LEAD DESIGN SPECIFICATIONS

Size: px
Start display at page:

Download "LEAD DESIGN SPECIFICATIONS"

Transcription

1 Maine State Housing Authority (MaineHousing) LEAD HAZARD REDUCTION DEMONSTRATION GRANT PROGRAM LEAD DESIGN SPECIFICATIONS APPLICANT (OWNER): CO-APPLICANT (CO-OWNER): Company Name (if applicable) Company Name (if applicable) First Name MI Last Name First Name MI Last Name PROPERTY: COMMUNITY ACTION AGENCY (CAA): Property Street CAA Name Property City Property State Property Zip CONTRACTOR: CONTRACT DATE: CONTRACT AMOUNT: Contractor Name LEAD DESIGN PREPARED BY: UNIT #: Designer Name FINAL DESIGN DATE: After careful review the applicant(s) and contractor understand and accept the work described. Only the work listed in this Design Specification will be performed. ANY and ALL changes to these design specifications must be by a written change order and agreed to by all parties following program requirements. OWNER Signature of Owner Date Signature of Co-Owner Date CONTRACTOR Signature of Contractor Representative Date Contractor Representative Name Contractor Telephone Number Demonstration Grant Program Page 1 of 23 Construction Contract - Exhibit C

2 REHABILITATION STANDARDS AND SPECIFICATIONS SECTION 1 GENERAL REQUIREMENT FOR ALL PROJECT SPECIFICATIONS 1. All work performed shall conform to the General Standards herein, DEP Lead Management Regulations (Chapter 424), HUD requirements for Notification, Evaluation, and Reduction of Lead-Based Paint Hazards in Federally Owned Residential Property and Housing receiving Federal assistance (24 CFR Part 35) EPA Renovation, Repair and Painting Rule, manufactures recommendations, and all applicable Local and State building codes, laws and regulations. If no local building code exists, the MUBEC will apply. 2. Scrape inspections are required for removal of paint from components (abatement or interim control). Scrape inspections are required for both interior and exterior work prior to the priming and or painting process. If a scrape inspection has not been performed, the Contractor will be required to remove any paint to ensure compliance with this section. 3. Any and all DEP project variances must also be approved in writing by the Lead Designer and Maine Housing prior to implementation. NOTE: Monetary change orders may be required by Maine Housing. 4. All measurements are approximate and must be verified by the Contractor. No claim for additional funds due to discrepancies in measurements or quantities shall not be honored. 5. All Materials having color or pattern shall be selected by the owner from standard color/style chart. All colors, styles, and types of materials will be listed in the job specifications prior to contract signing. 6. All installed windows and exterior doors will be Energy Star rated for the Northeast. All windows will have a U-Value of.30 or less. Windows will have full screens. Egress casement windows will have a factory installed horizontal mullion to give the appearance of a double hung window. NOTE: Single hung windows will require half screens. 7. All exterior doors installed will be keyed alike (per unit), and include adjustable thresholds and half glass unless otherwise noted in design specifications. Exterior doors will meet Energy Star requirements for the Northeast. 8. Building permits, electrical permits, plumbing permits and other permits required by local or State authorities shall be obtained by the contractor and the costs shall be incorporated into the proposal amount submitted by contractor. Contractor must obtain permits prior to commencement of work and must provide copies of permits to the Owner and the CAA for documentation. Failure to obtain required permits will result in nonpayment of work until the necessary permits are obtained. 9. Workmanship and materials not covered by manufacturers warranty shall be warranted by the Contractors for a period of at least one year from date of final payment to the contractor. All manufacturer warranties shall be delivered by the Contractor, to the homeowner along with the final billing. Manufacturer s installation instructions, as required by the 2009 ICC Code shall be available on the job site at the time of inspection. 10. Product information/labeling showing compliance, where required, with Energy Star Ratings shall be provided to the home owner and CAA prior to installation. 11. All Interim Control work must be performed in accordance with both RRP and HUD Lead-Based Paint regulations as described in 24 CFR Part 35 et al, with the exception that certain contractors such as electrical, plumbing, roofing, weatherization and heating specialists may be exempt from using HUD lead safe practices so long as they do not disturb any more than two square feet of painted surfaces per room or a total of 20 square feet of painted surfaces on the exterior. Contractors performing work in accordance with HUD Lead-Based Paint regulations as described in 24 CFR Part 35 et al must have attended an EPA RRP course taught by a Maine DEP certified training provider. Lead safe practices must be employed in all work that disturbs painted surfaces. After completion of all work, contractor must clean the work area(s) to meet HUD Lead Dust clearance standards as follows; Hard floors and Carpeted floors = 10 micrograms (ug) per square foot (ft 2 ). Interior Window Sills = 100 ug/ ft 2 Window troughs = 100 ug/ ft 2 Other nonporous surfaces = 10 ug/ ft 2 If dust wipe samples do not pass the above standards, contractor must return to the job site, at his own expense, and clean until these standards are met. Final payment will be withheld until clearance Demonstration Grant Program Page 2 of 23 Construction Contract - Exhibit C

3 standards are achieved. Costs incurred for an additional site visit and dust wipe sampling costs will be taken from monies due to the contractor. In homes where there are children under 6 years of age the Owners must, at their own expense, temporarily relocate these children from work areas where paint will be disturbed until the work has been completed and the dust wipe clearance standards shown above have been achieved. 12. The contractor must inspect the property and attend a pre-bid walkthrough. Submission of a bid is presumptive evidence that the bidder has thoroughly examined the site during a pre-bid walk through and is conversant with the requirements of the local jurisdiction. 13. All materials used in conjunction with this work write-up are to be new, of first quality and without defects unless stated otherwise or pre-approved by owner and Design Consultant in writing. 14. Contractors shall not perform any work, substitute any specified materials, colors, patterns, quantities, or change specified material qualities or quantities not listed in the job specifications without a written change order pre approved by Maine Housing, owner and Lead Design Consultant. 15. All materials shall be installed in full accordance with the manufactures specifications and industry standards for working conditions, surface preparation, methods, testing, and protection. 16. All repaired or newly installed exterior non pressure treated wood must be sealed, stained or otherwise protected from the elements following industry standards. 17. Walls and attached components shall be identified with the letters A, B, C, D etc. Wall A is always the wall that is closest to the address elevation or street side of the house. Moving clockwise, the walls are then B, C, D, etc. 18. Down payment or deposits to contractors are not authorized. No work/materials will be paid for in advance. 19. Detailed invoices shall accompany each payment request. 20. The use of the Booth system will be determined by the Lead Design Consultant. Determination shall be in writing. 21. Any and all changes in the Lead Design agreed to during the Pre-bid Walkthrough will be made in writing in the form of a bid amendment. This form will become part of the contractors bid proposal and will be submitted with contractors bid. SECTION 2 DEFINITIONS 1 Abatement. Abatement means any measure or set of measures designed to permanently eliminate lead hazards. For the purpose of this definition, permanently means for at least 20 years. 2 Impact Surface. Impact surface means a surface that is subject to damage by repeated sudden force, such as certain parts of door frames. 3 Interim control. Interim control means a set of non-abatement measures designed to temporarily reduce human exposure or likely exposure to lead hazards, including specialized cleaning, repairs, maintenance, painting, temporary containment, ongoing monitoring of potential lead hazards and the establishment and operation of management and resident education programs. NOTE: When interim control measures (covering a surface with a coating or other treatment) are used, friction points or friction surfaces must be treated so that paint is not subject to abrasion. Examples of acceptable treatments include re-hanging and or planning doors so that the door does not rub against the door frame, or removing paint from the friction/impact part of a door jamb (frame). 4 Install. Install means to purchase, set up, test, and warrant a new component. Replace means to remove and dispose of original material, purchase new material, deliver, install, test, and warrant. 5 PAINT. Paint means any substance applied to a surface as a coating, including, but not limited to household paints, varnishes, and stains. 6 Repair. Repair means to return a building component to like new condition through replacement, adjustment, and recoating of parts. 7 Reinstall. Reinstall means to remove, clean, store, and install a component. 8 Substrate. Substrate means the material underneath the paint such as brick, concrete, drywall, metal, plaster or wood. Demonstration Grant Program Page 3 of 23 Construction Contract - Exhibit C

4 9 Work Area. Work area means an interior or exterior area where lead abatement or interim control activities take place. There may be more than one work area in a residential dwelling or child care facility. 10 Window & Door Units. Window/door components are defined as follows: a. Window sash (includes mullions) b. Window casing (includes header and apron) c. Window sill d. Window jamb ( includes parting bead and stops) e. Window well ( also called trough) f. Door (includes stiles, panels and edge) g. Door jamb ( includes frame and stops) h. Door casing ( includes header) i. Door threshold SECTION 3 SCOPE of WORK The scope of work shall consist of complete paint removal, encapsulation, enclosure, and/or whole component removal of lead-based paint hazards as identified in the lead based-paint inspection report. 1. Owner Responsibilities: A. Owner shall remove all personal belongings from the house/work area. B. Owner shall shut off gas to the stove, (if applicable). C. Owner shall provide keys to the Contractor for access to the home. D. Owner shall pre-determine colors and flooring selections in writing. This shall be performed prior to the start date. E. Owner shall supply electricity, water and heat for the duration of the project. F. Owner shall remove and keep clear, all debris from the exterior at least 10 feet from the building perimeter if exterior work is performed. 2. Contractor Responsibilities: 2. Contractor shall confirm that all furniture and personal belongings have to be removed from the house/work area prior to the start of the project. 3. Contractor shall coordinate access to the home for any visual inspections and clearance sample testing. 4. Contractor shall be responsible for completing all work specified in the Design Plan including any and all revisions made to the design for the purpose of the project within contract dates specified. 5. Contractor shall perform an ASTM approved tape method before applying any encapsulating paint to a building component to ensure proper adhesion to the substrate. 6. Contractor shall store debris in a secure area until final disposal. Dispose of in accordance with the Department of Environmental Protection s Lead Management Regulations. 7. Contractor shall be financially responsible for all associated sampling costs such as administrator labor, travel, postage, and laboratory analysis of the dust samples if interim or final clearance samples fail. 8. Contractor shall repair or replace any building components damaged during the project to match existing building components. 9. All product warranty information must be given to the home owner prior to final payment of project. Product labels (stickers) showing Energy Star Compliance will remain in place until inspected and approved by Lead Design Consultant. 10. A written notification plan will be developed by the Contractor and provided to the owner/tenant, the Administrator and Maine Housing Demonstration Grant Program Page 4 of 23 Construction Contract - Exhibit C

5 11. Contractor shall provide a final abatement report to the MSHA, Administrator, and the homeowner within 30 days after project completion in accordance with DEP Chapter 424, Section 6.G. 12. The use of a Booth system will be determined by the Lead Design Consultant and shall be in writing. SECTION 4 NOTIFICATIONS 1. Notification: The abatement contractor shall notify the Department of Environmental Protection, the Administrator and Maine Housing at least five (5) working days prior to the start of any lead abatement activity, including set-up or on-site preparation activities. Delivery of notice by U.S. Postal Service, commercial delivery service, hand delivery, facsimile or are acceptable methods. Maine Housing also requires notification of Interim Control /LSR work performed on site. NOTE: A weekly updated schedule for each lead abatement project by dwelling unit, if applicable, shall be faxed/ ed each Monday morning to ALL above listed parties until the project is complete. In the event of a scheduled work day/hours are changed after the weekly notification, the contractor must notify the DEP, Administrator and MaineHousing by or phone no later than 8 A.M on the day of the scheduled change. 2. Tenant Notification: The abatement contractor shall notify the tenants of the pending abatement activity. This notification shall include the scheduled dates for abatement, work hours, identification of work areas, and information on any alternative entrance or exit to be used during the course of the abatement activities. This notification shall be in writing and delivered at least five days prior to the start of the project. SECTION 5 WINDOWS 1. Complete Window: A. Whole Component Removal and Replacement Abatement: Remove and dispose existing window, including storm window. Remove window weights if present. All windows must be labeled showing a U-vale of.30 or less. Labels must remain in place until approved/inspected by CAA Insulate window weight cavity using spray foam insulation. Caulk window stops using exterior grade caulking. Install pre approved complete [vinyl / clad / wood] [double hung / awning / casement / egress / basement hopper] following manufactures recommendations. Apply low expanding foam/caulking around window jamb/rough opening. [Re-install existing / Install new clear pine, matching existing] window stops. Any re-installed trim/window components damaged during removal will be replaced by contractor. NOTE: All windows will be 1 over 1 style sashes. Window grids will not be included unless specifically noted/written below. NOTE: Some window styles may change from existing style to allow for egress compliance requirements. NOTE: If existing exterior window casing is covered with coil stock, it shall be the contractors responsibility to ensure exterior window stops are also covered with coil stock when storm windows are removed. B. Interior Stops Abatement: Remove and dispose of existing window stops. Install new window stops matching existing style/color using clear pine or match existing material. C. Exterior Stops Abatement: Remove and dispose exterior window stops. Install new exterior window stops matching existing style/color using clear pine materials. Demonstration Grant Program Page 5 of 23 Construction Contract - Exhibit C

6 D. Interior Trim/Casing 2. Paint Removal: ABATEMENT: Remove and dispose of existing interior window trim/casing. Install new interior window trim/casing matching existing style/color using clear pine or match existing material. A. Sashes Abatement: Remove all paint to bare substrate. Apply one coat primer and two coats finish to entire surface of sash. INTERIM CONTROL: Wet scrape all loose and flaking paint from the window sash. Scraping work must be "feathered" at the edges such that a line between the new and original paint is not visible. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the sash. Apply one coat of primer to the scraped areas and two coats of finish paint to the entire surface of the sash. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. B. Casings/Aprons Abatement: Remove all paint to bare substrate. Apply one coat primer and two coats finish to entire surface of casing/apron. INTERIM CONTROL: Wet scrape all loose and flaking paint from the casing/apron. Wet sand smooth any rough paint edges. HEPA vacuum and wet wash the casing. Apply one coat of primer to the scraped areas and two coats of paint to the entire surface of the casing/apron. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. C. Jambs/Frames Abatement: Remove all paint to bare substrate. Include parting beads and stops. Apply one coat primer and two coats finish to entire surface of jamb/frame, parting beads and stops. INTERIM CONTROL: Wet scrape all loose and flaking paint from the window jamb where the sash strikes the jamb. Wet sand smooth any rough paint edges. HEPA vacuum and wet wash the jamb and frame. Apply one coat of primer to the scraped areas and two coats of paint to the entire surface of the jamb and frame. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. D. Sills Abatement: Remove all paint to bare substrate. Apply one coat primer and two coats finish to entire surface of sill. Demonstration Grant Program Page 6 of 23 Construction Contract - Exhibit C

7 INTERIM CONTROL: Wet scrape all loose and flaking paint from the window sill (both sides and edges). Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the sill. Apply one coat of primer to all areas and two coats of latex finish paint to the entire surface of the sill. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. E. Well/Troughs Abatement: Remove all paint to bare substrate. Apply one coat primer and two coats finish to entire surface of well/trough. INTERIM CONTROL: Wet scrape all loose and flaking paint from the window well/trough. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the sill. Apply one coat of primer to all areas and two coats of latex finish paint to the entire surface of the well/trough. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. F. Interior Stops Abatement: Remove all paint to bare substrate. Apply one coat primer and two coats finish to entire surface of stops. INTERIM CONTROL: Wet scrape all loose and flaking paint from the stops.. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the sill. Apply one coat of primer to all areas and two coats of latex finish paint to the entire surface of the stops. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. G. Exterior Stops Abatement: Remove all paint to bare substrate. Apply one coat primer and two coats finish to entire surface of stops. INTERIM CONTROL: Wet scrape all loose and flaking paint from the window well/trough. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the sill. Apply one coat of primer to all areas and two coats of latex finish paint to the entire surface of the stops. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. Demonstration Grant Program Page 7 of 23 Construction Contract - Exhibit C

8 SECTION 2 - WALLS 1. Interior Wall Repair Abatement: A. Complete Paint Removal: Remove all paint down to the bare substrate. Prepare walls for paint. Apply one coat of primer and two coats of interior finish paint to the entire wall. B. Whole Component Removal and Replacement: Remove defective wall by removing/preparing and disposing of properly damaged material.. Install new 1/2" sheetrock [gypsum wallboard] fastened to framing using bugle head screws. Tape and seal all seams and screw heads using joint compound. Use three coat method. Sand smooth. Apply one coat of primer and two coats of finish paint to the entire wall surface. C. Enclosure: Install new ½ sheetrock, paneling, or approved equal using bugle head screws. Tape and seal all seams and screw heads using joint compound. Tape three coat method and sand smooth. NOTE: 1x3 strapping may need to be fastened to wall in preparation for installing the sheetrock. Make sure all seams are caulked. D. Encapsulation: Wet scrape all loose and flaking paint down to the bare substrate. Apply one coat of primer and two coats of LBC according to the manufacturer s specifications. INTERIM CONTROL: Wall Repair: Wet scrape all loose and flaking paint from the wall. Fill and/or wet sand rough paint edges. Repair cracks, voids and defects in wall by removing/preparing, and disposing of properly damaged material. Repair/replace damaged areas and use taping/plastering techniques as needed to insure proper repair. Apply one coat of primer to the repaired areas and two coats of finish paint to the entire wall. 3. Ceiling Repair Abatement: primer and two coats of finish paint to the entire ceiling. B. Whole Component Removal and Replacement: Remove defective ceilings. Install new 1/2" sheetrock [gypsum wallboard] fastened to framing using bugle head screws or ring-shanked nails. Tape and seal all seams and nail heads using joint compound [U. S. Gypsum, Gold Bond or equal] Use three coat method. Sand smooth between coats. Apply one coat of primer and two coats of finish paint to the entire ceiling surface. Demonstration Grant Program Page 8 of 23 Construction Contract - Exhibit C

9 C. Enclosure: Install new ½ sheetrock, paneling, or approved equal using bugle head screws. Tape and seal all seams and screw heads using joint compound. Use the three coat method. Apply one coat of primer and two coats of finish paint. NOTE: 1x3 strapping may need to be fastened to wall in preparation for installing the sheetrock. D. Encapsulation: Wet scrape all loose and flaking paint. Apply one coat of primer and two coats LBC to the entire ceiling according to the manufacturer s specifications. INTERIM CONTROL: Ceiling Repair: Wet scrape all loose and flaking paint. Fill and/or wet sand rough paint edges. Repair cracks, voids and defects in ceiling by removing/preparing and disposing of properly damaged material. Repair/replace damaged areas and use taping/plastering techniques as needed to insure proper repair. HEPA vacuum and wet wash the entire ceiling surface. Apply one coat of primer to the repaired areas and two coats of finish paint to the entire ceiling. 4. Baseboard Repair Abatement: A. Complete Paint Removal: Wet scrape the entire baseboard down to the bare substrate. Apply one coat of primer and two coats of finish paint to the entire surface of the baseboard. B. Whole Component Removal and Replacement: Remove defective baseboard by removing / preparing and disposing of the damaged material. Install new baseboard using #1 select pine and surface four sides. Apply one coat of primer and two coats of finish paint to the baseboard to match existing trim. C. Enclosure: Enclose existing baseboards with ¼ luan plywood or other suitable material. Install quarter round cap molding to top of baseboards. Caulk all joints. Apply one coat of primer and two coats of finish paint to the entire surface. D. Encapsulation: Wet scrape all loose and flaking paint. Apply one coat of primer and two coats of LBC to the entire baseboard according to the manufacturer s specifications. INTERIM CONTROL: Baseboard Repair: Wet scrape all loose and flaking paint from the baseboard. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the baseboard. Apply one coat of primer to the entire area and two coats of finish paint to the entire surfaces of the baseboard. Demonstration Grant Program Page 9 of 23 Construction Contract - Exhibit C

10 5. Door Repair Abatement A. Complete Paint Removal: Wet scrape all paint down to the bear substrate. Apply one coat of primer and two coats of finish paint to the entire surface of the door. B. Whole Component Removal and Replacement: Remove and dispose of the door (including hardware) Install a new [six panel hollow core masonite door, 6 panel solid pine door, or luan door.] Exterior doors shall be Stanley K4, Brosco BE-89, Therma True style 204, or approved equal. All exterior doors must be labeled showing Energy Star compliance for the Northeast region. Labels must remain in place until approved/inspected by CAA. Newly installed exterior doors will have adjustable sills. Installation to include proper lockset [ Schlage F10 / F40] or approved equal and hinges. Newly installed exterior locksets/dead bolts will be keyed alike in each separate unit. Apply one coat of primer and two coats of finish paint to the entire surface of the door. NOTE: Exterior doors will be Energy Star compliant for the Northeast Region. Labels showing compliance will remain on doors until inspected/approved by Lead Design Consultant. NOTE: If existing exterior door has a screen/storm door in place, the screen/storm door will be replaced with similar style INTERIM CONTROL: Door Repair: Wet scrape all loose and flaking paint from the door. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. Scraping work must be "feathered" at the edges such that a line between the new and original paint is not visible. HEPA vacuum and wet wash the entire surface of the door. Apply one coat of primer to the scraped areas and two coats of finish paint to the entire door. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. 6. Casing Repair Abatement primer and two coats of interior finish paint to the entire wall. B. Whole Component Removal and Replacement: Remove and dispose of the door casings. Install premium pine casings on both sides to match the original as close as possible in style and material. Apply one coat of primer and two coats of finish paint to the entire surface of the new door casings. C. Enclosure: Install ¼ luan or approved equal using bugle head screws. Caulk all seams and screw holes. Apply one coat of primer and two coats of finish paint to the entire door casing. D. Encapsulation: Wet scrape all loose and flaking paint. Apply one coat of primer and two coats of LBC or Childguard to the entire door casings according to the manufacturer s specifications. Demonstration Grant Program Page 10 of 23 Construction Contract - Exhibit C

11 INTERIM CONTROL: Casing Repair: Wet scrape all loose and flaking paint from the casings. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the casings. Apply one coat of primer to the scraped area and two coats of finish paint to the entire surface of the casings. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. 7. Door Jamb Repair Abatement primer and two coats of finish paint to the entire surface of the door jamb. B. Whole Component Removal and Replacement: Remove and dispose of the door jambs. Install premium pine jambs to match the original as close as possible in style and material. Apply one coat of primer and two coats of finish paint to the entire door jamb. C. Enclosure: Install ¼ luan or approved equal using bugle head screws. Caulk all seams and screw holes. Apply one coat of primer and two coats of finish paint to the entire door jamb. Material $ Labor $ Total $ INTERIM CONTROL: Door Jamb Repair: Wet scrape all loose and flaking paint from the jamb where the door meets the jamb. Wet scrape all loose and flaking paint from the remainder of the jamb. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the jamb. Apply one coat of primer to the scraped areas and two coats of finish paint to the entire surface of the jamb NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. 8. Door Threshold Repair Abatement A. Complete Paint Removal: Remove all paint down to the bare substrate..apply one coat of primer and two coats of finish paint to the entire surface of the threshold. B. Whole Component Removal and Replacement: Remove and dispose of the threshold. Install new oak threshold to match the original as close as possible with in-stock materials. Apply one coat of primer and two coats of finish paint to the entire surface of the threshold. C. Enclosure: Install ¼ luan or approved equal using bugle head screws. Caulk all seams and screw holes. Apply one coat of primer and two coats of finish paint to match existing trim as close as possible. Demonstration Grant Program Page 11 of 23 Construction Contract - Exhibit C

12 INTERIM CONTROL: Threshold Repair: Wet scrape all loose and flaking paint from the threshold. Wet sand smooth the threshold. HEPA vacuum and wet wash the threshold. Apply one coat of primer and two coats of finish paint to the entire surface of the threshold. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. 9. Door Hardware Repair Abatement: A. Complete Paint Removal: Remove all paint from the hardware. "Clean" hardware and re-install. B. Removal and Replacement: Remove existing door hardware and Install new hardware as close as possible to the original with in-stock materials. INTERIM CONTROL: Door hardware Repair: Wet scrape all loose and flaking paint from the hardware. "Clean" hardware and re-install. 10. Stair Skirt-Stringer Repair Abatement primer and two coats of finish paint to the entire surface of the stair stringer. B. Whole Component Removal and Replacement: Remove and dispose of the skirt-stringer. Install new stair skirt-stringer to match the original. Apply one coat of primer and two coats of finish paint to the entire stair stringer. C. Enclosure: Enclose existing skirt-stringer with ¼ luan plywood or other suitable material. Install quarter Rd cap molding to top of skirt-stringer. Caulk all joints. Apply one coat of primer and two coats of finish paint to the entire surface. D. Encapsulation: Wet scrape all loose and flaking paint from the skirt-stringer.. Apply one coat of primer, and two coats of LBC to the entire stringer according to the manufacturer s specifications. INTERIM CONTROL: Stringer Repair: Wet scrape all loose and flaking paint from the skirt-stringer. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the skirt-stringer. Apply one coat of primer to the entire area and two coats of finish paint to the entire surfaces of the skirt-stringer. Demonstration Grant Program Page 12 of 23 Construction Contract - Exhibit C

13 11. Stair Handrail Repair Abatement A. Complete Paint Removal: Remove all paint down to bare substrate. Apply one coat of primer and two coats of finish paint to the entire surface. B. Whole Component Removal and Replacement: Remove and properly dispose of the handrail. Install new handrail to match the original as close as possible in style and material. Apply one coat of primer and two coats of finish paint to the entire surface of the handrail. C. Encapsulation: Wet scrape all loose and flaking paint from the entire handrail. Apply one coat of primer and two coats of LBC to entire handrail. INTERIM CONTROL: Handrail Repair: Wet scrape all loose and flaking paint from the handrail. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the handrail. Apply one coat of primer to the scraped areas and two coats of finish paint to entire surface of the handrail. 12. Stair Newel Post Repair Abatement primer and two coats of finish paint to the entire surface. B. Whole Component Removal and Replacement: Remove and dispose of the newel post. Install new newel post to match the original as close as possible in style and material. Apply one coat of primer and two coats of finish paint to the entire surface of the newel post. C. Enclosure: Enclose existing newel post with ¼ luan plywood or other suitable material. Caulk all joints. Apply one coat of primer and two coats of finish paint to the entire surface. D. Encapsulation: Wet scrape all loose and flaking paint from the entire handrail. Apply one coat of primer and two coats of LBC to the entire newel post. Demonstration Grant Program Page 13 of 23 Construction Contract - Exhibit C

14 INTERIM CONTROL: Newel Post Repair: Wet scrape all loose and flaking paint from the newel posts. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the newel post. Apply one coat of primer to the scraped areas and two coats of finish paint to entire surface of the newel post. 13. Stair Baluster Repair Abatement A. Removal and Replacement: Remove and dispose of the balusters. Install new balusters to match the original as close as possible in style and material. Apply one coat of primer and two coats of finish paint to the entire surface of the balusters. Color to be INTERIM CONTROL: Baluster Repair: Wet scrape all loose and flaking paint from the baluster. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the baluster. Apply one coat of primer to the scraped areas and two coats of finish paint to entire surface of the baluster. 14. Stair Tread Repair Abatement primer and two coats of finish paint to the entire surface. B. Removal and Replacement: Remove and dispose of the stair Install new stair tread to match the originals as close as possible in style and material with in-stock materials. Apply one coat of primer and two coats of finish paint to the entire surface. C. Enclosure: Install ¼ luan plywood or approved equal to the tread using screws. Caulk all seams and screw holes. Apply one coat of primer and two coats of finish paint to the entire surface. NOTE: the round bull nose may have to be sanded flat or cut flush in order to effectively utilize the enclosure method on the stair treads. INTERIM CONTROL: Tread Repair: Wet scrape all loose and flaking paint from the tread. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the tread. Install new FHA-approved, Nylon, stain release carpet [Salem Carpets or approved equal] over 6# rebound padding using tack strips according to the manufacturer's specifications. Owner to select in stock color / pattern under a $18.00 / SY (installed ) allowance. Carpet to have minimum 10 year warranty against fiber loss. Color/pattern to be 15. Stair Riser Repair Abatement A. Complete Paint Removal: Remove all paint down to the bare substrate.apply one coat of primer and two coats of finish paint to the entire surface. Demonstration Grant Program Page 14 of 23 Construction Contract - Exhibit C

15 B. Whole Component Removal and Replacement: Remove and dispose of the riser(s). Install new riser(s) to match the original as close as possible in style and material with in-stock materials. Apply one coat of primer and two coats if finish paint to the entire surface of the new riser(s). C. Enclosure: Install ¼ luan or approved equal to the riser using screws. Caulk all seams and screw holes. Apply one coat of primer and two coats of finish paint the entire surface. INTERIM CONTROL A: Riser Repair: Wet scrape all loose and flaking paint from the riser. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the riser. Apply one coat of primer to the scraped areas and two coats of finish paint to entire surface of the riser. INTERIM CONTROL B: Riser Repair: Wet scrape all loose and flaking paint from the riser. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the riser. Install new FHA-approved, Nylon, stain release carpet [Salem Carpets or approved equal] over 6# rebound padding using tack strips according to the manufacturer's specifications to the entire floor. Owner to select in stock color / pattern under a $18.00 / SY (installed ) allowance. Carpet to have minimum 10 year warranty against fiber loss. Color/pattern to be 16. Floor Repair Abatement primer and two coats of finish paint to the entire floor. NOTE: Deck paint may be used. B1. Enclosure Method for Painted Floor: Install ¼ luan underlayment or approved equal to the entire floor. Screw new flooring every 6 inches on center and every 4 inches along all edges. Screws are to be counter sunk. Apply levelastic floor leveler or approved equal to all nail/screw holes and seems. Caulk all edges. Floor shall be free of voids to insure proper installation of new flooring materials. B2. Enclosure Method for Carpeted Floors: Remove and dispose of the carpet and pad Scrape the entire original padding from the floor. Install ¼ luan underlayment or approved equal to the entire floor. Screw new flooring every 6 inches on center and every 4 inches along all edges. Screws are to be counter sunk. Apply levelastic floor leveler or approved equal to all nail/screw holes and seems. Caulk all edges. NOTE: Per DEP, an interim clearance sample is needed prior to installation of new materials by non-licensed personnel. Install new FHA-approved, Nylon, stain release carpet [Salem Carpets or approved equal] over 6# rebound padding using tack strips according to the manufacturer's specifications to the entire floor. Owner to select in stock color / pattern at a minimum $18.00 / SY (installed) allowance. Carpet shall have a minimum 10- year warranty against fiber loss. Color/pattern to be Demonstration Grant Program Page 15 of 23 Construction Contract - Exhibit C

16 B3. Enclosure Method Using Vinyl Tile or Vinyl Sheet: Install ¼ solid birch, maple, or CDX underlayment or approved equal to the entire floor. Screw new flooring every 6 inches on center and every 4 inch along all edges. Screws to be counter sunk. Apply levelastic floor leveler or approved equal to all nail/screw holes and seems. Caulk all edges. Floor shall be free of voids to insure proper installation of new flooring materials. Install new 1/8" vinyl floor tiles [ Armstrong, Standard, Excelon, Tarkett Artflecs, Tarkett Thru-Chip or approved equal ] or new vinyl inlaid [Tarkett, Mannington, Armstrong of equal]and secure using full spread waterproof cement according to the manufacturers specifications. All edge tile will be approximately the same width for an even appearance. Color/pattern to be B4. Enclosure Method Using Laminate Wood Flooring:. Install ¼ luan underlayment or approved equal to the entire floor. Screw new flooring every 6 inches on center and every 4 inch along all edges. Screws to be counter sunk. Apply levelastic floor leveler or approved equal to all nail/screw holes and seems. Caulk all edges. Floor shall be free of voids to insure proper installation of new flooring materials. Install interlocking laminate flooring (Pergo, Bella, Uniclick) or approved equal according the manufacturer s specifications. Install quarter round baseboard along the entire perimeter of the room. Owner shall select flooring type and color from in-stock materials. Color/style to be INTERIM CONTROL A: Floor Repair: Wet scrape all loose and flaking paint from the floor. Intact paint does not need to be scraped. HEPA vacuum and wet wash the entire surface of the floor. Apply one coat of primer and two finish coats to the entire surface of the floor. INTERIM CONTROL B: Floor Repair (unpainted floor): HEPA vacuum and wet wash the entire surface of the floor. Apply three coats of shellac/varnish, or poly to the entire surface of the floor. INTERIM CONTROL C: Floor Repair: Wet scrape all loose and flaking paint from the floor. Intact paint does not need to be scraped. Scrape the entire original padding from the floor. HEPA vacuum and wet wash the entire surface of the floor. Apply one coat of primer to the entire floor surface. Install new FHA approved, Nylon, stain release carpet [Salem Carpets or approved equal] over 6# rebound padding using tack strips according to the manufacturer s specifications to the entire floor. Owner to select in stock color / pattern under a $18.00 / SY (installed ) allowance. Carpet to have minimum 10-year warranty against fiber loss. Color/pattern to be 17. Wainscoting Repair Abatement primer and two coats of finish paint to the entire surface. B. Whole Component Removal and Replacement: Remove and dispose of the wainscoting by wrapping in a protective covering with all seams taped. Install new wainscoting to match the original as close as possible in style and material with in-stock materials. Apply one coat of primer and two coats of finish paint to the entire surface of the new wainscoting. Demonstration Grant Program Page 16 of 23 Construction Contract - Exhibit C

17 C. Enclosure: Install ¼ luan, ½ sheetrock, or approved equal using screws. Caulk all seams and screw holes. If installing sheetrock, use the three coat method using USG1 mud or approved equal. Apply one coat of primer and two coats of finish paint to the entire surface of the wainscoting. D. Encapsulation: Wet scrape all loose and flaking paint down to the bare substrate. Apply one coat of primer and two coats of LBC to the entire surface according the manufacturer s specifications. INTERIM CONTROL: Wainscoting Repair: Wet scrape all loose and flaking paint from the wainscoting. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the wainscoting. Apply one coat of primer to the scraped areas and two coats of finish paint to entire surface of the wainscoting. 18. Chair Rail Repair Abatement primer and two coats of finish paint to the entire surface of the new chair rail. B. Whole Component Removal and Replacement: Remove and dispose of the chair rail. Install new chair rails to match the original as close as possible in style and material with in-stock materials. Apply one coat of primer and two coats of finish paint to the entire surface of the new chair rail. C. Enclosure: Install ¼ luan using screws. Caulk all seams and screw holes. Apply one coat of primer and two coats of finish paint to the entire surface. D. Encapsulation: Wet scrape all loose and flaking paint down to the bare substrate. Apply one coat of primer and two coats of LBC to the entire surface. INTERIM CONTROL: Chair Rail Repair: Wet scrape all loose and flaking paint from the chair rail. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the chair rail. Apply one coat of primer to the all areas and two coats of finish paint to the entire surface of the chair rail. Demonstration Grant Program Page 17 of 23 Construction Contract - Exhibit C

18 19. Shelf Repair Abatement: primer and two coats of finish paint to the entire surface of the new shelves. B. Whole Component Removal and Replacement: Remove and dispose of the shelves. Install new #2 pine shelves to match the original as close as possible with in-stock materials. Apply one coat of primer and two coats of finish paint to the entire surface of the new shelves. C. Encapsulation: Wet scrape all loose and flaking paint down to the bare substrate. Apply one coat of primer and two coats of LBC to the entire surface. D. Enclosure: Install ¼ luan using screws. Caulk all seams and screw holes. Apply one coat of primer and two coats of finish paint to the entire surface of the shelves. INTERIM CONTROL: Shelf Repair: Wet scrape all loose and flaking paint from the shelves. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the shelves. Apply one coat of primer to the all areas and two coats of finish paint to the entire surface of the shelves. 20. Cabinet Repair Abatement primer and two coats of finish paint to the entire surface of the new cabinets. B. Whole Component Removal and Replacement: Remove and dispose of the cabinets. Install new wood wall cabinets. Cabinet layout will match existing unless otherwise noted. Cabinets are to be installed as plumb and level as existing conditions allow following industry standards. Owner to select from manufacturer's standard flat panel cabinet line. Cabinets to be Merillatt, Yorktowne, Tri-Pac, American Woodmark or pre-approved equal. Cabinets to have a solid wood front and particleboard sides. All cabinets must bear a National Kitchen Cabinet Association certification label. Model/style to be C. Enclosure: Install ¼ luan using screws, or wood laminate using manufacturer s specified adhesive. Caulk all seams and screw holes. Apply one coat of primer and two coats of finish paint to the entire surface of the cabinet. Demonstration Grant Program Page 18 of 23 Construction Contract - Exhibit C

19 D. Encapsulation: Wet scrape all loose and flaking paint down to the bare substrate. Apply one coat of primer and two coats of LBC to the entire surface of the cabinet. INTERIM CONTROL: Cabinet Repair: Wet scrape all loose and flaking paint the cabinets. Scrape to bare substrate all impact surfaces. Intact paint does not need to be scraped. Wet sand smooth the rough paint edges. HEPA vacuum and wet wash the entire surface of the cabinets. Apply one coat of primer to the scraped areas and two coats of finish paint to the entire surface of the cabinets. NOTE: All impact surfaces must be scraped to bare wood a minimum of 2 from impact edges. 21. Fireplace Mantle Repair Abatement primer and two coats of finish paint to the entire surface of the new mantle. B. Whole Component Removal and Replacement: Remove and dispose of the mantle. Install new mantle of the same style and design. Apply one coat of primer and two coats of finish paint. C. Enclosure: Install new ¼ luan to all of the interior walls. Caulk all seems and screw holes. Apply one coat of primer and two coats of finish paint to the entire interior of the cabinets including shelving. D. Encapsulation: Wet scrape all loose and flaking paint down to the bare substrate. Apply one coat of primer and two coats of LBC to the entire surface of the mantle. INTERIM CONTROL: Mantle Repair: Wet scrape all loose and flaking paint from the mantle. HEPA vacuum and wet wash the entire surface. Apply one coat of primer and two coats of finish paint to the entire surface. Demonstration Grant Program Page 19 of 23 Construction Contract - Exhibit C

20 22. Exterior Clapboard Repair Abatement EXTERIOR COMPONENTS primer and two coats of finish paint to the entire surface of the wall. B. Whole Component Removal and Replacement: Remove and dispose of the clapboards. Install new wood clapboards of the same style and design using ring-shanked nails. C. Enclosure: Prepare walls by re-nailing existing siding to provide smooth surface. Mechanically fasten a minimum of 3/8 fan-fold building insulation to the entire wall surface (including soffits). Vinyl enclosure systems do not need to be caulked or sealed according the Maine Lead Management Regulations, Chapter 424. All cuts at windows and doors will be cleanly cut and closely fitted. Install all required starter strips. Double four ( 8" ) or double five ( 10" ) vinyl siding [Alcoa Liberty, Alside, Certainteed or pre- approved equal] shall be installed in accordance with manufacturer's specifications, shall have at least a 20 year guarantee and include all installation accessories following manufacturers recommendations. Owner to select color from manufacturer's standard colors. Work to include all starter strips, J molding and corner trim. D. Encapsulation: Wet scrape all loose and flaking paint down to the bare substrate. Apply one coat of primer and two coats of LBC to the entire wall surface. INTERIM CONTROL: Clapboard Repair: Wet scrape all loose and flaking paint from the siding. Intact paint does not need to be scraped. HEPA vacuum and wet wash the siding. Apply one coat of primer to the scraped areas and two coats of exterior finish paint to the entire surface of the siding. 23. Exterior Trim Repair (Including upper and lower trim) Abatement primer and two coats of finish paint to the entire surface of the fascia. B. Whole Component Removal and Replacement: Remove and dispose of all fascia. Install new fascia board with the same style and design. C. Enclosure with Aluminum Coil Stock:. Install aluminum coil stock to the entire surface of the fascia using color coordinated nails. Caulk all seams (Do not caulk and seal long spans where the building needs room to expand and contract with the seasons). Material $ Labor $ Total $ Demonstration Grant Program Page 20 of 23 Construction Contract - Exhibit C

21 D. Encapsulation: Wet scrape all loose and flaking paint down to the bare substrate. Apply one coat of primer and two coats of LBC to the entire surface. Material $ Labor $ Total $ INTERIM CONTROL: Trim Repair: Wet scrape all loose and flaking paint from the trim. Intact paint does not need to be scraped. HEPA vacuum and wet wash the entire surface of the trim. Apply one coat of primer to the scraped areas and two coats of finish paint to entire surface of the trim. 24. Exterior Soffit Repair Abatement A. Complete Paint Removal: Remove all paint down to the bare substrate using DEP approved methods. Apply one coat of primer and two coats of finish paint to the entire surface of the wall. B. Whole Component Removal and Replacement: Remove and dispose of all soffit. HEPA vacuum and wet wash the entire surface of the trim. Install new soffit with the same style and design. C. Enclosure: Install new ventilated vinyl soffit [ Bird, Mastic, Alside or approved equal ] according to the manufacturer's specifications. Use color coordinated nails for installation. Caulk all seems. D. Encapsulation: Wet scrape all loose and flaking paint down to the bare substrate. Apply one coat of primer and two coats of LBC to the entire surface. INTERIM CONTROL: Soffit Repair: Wet scrape all loose and flaking paint from the soffit. Intact paint does not need to be scraped. HEPA vacuum and wet wash the entire surface of the trim. Apply one coat of primer to the scraped areas and two coats of finish paint to entire surface of the trim. 25. Porches Abatement primer and two coats of exterior finish paint to the entire surface of the ceiling. B. Whole Component Removal and Replacement: Remove and dispose of the porch ceiling. Install new ceiling to match the original as close as possible with in stock materials. Apply one coat of primer and two coats of exterior finish paint. C. Enclosure Using Vinyl: Prepare ceiling by re-nailing existing material to provide a smooth surface. Mechanically fasten a minimum of 3/8 ridgid building insulation to the entire porch ceiling. Vinyl enclosure systems do not need to be caulked or sealed according the Maine Lead Management Regulations, Chapter 424. All cuts at corners will be cleanly cut and closely fitted. Install all required starter strips. Solid vinyl soffit will be [Alcoa Liberty, Alside, Certainteed or approved equal] and shall be installed in accordance with manufacturer's specifications and shall have at least a 20 year guarantee. Owner to select color from manufacturer's standard colors. Work to include all starter strips and J molding. Demonstration Grant Program Page 21 of 23 Construction Contract - Exhibit C

Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16

Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16 Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB Job # BID-CDBG #16 Bid is to be turn-key, including all applicable code requirements, materials, labor, City Business License permits,

More information

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type. SECTION 062000 - FINISH CARPENTRY PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and

More information

DATE SENT: RESPONSE NEEDED: YES NO SUBJECT: Risk Assessment(s)

DATE SENT: RESPONSE NEEDED: YES NO SUBJECT: Risk Assessment(s) Michael Kennedy Kennedy Investments, LLC 803 McKinch Hwy Saranac, MI 48881 PHONE: (517) 243-7790 email: Michael.Kennedy@greenstonefcs.com DATE SENT: 03-27-15 RESPONSE NEEDED: YES NO SUBJECT: Risk Assessment(s)

More information

Material List for Log Complete Packages

Material List for Log Complete Packages Material List for Log Complete Packages DAYLIGHT BASEMENT EXTERIOR WALLS ( If Applicable ) 2X6 Pressure Treated Sills With 6" Foam Sill Sealer 2X6 K.D. Spruce Plates And Studs 2X10 K.D. Spruce Headers

More information

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation. Installation Guide for E-Series/Eagle High-Performance Mullion Windows with LVL Reinforcement and Installed Using Type B Clips Thank you for choosing Andersen. Instructions are for typical, new wood-framed

More information

Tools required by installer: Materials required by installer:

Tools required by installer: Materials required by installer: Installation Guidelines For Quaker Window Products Vinyl product line (Single Hung, Double Hung, Sliding Window, Fixed Window, Casement, Awning, and Hopper) Installer: Read these instructions completely

More information

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated DMI Database CCF5IF9HGLPD-QB (4,88) $14,775.00 CSI Section 05400 DMI Light Gage Structural Steel Framing Systems Angle Framing Bridging Channel Flat Strapping Furring Clip Angle Soffit/Fascia/Deck Framing

More information

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door Installation Guide for E-Series/Eagle Clad Hinged Inswing French Door Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place.

More information

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows Guide for E-Series/Eagle Clad Mechanically Fastened Windows Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place. Instructions

More information

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Installation Guidelines Next Dimension Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Windsor Windows & Doors Windsor Windows & Doors 900 S. 19 th St. 2210 Stafford St. Extn

More information

VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS

VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS BEFORE you start to remove the existing windows Place clean drop cloths in all work areas. Re-measure the opening to ensure the new window will fit. Remove

More information

Dear Contractor, I am glad that you are interested in our window rebate program.

Dear Contractor, I am glad that you are interested in our window rebate program. Dear Contractor, I am glad that you are interested in our window rebate program. I have included three documents with this letter. One is our form to indicate your intention to participate in the program.

More information

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to

More information

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions

More information

Eagle clad double-hung window installation instructions

Eagle clad double-hung window installation instructions Eagle clad double-hung window installation instructions These instructions are for typical installation in new typical wood frame wall construction. These instructions and methods are not intended for

More information

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section. SECTION 06200 - FINISH CARPENTRY PART 1 GENERAL 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section. 1.2 RELATED SECTIONS A. Section 06100 - Rough Carpentry:

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

SECTION WOOD DOORS

SECTION WOOD DOORS SECTION 08211 WOOD DOORS Notice to Vendors: CANV prefers to purchase products that contain tropical wood only if they are certified according to the guidelines of the Forest Stewardship Council (FSC).

More information

Sun Windows General Information New Construction Hinged Door Installation Instructions

Sun Windows General Information New Construction Hinged Door Installation Instructions A G H F H H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape F. Apply

More information

Chevy Chase Club June 30, 2008 Bowie Gridley Architects

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION 081433 - STILE AND RAIL WOOD DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Standard Lap and Self-Aligning Lap Siding Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.

More information

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

More information

ELIMINATING LEAD HAZARDS

ELIMINATING LEAD HAZARDS ELIMINATING LEAD HAZARDS Information and Instructions IOWA DEPARTMENT OF PUBLIC HEALTH Childhood Lead Poisoning Prevention Program 1 - (800) - 972-2026 Lead-based paint hazards can cause lead poisoning

More information

Installation Recommendations for Finless Frame Doors

Installation Recommendations for Finless Frame Doors Installation Recommendations for Finless Frame Doors These installation recommendations are made available by MI Windows and Doors, LLC (MI) to assist with the integration of finless or flange sliding

More information

SECTION PAINTS AND COATINGS

SECTION PAINTS AND COATINGS SECTION 09 90 00 PAINTS AND COATINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Surface preparation. B. Field application of paints and other coatings. 1.2 RELATED SECTIONS A. Division 05 - Metal Fabrications.

More information

INSTALLATION INSTRUCTIONS for Custom and Tradition Plus/W-4500 Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY

INSTALLATION INSTRUCTIONS for Custom and Tradition Plus/W-4500 Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY for Custom and Tradition Plus/W-4500 Pocket Windows (JII022) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Pocket (replacement) Double-Hung,

More information

Ash Brook Golf Course Scotch Plains, New Jersey

Ash Brook Golf Course Scotch Plains, New Jersey SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. SECTION 07460 LAP SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. B. Factory-finished fiber cement lap siding, panels, single,

More information

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.

More information

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system. www.quakerwindows.com www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines for all Quaker products with nail fins New

More information

SPECIFICATIONS PROPOSAL & BID DOCUMENT

SPECIFICATIONS PROPOSAL & BID DOCUMENT Cerro Gordo County Department of Public Health LEAD-BASED PAINT HAZARD CONTROL PROGRAM IALHB0628-16 SPECIFICATIONS PROPOSAL & BID DOCUMENT Property: 13 N Monroe Tenant s Relocating: Yes No Lead Based Paint

More information

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Vinyl Siding Labor Division 190. General Requirements

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Vinyl Siding Labor Division 190. General Requirements EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR Scope of Work Vinyl Siding Labor Division 190 General Requirements 1. All Work shall be performed in accordance with manufacturer

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

Finishing Finishing Instructions Painting Tips Aluminum Astragal Painting Doorlite Frame Finishing

Finishing Finishing Instructions Painting Tips Aluminum Astragal Painting Doorlite Frame Finishing Finishing... 2.3 Painting Tips... 2.6 Aluminum Astragal Painting... 2.9 Doorlite Frame Finishing... 2.10 SITE 2 2017 2.1 2.2 2017 SITE 2 SITE 2 2017 2.3 2.4 2017 SITE 2 SITE 2 2017 2.5 Painting Tips Therma-Tru

More information

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS. INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS. Installer: DO NOT DISCARD Please leave the Installation Guide

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1 [25.4mm] BASE DETAIL Please Read All sheet will be provided in stock sizes for field cutting. All trims will be provided in 8-0 stock lengths for field cutting. CEILING TRIM 1" [25.4mm] Acrovyn Interiors vinyl acrylic wall

More information

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10% EXAM INFORMATION Items 73 Points 73 Prerequisites NONE Course Length DESCRIPTION This is the first in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden

More information

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES 1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 08/31/2018 Installation Guideline Disclaimer This document contains general installation

More information

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS 2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 08 - OPENINGS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 08 - OPENINGS SECTION 081433 - STILE AND RAIL WOOD DOORS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior stile and rail wood doors and sidelites. 2. Interior stile and rail wood doors. 3. Interior fire-rated,

More information

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are

More information

Chapter 9. Windows and Exterior Doors

Chapter 9. Windows and Exterior Doors Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail apron

More information

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

Installation Instructions for Panel Siding and Soffit

Installation Instructions for Panel Siding and Soffit Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808

More information

Chapter 12 - Windows and Doors

Chapter 12 - Windows and Doors Chapter 12 - Windows and Doors Contents Chapter 12 - Windows and Doors... 12-1 Timing & Prerequisites... 12-2 Verifying Windows and Doors Orders... 12-3 Windows... 12-4 Prepare the Window Openings... 12-4

More information

PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 310 Oak Street Slinger, WI. Work Area: Pre-Renovation

PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 310 Oak Street Slinger, WI. Work Area: Pre-Renovation PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT Stantec Site: Work Area: Pre-Renovation Inspection Date: February 22, 2016 Report Date: March 10, 2016 NorthStar No. 160-064 Submitted By: NorthStar Environmental

More information

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES 1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 9/29/2017 Installation Guideline Disclaimer This document contains general installation

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

HR175 Sash Replacement Kit Installation Instructions

HR175 Sash Replacement Kit Installation Instructions HR175 Sash Replacement Kit Installation Instructions IMPORTANT: Please read before you begin. Weather Shield HR175 Sash Replacement Kits Important: Thoroughly read and follow these instructions, failure

More information

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing) Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing) Things to Know Before You Start Things to Know Before You Start Removal of Old Fenestration Products Ensure any old fenestration

More information

Chapter 12 - Windows and Doors

Chapter 12 - Windows and Doors Chapter 12 - Windows and Doors Contents Chapter 12 - Windows and Doors... 12-1 Timing & Prerequisites... 12-2 Verifying Windows and Doors Order... 12-3 Windows... 12-4 Prepare the Window Openings... 12-4

More information

Chapter 22 - Cabinets & Vanities

Chapter 22 - Cabinets & Vanities Chapter 22 - Cabinets & Vanities Contents Chapter 22 - Cabinets & Vanities... 22-1 Timing & Prerequisites... 22-2 Cabinets... 22-3 Cabinet Layout... 22-3 Wall Cabinets... 22-4 Assemble the Wall Units...

More information

EMILY BLACK FARMHOUSE. First Floor 1,617 SF Second Floor 1,292 SF Garage 543 SF Total 2,909 SF

EMILY BLACK FARMHOUSE. First Floor 1,617 SF Second Floor 1,292 SF Garage 543 SF Total 2,909 SF EMILY BLACK FARMHOUSE First Floor 1,617 SF Second Floor 1,292 SF Garage 543 SF Total 2,909 SF For more information, pricing or to schedule a visit, please call (207) 424-0400 or email homes@ This traditional

More information

PROJECT LOCATION SECTION PREFINISHED STEEL DOOR FRAMES

PROJECT LOCATION SECTION PREFINISHED STEEL DOOR FRAMES SECTION 08 1213.17 PART 1 - GENERAL 1.01 SECTION INCLUDES A. Prefinished steel door frames. B. [Sidelites] [, borrowed lites] [, and transom] assemblies. 1.02 RELATED REQUIREMENTS A. Section 06 2000 Finish

More information

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture A B A - Open / Closed (Page 5) B - Vented (Page 6) ON SITE STORAGE Store off the ground well supported, on a flat well-drained

More information

HELENA WOOLSEY HOUSE. First Floor 1,297 SF Second Floor 1,303 SF Garage 991 SF Total Living Space 2,600 SF

HELENA WOOLSEY HOUSE. First Floor 1,297 SF Second Floor 1,303 SF Garage 991 SF Total Living Space 2,600 SF HELENA WOOLSEY HOUSE First Floor 1,297 SF Second Floor 1,303 SF Garage 991 SF Total Living Space 2,600 SF For more information, pricing or to schedule a visit, please call (207) 424-0400 or email homes@

More information

Chapter 9. Windows and Exterior Doors

Chapter 9. Windows and Exterior Doors Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING BASEMENT EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail

More information

RACHEL KINNICUTT FARMHOUSE. First Floor 1,617 SF Second Floor 1,292 SF Garage 543 SF Total Living Space 2,909 SF

RACHEL KINNICUTT FARMHOUSE. First Floor 1,617 SF Second Floor 1,292 SF Garage 543 SF Total Living Space 2,909 SF RACHEL KINNICUTT FARMHOUSE First Floor 1,617 SF Second Floor 1,292 SF Garage 543 SF Total Living Space 2,909 SF For more information, pricing or to schedule a visit, please call (207) 424-0400 or email

More information

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO 2008 Pella Corporation Part Number: 801P0101 INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO Corner Corner Top Fin Corner

More information

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding Includes: Cove, Craftsmen Staggered, Diamond, Fish Scale, Octagon, Round and Old Mill Shingle Lap Important: Read and understand

More information

Bovard Studios Inc. Section April 6, 2004 Page 1

Bovard Studios Inc. Section April 6, 2004 Page 1 April 6, 2004 Page 1 This section includes solid flush and surface articulated wood doors, may have veneer facing, solid or glazed (stained glass) design, factory pre-fit, may be factory finished or site

More information

CHARLOTTE PRINDLE HOUSE. First Floor 1,297 SF Second Floor 1,303 SF Garage 991 SF Total 2,600 SF

CHARLOTTE PRINDLE HOUSE. First Floor 1,297 SF Second Floor 1,303 SF Garage 991 SF Total 2,600 SF CHARLOTTE PRINDLE HOUSE First Floor 1,297 SF Second Floor 1,303 SF Garage 991 SF Total 2,600 SF For more information, pricing or to schedule a visit, please call (207) 424-0400 or email homes@ This Greek

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary. for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) Thank you for selecting JELD -WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows

More information

GENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F

GENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F GENERAL INSTALLATION GUIDE: Unless otherwise indicated, all Seven Oaks M.U. Architectural Products materials are to be used for decorative purposes only. All products must be installed using ample amount

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation SL-450TB (2" x 4-1/2" with 1" Glazing) & SL-600TB (2" x 6" with 1" Glazing) IMPORTANT: Read all instructions before beginning installation.

More information

Thermally Broken Framing and Door Installation

Thermally Broken Framing and Door Installation INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation problems

More information

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply

More information

Flashing Materials. Rough Opening Preparation

Flashing Materials. Rough Opening Preparation Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or

More information

UNIT 12: INTERIOR DOORS AND TRIM

UNIT 12: INTERIOR DOORS AND TRIM KEY CONCEPTS 1. Identify tools needed for finishing and trim work 1. Cabinet and door hardware 2. Installation of doors 2. Identify common finishing tasks (trim, shelves, doorstops, bath accessories, etc.)

More information

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS RECOMMENDED INSTALLATION INSTRUCTIONS Please choose the appropriate instructions for the product(s) you are using. Read the instructions thoroughly before beginning the installation process. All instructions

More information

St. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011

St. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011 As responsible stewards of our facility, this list is maintained by the trustees to identify tasks we need to have completed to keep our church well groomed and attractive to present a welcoming, safe,

More information

Painting Hard Co. Inc.

Painting Hard Co. Inc. The Cottages ~ Marysville, Washington New Commercial Construction: 4 Building -Assisted living complex, 5 color paint job per Architect s Spec s. Historic Home ~ Seattle/Mt. Baker, Washington Page 1 of

More information

Quick Reference Guide For MoistureFree Certified Inspectors and Contractors

Quick Reference Guide For MoistureFree Certified Inspectors and Contractors Quick Reference Guide For MoistureFree Certified Inspectors and Contractors Topic Page No. Critical Elements Of The Kickout 2 Bad Kickout Examples 3 Raintek Kickout By Demand Products 4 Inspecting and

More information

Window Frame Installation Instructions For Nail-on and Block Frames

Window Frame Installation Instructions For Nail-on and Block Frames General The key to any window or door installation is preparation. This extends from storage of the product to the final installation and to all points in between. Careful planning and attention to detail

More information

Series Sloped glazed Curtain wall. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

Entry Level Assessment Blueprint Carpentry

Entry Level Assessment Blueprint Carpentry Entry Level Assessment Blueprint Carpentry Test Code: 4215 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Safety Demonstrate safe material handling practices Display comprehension

More information

Series 9000 Vinyl Single Hung

Series 9000 Vinyl Single Hung Series 9000 Single Hung Series 9000 Vinyl Single Hung Contents List of Architectural Drawings...9000SH - 3 Elevations - Single Hung...9000SH - 4 Available Sizes - Single Hung...9000SH - 5 Elevations -

More information

IMPORTANT: Please read completely before you begin.

IMPORTANT: Please read completely before you begin. Standardized Window Installation Instructions For Maintaining Design Pressure Ratings For Aluminum or Vinyl Clad & All-Vinyl Window Units With Nailing Fin Structure With Weather Resistant Barrier Applied

More information

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG 2008 Pella Corporation Part Number: 80ED0101 INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG Instrucciones en español

More information

Vinyl Windows Manufactured by VPI Quality Windows

Vinyl Windows Manufactured by VPI Quality Windows Vinyl Windows Manufactured by VPI Quality Windows Part Number: 531&591 Installation 531 & 591 SERIES SLIDING AND HUNG WINDOW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction.

More information

Wood Hinged Patio Door Installation Instructions

Wood Hinged Patio Door Installation Instructions Wood Hinged Patio Door Installation Instructions #1029970 / 1029971 / 1182557 (12/05) Rev 4 IMPORTANT: Please read before you begin installation. Wood Hinged Patio Door Door Installation Instructions IMPORTANT:

More information

Sliding Glass Door Assembly and Installation Guide

Sliding Glass Door Assembly and Installation Guide Sliding Glass Door Assembly and Installation Guide Index Door System Components and Hardware The following components are needed to complete the installation of your Sliding Patio Door unit. Check all

More information

Chapter 18. Interior Doors

Chapter 18. Interior Doors Chapter 18. Interior Doors 18.1 SWINGING DOORS 18.2 SLIDING DOORS 18.3 BIFOLD DOORS Tools needed by volunteers: Hammer Nail apron Tape measure Square Pencil Tools and equipment needed: Extension cords

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

Replacement Windows Measuring & Installation Guide

Replacement Windows Measuring & Installation Guide Proper Measuring Proper Measuring of Typical Wood Openings Replacement windows are ordered and manufactured E.B. (Exact Both) size, exact width and exact height. Windows are manufactured to the nearest

More information

POCKETING MULTI-SLIDE DOOR SYSTEM

POCKETING MULTI-SLIDE DOOR SYSTEM PMSD POCKETING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION! CAUTION Lead-based paint may be present in older homes, and the removal

More information

UNIT 5: EXTERIOR DOORS AND WINDOWS

UNIT 5: EXTERIOR DOORS AND WINDOWS KEY CONCEPTS 1. Identify tools needed for exterior door and window installation 2. Last step to weather proofing the home 3. Steps to installing exterior doors and windows 4. Maintenance and safety of

More information

INTERIOR. Checkrail. Flashing tape

INTERIOR. Checkrail. Flashing tape Pella Corporation 2007 Part Number: 808F0100 INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR PELLA PRECISION FIT DOUBLE-HUNG VENT WINDOW PARA LA VENTANA DE GUILLOTINA CON HOJA PRACTICABLE PRECISION

More information

LUCY SAYRE HOUSE. First Floor 1,274 SF Second Floor 768 SF Garage 576 SF Total Living Space 2,042 SF

LUCY SAYRE HOUSE. First Floor 1,274 SF Second Floor 768 SF Garage 576 SF Total Living Space 2,042 SF LUCY SAYRE HOUSE First Floor 1,274 SF Second Floor 768 SF Garage 576 SF Total Living Space 2,042 SF For more information, pricing or to schedule a visit, please call (207) 424-0400 or email homes@burntmillsettlement.com

More information

PATIENCE PRESCOTT HOUSE. First Floor 1,274 SF Second Floor 768 SF Garage 576 SF Total 2,042 SF

PATIENCE PRESCOTT HOUSE. First Floor 1,274 SF Second Floor 768 SF Garage 576 SF Total 2,042 SF PATIENCE PRESCOTT HOUSE First Floor 1,274 SF Second Floor 768 SF Garage 576 SF Total 2,042 SF For more information, pricing or to schedule a visit, please call (207) 424-0400 or email homes@ This Greek

More information

All bids must be submitted in a sealed envelope and plainly labeled on the outer most package RFP CDBG Housing

All bids must be submitted in a sealed envelope and plainly labeled on the outer most package RFP CDBG Housing BID Number: RFP 2015-0619 CDBG Housing WORK WRITE-UP BID SHEET CASE NUMBER: LCSS1203 BID OPENING DATE: June 19, 2015 TIME: 2:00 pm AT: Lincoln County C/O John Henry Purchasing Office Third Floor Citizens

More information

AMBICO Limited Section and WOOD BULLET RESISTANT DOORS AND FRAMES Page 1

AMBICO Limited Section and WOOD BULLET RESISTANT DOORS AND FRAMES Page 1 Page 1 This section includes AMBICO Bullet Resistant, Wood Doors and Bullet Resistant Steel Frames which meet the UL752 Standard for Bullet-Resisting Equipment. This section relies on both the Canadian

More information

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO 2008 Pella Corporation Part Number: 801V0101 INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE

More information