the greenhouse screwing directly to the ground rails, and around all door and fan openings. Page 16
35 IMPORTANT NEVER APPLY POLY TOO LOOSELY. IF POLY IS LOOSE, IT WILL SAG BETWEEN FRAMING MEMBERS AND POCKET WATER AND /OR SNOW. THIS MAY RESULT IN SEVERE STRUCTURAL DAMAGE Page 17
36
37 Cover the ends first. Secure the poly in place by wiggling the wire into the channel as shown. Helpful Hint: It is easier to start at the top and work your way down. Cover the other end in the same manner. Page 19
38 Trim around the door and fan openings leaving approx. 1" over hang. Lay out the poly along the side of the greenhouse and pull it over the top as shown. Page 20
39 Pull the polyfilm over the greenhouse, attach the side without the curtain at the groundrail first. Pull the polyfilm tight and secure it at the eave on the curtain side. Note: DO NOT cut the polyfilm at the eave, the curtain and the roof poly are the same piece. Lay the curtain rod in the curtain channel on top of the polyfilm with the wire lock base pointing up. Fold the poly film up so you can lock the polyfilm to the crank rod using the wiggle wire. Be sure the crank rod lays flat in the curtain channel while you are locking the polyfilm in place. NOTE: Be sure to position the crank rod so that the swedged will iinsert into the crank handle After you are certain you have the polyfilm properly locked in place cut the polyfilm and attach the piece you cut off to the bottom knee wall NOTE: It is easier if you start from the center and work to the ends when locking poly into place. Bottom Knee Wall Page 21
40 OPTIONAL CURTAIN SYSTEM Field Drill Roll the curtain up so it rolls to the inside attach the curtain guides using a Tek-screw at the top and or bolt and nut at the bottom as shown, you will need to drill the holes in the curtain channel for the bolts and nuts. Crank slides to lock the curtain up. Slide the crank in so it will lock the curtain in its up position, pull the crank out to roll the curtain down. Page 22
41 Starting at the top on one end begin securing the poly in place using "extra" wire, stager the wire humps. After you have secured both ends, secure the poly in place along the groundrail. When you are finished securing the poly in place trim the excess leaving approx. 3" over-hang on the ends and approx. 6" overhang along the side walls. Page 23
42 BOW ASSEMBLY APPROX. 8" TO 10" INSTALLATION OF (OPTIONAL) BENCH SYSTEM BENCH FRAME 1 5 8" CLAMP, BOLT, & NUT TEK SCREWS WITH ONE HOLE CLAMPS BENCH FRAME STEP 1 - LAYOUT BRACES. STEP 2 - PLACE 1 5 8" CLAMP AROUND BOW ASSEMBLY STEP 3 - ATTACH BENCH FRAME APPROXIMATELY 26" TO 30" FROM GROUND. STEP 4 - ATTACH 3 RUNS OF TOP RAIL USING ONE HOLE CLAMPS WITH TEK SCREWS AS SHOWN. APPROX. 26" TO 30" ABOVE GROUND ANCHOR POST GROUND HOBBY BENCH INSTALLATION DRAWING NUMBER HOB13 DATE DRAWN RICK Page 24
43 Attach the top rail on to the top of the endwall horizontal as shown in picture 1& 2 using the 3/4" clamps and tek screws. Tie the benchwire to the top rails using the aluminum wire ties provided in your hardware box. ALUMINUM WIRE TIES
44
45
Extrusions POLYLOCK ATTACHING EXTRUSIONS
Extrusions POLYLOCK ATTACHING EXTRUSIONS ITEM # DESCRIPTION USES 1001 Aluminum Girt 16 lengths Used in metal end packages and sidewalls as horizontal members. Requires girt/baseboard splice (#1000). 1000
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationLow/High Tunnel Greenhouse Plans
Low/High Tunnel Greenhouse Plans Tools Needed (See the complete list of Greenhouse Tools) Hacksaw or Reciprocating Saw Socket Wrench, Adjustable Wrench or Nut Drivers Electric Drill with Drill Bits Sledge
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationKwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Installation Instructions Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationGable Greenhouse Instructions
Gable Greenhouse Instructions Part 1; Build The Base Frame Photo below shows connector components in this basic 12x12 kit. Self Drilling tech screws are included with kit. This kit requires 16 gage or
More informationSpring Loaded All Season Roll-Up Doors
Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More informationALL SEASON PATIO COVER
ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the
More informationSpring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST
Spring Loaded SCREEN-PRO All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More informationAWNING / PATIO COVER INSTALLATION INSTRUCTIONS
AWNING / PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin Read the installation instructions thoroughly before beginning the installation procedure. Perspective In the Awning Instructions, Back means
More informationClassic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Classic Roll Tarp Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationTaurean Sectional Garage Door INSTALLATION INSTRUCTIONS
BEFORE YOU BEGIN MAKE SURE THESE INSTRUCTIONS ARE READ AND UNDERSTOOD COMPLETELY. THESE INSTRUCTIONS ARE INTENDED FOR PROFESSIONAL GARAGE DOOR INSTALLERS. ALL REFERENCES ARE TAKEN FROM THE INSIDE LOOKING
More informationClassic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Classic Roll Tarp Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationAssembly Instructions
18' W x 10' H or 12' H Peak Style Frame Assembly Assembly Instructions Before you start: 2+ individuals recommended for assembly, approximate time 3 hours. Recommended tools: Power Drill, Safety Glasses,
More informationN. 15th Street, Middlesboro, KY LOCK-N-ROLL INSTALLATION INSTRUCTIONS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 LOCK-N-ROLL INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Tarp Lock-N-Roll tarping system. With tarping systems for
More informationLedgewood Farm greenhouse. construction
Ledgewood Farm greenhouse How do I Start? construction to I m Finished! Post layout The string will be 7 above the ground and the posts will be driven until the proper drill hole is at the string. Spacing
More informationEZ Shed. Tool eeded ST MER SER I E
00 EZ Shed PLEASE READ ALL INSTRUCTIONS AND HELPFUL HINTS CAREFULLY BEFORE CONSTRUCTION Tool eeded ST MER SER I E 203 591-9032 - 30-5 30 INSTRUCTIONS 1. Separate and stack all parts included in kit. STUD
More informationREVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION
INSTALLATION INSTRUCTIONS Service Doors, Counter Service Doors & Grilles REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION GENERAL NOTES: Instructions are intended for qualified door mechanics
More informationAssembly Book. 10' x 12' the Cambridge II. revised June 13, 2014
Assembly Book revised June 13, 2014 the Cambridge II 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the
More informationMODULAR HIGH TUNNEL INSTALLATION GUIDE
9615 Grandview Rd. Kansas City, MO 64137 Version: 15 JAN -2015 Sustainable Agriculture Solutions MODULAR HIGH TUNNEL INSTALLATION GUIDE (816) 444-7330 SmallFarmTools.com Thank you for purchasing a Modular
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised August 17, 2017 the Roanoke 16'x32' Building w/ full loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted
More informationGABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 3 Step 2a Footing Set-Out for Concrete
More informationClearSpan End Frame Kit 26' Wide x 12' High
ClearSpan End Frame Kit 26' Wide x 12' High Diagram shows the end frame kit for an end wall without a door. (Door and end panel are purchased separately.) Rafter and struts shown in the above diagram are
More informationInstallation Instructions for. Handrail Component System
Handrail STEP-BY-STEP Installation Instructions for Handrail Component System Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32
More informationMount to the Wall INSTALLATION MANUAL
Mount to the Wall 15 Locate the Wooden Studs This step applies to wooden stud wall installation only. Determine and mark the exact locations of two stud centers on the wall. Wooden studs should be spaced
More informationGarage-in-a-Box SUV/Truck 13' x 20' x 12' Peak Style Shelter Assembly Instructions
Garage-in-a-Box SUV/Truck 13' x 20' x 12' Peak Style Shelter Assembly Instructions Description Model # Garage-in-a-Box SUV/Truck 13' x 20' x 12' - Green 62694 Recommended Tools Please read instructions
More informationClearSpan Twist-of-the-Wrist Assembly Instructions
ClearSpan Twist-of-the-Wrist Assembly Instructions Curved-Wall for Roll-Up Side Flat-Wall for Curtain Application 2008 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision
More information10 x 10 Flat Top Two Tone Pergola
0 x 0 Flat Top Two Tone Pergola Models: Bordeaux ASSEMBLY GUIDE OPTIONAL ACCESSORIES Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post) Bolt Down Bracket Kit ( for Pergola) Ver.0-00
More information12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly.
12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly. Layout out frame parts as shown and match up items with quantity to make sure no parts are missing.
More informationElite Home-Attached Greenhouse
Elite Home-Attached Greenhouse Photo may show a greenhouse of a different length. Elite Home-Attached Greenhouse Use these instructions for the following greenhouses: #104711 #104713 #104715 2007 ClearSpan
More informationGrowSpan Round Pro Greenhouses and Systems
GrowSpan Round Pro Greenhouses and Systems Photo may show a different but similar model. 2018 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 104836 14
More informationOxford Stalls Installation Instructions
Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or
More informationGrowSpan Estate Pro I Greenhouse
GrowSpan Estate Pro I Greenhouse Photo may show a different but similar model. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 104564 11'-8" W x
More informationVersion 2016_1.1 VICTORIAN ASSEMBLY INSTRUCTIONS. Victorian Vi-23, 34, 36
Version 2016_1.1 VICTORIAN ASSEMBLY INSTRUCTIONS Victorian Vi-23, 34, 36 PRODUCT INFORMATION Dear customer, Thank you for buying a high-quality aluminium greenhouse. REMARKS The drawings in these instructions
More informationINS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...
INS-88.300-0A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Verify Curb Installation... 2 2. Required Installation Tools... 2 3. Unpacking the KSR... 3 4. Attach KSR Bottom Rail to Curb... 5 5. Attach
More informationINSTALLATION INSTRUCTIONS
STRIP DOORS AIR DOORS INSTALLATION INSTRUCTIONS BULK PVC FILM STRIP SHEET PANEL SCREENS, CURTAINS and ENCLOSURES MEGA-PRO SWINGING DOORS DOCK ACCESSORIES IMPORTANT Carefully examine the carton(s) for damage.
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More information11 x 20 ALL SEASON GARAGE / 3.35M x 6M Carport Assembly Manual
x 0 ALL SEASON GARAGE / 3.35M x 6M Carport Assembly Manual Parts: (8) PCS PIPE (9) PCS PIPE (8) PCS 3 PIPE (4) PCS 4 PIPE 3WAY FITTING (6) 4WAY FITTING (6) COVER 0 LONG SIDEWALLS () ENDWALL () (8) FOOT
More informationSystem 3000 specifications
System 3000 specifications Scope: Materials: Type of Bookstack: This specification covers delivery and installation of steel library shelving of the bracket type. Height, depth and accessories shall be
More informationAssembly Book. 10' x 16' the Cambridge II. revised July 15, 2014
Assembly Book revised July 15, 2014 the Cambridge II 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the
More informationUNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS
UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS SINGLE DOOR GARAGE AVAILABLE IN 12, 20, 24 AND 30 WIDTHS DOUBLE DOOR GARAGE AVAILABLE IN 24 AND 30 WIDTHS Our unique assembly process quickly
More information6' x 8' x 6'6" Quad-Vent Greenhouse-in-a-Box Assembly Instructions
6' x 8' x 6'6" Quad-Vent Greenhouse-in-a-Box Assembly Instructions Description Model # 6' x 8' x 6'6" Quad-Vent Greenhouse-in-a-Box 70652 Recommended Tools Please read instructions COMPLETELY before assembly.
More informationSliding Door Kit
YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE DOOR KIT. Thank you for purchasing this GrowSpan door kit. When properly assembled and maintained, this product will provide years of reliable
More informationFOR PROFESSIONAL GARAGE DOOR INSTALLERS
Composite Garage Doors Installation Instructions FOR PROFESSIONAL GARAGE DOOR INSTALLERS Tools required Screwdriver Claw Hammer Locking Pliers Power Drill Level with a 3/32" Drill Bit Utility Knife 9/16",
More informationGrowSpan Heavy-Duty Commercial Cold Frame
GrowSpan Heavy-Duty Commercial Cold Frame Photo may show a different but similar model. 2018 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 106363 4'
More informationPowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 FOR Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com Indianapolis,
More information50 W ide. Future Trac G able E nd. Installation Instructions AIGE
G able E nd W ide TopTec Products, LLC 7601 Highway 221 Moore, SC 29369 Phone: (800) 845-2830 Fax: (800) 921-77 e-mail: sales@toptecproducts.com www.toptecproducts.com AIGE 2003915 General Information
More informationClearSpan Economy Round Style High Tunnel
ClearSpan Economy Round Style High Tunnel Photo may show a different but similar model. 2012 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: 0112 STK# PB01725R6
More informationGIRTS ON BACK OF BUILDING
GIRTS ON BACK OF BUILDING ALL GIRTS ARE 1 1/2 SQUARE TUBE. GIRT LENGTHS FOR 12, 20, 24, AND 30 WIDE BUILDINGS: ON 12 WIDE BUILDINGS GIRTS ARE 67 3/4 LONG ON 20 WIDE BUILDINGS GIRTS ARE 56 3/4 LONG ON 24
More information10 x 10 Arch Top Pergola
0 x 0 Arch Top Pergola I N S T A L L A T I O N G U I D E O P T I O N A L A C C E S S O R I E S Privacy Fence Panel System ( Panels & Middle Post Included) Bolt Down Bracket Kit (Set of ) Additional Shade
More information22'W x 13'H Peak Style Shelter Frame Assembly Instructions
22'W x 13'H Peak Style Shelter Frame Assembly Instructions Recommended Tools Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored. THIS IS A TEMPORARY STRUCTURE AND
More informationAppendix B Framing Component Installation Last updated 5/27/2013
Appendix B Framing Component Installation Last updated 5/27/2013 Apex Brace Installation Appendix B 1 Refer to apex connection detail on the engineering plans for the location of the apex brace. Refer
More informationDUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL
DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 4 Step 2a Footing Set-Out for Concrete
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationAssembly Guide for Series 500 Ridge Vent Kits
Assembly Guide for Series 500 Ridge Vent Kits Photo shows a sample ridge vent as installed on a greenhouse. Actual building and ridge vent length may differ. 2014 ClearSpan All Rights Reserved. Reproduction
More information16 & 20 FT. WIDE GROUND TO GROUND
CF SERIES 1000 16 & 20 FT. WIDE GROUND TO GROUND conleys.com CF Series 1000 Ground to Ground outstanding features Two-piece arch that laps and bolts together Simple to install Arches nest together for
More informationINSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED
INSTALLATION INSTRUCTIONS LS-30 30 X 12-2 X 7 1/2 FRAME ACTUAL FRAME BASE SIZE: 30 X 12-2 LOAFING SHED Our unique assembly process quickly transforms the individual pieces into a finished structure that
More informationGrowSpan 24' Wide Series 500 Tall High Tunnels with Roll-Up Sides
GrowSpan 24' Wide Series 500 Tall High Tunnels with Roll-Up Sides Photo may show a building of a different length and style. Frame shown includes roll-up sides and customer-supplied baseboards. Actual
More information8x12 SpaceMaker Garden Shed Assembly Manual
8x12 SpaceMaker Garden Shed Assembly Manual Version #6 Revised June / 2007 Thank you for purchasing a 8x12 SpaceMaker Garden Shed. Please take the time to identify all the parts prior to assembly. Safety
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationIMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will
More informationKS SERIES - VERTICAL INSTALLATION
CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV
More informationTwin-Wall Double Swinging Door Kit
115021 Twin-Wall Double Swinging Kit READ THIS DOCUMENT BEFORE YOU BEGIN Thank you for purchasing this GrowSpan door kit. When properly assembled and maintained, this product will provide years of reliable
More informationAuto Light Dep Greenhouse
Humboldt Light Dep LLC Auto Light Dep Greenhouse Instruction Manual James Defenbaugh 16 Thank you for choosing Humboldt Light Dep for you Auto Light Dep Greenhouse needs. I have successfully built and
More informationGrowSpan 30' Wide Series 500 Tall Greenhouses
GrowSpan 30' Wide Series 500 Tall Greenhouses Photo may show a building of a different length and style. Frame shown includes optional roll-up sides and customer-supplied baseboards. Building shown is
More informationClearSpan Twin-Wall Polycarbonate End Panel Kit
ClearSpan Twin-Wall Polycarbonate End Kit 30' Wide & 35' Wide Diagram shows a sample end panel kit for a frame. Actual panel positions and sizes for your end panel package may differ from what is shown.
More informationClearSpan Cedar 12' Wide End Frame Kit with Dutch Door
ClearSpan Cedar 12' Wide End Frame Kit with Dutch Door Photo may show a different but similar model. 2010 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK # WIDTH 105366
More informationGrowSpan Gothic Pro Greenhouses and Systems
GrowSpan Gothic Pro Greenhouses and Systems Photo may show a different but similar model. Film Cover with Film Roll-Up Side Panels 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without
More informationIMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible
More informationAssembly Instructions
8' x 6' x 6'6" Professional Growers Greenhouse Assembly Instructions Description Model # 8' x 6' x 6'6" Professional Growers Greenhouse PGG68 350351 Please read instructions COMPLETELY before assembly.
More informationGrowSpan Series 500 Door Kits
GrowSpan Series 500 Door Kits Double Swinging Door Finished Grade Finished Grade Diagram shows a double-swinging door centered and installed in an end wall frame. The door kit includes materials for the
More informationMARQUEE INSTALLATION HANDBOOK. Curved Structures
MARQUEE INSTALLATION HANDBOOK Curved Structures 12m Curved Roof Beam Assembly Instructions Ensure there are no overhead or underground obstructions or services before starting to assemble frame. Square
More information10 x 10 Flat Top Pergola
0 x 0 Flat Top Pergola A S S E M B L Y G U I D E Models: Venetian, Tuscany, Luxor, Acadia O P T I O N A L A C C E S S O R I E S Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post)
More informationGrowSpan Gothic HobbyPro Greenhouses
GrowSpan Gothic HobbyPro Greenhouses Photo may show a different but similar model. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 104889 16 W x
More informationGrowSpan Round Premium High Tunnels
GrowSpan Round Premium High Tunnels Photo may show a different but similar model. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# PB01680R4 PB01690R4 DIMENSIONS
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised September 19, 2016 the Meadowbrook-R 16' x 10' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is
More information8 x 8 Flat Top Pergola
A S S E M B L Y G U I D E O P T I O N A L A C C E S S O R Y Bolt Down Bracket Kit Models: Mirage, Mandalay Ver 6/00 Ta b l e o f Co n t e n t s Introduction & Overview......................................................
More informationGeneral Guidelines:
ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please
More informationPowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 PowerLock Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com Indianapolis,
More informationUNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS
UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS FRAME SIZES: WIDTH: 10, 12, 14, 16, 18, 20, 24, AND 30 ON CENTER FRAME SPACING: 4, 4 1/2, AND 5 FRAME LENGTH: 4 ON CENTER 20-2, 4 1/2 ON CENTER 18 AND 5
More information10x10 Trellis Pergola
0x0 Trellis Pergola ASSEMBLY GUIDE Ver.0-7 Table of Contents PAGE Introduction & Overview...................................................... Pergola Materials Overview..............................................................
More informationGrowSpan Gothic Premium Greenhouses
GrowSpan Gothic Premium Greenhouses Photo may show a different but similar model. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 106209 16' W x
More informationTRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT
TRADITIONAL GABLE ATTACHED PATIO AND CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT BEFORE YOU START Carefully read
More informationClearSpan End Frame Kit 30' Wide x 11' High
ClearSpan End Frame Kit 30' Wide x 11' High Diagram shows the end frame kit for an end wall without a door. (Door and end panel are purchased separately.) Rafter and mounting feet shown in the above diagram
More informationClearSpan Front Roll-Up Kit Installation Guide
ClearSpan Front Roll-Up Kit Installation Guide Roll-up panel opened. Roll-up panel closed. Actual building and panel may differ from what is shown. 2008 ClearSpan All Rights Reserved. Reproduction is prohibited
More informationHoop House Construction Plans
Kerr Center for Sustainable Agriculture (918) 647-9123 24456 Kerr Rd. Poteau, OK 74953-5215 Copyright 2017 Published Fall 2017 www.kerrcenter.com Hoop House Construction Plans This document explains how
More informationINSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED
INSTALLATION INSTRUCTIONS LS-24 24 X 12-2 X 7 1/2 FRAME ACTUAL FRAME BASE SIZE: 24 X 12-2 LOAFING SHED Our unique assembly process quickly transforms the individual pieces into a finished structure that
More informationGrowSpan Series 500 Roll-Up Ends
GrowSpan Series 500 Roll-Up Ends Photo may show a different but similar model. Doorframe materials are not included. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission.
More informationINSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED
INSTALLATION INSTRUCTIONS LS-12 12 X 12-2 X 7 1/2 FRAME ACTUAL FRAME BASE SIZE: 12 X 12-2 LOAFING SHED Our unique assembly process quickly transforms the individual pieces into a finished structure that
More informationPremium Solar Star Greenhouse
Premium Solar Star Greenhouse Assembly Instructions SKU# 104901 2006 ClearSpan All rights reserved. Reproduction without permission is prohibited. Revision date: March 2006g Contact your sales representative
More informationENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH
ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH RAFTER PREPERATION RAFTER PREPARATION A FRAME PREPERATION AND ASSEMBLY A FRAME PREPARATION AND ASSEMBLY... Open boxes, remove
More informationINTRODUCTION. EqunioxRoof.com. Pro Tip
INSTALLATION MANUAL INTRODUCTION The Equinox Louvered Roof System is designed to be installed in an aluminum frame. All these sections are 1/8" thick extruded aluminum. All engineering for this system
More informationSTANDARD GRAVITY BOX TARP INSTALLATION
OPERATORS MANUAL Rev. 9.9.2016 STANDARD GRAVITY BOX TARP INSTALLATION J. & M. Mfg. Co., Inc. 284 Railroad Street - P.O. Box 547 Fort Recovery, OH 45846 Ph: (419) 375-2376 Fax: (419) 375-2708 www.jm-inc.com
More informationCURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START
ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction
More information3.2.3 Rear Door Window and Quarter Window Carrier Assembly
Tighten all bolts. Tighten bolts marked -1- and -2- in specified sequence. Tightening torque: 8 Nm Remaining bolts can be tightened in any sequence. Insert door window -3- through window recess without
More informationgabriel ash essential range
gabriel ash essential range Dear Customer, Please read ALL these instructions before assembly. The assembly of your new Essential greenhouse requires no technical knowledge. However it is important that
More informationVACUSEAL MODEL 200. HOT TUB PRODUCTS 233 Carrington Road Bethany CT
VACUSEAL MODEL 200 J G F G H L HOT TUB PRODUCTS 233 Carrington Road Bethany CT 06524 860-469-2580 www.vacusealcoverlift.com www.hottubproducts.com Made in USA H K E D C I A P B 10 9 8 7 6 5 4 3 2 1 0 SPAS
More informationMM750 Installation Instructions
MM750 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on
More informationGrowSpan 42' Wide Series 500 Tall High Tunnels with Roll-Up Sides
GrowSpan 42' Wide Series 500 Tall High Tunnels with Roll-Up Sides Photo may show a building of a different length and style. Frame shown includes drop-down sides and customersupplied baseboards. Actual
More information