1 Alcator C-Mod Second Quarter FY07 DoE Review May 7, 2007 Facility status: Jim Irby ICRF status: Earl Marmar (for Steve Wukitch) Cryopump status: Brian LaBombard LHRF status: Ron Parker Research campaign summary and plans: Steve Wolfe

2 Facility Status and Plans DoE Quarterly Review 05/07/07 1

3 Status Alcator C-Mod is currently in operation (details from Steve Wolfe) Before operation began, major activities completed included Upper divertor cryopump in-vessel installation W-tile toroidal ring in outer divertor Rotation of Long Pulse DNB (7 o toroidal) Many diagnostic upgrades and several new installations 2

4 Updates: Operations W-Tile Belt Installed Complete toroidal ring 8 tungsten plates per module ITER relevant activity Tile Module Installed tiles 3

5 Updates: Operations Lower Hybrid Control and Protection System Continuing to work with vendor of high speed CPCI data acquisition card to provide programming area for interlock signals Programmable trip levels will save hours of in-cell activity Ron Parker will detail operation Lower Hybrid Stainless Steel Couplers Procurement of new couplers complete Alumina windows in-house Preparations being made for brazing Fast-Ferrite Tuner development and installation complete with promising first operation 4

6 Updates: Diagnostics Retro/shutter probes Two new inner wall scanning probes have been installed Six retro-reflectors for the polarimeter installed with new pneumatic shutter Dual FIR laser system on order Beam position feedback system being developed 5

7 Updates: Diagnostics Upgrades to CXRS, fast scanning probes, x-ray spectrometers, Thomson scattering, bolometry, Penning gauges, polarimeter prototype, plasma video system K-Port Horizontal Science Surface Station installed (S 3 ) Microbalances measure deposition (radial, perp, 0.1 to 1 nm resolution) Langmuir probes measure density NeSOX SiLi S 3 Polarimeter Beamline 6

8 New X-ray Spectrometer Spatially Resolving HIgh REsolution X-ray spectrometer (SR HiReX) Improved time response, and spatial resolution and coverage Spherically bent crystal spectrometer looking at H & He-like Argon emissions lines Is now providing impurity temperature and rotation profiles for r/a ~<0.8 He-like Crystal Gate Valve B-port H-like Crystal He-like Detectors H-like Detector Spectrometer Layout Pilatus X-ray Detector Module 7

9 Updates: Diagnostics Rotation of Long Pulse DNB Trapping of beam neutrals in TF ripple field resulted in anomalous signals in MSE diagnostic DNB removed so that stand could be modified DNB horizontal flange removed for modification of beamline entry angle Some diagnostic views were optimized for new beam angle 8

10 Historically, C-Mod MSE beam-into-gas calibrations have been strongly anomalous 30 Channel: 2 MSE measured pitch angle (degrees) perpendicular beam (2005) y=x Actual pitch angle (degrees) 2006: H. Yuh (Nova Photonics) proposes mechanism: spurious emission by 'secondary' beam neutrals with long residence time in MSE field-of-view due to perpendicular beam injection.

11 Rotating the diagnostic beam ~7 o significantly reduces the anomaly 30 MSE measured pitch angle (degrees) Channel: 2 perpendicular beam (2005) 7 o rotated beam (2007) y=x Actual pitch angle (degrees) These results have motivated ITER to re-consider the orientation of its diagnostic neutral beam. J. Ko (PSFC) S. Scott (PPPL) H. Yuh (Nova Photonics)

12 Plans Plasma research operation for 15 weeks Plasma cleanup phase complete Ready for boronization Addition of vertical field to localize deposition S 3 diagnostic measures deposition and plasma density Cryopump operation FFT operation Continue design of new E-plane launcher and fabrication of new klystron cart (4 klystrons) Two lower hybrid launchers From 3 to 4 MW of source power 2 nd ICRF 4-strap antenna design/fab will continue 9

13 List of Completed Up-to-Air Tasks General Ops: Service Liquid Nitrogen System Service LN 2 vent duct Service Power Systems Sparker Development Service/Repair PFCs Replace HEAT TC Scanner Replace HV reed relays in TF Scanner Data system upgrades Network upgrades Diagnostics/Invessel: NESOX move to k-hor 10" flange microbalance installation (S 3 ) bolometer upgrade mods to b-hor for hirex/new detector MSE cals/checks/mods flapper removal/cover plate installation W-Tile belt installation Upper Chamber Cryopump installation outer divertor test tiles (B, CBN, W) shutter for polarimeter retros Mo/Ceramic polarimeter retros TCI feedback control install 7 limiter magnetic coils fix magnetics as possible (f11) mods to tiles at f-port (DNB location) mods to CXRS systems new upper divertor probe array new cryopump Penning gauges repair Penning gauge cables install two new inner-wall scanning probes install new F-top MKS gauge refurbish outer divertor probe array install 10 halo Rogowskis upper divertor change fiber bundle inner wall telescope Mo source diag coverage mods clean or replace fast camera telescope replace fiber bundle inner wall telescope new GPI telescope on A-B shelf Thomson Scattering Upgrades Upgrade to HiReX Improve LH camera reliability 10

14 Status of ICRF System and Initial Antenna Operation with FFT Matching Network DoE Quarterly Review May 7, 2007 MIT, Cambridge MA Outline: 1. Operational status of ICRF system 2. Overview of Antenna operation with FFT matching network 3. Initial results from plasma operation.

15 ICRF System Status Removed all antennas during the last machine opening. D and E antennas were inspected and had arc damage between the back plate and vacuum transmission line where E B. Modified the backplate to reduce the E along B in-situ. During the inspection of the J antenna and associated transmission network, we found that: Vacuum transmission line had significant dust, likely Ti left over from previous LH grill disintegration; and Arc damage on two feedthrus and stub tuner. J antenna was reinstalled with clean vacuum transmission line and feedthrus; and the stub tuner section was cleaned and the damaged teflon removed. All antennas have operated near full power (~1 MW per transmitter) without significant problems. Gate board problems with FMIT#1 (D antenna) have been stabilized.» Have decided to develop a new board based on CPLD rather the current one-shot analog devices. Leaks in the transmission line have limited the use of SF6 which is critical for high power operation.» Repairs should be complete within couple of weeks.

16 C-Mod Discharges Present Wide Variety of Antenna Loads Source of load variation separates into two groups: External demand - experimental plan calls for a parameter scan. Plasma state change L H, H L and ITB evolution are examples. Previously, external demand mismatches are managed by either: Making small changes during scan or Making large parameter change and take successive discharges to obtain match. Plasma state induced variations required multiple discharges to allow for an optimal match to be obtained. Real time matching eliminates mismatches arising from external demand and plasma state changes.

17 Mechanical Stub Tuner and Phase Shifter Matching System Stub Phase shifter (line stretcher) Transmitter 50 Ω coaxial line Γ dc1 Γ dc2 Antenna Directional coupler #1 Directional coupler #2 Matched side (low VSWR) Un-matched side (high VSWR) Adjust stub and phase shifter lengths to obtain zero reflection (Γ dc1 0) between discharges.

18 Typical Results from ST/PS System Poor match Poor match Good match Good match

19 Options for Real Time ICRF Matching Frequency modulation: Vary RF source frequency to follow changes in antenna loading. Long (relative to wavelength) unmatched transmission line acts as phase shifter. Transmitter frequency bandwidth must be sufficient (bandwidth determined by transmission line length) Although demonstrated on JET and LHD, C-Mod unmatched line lengths are too short given the transmitter bandwidth. Conjugate T passive matching network. Requires antenna elements to be decoupled and independent. Successfully demonstrated on JET. We demonstrated that coupling degrades conjugate T matching. Dielectric liquid: Vary electrical length of stub tuner and phase shifter by varying level of dielectric liquid. Slow time response and has power handling limitations. Ferrite material: Varying magnetic field on ferrite material to change effective electrical length Fast (milliseconds) Limited range of electrical length variation Tested on ASDEX-Upgrade but had matching performance worse than mechanical stub tuner and phase shifter matching.

20 Fast Ferrite Tuner System Tuner #1 Tuner #2 Transmitter Short Stub #1 Short Stub #2 l st1 l st1,st2 =3/8 λ l st2 Γ 1 Γ 1 Γ 2 Γ 2 Load/Antenna

21 Fast Ferrite Tuning System

22 Digital Controller and Power Supply Digital Controller Power Supplies

23 Characteristics of AFT Ferrite Tuner A combination of permanent magnets and magnetic field coils is used for the magnetization of the ferrites. Permeability is varied around a set point by changing the magnetic field created by the coils. The electrical characteristic of the tuner is controlled by varying the current in the coils. Effective electrical length can vary ~35 cm at 80 MHz for current range of ± 150 A. 4 msec time response swing from -15 cm to +20 cm.

24 Demonstrate Good Time Response Feedback loop minimizes matched side reflection coefficient to 1% reflected power. Calculate the stub electrical lengths by comparing reflection coefficients on matched and unmatched sides of tuners. Calculate the new stub lengths using unmatched reflection coefficient. Calculate the error signals of the stub lengths. Convert the errors lengths to the FFT current errors. Calculate the demand signals using a tuned PID feedback loop to ensure stability and speed. Match is obtained in in less than 3 ms.

25 Good Match is Maintained Through Plasma State Change Reflected power maintained < 5% during the excursion caused by L H transition.

26 Matching Performance Comparison Previous ST/PS System FFT system L H LH Poor match Always matched Good match FFT system did not miss discharges due to plasma changes due to experimental demands.

27 Concluding Remarks Antennas have been re-installed and are operating at ~1 MW/transmitter. FFT matching network has been very successful in following external and plasma state variations in antenna loading. Considering options for adding capability to all 3 systems (~$200k per transmitter)

28 Alcator C-Mod Upper Divertor Cryopump Quarterly Progress Report Presented by B. LaBombard for the Cryopump Team May 7, 2007

29 Recent Accomplishments Alcator C-Mod Pumping Slots Gas Baffle Gas Cuffs (for laser access) Cryopump System Installed in C-Mod 10 instrumented shim plates In-vessel orbital welding and leak-testing of cryogenic tubing Custom-fit cryogenic-feed baffles, hangers 30 sectors: shelf, plates, posts, baffles 720 Moly tiles, fasteners, keepers,... Probes, rogowskis & gauge instrumentation Cryogenic Systems are Leak-Tight LN2 and LHe systems cooled down to LN2 temperatures -- no leaks Periscope Pumping Slot & Baffles Work as Planned Upper plenum pressures in USN exceed lower divertor pressures in LSN (~ x1.5) Penning gauges

30 Current Activities Alcator C-Mod External cryogenic components are being fabricated/assembled: LN2 transfer lines (complete) LHe transfer line (complete) Dewar tray & support brackets (complete) Heat exchanger (complete) LHe stepper control valve (tested) Installation of valves, sensors, pump,... Cryogenic System at Igoo Top heat stepper LHe line exchanger control valve LN2 line LHe Dewar PLC Rack Cryogenic Control System is being assembled/programmed: Wiring from PLC Rack to valves & sensors PLC programming for manual operation with interlocks & C-Mod permissives LHe transfer line fabrication

31 Remaining Tasks & Schedule Alcator C-Mod Cryopump Control System - Complete wiring/testing - Demonstrate manual control - Interface to C-Mod - Debug - Perform cool-down to LHe => LHe in dewar next week Helium Bottle A2 0, 2, 4 PSI Regulated Pressurizer/ Heater B2- high He Bottle Pressure Manual Dewar Vent Valve Regulator (manual) A1 LHe Level Meter B2- low Helium purge Pressure Dewar Vent Valve A4 Dewar Pressure 500 liter Helium Dewar A5 normally open 0.5 PSI Relief Valve +/- 15PSI/"Hg A3 LHe Valve - stepping motor drive - open and closed limit switches - % open-closed based on stepping motor Cryopump Control System B1 pneumatically actuated Helium Purge Valve Helium Pump&Purge Upper Divertor Cryopump Control System Relief Valve 10 PSI LHe Transfer Line State Diagram Standby Remote Control Readout D1 LHe Level Meter "dipstick" D2 He Exhaust Pressure D8 +/-30PSI/"Hg TC, Type K C6 Purge Vent to Cell Relief Valve Temperature sensor Temperature sensor TC, Type K 8 PSI C3 LN2 Sensor Manual Valve Heat Exchanger Relief Valve 30 PSI LN2 Manual Flow Control Valve D8 D3 Relief Valve Rouging Pump D PSI D7 Bypass Valve Temperature sensor Manual Valve TC, Type K C4 N2 Purge Valve LN2 Pressure Roughing Pump Valve C-Mod LN2 Sump to Helium gas recovery system 0-60 PSI C2 Flow Meter pneumatically actuated C5 N2 Purge Pressure LN2 Flow Valve D4 C1 Alcator C-Mod Vacuum Chamber D6 Helium Exhaust Valve LN2 Sump Status: Full or Not Full 0-60 PSI N2 inlet LN2 inlet Nitrogen Purge Cooldown to LN2 Change-Dewar He Purge LN2 Ready Start MP#475 Cryopump Startup ~ 1-2 wks I - System Assembly & Checkout II - Cool-down/Regeneration and pumping speed benchmarks III - Operation during C-Mod Discharge IV - Effect of SSEP on pumping V- Density control in H-mode discharges Shutdown C-Mod "INIT" C-Mod "PULSE" C-Mod "RECOOL" Cooldown to LHe LHe Ready Regeneration B. LaBombard April 27, 2007

32 Lower Hybrid Experiments Ron Parker Quarterly Progress Report 7 May 2007

33 LH Objectives for First Weeks of 2007 Campaign Reestablish LH operation similar to 2006 campaign Optimize coupling: Density, shape and power H-Modes, ICRF Investigate density limit Study distribution of LH-produced fast electrons in energy and space (via Bremsstrahlung)

34

35

36

37

38 Parametric Decay Density Limit?

39 Summary: Coupling Studies Limited success with ICRF ~ 1MW J-port Appears to require gas feed to LH antenna to keep density from falling during ICRF next campaign Parametric decay to ICW s may indicate density limit Experiments and modeling continue Greg Wallace thesis

40 C-Mod Cross section with pinhole camera a c =5mm a d =5mm Spatial resolution =1.7cm

41 Coupled Power (kw) Time Traces for Low Density, 60 o Phasing Shots nl (10 20 m 2 ) 8 x HXR Count Rate (s 1 ) 4 x

42 60 Phasing (n = 1.6) Profiles Are Relatively Broad Count rate for kev (s 1 ) HXR Profiles for Low Density, 60 o Phasing Shots Viewing Cord Channel ms ms ms ms ms ms ms ms ms ms kev emissivity (counts/(mm 2 str s)) Flux surface emissivity for Low Density, 60 o Phasing Shots r/a ms ms ms ms ms ms ms ms ms ms

43 90 Phasing (n = 2.3) Have More structure, Peaking) Count rate for kev (s 1 ) HXR Profiles for Medium Density, 90 o Phasing Shots Viewing Cord Channel ms ms ms ms ms ms ms ms ms ms kev emissivity (counts/(mm 2 str s)) Flux surface emissivity for Medium Density, 90 o Phasing Shots r/a ms ms ms ms ms ms ms ms ms ms

44 Summary: Bremsstrahlung Measurements More structure, more peaking in the medium density, 90º shots. In both cases, peak seems to deplete faster than wings enhanced diffusion inside sawtooth mixing radius? Photon profiles reflect complex interplay between fast electron slow down, diffusion, energy, and deposition profile. More detailed modeling required--will be basis for Andrea Schmidt s PhD thesis.

45 Alcator C Mod C-Mod 2007 Campaign Status Presented by: Stephen M. Wolfe Alcator C-Mod Quarterly Review MIT Plasma Science & Fusion Center Cambridge, MA May 7, 2007

46 C-Mod JOULE target 15 Weeks of Research Operation in FY2007. Alcator C Mod Budgeted for 60 Research Days plus 14 Startup & Conditioning Tokamak Operations began March 13 (Power Tests) First Plasma March 21 First Research run March 29 (Lower Hybrid Physics) Ohmic and Lower Hybrid research runs carried out while machine cleanup, H/D reduction proceeds First boronization will take place this week Alcator C-Mod Quarterly Review May 7, 2007 smw 1

47 Run Utilization (Days). Alcator C Mod Topic/Thrust Through 2rd Quarter thru May 04 Lower Hybrid Operations/Diagnostics Integrated Scenarios (AT) Integrated Scenarios (H) Transport Physics Edge/Divertor ICRF Physics & Tech MHD Total Research Days Startup & Conditioning Total Operating Days Alcator C-Mod Quarterly Review May 7, 2007 smw 2

Upper Divertor Cryopump Quarterly Progress Report Presented by B. LaBombard for the Cryopump Team July 26, 2007

Upper Divertor Cryopump Quarterly Progress Report Presented by B. LaBombard for the Cryopump Team July 26, 2007 Alcator C-Mod Upper Divertor Cryopump Quarterly Progress Report Presented by B. LaBombard for the Cryopump Team July 6, 7 Recent Accomplishments Alcator C-Mod Pumping Slots Gas Baffle Gas Cuffs (for laser

More information

Overview of ICRF Experiments on Alcator C-Mod*

Overview of ICRF Experiments on Alcator C-Mod* 49 th annual APS-DPP meeting, Orlando, FL, Nov. 2007 Overview of ICRF Experiments on Alcator C-Mod* Y. Lin, S. J. Wukitch, W. Beck, A. Binus, P. Koert, A. Parisot, M. Reinke and the Alcator C-Mod team

More information

Status Alcator C-Mod Engineering Systems. DoE Quarterly Review October 27, 2005

Status Alcator C-Mod Engineering Systems. DoE Quarterly Review October 27, 2005 Status Alcator C-Mod Engineering Systems DoE Quarterly Review October 27, 2005 1 Outline Run campaign Up-to-Air Machine Status Lower Hybrid Cryopump Tungsten Tiles Schedule/Plans 2 FY2005 Run Campaign

More information

Facilities and Diagnostics. Jim Irby MIT-PSFC

Facilities and Diagnostics. Jim Irby MIT-PSFC Facilities and Diagnostics Jim Irby MIT-PSFC Outline Machine History and Status Update on C-Mod Contributions to ITER Technology Facility Upgrades Diagnostics Data Acquisition Short term plans Machine

More information

First Results From the Alcator C-Mod Lower Hybrid Experiment.

First Results From the Alcator C-Mod Lower Hybrid Experiment. First Results From the Alcator C-Mod Lower Hybrid Experiment. R. Parker 1, N. Basse 1, W. Beck 1, S. Bernabei 2, R. Childs 1, N. Greenough 2, M. Grimes 1, D. Gwinn 1, J. Hosea 2, J. Irby 1, D. Johnson

More information

Advanced Tokamak Program and Lower Hybrid Experiment. Ron Parker MIT Plasma Science and Fusion Center

Advanced Tokamak Program and Lower Hybrid Experiment. Ron Parker MIT Plasma Science and Fusion Center Advanced Tokamak Program and Lower Hybrid Experiment Ron Parker MIT Plasma Science and Fusion Center Alcator C-Mod Program Advisory Meeting 23-24 February 2004 Main Goals of the Alcator C-Mod AT Program

More information

Lower Hybrid. Ron Parker Alcator C-Mod PAC Meeting January January 2006 Alcator C-Mod PAC Meeting 1

Lower Hybrid. Ron Parker Alcator C-Mod PAC Meeting January January 2006 Alcator C-Mod PAC Meeting 1 Lower Hybrid Ron Parker Alcator C-Mod PAC Meeting 25-27 January 2006 25-27 January 2006 Alcator C-Mod PAC Meeting 1 Goal of Lower Hybrid Current Drive Experiments Use Lower Hybrid Current Drive to supplement

More information

Facilities and Upgrades PAC Presented by Jim Irby for the C-Mod Group

Facilities and Upgrades PAC Presented by Jim Irby for the C-Mod Group Facilities and Upgrades PAC 2010 Presented by Jim Irby for the C-Mod Group Outline Machine History and Status Alternator/Machine 2009 run campaign 2010 run campaign Availability Chart Contributions to

More information

Development of C-Mod FIR Polarimeter*

Development of C-Mod FIR Polarimeter* Development of C-Mod FIR Polarimeter* P.XU, J.H.IRBY, J.BOSCO, A.KANOJIA, R.LECCACORVI, E.MARMAR, P.MICHAEL, R.MURRAY, R.VIEIRA, S.WOLFE (MIT) D.L.BROWER, W.X.DING (UCLA) D.K.MANSFIELD (PPPL) *Supported

More information

Diagnostic development to measure parallel wavenumber of lower hybrid waves on Alcator C-Mod

Diagnostic development to measure parallel wavenumber of lower hybrid waves on Alcator C-Mod Diagnostic development to measure parallel wavenumber of lower hybrid waves on Alcator C-Mod S. G. Baek, T. Shinya*, G. M. Wallace, S. Shiraiwa, R. R. Parker, Y. Takase*, D. Brunner MIT Plasma Science

More information

Initial Results from the C-Mod Prototype Polarimeter/Interferometer

Initial Results from the C-Mod Prototype Polarimeter/Interferometer Initial Results from the C-Mod Prototype Polarimeter/Interferometer K. R. Smith, J. Irby, R. Leccacorvi, E. Marmar, R. Murray, R. Vieira October 24-28, 2005 APS-DPP Conference 1 Abstract An FIR interferometer-polarimeter

More information

RF Physics: Status and Plans

RF Physics: Status and Plans RF Physics: Status and Plans Program Advisory Committee meeting February 6-7, 2002 S. J. Wukitch Outline: 1. Overview of RF Physics issues 2. Review of antenna performance and near term modifications.

More information

Novel Vacuum Vessel & Coil System Design for the Advanced Divertor Experiment (ADX)

Novel Vacuum Vessel & Coil System Design for the Advanced Divertor Experiment (ADX) Novel Vacuum Vessel & Coil System Design for the Advanced Divertor Experiment (ADX) R.F. Vieira, J. Doody, W.K. Beck, L. Zhou, R. Leccacorvi, B. LaBombard, R.S. Granetz, S.M. Wolfe, J.H. Irby, S.J. Wukitch,

More information

Field Aligned ICRF Antenna Design for EAST *

Field Aligned ICRF Antenna Design for EAST * Field Aligned ICRF Antenna Design for EAST * S.J. Wukitch 1, Y. Lin 1, C. Qin 2, X. Zhang 2, W. Beck 1, P. Koert 1, and L. Zhou 1 1) MIT Plasma Science and Fusion Center, Cambridge, MA USA. 2) Institute

More information

System Upgrades to the DIII-D Facility

System Upgrades to the DIII-D Facility System Upgrades to the DIII-D Facility A.G. Kellman for the DIII-D Team 24th Symposium on Fusion Technology Warsaw, Poland September 11-15, 2006 Upgrades Performed During the Long Torus Opening (LTOA)

More information

Status of C-Mod Diagnostics. Presented by Jim Irby For the C-Mod Group

Status of C-Mod Diagnostics. Presented by Jim Irby For the C-Mod Group Status of C-Mod Diagnostics Presented by Jim Irby For the C-Mod Group Outline Diagnostic Availability Selected Diagnostics PAC 2009 PAC 2009 Diagnostic Availability UCLA Polarimetry Dual FIR lasers operational

More information

C-Mod ICRF Research Program

C-Mod ICRF Research Program C-Mod ICRF Research Program C-Mod Ideas Forum December 2-6, 2004 MIT PSFC Presented by Steve Wukitch Outline: 1. Overview of ICRF program 2. Summary of MP s and proposals ICRF Highlights Antenna Performance

More information

High Field Side Lower Hybrid Current Drive Launcher Design for DIII-D

High Field Side Lower Hybrid Current Drive Launcher Design for DIII-D High Field Side Lower Hybrid Current Drive Launcher Design for DIII-D by G.M. Wallace (MIT PSFC) Presented at the American Physical Society Division of Plasma Physics Annual Meeting October 23, 2017 On

More information

Evaluation of a Field Aligned ICRF Antenna in Alcator C-Mod

Evaluation of a Field Aligned ICRF Antenna in Alcator C-Mod Evaluation of a Field Aligned ICRF Antenna in Alcator C-Mod 24th IAEA Fusion Energy Conference San Diego, USA October 8-13 2012 S.J. Wukitch, D. Brunner, M.L. Garrett, B. Labombard, C. Lau, Y. Lin, B.

More information

Dust Measurements With The DIII-D Thomson system

Dust Measurements With The DIII-D Thomson system Dust Measurements With The DIII-D Thomson system The DIII-D Thomson scattering system, consisting of eight ND:YAG lasers and 44 polychromator detection boxes, has recently been used to observe the existence

More information

Status of the rf Current Drive Systems on MST

Status of the rf Current Drive Systems on MST Status of the rf Current Drive Systems on MST John A. Goetz for A. Almagri, J.K. Anderson, D.R. Burke, M.M. Clark, W.A. Cox, C.B. Forest, R. Ganch, M.C. Kaufman, J.G. Kulpin, P. Nonn, R. O Connell, S.P.

More information

3D modeling of toroidal asymmetry due to localized divertor nitrogen puffing on Alcator C-Mod

3D modeling of toroidal asymmetry due to localized divertor nitrogen puffing on Alcator C-Mod 3D modeling of toroidal asymmetry due to localized divertor nitrogen puffing on Alcator C-Mod J.D. Lore 1, M.L. Reinke 2, B. LaBombard 2, B. Lipschultz 3, R. Pitts 4 1 Oak Ridge National Laboratory, Oak

More information

ICRF Mode Conversion Flow Drive Studies with Improved Wave Measurement by Phase Contrast Imaging

ICRF Mode Conversion Flow Drive Studies with Improved Wave Measurement by Phase Contrast Imaging 57 th APS-DPP meeting, Nov. 2015, Savannah, GA, USA ICRF Mode Conversion Flow Drive Studies with Improved Wave Measurement by Phase Contrast Imaging Yijun Lin, E. Edlund, P. Ennever, A.E. Hubbard, M. Porkolab,

More information

ICRF Physics in KSTAR Steady State

ICRF Physics in KSTAR Steady State ICRF Physics in KSTAR Steady State Operation (focused on the base line operation) Oct. 24, 2005 Jong-gu Kwak on the behalf of KSTAR ICRF TEAM Korea Atomic Energy Research Institute Contents Roles of ICRF

More information

Development Status of KSTAR LHCD System

Development Status of KSTAR LHCD System Development Status of KSTAR LHCD System September 24, 2004 Y. S. Bae,, M. H. Cho, W. Namkung Plasma Sheath Lab. Department of Physics, Pohang University of Science and Technology LHCD system overview Objectives

More information

Poloidal Transport Asymmetries, Edge Plasma Flows and Toroidal Rotation in Alcator C-Mod

Poloidal Transport Asymmetries, Edge Plasma Flows and Toroidal Rotation in Alcator C-Mod Poloidal Transport Asymmetries, Edge Plasma Flows and Toroidal Rotation in B. LaBombard, J.E. Rice, A.E. Hubbard, J.W. Hughes, M. Greenwald, J. Irby, Y. Lin, B. Lipschultz, E.S. Marmar, K. Marr, C.S. Pitcher,

More information

SOL Reflectometer for Alcator C-Mod

SOL Reflectometer for Alcator C-Mod Alcator C-Mod SOL Reflectometer for Alcator C-Mod C. Lau 1 G. Hanson 2, J. B. Wilgen 2, Y. Lin 1, G. Wallace 1, and S. J. Wukitch 1 1 MIT Plasma Science and Fusion Center, Cambridge, MA 02139 2 Oak Ridge

More information

A NEW MULTI-POINT, MULTI-PULSE THOMSON SCATTERING SYSTEM FOR THE MST RFP

A NEW MULTI-POINT, MULTI-PULSE THOMSON SCATTERING SYSTEM FOR THE MST RFP A NEW MULTI-POINT, MULTI-PULSE THOMSON SCATTERING SYSTEM FOR THE MST RFP D. J. HOLLY, P. ANDREW, and D. J. DEN HARTOG Department of Physics, University of Wisconsin Madison, 1150 University Avenue, Madison,

More information

Structural Analysis of High-field-Side RF antennas during a disruption on the Advanced Divertor experiment (ADX)

Structural Analysis of High-field-Side RF antennas during a disruption on the Advanced Divertor experiment (ADX) Structural Analysis of High-field-Side RF antennas during a disruption on the Advanced Divertor experiment (ADX) J. Doody, B. LaBombard, R. Leccacorvi, S. Shiraiwa, R. Vieira, G.M. Wallace, S.J. Wukitch,

More information

Design and commissioning of a novel LHCD launcher on Alcator C-Mod

Design and commissioning of a novel LHCD launcher on Alcator C-Mod FTP/P6-4 Design and commissioning of a novel LHCD launcher on Alcator C-Mod S. Shiraiwa, O. Meneghini, W. Beck, J. Doody, P. MacGibbon, J. Irby, D. Johnson, P. Koert, C. Lau, R. R. Parker, D. Terry, R.

More information

P. Koert, P. MacGibbon, R. Vieira, D. Terry, R.Leccacorvi, J. Doody, W. Beck. October 2008

P. Koert, P. MacGibbon, R. Vieira, D. Terry, R.Leccacorvi, J. Doody, W. Beck. October 2008 PSFC/JA-08-50 WAVEGUIDE SPLITTER FOR LOWER HYBRID CURRENT DRIVE P. Koert, P. MacGibbon, R. Vieira, D. Terry, R.Leccacorvi, J. Doody, W. Beck October 2008 Plasma Science and Fusion Center Massachusetts

More information

Investigation of RF-enhanced Plasma Potentials on Alcator C-Mod

Investigation of RF-enhanced Plasma Potentials on Alcator C-Mod PSFC/JA-13-3 Investigation of RF-enhanced Plasma Potentials on Alcator C-Mod Ochoukov, R., Whyte, D.G., Brunner, D., Cziegler *, I., LaBombard, B., Lipschultz, B., Myra **, J., Terry, J., Wukitch, S *

More information

High Power Antenna Design for Lower Hybrid Current Drive in MST

High Power Antenna Design for Lower Hybrid Current Drive in MST High Power Antenna Design for Lower Hybrid Current Drive in MST M.A. Thomas, J.A. Goetz, M.C. Kaufman, S.P. Oliva University of WisconsinMadison J.B.O. Caughman, P.M. Ryan Oak Ridge National Laboratory

More information

C-Mod ICRF Program. Alcator C-Mod PAC Meeting January 25-27, 2006 MIT Cambridge MA. Presented by S.J. Wukitch

C-Mod ICRF Program. Alcator C-Mod PAC Meeting January 25-27, 2006 MIT Cambridge MA. Presented by S.J. Wukitch C-Mod ICRF Program Alcator C-Mod PAC Meeting January 5-7, 006 MIT Cambridge MA Presented by S.J. Wukitch Outline: 1. Overview of ICRF program. Antenna performance evaluation and coupling 3. Mode conversion

More information

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS J. Teichert, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A.

More information

Abstract. *Supported by U.S. DoE grant No. DE-FG02-96ER Pegasus Toroidal Experiment University of Wisconsin-Madison

Abstract. *Supported by U.S. DoE grant No. DE-FG02-96ER Pegasus Toroidal Experiment University of Wisconsin-Madison Abstract The Pegasus Facility is studying Extremely-Low-Aspect Ratio Tokamak (ELART) plasmas, accessing high-β plasmas. A 60 Turn Toroidal Field bundle in the centerstack limited rod currents to

More information

Measurements of Mode Converted ICRF Waves with Phase Contrast Imaging in Alcator C-Mod

Measurements of Mode Converted ICRF Waves with Phase Contrast Imaging in Alcator C-Mod Measurements of Mode Converted ICRF Waves with Phase Contrast Imaging in Alcator C-Mod N. Tsujii, M. Porkolab, E.M. Edlund, L. Lin, Y. Lin, J.C. Wright, S.J. Wukitch MIT Plasma Science and Fusion Center

More information

C-Mod/PSFC MFE DoE Quarterly Review August 10, 2015

C-Mod/PSFC MFE DoE Quarterly Review August 10, 2015 C-Mod/PSFC MFE DoE Quarterly Review August 10, 2015 Status of Agreements and Subcontracts (Marmar) C-Mod Facility (Irby) Priority Research Topics, Runtime (Granetz) MDSplus (Greenwald) International Collaborations

More information

Technical Readiness Level For Plasma Control

Technical Readiness Level For Plasma Control Technical Readiness Level For Plasma Control PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION A.D. Turnbull, General Atomics ARIES Team Meeting University of Wisconsin, Madison,

More information

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK E. Kako #, H. Hayano, S. Noguchi, T. Shishido, K. Watanabe and Y. Yamamoto KEK, Tsukuba, Ibaraki, 305-0801, Japan Abstract An input coupler,

More information

Detection and application of Doppler and motional Stark features in the DNB emission spectrum in the high magnetic field of the Alcator C-Mod tokamak

Detection and application of Doppler and motional Stark features in the DNB emission spectrum in the high magnetic field of the Alcator C-Mod tokamak Detection and application of Doppler and motional Stark features in the DNB emission spectrum in the high magnetic field of the Alcator C-Mod tokamak I. O. Bespamyatnov a, W. L. Rowan a, K. T. Liao a,

More information

Instrumentation Development for a Novel Local Electric and Magnetic Field Fluctuation Diagnostic

Instrumentation Development for a Novel Local Electric and Magnetic Field Fluctuation Diagnostic Instrumentation Development for a Novel Local Electric and Magnetic Field Fluctuation Diagnostic Mindy Bakken On behalf of: R.J. Fonck, M.G. Burke, B.T. Lewicki, A.T. Rhodes, G.R. Winz 58 th Annual Meeting

More information

GA A22577 AN ELM-RESILIENT RF ARC DETECTION SYSTEM FOR DIII D BASED ON ELECTROMAGNETIC AND SOUND EMISSIONS FROM THE ARC

GA A22577 AN ELM-RESILIENT RF ARC DETECTION SYSTEM FOR DIII D BASED ON ELECTROMAGNETIC AND SOUND EMISSIONS FROM THE ARC GA A22577 AN ELM-RESILIENT RF ARC DETECTION SYSTEM FOR DIII D BASED ON ELECTROMAGNETIC AND SOUND EMISSIONS FROM THE ARC by D.A. PHELPS APRIL 1997 This report was prepared as an account of work sponsored

More information

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY Abstract HIGH POWER COUPLER FOR THE TESLA TEST FACILITY W.-D. Moeller * for the TESLA Collaboration, Deutsches Elektronen-Synchrotron DESY, D-22603 Hamburg, Germany The TeV Energy Superconducting Linear

More information

RF, Disruption and Thermal Analyses of EAST Antennas*

RF, Disruption and Thermal Analyses of EAST Antennas* RF, Disruption and Thermal Analyses of EAST Antennas* L. Zhou, W.K. Beck, P. Koert, J. Doody, R.F. Vieira, S.J. Wukitch, R.S. Granetz, and J.H. Irby Plasma Science and Fusion Center (PSFC) Massachusetts

More information

Measurement of Mode Converted ICRF Waves with Phase Contrast Imaging and Comparison with Full-wave Simulations on Alcator C-Mod

Measurement of Mode Converted ICRF Waves with Phase Contrast Imaging and Comparison with Full-wave Simulations on Alcator C-Mod Measurement of Mode Converted ICRF Waves with Phase Contrast Imaging and Comparison with Full-wave Simulations on Alcator C-Mod N. Tsujii 1, M. Porkolab 1, P.T. Bonoli 1, Y. Lin 1, J.C. Wright 1, S.J.

More information

MICROWAVE MICROWAVE TRAINING BENCH COMPONENT SPECIFICATIONS:

MICROWAVE MICROWAVE TRAINING BENCH COMPONENT SPECIFICATIONS: Microwave section consists of Basic Microwave Training Bench, Advance Microwave Training Bench and Microwave Communication Training System. Microwave Training System is used to study all the concepts of

More information

Density and temperature maxima at specific? and B

Density and temperature maxima at specific? and B Density and temperature maxima at specific? and B Matthew M. Balkey, Earl E. Scime, John L. Kline, Paul Keiter, and Robert Boivin 11/15/2007 1 Slide 1 Abstract We report measurements of electron density

More information

Outline of optical design and viewing geometry for divertor Thomson scattering on MAST

Outline of optical design and viewing geometry for divertor Thomson scattering on MAST Home Search Collections Journals About Contact us My IOPscience Outline of optical design and viewing geometry for divertor Thomson scattering on MAST upgrade This content has been downloaded from IOPscience.

More information

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES S. Belomestnykh HPC workshop JLAB, 30 October 2002 Introduction Many aspects of the high-power coupler design, fabrication, preparation, conditioning, integration

More information

Toroidal Rotation and Ion Temperature Validations in KSTAR Plasmas

Toroidal Rotation and Ion Temperature Validations in KSTAR Plasmas Toroidal Rotation and Ion Temperature Validations in KSTAR Plasmas S. G. Lee 1, H. H. Lee 1, W. H. Ko 1, J. W. Yoo 2, on behalf of the KSTAR team and collaborators 1 NFRI, Daejeon, Korea 2 UST, Daejeon,

More information

FIR Polarimetry on the Alcator C-Mod Tokamak. Presented by James Irby for the Alcator C-Mod Group

FIR Polarimetry on the Alcator C-Mod Tokamak. Presented by James Irby for the Alcator C-Mod Group FIR Polarimetry on the Alcator C-Mod Tokamak Presented by James Irby for the Alcator C-Mod Group Acknowledgements UCLA: Will Bergerson, David Brower, Weixing Ding PPPL: Dennis Mansfield, Walter Guttenfelder

More information

ABSTRACT. Supported by U.S. DoE grant No. DE-FG02-96ER54375

ABSTRACT. Supported by U.S. DoE grant No. DE-FG02-96ER54375 ABSTRACT A CCD imaging system is currently being developed for T e (,t) and bolometric measurements on the Pegasus Toroidal Experiment. Soft X-rays (E

More information

Abstract. G.D. Garstka 47 th APS-DPP Denver October 27, Pegasus Toroidal Experiment University of Wisconsin-Madison

Abstract. G.D. Garstka 47 th APS-DPP Denver October 27, Pegasus Toroidal Experiment University of Wisconsin-Madison Abstract The PEGASUS Toroidal Experiment provides an attractive opportunity for investigating the physics and implementation of electron Bernstein wave (EBW) heating and current drive in an overdense ST

More information

Overview and Initial Results of the ETE Spherical Tokamak

Overview and Initial Results of the ETE Spherical Tokamak Overview and Initial Results of the ETE Spherical Tokamak L.A. Berni, E. Del Bosco, J.G. Ferreira, G.O. Ludwig, R.M. Oliveira, C.S. Shibata, L.F.F.P.W. Barbosa, W.A. Vilela Instituto Nacional de Pesquisas

More information

2.3 PF System. WU Weiyue PF5 PF PF1

2.3 PF System. WU Weiyue PF5 PF PF1 2.3 PF System WU Weiyue 2.3.1 Introduction The poloidal field (PF) system consists of fourteen superconducting coils, including 6 pieces of central selenoid coils, 4 pieces of divertor coils and 4 pieces

More information

Commissioning of Thomson Scattering on the Pegasus Toroidal Experiment

Commissioning of Thomson Scattering on the Pegasus Toroidal Experiment Commissioning of Thomson Scattering on the Pegasus Toroidal Experiment D.J. Schlossberg, R.J. Fonck, L.M. Peguero, G.R. Winz University of Wisconsin-Madison 55 th Annual Meeting of the APS Division of

More information

FY11 FES Joint Research Target: C-Mod Highlights

FY11 FES Joint Research Target: C-Mod Highlights FY11 FES Joint Research Target: C-Mod Highlights J.W. Hughes, E. Davis, A.E. Hubbard, M. Porkolab, L. Sugiyama, J. Terry J.R. Walk, A. White, D.G. Whyte, S.M. Wolfe, MIT R.J. Groebner, T. Osborne, P.B.

More information

RF power tests of LEP2 main couplers on a single cell superconducting cavity

RF power tests of LEP2 main couplers on a single cell superconducting cavity RF power tests of LEP2 main couplers on a single cell superconducting cavity H.P. Kindermann, M. Stirbet* CERN, CH-1211 Geneva 23, Switzerland Abstract To determine the power capability of the input couplers

More information

Study of Plasma Equilibrium during the AC Current Reversal Phase on the STOR-M Tokamak

Study of Plasma Equilibrium during the AC Current Reversal Phase on the STOR-M Tokamak 1 Study of Plasma Equilibrium during the AC Current Reversal Phase on the STOR-M Tokamak C. Xiao 1), J. Morelli 1), A.K. Singh 1, 2), O. Mitarai 3), T. Asai 1), A. Hirose 1) 1) Department of Physics and

More information

C-Mod Quarterly Review FY2009 Q3. 21 July Developing the steady state, high-z wall, high-field tokamak for ITER and beyond

C-Mod Quarterly Review FY2009 Q3. 21 July Developing the steady state, high-z wall, high-field tokamak for ITER and beyond C-Mod Quarterly Review FY2009 Q3 21 July 2009 Developing the steady state, high-z wall, high-field tokamak for ITER and beyond FY09 Q3 Status and Plans Alternator Recertified (April, 2009) Now in service

More information

2. Composing and characteristics of EAST

2. Composing and characteristics of EAST Overview Progress and Future Plan of EAST project Yuanxi Wan, Jiangang Li, Peide Weng and EAST, GA, PPPL team Institute of Plasma Physics, Chinese Academy of Sciences P. O. Box 1126 Hefei Anhui 230031

More information

3.10 Lower Hybrid Current Drive (LHCD) System

3.10 Lower Hybrid Current Drive (LHCD) System 3.10 Lower Hybrid Current Drive (LHCD) System KUANG Guangli SHAN Jiafang 3.10.1 Purpose of LHCD program 3.10.1.1 Introduction Lower hybrid waves are quasi-static electric waves propagated in magnetically

More information

National Fusion Research Institute a. Princeton Plasma Physics Laboratory

National Fusion Research Institute a. Princeton Plasma Physics Laboratory Ko-Ja Workshop on Physics and Technology of Heating and Current Drive, Pohang, Korea, 2016 M. Joung, J. H. Jeong, J. W. Han, I. H. Lee, S. K. Kim, S. J. Wang, J. G. Kwak, R. Ellis a, J. Hosea a and the

More information

Frequency Tuning and RF Systems for the ATLAS Energy Upgrade. Gary P. Zinkann

Frequency Tuning and RF Systems for the ATLAS Energy Upgrade. Gary P. Zinkann Frequency Tuning and RF Systems for the ATLAS Energy Upgrade Outline Overview of the ATLAS Energy Upgrade Description of cavity Tuning method used during cavity construction Description and test results

More information

Gyung-Su Lee National Fusion R & D Center Korea Basic Science Institute

Gyung-Su Lee National Fusion R & D Center Korea Basic Science Institute Status of the KSTAR Project and Fusion Research in Korea Gyung-Su Lee National Fusion R & D Center Korea Basic Science Institute Fusion Research Activities and Plan in Korea Basic Plasma and Fusion Research

More information

Design of the COMPASS Upgrade Tokamak

Design of the COMPASS Upgrade Tokamak Design of the COMPASS Upgrade Tokamak R. Panek, P. Cahyna, R. Dejarnac, J. Havlicek, J. Horacek, M. Hron, M. Imrisek, P. Junek, M. Komm, T. Markovic, J. Urban, J. Varju, V. Weinzettl, J. Adamek, P. Bilkova,

More information

Wall Conditioning Strategy for Wendelstein7-X. H.P. Laqua, D. Hartmann, M. Otte, D. Aßmus

Wall Conditioning Strategy for Wendelstein7-X. H.P. Laqua, D. Hartmann, M. Otte, D. Aßmus Wall Conditioning Strategy for Wendelstein7-X H.P. Laqua, D. Hartmann, M. Otte, D. Aßmus 1 Outline 1. Physics background 2. Experience from different experiments (LHD, Wega. Tore Supra) 3. Strategy for

More information

Investigation of ion toroidal rotation induced by Lower Hybrid waves in Alcator C-Mod * using integrated numerical codes

Investigation of ion toroidal rotation induced by Lower Hybrid waves in Alcator C-Mod * using integrated numerical codes Investigation of ion toroidal rotation induced by Lower Hybrid waves in Alcator C-Mod * using integrated numerical codes J.P. Lee 1, J.C. Wright 1, P.T. Bonoli 1, R.R. Parker 1, P.J. Catto 1, Y. Podpaly

More information

Millikelvin measurement platform for SQUIDs and cryogenic sensors

Millikelvin measurement platform for SQUIDs and cryogenic sensors Cryoconference 2010 Millikelvin measurement platform for SQUIDs and cryogenic sensors M. Schmidt, J. Beyer, D. Drung, J.-H. Storm Physikalisch-Technische Bundesanstalt, Abbe Str. 2-22, 10587 Berlin, Germany

More information

Faster, Hotter MHD-Driven Jets Using RF Pre-Ionization

Faster, Hotter MHD-Driven Jets Using RF Pre-Ionization Faster, Hotter MHD-Driven Jets Using RF Pre-Ionization V. H. Chaplin, P. M. Bellan, and H. V. Willett 1 1) University of Cambridge, United Kingdom; work completed as a Summer Undergraduate Research Fellow

More information

Magnetic Reconnection and Ion Flows During Point Source Helicity Injection on the Pegasus Toroidal Experiment

Magnetic Reconnection and Ion Flows During Point Source Helicity Injection on the Pegasus Toroidal Experiment Magnetic Reconnection and Ion Flows During Point Source Helicity Injection on the Pegasus Toroidal Experiment M.G. Burke, R.J. Fonck, J.L. Barr, K.E. Thome, E.T. Hinson, M.W. Bongard, A.J. Redd, D.J. Schlossberg

More information

Interdependence of Magnetic Islands, Halo Current and Runaway Electrons in T-10 Tokamak

Interdependence of Magnetic Islands, Halo Current and Runaway Electrons in T-10 Tokamak IAEA-CN-77/EXP2/02 Interdependence of Magnetic Islands, Halo Current and Runaway Electrons in T-10 Tokamak N.V. Ivanov, A.M. Kakurin, V.A. Kochin, P.E. Kovrov, I.I. Orlovski, Yu.D.Pavlov, V.V. Volkov Nuclear

More information

Detection of Lower Hybrid Waves on Alcator C-Mod with Phase Contrast Imaging Using Electro-Optic Modulators

Detection of Lower Hybrid Waves on Alcator C-Mod with Phase Contrast Imaging Using Electro-Optic Modulators Detection of Lower Hybrid Waves on Alcator C-Mod with Phase Contrast Imaging Using Electro-Optic Modulators K. Arai, M. Porkolab, N. Tsujii, P. Koert, R. Parker, P. Woskov, S. Wukitch MIT Plasma Science

More information

ECRH on the Levitated Dipole Experiment

ECRH on the Levitated Dipole Experiment ECRH on the Levitated Dipole Experiment S. Mahar, J. Kesner, A.C. Boxer, J.E. Ellsworth, I. Karim, A. Roach MIT PSFC A.K. Hansen, D.T. Garnier, M.E. Mauel, E.E.Ortiz Columbia University Presented at the

More information

ICRF Operation with Improved Antennas in a Full W-wall ASDEX Upgrade, Status and Developments

ICRF Operation with Improved Antennas in a Full W-wall ASDEX Upgrade, Status and Developments 1 EX/P5-19 ICRF Operation with Improved Antennas in a Full W-wall ASDEX Upgrade, Status and Developments V. Bobkov 1*, M. Balden 1, F. Braun 1, R. Dux 1, A. Herrmann 1, H. Faugel 1, H. Fünfgelder 1, L.

More information

INITIAL RESULTS FROM THE MULTI-MEGAWATT 110 GHz ECH SYSTEM FOR THE DIII D TOKAMAK

INITIAL RESULTS FROM THE MULTI-MEGAWATT 110 GHz ECH SYSTEM FOR THE DIII D TOKAMAK GA A22576 INITIAL RESULTS FROM THE MULTI-MEGAWATT 110 GHz ECH SYSTEM by R.W. CALLIS, J. LOHR, R.C. O NEILL, D. PONCE, M.E. AUSTIN, T.C. LUCE, and R. PRATER APRIL 1997 This report was prepared as an account

More information

ICRF-Edge and Surface Interactions

ICRF-Edge and Surface Interactions ICRF-Edge and Surface Interactions D. A. D Ippolito and J. R. Myra Lodestar Research Corporation Presented at the 19 th PSI Meeting, San Diego, CA, May 24-28, 2009 Introduction Heating and current drive

More information

Recent progress of 170 GHz Gyrotron in KSTAR

Recent progress of 170 GHz Gyrotron in KSTAR Recent progress of 170 GHz Gyrotron in KSTAR Japan-Korea Workshop on Physics and Technology of Heating and Current Drive Hanwha Resort, Haeundae, Busan, Korea January 28-30, 2013 J.H. Jeong, M. Joung,

More information

FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture

FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture Konrad Gajewski 10 September 2013, Uppsala Why FREIA? Several circumstances test stand for

More information

TECHNICAL SPECIFICATIONS. FOR AN MRBR 7.0 TESLA / 160mm ACTIVELY SHIELDED ROOM TEMPERATURE BORE MAGNET SYSTEM

TECHNICAL SPECIFICATIONS. FOR AN MRBR 7.0 TESLA / 160mm ACTIVELY SHIELDED ROOM TEMPERATURE BORE MAGNET SYSTEM TECHNICAL SPECIFICATIONS FOR AN MRBR 7.0 TESLA / 160mm ACTIVELY SHIELDED ROOM TEMPERATURE BORE MAGNET SYSTEM Prepared by:- Magnex Scientific Limited The Magnet Technology Centre 6 Mead Road Oxford Industrial

More information

Magnetics and Power System Upgrades for the Pegasus-U Experiment

Magnetics and Power System Upgrades for the Pegasus-U Experiment Magnetics and Power System Upgrades for the Pegasus-U Experiment R.C. Preston, M.W. Bongard, R.J. Fonck, and B.T. Lewicki 56 th Annual Meeting of the APS Division of Plasma Physics University of Wisconsin-Madison

More information

ICRF antenna matching systems with ferrite tuners for the Alcator C-Mod tokamak

ICRF antenna matching systems with ferrite tuners for the Alcator C-Mod tokamak ICRF antenna matching systems with ferrite tuners for the Alcator C-Mod tokamak The MIT Faculty has made this article openly available. Please share how this access benefits you. Your story matters. Citation

More information

Alcator C-Mod Ion Cyclotron Antenna Performance

Alcator C-Mod Ion Cyclotron Antenna Performance FT/-6 Alcator C-Mod Ion Cyclotron Antenna Performance S.J. Wukitch, T. Graves, Y. Lin, B. Lipschultz, A. Parisot, M. Reinke, P.T. Bonoli, M. Porkolab, I.H. Hutchinson, E. Marmar, and the Alcator C-Mod

More information

Improved core transport triggered by off-axis ECRH switch-off on the HL-2A tokamak

Improved core transport triggered by off-axis ECRH switch-off on the HL-2A tokamak Improved core transport triggered by off-axis switch-off on the HL-2A tokamak Z. B. Shi, Y. Liu, H. J. Sun, Y. B. Dong, X. T. Ding, A. P. Sun, Y. G. Li, Z. W. Xia, W. Li, W.W. Xiao, Y. Zhou, J. Zhou, J.

More information

IAEA-CN-94/FT/2-2 Test Results on Systems Developed for SST-1 Tokamak

IAEA-CN-94/FT/2-2 Test Results on Systems Developed for SST-1 Tokamak Test Results on Systems Developed for SST-1 Tokamak D. Bora, and SST-1 TEAM Institute for Plasma Research, Bhat, Gandhinagar 382 428, INDIA e-mail: dbora@ipr.res.in Abstract. Steady state Superconducting

More information

Micro-manipulated Cryogenic & Vacuum Probe Systems

Micro-manipulated Cryogenic & Vacuum Probe Systems Janis micro-manipulated probe stations are designed for non-destructive electrical testing using DC, RF, and fiber-optic probes. They are useful in a variety of fields including semiconductors, MEMS, superconductivity,

More information

A Modular Commercial Tokamak Reactor with Day Long Pulses

A Modular Commercial Tokamak Reactor with Day Long Pulses PFC/JA-82-217 A Modular Commercial Tokamak Reactor with Day Long Pulses L. Bromberg, D.R. Cohn, and J.E. C. Williams Massachusetts Institute of Technology Cambridge, Massachusetts 02139 Journal of Fusion

More information

Overview of ICRF Experiments in Alcator C-Mod

Overview of ICRF Experiments in Alcator C-Mod Overview of ICRF Experiments in Alcator C-Mod 50 th APS Plasma Physics Conference November 17-1, 008 S.J. Wukitch, Y.Lin, P.T. Bonoli, A. Hubbard, B. LaBombard, B. Lipschultz, M. Porkolab, J.E. Rice, D.

More information

Initial Active MHD Spectroscopy Experiments Exciting Stable Alfvén Eigenmodes in Alcator C-Mod

Initial Active MHD Spectroscopy Experiments Exciting Stable Alfvén Eigenmodes in Alcator C-Mod PSFC/JA-03-26 Initial Active MHD Spectroscopy Experiments Exciting Stable Alfvén Eigenmodes in Alcator C-Mod J.A. Snipes, D. Schmittdiel, A. Fasoli*, R.S. Granetz, R.R. Parker 16 December 2003 Plasma Science

More information

Experimental results and Upgrade plan of ECH/CD system in KSTAR

Experimental results and Upgrade plan of ECH/CD system in KSTAR 2015 KSTAR conference, Feb. 27, 2015, Daejeon, Korea Experimental results and Upgrade plan of ECH/CD system in KSTAR J. H. Jeong a, Y. S. Bae a, M. Joung a, J. W. Han a, I. H. Rhee a, I. H. Rhee a, S.

More information

J.A. Casey and J.H. Irby. M.I.T. Plasma Fusion Center

J.A. Casey and J.H. Irby. M.I.T. Plasma Fusion Center March 27, 1986 PFC/JA-86-16 Thomson Scattering in the Tara Tandem Mirror Central Cell J.A. Casey and J.H. Irby M.I.T. Plasma Fusion Center I ABSTRACT: A Thomson Scattering experiment is under construction

More information

5.4 Production of the R.F. Magnetic Field 5.11

5.4 Production of the R.F. Magnetic Field 5.11 Chapter 5 - Experimental Apparatus 5.1 Introduction 5.1 5.2 Large System 5.1 5.3 The Solenoid 5.'7 5.4 Production of the R.F. Magnetic Field 5.11 5.5 Small System 5. 5.1 5.1 Introduction Details of the

More information

Importance of edge physics in optimizing ICRF performance

Importance of edge physics in optimizing ICRF performance Importance of edge physics in optimizing ICRF performance D. A. D'Ippolito and J. R. Myra Research Corp., Boulder, CO Acknowledgements D. A. Russell, M. D. Carter, RF SciDAC Team Presented at the ECC Workshop

More information

The Results of the KSTAR Superconducting Coil Test

The Results of the KSTAR Superconducting Coil Test K orea S uperconducting T okamak A dvanced R esearch The Results of the KSTAR Superconducting Coil Test Nov. 5 2004 Presented by Yeong-KooK Oh Y. K. Oh, Y. Chu, S. Lee, S. J. Lee, S. Baek, J. S. Kim, K.

More information

VGOS MEMO #042 MASSACHUSETTS INSTITUTE OF TECHNOLOGY HAYSTACK OBSERVATORY WESTFORD, MASSACHUSETTS August 22, 2016

VGOS MEMO #042 MASSACHUSETTS INSTITUTE OF TECHNOLOGY HAYSTACK OBSERVATORY WESTFORD, MASSACHUSETTS August 22, 2016 To: From: Subject: VGOS MEMO #042 MASSACHUSETTS INSTITUTE OF TECHNOLOGY HAYSTACK OBSERVATORY WESTFORD, MASSACHUSETTS 01886 Space Geodesy Project August 22, 2016 Ganesh Rajagopalan and Chris Eckert Failure

More information

High Rep-Rate KrF Laser Development and Intense Pulse Interaction Experiments for IFE*

High Rep-Rate KrF Laser Development and Intense Pulse Interaction Experiments for IFE* High Rep-Rate KrF Laser Development and Intense Pulse Interaction Experiments for IFE* Y. Owadano, E. Takahashi, I. Okuda, I. Matsushima, Y. Matsumoto, S. Kato, E. Miura and H.Yashiro 1), K. Kuwahara 2)

More information

CRYOGENICS OPERATIONS 2008

CRYOGENICS OPERATIONS 2008 CRYOGENICS OPERATIONS 2008 Organized by CERN Collection of data related to the operation experience on the Tore Supra cryogenic system Related to the European Fusion Development Agreement Task TW6-TSL-004

More information

EC 1402 Microwave Engineering

EC 1402 Microwave Engineering SHRI ANGALAMMAN COLLEGE OF ENGINEERING & TECHNOLOGY (An ISO 9001:2008 Certified Institution) SIRUGANOOR,TRICHY-621105. DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING EC 1402 Microwave Engineering

More information

MG7095 Tunable S-Band Magnetron

MG7095 Tunable S-Band Magnetron MG7095 Tunable S-Band Magnetron The data should be read in conjunction with the Magnetron Preamble and with British Standard BS9030 : 1971. ABRIDGED DATA Mechanically tuned pulse magnetron intended primarily

More information