REQUEST FOR COUNCIL DIRECTION ON PLACEMENT OF A RADIO TOWER ON DRAKES PEAK

Size: px
Start display at page:

Download "REQUEST FOR COUNCIL DIRECTION ON PLACEMENT OF A RADIO TOWER ON DRAKES PEAK"

Transcription

1 Agenda Item No. 9A March 28, 2017 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: Jeremy Craig, Interim City Manager Dawn Leonardini, Administrative Services Director, Kris Concepcion, Fire Chief, and John Carli, Chief of Police (Staff Contact: Chief John Carli, (707) ) REQUEST FOR COUNCIL DIRECTION ON PLACEMENT OF A RADIO TOWER ON DRAKES PEAK DISCUSSION: In April 2016, CSI Telecommunications was selected as the consultant firm for the City of Vacaville to help implement the public safety radio system replacement. The current Motorola radio system that is shared between the Cities of Vacaville and Fairfield will reach the manufacturer s end-of-life replacement and maintenance cycle in December To prepare for its replacement, the project was divided into 3 phases to include a needs assessment, procurement and system implementation. The needs assessment included the evaluation of the existing system and radio sites, user visits, site visits, conceptual design, and a coverage prediction study. Staff met regularly over the last year and reviewed the findings of the needs assessment in preparation for requests for proposals (RFP). Coverage, redundancy and interoperability were identified as the most significant factors when preparing this request for proposal. A 2005 staff report titled Fire Station 73 Transmitter Relocation documented the status of the radio system and future plans for city growth and radio coverage. The report identified alternative radio sites based on radio coverage, redundancy and interoperability. The recommendation for the future was to develop Drakes Peak in Vacaville and Cement Hill in Fairfield, which would replace Butcher Hill and Fire Station 73 radio sites. In 2006, Vacaville and Fairfield entered into a cost sharing agreement with Solano County to develop Cement Hill. The report concluded that future development of Drakes Peak would further enhance interoperability for Vacaville and Solano County and allow for migrating the radio site on Butcher Hill to Cement Hill. (See Attachment 1.) Drakes Peak, also known as Drakes Point or Old Rocky, was originally proposed as New Drakes in 1991 as part of a 2-site solution for Vacaville s public safety radio system, along with the Butcher Hill radio site. At the time, the land was not owned by the city so an alternate site was developed at Fire Station 73. Drakes Peak has always been considered superior to Fire Station 73 as a radio site. The infill radio coverage from Station 73 radio tower has been problematic since it was put into service in In 2008, the City of Fairfield replaced its UHF radio system by joining Vacaville and implementing its own 800 MHz radio sites at Cement Hill and Nelson. Cement Hill, which is now fully operational, is a primary site for Fairfield and supports Vacaville s radio equipment as well. This joint radio system, comprised of 4 sites, provides both cities greater range in coverage, and enables full interoperable communication between Fairfield, Vacaville and Suisun City, covering over half of the entire terrain in Solano County. This single-shared network greatly supports interoperability between all departments and cities, as well as providing the technology that currently affords interoperability with Solano County.

2 Recently, staff analyzed the current radio system coverage maps as part of the radio replacement project to determine if any recommended changes were required. Butcher Hill is elevated along the ridgeline near Butcher Road and provides optimal coverage for about 85-90% of Vacaville. The site was determined to be working effectively with only minor challenges relating to site access and power. The City leases this space from American Tower, currently costing $24,000 per year. The secondary radio site located at Fire Station 73 on Eubanks Court is less than ideal. Situated at 60 above the ground, the radio tower provides optimal coverage for only 20-25% of Vacaville. Development in the surrounding area creates interference in the Browns Valley area and has further limited the radio coverage in north Vacaville. Newer neighborhoods, such as Cheyenne, have inadequate reception and will require either a change in the design or an alternative site to ensure proper radio coverage in the future. CSI Telecommunications provided additional analysis in order to determine the benefit of increasing the tower height to 100 to improve coverage with less than ideal results. Figure 1. Coverage Prediction Map of new Project25 system with Butcher Hill and Fire Station 73 Figure 1. Description: 95% Reliability to a Portable radio in a police vest or in fire turn-out pocket Clear area: Outside and Inside most buildings Green area: Outside

3 Figure 2. Coverage Prediction Map of new Project25 system with Drakes Peak Figure 2. Description: 95% Reliability to a Portable radio in a police vest or in fire turn-out pocket Clear area: Outside and Inside most buildings Green area: Outside Staff researched alternative sites to address the shortcomings of the current configuration, radio tower locations and reliability issues that require redundancy. Mount Vaca and Mix Canyon ridgelines were evaluated and determined to be inadequate alternative tower locations, specifically due to topographical challenges that limit radio coverage in Vacaville. Drakes Peak, also known as Old Rocky, was determined to be an ideal site location, providing improved radio coverage, redundancy and interoperability for the future. This peak is situated on the southern end of the Vine Street ridgeline and is owned by the City of Vacaville. CSI Telecommunications consultants and city staff made multiple site visits to Drakes Peak, evaluated its significance as proposed in 1991, and confirmed the conclusions presented by staff in the 2005 Fire Station 73 Transmitter Relocation Report. Developing a radio site on Drakes Peak would cover the entire city with the exception of Lagoon Valley, which is now covered by Cement Hill. This means that a single site in Drakes would replace the current 2 sites, and provide radio coverage in areas that currently are problematic in the Browns Valley/Cheyenne residential developments.

4 Land Use considerations were discussed, and it was determined that the placement of a radio tower for the sole use of providing radio coverage for the City of Vacaville was the best course of action. The most significant challenge in 1991 was that the land was not owned by the City of Vacaville, hindering its ability to develop the radio site. Since that time, it has become city-owned and is considered open space for hiking. By not partnering with commercial ventures, the impact would be limited to city use, thus keeping the site small and less visible than many of the other tower sites already visible on mountain peaks around the Vacaville ridgelines. This course, however, requires the City to incur all costs in developing the access and site. The proximity to the airport was also considered. The relatively undeveloped peak has a 38 wooden pole with a powered beacon to warn pilots who use the Nut Tree Airport. Staff determined the use of Drakes Peak could be accomplished by replacing the pole with a 50 monopole antenna, about 12 taller than the current pole. This was confirmed by the consultant. Furthermore, the FCC has granted future radio licenses to Vacaville for the use on Drakes Peak if staff is directed to develop this site. The view of the peak was considered as well. This location is highly visible and attracts hikers and rock climbers. Staff researched the existing access trail and identified an initial plan that would utilize an improved crushed granite path up the eastern slope. The path would utilize a pre-existing path that extends up a significant portion of the hill. An improved path also has a potential benefit of making this open space more accessible for hiking up to the peak, which provides great views from its rocky vista. A camouflaged radio tower and shelter façade could significantly reduce any visual impact, and can be placed as not to interfere with access by visitors who want to enjoy the scenery or walk the existing trails. The position and location of the required 12 x12 shelter would minimize its visual impact, with landscaping that would minimize its visibility. Staff determined that the cost to develop a site and provide a drivable access would be approximately $830,000. The Shelter, tower and backup power are estimated at $220,000. This cost will be required regardless since the shelter, tower and generator at Fire Station 73 would need to be replaced if this alternate site is not approved. This does not include future radio equipment, which will be replaced as part of the radio system project and would occur at any proposed sites. CSI Telecommunications assisted in the analysis and determined the Drakes Peak site would be the preferred site to replace the site at Fire Station 73 and could either eliminate Butcher Hill since it has equal coverage, or keep Butcher Hill to provide equal redundancy coverage for the City of Vacaville (85-90% from each site. Any alternatives in the design and configuration of the replacement radio system need to be included in the radio replacement RFP, even if the option is determined not suitable at a later date. Therefore, staff is presenting 3 options for consideration and input from the Council: Option 1 Develop Drakes Peak and eliminate Butcher Hill and Fire Station 73 Option 2 Develop Drakes Peak and keep Butcher Hill for redundancy Option 3 Keep Butcher Hill and Fire Station 73 FISCAL IMPACT: No General Fund Impact at this time. The capital Improvement project to replace the radio system will be funded using the General Fund, which will be brought before the Council in the future for approval. Funding is currently being set aside each year in preparation for replacing the radio equipment. Costs associated with the potential development of a new radio site would also come from the General Fund. RECOMMENDATION: Receive the presentation and provide input and direction to staff. ATTACHMENTS: Attachment 1: 2005 Fire Station 73 Transmitter Relocation Report

5

6

7

8

9

10

11

12

13

14

SECTION 35 ANTENNAS AND TOWERS

SECTION 35 ANTENNAS AND TOWERS SECTION 35 ANTENNAS AND TOWERS Section: 515-35-1 Purpose and Intent 515-35-2 General Standards 515-35-3 Certification, Inspection and Maintenance 515-35-4 Tower Design 515-35-5 Co-Location Requirement

More information

Radio Technology Overview. January 2011

Radio Technology Overview. January 2011 Radio Technology Overview January 2011 Presentation Objectives The objective of this presentation is to: Review terms as related to radio technology Review the challenges facing the City o FCC mandate

More information

Columbia Communications District Request for Information New Radio Communications System

Columbia Communications District Request for Information New Radio Communications System Columbia 9-1-1 Communications District Request for Information New Radio Communications System Submission Deadline January 2, 2018 1 1 Overview 1.1 Introduction The Columbia 911Communications District

More information

City of San José, California CITY COUNCIL POLICY

City of San José, California CITY COUNCIL POLICY City of San José, California CITY COUNCIL POLICY TITLE 1 1 of 6 EFFECTIVE DATE 1/22/91 REVISED DATE 9/16/03 APPROVED BY Council Action - January 22, 1991; August 11, 1992; August 20, 1996 (9d); September

More information

EMERGENCY COMMUNICATIONS

EMERGENCY COMMUNICATIONS EMERGENCY COMMUNICATIONS FY2004-2010 1. BACKGROUND ISSUES The Emergency Communications element of the capital plan is comprised of three projects concerning emergency radio communications, computer aided

More information

Radio System Replacement Project

Radio System Replacement Project Radio System Replacement Project City Council Briefing December 6, 2017 William Finch, Chief Information Officer, Communication & Information Services Presentation Overview Background Procurement Process

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO. 3.j REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL DATE: July 24, 2012 SUBJECT: ADOPT RESOLUTION NO. 12-62 APPROVING A SEVEN-YEAR CAPITAL LEASE AGREEMENT WITH MOTOROLA SOLUTIONS,

More information

The Professional Consulting Services Communications Consultant E-911. Design Alternatives

The Professional Consulting Services Communications Consultant E-911. Design Alternatives The Communications Consultant E-911 Sullivan County, New York April 21, 2010 Table of Contents 1. OVERVIEW... 4 2. TECHNOLOGY OPTIONS... 5 2.1 Analog Conventional... 5 2.2 Project 25 Conventional... 5

More information

Wireless Signal Propagation Concepts

Wireless Signal Propagation Concepts Wireless Signal Propagation Concepts NARUC 2017 Presented as part of: Mobile Broadband, Wireless Propagation, and the 706 NOI Presented by Adam Nelson Senior Consultant Federal Engineering, Inc. November

More information

MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR)

MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR) PROJECT SPONSOR AND LEAD AGENCY MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR) The Marin Emergency Radio Authority (MERA) is a

More information

Radio Frequency Engineering Report. Proposed Raymond, ME Cellular Facility

Radio Frequency Engineering Report. Proposed Raymond, ME Cellular Facility Radio Frequency Engineering Report Proposed, ME Cellular Facility (Site No.: 3462 ) May 12, 2010 C Squared Systems, LLC 920 Candia Road Manchester, NH 03109 Phone: (603) 657-9702 Fax: (603) 657-9707 Support@csquaredsystems.com

More information

Joint Application Village / AT&T

Joint Application Village / AT&T Joint Application Village / AT&T Telecommunications Monopole / Ground Facilities 347 Ivy Court Z o n i ng B o a r d o f A p p e a l s April 1 1, 20 1 6 Overview of Presentation Existing method of cellular

More information

The Public Safety Committee will be briefed on the Modernization of Dallas' Radio Network on Monday, November 1, 2010.

The Public Safety Committee will be briefed on the Modernization of Dallas' Radio Network on Monday, November 1, 2010. Memorandum CITY OF DALLAS Date: October 29, 2010 To: Mayor Pro Tem Dwaine Caraway, Chair and Members of the Public Safety Committee Subject: Modernization of Dallas' Radio Network The Public Safety Committee

More information

UPGRADES TO 800 MHZ TRUNK RADIO SYSTEM TECHNOLOGY

UPGRADES TO 800 MHZ TRUNK RADIO SYSTEM TECHNOLOGY INFORMATION PAPER BUSINESS ADMINISTRATION COMMITTEE UPGRADES TO 800 MHZ TRUNK RADIO SYSTEM TECHNOLOGY December 2013 Purpose To provide information on the completed analysis for a phased technology upgrade

More information

Steven W. Jennings, CIO Harris County ITC

Steven W. Jennings, CIO Harris County ITC Steven W. Jennings, CIO Harris County ITC Harris County operates an 800 MHz Motorola Multi-cast SmartZone Regional Radio System that supports 33,000 users in 512 departments in the region, covering nine

More information

Public Safety Communications Commission

Public Safety Communications Commission Public Safety Communications Commission Report to Governor and Joint Transportation, Highways and Military Affairs Committee June 2017 Matthew H. Mead Governor Wyoming Public Safety Communications Commission

More information

David J. Gellner, AICP, Principal Planner

David J. Gellner, AICP, Principal Planner Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission David J. Gellner, AICP, Principal Planner - 801-535-6107 - david.gellner@slcgov.com Date: October

More information

Butler County Department of Emergency Services. Butler County Radio Project Briefing

Butler County Department of Emergency Services. Butler County Radio Project Briefing Butler County Department of Emergency Services Butler County Radio Project Briefing Why are we here? Define : What is success = Establish long term solution for Public Safety Land-Mobile Radio FCC Mandate-

More information

PROJECT NARRATIVE AND ALTERNATIVE ANALYSIS

PROJECT NARRATIVE AND ALTERNATIVE ANALYSIS PROJECT NARRATIVE AND ALTERNATIVE ANALYSIS 15505 Sand Canyon Avenue Building D-1 Irvine, CA 92618 May 23, 2011 Subject: Verizon Wireless Proposed Cordillera Telecommunications Facility Located at 4515

More information

Wicomico County. RFP for new 700/800 hybrid P25 Phase II radio system

Wicomico County. RFP for new 700/800 hybrid P25 Phase II radio system Wicomico County RFP for new 700/800 hybrid P25 Phase II radio system 1 Wicomico County Proposal Team David G. Shipley Director of Emergency Services Rick Konrad Purchasing Agent Charles J. Ryan III, Esq.

More information

: PERSONAL WIRELESS TELECOMMUNICATIONS SERVICE FACILITIES: REGULATIONS AND DEVELOPMENT STANDARDS:

: PERSONAL WIRELESS TELECOMMUNICATIONS SERVICE FACILITIES: REGULATIONS AND DEVELOPMENT STANDARDS: 10-1-1118: PERSONAL WIRELESS TELECOMMUNICATIONS SERVICE FACILITIES: REGULATIONS AND DEVELOPMENT STANDARDS: A. PERMITTED IN R-3, R-4, AND R-5 ZONES AND IN ALL NON-RESIDENTIAL ZONES. Subject to the regulations

More information

Resource Review and Design Recommendations Public Safety Communications System Assessment and Design. Broome County, New York.

Resource Review and Design Recommendations Public Safety Communications System Assessment and Design. Broome County, New York. Resource Review and Design Recommendations Public Safety Communications System Assessment and Design Broome County, New York Report June 28, 2012 Table of Contents 1 Overview... 5 2 System Design... 6

More information

Sept 28, Mukhtar mook-tar Thakur

Sept 28, Mukhtar mook-tar Thakur MnDOT Office of Statewide Radio Communications (OSRC) Overview -Summary and ARMER Status Update Central Region Summit- Alexandria, MN Sept 28, 2016 Mukhtar mook-tar Thakur The Office of Statewide Radio

More information

Planning Commission meeting

Planning Commission meeting city of peachtree city March 8, 2010 Planning Commission meeting Public Hearings: NONE Workshop Items: Discuss potential modifications to the Telecommunication Towers and Antennas Ordinance and general

More information

IDK Communications ( IDK ) has been tasked with the following scope pertaining to the above referenced subject.

IDK Communications ( IDK ) has been tasked with the following scope pertaining to the above referenced subject. IDK Communications April 27, 2017 Mr. Ethan J. Croce Senior Planner Town of Falmouth 271 Falmouth Road Falmouth, ME 04105 RE: Verizon Application 175 Falmouth Road Dear Mr. Croce, IDK Communications (

More information

Guide for Short Term Interoperability

Guide for Short Term Interoperability Oregon State Interoperability Executive Council Guide for Short Term Interoperability Adopted: by the SIEC Technical Committee The Oregon State Interoperability Executive Council (SIEC) and the State of

More information

Guide for Short Term Interoperability Revised June 24, 2009

Guide for Short Term Interoperability Revised June 24, 2009 Oregon State Interoperability Executive Council Guide for Short Term Interoperability Revised The Oregon State Interoperability Executive Council (SIEC) and the State of Oregon encourage Oregon s public

More information

Radiocommunication Facility Review Protocol

Radiocommunication Facility Review Protocol Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within

More information

Verizon Wireless Albemarle County s Wireless Policy on Co-locations. August 31, Executive Summary

Verizon Wireless Albemarle County s Wireless Policy on Co-locations. August 31, Executive Summary Verizon Wireless Albemarle County s Wireless Policy on Co-locations August 31, 2011 Executive Summary Since Albemarle County s Wireless Policy was developed a decade ago, demand for wireless services has

More information

Small Cell Infrastructure in Denver

Small Cell Infrastructure in Denver September 2017 Small Cell Infrastructure in Denver The City and County of Denver is receiving growing numbers of requests from wireless providers and wireless infrastructure companies to construct small

More information

Fundamentals of AM, FM, and TV Coverage and Interference Considerations. Jeremy D. Ruck, PE Senior Engineer D.L. Markley & Associates, Inc. Peoria, Illinois jdr@dlmarkley.com Coverage Fundamentals The

More information

Chief Mike Persley, Police Department Chief Ron Rowe, Fire Department Stephen Collier, Assistant City Manager

Chief Mike Persley, Police Department Chief Ron Rowe, Fire Department Stephen Collier, Assistant City Manager City of Albany Post Office Box 447 Albany, Georgia 31702-0447 Department: Procurement - (229) 431-3211 Item A.5.W4/19/2016 AGENDA ITEM DATE: 3/31/2016 MEETING DATE: 4/19/2016 SUBJECT: P25 Master Site Equipment

More information

APPLICATION DESIGN REVIEW Please Print or Type

APPLICATION DESIGN REVIEW Please Print or Type www.srcity.org ZONING ADMINISTRATOR (ZA) APPLICATION DESIGN REVIEW Please Print or Type DESIGN REVIEW BOARD File # Related Files: LOCATION OF PROJECT (ADDRESS) ASSESSOR S PARCEL NUMBER(S) EXISTING ZONING

More information

CHAPTER TELECOMMUNICATIONS FACILITIES

CHAPTER TELECOMMUNICATIONS FACILITIES Telecommunications Facilities CITY OF CITRUS HEIGHTS MUNICIPAL CODE - TITLE 106 - ZONING CODE CHAPTER 106.44 - TELECOMMUNICATIONS FACILITIES Sections: 106.44.010 - Purpose 106.44.020 - Definitions 106.44.030

More information

Radio Communications Essentials. Module 9: Narrowbanding Pete Peterson

Radio Communications Essentials. Module 9: Narrowbanding Pete Peterson Radio Communications Essentials Module 9: Narrowbanding Pete Peterson 1 Topics Why is it Necessary? Who is Affected? Key Deadlines & Exceptions What are the Challenges? Sample Steps to Narrowband Frequently

More information

COUNCIL ACTION FORM WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT

COUNCIL ACTION FORM WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT ITEM # 28 _ DATE: 03/06/18 COUNCIL ACTION FORM SUBJECT: WIRELESS COMMUNICATIONS FACILITIES TEXT AMENDMENT BACKGROUND: The operation of wireless communication facilities are licensed and regulated by the

More information

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town. Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:

More information

Sudden Valley RF Documentation

Sudden Valley RF Documentation Network Engineering Verizon Wireless 3305 160th Ave. SE M/S 231 Bellevue, WA 98008 Sudden Valley RF Documentation Overview: Verizon Wireless strives to provide excellent wireless service for our customers

More information

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT To: Salt Lake City Administrative Hearing Officer From: Casey Stewart; 801-535-6260 Date: Re: September 22, 2017 (for September 28 Administrative

More information

FIXED MOUNT DVRS INDOOR/OUTDOOR APPLICATION NOTE. March 2016 Version 4

FIXED MOUNT DVRS INDOOR/OUTDOOR APPLICATION NOTE. March 2016 Version 4 FIXED MOUNT DVRS INDOOR/OUTDOOR APPLICATION NOTE March 2016 Version 4 CONTENTS APPLICATION NOTE Introduction...2 Trunking Systems...2 The Need for Coverage...2 The Challenge...3 FDVR Solution...3 Other

More information

North Winnipeg Antenna System Project. February 2018

North Winnipeg Antenna System Project. February 2018 North Winnipeg Antenna System Project February 2018 About the North Winnipeg Antenna System Project The City of Winnipeg (the City) must relocate an existing antenna system used by a number of City departments,

More information

Communications Interoperability- Current Status

Communications Interoperability- Current Status Communications Interoperability- Current Status Stephen Mitchell Abstract Over the past decade, the public-safety community in partnership with local, state, and federal agencies have worked to develop

More information

PENNSYLVANIA TURNPIKE COMMISSION COMMUNICATIONS INFRASTRUCTURE

PENNSYLVANIA TURNPIKE COMMISSION COMMUNICATIONS INFRASTRUCTURE PENNSYLVANIA TURNPIKE COMMISSION COMMUNICATIONS INFRASTRUCTURE Transportation Engineering and Safety Conference December 6, 2017 Bob Taylor, P.E., PTOE Chief Technology Officer Pennsylvania Turnpike Commission

More information

Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of Police Lower Merion Township Radio System Replacement DATE: June 25, 2014

Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of Police Lower Merion Township Radio System Replacement DATE: June 25, 2014 EXHIBIT B TOWNSHIP OF LOWER MERION POLICE DEPARTMENT DEPARTMENTAL MEMORANDUM INTEGRITY PROFESSIONALISM RESPECT TO: FROM: SUBJECT: Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of

More information

Raveon M7 GX Frequently Asked Questions

Raveon M7 GX Frequently Asked Questions Technical Brief AN134Rev A3 Raveon M7 GX Frequently Asked Questions By John Sonnenberg Raveon Technologies Corp How far will a 5-watt UHF radio communicate? An excellent question, but very difficult to

More information

CASE NUMBER: 17SN0737 APPLICANT: Chesterfield Department of Emergency Communications CHESTERFIELD COUNTY, VIRGINIA MIDLOTHIAN DISTRICT

CASE NUMBER: 17SN0737 APPLICANT: Chesterfield Department of Emergency Communications CHESTERFIELD COUNTY, VIRGINIA MIDLOTHIAN DISTRICT CASE NUMBER: 17SN0737 APPLICANT: Chesterfield Department of Emergency Communications CHESTERFIELD COUNTY, VIRGINIA MIDLOTHIAN DISTRICT ADDENDUM Board of Supervisors Hearing: APRIL 26, 2017 Board of Supervisors

More information

State of Wyoming. Public Safety Communications Commission. WyoLink Operations Work Group January 26, 2007 Meeting

State of Wyoming. Public Safety Communications Commission. WyoLink Operations Work Group January 26, 2007 Meeting State of Wyoming Dave Freudenthal Governor Steve DeCecco Chairman Public Safety Communications Commission WyoLink Operations Work Group January 26, 2007 Meeting Chairman Jerry Kennedy called the meeting

More information

Initial Comments on DRI Application for Wakeby Road Cell Tower September 26, 2017

Initial Comments on DRI Application for Wakeby Road Cell Tower September 26, 2017 Thinking outside the sphere Initial Comments on DRI Application for Wakeby Road Cell Tower September 26, 2017 The Cape Cod Commission ( Commission ) is hearing an application for DRI review of a proposed

More information

MOTOBRIDGE IP Interoperable Solution

MOTOBRIDGE IP Interoperable Solution MOTOBRIDGE IP Interoperable Solution BRIDGING THE COMMUNICATIONS GAP Statewide, regional and local now public safety organizations can make the connection without replacing their existing radio systems

More information

Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ)

Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ) Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ) Goals... 2 1. What is WyoLink supposed to accomplish?... 2 2. Who will oversee WyoLink

More information

SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions. Point-to-Point Connectivity in the 4.9 GHz Public Safety Band

SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions. Point-to-Point Connectivity in the 4.9 GHz Public Safety Band SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions Point-to-Point Connectivity in the 4.9 GHz Public Safety Band Contents pg Section 3 FCC and the Public Safety RF Band 3 Qualified

More information

WIRELESS TEMPERATURE S TATION I NSTALLATION MANUAL

WIRELESS TEMPERATURE S TATION I NSTALLATION MANUAL Wireless Temp Page 1 Thursday, December 7, 2000 2:09 PM WIRELESS TEMPERATURE S TATION I NSTALLATION MANUAL The Wireless Temperature Station is for use with Wireless Vantage Pro TM. COMPONENTS The Wireless

More information

CHAPTER 9 HIGH FREQUENCY RADIO OPERATION CHAPTER

CHAPTER 9 HIGH FREQUENCY RADIO OPERATION CHAPTER SECTION 2 ESTABLISHMENT, MAINTENANCE AND OPERATION OF COMMUNICATION SYSTEMS AND EQUIPMENT CHAPTER 9 HIGH FREQUENCY RADIO OPERATION CHAPTER 9 9.1 COMPLEXITIES AND VARIABLES The operation of High Frequency

More information

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT AUDIT OF EMERGENCY COMMUNICATIONS DEPARTMENT INTERGOVERNMENTAL RADIO PROGRAM Ken Burke, CPA* Clerk of the Circuit Court Ex Officio County Auditor Robert

More information

Proposed Coverage Enhancement Site in Thermopolis WY

Proposed Coverage Enhancement Site in Thermopolis WY Proposed Coverage Enhancement Site in Thermopolis WY There are two proposed Coverage Enhancement Sites for Thermopolis. One is at the Court House at 415 Arapahoe in Thermopolis, and the other is a cell

More information

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18 ADDENDUM NO. 1 The following clarifications, modifications and/or revisions to the

More information

Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment and Facilitate Infrastructure R56 Grounding Work

Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment and Facilitate Infrastructure R56 Grounding Work CITY OF MARTINEZ CITY COUNCIL AGENDA March 21, 2012 TO: FROM: SUBJECT: Mayor and City Council Gary D. Peterson, Chief of Police Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment

More information

CONCEPTS TO OPERATIONS, INC.

CONCEPTS TO OPERATIONS, INC. CHANNEL 16 PROJECT Presented by CONCEPTS TO OPERATIONS, INC. E-mail: cto@concepts2ops.com Web Site: www.concepts2ops.com APCO International Annual Conference Denver, Colorado Professionals Putting Good

More information

Public Safety Radio System. August 6, 2018

Public Safety Radio System. August 6, 2018 Public Safety Radio System August 6, 2018 Project overview Phase I Needs Assessment Coverage Capacity Resiliency & Redundancy Interoperability Encryption Phase II RFP Development Response Review Selection

More information

ADDENDUM 1. Forsyth County. Request for Qualifications and Proposals. Consulting Services for Public Safety Radio Communications

ADDENDUM 1. Forsyth County. Request for Qualifications and Proposals. Consulting Services for Public Safety Radio Communications March 27, 2018 Forsyth County Request for Qualifications and Proposals Consulting Services for Public Safety Radio Communications Qualifications and Proposals Will Be Received Until **Date Change** 12:00

More information

PALMETTO 800 History Project Cost

PALMETTO 800 History Project Cost PALMETTO 800 South Carolina has implemented the largest statewide emergency communications radio system in the nation. With over twenty thousand users, the system is available to federal, state, and local

More information

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission #2015-52 Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission Meeting Date: October 21, 2015 Request: Location: A Special Use Permit for a wireless communication

More information

Public Safety Radio System Update September 9, 2013

Public Safety Radio System Update September 9, 2013 Public Safety Radio System Update September 9, 2013 Bill Greeves, CIO John Higgins, Deputy CIO 1 Timeline Beginning in 2016, Motorola will no longer support the current system. Also, future upgrades are

More information

WIRELESS TELECOMMUNICATION FACILITIES. Chapter 15

WIRELESS TELECOMMUNICATION FACILITIES. Chapter 15 Title 9 Land Management Code WIRELESS TELECOMMUNICATION FACILITIES Chapter 15 9-15-1: PURPOSE: 9-15-2: DEFINITIONS: 9-15-3: APPLICABILITY: 9-15-4: MASTER PLAN REQUIRED: 9-15-5: ALLOWABLE USES: 9-15-6:

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 18, 2015 DATE: July 3, 2015 SUBJECT: U-3409-15-1 USE PERMIT for installation of telecommunications equipment at Mercedes-Benz of Arlington;

More information

FM Transmission Systems Course

FM Transmission Systems Course FM Transmission Systems Course Course Description An FM transmission system, at its most basic level, consists of the transmitter, the transmission line and antenna. There are many variables within these

More information

County of Marin. Application for 700 MHz Frequencies

County of Marin. Application for 700 MHz Frequencies County of Marin Application for 700 MHz Frequencies The County of Marin respectfully submits the following application for licensing 700 MHz frequencies in accordance with the Region 6 700 MHz plan. County

More information

SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions. Point-to-Point Connectivity in the 4.9 GHz Public Safety Band

SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions. Point-to-Point Connectivity in the 4.9 GHz Public Safety Band SOLUTIONS Paper Wi4 Fixed: Point-to-Point Wireless Broadband Solutions Point-to-Point Connectivity in the 4.9 GHz Public Safety Band Contents pg Section 3 FCC and the Public Safety RF Band 3 Qualified

More information

The Eastern Shore of Virginia Radio Analysis

The Eastern Shore of Virginia Radio Analysis The Eastern Shore of Virginia Radio Analysis The Commonwealth of Virginia, Virginia Information Technologies Agency, by request of the Eastern Shore of Virginia 911 Commission 1, has analyzed communications

More information

Sec Radio, television, satellite dish and communications antennas and towers.

Sec Radio, television, satellite dish and communications antennas and towers. Se 2106. - Radio, television, satellite dish and communications antennas and towers. (a) (b) (c) (d) No guy wires or other accessories associated with any antenna or tower shall cross, encroach, or otherwise

More information

SAN DIEGO CITY SCHOOLS

SAN DIEGO CITY SCHOOLS S C D S SAN DIEGO CITY SCHOOLS EUGENE BRUCKER EDUCATION CENTER 4100 Normal Street, San Diego, CA 92103-2682 Executive Summary Board Date: November 13, 2001 Office of the Superintendent SUBJECT: Resolution

More information

Wireless Video Surveillance Challenge or Opportunity? Mike Intag, RCDD RSM, Firetide

Wireless Video Surveillance Challenge or Opportunity? Mike Intag, RCDD RSM, Firetide Wireless Video Surveillance Challenge or Opportunity? Mike Intag, RCDD RSM, Firetide Why wireless? Agenda Understanding wireless and RF Wireless mesh Case studies Construction site security Burj Dubai

More information

EXHIBIT 2 Page 1 of 5 Reasonable Necessity for Eminent Domain Action Tuttle Property Final Report PREPARED JANUARY 2018 FOR BROWARD COUNTY, FLORIDA MissionCriticalPartners.com State College Office 690

More information

MARIN COUNTY ON BEHALF OF MARIN EMERGENCY RADIO AUTHORITY (MERA) RADIO COMMUNICATIONS SYSTEM

MARIN COUNTY ON BEHALF OF MARIN EMERGENCY RADIO AUTHORITY (MERA) RADIO COMMUNICATIONS SYSTEM MARIN COUNTY ON BEHALF OF MARIN EMERGENCY RADIO AUTHORITY (MERA) RADIO COMMUNICATIONS SYSTEM REQUEST FOR PROPOSALS EXECUTIVE SUMMARY When Marin County calls 911, your dispatcher sends help with a Motorola

More information

An E911 Location Method using Arbitrary Transmission Signals

An E911 Location Method using Arbitrary Transmission Signals An E911 Location Method using Arbitrary Transmission Signals Described herein is a new technology capable of locating a cell phone or other mobile communication device byway of already existing infrastructure.

More information

Broadcasting Decision CRTC

Broadcasting Decision CRTC Broadcasting Decision CRTC 2015-575 PDF version Reference: Part 1 applications posted on 10 April 2015 Ottawa, 22 December 2015 Torres Media Ottawa Inc. Ottawa, Ontario Application 2015-0266-7 Pontiac

More information

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE Moline Illinois CODE OF ORDINANCES Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE SEC. 8-9300. TITLE. The title of this division shall be the Emergency Radio System Coverage

More information

Get in Sync and Stay that Way

Get in Sync and Stay that Way Get in Sync and Stay that Way CHOOSING THE RIGHT FREQUENCY FOR YOUR WIRELESS TIMEKEEPING SOLUTION Prepared by Primex Wireless 965 Wells Street Lake Geneva, WI 53147 U.S. 800-537-0464 Canada 800-330-1459

More information

PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN#

PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN# PROJECT DESCRIPTION AT&T Proposed Telecommunications Facility 2700 Watt Avenue APN# 269-0090-051 Proposed Use AT&T is currently deploying the infrastructure of its wireless communications network in California.

More information

City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification

City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification Authorized Agent for Verizon Wireless City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification With current efforts underway to establish the required infrastructure

More information

9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade

9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade 9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade 1. Program Area: PUBLIC PROTECTION 2. Identify agencies and departments involved. Sheriff-Coroner 3. Is the Strategic Priority new

More information

EMWIN System Radio Coverage Update Prepared for the Urban Drainage and Flood Control District. Prepared by

EMWIN System Radio Coverage Update Prepared for the Urban Drainage and Flood Control District. Prepared by EMWIN System Radio Coverage Update Prepared for the Urban Drainage and Flood Control District Prepared by January, 2004 Radio Coverage Update Table of Contents Page I. Executive Summary Radio Coverage

More information

Building Canada s Advanced Wireless Networks: Protocol Development

Building Canada s Advanced Wireless Networks: Protocol Development Building Canada s Advanced Wireless Networks: Protocol Development Meeting with Markham Development Services Committee May 20, 2014 1 Origins of this meeting Development Services Committee resolved to

More information

WASHINGTON COUNTY-WIDE Digital Trunked P25 Phase 2 Interoperable EMERGENCY RADIO, PAGING & SYSTEM for sheriff, police, fire

WASHINGTON COUNTY-WIDE Digital Trunked P25 Phase 2 Interoperable EMERGENCY RADIO, PAGING & SYSTEM for sheriff, police, fire 2018-2019 WASHINGTON COUNTY-WIDE Digital Trunked P25 Phase 2 Interoperable EMERGENCY RADIO, PAGING & 9-1-1 SYSTEM for sheriff, police, fire departments ems first responders & ambulance Operating from a

More information

Public Safety Radio Communications

Public Safety Radio Communications Public Safety Radio Communications Dare County, North Carolina September 18, 2006 INDEPENDENT PROFESSIONAL QUALITY DRIVEN EXPERIENCED User Organizations Sheriff County Fire Departments County EMS Departments

More information

TRANSBAY JOINT POWERS AUTHORITY. REQUEST FOR PROPOSALS No TWO-WAY RADIO SYSTEM

TRANSBAY JOINT POWERS AUTHORITY. REQUEST FOR PROPOSALS No TWO-WAY RADIO SYSTEM RANBAY JOIN POWR AUHORIY RQU FOR PROPOAL No. 18-02 WO-WAY RADIO YM QUION & ANWR: et No. 2 A participant in the May 8 Webx and site walk provided the attached signal strength readings from tests conducted

More information

ORDINANCE NO. BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING:

ORDINANCE NO. BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF CHEYENNE, WYOMING: ORDINANCE NO. ENTITLED: AN ORDINANCE PURSUANT TO SECTIONS 1.1.6 AND 2.4.1 OF THE CHEYENNE UNIFIED DEVELOPMENT CODE ( UDC ), REPLACING UDC SECTION 5.8.1 IN RESPONSE TO THE RAPIDLY CHANGING TECHNOLOGY AND

More information

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING July 31, 2018 6:00 PM Commissioners Chamber Call to order and Establishment of a Quorum Invocation and Pledge of Allegiance Approval

More information

SUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION

SUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION STAFF REPORT MEETING DATE: August 20, 2013 TO: City Council 75 Rowland Way #200 Novato, CA 94945-3232 (415) 899-8900 FAX (415) 899-8213 www.novato.org FROM: James Berg, Chief of Police SUBJECT: MARIN EMERGENCY

More information

Verizon Wireless 3003 E Harmony Road, Combined Project Development Plan and Final Plan, #FDP150014

Verizon Wireless 3003 E Harmony Road, Combined Project Development Plan and Final Plan, #FDP150014 ITEM NO FDP150014 MEETING DATE May 20, 2015 STAFF Noah Beals ADMINISTRATIVE HEARING OFFICER STAFF REPORT PROJECT: APPLICANT: OWNER: Verizon Wireless 3003 E Harmony Road, Combined Project Development Plan

More information

XPANDAcell Repeaters. Carrier Class Solutions to Expand Your Cellular Coverage.

XPANDAcell Repeaters. Carrier Class Solutions to Expand Your Cellular Coverage. XPANDAcell Repeaters Carrier Class Solutions to Expand Your Cellular Coverage http://www.xpandacell.com What it does RPT-9000 solves coverage problem Repeats LTE/UMTS/CDMA/GSM signals from a cell site

More information

DESIGN AND DEVELOPMENT STANDARDS FOR WIRELESS FACILITIES IN THE PUBLIC RIGHTS-OF-WAY

DESIGN AND DEVELOPMENT STANDARDS FOR WIRELESS FACILITIES IN THE PUBLIC RIGHTS-OF-WAY DESIGN AND DEVELOPMENT STANDARDS FOR WIRELESS FACILITIES IN THE PUBLIC RIGHTS-OF-WAY The following Design and Development Standards are subject to change at any time at the sole discretion of the City

More information

ORDINANCE NO WHEREAS, the Planning Commission clarified minor changes to the SAF ordinance on May 24, 2018; and

ORDINANCE NO WHEREAS, the Planning Commission clarified minor changes to the SAF ordinance on May 24, 2018; and ATTACHMENT 1 ORDINANCE NO. 2018- AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF AMERICAN CANYON AMENDING THE AMERICAN CANYON MUNICIPAL CODE TO ADOPT A NEW SECTION 19.53, WHICH PROVIDES A MINISTERIAL PERMIT

More information

Wireless Communication Facility Development Ordinance

Wireless Communication Facility Development Ordinance Wireless Communication Facility Development Ordinance Ordinance No. Adopted AN ORDINANCE AMENDING TITLE 14, THE ZONING ORDINANCE OF THE CITY OF JONESBORO, ARKANSAS, ESTABLISHING STANDARDS FOR THE LOCATION,

More information

Wind Power GeoPlanner. Land Mobile Report - UPDATE

Wind Power GeoPlanner. Land Mobile Report - UPDATE Prepared on Behalf of Iberdrola Renewables, LLC December 13, 2012 Table of Contents 1. Introduction - 1-2. Summary of Results - 1-3. Impact Assessment - 3-4. Conclusions - 4-5. Recommendations & Mitigation

More information

Chapter 22 Wireless Telecommunications Facilities

Chapter 22 Wireless Telecommunications Facilities Chapter 22 Wireless Telecommunications Facilities Section 10:22:1 Purpose Section 10:22:2 Authority Section 10:22:3 Jurisdiction Section 10:22:4 Enactment Section 10:22:5 Interpretation, Conflict, and

More information

Public Safety Radio System Request For Proposal. Otsego County, NY. Addendum #2

Public Safety Radio System Request For Proposal. Otsego County, NY. Addendum #2 Otsego County, NY Addendum #2 January 29, 2013 Table of Contents 1 RFP Modifications... 4 2 Vendor Questions... 5 Addendum #2 2 Blue Wing Services List of Figures No table of figures entries found. List

More information

Antenna Basics. A general guide for antenna selection and installation techniques

Antenna Basics. A general guide for antenna selection and installation techniques Antenna Basics A general guide for antenna selection and installation techniques Introduction to RF antennas What is an antenna, how does it work? An antenna is a metallic device that releases electromagnetic

More information

PUP Zoning RTH B-3 B-1C M-1 A-1 R-4 B-2 B-3C B-1 B-2 R-3 R-2A M-1C R-2A C-1 R-6 A-1 R-3 B-2 A-1 A-1 R-3 B-3 A-1 B-1 R-4 R-5 B-2 B-1

PUP Zoning RTH B-3 B-1C M-1 A-1 R-4 B-2 B-3C B-1 B-2 R-3 R-2A M-1C R-2A C-1 R-6 A-1 R-3 B-2 A-1 A-1 R-3 B-3 A-1 B-1 R-4 R-5 B-2 B-1 WOODROW AVE WINNETKA AVE ELIZABETH ST STUKELEY LN CONLEY RD R-3 R-4 TAMIANI AVE R-2A SANDPIPER D R AZALEA AVE WAXWING D R LARK DR FLICKER DR SORA D R RTH HUMMINGBIRD RD BOBWHITE LN R-2A THRUSH LN B-1C

More information

The Vertical Buddi Beam on 20m using no Coils.

The Vertical Buddi Beam on 20m using no Coils. The Vertical Buddi Beam on 20m using no Coils. design by Lou Rummel KE4UYP In this article I am going to describe a totally new way to construct and use a very old design the two element Yagi antenna.

More information