PROJECT NARRATIVE AND ALTERNATIVE ANALYSIS

Size: px
Start display at page:

Download "PROJECT NARRATIVE AND ALTERNATIVE ANALYSIS"

Transcription

1 PROJECT NARRATIVE AND ALTERNATIVE ANALYSIS Sand Canyon Avenue Building D-1 Irvine, CA May 23, 2011 Subject: Verizon Wireless Proposed Cordillera Telecommunications Facility Located at 4515 Park Entrada; Calabasas, CA Project Narrative The proposal consists of the installation and operation of a faux pine tree (monopine) located at the Calabasas Golf and Country Club at 4515 Park Entrada. The proposed monopine consists of a three (3) arrays, each containing four (4) panel antennas, for a total of 12 panel antennas. The proposal also consists of the installation of four (4) equipment cabinets and three (3) GPS antennas to be installed near the base of the monopine. The monopine, equipment cabinets, GPS antennas and other ancillary equipment will be enclosed within a stucco CMU wall, textured and painted to match the existing building. The height and location of the monopine was carefully determined by the existing trees, engineering needs and by keeping the facility as far away from residential without interfering in the operations of the Calabasas Golf and Country Club. By keeping the height of the monopine to 55, which is similar to the height of the trees in the area, and having the monopine over 240 from a residential dwelling unit, the proposed monopine is consistent with the General Plan, the Calabasas Development Code and the provisions of the Open Space Recreation zone. Also, there is a significant amount of landscape screening separating this site from the residential units to the east (See Picture No. 1.01). Additionally, this facility will meet or exceed all applicable State and Federal in regards EME exposure and RF frequency. Since there are no other significant impacts as a result of this proposal, the site will be in compliance with the California Environmental Quality Act (CEQA). Once the facility has been built, the site will be serviced by a maintenance technician at a maximum of one (1) visit per month, on average.

2 Picture No View from Proposed Site, Looking Northeast This section below is the response to questions in 4.05 through 4.27 The proposed Verizon Wireless Cordillera site has several objectives, all of which are designed to address a significant gap in service coverage to the area surrounding the proposed site (as shown in the attached exhibits) in the City of Calabasas. The area Verizon Wireless is attempting to provide coverage is comprised of single-family residences and open space uses. These objectives are: 1. To provide coverage and additional capacity along Parkway Calabasas, south of the 101 Freeway. This will offload network traffic from the Hopper PCS Macro cell site, located near the intersection of Park Granada and Calabasas Road, in order to meet capacity needs. The existing Verizon macro site is currently overloaded and it is critical to offload wireless service to the Cordillera site, in order to provide safe and reliable wireless service; 2. To provide new LTE (4G high speed data service) radio frequency service in the 700 MHz frequency to the surrounding area and to Highway 101. Verizon Wireless is in the process of their nationwide roll-out for LTE; 3. To provide coverage and additional capacity to residents near the intersection of Parkway Calabasas and Park Entrada. The propagation plots attached in this application depict the general geographic area of Verizon Wireless coverage objectives. Just as radio waves do not stop at an arbitrary physical

3 boundary, the general geographic area in which coverage is sought cannot be bounded. Moreover, RF coverage is not static, and is subject to fading as result of the morphology and topography of the area. As a result, Verizon Wireless cannot quantify the size of the area in units of square miles to define the significant gap in service coverage that the Cordillera site seeks to remedy. As noted above, there a number of objectives that this site is designed to fill. Although there will be new coverage added in the 700 MHz frequency range over a physical area, a significant gap in service coverage can exist for a variety of other reasons. For this particular area, the Cordillera site will significantly improve a gap in service coverage by addressing the lack of sufficient capacity for all calls and data routing through the cell sites in the area, or insufficient reliability of RF signal in the area due to interference or other issues. For the reasons noted above, these significant gaps in service coverage may not necessarily be depicted on a propagation plot. Other than stating that a significant gap in service coverage exists when Verizon Wireless cannot provide safe, adequate and reliable levels of service coverage to its users, the definition of what constitutes a significant gap is site specific. Although limited by the above factors, propagation plots (see attached maps addressing 6.02) provide important information regarding the level of signal, and therefore the anticipated coverage provided by a cell site. For a cellular system to work properly, each cell site must provide areas of discrete coverage as well as overlapping coverage with neighboring sites. Coverage exists when there is sufficient radio frequency ( RF ) signal strength to provide safe, effective and reliable levels of coverage in a particular geographic area. As user travels between the discrete coverage areas of two or more sites, a handoff is triggered within the zone of overlapping coverage. If the handoff is successful, it is transparent to the user and results in seamless coverage. If the handoff is not successful, the call is lost and must be reestablished once the user gets within range of the next site. Without adequate RF signal, there is no reliability in the ability to make or receive voice calls, and data throughput speed is limited. This is especially significant in that Verizon Wireless, as an FCC licensee, is mandated to provide enhanced 911 services to its users. The strength of RF signal coverage is measured in decibel level and is noted as a dbm level. As decibel level is degraded (i.e. signal level is weakened), it is reflected in increasingly larger negative numbers. Hence, -75dBM is a stronger signal than - 85dBM, which in turn is stronger than -95dBM. In order to identify a potential site to fill this gap in coverage, Verizon Wireless engineers have created a search ring that represents an area in which a potential cell site can be located to begin the process of identifying and evaluating potential locations for a site. The specific requirements for this site are captured in the document called a Search Area Review Form (SARF). The SARF depicts the area in which a site needs to be located in order to obtain the needed coverage. As previously mentioned, the goal for this particular site has several coverage objectives mentioned above. The Cordillera site will meet all the RF objectives, and is also the least intrusive means to provide the needed coverage. The design consists of installing a monopine on the Country Club property. The property consists of a number of tall trees and the monopine will not exceed the height of any of the existing trees on the site, thereby minimizing visual impacts and resulting in the least intrusive design.

4 Alternatives Analysis (Exhibit No. 8.04) The search area consists of residential uses, open space (hillsides), a country club and one commercial property. The analysis of the alternatives are listed below: Commercial Property located at the SE Corner of Parkway Calabasas and Park Granada This property is located on the outside edge of the search area. However, due to its lower elevation, the distance to the targeted residential area near the intersection of Parkway Calabasas and Park Entrada (No. 3, above), and the topography in the general area, this property was eliminated as a potential site. Since there are no other commercial or other non-residential uses within the search ring, the Country Club is then the only viable option for a wireless site. However, there were a number of options to locate the monopine on the property. Monopine Preferred location Adjacent to Easterly Property Line The RF Engineer for Verizon would prefer the location on the east side of the property, adjacent to the residential properties (see Picture No. 8.01). This location is closest to both of the projected coverage/capacity areas, described above, and is also at the edge of the ridgeline. If the monopine were moved any further north of this location, the signal would experience significant shadowing. However, since this was abutting residential, it was not considered a viable option. Picture No RF Preferred Location of Monopine

5 Monopine Locat ion 2 East Side of Clubhouse (Proposal) As an alternative, the RF engineer agreed that a location on the east side of the clubhouse would be feasible as well. This is our proposed location. Monopine Locat ion 3 West Side o f Clubhouse Unfortunately, due to the operation of Clubhouse, any location on the west side of the clubhouse is not feasible. That portion of the facility is constantly used for gatherings, golf cart and pedestrian traffic, and for periodic outdoor dining. Placing a monopine at this location would significantly impact the normal operation of the clubhouse.

6 ALTERNATIVES ANALYSIS Alternative 1: Water Tank at The Oaks, off of 4298 Prado De Los Ciervos In order for Verizon Wireless to have a site at this location, utility lines (power and telco) would have to cross property owned by the HOA. VZW confirmed that the HOA opposed any utility crossing their property. HOA contact: Laura Thaller, The Oaks at Calabasas HOA. Per a February 24, , the HOA is unable to grant an easement for a wireless facility for Prado del Los Ciervos. Alternative 2: Water Tank at Park Belmonte, Calabasas, CA The HOA owns the land leading up to the water tank, and will not grant an easement to any additional cell phone companies (Sprint is there now). The water tank is located on a steep hill, so the only means of access is through HOA owned land. Additionally, this location is too far outside the Search Area to meet Verizon s RF objectives. HOA contact: Paula Neidlinger, Ross Morgan Company. The HOA voted NOT to allow any more easements to cell companies. The will not allow wireless companies to cross their property to access the water tank. Alternative 3: Bay Laurel Elementary School at Paseo Primario, Calabasas, CA Verizon wants to be sensitive to sites at Elementary Schools and therefore did not pursue this location. Any site at this location would also be much more visible to the public. The proposed site at the Calabasas Country Club already has a significant amount of existing trees on the property that help screen the monopine. The site at the Calabasas Country Club is less intrusive than a site at the elementary school. Alternative 4: Microcell along South side of Parkway Calabasas and Park Entrada cross street In order for this location to meet RF objectives and provide much-needed coverage to the homes north of the Calabasas Country Club, each existing 20 to 25 pole would need to be 2 to 3 times taller, resulting in a large visual impact.

7 Additionally, Verizon needs a full 12-antenna site in order to meet its objectives. The proposed site at the Country Club is a less intrusive visual impact to the community. Alternative 5: Offices at 4500 Park Granada, Calabasas, CA During a visit to the Search Ring, this office location was ruled out by the Verizon Wireless RF Engineer as too low to meet coverage objectives. This candidate was further disqualified when owners indicated that they would not be interested in leasing. However, the main reason why this site was no longer pursued is from the Verizon RF Engineers confirming that the site is too far away and too low from the area needing coverage. Alternative 6: Hilton Garden at Park Sorrento, Calabasas, CA During a visit to the Search Ring, this Hilton Garden location was ruled out by the Verizon Wireless RF Engineer as too low and also too far away to meet Verizon s coverage objectives. Similar to Alternative 5 above, this site was no longer pursued when Verizon RF Engineers confirmed the distance was too far away to be considered for the area that needs improved coverage.

Sudden Valley RF Documentation

Sudden Valley RF Documentation Network Engineering Verizon Wireless 3305 160th Ave. SE M/S 231 Bellevue, WA 98008 Sudden Valley RF Documentation Overview: Verizon Wireless strives to provide excellent wireless service for our customers

More information

City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification

City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification Authorized Agent for Verizon Wireless City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification With current efforts underway to establish the required infrastructure

More information

IDK Communications ( IDK ) has been tasked with the following scope pertaining to the above referenced subject.

IDK Communications ( IDK ) has been tasked with the following scope pertaining to the above referenced subject. IDK Communications April 27, 2017 Mr. Ethan J. Croce Senior Planner Town of Falmouth 271 Falmouth Road Falmouth, ME 04105 RE: Verizon Application 175 Falmouth Road Dear Mr. Croce, IDK Communications (

More information

Radio Frequency Engineering Report. Proposed Raymond, ME Cellular Facility

Radio Frequency Engineering Report. Proposed Raymond, ME Cellular Facility Radio Frequency Engineering Report Proposed, ME Cellular Facility (Site No.: 3462 ) May 12, 2010 C Squared Systems, LLC 920 Candia Road Manchester, NH 03109 Phone: (603) 657-9702 Fax: (603) 657-9707 Support@csquaredsystems.com

More information

Wireless Facility Peer Engineering Review

Wireless Facility Peer Engineering Review Page 1 of 11 Wireless Facility Peer Engineering Review Regarding Verizon Wireless Application 2750 Dwight Way, Berkeley, CA August 10, 2015 Page 2 of 11 Introduction RCC Consultants, Inc. has been engaged

More information

Frequently Asked Questions about Wireless Facilities on Wooden Utility Poles and Streetlight Poles

Frequently Asked Questions about Wireless Facilities on Wooden Utility Poles and Streetlight Poles City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 PH: (408) 777-3354 FX: (408) 777-3333 PUBLIC WORKS DEPARTMENT Frequently Asked Questions about Wireless Facilities on 1. What is a small cell facility?

More information

Wireless Facility Engineering Review

Wireless Facility Engineering Review Page 1 of 7 Wireless Facility Engineering Review AT&T Application for Site (CNU 4989) 2095 Rose Street, Berkeley, CA 2/18/2013 RCC Consultants, Inc. Western Regional Office 266 E. 33 rd Street, San Bernardino,

More information

RF Report. Proposed Wireless Facility. BS13XC Main Street, Cotuit, MA 02635

RF Report. Proposed Wireless Facility. BS13XC Main Street, Cotuit, MA 02635 C Squared Systems, LLC 65 Dartmouth Drive Auburn, NH 03032 Phone: (603) 644 00 support@csquaredsystems.com RF Report Proposed Wireless Facility 414 Main Street, Cotuit, MA 02635 August 17, 2017 TABLE OF

More information

: PERSONAL WIRELESS TELECOMMUNICATIONS SERVICE FACILITIES: REGULATIONS AND DEVELOPMENT STANDARDS:

: PERSONAL WIRELESS TELECOMMUNICATIONS SERVICE FACILITIES: REGULATIONS AND DEVELOPMENT STANDARDS: 10-1-1118: PERSONAL WIRELESS TELECOMMUNICATIONS SERVICE FACILITIES: REGULATIONS AND DEVELOPMENT STANDARDS: A. PERMITTED IN R-3, R-4, AND R-5 ZONES AND IN ALL NON-RESIDENTIAL ZONES. Subject to the regulations

More information

Joint Application Village / AT&T

Joint Application Village / AT&T Joint Application Village / AT&T Telecommunications Monopole / Ground Facilities 347 Ivy Court Z o n i ng B o a r d o f A p p e a l s April 1 1, 20 1 6 Overview of Presentation Existing method of cellular

More information

To Whom It May Concern,

To Whom It May Concern, To Whom It May Concern, Verizon Wireless is proposing a new tower called Hulk within Chaska at Peavey Circle Chaska, MN 55318. The proposed new tower will provide additional capacity to the Verizon Network

More information

C. CEQA Determination: Categorically exempt pursuant to Section of the CEQA Guidelines ( Existing Facilities ).

C. CEQA Determination: Categorically exempt pursuant to Section of the CEQA Guidelines ( Existing Facilities ). Z O N I N G A D J U S T M E N T S B O A R D S t a f f R e p o r t FOR BOARD ACTION FEBRUARY 17, 2011 1760 Solano Avenue Use Permit Modification #09-70000017 to modify the T-Mobile wireless telecommunication

More information

Small Cell Infrastructure in Denver

Small Cell Infrastructure in Denver September 2017 Small Cell Infrastructure in Denver The City and County of Denver is receiving growing numbers of requests from wireless providers and wireless infrastructure companies to construct small

More information

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES I. PURPOSE AND COMPLIANCE In implementing City Code, Chapter 8, Section 815, the City Council of the City of Pine City (the City ) finds that

More information

Wind Power GeoPlanner. Land Mobile Report - UPDATE

Wind Power GeoPlanner. Land Mobile Report - UPDATE Prepared on Behalf of Iberdrola Renewables, LLC December 13, 2012 Table of Contents 1. Introduction - 1-2. Summary of Results - 1-3. Impact Assessment - 3-4. Conclusions - 4-5. Recommendations & Mitigation

More information

David J. Gellner, AICP, Principal Planner

David J. Gellner, AICP, Principal Planner Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission David J. Gellner, AICP, Principal Planner - 801-535-6107 - david.gellner@slcgov.com Date: October

More information

Initial Comments on DRI Application for Wakeby Road Cell Tower September 26, 2017

Initial Comments on DRI Application for Wakeby Road Cell Tower September 26, 2017 Thinking outside the sphere Initial Comments on DRI Application for Wakeby Road Cell Tower September 26, 2017 The Cape Cod Commission ( Commission ) is hearing an application for DRI review of a proposed

More information

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING July 31, 2018 6:00 PM Commissioners Chamber Call to order and Establishment of a Quorum Invocation and Pledge of Allegiance Approval

More information

Soundview Cell Tower 1

Soundview Cell Tower 1 Soundview Cell Tower 1 2 3 4 Coverage Gaps ATT 5 Coverag e Gaps Verizon 6 Coverag e Gaps Sprint 7 Coverag e Gaps T-Mobile 8 Cell Sites serving New Canaan (Contrary to popular belief, no cell towers in

More information

CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM

CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM City of Brooklyn Park 5200 85 th Avenue N. Brooklyn Park, MN 55443-1825 Permit #: CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM Site Name & Address: (existing

More information

The Problem: Close Proximity Microwave Radiation Antennas near Homes MARCH 6, 2018 SANTA ROSA CITY COUNCIL STUDY SESSION MYSTREETMYCHOICE.

The Problem: Close Proximity Microwave Radiation Antennas near Homes MARCH 6, 2018 SANTA ROSA CITY COUNCIL STUDY SESSION MYSTREETMYCHOICE. The Problem: Close Proximity Microwave Radiation Antennas near Homes MARCH 6, 2018 SANTA ROSA CITY COUNCIL STUDY SESSION MYSTREETMYCHOICE.COM The Solution: Moratorium for six months Update Municipal Wireless

More information

TOWN OF HILLSBOROUGH SUPPLEMENTAL APPLICATION FORM FOR WIRELESS PROJECTS

TOWN OF HILLSBOROUGH SUPPLEMENTAL APPLICATION FORM FOR WIRELESS PROJECTS TOWN OF HILLSBOROUGH SUPPLEMENTAL APPLICATION FORM FOR WIRELESS PROJECTS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS The, California recognizes that the provision of wireless and DAS services are highly

More information

ARTICLE 25 WIRELESS COMMUNICATIONS TOWERS AND ANTENNAS Updated

ARTICLE 25 WIRELESS COMMUNICATIONS TOWERS AND ANTENNAS Updated Allendale Township Zoning Ordinance Article 25 ARTICLE 25 WIRELESS COMMUNICATIONS TOWERS AND ANTENNAS Updated 8-14-2017 Section 25.01 GENERAL PROVISIONS A. Purpose. It is the intent of this Article to

More information

City of Burbank. Planning and Transportation Division WIRELESS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS SUPPLEMENTAL APPLICATION FORM

City of Burbank. Planning and Transportation Division WIRELESS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS SUPPLEMENTAL APPLICATION FORM Planning and Transportation Division WIRELESS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS SUPPLEMENTAL APPLICATION FORM 150 North Third Street Burbank, California 91502 www.burbankusa.com T: 818-235-5250

More information

Data and Computer Communications. Tenth Edition by William Stallings

Data and Computer Communications. Tenth Edition by William Stallings Data and Computer Communications Tenth Edition by William Stallings Data and Computer Communications, Tenth Edition by William Stallings, (c) Pearson Education - 2013 CHAPTER 10 Cellular Wireless Network

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 18, 2015 DATE: July 3, 2015 SUBJECT: U-3409-15-1 USE PERMIT for installation of telecommunications equipment at Mercedes-Benz of Arlington;

More information

Unit-1 The Cellular Concept

Unit-1 The Cellular Concept Unit-1 The Cellular Concept 1.1 Introduction to Cellular Systems Solves the problem of spectral congestion and user capacity. Offer very high capacity in a limited spectrum without major technological

More information

WIRELESS TELECOMMUNICATION FACILITIES. Chapter 15

WIRELESS TELECOMMUNICATION FACILITIES. Chapter 15 Title 9 Land Management Code WIRELESS TELECOMMUNICATION FACILITIES Chapter 15 9-15-1: PURPOSE: 9-15-2: DEFINITIONS: 9-15-3: APPLICABILITY: 9-15-4: MASTER PLAN REQUIRED: 9-15-5: ALLOWABLE USES: 9-15-6:

More information

Verizon Wireless Proposed Base Station (Site No Lake Cachuma ) 2680 Highway 154 Santa Barbara County, California

Verizon Wireless Proposed Base Station (Site No Lake Cachuma ) 2680 Highway 154 Santa Barbara County, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications

More information

SEN366 (SEN374) (Introduction to) Computer Networks

SEN366 (SEN374) (Introduction to) Computer Networks SEN366 (SEN374) (Introduction to) Computer Networks Prof. Dr. Hasan Hüseyin BALIK (8 th Week) Cellular Wireless Network 8.Outline Principles of Cellular Networks Cellular Network Generations LTE-Advanced

More information

SECTION 35 ANTENNAS AND TOWERS

SECTION 35 ANTENNAS AND TOWERS SECTION 35 ANTENNAS AND TOWERS Section: 515-35-1 Purpose and Intent 515-35-2 General Standards 515-35-3 Certification, Inspection and Maintenance 515-35-4 Tower Design 515-35-5 Co-Location Requirement

More information

Sec Radio, television, satellite dish and communications antennas and towers.

Sec Radio, television, satellite dish and communications antennas and towers. Se 2106. - Radio, television, satellite dish and communications antennas and towers. (a) (b) (c) (d) No guy wires or other accessories associated with any antenna or tower shall cross, encroach, or otherwise

More information

Verizon Wireless Proposed Base Station (Site No South Goleta ) 4500 Hollister Avenue Santa Barbara, California

Verizon Wireless Proposed Base Station (Site No South Goleta ) 4500 Hollister Avenue Santa Barbara, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications

More information

Voice Communications in Rural Areas Voting Scan. Voice Communications in Rural Areas. Voting Scan. Javier del Rio, PE John Schmidt, PE

Voice Communications in Rural Areas Voting Scan. Voice Communications in Rural Areas. Voting Scan. Javier del Rio, PE John Schmidt, PE Voice Communications in Rural Areas Javier del Rio, PE John Schmidt, PE 1 DISCLAIMER The authors of this presentation are employees of the California Department of Transportation. The contents of this

More information

City of Cape May Zoning Board of Adjustment Meeting Minutes April 28, 2011

City of Cape May Zoning Board of Adjustment Meeting Minutes April 28, 2011 City of Cape May Zoning Board of Adjustment Meeting Minutes April 28, 2011 Opening: In compliance with the Open Public Meetings Act, adequate notice of the meeting was provided. Chairperson Pitman called

More information

DESIGN AND DEVELOPMENT STANDARDS FOR WIRELESS FACILITIES IN THE PUBLIC RIGHTS-OF-WAY

DESIGN AND DEVELOPMENT STANDARDS FOR WIRELESS FACILITIES IN THE PUBLIC RIGHTS-OF-WAY DESIGN AND DEVELOPMENT STANDARDS FOR WIRELESS FACILITIES IN THE PUBLIC RIGHTS-OF-WAY The following Design and Development Standards are subject to change at any time at the sole discretion of the City

More information

WHEREAS, the City of (the City ) is an Illinois municipality in. accordance with the Constitution of the State of Illinois of 1970; and,

WHEREAS, the City of (the City ) is an Illinois municipality in. accordance with the Constitution of the State of Illinois of 1970; and, SMALL CELL ANTENNA/TOWER RIGHT-OF-WAY SITING ORDINANCE WHEREAS, the City of (the City ) is an Illinois municipality in accordance with the Constitution of the State of Illinois of 1970; and, WHEREAS, the

More information

County of Orange Proposed Wireless Communications Facilities Within County Highways Ordinance Draft September 30, 2015

County of Orange Proposed Wireless Communications Facilities Within County Highways Ordinance Draft September 30, 2015 County of Orange Proposed Wireless Communications Facilities Within County Highways Ordinance Draft September 30, 2015 (New language is underlined, deleted language is struck) Title 6, Division 6, Article,

More information

Town of Burlington Small Wireless Facility. and similar structures. Design Rules and Regulations

Town of Burlington Small Wireless Facility. and similar structures. Design Rules and Regulations Town of Burlington Small Wireless Facility and similar structures Design Rules and Regulations This policy describes approved aesthetic and location criteria for Small Wireless Facilities in the Town of

More information

ECE 5325/6325: Wireless Communication Systems Lecture Notes, Spring 2010

ECE 5325/6325: Wireless Communication Systems Lecture Notes, Spring 2010 ECE 5325/6325: Wireless Communication Systems Lecture Notes, Spring 2010 Lecture 2 Today: (1) Frequency Reuse, (2) Handoff Reading for today s lecture: 3.2-3.5 Reading for next lecture: Rap 3.6 HW 1 will

More information

SolidRF SOHO Tri-Band Cell Phone Signal Booster for GSM, GPRS, CDMA 3G and Verizon 4G LTE. 700 MHz(Band 13) / 850 MHz / 1900 MHz ONLY

SolidRF SOHO Tri-Band Cell Phone Signal Booster for GSM, GPRS, CDMA 3G and Verizon 4G LTE. 700 MHz(Band 13) / 850 MHz / 1900 MHz ONLY SolidRF SOHO Tri-Band Cell Phone Signal Booster for GSM, GPRS, CDMA 3G and Verizon 4G LTE 700 MHz(Band 13) / 850 MHz / 1900 MHz ONLY If you have any questions or concerns when installing or operating your

More information

SPECTRUM SHARING: OVERVIEW AND CHALLENGES OF SMALL CELLS INNOVATION IN THE PROPOSED 3.5 GHZ BAND

SPECTRUM SHARING: OVERVIEW AND CHALLENGES OF SMALL CELLS INNOVATION IN THE PROPOSED 3.5 GHZ BAND SPECTRUM SHARING: OVERVIEW AND CHALLENGES OF SMALL CELLS INNOVATION IN THE PROPOSED 3.5 GHZ BAND David Oyediran, Graduate Student, Farzad Moazzami, Advisor Electrical and Computer Engineering Morgan State

More information

PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN#

PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN# PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN# 269-0090-051 Proposed Use AT&T is currently deploying the infrastructure of its wireless communications network in California.

More information

ECE 476/ECE 501C/CS Wireless Communication Systems Winter Lecture 3: Cellular Fundamentals

ECE 476/ECE 501C/CS Wireless Communication Systems Winter Lecture 3: Cellular Fundamentals ECE 476/ECE 501C/CS 513 - Wireless Communication Systems Winter 2004 Lecture 3: Cellular Fundamentals Chapter 3 - The Cellular Concept - System Design Fundamentals I. Introduction Goals of a Cellular System

More information

ORDINANCE NO WHEREAS, the Planning Commission clarified minor changes to the SAF ordinance on May 24, 2018; and

ORDINANCE NO WHEREAS, the Planning Commission clarified minor changes to the SAF ordinance on May 24, 2018; and ATTACHMENT 1 ORDINANCE NO. 2018- AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON AMENDING THE AMERICAN CANYON MUNICIPAL CODE TO ADOPT A NEW SECTION 19.53, WHICH PROVIDES A MINISTERIAL PERMIT

More information

GTBIT ECE Department Wireless Communication

GTBIT ECE Department Wireless Communication Q-1 What is Simulcast Paging system? Ans-1 A Simulcast Paging system refers to a system where coverage is continuous over a geographic area serviced by more than one paging transmitter. In this type of

More information

Radio Frequency Analysis Report. 196 West Street Paxton, MA 01612

Radio Frequency Analysis Report. 196 West Street Paxton, MA 01612 Radio Frequency Analysis Report Site MA-43 196 West Street Paxton, MA 01612 {A025043.1 } C Squared Systems, LLC i C Squared Systems, LLC 65 Dartmouth Drive, A3 Auburn, NH 03032 Phone: 603) 644-200 Fax:

More information

Modeling Electromagnetic Radiation on Lookout Mountain, Colorado

Modeling Electromagnetic Radiation on Lookout Mountain, Colorado Modeling Electromagnetic Radiation on Lookout Mountain, Colorado 1. Introduction 1.1. Goal of Research This Capstone project has been initiated in an attempt to model the Electromagnetic Radiation (EMR)

More information

Carriers Sites in the surrounding area

Carriers Sites in the surrounding area Carriers Sites in the surrounding area Wireless Communications Site St. Margaret Mary Catholic Church, 8500 Islington Avenue, Vaughan, ON. Rogers Site: C3382 (Islington Ave. & Langstaff Rd.) Rogers Communications

More information

Verizon Wireless Albemarle County s Wireless Policy on Co-locations. August 31, Executive Summary

Verizon Wireless Albemarle County s Wireless Policy on Co-locations. August 31, Executive Summary Verizon Wireless Albemarle County s Wireless Policy on Co-locations August 31, 2011 Executive Summary Since Albemarle County s Wireless Policy was developed a decade ago, demand for wireless services has

More information

Multi-antenna Cell Constellations for Interference Management in Dense Urban Areas

Multi-antenna Cell Constellations for Interference Management in Dense Urban Areas Multi-antenna Cell Constellations for Interference Management in Dense Urban Areas Syed Fahad Yunas #, Jussi Turkka #2, Panu Lähdekorpi #3, Tero Isotalo #4, Jukka Lempiäinen #5 Department of Communications

More information

Chapter 3: Cellular concept

Chapter 3: Cellular concept Chapter 3: Cellular concept Introduction to cellular concept: The cellular concept was a major breakthrough in solving the problem of spectral congestion and user capacity. It offered very high capacity

More information

Data and Computer Communications

Data and Computer Communications Data and Computer Communications Chapter 14 Cellular Wireless Networks Eighth Edition by William Stallings Cellular Wireless Networks key technology for mobiles, wireless nets etc developed to increase

More information

Solutions. Remotek's Advantages

Solutions. Remotek's Advantages About Remotek Remotek Corporation specialized in Research, Design and Production of radio coverage solutions for all types of mobile radio network, RF components and the provision of relevant services.

More information

Notice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone.

Notice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone. 10019 103 Avenue NW Edmonton, AB T5J 0G9 P: 780-496-6079 F: 780-577-3537 sdab@edmonton.ca edmontonsdab.ca Date: November 2, 2018 Project Number: 286136272-001 File Number: SDAB-D-18-181 Notice of Decision

More information

AT&T Mobility Proposed Base Station (Site No. CN4779A) 1101 Keaveny Court Walnut Creek, California

AT&T Mobility Proposed Base Station (Site No. CN4779A) 1101 Keaveny Court Walnut Creek, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of AT&T Mobility, a personal wireless telecommunications

More information

Radio Frequency Emissions Analysis Report Sprint Wireless Water Tank Facility

Radio Frequency Emissions Analysis Report Sprint Wireless Water Tank Facility Radio Frequency Emissions Analysis Report Sprint Wireless Water Tank Facility Site ID: BS3XC490 Site Name: Cedar St. Water Tank Address: 396 Cedar Street, Ashland, MA 0171 Latitude: 4.35300 Longitude:

More information

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission #2015-52 Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission Meeting Date: October 21, 2015 Request: Location: A Special Use Permit for a wireless communication

More information

Verizon Wireless Proposed Base Station (Site No Berkeley Bekins ) 2721 Shattuck Avenue Berkeley, California

Verizon Wireless Proposed Base Station (Site No Berkeley Bekins ) 2721 Shattuck Avenue Berkeley, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications

More information

EKT 450 Mobile Communication System

EKT 450 Mobile Communication System EKT 450 Mobile Communication System Chapter 6: The Cellular Concept Dr. Azremi Abdullah Al-Hadi School of Computer and Communication Engineering azremi@unimap.edu.my 1 Introduction Introduction to Cellular

More information

Determining Radio Frequency (RF) Coverage for Criminal and Civil Legal Cases

Determining Radio Frequency (RF) Coverage for Criminal and Civil Legal Cases Determining Radio Frequency (RF) Coverage for Criminal and Civil Legal Cases Introduction Both criminal and civil cases use certain techniques to determine whether a mobile phone was either in or not in

More information

Metro Cell: Best Practices. For a Successful Densification Strategy

Metro Cell: Best Practices. For a Successful Densification Strategy Metro Cell: Best Practices For a Successful Densification Strategy Metro Cell Best Practice: Introduction Densification: a big part of your capacity strategy Densification is the best known and most effective

More information

SMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)

SMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application) REVIEW TYPE: PRELIMINARY FINAL LANDSCAPE ABBREVIATED ADDITION COLOR BOARD Application Form* X X X X X Design Review Fee* X X X Registered Survey** X Site Plan X X X X X Floor Plans X X X Elevations X X

More information

REQUEST FOR COUNCIL DIRECTION ON PLACEMENT OF A RADIO TOWER ON DRAKES PEAK

REQUEST FOR COUNCIL DIRECTION ON PLACEMENT OF A RADIO TOWER ON DRAKES PEAK Agenda Item No. 9A March 28, 2017 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: Jeremy Craig, Interim City Manager Dawn Leonardini, Administrative Services Director, Kris Concepcion, Fire

More information

INFORMATION DOCUMENT PUBLIC NOTICE TELECOMMUNICATIONS TOWER IMPLEMENTATION PROJECT

INFORMATION DOCUMENT PUBLIC NOTICE TELECOMMUNICATIONS TOWER IMPLEMENTATION PROJECT INFORMATION DOCUMENT PUBLIC NOTICE TELECOMMUNICATIONS TOWER IMPLEMENTATION PROJECT AT LATITUDE NAD 83: N 47 36' 53.37" LONGITUDE NAD 83: W 52 40' 42.87". ACROSS FROM 41 SUGARLOAF PLACE ST. JOHN S, NEWFOUNDLAND

More information

PLANNING COMMISSION AGENDA. Next Planning Commission Meeting Monday, September 20, :00 pm

PLANNING COMMISSION AGENDA. Next Planning Commission Meeting Monday, September 20, :00 pm QLatmtu PLANNING COMMISSION AGENDA DATE: Tuesday, September 7, 2010 5:00 pin Regular Meeting Bedford County Administration Bldg Ground Floor Training Room A. Call to Order and Determination of Quorum D.

More information

REQUEST FOR APPROVAL FOR SATELLITE DISH/ANTENNA INSTALLATION JASMINE HEIGHTS HOMEOWNERS ASSOCIATION, INC.

REQUEST FOR APPROVAL FOR SATELLITE DISH/ANTENNA INSTALLATION JASMINE HEIGHTS HOMEOWNERS ASSOCIATION, INC. REQUEST FOR APPROVAL FOR SATELLITE DISH/ANTENNA INSTALLATION JASMINE HEIGHTS HOMEOWNERS ASSOCIATION, INC. The Jasmine Heights Declaration of Restrictions and Declaration Establishing a Plan of Condominium

More information

LMS4000 & NCL MHz Radio Propagation

LMS4000 & NCL MHz Radio Propagation LMS4000 & NCL1900 900-MHz Radio Propagation This application note is an update to the previous LMS3000/LMS3100 900 MHz Radio Propagation note. It provides general guidelines to estimate CCU3000 & NCL1900

More information

Signal Leakage Patrolling in the 700 MHz Frequency Band

Signal Leakage Patrolling in the 700 MHz Frequency Band Signal Leakage Patrolling in the 700 MHz Frequency Band Welcome to the 1 st Quarter 2013 CSEI Technical Report. My last technical report, in the 2 nd Qtr of 2012 (the 3 rd & 4 th quarters of 2012 were

More information

Wireless Facility Engineering Review

Wireless Facility Engineering Review Page 1 of 8 Wireless Facility Engineering Review Sprint Application for Site (Site No. FN03XC064) 1760 Solano Avenue, Berkeley, CA 10/9/2013 RCC Consultants, Inc. - Western Regional Office 266 E. 33 rd

More information

NOISE IMPACT ANALYSIS

NOISE IMPACT ANALYSIS NOISE IMPACT ANALYSIS Verizon Wireless Site Name: Sidewinder Zone 1 22233 Mulholland Highway Calabasas, California 90290 Prepared For Cable Engineering Services Attention: Adrian Culici 10640 Sepulveda

More information

Royal Street Communications, LLC Proposed Base Station (Site No. LA0366A) 315 4th Avenue Venice, California

Royal Street Communications, LLC Proposed Base Station (Site No. LA0366A) 315 4th Avenue Venice, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Royal Street Communications, LLC, a personal wireless

More information

Chapter- 5. Performance Evaluation of Conventional Handoff

Chapter- 5. Performance Evaluation of Conventional Handoff Chapter- 5 Performance Evaluation of Conventional Handoff Chapter Overview This chapter immensely compares the different mobile phone technologies (GSM, UMTS and CDMA). It also presents the related results

More information

City of San José, California CITY COUNCIL POLICY

City of San José, California CITY COUNCIL POLICY City of San José, California CITY COUNCIL POLICY TITLE 1 1 of 6 EFFECTIVE DATE 1/22/91 REVISED DATE 9/16/03 APPROVED BY Council Action - January 22, 1991; August 11, 1992; August 20, 1996 (9d); September

More information

If tenants and businesses move to nearby towns, such as Albany, Kensington or El Cerrito, millions of revenues will be lost forever.

If tenants and businesses move to nearby towns, such as Albany, Kensington or El Cerrito, millions of revenues will be lost forever. 7/6/2009 ATTACHMENT Page 12 1 of 2 Page 1 of 6 From: kat hua [kathua@juno.com] Saturday, January 17, 2009 6:10 PM ; Planning Dept. Mailbox Subject: Request Dear Ms. Mendez and City of Berkeley Planning

More information

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE Moline Illinois CODE OF ORDINANCES Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE SEC. 8-9300. TITLE. The title of this division shall be the Emergency Radio System Coverage

More information

Spectrum Policy Task Force

Spectrum Policy Task Force Spectrum Policy Task Force Findings and Recommendations February 2003 mmarcus@fcc.gov www.fcc.gov/sptf 1 Outline Introduction Spectrum Policy Reform: The Time is Now Major Findings and Recommendations

More information

Wind Power GeoPlanner. Land Mobile & Emergency Services Report

Wind Power GeoPlanner. Land Mobile & Emergency Services Report Prepared on Behalf of Wind LLC February 27, 2015 Wind LLC Table of Contents 1. Introduction - 1-2. Summary of Results - 2-3. Impact Assessment - 8-4. Recommendations - 8-5. Contact - 9 - Comsearch Proprietary

More information

Planning Commission meeting

Planning Commission meeting city of peachtree city March 8, 2010 Planning Commission meeting Public Hearings: NONE Workshop Items: Discuss potential modifications to the Telecommunication Towers and Antennas Ordinance and general

More information

Addendum: New Business c) Date: December 15, 2016 Attention: From: Regarding: Mr. Patrick Chury, CCM General Manager Gorge Vale Golf Club 1005 Craigflower Rd, Victoria BC, V9A 2X9 Cyrus Ghassabeh Forbes

More information

EXHIBIT 2 Page 1 of 5 Reasonable Necessity for Eminent Domain Action Tuttle Property Final Report PREPARED JANUARY 2018 FOR BROWARD COUNTY, FLORIDA MissionCriticalPartners.com State College Office 690

More information

INFORMATION DOCUMENT PUBLIC NOTICE TELECOMMUNICATIONS TOWER IMPLEMENTATION PROJECT AT LATITUDE NAD 83: N 47º LONGITUDE NAD 83: W 52º

INFORMATION DOCUMENT PUBLIC NOTICE TELECOMMUNICATIONS TOWER IMPLEMENTATION PROJECT AT LATITUDE NAD 83: N 47º LONGITUDE NAD 83: W 52º INFORMATION DOCUMENT PUBLIC NOTICE TELECOMMUNICATIONS TOWER IMPLEMENTATION PROJECT AT LATITUDE NAD 83: N 47º 31 40.98 LONGITUDE NAD 83: W 52º 50 26.25 34 ST. ANNE S CRESCENT PARADISE, NEWFOUNDLAND JANUARY

More information

Wireless Signal Propagation Concepts

Wireless Signal Propagation Concepts Wireless Signal Propagation Concepts NARUC 2017 Presented as part of: Mobile Broadband, Wireless Propagation, and the 706 NOI Presented by Adam Nelson Senior Consultant Federal Engineering, Inc. November

More information

Verizon Wireless 3003 E Harmony Road, Combined Project Development Plan and Final Plan, #FDP150014

Verizon Wireless 3003 E Harmony Road, Combined Project Development Plan and Final Plan, #FDP150014 ITEM NO FDP150014 MEETING DATE May 20, 2015 STAFF Noah Beals ADMINISTRATIVE HEARING OFFICER STAFF REPORT PROJECT: APPLICANT: OWNER: Verizon Wireless 3003 E Harmony Road, Combined Project Development Plan

More information

Memorandum SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Harry Freitas. SUBJECT: SEE BELOW DATE: My 27, 2016

Memorandum SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Harry Freitas. SUBJECT: SEE BELOW DATE: My 27, 2016 COUNCIL AGENDA: 08/16/16 ITEM: it n 11.2- CITYOP SAN JOSE CAPITAL OF SILICON VALLEY Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL FROM: Harry Freitas SUBJECT: SEE BELOW DATE: My 27, 2016 Approved: Date:

More information

SPO MORAN 4620 S GLENROSE ROAD SPOKANE, WA 99223

SPO MORAN 4620 S GLENROSE ROAD SPOKANE, WA 99223 0 S GLENROSE ROAD CONTACT LIST APPLICANT: VERIZON WIRELESS 8TH AVENUE SE, MS BELLEVUE, WA 8008 ARCHITECT: LDC, INC. 0 NE 00TH ST, SUITE 00 WOODINVILLE, WA 80 CONTACT: RICHARD B. HALL, AIA PHONE: () 80-8

More information

Developing the Model

Developing the Model Team # 9866 Page 1 of 10 Radio Riot Introduction In this paper we present our solution to the 2011 MCM problem B. The problem pertains to finding the minimum number of very high frequency (VHF) radio repeaters

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT

MONTGOMERY COUNTY PLANNING DEPARTMENT MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 7 Date: 3-8-18 Zoning Text Amendment (ZTA) No. 18-02, Telecommunications Towers Limited Use

More information

EENG473 Mobile Communications Module 2 : Week # (8) The Cellular Concept System Design Fundamentals

EENG473 Mobile Communications Module 2 : Week # (8) The Cellular Concept System Design Fundamentals EENG473 Mobile Communications Module 2 : Week # (8) The Cellular Concept System Design Fundamentals Improving Capacity in Cellular Systems Cellular design techniques are needed to provide more channels

More information

Special Meeting of the Village Board

Special Meeting of the Village Board Special Meeting of the Village Board Proposed Relocation of Cellular Antennas to a Monopole at 347 Ivy Court May 17, 20 1 6 Overview of Presentation Opening Remarks Presentation of Stability Concerns -

More information

Ericsson Radio Dot System

Ericsson Radio Dot System Ericsson Radio Dot System Redefining In-Building Small Cells As enterprises pursue mobile strategies and consumers depend more heavily on their mobile devices, cellular networks are becoming mission critical

More information

Mitigating Interference & Maximizing Throughput in 700MHz for SCADA

Mitigating Interference & Maximizing Throughput in 700MHz for SCADA Mitigating Interference & Maximizing Throughput in 700MHz for SCADA Paul Reid and Kathy Shaft (GRE) October 2018 WAS SPUN OUT OF 2 3 Phoenix US Headquarters US Headquarters Technical Support Hub Repair

More information

Modify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types):

Modify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types): ORDINANCE NO. AN ORDINANCE CHANGING THE ZONING CODE FOR MENDOCINO COUNTY The Board of Supervisors of the County of Mendocino, State of California, ordains as follows: Pursuant to Division I of Title 20,

More information

AN EDUCATIONAL GUIDE HOW RPMA WORKS A WHITE PAPER BY INGENU

AN EDUCATIONAL GUIDE HOW RPMA WORKS A WHITE PAPER BY INGENU AN EDUCATIONAL GUIDE HOW RPMA WORKS A WHITE PAPER BY INGENU HOW RPMA WORKS Designed from the ground up for machine communications, Random Phase Multiple Access (RPMA) technology offers many advantages

More information

Deployment and Radio Resource Reuse in IEEE j Multi-hop Relay Network in Manhattan-like Environment

Deployment and Radio Resource Reuse in IEEE j Multi-hop Relay Network in Manhattan-like Environment Deployment and Radio Resource Reuse in IEEE 802.16j Multi-hop Relay Network in Manhattan-like Environment I-Kang Fu and Wern-Ho Sheen Department of Communication Engineering National Chiao Tung University

More information

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT To: Salt Lake City Administrative Hearing Officer From: Casey Stewart; 801-535-6260 Date: Re: September 22, 2017 (for September 28 Administrative

More information

COUNCIL ACTION FORM WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT

COUNCIL ACTION FORM WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT ITEM # 28 _ DATE: 03/06/18 COUNCIL ACTION FORM SUBJECT: WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT BACKGROUND: The operation of wireless communication facilities are licensed and regulated by the

More information

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES)

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES) Reference: Denver Fire Code Sections 510 Approved: Manuel Almagure Division Chief, Fire Prevention Division Number: 510-1 Effective Date: February 1, 2018 Page 1 of 8 This Policy 510-1 provides additional

More information

ZONING ORDINANCES AND TELECOM PROVIDERS CAN WE LIVE IN HARMONY?

ZONING ORDINANCES AND TELECOM PROVIDERS CAN WE LIVE IN HARMONY? WYOMING ASSOCIATION OF MUNICIPALITIES ZONING ORDINANCES AND TELECOM PROVIDERS CAN WE LIVE IN HARMONY? Corporation Bob Duchen Vice President June 1, 2017 Copyright 2017 by Corporation. All rights reserved.

More information

Figure 1.1:- Representation of a transmitter s Cell

Figure 1.1:- Representation of a transmitter s Cell Volume 4, Issue 2, February 2014 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Study on Improving

More information