Company Directive STANDARD TECHNIQUE : TP21L/1. Fixed Earthing Systems - Construction Techniques - Jointing

Size: px
Start display at page:

Download "Company Directive STANDARD TECHNIQUE : TP21L/1. Fixed Earthing Systems - Construction Techniques - Jointing"

Transcription

1 Company Directive STANDARD TECHNIQUE : TP21L/1 Fixed Earthing Systems - Construction Techniques - Jointing Policy Summary This document defines how jointing of earthing system conductors shall be performed when using bolting, brazing or exothermic welding techniques. ST:TP21L/1 February of 35 -

2 IMPLEMENTATION PLAN Introduction The process for carrying out jointing using exothermic welding has been modified in line with the manufactures comments. Main Changes The amendments are minor and consist of checking the alignment of the mould prior to carrying out the procedure and that the igniter is functioning prior to connecting it (pages 12 & 13). Reference to SHOPS have been replaced with E5. The contact details on page 33 have been amended bringing it up to date in line to that held on E5. Impact of Changes There is no impact on company practice as the changes are minor in nature. Implementation Actions Team Managers shall advise their staff who are required to carry out jointing of an earthing system that this document has been amended. Implementation Timetable This Standard Technique can be implemented with immediate effect. ST:TP21L/1 February of 35 -

3 Document Revision & Review Table Date Comments Author 26/06/2014 The amendments are minor and consist of checking the alignment of the mould prior to carrying out the procedure and that the igniter is functioning prior to connecting it (pages 12 &13). P. Hooper 23/07/2013 Reference to SHOPS have been replaced with E5 The contact details on page 33 have been amended bringing it up to date in line to that held on E5 Table D2 in Appendix D (page 33) has been extended to include 5 extra moulds to cover Cadwelding onto 12.5mm earth rods Richard Summers ST:TP21L/1 February of 35 -

4 1.0 INTRODUCTION 1.1 This document defines how jointing of earthing system conductors shall be performed when using bolting, brazing or exothermic welding techniques. 2.0 SCOPE 2.1 This policy applies to all new or replacement substation earthing system joints when using bolting, brazing or exothermic welding techniques. Crimped (compression) joints are covered in ST:OH4F/ The general requirement for temporary adequately rated continuity bonding when making or breaking connections is covered in EE SPEC 89/1 clause 8.1. Selection of the appropriate jointing technique is also covered in EE SPEC 89/1 clause 8.3; note that this requires that bolted connections shall not be used below ground. 3.0 GENERAL REQUIREMENTS 3.1 This document shall be read in conjunction with Company Safety and Operational Policy, including:- a) ST:HS20A Site Specific Safety Risk Assessment and Near Miss Reporting b) POL:HS8/1 Personal Protective Equipment c) ST:HF15D/1 The Safe Use Of Welding, Brazing and Flame Cutting Equipment. 3.2 Risk Assessment In accordance with ST:HS20A, a risk assessment shall be performed before commencing work. Generic risk assessments are given in Appendices A and B. 3.3 Approved PPE In accordance with POL:HS8/1, approved Personal Protective Equipment (PPE) shall be worn to control the hazards presented by jointing earthing system conductors. Approved PPE is given in Appendix E. 3.4 Training All persons undertaking jointing shall be trained in effective and safe jointing techniques. 4.0 CONTROL OF HAZARDS 4.1 Control of Electric Shock Hazard When undertaking jointing several hazards arise which could lead to electric shock if not adequately controlled. These hazards are briefly explained in Section 7.1. ST:TP21L/1 February of 35 -

5 4.1.2 Precautions shall be taken to prevent electric shock. 4.2 Control of Fume Hazard Fumes are produced when making joints by brazing or exothermic welding techniques and also when tinning copper. This hazard is overcome in well ventilated areas when appropriate brazing/welding/tinning materials are used. Where ventilation is restricted, consideration shall be given to use of a suitable respiratory mask fitted with an appropriate cartridge filter system and/or forced ventilation/extraction. 4.3 Control of Hazard from Inadvertent Ignition of Exothermic Weld Reaction There are two types of package used in exothermic welding - the original which employs a cartridge containing powdered weld material and compacted starting powder and the new type which has a sealed weld material cup package and ignition strip (e.g. CADWELD PLUS). With the original cartridge and starting powder type (e.g. standard CADWELD or FURSEWELD it was necessary to prevent unwanted ignition by suitable storage and removal of sources of ignition when preparing for jointing. The newer type with sealed package and ignition strip reduces this risk requiring electronic ignition using a dedicated control unit; it is also moisture resistant. Given the reduced risk, only the sealed package and ignition strip type is now approved for use (e.g. CADWELD PLUS). Weld material packages shall be stored and carried in a fire-proof and damp-proof container. 4.4 Control of Hazard from Molten Metal Exothermic welding processes cause a rapid and substantial rise of temperature (i.e. >1400 o C) which melts conductors and weld material. If moisture is present molten metal can be ejected from the mould. Care is required to avoid this through removal of moisture from the mould. Further, under-sized conductor/very worn moulds must also be avoided to prevent ejection of molten metal. Precautions shall be taken to prevent injury and damage. These are detailed in the Jointing Methods below. The risk is further reduced by use of the newer sealed weld material cup package and ignition strip (e.g. CADWELD PLUS) which incorporate a remote ignition control unit and long connecting lead. Risk is minimised by use of the longest lead available (e.g. 4.6m for CADWELD PLUS system). Given the reduced risk, only the sealed weld material package and ignition strip type with remote ignition control unit and lead not less than 4m is now approved for use (e.g. CADWELD PLUS). 4.5 Control of Hazard from Hot Equipment Heat is involved with both the brazing and exothermic welding techniques. Care is required in handling hot equipment (e.g. hot torch, hot exothermic mould and hot newly made joint) Precautions shall be taken to prevent burns and fire. ST:TP21L/1 February of 35 -

6 5.0 JOINTING METHOD 5.1 Approved methods shall be used for making joints using brazing and exothermic welding techniques. These approved methods are detailed below. 6.0 JOINT ACCEPTANCE 6.1 The resistance of joints shall be measured to verify low resistance. The required method and acceptance criteria are defined in ST:TP21O/ BACKGROUND 7.1 Electric Shock Hazards The electric shock hazards include:- a) Touch potential b) Step potential c) Potential difference across the joint. 7.2 Touch and Step Potential Under earth fault conditions, current in the earthing system of a substation causes a voltage gradient across the site. Potential difference between accessible points may cause a hazard for personnel, for example between hand and feet, hand to hand, or foot to foot. 7.3 Potential Difference A potential difference may exist or develop across conductors to be jointed. This hazard is controlled using temporary continuity bonds. 7.4 Exothermic Welding The exothermic welding process is a method of making permanent electrical connection between metals. It is based on the reduction of copper oxide by aluminium. The process causes a flow of molten superheated metal, produced in a special mould, to be directed on to the conductors to be joined causing them to melt and weld together into a solid homogeneous mass. The reaction is rapid and the mould can be removed after ten seconds The welded connection formed has a current carrying capability equal to that of the conductors involved. Tests show that the conductors will melt before the joint. No loosening or corrosion can occur as no mechanical pressure or contact surfaces are involved. ST:TP21L/1 February of 35 -

7 7.5 Brazing Brazing is a method of joining metals by 'hard soldering'. Brazing is particularly suited to copper-to-copper jointing. The brazing process uses capillary attraction to allow a molten filler metal to flow into a small gap between metals to be joined Two basic methods are possible:- a) Hand feeding at brazing temperature b) Brazing filler metal pre-placement For earthing system applications, brazing is used to join copper earth tapes together The hand feeding method involves:- a) clamping the two tapes to be joined together with sufficient overlap b) heating until a 'cherry red' appearance is seen c) applying a suitable rod of filler metal on one side of the joint such that capillary attraction draws the molten filler metal through the joint The joint is complete when filler rod is seen to emerge from the opposite sides to which it was applied. The success of hand fed brazing is largely dependent upon skill With the pre-placement method, the filler metal is placed in the joint prior to heating. This simplifies the process as it ensures the correct amount of filler metal is available Advantages arise from using a silver-copper-phosphorus alloy brazing filler metal; namely, no flux is required and the toxic problems associated with filler metal containing cadmium and zinc are avoided. ST:TP21L/1 February of 35 -

8 JOINTING METHOD TYPE: BR1 EQUIPMENT BRAZING (COPPER STRIP-COPPER STRIP) Suitably rated approved continuity bond (3-way = SHOPS item 38986, 2-way = SHOPS item 40726) General engineering tools (hacksaw, files, hammer, scribing tool, set square, G-clamp and ruler) Wire brush, Scotchbrite abrasive pad and approved degreasing agent Heat resistant packing (e.g. Thermalite block) Heat resistant material Oxy-acetylene welding equipment with selection of nozzles Filler rods or Silfos foil (W J Furse - Cat No FS005) suitable for copper-copper with melting point above 640 o C Flint gun Magnifying glass (x10) Bitumastic paint Micro-ohmmeter. BR2 SAFETY PRECAUTIONS The following precautions shall be taken:- Compliance with ST:HS15D/1 Only trained operators shall use gas welding/cutting equipment see ST:HS15D/1 Operator to inspect all equipment before use - see ST:HS15D/1 Wear appropriate PPE, including: o See ST:HS15D/1 o Apply/remove earth continuity bond(s) across joint wearing Class 1 rubber gloves and safety footwear while standing on an insulated mat All work under immediate control of one person No work if lightning likely DO NOT COMPLETE THE POSSIBLE CIRCUIT BETWEEN CONDUCTORS WITHOUT AN EARTH CONTINUITY BOND APPLIED Remove all flammable materials from joint position Protect plant that cannot be removed (e.g. power cables) and equipment (e.g. gas bottles) from heat with heat resistant material Support conductors to be jointed on heat resistant packing (e.g. Thermalite blocks) - DO NOT APPLY HEAT TO CONCRETE Place a 2kg dry powder fire extinguisher and fire blanket at work location Warn other personnel of heat hazard Electrically test joint using ST:TP21O/2. ST:TP21L/1 February of 35 -

9 BR3 METHOD - BRAZING (COPPER STRIP-COPPER STRIP) - FILLER ROD 1 APPLY Adequately rated continuity bond between conductors to be joined. 2 CUT conductors to length; ensure ends are square. 3 PREPARE conductors to ensure they are square, free from burrs and flat. 4 CLEAN the conductors using wire brush (reserved for copper) and/or Scotchbrite abrasive pad to achieve a bright-clean, slightly roughened finish. Degrease using an approved solvent and dry the conductors with a clean rag. 5 ASSEMBLE conductors and clamp together using G-clamp or welding grips, ensuring correct contact area and close-fitting faces. Use heat resistant packing to support assembly. NOTE The area to be jointed shall overlap a distance at least equal to the width of the thinnest conductor (e.g. 25mm for a 50mm x 4mm to 25mm x 4mm joint). 6 SELECT appropriate nozzle for size of copper to be joined. 7 LIGHT oxy-acetylene torch and apply heat to joint until 'cherry red' appearance. 8 APPLY appropriate filler metal rod to joint by running along one edge of the joint only. The molten filler should be seen to be 'sucked' into the joint by capillary action. By regulating the heat and adding more filler rod as required the filler will eventually appear on the opposite sides of the joint. The joint is then complete. 9 REMOVE heat and allow to cool naturally. Do not disturb the joint in any way until it is cool. NOTE The copper will remain hot for some time. 10 WAIT for the joint to cool. 11 CHECK the joint visually. Are there any holes or cracks present (use x10 magnification)? Is full penetration of filler rod seen at edges? 12 REMOVE continuity bond. 13 TEST joint resistance in accordance with ST:TP21O/2. 14 APPLY approved bitumastic paint to the completed joint. ST:TP21L/1 February of 35 -

10 BR4 METHOD - BRAZING (COPPER STRIP-COPPER STRIP) - SILFOS FOIL 1 APPLY Adequately rated continuity bond between conductors to be joined. 2 CUT conductors to length; ensure ends are square. 3 PREPARE conductors to ensure they are square, free from burrs and flat. 4 CLEAN the conductors using wire brush (reserved for copper) and/or Scotchbrite abrasive pad to achieve a bright-clean, slightly roughened finish. Degrease using an approved solvent and dry the conductors with a clean rag. 5 ASSEMBLE conductors and clamp together with a suitable length of the foil between the faces using G-clamp or welding grips, ensuring correct contact area and closefitting faces. Use heat resistant packing to support assembly. The length of foil should equal the overlap of conductors. No flux is required. NOTE The area to be jointed shall overlap a distance at least equal to the width of the thinnest conductor (e.g. 25mm for a 50mm x 4mm to 25mm x 4mm joint). 6 SELECT appropriate nozzle for size of copper to be joined. 7 LIGHT oxy-acetylene torch and apply heat joint rapidly to 700 o C rapidly or until foil is seen to flow. NOTE Do not keep alloy molten longer than necessary. 8 REMOVE heat and allow to cool naturally. Do not disturb the joint in any way until it is cool. NOTE The copper will remain hot for some time. 9 WAIT for the joint to cool. 10 CHECK the joint visually. Are there any holes or cracks present (use x10 magnification)? Has the filler metal flowed across the joint area? NOTE Unsatisfactory joints shall not be reheated. They shall be re-made - ensure continuity bond in place when breaking connection. 11 REMOVE continuity bond. 12 TEST joint resistance in accordance with ST:TP21O/2. 13 APPLY approved bitumastic paint to the completed joint. ST:TP21L/1 February of 35 -

11 JOINTING METHOD TYPE: EX1 EQUIPMENT EXOTHERMIC WELDING (CADWELD PLUS) Suitably rated approved continuity bond (3-way = E5 item 38986, 2-way = E5 item 40726) General engineering tools (hacksaw, files, hammer, scribing tool, set square, callipers and ruler) Wire brush, Scotchbrite abrasive pad and approved degreasing agent Heat resistant packing to support mould (e.g. Thermalite block) Heat resistant material Blow torch Graphite mould appropriate to conductors to be joined } see Appendix D for supplier Sealed weld material cup package } Ignition control unit with lead of length >4m } Mould cleaning tool and small brush Magnifying glass (x10) Micro-ohmmeter. EX2 SAFETY PRECAUTIONS The following precautions shall be taken:- Read the manufacturer's instructions Only trained operators shall use exothermic welding equipment Operator to inspect all equipment before use; do not use worn or broken equipment which could cause molten metal leakage Wear appropriate PPE, including: o Eye protection, Hand protection & foot protection o When preparing copper or cleaning the graphite mould, wear a suitable mask to avoid dust inhalation or ventilate as necessary and wear cotton overalls with hide gloves o Wear face visor, hide gloves and safety footwear when handling welding material package and when jointing including when attaching the control unit termination clip to the ignition strip o Apply/remove earth continuity bond(s) across joint wearing Class 1 rubber gloves and safety footwear while standing on an insulated mat All work under immediate control of one person DO NOT COMPLETE THE POSSIBLE CIRCUIT BETWEEN CONDUCTORS WITHOUT AN EARTH CONTINUITY BOND APPLIED Remove all flammable materials from joint position Protect plant that cannot be removed (e.g. power cables) and equipment (e.g. propane bottles) from heat with heat resistant material Support conductors/mould on heat resistant packing (e.g. Thermalite blocks) Ensure a 2kg dry powder fire extinguisher is available at work location Warn nearby personnel of heat and molten metal hazard Provide adequate ventilation to the work area. Avoid contact with hot materials Do not use welding material package if damaged or not fully intact. Ignite from a position >2m from the mould and not horizontally below it. Avoid direct eye contact with flash of light from ignition Electrically test joint using ST:TP21O/2. ST:TP21L/1 February of 35 -

12 EX3 METHOD - EXOTHERMIC WELDING (CADWELD PLUS) 1 APPLY Adequately rated continuity bond between conductors to be joined. 2 SELECT appropriate mould and handle for given conductors and application. 3 INSPECT mould and handle for damage, wear and cleanliness. 4 CHECK mould entries match conductors and application. NOTE Use of the incorrect mould may cause molten metal to be ejected on ignition. 5 FIT mould handle clamp to mould. 6 CLOSE the handle checking that the mould closes fully but not exerting too much pressure. NOTE The clamping pressure exerted by the handles can be adjusted by an adjustment screw on the handle 7 SELECT appropriate weld material cup package for given mould. NOTE There are different sizes of package and incorrect choice can lead to inadequate joints. The required package is stamped on the mould label. If two packages are required, this is explicitly stated. 8 CUT conductors to length. 9 PREPARE conductors to ensure they are free from burrs and flat/round where they would enter mould. 10 CHECK that the conductors do not hold the mould faces open when the clamp is closed. NOTE A small gap may be enough to cause molten metal to be ejected on ignition and can lead to inadequate joints. 11 DRY The conductor by wiping with a clean rag 12 DRY the mould and dry the conductors thoroughly using a blow torch until all moisture is removed. Heat the mould from the outside. Do not heat the inside of the mould directly. NOTE If moisture is present this may cause the mould to crack and/or eject molten metal and or create a porous, inadequate joint. 13 CLEAN the conductors using wire brush (reserved for the purpose) and Scotchbrite abrasive pad to achieve a bright-clean finish free of oxides. Degrease using an approved solvent and dry the conductors with clean rag. NOTE It may be necessary to use an approved solvent to remove grease etc. If so, the conductor must be dried. 14 INSERT the conductors in the mould and position appropriately. The required gap is marked on the mould label and the gap must be centred under the tap hole. Mark the conductors where they enter the mould. 15 LOCK the two sections of the mould together using the mould handle clamp. Ensure the mould faces meet fully. NOTE Molten metal may be ejected if the mould faces do not meet. 16 INSERT the sealed weld material cup package (e.g. CADWELD PLUS package) into the mould. Page revised 26 June 2014 ST:TP21L/1 February of 35 -

13 17 CHECK ignition control unit is not damaged and functioning correctly 18 ATTACH the ignition control unit termination clip to the ignition strip of the sealed weld material cup package. 19 CLOSE the mould-top cover. 20 MOVE to a location >2m from the mould. 21 PRESS and hold the control unit switch and wait for the ignition. 22 WAIT seconds. 23 OPEN and remove the mould carefully so as to prevent chipping. Remove the expended steel cup. Any excess tap metal/slag can be removed while the weld is hot. NOTE The mould (and conductors) remain hot for some time. 24 WAIT for the joint to cool. 25 CHECK the joint visually. Are there any holes or cracks present (use x10 magnification)? Refer to manufacturer's guide extract to visually check a joint is good, acceptable or must be rejected Appendix C. 26 REMOVE continuity bond. 27 TEST the joint resistance in accordance with ST:TP21O/2. 28 CLEAN the slag from the mould using the appropriate tool. Do not use a wire brush as this will wear the carbon mould significantly. Lightly brush away the remaining residue. 29 STORE the mould when cool. Page revised 26 June 2014 ST:TP21L/1 February of 35 -

14 JOINTING METHOD TYPE: BOLTING - COPPER-COPPER (ABOVE GROUND) BCC1 EQUIPMENT Suitably rated approved continuity bond (3-way = E5 item 38986, 2-way = E5 item 40726) General engineering tools (hacksaw, files, drill, hammer, scribing tool, set square, callipers, ruler and spanners) Wire brush, Scotchbrite abrasive pad and approved degreasing agent Blow torch Flint gun Tinmans Solder rod (E5 item 31327) and flux paste or tinning paint (E5 item 32497) and no flux Bolts, nuts and washers shall be of steel, spun galvanised to BSEN1461 or stainless steel. Bolts and nuts to ISO metric strength grade designation 8.8 of BS4190, threads conforming to BS3643 Part 2 (coarse). Neutral compound grease (Castrol Rustillo 431 or Shell Ensis CD) Bitumastic paint Micro-ohmmeter. BCC2 SAFETY PRECAUTIONS The following precautions shall be taken:- Wear appropriate PPE, including: o When preparing copper, wear a suitable mask to avoid dust inhalation or ventilate as necessary and wear cotton overalls with hide gloves o Wear eye protection, hide gloves and safety footwear when tinning o Apply/remove earth continuity bond(s) across joint wearing Class 1 rubber gloves and safety footwear while standing on an insulated mat All work under immediate control of one person DO NOT COMPLETE THE POSSIBLE CIRCUIT BETWEEN CONDUCTORS WITHOUT AN EARTH CONTINUITY BOND APPLIED Remove all flammable materials from tinning position Protect plant that cannot be removed (e.g. power cables) and equipment (e.g. propane bottles) from heat with heat resistant material Support conductors on heat resistant packing (e.g. Thermalite blocks) - DO NOT APPLY HEAT TO CONCRETE Place a 2kg dry powder fire extinguisher and fire blanket at work location Warn other personnel of heat hazard Electrically test joint using ST:TP21O/2. ST:TP21L/1 February of 35 -

15 BCC3 METHOD - BOLTING (COPPER-COPPER) 1 APPLY Adequately rated continuity bond between conductors to be joined. 2 CUT conductors to length; ensure ends are square. NOTE See table BCC1 for overlap requirement. For tee-off points, a tag can be brazed on to allow this requirement to be met if bolting is required. 3 PREPARE conductors to ensure they are square, free from burrs and flat. 4 DRILL holes for bolts (minimum of 2). NOTE See table BCC1 for hole diameter requirement. 5 CLEAN the conductors using wire brush (reserved for copper) and/or Scotchbrite abrasive pad to achieve a bright-clean, smooth finish. Degrease using an approved solvent and dry the conductors. 6 TIN the copper across the area of overlap. Tinmans Solder rod method: Apply flux paste to cleaned conductor and clean rag. Heat conductor and apply solder rod to form pool of solder on conductor and wipe around to cover required area, removing excess. Tinning paint method: Paint cleaned conductor with tinning paint to cover required area. Heat painted area and wipe off excess with clean rag. 7 APPLY neutral compound grease to joint faces. 8 BOLT conductors together. NOTE See Table 1 for bolt diameter and torque. 9 REMOVE continuity bond. 10 TEST joint resistance in accordance with ST:TP21O/2. 11 APPLY neutral compound grease to the completed joint. Wipe off excess. 12 APPLY bitumastic paint. Tape Width (mm) 25mm 50mm Length of Overlap (mm) Minimum Dimensions A (mm) Minimum Dimensions B (mm) Bolt M10 M12 Bolt Hole Diameter (mm) Torque (Nm) Maximum Spanner Length (mm) Table BCC1 - Bolting Schedule Refer to Figure 1. ST:TP21L/1 February of 35 -

16 Figure 1 - Bolting Arrangement ST:TP21L/1 February of 35 -

17 JOINTING METHOD TYPE: BOLTING - COPPER-EQUIPMENT EARTH TERMINAL (ABOVE GROUND) BCC1 EQUIPMENT Suitably rated approved continuity bond (3-way = E5 item 38986, 2-way = E5 item 40726) General engineering tools (hacksaw, files, drill, hammer, scribing tool, set square, callipers, ruler and spanners) Wire brush, Scotchbrite abrasive pad and approved degreasing agent Blow torch Flint gun Tinmans Solder rod (E5 item 31327) and flux paste or tinning paint (E5 item 32497) and no flux Bolts, nuts and washers shall be of steel, spun galvanised to BSEN1461 or stainless steel. Bolts and nuts to ISO metric strength grade designation 8.8 of BS4190, threads conforming to BS3643 Part 2 (coarse). Neutral compound grease (Castrol Rustillo 431 or Shell Ensis CD) Micro-ohmmeter. BCC2 SAFETY PRECAUTIONS The following precautions shall be taken:- Wear appropriate PPE, including: o When preparing copper, wear a suitable mask to avoid dust inhalation or ventilate as necessary and wear cotton overalls with hide gloves o Wear eye protection, hide gloves and safety footwear when tinning o Apply/remove earth continuity bond(s) across joint wearing Class 1 rubber gloves and safety footwear while standing on an insulated mat All work under immediate control of one person DO NOT COMPLETE THE POSSIBLE CIRCUIT BETWEEN CONDUCTORS WITHOUT AN EARTH CONTINUITY BOND APPLIED Remove all flammable materials from tinning position Protect plant that cannot be removed (e.g. power cables) and equipment (e.g. propane bottles) from heat with heat resistant material Support conductors on heat resistant packing (e.g. Thermalite blocks) - DO NOT APPLY HEAT TO CONCRETE Place a 2kg dry powder fire extinguisher and fire blanket at work location Warn other personnel of heat hazard Electrically test joint using ST:TP21O/2. ST:TP21L/1 February of 35 -

18 BCE3 METHOD - BOLTING (COPPER-EQUIPMENT EARTH TERMINAL) 1 APPLY Adequately rated continuity bond between conductors to be joined. 2 CUT conductors to length; ensure ends are square. 3 PREPARE conductors to ensure they are square, free from burrs and flat. 4 DRILL hole(s) for bolt(s) to match equipment earth terminal. 5 CLEAN the copper conductor using wire brush (reserved for copper) and/or Scotchbrite abrasive pad to achieve a bright-clean, smooth finish. Degrease using an approved solvent and dry the conductors. 6 TIN the copper across the area of overlap. Tinmans Solder rod method: Apply flux paste to cleaned conductor and clean rag. Heat conductor and apply solder rod to form pool of solder on conductor and wipe around to cover required area, removing excess. Tinning paint method: Paint cleaned conductor with tinning paint to cover required area. Heat painted area and wipe off excess with clean rag. 7 CLEAN the equipment earth terminal to a bright clean, smooth finish. Degrease using an approved solvent and dry the conductors. 8 APPLY neutral compound grease to joint faces. 9 BOLT conductors together. 10 REMOVE continuity bond. 11 TEST joint resistance in accordance with ST:TP21O/2. 12 APPLY neutral compound grease to the completed joint. ST:TP21L/1 February of 35 -

19 JOINTING METHOD TYPE: BOLTING - COPPER-ALUMINIUM ( 150mm ABOVE GROUND LEVEL) BCA1 EQUIPMENT Suitably rated approved continuity bond (3-way = E5 item 38986, 2-way = E5 item 40726) General engineering tools (hacksaw, files, drill, hammer, scribing tool, set square, callipers, ruler and spanners) Wire brush, Scotchbrite abrasive pad and approved degreasing agent Blow torch Flint gun Tinmans Solder rod (E5 item 31327) and flux paste or tinning paint (E5 item 32497) and no flux Bolts, nuts and washers shall be of steel, spun galvanised to BSEN1461 or stainless steel. Bolts and nuts to ISO metric strength grade designation 8.8 of BS4190, threads conforming to BS3643 Part 2 (coarse). Neutral compound grease (Castrol Rustillo 431 or Shell Ensis CD) Bitumastic paint Micro-ohmmeter. BCA2 SAFETY PRECAUTIONS The following precautions shall be taken:- Wear appropriate PPE, including: o When preparing copper, wear a suitable mask to avoid dust inhalation or ventilate as necessary and wear cotton overalls with hide gloves o Wear eye protection, hide gloves and safety footwear when tinning o Apply/remove earth continuity bond(s) across joint wearing Class 1 rubber gloves and safety footwear while standing on an insulated mat All work under immediate control of one person DO NOT COMPLETE THE POSSIBLE CIRCUIT BETWEEN CONDUCTORS WITHOUT AN EARTH CONTINUITY BOND APPLIED Remove all flammable materials from tinning position Protect plant that cannot be removed (e.g. power cables) and equipment (e.g. propane bottles) from heat with heat resistant material Support conductors on heat resistant packing (e.g. Thermalite blocks) - DO NOT APPLY HEAT TO CONCRETE Place a 2kg dry powder fire extinguisher and fire blanket at work location Warn other personnel of heat hazard Electrically test joint using ST:TP21O/2. ST:TP21L/1 February of 35 -

20 BCA3 METHOD - BOLTING (COPPER-ALUMINIUM) 1 APPLY Adequately rated continuity bond between conductors to be joined. 2 CUT conductors to length; ensure ends are square. NOTE See Table BCC1 for overlap requirement. The joint shall be in the vertical plane and the bottom of the overlap shall be a minimum of 150mm above ground level. 3 PREPARE conductors to ensure they are square, free from burrs and flat. 4 DRILL holes for bolts (minimum of 2). NOTE See Table BCC1 for hole diameter requirement. 5 CLEAN the conductors using wire brush (one reserved for copper and one for aluminium) and/or Scotchbrite abrasive pad (reserved for copper and aluminium respectively) to achieve a bright-clean, smooth finish. Degrease using an approved solvent and dry the conductors. 6 TIN the copper across the area of overlap. Tinmans Solder rod method: Apply flux paste to cleaned conductor and clean rag. Heat conductor and apply solder rod to form pool of solder on conductor and wipe around to cover required area, removing excess. Tinning paint method: Paint cleaned conductor with tinning paint to cover required area. Heat painted area and wipe off excess with clean rag. 7 APPLY neutral compound grease to joint faces. 8 BOLT conductors together. NOTE See Table BCC1 for bolt diameter and torque. 9 REMOVE continuity bond. 10 TEST joint resistance in accordance with ST:TP21O/2. 11 APPLY neutral compound grease to the completed joint. Wipe off excess. 12 APPLY bitumastic paint to the completed joint. ST:TP21L/1 February of 35 -

21 APPENDIX A RISK ASSESSMENT - BRAZING Nature of Hazard Dust Fumes Arc eye Inflammable Gas Hot/molten metal Touch potential Step potential Potential difference Control Measures Suitable respiratory mask fitted with appropriate cartridge as necessary Clear goggles. Adequate ventilation/forced extraction Suitable respiratory mask fitted with appropriate cartridge (i.e. P3) as necessary. Welding goggles/face visor. Training. Welding goggles/face visor Leather safety boots. Cotton overalls, leather apron and cap. Hide gloves/leather gauntlets and leather spats. Remove flammable materials from joint position. Protect plant with heat resistant material. 2kg dry powder fire extinguisher and fire blanket. No work if lightning likely. No work if fault switching. HV electrical gloves where possible. Footwear with substantial sole. Insulated mat at joint position. Adequately rated continuity bond between conductors to be joined. NB See ST:HS15D/1 for further details. RISK ASSESSMENT - EXOTHERMIC WELDING (CADWELD PLUS) APPENDIX B Nature of Hazard Dust Fumes Hot/molten metal Hot mould Touch potential Step potential Potential difference Control Measures Suitable respiratory mask fitted with appropriate cartridge as necessary Clear goggles. Adequate ventilation Suitable respiratory mask fitted with appropriate cartridge (i.e. P3) as necessary. Face visor Cotton overalls Hide gloves/leather gauntlets Safety footwear Remove flammable materials from joint position Protect plant with heat resistant material 2kg dry powder fire extinguisher Use correct mould Check mould faces meet when conductor fitted Pre-heat mould Remote ignition control unit operated from >2m If sealant is used to prevent leakage only the specific sealant recommended by the mould manufacturer shall be used. Hide gloves/leather gauntlets. No work if lightning likely No work if fault switching HV electrical gloves Footwear with substantial sole Insulated mat at joint position. Adequately rated continuity bond between conductors to be joined. ST:TP21L/1 February of 35 -

22 APPENDIX C CADWELD PHOTOGRAPHIC GUIDE & PROBLEM SOLVER (Extract from ERICO Publication A-7D Installer's and Inspectors Guide for CADWELD Electrical Connections ). CADWELD MOULD INSPECTION Chip in mould parting face Mould parting face smooth Tap hole well Mould parting face has erosion lines Chip in weld Weld cavity well defined Cable opening Good Replace A CADWELD mould is designed to last for an average of 50 connections. This will vary according to the care given to the mould during use. Inspect the mould regularly. Check the following items to determine if a mould should be replaced: Cable Opening The conductor should fit snugly. A loose fit will cause leakage. The opening should not be chipped or worn. Weld Cavity The cavity should be well defined. There should be no chips or gouges. Tap Hole The tap hole should be well defined. Mould Parting Face The parting face should not be chipped. The parting face should always be cleaned properly. Use a clean shop towel or newspaper and wipe clean. Using a wire brush to clean the mould will cause erosion and quickly destroy the mould. ST:TP21L/1 February of 35 -

23 INSPECTION OF CADWELD CONNECTIONS - GENERAL INDICATIONS Proper inspection of a CADWELD connection relies on the judgment of the field personnel. Look closely at the size, colour, surface finish, and porosity of the connection. Following the guidelines below will assist in making meaningful inspections. Photographs of good, acceptable, and reject connections appear below. Size 1. No portion of the conductor within the confines of the weld should be exposed. 2. Maximum depression under the riser on horizontal connections (after the slag has been removed) should be no lower than the top of the conductor. A low fill indicates: (a) Not enough weld material was used. (b) Excessive leakage of molten metal. (c) Improper positioning of the conductor inside the mould. (d) Movement of conductor. 3. Excessively high fill (tall riser) indicates: (a) Too large weld material size was used (connection is still acceptable). (b) Apparent volume increase due to contaminants in conductor or mould (see Porosity below). Colour The colour of a CADWELD connection is best seen after a light wire brushing of the connection. It should normally be gold to bronze in colour. Occasionally, it may be silvery at the top. This silver colour indicates tin sweat of the surface, a normal condition. A CADWELD connection to cast iron or galvanized surfaces is often silvery due to alloying with the metals. Surface Finish The surface of a CADWELD connection should be reasonably smooth and free of major slag deposits. If slag deposits cover more than 20% of the connection surface, or if any cable strands are exposed after slag has been removed, the connection must be rejected. Porosity The connection should be essentially free from porosity. Excessive porosity is normally the result of contaminants (water, oil, dirt, etc.) in the conductor and/or mould. A few small pinholes may be present on the surface of the riser. The depth of a pinhole must never extend beyond the centre of the conductor. To check the depth, probe the pinhole with a 1/32-in.-diameter wire (paper clip). Reject the connection if the depth of the pinhole extends beyond the centre of the conductor. ST:TP21L/1 February of 35 -

24 INSPECTION OF CADWELD CONNECTIONS - VISUAL INSPECTION Photographic Guides Like all electrical connections, a visual inspection is no guarantee of performance. Crimped or bolted connections cannot be inspected visually, but CADWELD connections can be visually inspected and provide an indication of the quality of the weld. Visual inspection is recommended as a practical minimum. Use the photographs on the following pages as a guide to visual inspection. CADWELD connections are normally rated as good, acceptable or reject. A good connection is a normal weld with only minor surface imperfections. An acceptable connection is a less than normal weld, but a good performing weld. Imperfections indicate that:- 1) A new mould is required 2) A change in procedure is necessary 3) The proper mould conductor and/or weld metal should be used. A reject connection shows inadequate fill or an extra high riser due to:- 1) Use of incorrect procedure 2) Use of incorrect equipment and/or equipment worn beyond its useful life 3) Use of incorrect material. ST:TP21L/1 February of 35 -

25 INSPECTION OF CADWELD CONNECTIONS - PHOTOGRAPHIC GUIDE Good. A solid weld with only minor surface imperfections. Acceptable. Fill is lower than normal, but still sufficient. ST:TP21L/1 February of 35 -

26 Acceptable. A worn or incorrect mould was used, allowing leakage around conductor. The fill in this connection is sufficient to allow it as acceptable. Attention to mould is required prior to making next connection. Acceptable. The presence of water/moisture in conductor strands or mould indicates that one or both were not properly dried. Although the riser is porous, the weld is solid. The degree of porosity is not sufficient to reject this connection. ST:TP21L/1 February of 35 -

27 Reject. Extreme amounts of slag on surface are caused by weld material leaking past disk or complete lack of disk. Inspect the condition of mould disk seat and check disk positioning prior to making the next connection. This is not a problem associated with CADWELD PLUS as the system does not employ a separate disk and is therefore shown for information only. Reject. Excessive water in cable strands and/or mould. Cable and mould must be dried by heating. ST:TP21L/1 February of 35 -

28 Reject. Light carbon traces on cable and connection are evidence of oil on cable strands. Oily cables must be cleaned with safety solvent, before brushing and drying Reject. Heavy carbon coating on cable and connection is evidence of large amounts of oil or grease on cable. Cable must be cleaned with safety solvent, before brushing and drying ST:TP21L/1 February of 35 -

29 Reject. Fill too low. Weld cavity was not filled over cable strands. Fins indicate that the mould was not closed tightly due to incorrect mould, incorrectly adjusted handle clamp, or presence of foreign material in mould parting line. Before making the next connection, check the mould for each of the above. Reject. Fill too low. Weld cavity was not filled over cable strands. Absence of leakage indicates that weld material size was incorrect (too small) or through conductor moved. ST:TP21L/1 February of 35 -

30 Problem A THE MOULD DOESN T CLOSE TIGHTLY Check for: 1. Adjustment of handle clamps. 2. Cables out of round or bent. 3. Dirt or slag in mould parting line. 4. Correct cable size. NOTE: Use C clamp if necessary. Problem B THE CONNECTION IS COVERED WITH EXCESSIVE SLAG (Not a phenomenon associated with Cadweld Plus) Check for: 1. Weld material leaking past the disk, caused by: (a) Chipped graphite at tap hole. (b) Disk moved when weld material was dumped. (c) Disk not properly seated. (d) Disk was not installed. NOTE: A small amount of slag on the surface is not abnormal. Problem C MOLTEN METAL SPITS OUT OF THE CRUCIBLE WHEN MAKING A CONNECTION Remedy: 1. See Problem D Problem D THE CONNECTION IS POROUS Check for: 1. Presence of moisture either in conductor or mould. Remedy: (a) Dry the conductor by wiping and heating. (b) Heat mould with torch (to above 120 C (212 F) )until a discernable colour change ( light grey) 2. Other contaminants (oil, insulation, etc.) present in conductors. Remedy: (a) Use a safety solvent to wash the conductor, and then dry it. (b) If insulation is present between strands, remove it. Check for: 3. Mould packing material in weld cavity of mould. Remedy: (a) Always apply mould packing material to conductor after mould is closed. ST:TP21L/1 February of 35 -

31 Problem E THE CONDUCTORS DO NOT WELD Check for: 1. Conductors were not properly cleaned and dried. Remedy: (a) Remove oxides with a wire brush. If heavily oxidized, have fresh-cut conductor end and use CADWELD Heavy Duty moulds. (b) Dry conductors with a torch. Check for: 2. Conductors not properly positioned in the mould. Remedy: (a) Check for proper gap or butting as required (see the mould tag and read the instructions packaged with mould). (b) Check to be sure gap is centred under tap hole. NOTE: In some cases, the run (through) conductor must be cut and gapped. Follow instructions for same or use CADWELD Heavy Duty moulds. Problem F THE WELD MATERIAL LEAKS AROUND THE CONDUCTOR Remedy: 1. Use packing material around the conductor after the mould is closed. 2. Use moulds with wear plates (which also act as chill plates). 3. Check for the proper mould. Mould must be sized for the cable being welded. 4. If the mould is excessively worn, replace with a new mould. Problem G THE CONNECTION HAS FINS METAL IS LOST Check for: 1. Mould not completely closed. 2. Mould worn beyond useful life and needs replacement. Problem H THE CABLES PULL OUT OF THE MOULD DURING WELDING Remedy: 1. Use a clamp (CADWELD B-265) or other means to prevent movement of conductors when welding. Problem I INSUFFICIENT FILL MATERIAL TO COVER CONDUCTORS Check for: 1. Use of proper weld material size (see mould tag). 2. Too large a gap between conductors (see positioning instructions). 3. Mould leakage. Remedy: (a) See Problem F. (b) See Problem G. (c) See Problem H. ST:TP21L/1 February of 35 -

32 4. Conductor movement. Problem J THE RISER IS TOO HIGH Check for: 1. Use of proper weld material size (see mould tag). 2. Moisture in mould or conductor. Remedy: (a) See Problem D. Problem K THE MOULD WEARS OUT QUICKLY (Moulds should produce an average of 50 connections.) Remedy: 1. Use CADWELD B-265 cable clamp for hard-drawn copper or DSA Copperweld. 2. Clean the mould with a soft brush, clean cloth, or newspaper. DO NOT USE A WIRE BRUSH. 3. Use care in removing the mould from a finished connection to prevent chipping of mould. Problem L WHEN WELDING TO STEEL, THE WELD DOES NOT STICK TO THE STEEL Remedy: 1. Clean the steel with a rasp or grinder to bright metal. When grinding, use an ERICO approved grinding wheel only. All mill scale, paint, and/or other coating must be removed. Wire brushing will NOT suffice. Grease must be removed with safety solvent before cleaning. 2. Clean galvanized surfaces with a wire brush or emery cloth. However, extra heavy galvanized steel must be cleaned with a rasp. 3. If the steel is moist, heat with a torch (from the back side if possible). Any carbon deposit from the flame must be removed. 4. If conductors are not in proper position, check the instruction sheet. Problem M WHEN WELDING TO DUCTILE IRON OR CAST IRON, THE WELD DOES NOT STICK TO THE SURFACE Remedy: 1. Remove all coatings before cleaning. 2. Clean the surface with a rasp or grinder to bright metal. When grinding, use an ERICO-approved wheel only. 3. Clean the surface with a safety solvent after grinding or rasping. 4. Use CADWELD XF-19 alloy weld material (orange cap). ST:TP21L/1 February of 35 -

33 APPENDIX D CADWELD PLUS SUPPLIER INFORMATION Company ETS Cable Components (Vendor No ) Contact Ben Hancock Tel No Mobile No Table D1 Supplier Information CADWELD Plus Page revised 26 June 2014 ST:TP21L/1 February of 35 -

34 APPENDIX D (contd) Table D2- Common Cadweld Joints and Associated Mould, Weldmetal and Mould Clamps Function Mould Cadweld Plus Mould Conductor A Conductor B Joint Weldmetal Clamps 70mm 2 stranded copper [Y4] 70mm 2 stranded copper [Y4] Straight SSC-Y4 65 PLUS F20 L-160 (E5 Item 30006) (E5 Item 30006) Dark Green 70mm 2 stranded copper [Y4] 12.5mm dia. copper-clad steel Through conductor GYE-P128-Y4 115 PLUS F20 L M32 (E5 Item 30006) rod (E5 Item 30554) to rod side Orange 70mm 2 stranded copper [Y4] 7 No.8 stranded copper-clad Straight GFC-P100-Y4 65 PLUS F20 L-160 (E5 Item 30006) steel Dark Green 50mm x 4mm copper tape 50mm x 4mm copper tape Cross EBC-EAM 200 PLUS F20 L-160 (E5 Item 30606) (E5 Item 30606) Yellow 50mm x 4mm copper tape 50mm x 3mm copper tape Tee to 50mm x 3mm BMD-CAM-EAM 200 PLUS F20 L-159 (E5 Item 30606) (E5 Item 41285) through conductor Yellow 50mm x 4mm copper tape 70mm 2 stranded copper [Y4] Tee to 50mm x 4mm LJC-Y4-EAM 90 PLUS F20 L-160 (E5 Item 30606) (E5 Item 30006) through conductor Grey 50mm x 3mm copper tape 70mm 2 stranded copper [Y4] Tee to 50mm x 3mm LJC-Y4-CAM 65 PLUS F20 L-160 (E5 Item 41285) (E5 Item 30006) through conductor Dark Green 50mm x 4mm copper tape 12.5mm dia. copper-clad steel Elbow joint CNC-P128-EAM 115 PLUS F20 L-160 (E5 Item 30606) rod (E5 Item 30554) Orange 50mm x 3mm copper tape (E5 Item 41285) 12.5mm dia. copper-clad steel rod (E5 Item 30554) Elbow joint CNC-P128-CAM 90 PLUS F20 Grey L No.8 stranded copper-clad steel Lug Lug joint SSC-Y4-W8 65 PLUS F20 Dark Green L-160 5mm earth electrode solid 12.5mmEarth Rod CC h GYE14W3M 90PLUSF20 L-160 (SHOPS item 39101) (E5 item 30554) 16mm 2 stranded copper (SHOPS 12.5mmEarth Rod CC h GYE14W3 90PLUSF20 L-160 item 30039) (E5 item 30554) 35mm 2 stranded copper (SHOPS 12.5mmEarth Rod CC h GYE14Y2 90PLUSF20 L ) (E5 item 30554) 70mm 2 stranded copper (SHOPS 12.5mmEarth Rod CC h GYE14Y4 115PLUSF20 L-160 Item 30006) (E5item 30554) 120mm 2 stranded copper (E5Item 50036) 12.5mmEarth Rod CC (E5 item 30554) h GYE14Y6 115PLUSF20 L-160 Page revised 23 July 2013 ST:TP21L/1 February of 35 -

35 APPENDIX E APPROVED PERSONAL PROTECTIVE EQUIPMENT The PPE referred to under Safety Precautions is approved. APPENDIX F SUPERSEDED DOCUMENTATION This document supersedes ST:TP21L dated May 1999 which should now be withdrawn. ASSOCIATED DOCUMENTATION APPENDIX G ST:OH4F/3 ST:HS20A POL:HS8/1 EE SPEC 89/1 ST:TP21O/2 ST:HS15D/1 Construction Techniques for Wood Pole Lines Site Specific Safety Risk Assessment and Near Miss Reporting Personal Protective Equipment Fixed Earthing Systems for Major Substations Measurements Associated With Earthing Systems Relating To The Safe Use Of Welding, Brazing and Flame Cutting Equipment APPENDIX H KEY WORDS Brazing, Bonding Conductor, Cadweld, Continuity Bond, Earth Electrode, Earthing, Earthing Conductor, Earthing System, Exothermic Weld, Jointing, Step Potential, Testing, Touch Potential. ST:TP21L/1 February of 35 -

6043 DESIGN AND TECHNOLOGY

6043 DESIGN AND TECHNOLOGY www.onlineexamhelp.com www.onlineexamhelp.com CAMBRIDGE INTERNATIONAL EXAMINATIONS GCE Ordinary Level MARK SCHEME for the October/November 2013 series 6043 DESIGN AND TECHNOLOGY 6043/01 Paper 1, maximum

More information

PLK CJ PRODUCT INSTRUCTION PI002 REV Page 1

PLK CJ PRODUCT INSTRUCTION PI002 REV Page 1 PLK One Shot Crucible Weld Kit PLK Kit Components CJ One Shot Crucible PLK CJ PRODUCT INSTRUCTION PI002 REV 3 270807 Page 1 PLK The Complete Welding Process The All New Railtech PLK-CJ welding process

More information

PIN BRAZING PROCEDURE PB001

PIN BRAZING PROCEDURE PB001 Rev. Date. Issue Type. Prepared by: Checked by: Approved by: 1 28/08/2013 Issued LG SJ SFG OPERATION OF EASYBOND PIN BRAZING UNIT 1 PREPARATION OF THE SURFACE It is crucial that to achieve a successful

More information

SOLDERING MANUAL A simple, yet easy to follow manual for your basic soldering needs. Copyright 2017 TortugaPro. All Rights Reserved

SOLDERING MANUAL A simple, yet easy to follow manual for your basic soldering needs. Copyright 2017 TortugaPro. All Rights Reserved A simple, yet easy to follow manual for your basic soldering needs Copyright 2017 TortugaPro. All Rights Reserved Purpose Soldering is not limited to electrical and electronics work. It is a skill that

More information

BRAZE INSTRUCTION VIDEO

BRAZE INSTRUCTION VIDEO BRAZE INSTRUCTION VIDEO 1 Purpose: The purpose of this video is to provide instructions, guidelines and examples as to the proper techniques involved in the brazing of diamond cutters into matrix or steel

More information

INTRODUCTION. Tube and fitting

INTRODUCTION. Tube and fitting Service Application Manual SAM Chapter 630-41A Section 21 SOLDERING & BRAZING COPPER TUBE The Copper Development Association Inc. INTRODUCTION The material that follows is adapted from publications first

More information

Union coupling, copper x female thread. Cone joint

Union coupling, copper x female thread. Cone joint Union coupling, copper x female thread. Cone joint N69F Union coupling Size Pattern No. Pack 1 Qty Pack 2 Qty Code Barcode Price ( ) ex VAT test 15mm x 1/2" N69F 10 100 84842D 5022050269638 3589.48 22mm

More information

Welding Engineering Dr. D. K. Dwivedi Department of Mechanical & Industrial Engineering Indian Institute of Technology, Roorkee

Welding Engineering Dr. D. K. Dwivedi Department of Mechanical & Industrial Engineering Indian Institute of Technology, Roorkee Welding Engineering Dr. D. K. Dwivedi Department of Mechanical & Industrial Engineering Indian Institute of Technology, Roorkee Module - 4 Arc Welding Processes Lecture - 8 Brazing, Soldering & Braze Welding

More information

ELECTRICAL CONNECTIONS

ELECTRICAL CONNECTIONS ELECTRICAL CONNECTIONS Lesson 13 EET 150 Electrical Connections Learning Objectives In this lesson you will: see different methods of making electrical connections. learn a procedure for making soldered

More information

FLUX CORE 90 WELDER ASSEMBLY & OPERATING INSTRUCTIONS

FLUX CORE 90 WELDER ASSEMBLY & OPERATING INSTRUCTIONS Part #20280 FLUX CORE 90 WELDER ASSEMBLY & OPERATING INSTRUCTIONS SPECIFICATIONS Output Amperage No Load Voltage Max. Input Amperage Input Voltage 90 27 20 Amp 120V, 1ph, 60Hz Rated Duty Cycle 20% @ 90

More information

Angle Grinder MODEL 9553B MODEL 9555B

Angle Grinder MODEL 9553B MODEL 9555B ENGLISH Angle Grinder MODEL 9553B MODEL 9555B 006649 DOUBLE INSULATION I N S T R U C T I O N M A N U A L WARNING: For your personal safety, READ and UNDERSTAND before using. SAVE THESE INSTRUCTIONS FOR

More information

Materials Needed. Tube Size O.D.

Materials Needed. Tube Size O.D. Materials Needed Eaton FF9075 silver braze rings or 1/16- inch diameter 45% silver alloy braze wire Water soluble flux Brazing outfit capable of +1200ºF (propane or mapp gas) Small files - rattail and

More information

INSTALLATION INSTRUCTIONS FOR #101NS & #101QR FIXED BASE

INSTALLATION INSTRUCTIONS FOR #101NS & #101QR FIXED BASE INSTALLATION INSTRUCTIONS FOR #101NS & #101QR FIXED BASE #165 Anchor Kit #160/161 Epoxy Kit #163 Super Bundy Plus NOTE: BITUMINOUS PRODUCTS CANNOT BE USED TO INSTALL #101 FIXED BASE Revised MAY 2010 IMPACT

More information

Page 1. Wide Gap 68 CJ Acetylene Product Instruction PI014 Rev

Page 1. Wide Gap 68 CJ Acetylene Product Instruction PI014 Rev Wide Gap One Shot Crucible Weld Kit Wide Gap Kit Components CJ One Shot Crucible Page 1 T h e Al l N ew Railtech W i d e G a p w e l d i n g pr o c e s s d e s i g n e d f or Au s t r a l i a n c o n d

More information

DULUX UNIVERSAL UNDERCOAT

DULUX UNIVERSAL UNDERCOAT TECHNICAL DATA SHEET Version 1 2015 JUNE THIS ISSUE SUPERSEDES ALL PREVIOUS PUBLICATIONS PRODUCT DESCRIPTION Intermediate coating for use under decorative topcoats, for interior and exterior use PRODUCT

More information

M30 SPOT WELDER INSTRUCTION MANUAL 230V 1PH.

M30 SPOT WELDER INSTRUCTION MANUAL 230V 1PH. M30 SPOT WELDER INSTRUCTION MANUAL 230V 1PH. We have the right to improve and update the machine. The picture and the content are just for your reference. IN20808 2017 Chief Automotive Technologies CO9910.4

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

Single and Double Gates Operation & Maintenance Manual

Single and Double Gates Operation & Maintenance Manual R E L I A B L E S A F E A C C E S S Single and Double Gates Operation & Maintenance Manual System Overview SAFETY GATES KEE GATE is a complete range of safety gates designed specifically to provide permanent

More information

Forming and Assembling Pipework Systems F/508/4663

Forming and Assembling Pipework Systems F/508/4663 Unit Title Ofqual unit reference number (code) Organisation Reference Forming and Assembling Pipework Systems F/508/4663 QU051481 Unit Level Level 2 Unit Sub Level None GLH 64 Unit Credit Value 14 Sector

More information

METAL FABRICATION MECHANICAL

METAL FABRICATION MECHANICAL METAL FABRICATION MECHANICAL Machine Screws Machine screws have a parallel thread and need a threaded hole to screw into. They come in a wide variety of materials and sizes and are used for semi-permanent

More information

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING DISC GRINDER

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING DISC GRINDER GENERAL OPERATIONAL PRECAUTIONS WARNING! When using electric tools, basic safety precautions should always be followed to reduce the risk of fire, electric shock and personal injury, including the following.

More information

Better Soldering (A COOPER Tools Reprint) Overview Solder and Flux Base Material

Better Soldering (A COOPER Tools Reprint) Overview Solder and Flux Base Material Better Soldering (A COOPER Tools Reprint) Purpose We hope this short manual will help explain the basics of Soldering. The emphasis will be on the care and use of equipment. Overview Soldering is accomplished

More information

Soldering Basics. Purpose We hope this short manual will help explain the basics of Soldering. The emphasis will be on the care and use of equipment.

Soldering Basics. Purpose We hope this short manual will help explain the basics of Soldering. The emphasis will be on the care and use of equipment. Soldering Basics Purpose We hope this short manual will help explain the basics of Soldering. The emphasis will be on the care and use of equipment. Overview Soldering is accomplished by quickly heating

More information

Curium 19H Installation Instructions & Parts List

Curium 19H Installation Instructions & Parts List Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

SUPPLIED BY DELTA FLUID PRODUCTS LTD DELTA ROAD ST. HELENS WA9 2ED UK TEL: FAX:

SUPPLIED BY DELTA FLUID PRODUCTS LTD DELTA ROAD ST. HELENS WA9 2ED UK TEL: FAX: BRAZOWELD TECHNIICAL LIITERATURE SUPPLIED BY DELTA FLUID PRODUCTS LTD DELTA ROAD ST. HELENS WA9 2ED UK TEL: 01744 611 811 FAX: 01744 453 975 BRAZING COPPER TUBE TO BROWNALL BRAZOWELD FITTINGS 1) Preparation:

More information

Delmec Engineering Limited

Delmec Engineering Limited Delmec Engineering Limited DEL6 Tower Maintenance Specification Delmec Product Manual 2 Delmec Engineering Ltd. Approvals Name Signature Date Ivan Daly Kealan Delaney Delmec Engineering Ltd. Distribution

More information

GENERAL SOLDERING PROCEDURE

GENERAL SOLDERING PROCEDURE College of Engineering Laboratory Procedure GENERAL SOLDERING PROCEDURE Dept: Multi-department Laboratory: Multi-lab Rm: Multi-lab Authored by: Dick Sevier, Lab Support Engineer Date: Reviewed and Approved

More information

Curium 19.4H Installation Instructions & Parts List

Curium 19.4H Installation Instructions & Parts List Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

Call Today Ship Today!

Call Today Ship Today! JUST LIKE HAVING IT ON THE SHELF MOLDS WELD METAL ACCESSORIES M-100 M-101 M-102 M-10 M-106 M-112 M-12 M-151 M-15 M-156 M-159 M-161 SAME DAY SERVICE ( Market) 15CP 25CP 25CI 32CI 5CI Mini- Clamp Flint Ignitors

More information

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI P.O. Box 9019 Verona, WI 9-019 GENERAL OPERATING & SAFETY INSTRUCTIONS * READ INSTRUCTIONS BEFORE USE * CAUTION: Disconnect power supply cord from power source when doing repair work or changing belt.

More information

Type XTSR71 Sizes

Type XTSR71 Sizes (Page 1 of 13) s 494-5258 Type XTSR71 s 494-5258 Figure 1 Thomas XTSR71 Coupling 1. General Information 1.1 Thomas Couplings are designed to provide a mechanical connection between the rotating shafts

More information

Durapipe ABS Jointing Guide

Durapipe ABS Jointing Guide Durapipe ABS Jointing Guide Solvent cement welding offers a simple and quick means of constructing high integrity, leak-free joints. The solvent cement operates by chemically softening the joint surfaces.

More information

UNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES

UNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES 3.1 Single-Core Copper Wire Screened Polymeric Cables 3.1.1 Removing the Outer Sheath Clean and abrade the outer sheath with an approved abrasive paper for

More information

Maintenance & Parts list for:

Maintenance & Parts list for: Maintenance & Parts list for: Industrial gun GB 2 Juni 2017 This Maintenance & Parts list for industrial gun is prepared by : Winchester Europe Service V. Parbst & Søn as a comprehensive maintenance guide

More information

(a) Work gloves may be cloth, leather palm, or all leather; (b) Welding gloves are gauntlet-type gloves with high

(a) Work gloves may be cloth, leather palm, or all leather; (b) Welding gloves are gauntlet-type gloves with high Figure 16-1 cuffs (a) Work gloves may be cloth, leather palm, or all leather; (b) Welding gloves are gauntlet-type gloves with high Figure 16-2 Welding boots should have smooth toes to prevent sparks from

More information

New Product Update & Parts Information

New Product Update & Parts Information Update & Parts NEW Range Liquid Accessories Range Vapormatic is pleased to introduce a new liquid accessories range to replace existing s. The NEW range is manufactured in the UK, to ISO 9001 standard.

More information

College of Forestry 610: Power Tools

College of Forestry 610: Power Tools College of Forestry 610: Power Tools Safety Policy & Procedure Manual Section 600: Workshops and Shop Tools Effective: 01 January 2007 Revised: August 2014 PURPOSE The purpose of this section is to provide

More information

Single and Double Gates Operation & Maintenance Manual

Single and Double Gates Operation & Maintenance Manual R E L I A B L E S A F E A C C E S S Single and Double Gates Operation & Maintenance Manual 2 System Overview SAFETY GATES KEE GATE is a complete range of safety gates designed specifically to provide permanent

More information

BIPPMM03 (Published) Book specs- Dates: / / Lang: ENG01 Applic: PPM

BIPPMM03 (Published) Book specs- Dates: / / Lang: ENG01 Applic: PPM BIPPMM03 (Published) Book specs- Dates: 20060412 / 20060412 / 20060412 Lang: ENG01 Applic: PPM Installing the Milnor Diaphragm in the Single Stage Press This document applies to models MP160Axx, MP1604xx,

More information

Suggested Specification for Preparing Hot-Dip Galvanized Steel Surfaces for Painting Revised February 2002

Suggested Specification for Preparing Hot-Dip Galvanized Steel Surfaces for Painting Revised February 2002 Suggested Specification for Preparing Hot-Dip Galvanized Steel Surfaces for Painting Revised February 2002 This suggested specification is provided as a guide to preparing a quality document calling for

More information

Forming and assembling pipework systems

Forming and assembling pipework systems Unit 007 Forming and assembling pipework systems Level: 2 Credit value: 14 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to cover a

More information

Hydraulic Hand Crimping Tool, PN

Hydraulic Hand Crimping Tool, PN ORIGINAL INSTRUCTIONS Hydraulic Hand Crimping Tool, PN 59975-1 Instruction Sheet 408-6758 21 JUN 17 Rev F PROPER USE GUIDELINES Cumulative Trauma Disorders can result from the prolonged use of manually

More information

SEMPEO SQA Unit Code FP38 04 Preparing and using manual flame brazing and braze welding equipment

SEMPEO SQA Unit Code FP38 04 Preparing and using manual flame brazing and braze welding equipment Preparing and using manual flame brazing and braze welding Overview This standard covers a broad range of basic manual flame brazing and braze welding competences that will prepare you for entry into the

More information

EZ-SKIRT. Conveyor Skirting System. Installation and Users Manual. Manufactured by

EZ-SKIRT. Conveyor Skirting System. Installation and Users Manual. Manufactured by EZ-SKIRT Conveyor Skirting System Installation and Users Manual Manufactured by Nelson Williams Linings, Inc. 8330 Jasmine Street PO Box 476 Mountain Iron, MN 55768 218-741-1080 May 2011 INTRODUCTION The

More information

Gallium 03 Installation Instructions & Parts List

Gallium 03 Installation Instructions & Parts List Gallium 03 Installation Instructions & Parts List Illustration Gallium 03, H1 Handle Left Hand: Open Out 04/05/2016 Revision 1.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed

More information

Gluing windows with SABA Glasstack 760

Gluing windows with SABA Glasstack 760 Info sheet 208 Gluing windows with SABA Glasstack 760 Version 2008-05-08 EN, replaces all prior versions Page 2 of 9 Info sheet 208 Gluing windows with SABA Glasstack 760, version 2008-05-08 EN 1. Introduction

More information

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement 1 Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement The following instructions are a supplement

More information

INSTRUCTION MANUAL. Force Transducer Output Tube Repair Kit

INSTRUCTION MANUAL. Force Transducer Output Tube Repair Kit INSTRUCTION MANUAL Model 400-TR Force Transducer Output Tube Repair Kit June 4, 2004, Revision 5 Copyright 2004 Aurora Scientific Inc. Aurora Scientific Inc. 360 Industrial Pkwy. S., Unit 4 Aurora, Ontario,

More information

The Virgo/Libra Steam Engine

The Virgo/Libra Steam Engine The Virgo/Libra Steam Engine Congratulations on becoming the owner of a Virgo or Libra Steam Engine. With careful use and maintenance it will give many years of satisfying performance. Contents 1) Notes

More information

Optima 450 LED Edge-Lit Single-Sided Light Box. Installation Instructions INSTALLATION INSTRUCTIONS. Figure 1. Tools you ll need

Optima 450 LED Edge-Lit Single-Sided Light Box. Installation Instructions INSTALLATION INSTRUCTIONS. Figure 1. Tools you ll need Installation Instructions Optima 450 LED Edge-Lit Single-Sided Light Box Figure 1 INSTALLATION INSTRUCTIONS Before you begin These instructions illustrate the Stylmark Optima 450 LED Edge-Lit Single-Sided

More information

Cornerstone Electronics Technology and Robotics I Week 19 Soldering Tutorial

Cornerstone Electronics Technology and Robotics I Week 19 Soldering Tutorial Cornerstone Electronics Technology and Robotics I Week 19 Soldering Tutorial Administration: o Prayer o Turn in quiz o Using fixed resistors design and build a voltage divider divides 5 volts in half.

More information

Radon 07 Installation Instructions & Parts List

Radon 07 Installation Instructions & Parts List Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by

More information

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,

More information

MODEL H " BYRD SHELIX CUTTERHEAD INSTRUCTIONS

MODEL H  BYRD SHELIX CUTTERHEAD INSTRUCTIONS MODEL H9291 12" BYRD SHELIX CUTTERHEAD INSTRUCTIONS The Model H9291 12" Byrd Shelix cutterhead is designed to replace the straight-knife cutterhead on the Grizzly jointer Model G0609. The total procedure

More information

12 TON HYDRAULIC SHOP PRESS. Instruction Manual. Please read this instruction manual carefully before use.

12 TON HYDRAULIC SHOP PRESS. Instruction Manual. Please read this instruction manual carefully before use. 12 TON HYDRAULIC SHOP PRESS Instruction Manual Please read this instruction manual carefully before use. IMPORTANT PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFETY INSTRUCTIONS AND WARNINGS. USE

More information

Design Guide for Hot Dip Galvanizing best practice for venting and draining

Design Guide for Hot Dip Galvanizing best practice for venting and draining Design Guide for Hot Dip Galvanizing best practice for venting and draining Contents Introduction 3 Handrails/ 25 Balustrades Importance 4 of Venting and Draining Purpose Safety Quality Aesthetics General

More information

ATD AMP Variable Speed Reciprocating Saw Owner s Manual

ATD AMP Variable Speed Reciprocating Saw Owner s Manual ATD-10535 7 AMP Variable Speed Reciprocating Saw Owner s Manual Manufactured in China To ATD Tools, Inc. Specifications TECHNICAL SPECIFICATIONS Voltage: 120V Frequency: 60Hz Power input: 7 Amps No load

More information

VCE VET ENGINEERING STUDIES CERTIFICATE II

VCE VET ENGINEERING STUDIES CERTIFICATE II Victorian Certificate of Education 2009 SUPERVISOR TO ATTACH PROCESSING LABEL HERE STUDENT NUMBER Letter Figures Words VCE VET ENGINEERING STUDIES CERTIFICATE II Written examination Section Wednesday 18

More information

WET AREA PANELLING. Designer Walls. Fast

WET AREA PANELLING. Designer Walls. Fast WET AREA PANELLING Designer Walls. Fast AU/a5 WallART Brochure_ART BUNNINGS.qxp_Layout 1 7/6/18 10:16 am Page 3 LINEAR SERIES WET AREA PANELLING Add a touch of class to your SHEET COLOURS home or workplace

More information

Dust Collector. Model No: DC2200 (FM300S)

Dust Collector. Model No: DC2200 (FM300S) Dust Collector Model No: DC2200 (FM300S) GENERAL SAFETY INSTRUCTIONS Before attempting to operate this machine, it is important that you read, understand and follow these instructions very carefully. They

More information

Requirement for Holes - Holes for Hanging

Requirement for Holes - Holes for Hanging Requirement for Holes - Holes for Hanging In order for items to progress through the series of pretreatment and galvanizing baths at our facility, they must be suspended in a suitable manner to ensure

More information

Inventory (Figure 2)

Inventory (Figure 2) MODEL T10127 12" SPIRAL CUTTERHEAD INSTRUCTIONS The Model T10127 indexable insert spiral cutterhead is designed to replace the straightknife cutterhead from the Grizzly jointer Model G0609. The total procedure

More information

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( ) Installation Guide A Subsidiary of Panolam Surface Systems SMPBRO00-012 6/14 Pionite decorative laminates are designed for finished interior surfaces which require high impact, wear and stain resistance

More information

2014 HSC Industrial Technology Metal and Engineering Technologies Marking Guidelines

2014 HSC Industrial Technology Metal and Engineering Technologies Marking Guidelines 2014 HSC Industrial Technology Metal and Engineering Technologies Marking Guidelines Section I Multiple-choice Answer Key Question Answer 1 A 2 B 3 B 4 A 5 B 6 D 7 C 8 A 9 D 10 C 1 Section II Question

More information

WALK-BEHIND SPREADER 50 LB. CAPACITY Model 99623

WALK-BEHIND SPREADER 50 LB. CAPACITY Model 99623 WALK-BEHIND SPREADER 50 LB. CAPACITY Model 99623 Assembly, Operating, and Maintenance Instructions Diagrams within this manual may not be drawn proportionally. Due to continuing improvements, actual product

More information

EZYSTONE WORKSURFACES

EZYSTONE WORKSURFACES EZYSTONE WORKSURFACES Installation & Maintenance Instructions 1. Tools Required Worktop Edge Finishing Kit Pack 1-100mm Velcro Backing Pad Pack 2-100mm Diamond Dry Cut Velcro Discs (100 Grit Yellow) (200

More information

GENERAL OPERATIONAL PRECAUTIONS WARNING! When using electric tools, basic safety precautions should always be followed to reduce the risk of fire, electric shock and personal injury, including the following.

More information

Quick Set Dovetail Jig

Quick Set Dovetail Jig Quick Set Dovetail Jig FOR HELP OR ADVISE ON THIS PRODUCT PLEASE CALL OUR CUSTOMER SERVICE HELP LINE : 01509 500359 THE MANUFACTURER RESERVES THE RIGHT TO ALTER THE DESIGN OR SPECIFICATION TO THIS PRODUCT

More information

The DeltaGrip System. Safety and Operating Instructions. Trigger. Air Supply Connection. Handle Assembly. Air Line Assembly.

The DeltaGrip System. Safety and Operating Instructions. Trigger. Air Supply Connection. Handle Assembly. Air Line Assembly. The DeltaGrip System Safety and Operating Instructions Trigger Air Supply Connection Handle Assembly Air Line Assembly Punch Die Pneumatic Diaphragm Assembly Shackle, Pin & Jam Nut Jaw Frame Shoulder Screw

More information

Dubnium 11 Installation Instructions & Parts List

Dubnium 11 Installation Instructions & Parts List Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.

More information

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed. VIGO INDUSTRIES INSTALLATION GUIDE FOR SHOWER ENCLOSURE ()! SAFETY PRECAUTIONS This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated

More information

Name: Class: Teacher:..

Name: Class: Teacher:.. Name: Class: Teacher:.. 1 Metals All metals in use today are either PURE METALS or ALLOYS. Copper, iron, tin, lead, gold and silver are all examples of PURE METALS which have been mined from the Earth

More information

Welding-Oxy Fuel Metals Joining

Welding-Oxy Fuel Metals Joining Western Technical College 31442301 Welding-Oxy Fuel Metals Joining Course Outcome Summary Course Information Description Career Cluster Instructional Level Total Credits 1.00 Total Hours 36.00 Introduction

More information

A Practical Update on Advanced Copper Alloys and On-Site Joining Methods for HVACR Systems. Educate Promote Defend Support Inspire

A Practical Update on Advanced Copper Alloys and On-Site Joining Methods for HVACR Systems. Educate Promote Defend Support Inspire A Practical Update on Advanced Copper Alloys and On-Site Joining Methods for HVACR Systems A Practical Update on Advanced Copper Alloys and On-site Joining Methods for HVACR Systems Presented by: John

More information

Greenfaulds High School

Greenfaulds High School Greenfaulds High School Technical Department Standard Grade Craft & Design Knowledge & Understanding In Metal Page 1 Metals All metals in use today are either PURE METALS or ALLOYS. Copper, iron, tin,

More information

C-Clamps and Lifting Eyes (Eye Bolts)

C-Clamps and Lifting Eyes (Eye Bolts) 0-C-Clamps & Lifting Eyes-R 2/21/08 9:42 PM Page 1 C-Clamps A B C Armstrong C-Clamps When your requirements call for clamps, specify Armstrong the most accepted name in the business. When you see Armstrong

More information

Crimping Dies for TERMINYL* and PLASTI-GRIP* Terminals and Splices

Crimping Dies for TERMINYL* and PLASTI-GRIP* Terminals and Splices Crimping Dies for TERMINYL* and PLASTI-GRIP* Terminals and Splices Instruction Sheet 408-10051 11 APR 17 Rev D PROPER USE GUIDELINES Cumulative Trauma Disorders can result from the prolonged use of manually

More information

R2C Performance Products 7550 Industrial Drive Forest Park, IL Ph: (708)

R2C Performance Products 7550 Industrial Drive Forest Park, IL Ph: (708) Congratulations on your purchase of the finest Sprint Car Filter and stack sealing system available. This system has been designed for unparalleled ease of assembly, disassembly and cleaning while providing

More information

SOLDERING & BRAZING SOLDERING & BRAZING

SOLDERING & BRAZING SOLDERING & BRAZING SOLDERING & BRAZING SOLDERING & BRAZING Soldering Cleaning pads 198 Electric soldering pliers 198 Electric soldering unit 199 Turbo soldering torches 200 Solder wire and solder paste 201 REMS Cu-Vlies

More information

Technical Data February, 2016

Technical Data February, 2016 Technical Data February, 2016 Product Description 3M DP-600 is a non-sag, grey, rapid setting, two-component polyurethane. It is packaged as 1:1 ratio liquids in a duo-pak cartridge. With the squeeze of

More information

How to operate (folding)

How to operate (folding) How to operate (folding) LEFT HAND STACKING OUTWARD OPENING How to operate (folding) RIGHT HAND STACKING OUTWARD OPENING LOCK BOTH LEVER HANDLE AND FLAT HANDLE UTILISING THE D-HANDLE LOCATED ABOVE THE

More information

What is PUK? PUK 3s professional plus PUK 2 and PUK 111

What is PUK? PUK 3s professional plus PUK 2 and PUK 111 The PUK Welding - Work pieces are melted where they join each other and so fused together. - Filler material (added metal), always has the same melting temperature as the work piece itself. - The soldering

More information

Before you start Warnings Never use scourers, abrasives or chemical cleaner. IMPORTANT, RETAIN FOR FUTURE REFERENCE READ CAREFULLY See enclosed instru

Before you start Warnings Never use scourers, abrasives or chemical cleaner. IMPORTANT, RETAIN FOR FUTURE REFERENCE READ CAREFULLY See enclosed instru Product size: L150*W90*H72 cm The frame of this product is manufactured from mild steel coated with a weather resistant paint. Steel has a natural tendency to rust over time and, whilst we expect you to

More information

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING CUT-OFF MACHINE

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING CUT-OFF MACHINE GENERAL OPERATIONAL PRECAUTIONS WARNING! When using electric tools, basic safety precautions should always be followed to reduce the risk of fire, electric shock and personal injury, including the following.

More information

OPERATION AND MAINTENANCE MANUAL fervi.com Riveter for threaded inserts Art ORIGINAL INSTRUCTIONS

OPERATION AND MAINTENANCE MANUAL fervi.com Riveter for threaded inserts Art ORIGINAL INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Riveter for threaded inserts Art. 0469 ORIGINAL INSTRUCTIONS FOREWORD Read this manual before operation ORIGINAL INSTRUCTIONS Before starting any operation it is compulsory

More information

SOLISTRAND* Crimping Dies

SOLISTRAND* Crimping Dies SOLISTRAND* Crimping Dies Instruction Sheet (Used in Crimping Heads 08-697 69097 and 69099) 5 APR Terminals Butt Splices Parallel Splices = Wire Barrel DIE SET NUMBERS FOR DIE SET CRIMPING HEAD 69097 NUMBERS

More information

Model ADJUSTABLE ROLLER STAND WITH THREE-LEG SUPPORT

Model ADJUSTABLE ROLLER STAND WITH THREE-LEG SUPPORT ADJUSTABLE ROLLER STAND WITH THREE-LEG SUPPORT Model 46086 ASSEMBLY and Operating Instructions Visit our website at: http://www.harborfreight.com Read this material before using this product. Failure to

More information

H HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT

H HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT Page 1 IMPORTANT PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY. All equipment must be installed in accordance with these instructions. Check your shipment against Bill of Lading and Parts list.

More information

Wet Area Panelling. Linear Series

Wet Area Panelling. Linear Series Wet Area Panelling Linear Series LINEAR SERIES WET AREA Add a touch of class to your home or workplace with the Linear Series, WallART s line of wet area panelling. With a striking range of colours and

More information

INSTRUCTION MANUAL Q-HYDRAULIC

INSTRUCTION MANUAL Q-HYDRAULIC Dat: 15.04.02 No: 94-BA 5039E/1b TABLE OF CONTENTS Part III 3.0 Type code explanation 3.1 Service connections 3.2 Impeller clearance adjustment 3.2.1 Wear of wearing parts 3.2.2 General notes to adjustment

More information

DESCRIPTION 3. DIE INSTALLATION AND REMOVAL Die Removal (Figure 3) 3.1. Die Installation (Figure 3) Hydraulic Hand Tool

DESCRIPTION 3. DIE INSTALLATION AND REMOVAL Die Removal (Figure 3) 3.1. Die Installation (Figure 3) Hydraulic Hand Tool Crimping Dies Instruction Sheet for SOLISTRAND* 08 869 s and Splices 9 APR PROPER USE GUIDELINES Cumulative Trauma Disorders can result from the prolonged use of manually powered hand tools. Hand tools

More information

Xenon 05 Installation Instructions & Parts List

Xenon 05 Installation Instructions & Parts List Xenon 05 Installation Instructions & Parts List Illustration Xenon 05, H1 Handle Left Hand: Open Out 26/05/2016 Revision 2.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed by suitably

More information

18600 PORTABLE POWER DRIVE THREADER PRODUCT INFORMATION AND OPERATING INSTRUCTIONS:

18600 PORTABLE POWER DRIVE THREADER PRODUCT INFORMATION AND OPERATING INSTRUCTIONS: WIDDER TOOLS 18600 PORTABLE POWER DRIVE THREADER PRODUCT INFORMATION AND OPERATING INSTRUCTIONS: Description: The 18600 Portable Electric Threader is an electric-motor-driven, heavy-duty power drive which

More information

FG-02: Apply Hard Surface

FG-02: Apply Hard Surface FG-02: Apply Hard Surface Page 1 of 9 SAFETY FIRST Follow all Caterpillar facility safety standards when performing this task. An explosive hazard exists if acetylene or oxygen leaks when working in a

More information

18500 PORTABLE ELECTRIC POWER DRIVE

18500 PORTABLE ELECTRIC POWER DRIVE 18500 PORTABLE ELECTRIC POWER DRIVE PRODUCT INFORMATION AND OPERATING INSTRUCTIONS: Description: Widder 18500 Portable Electric Power Drive is an electric-motor-driven, heavy-duty power drive which provides

More information

WEAR SAFETY GLASSES WHEN INSTALLING THIS KIT.

WEAR SAFETY GLASSES WHEN INSTALLING THIS KIT. INSTALLATION INSTRUCTIONS Trans4mer Mounting Systems Part No. 29753 (black) Part No. 65654 (stainless) for full size GM pickups, and Blazer, Yukon, Suburban, Tahoe As you read these instructions, you will

More information

POPCORN MAKER. Overview JAMIE & JIMMY S FRIDAY NIGHT FEAST SERIES 6

POPCORN MAKER. Overview JAMIE & JIMMY S FRIDAY NIGHT FEAST SERIES 6 POPCORN MAKER JAMIE & JIMMY S FRIDAY NIGHT FEAST SERIES 6 Overview An ambitious theatrical popcorn maker, with a gas heated popcorn kettle that has a hinge mechanism to pour the popcorn down a acrylic

More information

Greenhouse Assembly Instructions

Greenhouse Assembly Instructions Greenhouse Assembly Instructions Our Help Line provides support and advice to customers of Summer Garden Buildings after ordering. For advice before you buy you can phone us free 7 days a week on 0800

More information

MODEL RA O RAIL ALIGNER

MODEL RA O RAIL ALIGNER MODEL RA-00-93-O RAIL ALIGNER OPERATION, MAINTENANCE, AND REPAIR MANUAL 1805 2 nd AVENUE NORTH * MOORHEAD, MN, USA 56560-2310 1805 2 nd AVENUE NORTH * MOORHEAD, MN, USA 56560-2310 PHONE (218) 236-0223

More information

SAFETY AND OPERATING MANUAL

SAFETY AND OPERATING MANUAL SAFETY AND OPERATING MANUAL BladeRunner X2 WX572 9 10 8 11 5 7 12 6 20 1 2 4 3 14 13 15 A2 A1 17 18 B2 B1 1 2 1 2 19 B3 3 4 2 C 1 D1 D1 C 2 1 E1 D2 1 2 E2 1 2 F G1 G1 F OFF ON G2 G3 H1 H2 I1 I2 I1 I2 J

More information