MBFC Tunnel Monitoring

Size: px
Start display at page:

Download "MBFC Tunnel Monitoring"

Transcription

1 MBFC Tunnel Monitoring The Marina Bay Financial Centre (MBFC) is a purpose-built financial district of the new downtown. The construction of the Marina Bay Financial Centre development comprises two phases, with the first phase completed in 3Q The entire development is due for completion in The first phase consists of the office Towers 1 (33 storeys) and 2 (50 storeys), Marina Bay Residences with 428 units and 93,800 square feet of the retail mall. The second phase comprises office Tower 3 (46 storeys), 82,200 square feet of the retail mall and Marina Bay Suites (which will complete in 2013). Monitoring Solution Providers Pte Ltd (MSP) is actively involved in the monitoring of the existing North South line MRT tunnel and Common Service Tunnel (CST) for various clients (e.g. BFC Development Pte Ltd, Econ Geotech Pte Ltd and Tritech Engineering and Testing Pte Ltd) at about 10 sub-contracts for the development at the Marina Bay Financial Centre. The monitoring zones for the sub-contracts overlap each other with many total stations and glass prisms deployed near to each other in intertwining networks. A brief description of the monitoring work carried out by MSP at MBFC with accompanying sketches and layout plans are given below. Protecting Your Future with Monitoring Solution 1 of 20 Tunnel Monitoring

2 (1) PROPOSED COMMERCIAL CIAL DEVELOPMENT AT MARINA BOULEVARD / CENTRAL BOULEVARD (BUSINESS AND FINANCIAL CENTRE) AUTOMATIC TUNNEL MONITORING SYSTEM SUB-CONTRACT AUTOMATED TUNNEL MONITORING SYSTEM IN MRT TUNNEL BETWEEN MARINA BAY AND RAFFLES PLACE MRT STATION (For BFC Development Pte Ltd) An Automated Deformation Monitoring System (ADMS) was deployed at the existing North South line MRT tunnel between Marina Bay & Raffles Place MRT station (from NB CH to NB CH in North Bound and SB CH to SB CH in South Bound) for tunnel displacement and vibration monitoring during the construction activity of the project. This ADMS was officially commissioned on 8 August The instruments used for the system are: 6 Nos. of Sokkia NET1-m-II total stations; 11 Nos. of RST Instantel Minimate Plus TM vibration monitoring sensors The Sokkia NET1-m-II total stations were installed in the MRT tunnel at locations and chainages stated below: Total station Description on Location Chainage STN 1 Inside North Bound Central Wall Crossover Tunnel CH STN 2 Inside North Bound Crossover Tunnel CH STN 3 Inside South Bound Crossover Tunnel CH STN 4 Inside North Bound Cut & Cover Tunnel CH STN 5 Inside North Bound Bored Tunnel CH STN 6 Inside North Bound Bored Tunnel CH The monitoring sensors are located within the North & South Bound MRT tunnel at locations and chainages: Vibration sensor Description on Location Chainage VB 1 Inside North Bound Crossover Tunnel CH VB 2 Inside North Bound Crossover Tunnel CH VB 3 Inside North Bound Crossover Tunnel CH VB 4 Inside North Bound Crossover Tunnel CH VB 5 Inside North Bound Crossover Tunnel CH VB 6 Inside South Bound Crossover Tunnel CH VB 7 Inside South Bound Crossover Tunnel CH VB 8 Inside South Bound Crossover Tunnel CH VB 9 Inside South Bound Crossover Tunnel CH VB 10 Inside South Bound Crossover Tunnel CH VB 11 Inside South Bound Crossover Tunnel CH GMB104 Glass Prism profile will be fixed throughout the influence zone. A typical tunnel cross section will consist of a profile of 4 prisms, except for the Crossover Tunnel where 2 tunnel cross section combines consist of 8 prisms. Protecting Your Future with Monitoring Solution 2 of 20 Tunnel Monitoring

3 STN3 STN2 STN1 to STN3 STN1 Protecting Your Future with Monitoring Solution 3 of 20 Tunnel Monitoring

4 Reference Prism at Marina Bay Station REF (SB) & REF (NB) Protecting Your Future with Monitoring Solution 4 of 20 Tunnel Monitoring

5 Since the monitoring zone involves a cross over section, for the purpose of standardizing the chainage of the prisms in theses location, all prism chainages would be based on the South Bound Tunnel. Fix reference prisms on each side to ensure good redundancy calculation and quality of processed data. The number of reference prism will depend on the site condition. For this particular site, fix reference prisms will be located at both ends of the tunnel (Raffles Place and Marina Bay MRT Station) as there is a monitoring site adjacent to the proposed site currently. As such, it is not adequate to provide fix reference prisms just outside the monitoring zone. The system for each end of the tunnel requires nine (9) fix reference prisms arranged in three (3) prisms per profile. Protecting Your Future with Monitoring Solution 5 of 20 Tunnel Monitoring

6 The 360 change point reference prisms are specially made to reflect EDM emitted from the SOKKIA NET 1m-II from any direction. These prisms are introduced in the system as connection prisms to form a link between 2 or more Total Station. Typical Layout of Prism Side Elevation View Note: Importance of providing good survey geometry between two connecting Automated Total Station, the prisms are spread over 20-30m providing various length and various height and adequate redundancy A generalized layout diagram for ATMS is shown below. Cross-sectional sectional STN STN STN STN STN STN Sending Modem Comms Receiving Modem 24V Uninterrupted Power Supply with minimum 4 hours backup Protecting Your Future with Monitoring Solution 6 of 20 Tunnel Monitoring

7 (2) PROPOSED COMMERCIAL DEVELOPMENT AT MARINA BOULEVARD / CENTRAL BOULEVARD (MARINA BAY FINANCIAL CENTRE) PHASE II AUTOMATIC TUNNEL MONITORING SYSTEM SUB-CONTRACT AUTOMATED TUNNEL MONITORING SYSTEM IN MRT TUNNEL BETWEEN MARINA BAY AND RAFFLES PLACE MRT STATION INITIAL REPORT (For BFC Development Pte Ltd) An Automated Deformation Monitoring System (ADMS) was deployed at the existing North- South line MRT tunnel between Marina Bay & Raffles Place MRT station (from NB CH to NB CH 59376, NB CH to NB CH in North Bound and SB CH to SB CH 59378, SB CH to SB CH in South Bound) for tunnel displacement and vibration monitoring during the construction activity of the project. The ADMS was officially commissioned on 8 August The instruments used for the system are: 2 Nos. of Sokkia NET1m-II total stations 3 Nos. of RST Instantel Minimate Plus TM vibration monitoring sensors Protecting Your Future with Monitoring Solution 7 of 20 Tunnel Monitoring

8 (3) PROPOSED COMMERCIAL DEVELOPMENT AT MARINA BOULEVARD / CENTRAL BOULEVARD (BUSINESS AND FINANCIAL CENTRE) PHASE 2 AUTOMATIC TUNNEL MONITORING SYSTEM SUB-CONTRACT AUTOMATED TUNNEL MONITORING SYSTEM IN MRT TUNNEL BETWEEN MARINA BAY AND RAFFLES PLACE MRT STATION (For BFC Development Pte Ltd) Phase 2 R2 An Automated Deformation Monitoring System (ADMS) was deployed at the existing North- South line MRT tunnel between Marina Bay & Raffles Place MRT Station (from NB CH to NB CH in the North Bound and SB CH to SB CH in the South Bound) for tunnel displacement and vibration monitoring during the construction activity of the Marina Business Financial Centre Phase 2 R2 development. The Initial Readings were obtained on 26 th December 2007 and the instruments used for the system are: 2 Nos. of Sokkia NET1m-II total stations installed in the MRT tunnel at location and chainage as stated below. Total station Description on Location Chainage STN 3 Inside South Bound Crossover Tunnel CH STN 4 Inside North Bound Box Tunnel CH STN 8 Inside South Bound Box Tunnel CH Protecting Your Future with Monitoring Solution STN3 to STN4 & STN8 8 of 20 Tunnel Monitoring

9 (4) PROPOSED COMMERCIAL DEVELOPMENT AT MARINA BOULEVARD / CENTRAL BOULEVARD (BUSINESS AND FINANCIAL CENTRE) PHASE 2 AUTOMATIC TUNNEL MONITORING SYSTEM SUB-CONTRACT AUTOMATED TUNNEL MONITORING SYSTEM IN MRT TUNNEL BETWEEN MARINA BAY AND RAFFLES PLACE MRT STATION (For BFC Development Pte Ltd) Phase 2 - T3 An Automated Deformation Monitoring System (ADMS) was deployed at the existing North- South line MRT tunnel between Marina Bay & Raffles Place MRT Station (from NB CH to NB CH in North Bound and SB CH to SB CH in South Bound for tunnel displacement and vibration monitoring during the construction activity of the Marina Business Financial Centre Phase 2 T3 development. The Initial Readings were obtained on 26 th December 2007 and the instruments used for the system are: 3 Nos. of Sokkia NET1m-II total stations installed in the MRT tunnel at location and chainage as stated below. Total station Description on Location Chainage STN 1 Inside North Bound Central Wall Crossover Tunnel CH STN 2 Inside North Bound Crossover Tunnel CH STN 7 Inside South Bound Crossover Tunnel CH Protecting Your Future with Monitoring Solution 9 of 20 Tunnel Monitoring

10 STN1 & STN7 Protecting Your Future with Monitoring Solution 10 of 20 Tunnel Monitoring

11 Monitoring Solution Providers Pte Ltd (MSP) is also involved in the monitoring of existing North South line MRT tunnel for the construction of the Downtown Line in the Marina Bay area. Two of the Land Transport Authority s Downtown Line construction projects which MSP participated in are C901 and C907. PROPOSED DOWNTOWN LINE C901 AUTOMATIC TUNNEL MONITORING SYSTEM FOR NORTH SOUTH LINE MRT TUNNEL FROM MARINA BAY STATION TO OVER RUN AREA Contract 901 is for the construction and completion of the Marina Bay station and tunnels. The scope of the contract also includes addition and alteration works to the existing North South Line (NSL) at Marina Bay station, diversions as well as demolition of an underpass. An Automated Deformation Monitoring System (ADMS) was deployed at the existing North South Line MRT station and tunnel from Marina Bay Station to the overrun area for structural deformation and displacement monitoring during the construction activity of the project. The ADMS was officially commissioned on 8 July 2008 and the instruments used for the system are: 3 Nos. of Sokkia NET1m-II in North Bound Tunnel 3 Nos. of Sokkia NET1-m-II in South Bound Tunnel The manual monitoring of the Marina Bay MRT Station, North & South tunnel monitoring towards Over Run was covered from NB CH to NB CH with a total length of 325m and from SB CH to SB CH with a total length of 320m. The monitoring system consists of 4 points inside the Bored Tunnel for each ring (i.e. Top, Bottom, Crown & Track Bed). 4 points were also installed for the Station Box (i.e Right, Track Bed, Right Bottom & Right Top). Protecting Your Future with Monitoring Solution 11 of 20 Tunnel Monitoring

12 DOWNTOWN LINE: CONTRACT 907 The Land Transport Authority (LTA) has awarded the civil works contract (C907) for Downtown Line Stage 1 Landmark Station to Taisei Corporation, valued at S$230.3 million. The Landmark Station is located at Central Boulevard near the Marina Bay Financial Centre. The contract covers the construction and completion of the Landmark Station and tunnels. The station will be connected via underground subway links to the Marina Bay Financial Centre. The contract also includes the construction and completion for the main trunk road, Central Boulevard, above the station. An Automated Deformation Monitoring System (ADMS) was deployed at the existing North South Line MRT station and tunnel from Marina Bay Station to Raffles Place Station for the structural deformation and displacement monitoring during the construction of the project. The instruments used for the system are: 3 Nos. of Zeiss ELTA S10 in the tunnel as stated below. Total station Description on Location Chainage STN N1 Inside North Bound Box Tunnel CH STN N2 Inside North Bound Box Tunnel CH STN N3 Inside North Bound Box Tunnel CH Nos. of Sokkia NET 1m-II total stations with bracket installed in the MRT tunnel at location stated below: Total station Description on Location Chainage STN 9 Under Existing MBFC STN 1 CH STN 10 Under Existing MBFC STN 2 CH STN 11 Under Existing MBFC STN 3 CH Nos. vibration monitoring sensors located within the North & South Bound Tunnel at location stated below: Vibration sensor Description on Location Chainage VM 1 Inside North Bound Crossover Tunnel CH VM 2 Inside South Bound Crossover Tunnel CH MB104 monitoring glass prisms were fixed throughout the influence zone. A typical tunnel cross-section will consist of a profile of 4 prisms, while at the Crossover Tunnel, 2 tunnel cross-sections combine to 8 prisms. Fix reference prisms located at both ends of the tunnel (Raffles Place and Marina Bay MRT Station ensure good redundancy calculation and quality of processed data. The number of reference prism will depend on the site condition. As there is a monitoring site adjacent to the proposed site, it is not adequate to provide fix reference prisms just outside the monitoring zone. The system for each end of the tunnel requires 9 fix reference prisms arranged in 3 prisms per profile. 360 change point reference prisms are specially made to reflect EDM emitted from the Sokkia NET1m-II from any direction. These prisms are introduced in the system as connection prisms to form a link between 2 or more total stations. Protecting Your Future with Monitoring Solution 12 of 20 Tunnel Monitoring

13 Protecting Your Future with Monitoring Solution 13 of 20 Tunnel Monitoring

14 AUTOMATED TUNNEL MONITORING SYSTEM FOR COMMON SERVICE TUNNEL MBFC PARCEL (T3 & R2) - 3 nos. Sokkia NET1-m Total Stations on wall mounted bracket will be installed in the CST tunnels. STN A Under MBFC Parcel T3 STN B Under MBFC Parcel R2 STN C Under MBFC Parcel R2 - GMB104 glass prism will be fixed throughout the influence zone. A typical tunnel cross section will consist of a profile of 4 prisms; refer to the cross-section diagram of the tunnel below. Typical Sectional Layout Fix reference prisms are needed to ensure good redundancy calculation and quality of processed data. The number of reference prisms will depend on the site condition. For this particular site, fix reference prisms will be located at both ends of the tunnel outside each monitoring zone. There will be at least 6 reference prisms at each of the monitoring zone. A generalized layout t diagram for ADMS in one tunnel bound is shown below. Protecting Your Future with Monitoring Solution 14 of 20 Tunnel Monitoring

15 DOWNTOWN LINE: CONTRACT 907 CST An Automated Deformation Monitoring System (ADMS) was deployed at the existing Common Service Tunnel at Parcel R2 and Parcel T3 for the structural deformation and displacement monitoring during the construction of the project. The instruments used for the system are: 2 Nos. of Sokkia NET1-m in Parcel R2 1 No. of Sokkia NET1-m in Parcel T3 Protecting Your Future with Monitoring Solution 15 of 20 Tunnel Monitoring

16 Protecting Your Future with Monitoring Solution 16 of 20 Tunnel Monitoring

17 Protecting Your Future with Monitoring Solution 17 of 20 Tunnel Monitoring

18 PROJECT PHOTOGRAPHS Protecting Your Future with Monitoring Solution 18 of 20 Tunnel Monitoring

19 Protecting Your Future with Monitoring Solution 19 of 20 Tunnel Monitoring

20 33 Ubi Avenue 3, #05-31, VERTEX Singapore Tel: Fax: Website: Co. Reg No: W Protecting Your Future with Monitoring Solution 20 of 20 Tunnel Monitoring

PART XII: TOPOGRAPHIC SURVEYS

PART XII: TOPOGRAPHIC SURVEYS PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface

More information

The Design and Philosophy of the Tunneling Survey for the Klang Valley Underground Mass Rapid Transit Project

The Design and Philosophy of the Tunneling Survey for the Klang Valley Underground Mass Rapid Transit Project The Design and Philosophy of the Tunneling Survey for the Klang Valley Underground Mass Rapid Transit, Malaysia Keywords: Underground tunnelling survey, surface network, underground network, control traverse.

More information

BALDUR ORDER SHEET. BALDUR // LED light line system. Name: Contact: Project:

BALDUR ORDER SHEET. BALDUR // LED light line system. Name: Contact: Project: Name: Contact: Project: BALDUR ORDER SHEET BALDUR // LED light line system STEP 1: Select trunking NORDEON BALDUR is the new generation in light line systems offering a flexible system for both general

More information

Please Print Clearly. Applicant s Signature: Date:

Please Print Clearly. Applicant s Signature: Date: Application for CERTIFICATE OF APPROPRIATENESS FEES: Staff Review: $20; HPC Reviews: $50-Minor Project; $150-Moderate Project; $500-Major Project Check with staff for correct amount. (Cash/check only make

More information

CONNOLS-AIR. AIR TERMINAL UNITS Engineered for Versatile Application and Energy Conservation

CONNOLS-AIR. AIR TERMINAL UNITS Engineered for Versatile Application and Energy Conservation CONNOLS-AIR AIR TERMINAL UNITS Engineered for Versatile Application and Energy Conservation Marina Bay Business District is considered the trendiest and most technologically advance area for business in

More information

New Instrumentation technologies

New Instrumentation technologies New Instrumentation technologies Daniel Naterop, Solexperts Ltd. Switzerland Technologies used for other application than for geotechnical instrumentation have been recently used successfully for civil

More information

AREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 1 BERRY PLACE LONDON EC1V

AREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 1 BERRY PLACE LONDON EC1V AREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 1 BERRY PLACE LONDON EC1V 1 BERRY PLACE LONDON EC1V Project Number 36889 Contents Report Issue Status Survey Report Summary of Areas Reference

More information

JCDECAUX MALL ADVERTISING ION ORCHARD 2010

JCDECAUX MALL ADVERTISING ION ORCHARD 2010 JCDECAUX MALL ADVERTISING ION ORCHARD 2010 1 ABOUT ION ORCHARD FAST FACTS Strategically located above Orchard MRT, at the junction of Orchard and Paterson Road 8 Retail Levels within a 218m-tall, 56-storey

More information

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger PIARC WG5 Complex Underground Road Networks Part A Case Studies - appendices Appendix 3.1 - CANADA / Québec Montréal tunnels Ville-Marie & Viger 1. SUMMARY The Ville-Marie and Viger tunnel complex is part

More information

SOUTH BAY CORPORATE CENTER

SOUTH BAY CORPORATE CENTER F O R L E A S E 1 9 2, 6 6 9 S F C o r p o r at e H e a d q u a r t e r s O f f i c e a n d R & D B u i l d i n G South Bay Corporate Center is a prominent office and R&D corporate headquarters facility

More information

CHAPTER 7 Total Station Surveying. CE 316 March 2012

CHAPTER 7 Total Station Surveying. CE 316 March 2012 CHAPTER 7 Total Station Surveying CE 316 March 2012 249 7.1 Introduction Total station surveying - defined as the use of electronic survey equipment used to perform horizontal and vertical measurements

More information

Special-purpose Micrometers and Calipers SMALL TOOL INSTRUMENTS AND DATA MANAGEMENT

Special-purpose Micrometers and Calipers SMALL TOOL INSTRUMENTS AND DATA MANAGEMENT Special-purpose Micrometers and Calipers SMALL TOOL INSTRUMENTS AND DATA MANAGEMENT 2 Mitutoyo Is Ready to Deliver the Best Possible Solution. In addition to standard measuring tools, many special-purpose

More information

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION This application, including the Conceptual Review Presentation, must be completed and submitted to the Downtown Development Review Board (DDRB) Staff twenty (20) business days prior to the upcoming DDRB

More information

Retail Space for Lease Le Quest (TOP 2020)

Retail Space for Lease Le Quest (TOP 2020) Space for Lease Le Quest (TOP 2020) West Avenue 6, Singapore Artist s Impression g Mixed commercial residential development located in an up and coming residential enclave g Surrounded by over 15,000 households

More information

Newton Suites Residential Tower

Newton Suites Residential Tower Newton Suites Residential Tower 60 Newton Road Singapore Architects WOHA Architects Pte Ltd / R Hassell, W M Summ Singapore Clients UOL Development Singapore Commission 2003 Design 2003-2004 Construction

More information

TOTAL STATION WORKSHOP

TOTAL STATION WORKSHOP DEPARTMENT OF CIVIL ENGINEERING TOTAL STATION WORKSHOP DATE : 11/03/2017 TIME : 11:00am to 4:30pm Gyanmanjari Institute of Technology, Bhavnagar WORKSHOP ON TOTAL STATION 1 CONTENTS REPORT SUMMERY... 3

More information

3647 N SOUTHPORT AVE CHICAGO, IL 60613

3647 N SOUTHPORT AVE CHICAGO, IL 60613 DEVELOPER P.O. BOX 1041 EVANSTON, ILLINOIS 60204 P: (773) 529-3700 P: (773) 977-8072 C O P Y R I G H T 2 0 1 7, S U L L I V A N G O U L E T T E W I L S O N, L T D. ARCHITECT SULLIVAN GOULETTE & WILSON,

More information

Wireless Facility Engineering Review

Wireless Facility Engineering Review Page 1 of 7 Wireless Facility Engineering Review AT&T Application for Site (CNU 4989) 2095 Rose Street, Berkeley, CA 2/18/2013 RCC Consultants, Inc. Western Regional Office 266 E. 33 rd Street, San Bernardino,

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please

More information

AREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 6 MARKET ROAD LONDON N7

AREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 6 MARKET ROAD LONDON N7 AREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 6 MARKET ROAD LONDON N7 Area Measurement Report 6 MARKET ROAD LONDON N7 Contents Report Issue Status Introduction Survey Report Summary of Areas

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

Civil Engineering Overview

Civil Engineering Overview Welcome to a Civil Engineering Overview by Mark S. Ditko from Zen Engineering A Civil Overview What is Civil Engineering What Civil Engineers do What a good Civil knows Civil Engineering basics Show how

More information

NSR100 millimeter wave radar User manual

NSR100 millimeter wave radar User manual NSR100 millimeter wave radar User manual Hunan Nanoradar Science and Technology Co., Ltd. Disclaimers Thanks to purchase this product. There is web pages about NSR100 radar sensor in our official website

More information

EMWIN System Radio Coverage Update Prepared for the Urban Drainage and Flood Control District. Prepared by

EMWIN System Radio Coverage Update Prepared for the Urban Drainage and Flood Control District. Prepared by EMWIN System Radio Coverage Update Prepared for the Urban Drainage and Flood Control District Prepared by January, 2004 Radio Coverage Update Table of Contents Page I. Executive Summary Radio Coverage

More information

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects;

More information

Standard Chartered PLC Board Member Visits Ghana

Standard Chartered PLC Board Member Visits Ghana Standard Chartered PLC Board Member Visits Ghana Accra 4 June 2006 -- Mr. Richard Meddings, member of the Board of Standard Chartered PLC and Group Executive Director of Standard Chartered Bank with responsibility

More information

Downtown Memphis Review Board Application

Downtown Memphis Review Board Application Downtown Memphis Review Board Application Program 114 North Main Street Memphis, TN 38103 901.575.0540 downtownmemphis.com Packet information revised on July 26, 2011 DESIGN REVIEW PROCESS 1. Pre-Design

More information

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue J Nov 17. Appendix C

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue J Nov 17. Appendix C APPENDIX C APPROVAL PROCESS SUBMISSION FORMS STEP 2A CONCEPT DESIGN SUBMISSION To: Edward Utteridge From: Bristol BS1 6AL Retailer: c.c. Piers Gorman piers.gorman@landsecurities.com Jonathan Everitt jeveritt@oriumdesign.co.uk

More information

OCS Inspection System

OCS Inspection System OCS Inspection System CATENARY EYE is an advanced OCS inspection system developed by Meidensha s latest image processing technology on edge detection and pattern-matching Inspection / Measuring Items &

More information

2560 LORD BALTIMORE DRIVE BALTIMORE, MD SJPI.COM

2560 LORD BALTIMORE DRIVE BALTIMORE, MD SJPI.COM 2560 LORD BALTIMORE DRIVE BALTIMORE, MD 410.788.0100 SJPI.COM MELFORD TOWN CENTER ABOUT Bowie's LIVE WORK PLAY Community About Melford Town Center Melford Town Center is a 466-acre comprehensive mixed-use

More information

New seismic reflection and other geophysical equipment available to CREWES

New seismic reflection and other geophysical equipment available to CREWES New geophysical equipment New seismic reflection and other geophysical equipment available to CREWES Malcolm B. Bertram, Don C. Lawton, Eric V. Gallant, Robert R. Stewart ABSTRACT A new 600 channel seismic

More information

PERENNIAL REAL ESTATE HOLDINGS LIMITED

PERENNIAL REAL ESTATE HOLDINGS LIMITED PERENNIAL REAL ESTATE HOLDINGS LIMITED (Incorporated in the Republic of Singapore) (Company Registration No. 200210338M) ENTRY INTO JOINT VENTURE TO INVEST IN HSR HEALTHCARE INTEGRATED MIXED-USE DEVELOPMENTS

More information

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

FIT-OUT PERMIT REQUEST (GENERAL WORKS) Dubai Maritime City P.O. Box 8988 Dubai, UAE T +97143450626 F +97143450116 www.dubaimaritimecity.com FIT-OUT PERMIT REQUEST (GENERAL WORKS) PROJECT DETAILS Project Name: Plot Number: TENANT DETAILS Contact

More information

Create styles that control the display of Civil 3D objects. Copy styles from one drawing to another drawing.

Create styles that control the display of Civil 3D objects. Copy styles from one drawing to another drawing. NOTES Module 03 Settings and Styles In this module, you learn about the various settings and styles that are used in AutoCAD Civil 3D. A strong understanding of these basics leads to more efficient use

More information

STATE STREET CORRIDOR MASTER PLAN Land Use Plan. IBI GROUP March 10, 2015

STATE STREET CORRIDOR MASTER PLAN Land Use Plan. IBI GROUP March 10, 2015 STATE STREET CORRIDOR MASTER PLAN Land Use Plan IBI GROUP March 10, 2015 Framework Plan Growth Nodes defining a Downtown 27 Mobility Signals/Boulevard/Street Network 28 Mobility Multiway Boulevard 29 Land

More information

THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2)

THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2) THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2) Building Control Acts 1990 and 2007 Application for a Revised Disability Access Certificate Building Control

More information

Certificate of Appropriateness (CoA) Checklist

Certificate of Appropriateness (CoA) Checklist Certificate of Appropriateness (CoA) Checklist This Checklist is intended to assist you in preparing a complete application for submittal. Occasionally, additional items may be required to complete the

More information

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION Christine S. Primiano, Principal Planner Room 14, City Hall, Jay Street SCHENECTADY, NY 12305-1938 518.382.5147 cprimiano@schenectadyny.gov www.cityofschenectady.com

More information

Historic Preservation DESIGN GUIDELINES

Historic Preservation DESIGN GUIDELINES CITY OF GRANBURY Historic Preservation DESIGN GUIDELINES 8. SIGNS Commentary: These guidelines apply to all signs within a City of Granbury historic district or signs on the property of a City of Granbury

More information

Tower. BHKs. 70Families. only. Thane (W) MAHARERA NO. - P

Tower. BHKs. 70Families. only. Thane (W) MAHARERA NO. - P 1 2&3 Tower BHKs only 70Families Thane () MAHARRA O. - P5170000734 A stilt +12 storey tower strategically located in the heart of Thane city, heth Fiona comes to you from the house of heth Corp renowned

More information

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary Richmond Official Community Plan CITY CENTRE AREA ST. ALBANS SUB-AREA PLAN Bylaw 7100 Schedule 2.10A ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN KEY MAP PLAN AREA MAP

More information

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603 869 86 863 W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI 53703 ph 608-709-1250 Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603 Re Submit/15002_Titleblock.dwg 868 SN LEGEND W 867

More information

MEASURING THE DYNAMIC DEFORMATION OF BRIDGES USING A TOTAL STATION

MEASURING THE DYNAMIC DEFORMATION OF BRIDGES USING A TOTAL STATION Proceedings, 11 th FIG Symposium on Deformation Measurements, Santorini, Greece, 23. MEASURING THE DYNAMIC DEFORMATION OF BRIDGES USING A TOTAL STATION Emily Cosser, Gethin W Roberts, Xiaolin Meng, Alan

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

Melford Bowie, MD 20715

Melford Bowie, MD 20715 Melford Bowie, MD 20715 2560 LORD BALTIMORE DRIVE BALTIMORE, MD 410.788.0100 SJPI.COM MELFORD ABOUT Bowie's LIVE WORK PLAY Community About Melford Melford is a 466-acre comprehensive mixed-use community

More information

Comm Series DC Power Supplies Radio Base Station Covers Battery Chargers DC UPS Backup Systems

Comm Series DC Power Supplies Radio Base Station Covers Battery Chargers DC UPS Backup Systems Product Catalog 2014 Condensed Version INNOVATIVE CIRCUIT TECHNOLOGY LTD. ICT has been providing DC power conversion products since 1986 for two-way wireless communications, fixed wireless broadband and

More information

ADMINISTRATIVE DESIGN REVIEW Information

ADMINISTRATIVE DESIGN REVIEW Information Information The following information summarizes the City s Administrative Design Review (ADR) provisions. If you have any questions, please contact the Planning and Development Services Department at

More information

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

dpd client assistance memo CAM   Plot Plan Requirements Basic Plot Plan What is a Plot Plan? dpd Seattle Department of Planning and Development formerly the Department of Design, Construction and Land Use CAM 103 client assistance memo Plot Plan Requirements November 2001 Applications for City

More information

5.3. Area of Polygons and Circles Play Area. My Notes ACTIVITY

5.3. Area of Polygons and Circles Play Area. My Notes ACTIVITY Area of Polygons and Circles SUGGESTED LEARNING STRATEGIES: Think/Pair/Share ACTIVITY 5.3 Pictured below is an aerial view of a playground. An aerial view is the view from above something. Decide what

More information

AUTOMATION OF 3D MEASUREMENTS FOR THE FINAL ASSEMBLY STEPS OF THE LHC DIPOLE MAGNETS

AUTOMATION OF 3D MEASUREMENTS FOR THE FINAL ASSEMBLY STEPS OF THE LHC DIPOLE MAGNETS IWAA2004, CERN, Geneva, 4-7 October 2004 AUTOMATION OF 3D MEASUREMENTS FOR THE FINAL ASSEMBLY STEPS OF THE LHC DIPOLE MAGNETS M. Bajko, R. Chamizo, C. Charrondiere, A. Kuzmin 1, CERN, 1211 Geneva 23, Switzerland

More information

Green Valley Pharmacy 2415 Shirlington Road

Green Valley Pharmacy 2415 Shirlington Road Nov 23 2018 ARLINGTON COUNTY, VIRGINIA HISTORICAL AFFAIRS AND LANDMARK REVIEW BOARD APPLICATION FOR CERTIFICATE OF APPROPRIATENESS DATE Z- - -HD RPC# (TO BE COMPLETED BY STAFF) DESIGNATED PROPERTY: Name

More information

Old School Square Historic Arts District (OSSHAD)

Old School Square Historic Arts District (OSSHAD) SECTION 4.4.24 Section 4.4.24 Old School Square Historic Arts District (OSSHAD) (A) Purpose and Intent: The Old School Square Historic Arts District (OSSHAD) is a mixed use district which is intended to:

More information

KNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION

KNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION KNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION PROPERTY ADDRESS: DISTRICT: Fourth and Gill H-1 906 Luttrell St 37917 FILE NO.: 11-I-13-HZ MEETING DATE: 11/21/2013

More information

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF Through inherited experience of its personnel and through its own projects, DNEC have accumulated over 30 years of precast concrete expertise.

More information

HorizontalBore SUBSEA TREE

HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.

More information

Combining Terrestrial and GNSS Technolgies for Geodetic Monitoring. Neil ASHCROFT Leica Geosystems Engineering Segment Manager

Combining Terrestrial and GNSS Technolgies for Geodetic Monitoring. Neil ASHCROFT Leica Geosystems Engineering Segment Manager Combining Terrestrial and GNSS Technolgies for Geodetic Monitoring Neil ASHCROFT Leica Geosystems Engineering Segment Manager Structural Monitoring Technolgies Introduction Monitoring Instrumentation Reflectors,

More information

Landmarks Preservation Commission Tacoma Economic Development Department Culture and Tourism Division

Landmarks Preservation Commission Tacoma Economic Development Department Culture and Tourism Division Tacoma Economic Development Department Culture and Tourism Division 747 Market Street Room 1036 Tacoma WA 98402-3793 253.591.5220 APPLICATION FOR DESIGN REVIEW FOR SINGLE FAMILY RESIDENTIAL PROPERTIES

More information

EMERGENCY COMMUNICATIONS

EMERGENCY COMMUNICATIONS EMERGENCY COMMUNICATIONS FY2004-2010 1. BACKGROUND ISSUES The Emergency Communications element of the capital plan is comprised of three projects concerning emergency radio communications, computer aided

More information

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG) GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) TO ARLINGTON COUNTY GOVERNMENT (ACG) Effective Date: February 15, 2016 Prepared by: Arlington

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

Applying for a Site Development Review

Applying for a Site Development Review Guide What is it? Applying for a Who approves it? ensures that new buildings or land uses are compatible with their sites and with the surrounding environment, other development, and traffic circulation.

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

Street Canyon Tool. User Guide CERC

Street Canyon Tool. User Guide CERC Street Canyon Tool User Guide CERC ADMS Street Canyon Tool Version 2.0 User Guide August 2018 Cambridge Environmental Research Consultants Ltd. 3, King s Parade Cambridge CB2 1SJ UK Telephone: +44 (0)1223

More information

HGS (INDIA) LIMITED. A variety of 1-C and 3-C waterproof land cases can accommodate the HG-6 geophone.

HGS (INDIA) LIMITED. A variety of 1-C and 3-C waterproof land cases can accommodate the HG-6 geophone. HG-6 Geophone Element Based on the technology transfer for manufacturing the SM range of geophones from Sensor Nederland BV, HGS (India) Limited (erstwhile Geosource India Limited) offers the HG-6 geophone

More information

Metrological Telecommunication System Development Project

Metrological Telecommunication System Development Project Philippines Metrological Telecommunication System Development Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Site Map:

More information

Staff Review Date: May 11, 2016 HDC PID#

Staff Review Date: May 11, 2016 HDC PID# Charlotte Historic District Commission Application for a Certificate of Appropriateness Staff Review Date: May 11, 2016 HDC 2016-086 PID# 07102333 LOCAL HISTORIC DISTRICT: PROPERTY ADDRESS: SUMMARY OF

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT 209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT

More information

MEDICI ARTIST LOFTS. An affordable housing project by DFA dev. Artifex West Studio. 34 units - 7ea 3 bed, 17ea 2 bed & 10ea 1 bed

MEDICI ARTIST LOFTS. An affordable housing project by DFA dev. Artifex West Studio. 34 units - 7ea 3 bed, 17ea 2 bed & 10ea 1 bed MEDICI ARTIST LOFTS An affordable housing project by DFA dev. 34 units - 7ea 3 bed, 7ea bed & 0ea bed The proposed, 34 unit, affordable housing and et rate project is located at the intersection of N Sutter

More information

Analytical Engineering Limited. Company profile About us Core business areas & transferable skills Clients Company mission statement

Analytical Engineering Limited. Company profile About us Core business areas & transferable skills Clients Company mission statement Consultant Engineers Analytical Engineering Limited Onshore and Offshore Engineering Solutions for the Petroleum Industry and more Company profile About us Core business areas & transferable skills Clients

More information

F210 Vision Sensor Flow Menus and Macro Capability

F210 Vision Sensor Flow Menus and Macro Capability F210 Vision Sensor Flow Menus and Macro Capability Reduce the overhead involved in system planning and introduction. The Three Features of Flow Menus and Macros The Flow Menus and Macros of the F500-UM3FE/UM3ME

More information

Swiber Holdings Limited 1Q FY08 Results Briefing

Swiber Holdings Limited 1Q FY08 Results Briefing Swiber Holdings Limited 1Q FY08 Results Briefing 15 May 2008 Page 1 Financial Highlights 1Q 2008 Page 2 Key highlights a record quarter Revenue (US$ m) Net Profit (US$ m) 160 1Q Y-O-Y: 266.9% 1Q Y-O-Y:

More information

A Member of the. Integrated Metering Technologies

A Member of the. Integrated Metering Technologies A T u n e d M e a s u r e A Member of the Integrated Metering Technologies AMR Ready ARAD 3G easy connection to any automated metering reading system. No Moving Parts No wear - Therefore low maintenance.

More information

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE 1 SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE F.Q. Wei, K. Dreyer, U. Fehlmann, J.L. Pochon and A. Wrulich SLS / Paul Scherrer Institute CH5232 Villigen PSI Switzerland ABSTRACT The Swiss Light Source

More information

LEICA TC2003/TCA2003. High-performance total station for precision surveying to millimetre accuracies with quality certificate

LEICA TC2003/TCA2003. High-performance total station for precision surveying to millimetre accuracies with quality certificate LEICA TC2003/TCA2003 High-performance total station for precision surveying to millimetre accuracies with quality certificate LEICA TC2003/TCA2003 high-performance total stations The TC2003/TCA2003 high-performance

More information

Residential Plot Plans

Residential Plot Plans Residential Plot Plans Planning & Development Services/Building Safety Division 1 Riverfront Plaza Ste. 110 Lawrence, KS 66044 (785)832-7700 Fax (785)832-3110 Email: buildinginspections@lawrenceks.org

More information

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206) CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA 98040 (206) 275-7605 SUBMITTAL REQUIREMENTS FOR DESIGN COMMISSION APPROVAL & SIGNAGE APPROVAL PURPOSE: Design Commission

More information

Property Information: Property Description: Proposed Use/Construction: Commercial Industrial Agricultural Residential (over 2 units)

Property Information: Property Description: Proposed Use/Construction: Commercial Industrial Agricultural Residential (over 2 units) Fairbanks North Star Borough Department of Community Planning 907 Terminal Street/P.O. Box 71267 Fairbanks, Alaska 99707-1267 (907) 459-1260 Fax: (907) 205-5169 planning@fnsb.us COMMERCIAL / INDUSTRIAL

More information

IC System TM Design Guide v 2.3

IC System TM Design Guide v 2.3 IC System TM Design Guide v 2.3 Updated August 2016 IC System TM Product Definitions... 3 Integrated Control Interface (ICI)... 4 Integrated Control Module (ICM)... 5 Integrated Control Surge Device (ICSD)...

More information

A T u n e d M e a s u r e

A T u n e d M e a s u r e A T u n e d M e a s u r e AMR Ready ARAD 3G built-in and Easy connection to any automated metering reading system. No Moving Parts No wear - Therefore low maintenance. ARAD is proud to introduce the OCTAVE,

More information

SITE PLAN REVIEW GUIDELINES Rev. 2016

SITE PLAN REVIEW GUIDELINES Rev. 2016 SITE PLAN REVIEW GUIDELINES Rev. 2016 The Site Plan Review process mandates that all information required in the Zoning Resolution and on the checklist be submitted and/or indicated on the site plan before

More information

RD:JVP:JMD File No. C /25/2016 ORDINANCE NO.

RD:JVP:JMD File No. C /25/2016 ORDINANCE NO. ORDINANCE NO. AN ORDINANCE OF THE CITY OF SAN JOSE REZONING CERTAIN REAL PROPERTY OF APPROXIMATELY 8 ACRES, SITUATED ON THE NORTH SIDE OF PIERCY ROAD, APPROXIMATELY 450 FEET EAST OF HELLYER AVENUE (455

More information

Checklist for Minor Plan Modification

Checklist for Minor Plan Modification Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

Wuxi OptonTech Ltd. Structured light DOEs without requiring collimation: For surface-emitting lasers (e.g. VCSELs)

Wuxi OptonTech Ltd. Structured light DOEs without requiring collimation: For surface-emitting lasers (e.g. VCSELs) . specializes in diffractive optical elements (DOEs) and computer generated holograms (CGHs)for beam shaping, beam splitting and beam homogenizing (diffusing). We design and provide standard and custom

More information

Area Referencing Report in accordance with the RICS Code of Measuring Practice Culverdon, Pyrcroft Road, Chertsey KT16 9LE

Area Referencing Report in accordance with the RICS Code of Measuring Practice Culverdon, Pyrcroft Road, Chertsey KT16 9LE Area Referencing Report in accordance with the RICS Code of Measuring Practice Culverdon, Pyrcroft Road, Chertsey KT16 9LE Prepared for Prepared by Berwick Hill Properties Tom Pugh BSc (Hons) MRICS Alistair

More information

shedkm architects complete first Ruskin Square office in Croydon

shedkm architects complete first Ruskin Square office in Croydon Press release December 2016 shedkm architects complete first Ruskin Square office in Croydon One Ruskin Square by shedkm architects Jack Hobhouse London and Liverpool based practice shedkm architects has

More information

Minor Site Plan Review Process

Minor Site Plan Review Process Minor Site Plan Review Process Pre-Application Conference Community Meeting (optional) Submit Application Determination of Completeness Staff Report (optional) Technical Review Committee Decision Notice

More information

SITE SURVEY REPORT. Contract number: Customer: Site Name: Site Location: (City, Country) Sub-contractor: Requested by TSS/Project Manager Date:

SITE SURVEY REPORT. Contract number: Customer: Site Name: Site Location: (City, Country) Sub-contractor: Requested by TSS/Project Manager Date: Contract number: Customer: Site Name: Site Location: (City, Country) SITE SURVEY REPORT Sub-contractor: Requested by TSS/Project Manager Date: Survey Date: Surveyor: Survey: CONTRACT NUMBER: SITE Survey

More information

MASTER SIGN PLAN APPLICATION

MASTER SIGN PLAN APPLICATION MASTER SIGN PLAN APPLICATION Pursuant to Article 7, Section 155.713 of the Unified Development Code (UDC), no sign, unless specifically exempted under Section 155.403(D) of the UDC may be erected, located

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

CHAPTER 18 Lighting Regulations

CHAPTER 18 Lighting Regulations CHAPTER 18 Lighting Regulations Section 18.1 Purpose The purpose of this Chapter is to regulate certain outdoor lighting in order to reduce or prevent light pollution. These regulations are intended to

More information

IBIS range. GeoRadar Division. GeoRadar Division. Static and Dynamic Monitoring of Civil Engineering Structures by Microwave Interferometry

IBIS range. GeoRadar Division. GeoRadar Division. Static and Dynamic Monitoring of Civil Engineering Structures by Microwave Interferometry Static and Dynamic Monitoring of Civil Engineering Structures by Microwave Interferometry Garry Spencer and Mark Bell 1 PRODUCTS IBIS range APPLICATIONS IBIS - FL LANDSLIDE & DAM MONITORING IBIS - FM SLOPE

More information

Innovation through precision, quality and performance. ARAD AMR Solutions. AMR Ready. No Moving Parts

Innovation through precision, quality and performance. ARAD AMR Solutions. AMR Ready. No Moving Parts ARAD AMR Solutions ARAD Technologies net management service (ATUS. COM) supplies the utility with a range of effective tools to manage and control its water, gas & electricity network. The system includes

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

Digital Amplifier Ultrasonic Sensor E4C-UDA Series

Digital Amplifier Ultrasonic Sensor E4C-UDA Series Digital Amplifier Ultrasonic Sensor E4C-UDA Series A Reflective Sensor That Handles All Types of Sensing Object Colors and Patterns Sensor Heads Head Variations 300-mm Model E4C-DS30 Sensing Distance:

More information

Bowie, MD LORD BALTIMORE DRIVE BALTIMORE, MD SJPI.COM

Bowie, MD LORD BALTIMORE DRIVE BALTIMORE, MD SJPI.COM Bowie, MD 20715 2560 LORD BALTIMORE DRIVE BALTIMORE, MD 410.788.0100 SJPI.COM MELFORD TOWN CENTER ABOUT Bowie's LIVE WORK PLAY Community About Melford Town Center Melford Town Center is a 466-acre comprehensive

More information

Neighborhood historic house tour. Photo courtesy of the Los Angeles Public Library.

Neighborhood historic house tour. Photo courtesy of the Los Angeles Public Library. MyPlace The purpose of MyPlace is to collect specific information about individual buildings or neighborhoods in an organized way through a variety of research activities. The research activities in MyPlace

More information