1 Transmission Outages Outage The McCall Rd. 500/230kV autotransformer will be opened for a couple of hours on Thursday October 23. This outage will isolate Effingham County generation from the transmission system. McCall Road TS Replacement of temperature devices on equipment The Hatch-Duval 500 kv line tripped out shortly before 11:00. The Florida outbound TTC is being reduced as a result of this outage. No estimate yet on time for a return to service. Please check the OASIS postings for updates. Homeland Macedonia 115 kv line. Work will be done at Saint George to remove breaker and isolation and replace switches. Work is scheduled to start at 07:00 Hrs 12/08/08 and end at 17:00 Hrs 12/19/08. Villa Rica - Wansley 500kV is expected to be out of service till 15:00 12/17/08 The Hatch-Duval 500 kv line has been taken out of service, Jan 13, 2009 at 13:24. No estimate yet on time for a return to service. Please check the SOCO OASIS postings for updates. Duration October 23, /10/ /12/ /10/08 12:00 noon TBA 12/08/ :00 Hr To 12/19/ :00 Hr 12/17/2008 until 15:00 Until further notice (check back for updates) ITS and Florida Official Transmission Outage For the Hatch - N. Tifton 500 kv line outage scheduled from 03/04/09 at 06:00 CPT until 03/20/09 at 17:00 CPT, the SOCO-Florida Interface will be reduced to 3200 MW. The Total Transfer Capability will be monitored and adjusted on a 2-day out basis and may be adjusted in real-time as conditions warrant. 6:00 CPT until 17:00 CPT

2 Outage notification: Bio Center 230kV Line is currently out due to damage and is scheduled to be out until 03/04/2009. Bio Hartwell Energy 230kV Operational Maintenance Testing from 03/15/09 6:00 to 16:30 500kV Bradley (TVA) Conasauga 500 kv Line outage scheduled to replace insulators 03/14/ :00 to 03/15/ :00 GTC has scheduled an outage on the Bio Center 230kV line on Sunday April 5. Outage notification: Bay Creek LG&E Monroe 230kV line. Unscheduled outage: Raccoon Creek Mitchell 230kV line Voltage drops occurred across phases 1 & 3. Emergency outage of the Hatch - Duval 500 kv line starting on 06/25/09 at 23:00 and ending on 06/26/09 at 05:00, the SOCO- Florida Interface will be reduced to 1200 MW. ITS Official Transmission Outage Outage of the East Point (TVA) - Miller (SoCo) 500kV line starting 07/07/09 at 08:00 until 07/10/09 at 16:00, the TVA-Southern Interface import limit will be reduced to 1700 MW. Outage of the East Point (TVA) - Miller (SoCo) 500kV line starting 07/14/09 through 07/17/09 from 09:00 to 18:00 each day, the TVA-Southern Interface import limit will be reduced to 1700 MW. Please note that this line will be returned to service at 18:00 each evening. For the emergency outage of the Hatch - Thalmann 500 kv line on 07/16/09 from 00:00 to 04:00, the SOCO-Florida Interface will be reduced to 2400 MW. Until 03/04/ /15/09 6:00 to 16:30 03/14/ :00 to 03/15/ :00 04/05/09 07:00 17:00 05/14/ /15/ /15/ :00 15:30 6/25/ :00 to 6/26/ :00 07/07/09 at 08:00 to 07/10/09 at 16:00 07/14/09 at 09:00 to 07/14/09 at 18:00 07/16/09 at 00:00 to 04:00

3 ITS Official Transmission Outage For the outage of the McIntosh (SoCo)- Purrysburg (SCPSA) 230kV TL starting at 9/30/09 7:00 until 9/30/09 9:00 the SOCO-SCPSA interface will be reduced to 128 MW. ITS Official Transmission Outage The Sequoyah - Bradley 500kV TL will be out of service from 10/05/09 at 04:00 until 10/09/09 at 16:00. This work may also necessitate opening the Bradley - Conasauga 500kV TL. The Loopers Farm - Oostanaula 230kV TL will be out of service from 10/05/09 at 07:00 until 10/06/09 at 17:00. For the concurrent outages of the Sequoyah - Bradley 500kV TL, the Bradley - Conasauga 500kV TL and the Loopers Farm - Oostanaula 230kV TL starting 10/05/09 at 04:00 until 10/06/09 at 17:00, the TVA-Southern interface limit will be reduced to 670MW. For the concurrent outages of the Sequoyah - Bradley 500kV TL and the Bradley - Conasauga 500kV TL starting 10/06/09 at 17:01 until 10/09/09 at 16:00, the TVA-Southern interface limit will be reduced to 780MW. If TVA determines that the Bradley - Conasauga 500kV can be safely left in service during the outage of the Bradley - Sequoyah 500kV TL, then for the concurrent outages of the Sequoyah - Bradley 500kV TL and the Loopers Farm - Oostanaula 230kV TL starting 10/05/09 at 04:00 until 10/06/09 at 17:00, the TVA-Southern interface limit will be reduced to 1550MW. 9/30/09 at 7:00 to 9:00 The Sequoyah - Bradley 500kV TL 10/05/09 at 04:00 until 10/09/09 at 16:00. Bradley - Conasauga 500kV TL and the Loopers Farm - Oostanaula 230kV TL 10/05/09 at 04:00 until 10/06/09 at 17:00 Sequoyah - Bradley 500kV TL and the Bradley - Conasauga 500kV TL starting 10/06/09 at 17:01 until 10/09/09 at 16:00 If TVA determines that the Bradley - Conasauga 500kV can be safely left in service during the outage of the Bradley - Sequoyah 500kV TL, then for the outage of the Sequoyah - Bradley 500kV TL starting 10/06/09 at 17:01 until 10/09/09 at 16:00, the TVA-Southern interface limit will be reduced to 1560MW. The Total Transfer Capability will be monitored and adjusted on a 2-day out basis and may be adjusted in real-time as system conditions warrant.

4 This interface notification replaces the prior notice. The outage of the Thalman - Duval 500kV TL previously scheduled for the evening of 10/07/09 has been delayed. In the same timeframe an outage will be taken of the the SOCO-Florida Interface will be reduced to 2000 MW. For the outage of the Thalmann - Duval 500kV TL starting at 10/13/09 22:00 until 10/14/09 06:00 the SOCO-Florida Interface will be reduced to 1300 MW. For the outage of the Hatch - Thalmann 500kV TL starting at 10/17/09 5:00 until 10/19/09 21:00 the SOCO-Florida Interface will be reduced to 2800 MW. ITS Official Transmission Outage For the outage of the Miller - South Bessemer 500kV TL starting at 10/19/09 7:00 until 10/29/09 17:00 the SOCO-TVA Interface will be reduced to 766 MW. For the outage of the Hatch - Thalmann 500kV TL starting at 10/24/09 5:00 until 10/26/09 21:00 the SOCO-Florida Interface will be reduced to 2900 MW. Pine Grove- Suwannee 230kV TL. starting at 10/7/09 19:00 until 10/8/09 09:00 Thalmann - Duval 500kV TL 10/13/09 22:00 until 10/14/09 06:00 Hatch - Thalmann 500kV TL 10/17/09 5:00 until 10/19/09 21:00 Miller - South Bessemer 500kV TL 10/19/09 7:00 until 10/29/09 17:00 Hatch - Thalmann 500kV TL 10/24/09 5:00 until 10/26/09 21:00

5 For the outage of the South Bainbridge - Sub 20 (TAL) 230kV TL starting at 12/10/09 06:00 until 12/11/09 16:00 the SOCO-Florida Interface will be reduced to 3300 MW. South Bainbridge - Sub 20 (TAL) 230kV TL 12/10/09 06:00 until 12/11/09 16:00 The Florida interface will re-evaluated on a 2-day out basis and may be adjusted in realtime as conditions warrant. For the outage of the South Bainbridge - Sub 20 (TAL) 230kV TL starting at 01/04/10 06:00 until 01/07/10 16:00 the SOCO-Florida Interface will be reduced to 3400 MW. The Florida interface will re-evaluated on a 2-day out basis and may be adjusted in real-time as conditions warrant. LUDOWICI PRIMARY 115kV Breaker Outage on 2/17/2010 A maintenance inspection has been scheduled on the Jesup 115kV line breaker at Ludowici substation on 08:00 to 02/17/ :00. ITS Official Transmission Outage For the outage of the Vogtle - Warthen 500kV TL starting at 02/17/10 08:00 until 02/18/10 16:30 the SOCO-VACAR Interface will be reduced to 1990 MW. For the outage of the North Tifton 230kV Bus #2 starting early morning at 02/23/10 01:00 until 02/23/10 04:00 the SOCO-Florida Interface will be reduced to 3200 MW. South Bainbridge - Sub 20 (TAL) 230kV TL 01/04/10 06:00 until 01/07/10 16:00 Jesup 115kv breaker at Ludowici 02/17/10 8:00 to 02/17/10 17:00 Vogtle - Warthen 500kV TL starting at 02/17/10 08:00 until 02/18/10 16:30 North Tifton 230kV Bus #2 02/23/10 01:00 until 02/23/10 04:00

6 Outage of the Duval (FP&L) - Hatch 500kV TL starting at 03/10/10 08:00 until 03/12/10 17:00. The SOCO-Florida Interface will be reduced to 1600 MW. This represents an additional 100MW reduction over previous anticipated reduction Update 8:05 a.m. No reduction on the SOCO-Florida Interface is anticpated. For the outage of the Pine Grove 115kV Bus #2 starting at 04/5/10 06:00 until 04/9/10 17:00 the SOCO-Florida Interface will be reduced to 2200 MW. Duval (FP&L) - Hatch 500kV TL starting at 03/10/10 08:00 until 03/12/10 17:00. Pine Grove 115kV Bus #2 starting at 04/5/10 06:00 until 04/9/10 17:00 The Florida interface will be re-evaluated on a 2-day out basis and may be adjusted in real-time as conditions warrant. For the outage of the Colerain - Kingsland 230kV TL starting at 04/12/10 07:00 until 04/13/10 07:00 the SOCO-Florida Interface will be reduced to 3300 MW. For the simultaneous outages of the East Moultrie 230kV bus, the East Moultrie 230/115kV transformer and the Colerain - Kingsland 230kV TL starting at 04/13/10 07:00 until 04/13/10 15:00 the SOCO-Florida Interface will be reduced to 3100 MW. For the outage of the Colerain - Kingsland 230kV TL starting at 04/13/10 15:00 until 04/14/10 16:00 the SOCO-Florida Interface will be reduced to 3300 MW. For the outage of the Hatch - Duval 500kV TL starting at 04/13/10 21:00 until 04/14/10 09:00 the SOCO-Florida Interface will be reduced to 1400 MW. Colerain - Kingsland 230kV TL at 04/12/10 07:00 until 04/13/10 07:00 East Moultrie 230kV bus, the East Moultrie 230/115kV transformer and the Colerain - Kingsland 230kV TL starting at 04/13/10 07:00 until 04/13/10 15:00 Colerain - Kingsland 230kV TL starting at 04/13/10 15:00 until 04/14/10 16:00 Hatch - Duval 500kV TL starting at 04/13/10 21:00 until 04/14/10 09:00

7 This notice replaces the prior notification regarding interface reduction associated with the Colerain - Kingsland 230kV TL outage which has been delayed to accommodate this work. For the outage of the Pine Grove Primary 230/115kV Bank and 115kV Bus #2 starting at 04/17/10 06:00 until 04/18/10 17:00 the SOCO-Florida Interface will be reduced to 2800 MW. For the outage of the Kingsland-Yulee 230kV TL starting at 04/26/10 06:00 until 05/14/10 16:30 the SOCO-Florida Interface will be reduced to 3200 MW. ITS Official Transmission Outage For the outage of the Miller Steam Plant (SoCo) - East Point(TVA) 500kV line starting 05/08/10 at 06:00 until 5/9/10 18:00, the TVA-Southern Interface import limit will be reduced to 900 MW. For the outage of the Duval (FP&L) - Hatch 500kV TL starting at 06/03/10 21:00 until 06/04/10 08:00 the SOCO-Florida Interface will be reduced to 1500 MW. Please take note that this outage occurs overnight during off-peak hours. Pine Grove Primary 230/115kV Bank and 115kV Bus #2 starting at 04/17/10 06:00 until 04/18/10 17:00 Kingsland-Yulee 230kV TL starting at 04/26/10 06:00 until 05/14/10 16:30 East Point(TVA) 500kV line starting 05/08/10 at 06:00 until 5/9/10 18:00 Duval (FP&L) - Hatch 500kV TL starting at 06/03/10 21:00 until 06/04/10 08:00 Bio - Center 230kV Line The Bio - Center 230kV line has been de-rated until further notice. The de-rating may impact available transfer capability on the Duke interface. Please check ATC/TTC postings for any potential impacts. For the Saturday outage of the Thomasville - West Valdosta 230kV TL starting at 06/12/10 06:00 until 06/12/10 17:00 the SOCO-Florida Interface will be Thomasville - West Valdosta 230kV TL starting at 06/12/10 06:00 until 06/12/10 17:00

8 reduced to 3300 MW. For the Sunday outage of the Thomasville - West Valdosta 230kV TL starting at 06/13/10 06:00 until 06/13/10 17:00 the SOCO-Florida Interface will be again reduced to 3300 MW. For the outage of the Pine Grove Primary - Twin Lakes 115kV TL starting at 06/17/10 22:00 until 06/18/10 05:00 the SOCO-Florida Interface will be reduced to 2800 MW. Please take note that this outage occurs overnight during off-peak hours. ITS Maintenance Work Yates to Yellowdirt 230kV line - Maintenance work to replace/install fiber optic cable will affect the Yates to Yellowdirt 230kV line from 6:00 to 17:00. ITS Maintenance Work Rescheduled Yates to Yellowdirt 230kV line - Maintenance work to replace/install fiber optic cable will affect the Yates to Yellowdirt 230kV line from 6:00 to 17:00. ITS Maintenance Work Rescheduled Yates to Yellowdirt 230kV line - Maintenance work to replace/install fiber optic cable will affect the Yates to Yellowdirt 230kV line from 6:00 to 17:00. Update: For the outage of the Pine Grove Primary - SUWANEE (PEF) 230kV TL starting at 10/04/10 06:00 until 10/07/10 17:00 the SOCO-Florida Interface will be reduced to 3300 MW. Thomasville - West Valdosta 230kV TL starting at 06/13/10 06:00 until 06/13/10 17:00 Pine Grove Primary - Twin Lakes 115kV TL starting at 06/17/10 22:00 until 06/18/10 05:00 Yates - Yellowdirt 230kV line starting at 6:00 to 17:00. Yates to Yellowdirt 230kV line starting at 6:00 to 17:00 Yates to Yellowdirt 230kV line starting at 6:00 to 17:00 Pine Grove Primary - SUWANEE (PEF) 230kV TL starting at 10/04/10 06:00 until 10/07/10 17:00 and 10/11/10 06:00 through 10/14/10 17:00. The outage of the Pine Grove Primary - SUWANEE (PEF) 230kV TL will restart on 10/11/10 06:00 and continue through 10/14/10 17:00. Again the SOCO-Florida Interface will be reduced to 3300 MW.

9 ITS Offician Transmission Outage Update: ITS Maintenance Work Ludowici Primary - Riceboro 115kV line - Maintenance work 6:00 to 17:30. : For the outage of the Hatch - Duval 500kV TL starting at 11/12/10 07:30 until 11/15/10 12:00 the SOCO-Florida Interface will be reduced to 1300 MW. This outage will not overlap the outages of the Pinegrove- Suwanee scheduled for 11/08/10-11/11/10 and 11/16/10-11/19/10. s: For the outage of the Hatch- Thalmann 500kV TL starting at 03/04/ :00 until 03/07/ :00 the SOCO-Florida Interface will be reduced to 3200 MW. s: For the outage of the S. Bainbridge - Sub kV TL starting tonight 03/01/2011 at 20:00 until 03/02/ :00 the SOCO-Florida Interface will be reduced to 2500 MW. Ludowici Primary - Riceboro 115kV line 6:00 to 17:30. Duval 500kV TL starting at 11/12/10 07:30 until 11/15/10 12:00 Hatch- Thalmann 500kV TL starting at 03/04/ :00 until 03/07/ :00 S. Bainbridge - Sub kV TL starting tonight 03/01/2011 at 20:00 until 03/02/ :00 s: The Hatch - Thalmann 500kV line will be switch back in service 14:00.SOCO-Florida transfers will be updated. Line Outage notification: Homeland to Macedonia 115kV line. Adding line traps and relocating SW at St. George substation 3/17/2011 at 08:00 OT until 3/24/ :30 OT. : For the outage of the Callaway - Port St. Joe 230kV TL starting Tuesday 05/17/2011 at 7:00 until Friday 05/20/ :00 the SOCO-Florida Interface is anticipated to be 3000 MW. ITS Transmission Outage notification: Construction outage The North Americus 230kV substation is scheduled to be taken out of service March 1 st thru April 9 th for bus reconstruction. Homeland to Macedonia 115kV line. 3/17/2011 at 08:00 OT until 3/24/ :30 OT. Callaway - Port St. Joe 230kV TL 05/17/2011 at 7:00 until Friday 05/20/ :00 North Americus 230kV Substation 03/1/ /09/2012

10 ITS Outage Due to work on the Bio- Center 230Kv Transmission Line, the Hartwell Energy Facility is limited to 120Mw per Unit. Expected duration of work is February 13 to March 4, ITS Outage The Conasauga Mosteller Springs 500kv Transmission line starting July 2, 2012 until Friday, July 6, This will limit deliveries into the ITS from the Murray facility. Until the line is back in service, all deliveries will require TVA transmission service. : Hatch has requested extending the outage of the Hatch Thalmann 500kV TL originally scheduled to end 2/17/13 17:00 until 2/21/13 17:00. The SOCO-Florida Interface will continue be reduced to around 2200 MW for the duration of this outage. The Florida interface will be re-evaluated on a 2-day out basis and may be adjusted in real-time as conditions warrant. Please note that multiple outages are currently contributing to the evaluated Florida interface capacity values. Bio-Center 230kV Transmission Line 2/13/2012-3/4/2012 Conasauga-Mosteller Springs Transmission Line 6/2/2012 6/6/2012 Hatch Thalmann 500kV Transmission Line 2/17/ :00 2/21/ :00 Disclaimer: For Information Only: The information contained in this report represents approved Georgia Transmission Corporation capital projects scheduled for completion over the next several years to expand the Integrated Transmission System (ITS). This report is intended to provide Transmission Customers with a listing of new construction activities on the ITS and is provided on a "For Information Only" basis. Any decision to use and/or rely in any way on this information for any purpose whatsoever is at the user's risk, and the user assumes sole responsibility for any such use and/or reliance as well as for any consequences thereof.

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g

1st Qua u r a ter e M e M e e t e in i g 2nd Qua u r a ter e M e M e e t e in i g 2011 SERTP Welcome SERTP 2011 First RPSG Meeting & Interactive Training Session 9:00 AM 3:00 PM 1 2011 SERTP The SERTP process is a transmission planning process. Please contact the respective transmission

More information

SUBJECT: Voltage Schedules in the Southern Balancing Area (SBA)

SUBJECT: Voltage Schedules in the Southern Balancing Area (SBA) BPO Procedure Bulk Power Operations Procedure #: BPO-1 SUBJECT: Voltage Schedules in the Southern Balancing Area (SBA) ASSOCIATED NERC STANDARD(S): VAR-001 (Voltage and Reactive Control) VAR-002 (Generator

More information

SUBJECT: Voltage Schedules and Reactive Resources in the Southern Balancing Area (SBA)

SUBJECT: Voltage Schedules and Reactive Resources in the Southern Balancing Area (SBA) BPO Procedure Bulk Power Operations Procedure #: BPO-1 SUBJECT: Voltage Schedules and Reactive Resources in the Southern Balancing Area (SBA) ASSOCIATED NERC STANDARD(S): VAR-001 (Voltage and Reactive

More information

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning

DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES. Transmission Planning DUKE ENERGY CAROLINAS TRANSMISSION SYSTEM PLANNING GUIDELINES Transmission Planning TABLE OF CONTENTS I. SCOPE 1 II. TRANSMISSION PLANNING OBJECTIVES 2 III. PLANNING ASSUMPTIONS 3 A. Load Levels 3 B. Generation

More information

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY Module 10 Initiation Code 1 M10 Initiation Code This is not the Initiating cause code The Outage Initiation Codes describe where an Automatic Outage was initiated on the power system. Element-Initiated

More information

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

Forced Oscillation Event Analysis

Forced Oscillation Event Analysis Forced Oscillation Event Analysis January 11, 2019 Event Ryan D. Quint, PhD, PE Senior Manager, Advanced System Analytics and Modeling, NERC February 2019 Background Oscillation observed across entire

More information

Energy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably.

Energy Delivery. Holland Bottom 500/161/115kV Substation. Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation Delivering energy safely, reliably, efficiently and affordably. For the past two summers, several substations in the Little Rock area showed low voltages with no

More information

At generating sites with 1200MW or greater of installed generating capacity.

At generating sites with 1200MW or greater of installed generating capacity. A. Introduction 1. 2. Number: 3. Purpose: To provide FRCC requirements for installation of Disturbance Monitoring Equipment (DME) and reporting of Disturbance data to facilitate analyses of events and

More information

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS S1. Standard Interconnection Methods with Typical Circuit Configuration for Single or Multiple Units Note: The protection requirements

More information

Experiences of Using Synchrophasors at Duke Energy

Experiences of Using Synchrophasors at Duke Energy 1 Experiences of Using Synchrophasors at Duke Energy Tim Bradberry, Megan Vutsinas, Kat Sico Duke Energy IEEE PES Tutorial July 19 th, 2016 Duke Energy s Phasor Plans Carolinas West Currently have 125

More information

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance

Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Imperfections in Coordinating Facility Ratings between Operations, Planning and Maintenance Nicholas Klemm Western Area Power Administration Rocky Mountain Region March 2012 Organizational Overview Western

More information

Trip of four 220 kv transmission lines at Mt Beauty on 24 November 2014

Trip of four 220 kv transmission lines at Mt Beauty on 24 November 2014 Trip of four 0 kv transmission lines at Mt Beauty on 4 November 04 AN AEMO POWER SYSTEM OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICTY MARKET PUBLISHED MARCH 05 Trip of four 0 kv transmission lines

More information

Voltage and Reactive Procedures CMP-VAR-01

Voltage and Reactive Procedures CMP-VAR-01 Voltage and Reactive Procedures CMP-VAR-01 NERC Standards: VAR-001-2 VAR-002-1.1b Effective Date: 07/31/2012 Document Information Current Revision 2.0 Review Cycle Annual Subject to External Audit? Yes

More information

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/ ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...

More information

Artificial Island Proposal Window

Artificial Island Proposal Window Artificial Island Proposal Window PJM TEAC Artificial Island Recommendation 6/16/2014 Artificial Island Timeline Past Timeline 9/13/2012 PJM discusses the trending Artificial Island operational issues

More information

Reliability Analysis Update

Reliability Analysis Update Reliability Analysis Update Transmission Expansion Advisory Committee August 11, 2016 2016 RTEP Window #3 Anticipated Scope and Timeline Anticipated 2016 RTEP Window #3 Anticipated 2016 RTEP Window #3

More information

Cause, Effect & Mitigation Strategies

Cause, Effect & Mitigation Strategies WSU HANDS ON RELAY SCHOOL 2019 Arc Flash Fault Cause, Effect & Mitigation Strategies Joe Xavier, Technical Manager West Region Arc Flash Fault - Agenda What is an Arc Flash? Why and when does Arc Flash

More information

QUESTIONNAIRE for Wind Farm Power Stations only

QUESTIONNAIRE for Wind Farm Power Stations only TRANSMISSION SYSTEM OPERATOR QUESTIONNAIRE for Wind Farm Power Stations only To be submitted by the Generation Licensees together with the Application for Connection Certificate according to IEC 61400-21

More information

Geoff Brown & Associates Ltd

Geoff Brown & Associates Ltd Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared

More information

Transmission Availability Data Systems Frequently Asked Questions

Transmission Availability Data Systems Frequently Asked Questions Transmission Availability Data Systems Frequently Asked Questions March 2016 NERC Report Title Report Date I Table of Contents Preface... iii Executive Summary... iv Chapter 1 TADS Inventory Related Questions...1

More information

Pick 3 Lottery 7 DAY NUMBERS-18. Numbers Good for the Week of Jan 17 Jan 23 (2016) AANewYork

Pick 3 Lottery 7 DAY NUMBERS-18. Numbers Good for the Week of Jan 17 Jan 23 (2016) AANewYork 1 Pick 3 Lottery 7 DAY NUMBERS-18 Numbers Good for the Week of Jan 17 Jan 23 (2016) AANewYork There were 47 Summary Report hits in Book 18. I thought it would be very interesting to see where these hits

More information

Southern Company Interconnection Requirements for Inverter-Based Generation

Southern Company Interconnection Requirements for Inverter-Based Generation Southern Company Interconnection Requirements for Inverter-Based Generation September 19, 2016 Page 1 of 16 All inverter-based generation connected to Southern Companies transmission system (Point of Interconnection

More information

Relay Communication Misoperations. Southwest Power Pool System Protection and Control Working Group

Relay Communication Misoperations. Southwest Power Pool System Protection and Control Working Group Relay Communication Misoperations Southwest Power Pool System Protection and Control Working Group Relay Misoperations The fundamental objective of power system protection schemes is to quickly provide

More information

Title: Path 24, Sierra Summit (PG&E) Intertie Number: NVN TOP 019. TOP Response to Transmission Limit Violations

Title: Path 24, Sierra Summit (PG&E) Intertie Number: NVN TOP 019. TOP Response to Transmission Limit Violations NV Energy Electrical System Control Center Title: Path 24, Sierra Summit (PG&E) Intertie Number: NVN TOP 019 TOP 008 1 Response to Transmission Limit Violations NERC Standards: EOP 001 0 Emergency and

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

FACILITIES STUDY PID 211 INTERCONNECTION LEWIS CREEK 138 KV

FACILITIES STUDY PID 211 INTERCONNECTION LEWIS CREEK 138 KV TRANSMISSION LINE & SUBSTATION PROJECTS COMPANY:ETI CUSTOMER: PID 211 FACILITIES STUDY EJO # F4PPTX0018 PID 211 INTERCONNECTION LEWIS CREEK 138 KV Revision: 1 Rev Issue Prepared Description of Revision

More information

SECTION VI SCOPE OF WORK

SECTION VI SCOPE OF WORK SECTION VI SCOPE OF WORK Overhead Lines and Underground cables VI 5.2 - i TABLE OF CONTENTS 5.2 SCOPE OF WORKS... 1 5.2.1 General... 1 5.2.2 Factory Acceptance Test... 2 5.2.3 33KV Lines and Cables...

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

Synchronous Measurement, Control, & Protection of Electric Power Systems. Dr. Edmund O. Schweitzer, III February 29, 2012

Synchronous Measurement, Control, & Protection of Electric Power Systems. Dr. Edmund O. Schweitzer, III February 29, 2012 Synchronous Measurement, Control, & Protection of Electric Power Systems Dr. Edmund O. Schweitzer, III February 29, 2012 Copyright SEL 2011 The Future of Power Systems No Blackouts New Sources Better Control

More information

European Amateur Chess Championship 2014

European Amateur Chess Championship 2014 European Amateur Chess Championship 2014 29th November - 07th December 2014 in Prague during the Prague Christmas Market 4**** Parkhotel Prague 7 groups / 2.800 Prizefunds The European Amateur Chess Championship

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

An Adaptive Protection Scheme for Optimal Overcurrent Relay Coordination in Interconnected Power Systems

An Adaptive Protection Scheme for Optimal Overcurrent Relay Coordination in Interconnected Power Systems From the SelectedWorks of Almoataz Youssef Abdelaziz March, 2000 An Adaptive Protection Scheme for Optimal Overcurrent Relay Coordination in Interconnected Power Systems Almoataz Youssef Abdelaziz Available

More information

Transmission System Phase Backup Protection

Transmission System Phase Backup Protection Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need

More information

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021

TRANSMISSION AND SUBSTATION PROJECT S EJO # GS0021 TRANSMISSION AND SUBSTATION PROJECT S OPERATING COMPANY: EGSI-TX CUSTOMER: COTTONWOOD ENERGY COMPANY, LP EJO # GS0021 FACILITY STUDY OPTIONAL SYSTEM UPGRADES FOR 1240 MW, IPP PROJECT NEAR HARTBURG, TX

More information

BIRD ISLAND FLATS SUBSTATION (BUILDING 67) ONE LINE DIAGRAM SET# 23 LEGEND DRAW-OUT CIRCUIT BREAKER DRAW-OUT CIRCUIT BREAKER, DRAW-OUT FUSES DRAW-OUT FUSES AND POTENTIAL TRANSFORMERS CABLE CONNECTION POTENTIAL

More information

Hamdy Faramawy Senior Application Specialist ABB Sweden

Hamdy Faramawy Senior Application Specialist ABB Sweden Design, Engineering and Application of New Firm Capacity Control System (FCCS) Mohammed Y. Tageldin, MSc. MIET Senior Protection Systems Engineer ABB United Kingdom mohammed.tageldin@gb.abb.com Hamdy Faramawy

More information

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED

More information

Zambezi (previously Caprivi) Link HVDC Interconnector: Review of Operational Performance in the First Five Years

Zambezi (previously Caprivi) Link HVDC Interconnector: Review of Operational Performance in the First Five Years 21, rue d Artois, F-758 PARIS B4-18 CIGRE 216 http : //www.cigre.org Zambezi (previously Caprivi) Link HVDC Interconnector: Review of Operational Performance in the First Five Years T G MAGG, Power System

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

Venue The Championships will be hosted at The International Convention Centre (ICC) in Durban. A Map will be sent out as soon as it is available.

Venue The Championships will be hosted at The International Convention Centre (ICC) in Durban. A Map will be sent out as soon as it is available. TO: All Chess Organizers, Coaches, Parents and Players CHESS CIRCULAR 1 / 2013: SOUTH AFRICA JUNIOR CHESS CHAMPIONSHIPS: DECEMBER 2013. 1. The purpose of this letter is to give parents more information

More information

Transmission Availability Data System Definitions

Transmission Availability Data System Definitions Table of Contents Transmission Availability Data System Definitions February 1, 2018 1 of 31 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents

More information

Standard MOD Area Interchange Methodology

Standard MOD Area Interchange Methodology A. Introduction 1. Title: Area Interchange Methodology 2. Number: MOD-028-2 3. Purpose: To increase consistency and reliability in the development and documentation of Transfer Capability calculations

More information

CNC Project Selkirk to NEO. Transmission Feasibility Assessment of Route Options and System Configurations

CNC Project Selkirk to NEO. Transmission Feasibility Assessment of Route Options and System Configurations CNC Project Selkirk to NEO Transmission Feasibility Assessment of Route Options and System Configurations 3 February 2011 Prepared for BC Hydro by: Phil Park, Consultant DISCLAIMER This document was prepared

More information

NOVEL PROTECTION SYSTEMS FOR ARC FURNACE TRANSFORMERS

NOVEL PROTECTION SYSTEMS FOR ARC FURNACE TRANSFORMERS NOVEL PROTECTION SYSTEMS FOR ARC FURNACE TRANSFORMERS Ljubomir KOJOVIC Cooper Power Systems - U.S.A. Lkojovic@cooperpower.com INTRODUCTION In steel facilities that use Electric Arc Furnaces (EAFs) to manufacture

More information

Money Bayou Outfall Relocation Project

Money Bayou Outfall Relocation Project Permit Sketches and General Notes Money Bayou Outfall Relocation Project 76 & 768 State Road (SR) Port St. Joe, Florida 2456 Section 9, Township 9S, Range W Gulf County, Florida 29 4.8' N, 85 7.2' W APPLICANT

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2014-03-31 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information

ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697.

ADDENDUM. (1) Ref. Regulation 33.4 (Page 643): (2) Ref. Regulation 71.2 (Page 676): Annexed as Appendix II to these Regulations at page 697. ADDENDUM No. AERC. 396/2012/Pt.-III/4.-Assam Electricity Regulatory commission (Terms and Conditions for determination of Multi Year tariff) Regulations, 2015 issued vide notification No. AERC.396/2012/Pt/-II/13

More information

INTEGRATED TRANSMISSION PLAN Glossary

INTEGRATED TRANSMISSION PLAN Glossary INTEGRATED TRANSMISSION PLAN Glossary SEPTEMBER 2017 GLOSSARY Term AC ACM asset health and asset health index (AHI) automatic underfrequency load shedding (AUFLS) availability bus cable capacitor bank

More information

Monitoring Voltage Stability using Real Time Dynamics Monitoring System

Monitoring Voltage Stability using Real Time Dynamics Monitoring System Monitoring Voltage Stability using Real Time Dynamics Monitoring System ipcgrid Meeting Voltage Stability Panel Session San Francisco March 26, 2013 Bharat Bhargava Electric Power Group. Built upon GRID-3P

More information

Harman Swim Center 7300 SW Scholls Ferry Road Beaverton, TriMet Route #56

Harman Swim Center 7300 SW Scholls Ferry Road Beaverton, TriMet Route #56 Harman Swim Center 7300 SW Scholls Ferry Road Beaverton, 97008 503-629-6314 TriMet Route #56 Aquatic Facility Supervisor: Heath Wright Feb. 8 - Mar. 27, 2016 Mar. 28 - June 19, 2016 Office Hours: Monday-Thursday

More information

G75 Irrigation Controller

G75 Irrigation Controller BACCARA G75 Irrigation Controller USERS GUIDE GETTING STARTED TABLE OF CONTENTS FEATURES PARTS IDENTIFICATION BASIC CONTROLLER FUNCTIONS INSTALLATION MANUAL OPERATION MAKING AN IRRIGATION SCHEDULE Irrigation

More information

System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion

More information

Saturday-Sunday Training Report

Saturday-Sunday Training Report DEPARTMENT OF ELECTRICAL ENGINEERING Saturday-Sunday Training Report 9 th -10 th January,2015 At 220 KV Substation, Shapur H.O.D Prof. M. M. Baraiya T. P. O Prof. M. M. Makavana Visited Student Nagariya

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

Lecturer: Dr. J B E AL-ATRASH No. of Pages: 4

Lecturer: Dr. J B E AL-ATRASH No. of Pages: 4 Philadelphia University Faculty of Engineering Dept. of Electrical Engineering Student Name: Student Number: Final Exam Course Title: Design of T&D System Date: 15 th June 2016 Course No: 610 515/650511

More information

Techniques for the Control of Steady State Voltage in MV and LV Networks

Techniques for the Control of Steady State Voltage in MV and LV Networks Techniques for the Control of Steady State Voltage in MV and LV Networks by Dr Robert Barr, Electric Power Consulting Pty Ltd Prof. Vic Gosbell, University of Wollongong Mr Chis Halliday, Electrical Consulting

More information

LINEAMPS LineAmps for all lines

LINEAMPS LineAmps for all lines LINEAMPS New System of Dynamic Line Ratings Electrotech Enterprises LLC, USA http://www.lineamps.com LINEAMPS New System of Dynamic Line Ratings Provides dynamic ratings of all lines in an electrical network

More information

Operationalizing Phasor Technology

Operationalizing Phasor Technology ELECTRIC POWER GROUP WEBINAR SERIES Operationalizing Phasor Technology Operationalizing Phasor Technology System Events Deciphering the Heartbeat of the Power Grid July 16, 2013 Webinar John W. Ballance

More information

Digital Lighting Systems, Inc.

Digital Lighting Systems, Inc. PD408-AN0-277 ANALOG 0-0 V 0-0V analog control 4 Channel x 2250 W Dimmer & Switch Packs 220/240/277 Volts operation PD408-AN0-277 4 circuit Analog -0V 4 x 8 A. Dimmer pack Serial Number Digital Lighting

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Notice of Network Change Russellville, AL Replacing Copper Facilities with Fiber and Digital Loop Carrier Systems

Notice of Network Change Russellville, AL Replacing Copper Facilities with Fiber and Digital Loop Carrier Systems Notice of Network Change Russellville, AL Replacing Copper Facilities with Fiber and Digital Loop Carrier Systems Carrier BellSouth Telecommunications, Inc. 675 West Peachtree Street NE Atlanta, Georgia

More information

Testing of 400 kv GIS

Testing of 400 kv GIS Testing of 400 kv GIS Robert le Roux, Dermot Dorgan, Brian Perry ESB International - Ireland Paper 028 1 Introduction The 400 kv transmission is designed for critical periods of low loading. Due to critical

More information

CAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24

CAISO Restricted - Do Not Distribute Outside of RC Project LOI and NDA Entities Page 1 of 24 RC0120A - RC IRO-010 Data Specification NOTE: Changes from Peak's Attachment A are highlighted in red in columns C through G Section Category Number Responsible Pa Data Item Data Transfer Method 1.1 Transmission

More information

Tri-County Area APPLICATION FORM

Tri-County Area APPLICATION FORM Tri-County Area APPLICATION FORM Special Transportation Discretionary (STF) 2016 STF Fund Discretionary Program for Regional Projects and Projects with Statewide Significance I. Organization s Information

More information

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays

More information

FACILITY RATINGS METHOD TABLE OF CONTENTS

FACILITY RATINGS METHOD TABLE OF CONTENTS FACILITY RATINGS METHOD TABLE OF CONTENTS 1.0 PURPOSE... 2 2.0 SCOPE... 3 3.0 COMPLIANCE... 4 4.0 DEFINITIONS... 5 5.0 RESPONSIBILITIES... 7 6.0 PROCEDURE... 8 6.4 Generating Equipment Ratings... 9 6.5

More information

Introduction to Substation Design TADP 542

Introduction to Substation Design TADP 542 Introduction to Substation Design TADP 542 Distribution Substations- Drawings and Documentation Instructor: Richard Snell Transmission & Distribution Program Drawings Drawings are prime method for communicating

More information

Fixed Series Compensation

Fixed Series Compensation Fixed Series Compensation High-reliable turnkey services for fixed series compensation NR Electric Corporation The Fixed Series Compensation (FSC) solution is composed of NR's PCS-9570 FSC control and

More information

Application Example Document ID: SA Rev. - September 24, 2004

Application Example Document ID: SA Rev. - September 24, 2004 Application Example Rev. - September 24, 2004 1 Summary Phasor based control of braking resistors A case study applied to large power oscillations experienced in the Swedish grid 1997 Phasor measurement,

More information

Definition of Bulk Electric System Phase 2

Definition of Bulk Electric System Phase 2 Definition of Bulk Electric System Phase 2 NERC Industry Webinar Peter Heidrich, FRCC, Standard Drafting Team Chair June 26, 2013 Topics Phase 2 - Definition of Bulk Electric System (BES) Project Order

More information

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING 1 PRACTICAL PROBLEMS WITH SUBSTATION EARTHING Dr Hendri Geldenhuys Craig Clark Eskom Distribution Technology This paper considers the issues around substation sites where the soil resistivity is of particularly

More information

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS CONNECTED TO THE DISTRIBUTION SYSTEM ORANGE AND ROCKLAND

More information

Progress Report on Failures of High Voltage Bushings with Draw Leads By Jim McBride and Larry Coffeen, JMX Services / NEETRAC 7/26/2010

Progress Report on Failures of High Voltage Bushings with Draw Leads By Jim McBride and Larry Coffeen, JMX Services / NEETRAC 7/26/2010 The Team: Jim McBride: IEEE Member Larry Coffeen: IEEE Senior Member President, JMX Services, Inc. Senior Research Engineer, NEETRAC BS EE Georgia Tech BS EE Georgia Tech Testing, DAQ, and Measurement

More information

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan Mark Hackney October 5-8, 2009 Amman, Jordan Energy Control Center Layout 2 Energy Control

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document Version 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying the definition.

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

E N G I N E E R I N G M A N U A L

E N G I N E E R I N G M A N U A L 1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn

More information

TTC/ATC 1.0 DEFINITIONS

TTC/ATC 1.0 DEFINITIONS TTC/ATC In this section: Definitions Total Transfer Capability (TTC) Available Transfer Capability (ATC) Counterflow ATC Postbacks in Pre-schedule of Grandfathered Agreements Real-Time Grant Remaining

More information

PRACTICAL CONSIDERATIONS FOR CONTROLLED SWITCHING OF POWER TRANSFORMERS

PRACTICAL CONSIDERATIONS FOR CONTROLLED SWITCHING OF POWER TRANSFORMERS Seminar / Workshop on Controlled Switching Possible Benefits for Transformers Applications PRACTICAL CONSIDERATIONS FOR CONTROLLED SWITCHING OF POWER TRANSFORMERS Esteban Portales Yvon Filion André Mercier

More information

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY Module 9 Fault Type Form 4.X 1 M9 Fault Type The descriptor of the fault, if any, associated with each Automatic Outage of an Element. 1. No fault 2. Phase-to-phase fault (P-P) 3. Single phase-to-ground

More information

Implementation of a High-Speed Distribution Network Reconfiguration Scheme

Implementation of a High-Speed Distribution Network Reconfiguration Scheme Implementation of a High-Speed Distribution Network Reconfiguration Scheme Greg Hataway and Ted Warren Schweitzer ngineering Laboratories, Inc Chris Stephens Coweta-Fayette lectric Membership Cooperative

More information

COS MANUAL. March 24, Version 1.2. Outage Coordination Process. Peak Reliability. Version 1.0. NERC Reliability Standard IRO-017-1

COS MANUAL. March 24, Version 1.2. Outage Coordination Process. Peak Reliability. Version 1.0. NERC Reliability Standard IRO-017-1 Outage Coordination Process Version 1.0 NERC Reliability Standard IRO-017-1 COS MANUAL March 24, 2017 www.peakrc.com. Contents 1. Conventions... 2 2. Introduction... 2 3. Purpose... 2 4. Applicability...

More information

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014 Expiry Year: 2018 APPROVED BY: Original signed by: Paul

More information

Bulk Electric System Definition Reference Document

Bulk Electric System Definition Reference Document Bulk Electric System Definition Reference Document JanuaryVersion 2 April 2014 This technical reference was created by the Definition of Bulk Electric System drafting team to assist entities in applying

More information

Sub Regional RTEP Committee Mid-Atlantic - PSEG Solution Meeting

Sub Regional RTEP Committee Mid-Atlantic - PSEG Solution Meeting Sub Regional RTEP Committee Mid-Atlantic - PSEG Solution Meeting October 29, 2018 Need Number: PSEG-2018-0001 Need Presented: 9/21/2018 Meeting Date: 10/29/2018 Process Stage: Solution Meeting Supplemental

More information

Moorhead / Dilworth Fixed Route Expansion Study

Moorhead / Dilworth Fixed Route Expansion Study Moorhead / Dilworth Fixed Route Expansion Study Prepared for: MATBUS Prepared by: Fargo Moorhead Metropolitan Council of Governments April 2014 Introduction With growth in southeast Moorhead and Dilworth,

More information

Enterprise City Schools August 25, 2015 Board Meeting Minutes

Enterprise City Schools August 25, 2015 Board Meeting Minutes Enterprise City Schools August 25, 2015 Board Meeting Minutes The Enterprise City Board of Education held the regular monthly meeting on Tuesday, August 25, 2015 at 6:00 p.m. in the Professional Development

More information

Company Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions

Company Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions Company Directive STANDARD TECHNIQUE: TP6F/1 Power Measurement Conventions Summary This document specifies the conventions that are used for the direction of Power Flow within Western Power Distribution

More information

Simulation and Analysis of Power System Transients using EMTP-RV

Simulation and Analysis of Power System Transients using EMTP-RV 5-Day course Montréal - CANADA October 1-5, 2012 Simulation and Analysis of Power System Transients using EMTP-RV This course is organized by POWERSYS. Place: DELTA MONTREAL http://www.deltahotels.com/en/hotels/quebec/delta-montreal/

More information

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES

Highgate Converter Overview. Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Overview Prepared by Joshua Burroughs & Jeff Carrara IEEE PES Highgate Converter Abstract Introduction to HVDC Background on Highgate Operation and Control schemes of Highgate 22 Why

More information

Shallow Water Array Performance (SWAP): Array Element Localization and Performance Characterization

Shallow Water Array Performance (SWAP): Array Element Localization and Performance Characterization Shallow Water Array Performance (SWAP): Array Element Localization and Performance Characterization Kent Scarbrough Advanced Technology Laboratory Applied Research Laboratories The University of Texas

More information

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate

More information

The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.

The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T. The Importance of the Neutral-Grounding Resistor Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T. Presentation Preview What is high-resistance grounding (HRG)? What is the purpose of HRG? Why

More information

ATC s Mackinac Back-to-Back HVDC Project: Planning and Operation Considerations for Michigan s Eastern Upper and Northern Lower Peninsulas

ATC s Mackinac Back-to-Back HVDC Project: Planning and Operation Considerations for Michigan s Eastern Upper and Northern Lower Peninsulas 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium ATC s Mackinac Back-to-Back HVDC Project: Planning and Operation Considerations for

More information

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell

More information

RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) PROJECT

RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) PROJECT RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) PROJECT PROJECT FUNDED BY: PROJECT PARTNERS: RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) Innovation in the supply chain is vital to the success of the

More information

ELECTRIC TRANSMISSION (ET) Guideline G0104

ELECTRIC TRANSMISSION (ET) Guideline G0104 ELECTRIC TRANSMISSION (ET) ISSUING DEPARTMENT: ETM x ETEC ETPO ETTS EFFECTIVE DATE: 06-01-1997 DEPARTMENTS AFFECTED: ETM ETEC ETPO x ETTS REVIEW DATE: 01-01-1998 DEPARTMENT GROUP: ALL All All x All P E

More information