VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS"

Transcription

1 RECOMMENDED INSTALLATION INSTRUCTIONS Please choose the appropriate instructions for the product(s) you are using. Read the instructions thoroughly before beginning the installation process. All instructions are intended as basic guides for window and/or door installation. VINYL WINDOWS (new construction or replacement) page 2 VINYL PATIO DOORS pages 3-43 WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS (replacement) pages 6-86 WOOD CLAD PATIO DOORS...pages ALUMINUM WINDOWS.page 11 ALUMINUM PANNING (installation & sealing instructions)...page 12 If you do not see the appropriate product listed, or you require more in-depth instructions, please contact your Quaker window dealer.

2 General Installation Instructions for Quaker Windows Please read the following instructions thoroughly before beginning the installation process of the window. The instructions below are intended as a basic guide for window installation. If you require more in-depth instructions, please contact your Quaker window dealer. Installation of New Construction Vinyl Windows in Frame Walls 1. Be sure your rough opening is level, plumb, and square, and the dimensions are correct (fig. 1). The width and height of your rough opening should be a minimum of 1/2" larger than your window size, but not to exceed 1" (fig. 2) Prepare the sill of your rough opening for flashing tape. Make sure that you use the correct flashing tape for your installation application. Cut a piece of tape (it must be a minimum of 12" longer than the rough opening width). Apply the flashing by centering it width-wise on the sill stud and adhering it to the rough opening. Flashing should touch the back edge of the sill stud but should not go onto the interior side of the stud. Flashing should cover the entire width of the sill stud and should extend at least 6" up each jamb. On the exterior side of the rough 4a opening, the flashing should extend approximately 9" downward from the sill stud. 3. When installing an operating unit (hung, slider, or venting), be sure that the operating sash is closed completely and locked. 4. Apply a continuous bead of silicone caulk (3/8" wide) to the following places: a) exterior face of the rough opening (fig. 4a) b) backside of the nailing fin (fig. 4b) 5. From the outside, center the window in the opening. Leave approximately 1/4" of room on each side. 6. Find the pre-punched hole in the nailing fin's top right corner. Using roofing nails (minimum of 1" in length), nail the top right corner through the nailing fin (fig. 6). 7. Shim and adjust so that the window is square and level, then nail the top left corner (fig. 7). Important Note: Thickness for all shims should be the same from the inside to the outside to ensure jambs will not bow or hour-glass. 8. Again, check the window to make sure it is square and level. If it is not, shim and adjust where needed until the window is level, plumb, and square. An even reveal around the window's frame should be seen. 6" 9. Nail the two remaining corners. Note: Units over 36" wide will require blocking under the window sill. 10. Going around the perimeter of the nailing fin at 8" to 10" intervals, nail the 9" pre-punched holes. DO NOT NAIL EACH HOLE. DO NOT NAIL TOO TIGHT. 11. Check the window's operation. Window should work properly if installation is correct. Do not apply interior trim until window works properly. 12. Vertically mulled units require a drip cap before the flashing is applied. Flash the nail fin along jambs. Then apply flashing to window header last (fig. 12). If properly applied π, the flashing will eliminate water infiltration and assure a watertight seal. 13. Place insulation strips (fiberglass or similar) between the window frame and rough opening to eliminate cold drafts. DO NOT OVER-PACK INSULATION. Also, do not use expanding or spray-in type foams. They will distort the window frame, causing operating and performance problems. Doing so will also void any warranty. Caulk around the entire interior perimeter of the window. 14. Keep siding material 1/4" off the window head, so that pressure will not cause the window head to sag, and possibly damage glass and hinder the window's operation. If working with masonry or brick applications, see steps below. π For application instructions, see your authorized Quaker dealer, or call Quaker Window Products at When using House Wraps and OSB substrates, or with applications under 45 F (7 C), spray an application adhesive (available at your Quaker dealer) around the perimeter of the window before applying flashing. Different applications require different spray adhesives so please check with your dealer for the proper type. Installation of New Construction Windows into Masonry & Brick Veneer Walls Follow same steps as shown above but also: 1. Allow a 1/4" minimum clearance between the window frame perimeter and brick to allow for expansion and setting. 2. Fill the void with silicone caulking. 2 WARNING (Failure to follow these instructions renders all warranties as null & void) 1. Do not expose windows to direct heat or sunlight. 2. Store all windows inside. 3. When carrying window, always keep it in a vertical position. 4. Stack windows as straight as possible to avoid bowing. Do not lay flat. 5. Do not drill through window sill to install alarm wires. 6. If using muriatic acid or brick wash cleaning solutions, please follow the manufacturer s instructions found on the product label or on the manufacturer s website. Special Note: If broken, glass can fragment causing injury. All Quaker products are available with safety glass. In many areas, local building codes require safety glass in certain locations and/or applications. Unless Quaker's stipulations dictate safety glass or safety glass is specifically ordered, Quaker windows are not provided with safety glass. Before installing, Quaker recommends consulting local building codes for more definitive information b Installation of Replacement Vinyl Windows Preparation 1. Remove inside trim stops on existing window opening. 2. Remove existing lower sash by cutting sash cord or chain. Sash weights will fall. 3. Remove lower sash & parting stops at sides and top. 4. Remove upper sash in the same manner as lower sash. 5. Remove the four pulley assemblies and plug holes with insulation. 6. If installing exterior casing covers (i.e. coil stock, break metal), now is the time to put on the sill cover. Extend it far enough on the sill so the new window will come down on top of it. 7. Caulk interior side of blindstop top and sides. Caulk inside edge of existing stool where window sill butts against stool. 8. Caulk the head of the rough opening in two places, so that when the window is inserted into the opening, the window's head expander will press against it. Place a strip or two of insulation in the head expander before placing it on the new window. 9. Place another strip of insulation on the sill. Set the window in the opening. Push out to stops. Installation 10. Pack insulation around side jambs. Do not use expanding or spray-in type foams. They will distort the window frame, causing operating and performance problems. Doing so will also void any warranty. 11. Lock up the window and check for squareness. Adjust as required. Sash MUST be square to master frame and bottom sash MUST sit evenly on sill. Shim window at jambs and wherever else accordingly. DO NOT OVERSHIM. 12. Secure window in place using six installation screws through jambs. Bring screws up snug, but do not overtighten. 13. Check for even alignment of both sashes to side jambs. 14. Check to assure window is operating properly, then replace inside trim stops. 15. Snap in the exterior sill trim. (It may need to be trimmed before it is applied.) Caulk and seal around it. 16. Caulk around perimeter of window inside & outside. Quaker Window Products reserves the right to implement design modifications &/or product changes at any time which may cause installation instructions to vary slightly Freeburg, MO A Tradition of Quality since 1949!

3 General Installation Instructions for Quaker Patio Doors Please read the following instructions thoroughly before beginning the installation process of the patio door. The instructions below are intended as a basic guide for patio door installation. If you require more in-depth instructions, please contact your Quaker dealer. Installation of New Construction Patio Doors in Wall Frame NOTE: Your patio door should have additional installation instructions attached when delivered. Refer to these instructions for installation of door hardware and screen adjustment. 1. Check rough opening for proper size for your patio door. Make sure the rough opening is plumb and square (figure 1). 2. With a 6-0 level, check floor inside rough opening for level and straightness (figure 2). There must be no crown or dip in floor as this will cause improper door and screen operation. Correct any problems with floor before proceeding. 3. Patio door is pre-assembled. Inspect door to make sure the sliding door panel is on correct side for your installation. If not, contact your dealer or supplier immediately. 4. Lay down three (3) 1/4 beads of caulk on the floor where the door sill is to set (figure 4). 5. Run a 1/4 bead of caulk outside of the rough opening behind the area in which the nailing fin overlays the opening (figure 5). 6. From outside, insert door into rough opening bottom first. Be sure to set bottom of door into caulking (figure 6). DO NOT SLIDE THE DOOR INTO THE ROUGH OPENING. 7. Center the door in the rough opening and tack the bottom corners of the side nail fins. Square the entire door by measuring corner to corner then tacking the two upper corners. 8. Adjust trolleys under sliding door panel until panel is level and square to sill. Trolley adjustment can be accessed from the edge of the patio door by removing the round end cap to expose the screw head. 9. Loosen nails tacked in upper corners of nail fins on exterior and adjust main frame of door so that it aligns with sliding door panel. 10. Shim main frame into place (figure 10). 11. Using 2" roofing nails, nail the pre-punched holes in the jamb fins at 8" to 10" intervals. DO NOT NAIL EACH HOLE. 12. Make sure the head of the main frame is straight and level and adjust as needed. Using 2" roofing nails, nail the pre-punched holes in the header fin at 8" to 10" intervals. Again, DO NOT NAIL EACH HOLE. 13. Inspect sliding door panel operation for smooth travel and proper alignment with master frame. 14. Apply the flashing over the nail fin along jambs first. Then apply flashing to the patio door header last (figure 14). If properly applied π, the flashing will eliminate water infiltration and assure a watertight seal. If sidelites are mulled to the patio door, a drip cap is required before the flashing can be applied. 15. Insulate around main frame, but do not over pack as this may bow or distort the frame. Caulk around perimeter of the patio door inside & outside. Do not caulk over the weep holes on the exterior sill WARNING (Failure to follow these instructions renders all warranties as null & void) 1. Do not expose patio doors to direct heat or sunlight. 2. Store all patio doors inside. 3. Stack patio doors as straight as possible to avoid bowing. Do not lay flat. 4. Do not drill through door sill to install alarm wires. Special Note: If broken, glass can fragment causing injury. All Quaker products are available with safety glass. In many areas, local building codes require safety glass in certain locations and/or applications. Unless Quaker's stipulations dictate safety glass or safety glass is specifically ordered, Quaker windows are not provided with safety glass. Before installing, Quaker recommends consulting local building codes for more definitive information. Installation of Replacement Patio Doors NOTE: Your patio door should have additional installation instructions attached when delivered. Refer to these instructions for installation of door hardware and screen adjustment. 1. Check rough opening for proper size for your patio door. Make sure the rough opening is plumb and square (figure 1). 2. With a 6-0 level, check floor inside rough opening for level and straightness (figure 2). There must be no crown or dip in floor as this will cause improper door and screen operation. Correct any problems with floor before proceeding. 3. Patio door is pre-assembled. Inspect door to make sure the sliding door panel is on correct side for your installation. If not, contact your dealer or supplier immediately. 4. Lay down three (3) 1/4 beads of caulk on the floor where the door sill is to set (figure 4). 5. From outside, insert door into rough opening bottom first. Be sure to set bottom of door into caulking (figure 6). DO NOT SLIDE THE DOOR INTO THE ROUGH OPENING. 6. Center door in rough opening. Square the entire door by measuring corner to corner then shim accordingly. 7. Place lock side installation screws into jamb track (same track in which strike is located). Be sure to shim side jambs so that overall width in center is same as top width and bottom width. 8. On fixed panel side, remove the vinyl cover piece on the inside of the jamb with a putty knife. Do this by prying on the rounded edge of the vinyl cover piece at the top interior of the jamb (near the top bumper stop). Place installation screws behind this cover and replace cover when done. 9. Adjust trolleys under sliding door panel until panel is level and square to sill. Trolley adjustment can be accessed from the edge of the patio door by removing the round end cap to expose the screw head. 10. Make sure the head of the main frame is straight and level and adjust as needed. 11. Inspect sliding door panel operation for smooth travel and proper alignment with master frame. 12. Apply support block under the front edge of sill. 13. Insulate around main frame, but do not over pack as this may bow or distort the frame. 14. Caulk around perimeter of patio door inside & outside. Do not caulk over the weep holes at the exterior. π For application instructions, see your authorized Quaker dealer, or call Quaker Window Products at When using House Wraps and OSB substrates, or with applications under 45 F (7 C), spray an application adhesive (available at your Quaker dealer) around the perimeter of the patio door before applying flashing. Different applications require different spray adhesives so please check with your dealer for the proper type. 14 Quaker Window Products reserves the right to implement design modifications &/or product changes at any time which may cause installation instructions to vary slightly. A Tradition of Quality since 1949! 1-05

4

5 Please read the following instructions thoroughly before beginning the installation process of the window. The instructions below are intended as a basic guide for window installation, and are suggested installation details. If you require more in-depth instructions, please contact your Quaker dealer. Installation of Brighton Wood Clad Windows in Frame Walls 1. Remove all shipping blocks & cardboard wrapping unless so marked. 2. If window is not going to be finished IMMEDIATELY after installing, wrap window in plastic, or paint with primer if you are painting window to avoid warping. 3. Be sure your rough opening is level, plumb, and square, and the dimensions are correct (fig. 3). The width and height of your rough opening should be a minimum of 1/2" larger than your window size, but not to exceed 1". 4. (fig. 4) Prepare the sill of your rough opening for flashing tape. Make sure that you use the correct flashing tape for your installation application. Cut a piece of tape (it must be a minimum of 12" longer than the rough opening width). Apply the 7a flashing tape by centering it width-wise on the sill stud and adhering it to the rough opening. Flashing tape should touch the back edge of the sill stud but should not go onto the interior side of the stud. Flashing tape should cover the entire width of the sill stud and should extend at least 6" up each jamb. On the exterior side of the rough opening, the flashing tape should extend approximately 9" downward from the sill stud. 5. When installing an operating unit (hung or venting), be sure that the operating sash is closed completely and locked. 6. Using a staple remover, pliers, or flat screwdriver, remove the staples that are securing the retractable nailing fin and foam gaskets. Set the foam gaskets nearby for use in Step Apply a continuous bead of silicone caulk (3/8" wide) to the following places: a) exterior face of the rough opening except on the sill (fig. 7a) b) backside of the nailing fins except on the sill (fig. 7b) 8. Place unit in rough opening from outside, making sure that all 4 sections of nailing fin are standing up. The nailing fin should overlap sheathing. 9. Center window in opening. Leave approximately 1/4" of room on 6" each side Find the pre-punched hole in the nailing fin's top right corner. Using 9" roofing nails (minimum of 1" in length), nail the top right corner through the top nailing fin (fig. 10). 11. From the outside, center the window in the opening. Shim and adjust so that the window is square and level (fig. 11). Important Note: Thickness for 11 all shims should be the same from the inside to the outside to ensure jambs will not bow or hour-glass. 12. Level window and secure opposite top corner with a second nail. Then pull center of window in to measure the same at top or bottom. Again, check the window to make sure it is square and level. If it is not, shim and adjust where needed until the window is level, plumb, and square. An even reveal around the window's frame should be seen. 13. Nail the two remaining corners. Note: Units over 36" wide will require blocking under the window sill. 14. Place one (1) foam gasket at each corner (fig. 14) to fill the void between the horizontal and vertical nailing fin. The gasket should overlap each nailing fin it contacts, as well as the sheathing. Run a bead of caulk along the entire edge of the gasket (fig. 14a) where it touches the main frame. 15. Complete nailing around perimeter. Going around the perimeter of the nailing fin at 8" to 10" intervals, nail the pre-punched holes. DO NOT NAIL EACH HOLE. 16. Check the window's operation. Window should work properly if installation is correct. Do not apply interior trim until window works properly. Please note: When adjusting casement windows, it is not uncommon for them to shift during shipment. If operating sash is dragging on top, bottom or sides, there is an adjustment on the hardware to fix this. You will need an adjustment wrench. If you do not have one, they can be supplied by Quaker at the request of your local dealer. There is a metal nut under the operating arm that hooks onto the WARNING (Failure to follow these instructions renders all warranties as null & void) 1. Store all windows inside. During construction stage of home, do not expose wood interior to moisture, soiling, direct sunlight, temperature extremes or dramatic changes in humidity. Manufacturer assumes no responsibility for defacing, warping, splitting or de-lamination caused by failure to finish properly or faulty installation. 2. Stack windows as straight as possible to avoid bowing. Do not lay flat. 3. Do not drill through window sill to install alarm wires. 4. If using muriatic acid or brick wash cleaning solutions, please follow the manufacturer s instructions found on the product label or on the manufacturer s website. Special Note: If broken, glass can fragment causing injury. All Quaker products are available with safety glass. In many areas, local building codes require safety glass in certain locations and/or applications. Unless Quaker's stipulations dictate safety glass or safety glass is specifically ordered, Quaker windows are not provided with safety glass. Before installing, Quaker recommends consulting local building codes for more definitive information. 14a 7b 14 sash at the top and bottom of the window. Slide the wrench onto this nut and adjust to the left or right to shift the sash into the opening. Find a location that prevents the sash from dragging and still ensure a weather tight seal from the interior. 17. On the interior, shim side jambs and jack stud to provide straight true jambs. Window should measure the same in center as at the top and bottom on inside of the house. On wide units, block sill between window sill and rough sill. 18. Vertically mulled units require a drip cap before the flashing tape is applied. Flash the nail fins along jambs. Then apply flashing tape to window header last (fig. 18). If properly applied π, the flashing tape will eliminate water infiltration and ensure a watertight seal. Important note: House wraps must be diagonally cut at the header and must overlap the flashing tape on the header only. 19. Place insulation strips (fiberglass or similar) between the window frame and rough opening to eliminate cold drafts. DO NOT OVER-PACK INSULATION. Also, do not use expanding or spray-in type foams. They will distort the window frame, causing operating and performance problems. Doing so will also void any warranty. Caulk around the entire interior perimeter of the window. 20. Remove center band at this time. 21. Keep siding material 1/4" off the window head, so that pressure will not cause the window head to sag, and possibly damage glass and hinder the window's operation. If working with masonry or brick applications, see steps below. π For application instructions, see your authorized Quaker dealer, or call Quaker Window Products at When using House Wraps and OSB substrates, or with applications under 45 F (7 C), spray an application adhesive (available at your Quaker dealer) around the perimeter of the window before applying flashing tape. Different applications require different spray adhesives so please check with your dealer for the proper type. Installation of Brighton wood clad windows into Masonry & Brick Veneer Walls Follow same steps as shown at left but also: 1. Allow a 1/4" minimum clearance between the window sill and the brick to allow for expansion and setting. 2. Fill the void with silicone caulking. Quaker Window Products reserves the right to implement design modifications &/or product changes at any time which may cause installation instructions to vary slightly. A Tradition of Quality Since 1949! 10-06

6 TM 2-08 Installation of Classic Fit Wood Clad Windows Preparation 1. Remove inside trim stops on existing window opening. 2. Remove existing lower sash by cutting sash cord or chain. Sash weights will fall. 3. Remove lower sash & parting stops at sides and top. 4. Remove upper sash in the same manner as lower sash. 5. Remove all pulley assemblies and plug holes with insulation. 6. If installing exterior casing covers (i.e. coil stock, break metal), now is the time to put on the sill cover. Extend it far enough on the sill so the new window will come down on top of it. 7. Caulk interior side of blindstop top and sides. Caulk inside edge of existing stool where window sill butts against stool. 8. Caulk the head of the rough opening in two places, so that when the window is inserted into the opening, the window head will press against it. 9. Place a strip of insulation on the sill. Set the window in the opening. Push out to stops. Installation 1. Pack insulation around side jambs. DO NOT OVER-PACK INSULATION. ALSO, DO NOT USE EXPANDING OR SPRAY-IN TYPE FOAMS as they could distort the window frame, causing operating and performance problems. Doing so will also void any warranty. 2. Lock up the window and check for squareness. Adjust as required. Sash MUST be square to master frame and bottom sash MUST sit evenly on sill. Shim window at jambs and wherever else accordingly. DO NOT OVERSHIM. 3. Secure window in place using installation screws through jambs. The number of screws used will depend on the window s height. Place screws approximately 12 to 16 apart. Bring screws up snug, but do not overtighten. 4. Check for even alignment of both sashes to side jambs. 5. Open locks and check the window's operation. Window should work properly if installation is correct. Do not apply trim until window works properly. 6. Snap in the exterior head or jamb trim if needed. Caulk and seal around it. 7. Caulk around perimeter of window inside & outside. Please read the following instructions thoroughly before beginning the installation process of the window. The instructions below are intended as a basic guide for window installation. If you require more in-depth instructions, please contact your Quaker window dealer. WARNING (Failure to follow these instructions renders all warranties as null & void) 1.Per Quaker Window s Lifetime Limited Warranty, the interior of Quaker s wood windows and patio doors must be painted or stained within one (1) month after invoice date. If interior wood is not painted or stained within one (1) month of invoice date, warranty is null and void. 2. Store all windows inside. During construction stage of home, do not expose wood interior to moisture, soiling, direct sunlight, temperature extremes or dramatic changes in humidity. Manufacturer assumes no responsibility for defacing, warping, splitting or de-lamination caused by failure to finish properly or faulty installation. 3.Stack windows as straight as possible to avoid bowing. Do not lay flat. 4. Do not drill through window sill to install alarm wires. 5. If using muriatic acid or brick wash cleaning solutions, please follow the manufacturer s instructions found on the product label or on the manufacturer s website. Special Note: If broken, glass can fragment causing injury. All Quaker products are available with safety glass. In many areas, local building codes require safety glass in certain locations and/or applications. Unless Quaker's stipulations dictate safety glass or safety glass is specifically ordered, Quaker windows are not provided with safety glass. Before installing, Quaker recommends consulting local building codes for more definitive information. Quaker Window Products reserves the right to implement design modifications &/or product changes at any time which may cause installation instructions to vary slightly. A Tradition of Quality since 1949!

7

8

9 2-08 General Installation Instructions for Quaker Wood Clad Patio Doors Please read the following instructions thoroughly before beginning the installation process of your patio door. The instructions below are intended as a basic guide for patio door installation, and are suggested installation details. If you require more in-depth instructions, please contact your Quaker dealer. Installation of New Construction Patio Doors in Wall Frame NOTE: Your patio door should have additional installation instructions attached when delivered. Refer to these instructions for installation of door hardware and screen adjustment (if applicable). 1) Check rough opening for proper size for your patio door. Rough opening size should be ½ larger in width and ½ larger in height. 2) Check the door opening to ensure it is plumb, level and square (Fig. 2a). Check for square by measuring diagonally (Fig. 2b). Both diagonal measurements should be the same. Check for plumb by placing a level on both vertical studs. Both studs should be perfectly vertical. 3) With a 6 level, check floor inside rough opening for level and straightness (Fig. 2a). The floor must be level, flat and free of voids, holes chipping and other conditions. Correct any problems with floor before proceeding. Failure to do so could cause the seal to fail as well as improper door and screen operation. 4) Patio door is pre-assembled. Inspect door to make sure the operational set-up is correct. If not, contact your dealer or supplier immediately. 5) Remove the shipping materials from the unit. Remove the nailing fins (silver aluminum angles) from the interior sides and top of the unit. DO NOT THROW THESE AWAY! 6) Install the nail fins to the door. Note: If mulled units are to be installed with nail fins, Quaker recommends an aluminum drip cap be applied to the top of the unit before the nail fin. (Fig. 6). 7) Measure the frame width inside out to determine nail fin location for wall openings such as 4 9/16. Line up the ridges in the fins to the slots on the door unit and fasten the nail fin in place using the (18) #6 x 1 self-tapping screws provided (Fig. 6). 8) Place the gray corner seal gaskets provided over the nail fin corners on the exterior side of the door frame corner, this will seal the corners of the unit. 9) Install optional brickmold by snapping the brickmold into place (Fig. 9). If door was ordered without brickmold, skip this step and go to step 10): 10)Test fit the unit and draw a line around the perimeter where the nailing fin or brickmold fin will lie against the exterior wall. (This line will be a guide for sealing the sill and the unit.) 11)Remove door from test fit and apply three (3) 3/8 continuous beads of sealant across the full length of sub-floor (fig. 11). These beads must be no further than 4 ½ inside the pencil line created in step 10. If a wood sub-floor is present, flashing needs to be applied below the sill before installation. Note: All surfaces contacting sealant must be clean, dry and free of all contaminants prior to applying sealant. 12)Run a 3/8 bead of caulk outside of the rough opening behind the area in which the nailing fin or brickmold fin overlays the opening (fig 12). 13)Remove brackets holding any operational panels in place. 14)Place the unit into the opening. From outside, insert door into rough opening bottom first. Be sure to set bottom of door into caulking (Fig. 14). DO NOT SLIDE THE DOOR INTO THE ROUGH OPENING. 15)Center the door in the rough opening and tack the bottom corners of the side nail fins. Square the entire door by measuring corner to corner then tacking the two upper corners. 16)Place wood shims as shown in (Fig 16). On swinging units, adjust shims so that there is a consistent gap between the panel and the jambs on the entire unit. Shims should be placed directly behind each hinge where one screw has been left out. After shimmed behind each of these locations correctly, install the #8 X 3 screws provided to anchor side jamb and hinge into wall stud. 17)FOR SLIDING UNITS ONLY: Adjust shims so that the unit is square and level. Adjust trolleys under sliding door panel until it is level and square to sill. 18)Assure that the unit is plumb by placing a level on the outside of the jambs. Jambs must be perfectly vertical. Panels must be flush to jamb and/or other panels depending on operation. 19)Loosen nails tacked in upper corners of nail fins on exterior and adjust main frame of door so that it aligns with sliding door panel. 20)Using 2 1/2" roofing nails or drywall screws, nail the pre-punched holes in the nailing fins or brickmold fin along each jamb. Do this at 8" to 10" intervals. DO NOT NAIL EACH HOLE. 21)Make sure the head of the main frame is straight and level and adjust as needed. Using 2 1/2" roofing nails, nail the pre-punched holes in the nailing fin or brickmold fin on the header fin at 8" to 10" intervals. Again, DO NOT NAIL EACH HOLE. 2a b WARNING (Failure to follow these instructions renders all warranties as null & void) 1. Store all patio doors inside. During construction stage, do not expose wood interior to moisture, soiling, direct sunlight, temperature extremes or dramatic changes in humidity. Manufacturer assumes no responsibility for defacing, warping, splitting or de-lamination caused by failure to finish properly or faulty installation. 2. Stand patio doors as straight as possible to avoid bowing. Do not lay flat. 3. Do not drill through patio doors sill to install alarm wires. 4. If using muriatic acid or brick wash cleaning solutions, please follow the manufacturer s instructions found on the product label or on the manufacturer s website. Special Note: Unless specified otherwise, your Quaker wood clad patio door will contain standard glass package, which is: Tempered (Safety), Dual-pane Insulated Glass with Low-E and argon gas fill. 3/4 overall thickness. 1/8 pane thickness. Before installing, Quaker recommends consulting local building codes for more definitive information. Safety glass can be broken. If broken, glass can fragment causing injury. 22)Inspect for smooth operation and proper alignment with master frame. FOR SLIDING UNITS ONLY: open the panel so that there is a ½ gap between the edge of the door and the jamb. If the gap is not consistent, adjust the rollers at the bottom of the panel until the gap is consistent. Turning the adjustment screw counter clockwise raises the panel. After the panels are properly adjusted insert the cap plugs provided into the adjustment holes. 23) Apply the flashing over the nail fin along jambs first. Then apply flashing to the patio door header last (fig. 23). If properly applied π, the flashing will eliminate water infiltration and assure a watertight seal. If sidelites are mulled to the patio door, a drip cap is required before the flashing can be applied. 24)Insulate around main frame, but do not over pack as this may bow or distort the frame. 25)Caulk around perimeter of the patio door inside & outside. When using House Wraps and OSB substrates, or with applications under 45 F (7 C), spray an application adhesive (available at your Quaker dealer) around the perimeter of the patio door before applying flashing. Different applications require different spray adhesives so please check with your dealer for the proper type. π For application instructions, see your authorized Quaker dealer, or call Quaker Window Products Company at Installation of Replacement Patio Doors NOTE: Your patio door should have additional installation instructions attached when delivered. Refer to these instructions for installation of door hardware and screen adjustment (if applicable). 25 1) Follow Steps 1 through 4 of New Construction instructions. 2) Measure in from the exterior side of the unit 2 5/8 and mark this at three (3) points along each side jamb. Then drill a 1/8 pilot hole through the entire unit at each of the six (6) marked places. After the pilot hole has been created, drill a 25/64 hole through the aluminum cladding only. (Fig. 25) 3) Test fit the unit and draw a line on the inside of the sill on the sub-floor. (This line will be a guide for sealing the sill and the unit.) 4) Remove door from test fit and apply three (3) 3/8 beads of caulk across the full length of sub-floor (Fig. 11). Note: All surfaces contacting sealant must be clean, dry and free of all contaminants prior to applying sealant. 5) From outside, insert door into rough opening bottom first. Be sure to set bottom of door into caulking (Fig. 14). DO NOT SLIDE THE DOOR INTO THE ROUGH OPENING. 6) Center door in rough opening. Square the entire door by measuring corner to corner then shim accordingly. 7) Remove brackets holding any operational panels in place. 8) Secure the unit to the studs with 2 1/2 drywall screws, through the holes you drilled in the jambs. Apply sealant around the hole you drilled and insert the provided plastic plugs. 9) Re-measure and if necessary, adjust shims on side jambs so that overall width in center is same as top width and bottom width. Assure that the unit is plumb by placing a level on the outside of the jambs. Jambs must be perfectly vertical. Panels must be flush to jamb and/or other panels depending on operation. 10)Make sure the head of the main frame is straight and level. Adjust and shim as needed. 11)Inspect for smooth operation and proper alignment with master frame. FOR SLIDING UNITS ONLY: open the panel so that there is a ½ gap between the edge of the door and the jamb. If the gap is not consistent, adjust the rollers at the bottom of the panel until the gap is consistent. Turning the adjustment screw counter clockwise raises the panel. After the panels are properly adjusted insert the cap plugs provided into the adjustment holes. 12)Insulate around main frame, but do not over pack as this may bow or distort the frame. 13)Caulk around perimeter of patio door inside & outside. Quaker Window Products Co., Inc. reserves the right to implement design modifications &/or product changes at any time which may cause installation instructions to vary slightly.

10 GETTING READY TO INSTALL DOOR UNIT FINISHING AND MAINTENANCE PREPARE THE OPENING SQUARE Make sure rough opening is square. Rough opening should be no less that 1/2 wider and 1/4 taller than outside dimension of frame. ROUGH OPENING PLUMB Jambs must be plumb and straight. Use plumb bob or level to check that top of jamb is not tipped in or out in relation to bottom. Door will not seal evenly along weatherstrip. ROUGH OPENING SUB-FLOOR FLAT, LEVEL Sub-flooring under door must be flat, level, and smooth. Failure to ensure this may result in improper operation of the door and water & air infiltration. ROUGH OPENING A B SQUARE: LINE A = LINE B FINISHING INSTRUCTIONS INSTALLATION OF THIS PRODUCT IS NOT COMPLETE UNTIL ALL EXPOSED WOOD SUR- FACES HAVE BEEN SEALED. FAILURE TO DO SO WILL RESULT IN POOR PERFORMANCE, IN- TRUSION OF MOISTURE INTO THE WOOD FIBER, AND DETERIORATION OF THE PRODUCT. FAILURE TO PROPERLY FINISH THIS PRODUCT WITHIN 30 DAYS OF INSTALLATION MAY VOID THE WARRANTY. EXPOSED WOOD SURFACES INCLUDE: ALL FOUR EDGES OF EACH DOOR PANEL INSIDE OF LOCK ROUTES, ROLLER POCKETS (SLIDING DOORS) USE ONLY HIGH QUALITY MATERIALS THAT SEAL THE WOOD. REGULAR REFINISHING MAY BE NECESSARY TO PREVENT MOISTURE INTRUSION INTO WOOD FIBER. FAILURE TO INSTALL AND FINISH DOOR UNITS PROPERLY WILL VOID WARRANTY.

11

12 FIGURE 1 FIGURE 3 MITERED PANNING CORNER FIGURE 2

Tools required by installer: Materials required by installer:

Tools required by installer: Materials required by installer: Installation Guidelines For Quaker Window Products Vinyl product line (Single Hung, Double Hung, Sliding Window, Fixed Window, Casement, Awning, and Hopper) Installer: Read these instructions completely

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary. for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) Thank you for selecting JELD -WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows

More information

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Sun Windows General Information New Construction Sliding Door Installation Instructions H F A G B D C H F H E H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO 2008 Pella Corporation Part Number: 801P0101 INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO Corner Corner Top Fin Corner

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows with nailing fin or primed wood windows with exterior trim. While the

More information

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door Installation Guide for E-Series/Eagle Clad Hinged Inswing French Door Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place.

More information

Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors

Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2012 Pella Corporation Part Number: 80WH0101 INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Installation Instructions for Typical Wood Frame Construction.

More information

INOVO 2-LITE SLIDING PATIO DOOR

INOVO 2-LITE SLIDING PATIO DOOR INOVO 2-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO 2008 Pella Corporation Part Number: 801V0101 INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE

More information

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

4-lite Patio Door. Installation Instructions

4-lite Patio Door. Installation Instructions 4-lite Patio Door Installation Instructions IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. Note: Only the 5-0 x 6-8

More information

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS These instructions were tested developed for replacing windows in wood-frame wall construction systems

More information

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl bay, bow and garden windows which incorporate an integral nailing fin. Read these instructions

More information

Installation Guide for Architectural Wood Hinged Windows

Installation Guide for Architectural Wood Hinged Windows Guide for Architectural Wood Hinged Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the benefits

More information

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Vinyl Windows and Doors Manufactured by VPI Quality Windows Vinyl Windows and Doors Manufactured by VPI Quality Windows Part Number: 511_Installation ENDURANCE CASEMENT\AWNING\PW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction These

More information

Installation Instructions

Installation Instructions For Medium (15-18.5K) + Heavy duty (22-28.5K) Air Conditioner READ BEFORE INSTALLING UNIT To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp

More information

INSTALLATION INSTRUCTIONS for Wood Patio Doors with Exterior Trim or Nailing Fin (JII026)

INSTALLATION INSTRUCTIONS for Wood Patio Doors with Exterior Trim or Nailing Fin (JII026) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood patio doors with exterior trim or nailing fin. Read these instructions thoroughly before

More information

Casement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer)

Casement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer) Casement/ Casement Picture Pocket Installation (Interior) Tools: (Not Provided by Manufacturer) Tape Measure Utility Knife Fig. 0-1 Drill Level Putty Knife Pry bar Square Caulk Gun Hammer Safety Glasses

More information

IMPORTANT: Please read completely before you begin.

IMPORTANT: Please read completely before you begin. Standardized Window Installation Instructions For Maintaining Design Pressure Ratings For Aluminum or Vinyl Clad & All-Vinyl Window Units With Nailing Fin Structure With Weather Resistant Barrier Applied

More information

Vinyl Hinged Door Installation Instructions Structure With Weather Resistant Barrier Applied Before Door Installation

Vinyl Hinged Door Installation Instructions Structure With Weather Resistant Barrier Applied Before Door Installation Vinyl Hinged Door Installation Instructions Structure With Weather Resistant Barrier Applied Before Door Installation IMPORTANT: Please read before you begin. Part No. 1221586 Install 262 02/08 Printed

More information

Picture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Fig. 0-1

Picture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Fig. 0-1 Picture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Tape Measure Drill Level Putty Knife Square Foam Gun Utility Knife Caulk Gun Hammer

More information

Replacement Windows Measuring & Installation Guide

Replacement Windows Measuring & Installation Guide Proper Measuring Proper Measuring of Typical Wood Openings Replacement windows are ordered and manufactured E.B. (Exact Both) size, exact width and exact height. Windows are manufactured to the nearest

More information

6400, 8400 and 9400 Series Sliding Patio Door

6400, 8400 and 9400 Series Sliding Patio Door Contemporary 3 Panel Classic 5 Panel French Panel 6400, 8400 and 9400 Series Sliding Patio Door (O) Fixed Panel Left (X) Operating / Mullion Panel Right (X) Operating / Lock Panel Left (O) Fixed Panel

More information

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure INSTALLATION INSTRUCTIONS 675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure Call Technical Dept @ 1-800-452-2726 QCI1003 Page 1 of 9 Certified 10/01/09 INSTALLATION NOTES: Unpack your unit carefully

More information

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nail Fin (JII025) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nail Fin (JII025) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS for Wood/Clad Wood Windows without Exterior Trim or Nail Fin (JII025) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR SLIDING PATIO DOOR

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR SLIDING PATIO DOOR Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR SLIDING PATIO DOOR Lea las instrucciones en español en el reverso. Installation Instructions

More information

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A 1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A F AB GLASS AND MIRROR www.fabglassandmirror.com Call: +1 888-474-2221 Fax: (614)-334-4919 Office Timing: 8:30-18:00 EST info@fabglassandmirror.com

More information

PELLA INSTALLATION INSTRUCTIONS - ADVANCED PERFORMANCE Nail Fin, Nail Fin with J-Channel and EnduraClad Exterior Trim with Nail Fin Windows

PELLA INSTALLATION INSTRUCTIONS - ADVANCED PERFORMANCE Nail Fin, Nail Fin with J-Channel and EnduraClad Exterior Trim with Nail Fin Windows PELLA INSTALLATION INSTRUCTIONS - ADVANCED PERFORMANCE Nail Fin, Nail Fin with J-Channel and EnduraClad Exterior Trim with Nail Fin Windows THE FOLLOWING INSTALLATION METHODS ARE INCLUDED IN THIS BOOKLET:

More information

Read guide from beginning to end before starting installation. Read and follow all warnings and cautions during unit installation.

Read guide from beginning to end before starting installation. Read and follow all warnings and cautions during unit installation. Installation Guide for Andersen Clad Outswing Folding Doors with Track-In-Floor Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection

More information

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS 8/7/17 1200 HP SWING DOOR INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction These instructions were developed and tested for use with typical construction in a wall system designed

More information

Installation Guide for E-Series/Eagle Ascent 2 or 4 Panel Gliding (Sliding) Patio Doors

Installation Guide for E-Series/Eagle Ascent 2 or 4 Panel Gliding (Sliding) Patio Doors Installation Guide for E-Series/Eagle Ascent 2 or 4 Panel Gliding (Sliding) Patio Doors Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection

More information

Picture Window and Welded Dead-Lite (Exterior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer) Fig.

Picture Window and Welded Dead-Lite (Exterior) Tools: (Not Provided by Manufacturer) Fig Supplies: (Not Provided by Manufacturer) Fig. Picture Window and Welded Dead-Lite (Exterior) Tools: (Not Provided by Manufacturer) Tape Measure Utility Knife Fig. 0-1 Drill Level Putty Knife Pry bar Square Foam Gun (Optional) Caulk Gun Hammer Safety

More information

Installation Guide for Andersen 400 Series Gliding Windows

Installation Guide for Andersen 400 Series Gliding Windows for Andersen 400 Series Gliding Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the benefits of your

More information

HERITAGE CASEMENT BOW & BAY WINDOW

HERITAGE CASEMENT BOW & BAY WINDOW HBB HERITAGE CASEMENT BOW & BAY WINDOW INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Kolbe & Kolbe Millwork, Co., Inc. 1323 S. 11th Ave. - Wausau, WI 54401

More information

INSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR

INSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR 2011 Pella Corporation Part Number: 818T0101 INSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR Installation Instructions for

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door.

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door. The performance and proper operation of a door is only as good as the installation. By following these instructions, the probability of a good installation greatly increases. Please read and understand

More information

WINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG, DOUBLE-HUNG, CASEMENT, AWNING INTO EXISTING CASEMENT FRAME USING FRAME SCREWS

WINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG, DOUBLE-HUNG, CASEMENT, AWNING INTO EXISTING CASEMENT FRAME USING FRAME SCREWS 2009 Pella Corporation Part Number: 80YV0102 WINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG, DOUBLE-HUNG,, AWNING INTO EXISTING FRAME USING FRAME SCREWS These instructions were tested and developed for

More information

Providing 3 Layers of Protection

Providing 3 Layers of Protection Providing 3 Layers of Protection Barrier 1: Barrier 2: Barrier 3: Integrate the Opening Seal the Exterior Seal the Interior Standard Integral Flange After Housewrap Standard Window Integral Flange After

More information

Installer Please leave this booklet for the homeowner after the install is completed. IMPORTANT: Please read before you begin.

Installer Please leave this booklet for the homeowner after the install is completed. IMPORTANT: Please read before you begin. Hinged Patio Door Standardized Installation Instructions Aluminum Clad, Vinyl Clad, Fiberglass Clad, and Units With Wood Exterior Casings Structure With Weather Resistant Barrier Applied Before Door Installation

More information

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS 1200 SERIES 2 PANEL DOOR 10.2013 rev.1 DETAILED INSTALLATION INTRUCTIONS GENERAL: Door elevations shown in these instructions are as viewed from the outside. X denotes the active or moving panel(s). O

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUTIONS BUILDERS HOIE FRAMED Shower Height Neo Angle Swing Door Model: L061 Rev. 09.20.13 MAINTENANE: Two primary materials are used to manufacture your new Aquatic enclosure: tempered

More information

A-935 RODA WALL MOUNT HINGES

A-935 RODA WALL MOUNT HINGES INSTALLATION INSTRUCTIONS A-935 RODA WALL MOUNT HINGES NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time FRAMELESS DOOR / PANEL CELESTA QCI0274 REV.

More information

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding** TYPAR WEATHER PROTECTION SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS Table of Contents...01 Special Installation Considerations...01 Code Requirements...02 Approvals and Reports...02 Recommended Materials...02

More information

SERIES 360. Single Hung Windows. NOTE: Read instructions completely before attempting any installation.

SERIES 360. Single Hung Windows. NOTE: Read instructions completely before attempting any installation. Installation Instructions SERIES 360 Single Hung Windows Page 2: Opening Preparation and Wood Buck Installation and Figure 1 Page 3-5: Installation Instructions for Series 360 WINDOWS Page 6: Figure 2:

More information

Follow instructions from foam, sealant and flashing manufacturer regarding material application and compatibility with this product.

Follow instructions from foam, sealant and flashing manufacturer regarding material application and compatibility with this product. Installation Guide for Andersen Wood Outswing Folding Doors Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place. Instructions

More information

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 0º PANEL This instruction sheet applies to the following units. C, C7, C7, C77, C, C7 This instruction sheet also applies to the following units. VTE / VSE

More information

Reinforced 10 Bow Window Assembly and Installation Guide for Andersen 400 Series Transom Joined Casement Windows

Reinforced 10 Bow Window Assembly and Installation Guide for Andersen 400 Series Transom Joined Casement Windows Reinforced 10 Bow Window Assembly and Installation Guide for Andersen 400 Series Transom Joined Casement Windows Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction

More information

Thermally Broken Framing and Door Installation

Thermally Broken Framing and Door Installation INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation problems

More information

CAUTION - IMPORTANT. IMPORTANT: Please read before you begin installation.

CAUTION - IMPORTANT. IMPORTANT: Please read before you begin installation. IMPORTANT: Please read before you begin installation. CAUTION - IMPORTANT Lead-based paint may be present in older homes, and the removal of windows & doors may cause this paint to be disturbed. To decrease

More information

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1 Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1 August 2007 This addendum was developed by the InstallationMasters Institute

More information

INSTALLATION INSTRUCTIONS for Swinging French and Patio Doors (JII105) IMPORTANT INFORMATION AND GLOSSARY

INSTALLATION INSTRUCTIONS for Swinging French and Patio Doors (JII105) IMPORTANT INFORMATION AND GLOSSARY Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Steel, Fiberglass, Vinyl and Wood French and Patio Doors. Read these instructions thoroughly

More information

(Non Handed Kits) Slotted Hand Screwdriver. Power Driver & Bits. Work Gloves

(Non Handed Kits) Slotted Hand Screwdriver. Power Driver & Bits. Work Gloves Patio Door Kit Assembly Instructions -- 2-Panel Patio Door with Non-Assembled Frame and Assembled Sash Panels. (Non Handed Kits) Project Requirements: ~ This door was manufactured for installation into

More information

INSTALLATION MANUAL STOREFRONT DOORS

INSTALLATION MANUAL STOREFRONT DOORS INSTALLATION MANUAL STOREFRONT DOORS www.aluflam-usa.com SYSTEM DESCRIPTION - Extruded and filled aluminum framing, tested and approved by UL - 3-3/8 frame depth - Clear, fire-rated safety glazing - Door

More information

Please read thoroughly and understand completely all the steps in this instruction prior to beginning installation.

Please read thoroughly and understand completely all the steps in this instruction prior to beginning installation. 2011 Pella Corporation Part Number: 81AK0101 INSTALLATION INSTRUCTION - NAIL FIN INSTALLATION AFTER WEATHER BARRIER AND FRAME SCREW OR CLIP INSTALLATION FOR REPLACEMENT ALUMINUM-CLAD EXTERIOR HINGED PATIO

More information

Swing Door Installation Manual

Swing Door Installation Manual Manual 20D/35D/50D 20DH/35DH 40M/50M 25FD 35XT 50XT 01-4000-03 2010 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes.......................................

More information

Installation Instructions

Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:

More information

1040 & 1050 SERIES HEAVY FRAMELESS BYPASS BATH ENCLOSURE

1040 & 1050 SERIES HEAVY FRAMELESS BYPASS BATH ENCLOSURE INSTALLATION INSTRUCTIONS 1040 & 1050 SERIES HEAVY FRAMELESS BYPASS BATH ENCLOSURE www.alumaxshowerdoor.com Copyright Alumax Bath Enclosures 2014. All rights reserved. !WARNINGS! INSTALLATION WARNINGS

More information

Cable Bay Windows. Tuscany Vinyl Replacement Window. - Min Max SINGLE-HUNG

Cable Bay Windows. Tuscany Vinyl Replacement Window. - Min Max SINGLE-HUNG Bay picture Bay single-hung Bay casement BAY BAY BAY PICTURE - Min 4 0 1 6 Max 8 0 5 0 SINGLE-HUNG - Min 4 0 1 6 Max 8 0 5 0 CASEMENT (refer to casement/awning section for maximum vent size) - Min 4 0

More information

TARGA 7300 CASEMENT INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

TARGA 7300 CASEMENT INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation. TARGA 7300 CASEMENT INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation. These instructions are provided as a general guide in the installation of CGI windows.

More information

C orrectly installing your vinyl window will add

C orrectly installing your vinyl window will add Installation Instructions for Vinyl Window with Integral Nailing Fin JII001 (07/05) Table of Contents Introduction...1 Handling...2 Precautions & Safety...2 Inspect and Prepare...3 Install Window...4 Complete

More information

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS / OR / FRAMELESS SWING DOOR WITH SINGLE INLINE OR TWO INLINE S This instruction sheet applies to the following units with a magnetic handle. C7, C7, C79 This instruction sheet also applies to the following

More information

Versatrim Side-Snap Frame

Versatrim Side-Snap Frame Versatrim Side-Snap Frame net door width finished opening width rough opening width (finished opening width plus 1 1/2") Figure 1 Cross section of strike and hinge jambs The rough opening width is equal

More information

Window Frame Installation Instructions For Nail-on and Block Frames

Window Frame Installation Instructions For Nail-on and Block Frames General The key to any window or door installation is preparation. This extends from storage of the product to the final installation and to all points in between. Careful planning and attention to detail

More information

Tilt and Slider Replacement Window Installation Instructions

Tilt and Slider Replacement Window Installation Instructions Tilt and Slider Replacement Window Installation Instructions Installer Please leave this booklet for the homeowner after the install is completed. IMPORTANT: Please read completely before you begin. Part

More information

Euro Series Product Installation Guide

Euro Series Product Installation Guide Euro Series Product Installation Guide Introduction... 3 Tools Required... 4 Installation Instructions... 5 Operation and Maintenance... 7 Hinge Adjustments... 10 Door Hinge & Locking Point Adjustments...

More information

IMPORTANT: Please read completely before you begin.

IMPORTANT: Please read completely before you begin. Standardized Installation Instructions For Windows With Exterior Casings or Nailing Fins For Wood Brickmould Units, PVC Casing Trim Units For Aluminum Clad, Fiberglass Clad, Vinyl Clad, and All-Vinyl Units

More information

FIG. #1 - ASD & USD 180/280 Shower Door Assembly

FIG. #1 - ASD & USD 180/280 Shower Door Assembly FIG. #1 - ASD & USD 180/280 Shower Door Assembly USD180 / 280 Euro Stall Header #1020 16 16 1 16 4 ASD180 / 280 Accent Stall Header #1021 5 3 8 6 7 8 Hinge Assembly: 2220, 2201, 2185, 2271, 2213 18 22

More information

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS Table of Contents I. Care and Maintenance...2 II. Tools / Material & Sealant Requirements...2 III. Assembly and Installation...2 IV. Glazing Assembly...3 V. Panel Assembly...3 1. X Panel...3 2. O Panel...4

More information

RECREATIONAL VEHICLE DOOR INSTALLATION INSTRUCTIONS

RECREATIONAL VEHICLE DOOR INSTALLATION INSTRUCTIONS RECREATIONAL VEHICLE DOOR INSTALLATION INSTRUCTIONS PHILIPS PRODUCTS PHONE NUMBER: 574/296-0000 LIT-1614 2/01 REV 1 GENERAL ROUGH OPENING PREPARATION PROPER INSTALLATION IS ESSENTIAL FOR THE ACCEPTABLE

More information

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

40mm Thermoclick.  Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial) http://www.sundancesupply.com 40mm Thermoclick Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial) U-Profile 12' Lengths $39 Out System offers a complete set of extrusions and accessories

More information

Panel Installation Instructions

Panel Installation Instructions EXTREMELY IMPORTANT INFORMATION PLEASE READ ENTIRE PACKET! Warranty Is Void If Panels Not Installed According to Instructions 1. WARNINGS & SPECIAL NOTES 1.1 Keep panels 24 from Heaters and shield Radiant

More information

738 SERIES PIVOT SHOWER DOOR

738 SERIES PIVOT SHOWER DOOR INSTALLATION INSTRUCTIONS 738 SERIES PIVOT SHOWER DOOR Copyright Alumax Bath Enclosures 1997. All rights reserved. Page 1 of 8 LIMITED WARRANTY AND REMEDY Alumax Bath Enclosures warrants to its dealers,

More information

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST INSTALLATION INSTRUCTIONS UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST QCI0240 Page 1 of 13 Certified 8/2/10 INSTALLATION NOTES: Unpack your

More information

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time FRAMELESS DOOR / PANEL CELESTA DRESDEN

More information

Vinyl Windows and Doors

Vinyl Windows and Doors Vinyl Windows and Doors Part Number: V983572 2011 Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION 350 SERIES REPLACEMENT WINDOW WITH 2-1/4 FLUSH FLANGE Lea las instrucciones en

More information

Knock Down Patio Door Assembly Instructions Regular & Impact

Knock Down Patio Door Assembly Instructions Regular & Impact Knock Down Patio Door Assembly Instructions Regular & Impact 72 x 80 72 x 82 72 x 96 96 x 80 96 x 82 96 x 96 Impress the Weather KD Patio Door Regular & Impact Sizes 72 x 80 72 x 82 72 x 96 96 x 80 96

More information

Installation Instructions

Installation Instructions Installation Instructions 1293 N. Harvey Mitchell Pkwy. Bryan, Texas 77803 800.444.1444 ph 979.823.1005 fax www.aswcommercial.com Simplifying Windows Complete Architectural CD Binder Inside B l as t I

More information

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes

More information

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE INSTALLATION INSTRUCTIONS ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE Copyright Alumax Bath Enclosures 2013. All rights reserved. G03980847 5-1-13 !WARNINGS! INSTALLATION WARNINGS a) Alumax Bath

More information

SITE 5 Repair and Replacement

SITE 5 Repair and Replacement SITE 5 Repairing Therma-Tru Door Slabs... 5.3 Sidelite Slab... 5.6 Mull Post... 5.13 Weatherstrip... 5.21 Adjustable Sill Threshold... 5.22 Basic Fixed Sill Vinyl Threshold... 5.24 Doorlite Glass and Frame...

More information

C.R. LAURENCE CO. INC Installation Instructions

C.R. LAURENCE CO. INC Installation Instructions IMPORTANT: PLEASE READ BEFORE INSTALLING THE WINDOW The following instructions will reduce your chances of experiencing problems during installation, and ensure smooth, trouble-free operation of these

More information

Finishing Finishing Instructions Painting Tips Aluminum Astragal Painting Doorlite Frame Finishing

Finishing Finishing Instructions Painting Tips Aluminum Astragal Painting Doorlite Frame Finishing Finishing... 2.3 Painting Tips... 2.6 Aluminum Astragal Painting... 2.9 Doorlite Frame Finishing... 2.10 SITE 2 2017 2.1 2.2 2017 SITE 2 SITE 2 2017 2.3 2.4 2017 SITE 2 SITE 2 2017 2.5 Painting Tips Therma-Tru

More information

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)... INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...

More information

Pharma-Slide. Installation Manual. [Revision: June 14, 2010, SL150001, Rytec Corporation 2005]

Pharma-Slide. Installation Manual. [Revision: June 14, 2010, SL150001, Rytec Corporation 2005] Pharma-Slide Installation Manual [Revision: June 14, 2010, SL150001, Rytec Corporation 2005] TABLE OF CONTENTS PAGE INTRODUCTION.............................................1 HOW TO USE MANUAL..............................................1

More information

Chapter 19. Interior Finish Work

Chapter 19. Interior Finish Work Chapter 19. Interior Finish Work 19.1 INSTALLING FLOOR TRIM 19.2 INSTALLING CLOSET SHELVES AND POLES 19.3 INSTALLING BATHROOM ACCESSORIES 19.4 HANGING MINI-BLINDS 19.5 INSTALLING APPLIANCES 19.6 INSTALLING

More information

Household Appliances. Over-the-Range Microwave. Installation Instructions. For Models: HMV9302, HMV9305, HMV9306, HMV9307

Household Appliances. Over-the-Range Microwave. Installation Instructions. For Models: HMV9302, HMV9305, HMV9306, HMV9307 Over-the-Range Microwave Household Appliances Installation Instructions For Models: HMV9302, HMV9305, HMV9306, HMV9307 PLEASE READ ENTIRE INSTRUCTIONS BEFORE PROCEEDING IMPORTANT: Save these instructions

More information

Panoramic Door. Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels

Panoramic Door. Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels 2515 Industry St. Oceanside, CA 92058 760-722-1250 www.panoramicdoors.com Panoramic Door Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels Signature Aluminum

More information

Model 2400/4000 Illustrated Installation Instructions

Model 2400/4000 Illustrated Installation Instructions Model 2400/4000 Illustrated Installation Instructions Contractors Wardrobe DESIGNERS MNUFCTURERS 26121 venue Hall Valencia, C 955 (661) 257-77 Fax: (661) 257-4907 Toll Free: (800) CW-DOORS (800) 293-6677

More information

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls

More information

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT

More information

Installation Instructions

Installation Instructions by Precision Screen & Security s 27040 San Bernardino Ave, Redlands, CA 92374 www.precision-screens.com TM Installation Instructions NOTE: Prior to Permanently mounting the BacTrac, insure the handle and

More information

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors) Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors) IMPORTANT: Please read before you begin. Table of Contents

More information

935 RODA VINESSE NEED INSTALLATION HELP? DOUBLE ROLLERS FRAMELESS DOOR INSTALLATION INSTRUCTIONS QCI XX/XX/XXXX. Call BASCO ( )

935 RODA VINESSE NEED INSTALLATION HELP? DOUBLE ROLLERS FRAMELESS DOOR INSTALLATION INSTRUCTIONS QCI XX/XX/XXXX. Call BASCO ( ) INSTALLATION INSTRUCTIONS 935 RODA DOUBLE ROLLERS FRAMELESS DOOR NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday VINESSE QCI0286 1 XX/XX/XXXX 935 Roda Parts List With double rollers

More information

FULL FRAME REMOVAL WHEN PREPARING TO INSTALL NEW BLOCK FRAME HINGED DOOR

FULL FRAME REMOVAL WHEN PREPARING TO INSTALL NEW BLOCK FRAME HINGED DOOR FULL FRAME REMOVAL WHEN PREPARING TO INSTALL NEW BLOCK FRAME HINGED DOOR This method of Full Frame Removal involves removing the sash and entire frame of the existing door from the wall. The resulting

More information

Crawford Creek Engineered Siding/Panelling Instructions

Crawford Creek Engineered Siding/Panelling Instructions Crawford Creek Engineered Siding/Panelling Instructions This product can be used for interior and exterior installations. Much of this guide refers to exterior installation, however, many of the construction

More information

PREHUNG INTERIOR DOOR INSTALLATION

PREHUNG INTERIOR DOOR INSTALLATION PREHUNG INTERIOR DOOR INSTALLATION Although prehung door units cost a little more, homeowners and builders alike often find the convenience and finished product well worth the difference in price. Prehung

More information

Figure #1 - ATE-ASE & UTE-USE Shower Door Assembly

Figure #1 - ATE-ASE & UTE-USE Shower Door Assembly Figure #1 - ATE-ASE & UTE-USE Shower Door Assembly Refer to FIG #3A or 3B For detail and orientation of towel bar and pull assemblies. Page Figure # 2 - Shower Door Assembly - Side View Figure # 3a - Shower

More information

8x4 SpaceSaver Garden Shed Bevel Model Assembly Manual Revision #18 March 9th, 2017

8x4 SpaceSaver Garden Shed Bevel Model Assembly Manual Revision #18 March 9th, 2017 8x4 SpaceSaver Garden Shed Bevel Model Assembly Manual Revision #18 March 9th, 2017 Thank you for purchasing an 8x4 SpaceSaver Garden Shed. Please take the time to identify all the parts prior to assembly.

More information