ULTRA REVOLUTION AUTOMATIC GATE INSTALLATION
|
|
- Roy Dalton
- 5 years ago
- Views:
Transcription
1 ULTRA REVOLUTION AUTOMATIC GATE INSTALLATION Before hanging your gate please note that each gate leaf is built to open one direction. The adjustable stop will always be on the same side that the gate leaf will open. MIN. 4 POST OR COLUMN STOP GATE screw side (if gate has screws) (4) /8 Bolts/Screws recommended install aluminum post 5 thru bolts steel post tap and screw Hanging the gate is similar t o h a n g i n g a s t a n d a r d Ultra Gate. The mounting plate is 4 square and takes /8 bolts/screws. O n c e y o u h a v e d e c i d e d where on the post you want your gate mounted mark a n d i n s t a l l t h e b o t t o m hinge first. The hinge pivots so you can place the gate in the hinge, raise it upright and mark the holes for the top hinge. PAGE
2 It is very important to make sure that the hinge pivots are completely inserted in the gate extrusion before attaching the hinges to the gate post gate frame extrusion The adjustable hinges come assembled and mounted to the gate. They are made of a plate that mounts to the post(urgh-l) & an adjustable bolt that connects the plate to the motor thru the thrust plate (UR-M0/UR THRUST KN). T h e t h r u s t p l a t e connects to the top o f t h e m o t o r. I t clamps down with (4) 6 M M M e t r i c S c r e w s a n d ( ) 6 M M s e t screws on the side. Note: Once you have mounted the plate to t h e p o s t y o u c a n remove the screws and lay the gate down to service it if needed. No need to take the hinge plate off the post. PAGE
3 Motor Key Release The rd Generation Revolution comes with a key release for the motor. It is installed at the bottom of the motor in the extrusion. To release the motor turn the key toward the hinge post. The gate leaf can be operated manually. Key Release Don t forget to lock it back or the gate motor will not operate properly. This can cause damage to the gears. UNLOCK /4 Turn toward Post LOCK /4 Turn toward gate DON T FORCE THE KEY! If you turn it more than /4 turn you risk spinning out the key release. This can only be fixed by removing the motor and adjusting the key release. Motor Wires The Revolution Hide Motor is installed inside the Ultra extrusion welded to the gate upright. the motor wire comes out of the extrusion near the bottom of gate. (Fig. 6) leaving a loop or slack to the power cable going from the extrusion to the control or is very important. This prevents damage to the cable caused by gate movement. gate frame extrusion to control or power cable FIG. 6 PAGE
4 Running Wires to the Control Box As seen in Fig. 6 the motor wire comes out of the gate frame extrusion. One of the most common ways is to run the motor wires to a nearby (not provided.) Regardless of what you use to direct the wires into the conduit, make sure you leave some slack in the wire to avoid any kinking or twisting. It is also recommended to use a cord connector to direct the wire to the. This will hold the end of the wire in place. If at all possible avoid splicing the wires in the. Fish them through the conduit. when running the motor power cable, avoid splicing. whenever possible. the cable should be in a conduit, following local electrical low voltage codes control box (not provided) no splices (not provided) no splices The wire is /4 thick so keep that in mind when running conduit. Also, never run 0V wire and low voltage wire in the same conduit and preferably in the same trench. In typical installations, the MagLock wire (if installed) is the only other wire that will be coming out of the extrusion. This is installed on the control box side by Ultra. The easiest side to place the 4x Control Box is on the same side as your electrical, photo eye and keypad (if applicable.) PAGE 4
5 connect your main gate wires to motor terminals (6, 7 & 8) for right-hand gate connect wire to terminal 4, wire to terminal and wire to terminal 5 once again, use [-] to scroll down and look for mot on if when pressing [+] the motor moves in the closing direction, swap wires & on both motors scroll up [+] to see AUTOSET. press [ok] WHEN THE SCREEN READS HIDDEN BUTTON... for left-hand gate connect wire to terminal 6, wire to terminal 7 and wire to terminal 8 wire #4 (from both motors if are installed) goes to terminal 4 press [ok] and press [+] to switch on. then press [ok] IF MOTORS WERE SELECTED, OPM WILL SHOW. PRESS [+] to bring the nd gate to the fully open position... press [ok] to set limit UPON PRESSING [OK], THE GATE WILL OPEN AND CLOSE AUTOMATICALLY TO TIMES SIMULTANEOUSLY PRESS AND HOLD THE BUTTONS ON YOUR REMOTE UNTIL THE SCREEN READS RELEASE for right-hand gate connect wire to terminal 7, wire to terminal 6 and wire to terminal 8 connect wire 5 to terminal, and wire 6 to terminal (both motors if applicable) press [+] & [-] at the same time to go back to the main menu press the [-] button to close the gate and hold it UNTIL the gate does not move any more. press [ok] THE SCREEN WILL THEN READ DESIRED BUTTON. PRESS THE BUTTON YOU WANT TO OPERATE THE GATE WITH if needed, connect your secondary gate wires to motor terminals (, 4 & 5) this motor will open after the other has started press the [ok] twice to enter programming if two gates are installed, repeat the previous step for the opposing gate. the close limit is adjusted press [ok] to set limit physically at the gate THE SCREEN WILL READ OK. PRESS [OK] TO CONTINUE.. If two gates are installed, skip to this step scroll down [-] and look for lsw adjust. press [ok] scroll up [+] to radio and press [ok] THE SCREEN WILL DISPLAY OK AND THE NUMBER OF THE REMOTE IN MEMORY. repeat the process for additional remotes for left-hand gate connect wire to terminal, wire to terminal 4 and wire to terminal 5 if only one gate is connected, scroll down using [-]. look for logic. then press [ok] OPM (OPEN MOTOR ) WILL BE DISPLAYED ON THE SCREEN press the [+] button until the gate has reached its open limit....then press [ok] to set the limit. THE SCREEN WILL READ OK. PRESS [OK] TO CONTINUE.. the screen will read add start. press [ok] again press [+] & [-] at the same time times to exit programming Mounting the Control Box The Revolution Hide Control Box is 4 H x Wide and hinges on the Left Side. The control box is meant to be flush mounted. To access the (4) screw holes located in the corners you will need to open the door. What you mount the box to will determine what fasteners to use. It is recommended to attach using all (4) screw holes. Self tapping screws for aluminum and steel posts (drill pilot hole.) If mounting to a column make sure you can get a solid connection with the brick or stone and that it is flat. The motors come with 0 of cable. Keep that in mind when mounting the control box. The motor wire is a specific wire and m a y b e difficult to f i n d i n t h e UltraAluminum M fg.,inc. TM 4 GrandCommerceDrive field. Extra Howel,MI48855 Phone: Tol-FreePhone: Hide Tol-FreeFax: w i r e i s a v a i l a b l e t h r o u g h 4 Ultra {press} {press} rev..6 Foradditionalinform ationpleaserefertothe insta lation m anual Battery Backup Conduit Plan your conduit carefully. The easiest access to the control box is on the left side next to the battery backup. 0 Volts -4Volts PAGE 5
INSTALLING YOUR NEW SPRING LIFT ARM KIT
INSTALLING YOUR NEW SPRING LIFT ARM KIT 1. Measure the distance that the roof is to be raised. [If your lift system is completely non-functional, you will need to calculate or estimate this distance as
More informationParts Included: T-Feet Assembly
Parts Included: T-Feet Assembly Foot Kit: J-Rail Kit: Column Kit: 2 Feet 2 T-Top Supports 2 J-Rails Hex Rod to be Included on a Crank Assembly only. 2 Electric or Crank Columns 3 rd Leg option for 3 leg
More informationVersatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series
Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series TM Rough opening width (finished opening width plus 9/16") Notch for top track units (used as frame header) Rough opening height
More informationVSD-6500 Frame Exploded View LIFT P/N
VSD-6500 Frame Exploded View LIFT P/N 511-65075-01 34 34 45 96 55 108 22 9 7 55 54 34 89 90 56 24 99 23 111 SEE SHEET 4 34 91 45 106 20 55 26 68 95 5 55 109 7 22 8 54 53 71 66 5 95 31 58 6 6 46 60 73 25
More informationWARNING: Prior to installation, turn the power off to the vending machine and unplug it from its power source. Also, make sure to level the machine.
Installation of Gum and Mint Tray for National 147, 157, 167 Important Note: Please read all instructions thoroughly before continuing with installation of kit. If you are having problems installing the
More informationSentinel Electronic Safe Installation Guide
Sentinel Electronic Safe Installation Guide by Rev 07/12/2004 P/N 100020 Table of Contents 1. OVERVIEW...3 2. SAFE INSTALLATION...3 2.1. TOOLS REQUIRED...3 2.2. SELECTING THE MOUNTING LOCATION...3 2.3.
More informationInstalling Your Electronic Deadbolt
Ultra Security Plus Electronic Deadbolt Installation Instructions http://www.hberger.com/video-gallery/electronic-deadbolt New Installation Lock Location Preparation (Skip this section if you door has
More informationCHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included)
CHICKEN COOP & CHICKEN RUN ASSEMBLY MANUAL SKU# 6839 Tools required for assembly (not included) Distributed by: TRACTOR SUPPLY COMPANY 0 VIRGINIA WAY, BRENTWOOD, TN 3707 For customer support, call: -888-376-960
More informationHover. Installation Instructions. Raised Panel. Version
Installation Instructions Version 8-2-17 Raised Panel Table of Contents Page Raised Panel Trough 3-13 Platform Trough 14-20 Platform 120 Degree Trough 21-24 Electrical 25-28 Type A Electric Bases 29-31
More informationTOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill
DEVICES COVERED IN THIS DOCUMENT: 4700S Surface Vertical Rod Device 4700SF Fire Exit Surface Vertical Rod Device TOOLS REQUIRED Metal Wood Wood and Metal Screws Sex Bolts #7 Drill ¼ -20 Tap #16 Drill #12-24
More informationINSTALLATION INSTRUCTIONS FOR HAND OPERATED SILENT STEEL ADC HEAVY DUTY CURTAIN TRACK MODELS: 280, 281, 282, 280-A, 283-N, 283-R
INSTALLATION INSTRUCTIONS FOR HAND OPERATED SILENT STEEL ADC HEAVY DUTY CURTAIN TRACK MODELS: 280, 281, 282, 280-A, 283-N, 283-R I. SUSPENDED INSTALLATIONS 1. Lay the two track halves on the floor with
More informationPRS X-Axis E-Chain Installation For Tools with a 12 Z-Axis
888-680-4466 ShopBotTools.com PRS X-Axis E-Chain Installation For Tools with a 12 Z-Axis This kit is compatible with PRS Shopbots that have an X-axis cutting area of 96 to 144. It is not immediately compatible
More informationHow To Measure Your Finished Opening
3000 Series Bifold Doors How To Measure Your Finished Opening MEASURE FROM RIGHT TO LEFT 2 PLACES (WIDTH) MEASURE FROM TOP TO BOTTOM 2 PLACES (HEIGHT) Tools Required for Assembly: Tools Needed: Phillips
More informationTELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.
TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL. Telescopic gates have been manufactured for many years essentially in the same way they are largely today. In recent years hardware suppliers have
More informationMultiTable Mod-E 2 Electric Standing Desk
The Height of Healthy Design MultiTable Mod-E 2 Electric Standing Desk ASSEMBLY INSTRUCTIONS MultiTable Mod-E 2 Electric Standing Desk Frame PARTS AND TOOLS PLEASE REVIEW these instructions before beginning
More informationMETAL BLINDS. Deluxe GETTING STARTED OPTIONAL HARDWARE. A few simple tools are required: STANDARD HARDWARE
METAL BLINDS Deluxe GETTING STARTED OPTIONAL HARDWARE A few simple tools are required: Steel Tape Measure Pencil Level Hold Down Brackets with Screws Extension Bracket Power Drill and Drill Bits Flathead
More informationInstallation Instructions For The 8850FL Series Mortise eboss
Installation Instructions For The 8850FL Series Mortise eboss Electronic Battery Operated Security Solution FEATURES Battery Operated (Hardwire Capable) Motorized Grade 1 Mortise Lock 94 User Code Capacity
More informationPrecision Steel Car s 100 T Steel Coil Car
Precision Steel Car s 100 T Steel Coil Car Precision Steel Car www.precisionsteelcar.com info@precisionsteelcar.com Paul Vernon: (513) 571-5739 Revised 4/30/2009 Contents of Kit Main Tube Side Frame 2
More informationZODIAC CH 601 XL 6TD3-1 TD MAIN GEAR UPRIGHTS (QTY=1L + 1R) Cutout in the side skin is below the diagonal rivet line.
6TD3-1 TD MAIN GEAR UPRIGHTS (QTY=1L + 1R) Cutout in the side skin is below the diagonal rivet line. The TD Gear Upright 6TD3-1 is installed on top of the landing gear 6TD2-7. 6TD3-1 makes the corner between
More informationTRIUMPH-LX ELECTRIC TABLE BASE
TRIUMPH-LX ELECTRIC TABLE BASE 2T-LX Rev A 7/17 Model 2T-LX-C28-24- Model 2T-LX-C28-30- Model 2T-LX-C40-24- Model 2T-LX-C40-30- = SLV, BLK or WHT ASSEMBLY AND OPERATION TRIUMPH-LX 2 LEG ELECTRIC TABLE
More informationAssembly Instructions
InTandem Table System November 20 InTandem Table System - Worksurface #4 x/" 4 wood screw power beam Tools Provided T-0 Extended Torx Driver T-25 Torx Driver Additional Tools Required Soft protective
More informationProLogic Xtreme L22 - Electromechanical Redundant Safe Lock System - Instructions
ProLogic Xtreme L22 - Electromechanical Redundant Safe Lock System - Instructions Please visit the website below by scanning the QR code with your smartphone or by typing in the address below for video
More informationInstallers guide Deadbolt 02.
Installers guide Deadbolt 02. version 0.7.1 Specifications Model igloohome Smart Deadbolt 02 Material Zinc Alloy Current Rating (Standby) ~30uA Current Rating (Active) ~200mA Batteries 4 x AA Alkaline
More informationUser Instructions Multiline Otter Scoreboard Caddy Assembly
List of parts: User Instructions Multiline Otter Scoreboard Caddy Assembly Single Caddy Double Caddy 1 1 Base assembly with attached wheels 2 4 1 1 2 4 4 8 10 20 12 Uprights (60 or 74 aluminum extrusion)
More informationMotorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions
Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil 4 Level Phillips
More informationHardware Installation. Do this first:
1 Do this first: Hardware Installation Need some help? Here s what you ll need: 4 AA Batteries Phillips screwdriver Visit us online. support.remotelock.com We re here to help. 1 (877) 254 5625 support@remotelock.com
More information535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.
Pipe and Bolt Threading Machine -Manual Main Components 0 Screw, Button Head /" - 0 x /" () Washer, Flat /" ()" Top Cover 0 0 Cutter Assembly Stop Pin 0 Pin Reamer Assembly Carriage Assembly 0 Stop Screw
More informationROMAN AND. Roller Lift System Continuous Cord Loop GETTING STARTED BRACKET INFORMATION INSIDE MOUNT. A few simple tools are required:
ROMAN AND WOVEN WOOD SHADES Roller Lift System Continuous Cord Loop GETTING STARTED BRACKET INFORMATION A few simple tools are required: The brackets you received with your product are REQUIRED for proper
More informationFor installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.
SARGENT Installation Instructions for LP8600 x LR8600 & 12-LP8600 x 12-LR8600 Series Low Profile Panic and Fire Exit Devices on Double Egress & Double Doors or LS8600 & 12-LS8600 Low Profile Exit Device
More informationIs there sufficient space adjacent the driveway for the gate to slide back onto when open?
How to Install a sliding gate from EasyGate Want to install your own automatic sliding gate? EasyGate has all the gear you need to build and install an automatic sliding gate. Note: The information on
More informationInstallation Instructions. Materials Needed. Parts Included. Tools You Will Need
Installation Instructions 27 Built In Wall Oven JKP15, JKP18, JKP27, JKP45, JKP56 JKS05, ZEK937, ZEK957 If you have questions, call 800-GE-CARES or visit our website at: www.geappliances.com Before you
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationHAPPY CHICKEN TRACTOR
HAPPY CHICKEN TRACTOR www.thelittlechickenfactory.com Consumer Assembly Instructions 2014 Six-foot unit Picture of six-foot unit shade/rain cover not shown NEW HANDLE INSERT INTO FRAME HOLES WHILE ASSEMBLING
More informationED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS
ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS Ver.2 1300 SERIES CONCEALED VERTICAL ROD DEVICE Top Strike Latch Screws Strike Screws Release Plunger Top Latch Plunger Screws
More informationEND FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"
END FRAMES End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 23" 17 1/2" (B) (B) Measure from the bottom of your stone to 1" below the lip to get your measurement. 17 1/2"(B) 36" 34" 1/2" flat
More informationInstallation Instructions
Installation Instructions 30 Built-In Wall Oven with Microwave JTP86, JT965 If you have questions, call 1.800.GE.CARES or visit our website at: ge.com Before You Begin Read these instructions carefully
More informationSpring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST
Spring Loaded SCREEN-PRO All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More informationMod-E Pro Electric L-Shaped Standing Desk
The Height of Healthy Design Mod-E Pro Electric L-Shaped Standing Desk ASSEMBLY AND OPERATION MultiTable Mod-E Pro Electric L-Shaped Table Base PARTS AND TOOLS PLEASE REVIEW these instructions before beginning
More informationINTRODUCTION. EqunioxRoof.com. Pro Tip
INSTALLATION MANUAL INTRODUCTION The Equinox Louvered Roof System is designed to be installed in an aluminum frame. All these sections are 1/8" thick extruded aluminum. All engineering for this system
More informationParts. Backplate. Battery Cover. Backup Key. Touchscreen Assembly. Inside Assembly. Thumbturn. Strike. Reinforcement Plate. Bolt.
Quick Start Guide Backplate Backup Key Battery Cover Touchscreen Assembly Parts Strike Bolt Inside Assembly Thumbturn Reinforcement Plate Set Screw Reinforcement Screws Inside Assembly Screw Backplate
More informationCloset System Installation Manual
Closet System Manual Thank you For choosing our Custom Closet Collection to fit all your needs Closets come fully assembled to make your project an enjoyable and satisfying experience. With quality Custom
More informationA Generic Sauna Room Assembly Manual
A Generic Sauna Room Assembly Manual Parts List Exterior 1. Ceiling Assembly 2. Wall Elements 3. Exterior Mouldings 4. Top Exterior Mouldings 5. Bottom Exterior Mouldings 6. Main Base Frame 7. ABS Bolt
More informationSpring Loaded All Season Roll-Up Doors
Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately
More informationINSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260
INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260 I. SUSPENDED INSTALLATIONS NOTE: MODEL 260 FENSTEEL TRACK IS ASSEMBLED IN THE SAME MANNER AS DESCRIBED BELOW WITH THE EXCEPTION
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationINSTALLING INVISIRAIL GLASS PANELS POST INFORMATION... 2 PRE-INSTALLATION... 2
Contents POST INFORMATION... 2 PRE-INSTALLATION... 2 STEP A1: MEASURING FOR INVISIRAIL CUSTOM GLASS PANELS (skip if using Standard Sized Panels)... 2 STEP A2: GATHER ADDITIONAL TOOLS/SUPPLIES... 2 STEP
More informationDouble Screen Door Installation Instructions
Double Screen Door Installation Instructions (36) #8x1 tek screws (20) #8x1/2 tek screws Package Includes: (2) PCA Screen Doors (1) Astragal (1) Left Hand Z-bar (1) Right Hand Z-bar (1) Header Z-bar (2)
More informationPivot-Door Downdraft Cabinet Plans
Pivot-Door Downdraft Cabinet Plans Finished Cabinet Closed Open Exploded View Introduction This simple downdraft-style dust collection cabinet is a great way to keep your shop cleaner and keep your router
More informationSheet Metal Brake Plans for a 6' Sheet Metal Brake
Sheet Metal Brake Plans for a 6' Sheet Metal Brake,1752'8&7,21 Thank you for purchasing the sheet metal brake plans. The plans include a complete list of material needed and easy to follow steps to build
More informationSide "C" Stake here. Side "B" Here Shirley and I are setting up a 10 X 16 ground work.
Choosing the Location It is always best to locate your greenhouse so that it can receive maximum sunlight at all times of the year especially in winter months. If Possible orient the long side towards
More informationFord Pick Up Rear leaf Spring Kit Installation Instructions
1948-1956 Ford Pick Up Rear leaf Spring Kit Installation Instructions 1-800-984-6259 www.totalcostinvolved.com Parts 48 inch leaf (2) springs (4) U-bolts 3/8-24 x l 1/4bolts (16) & nuts (2) 1/2-20 x 4
More informationAluminum Continuous Geared Hinges
Manufacturing, Inc. Overhead Holders & Stops Hospital Push/Pull Latches Electro-Magnetic Door Holders Electrical Power Transfer Products Stainless Steel Continuous Pin & Barrel Hinges Stainless Steel Edge
More informationROLA SECURITY PRODUCTS WOODEN SASH WINDOW STOPS
WOODEN SASH WINDOW STOPS Rola sash stops are designed to stop sash windows opening past each other whilst allowing ventilation. The heads revolve, but they are removable with a key. A Rola S comes in three
More informationDeck Mount Installation with Bench
Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out
More informationPlastibeton Trench System. Installation Packet
Plastibeton Trench System Installation Packet Plastibeton Installation Guide This Installation Guide is intended to assist in the preparation and installation of Plastibeton products manufactured by Oldcastle
More informationLend-A-Hand OEM INSTALLATION MANUAL
Lend--Hand OEM INSTLLTION MNUL TBLE OF CONTENTS Introduction 2 Safety 2 Resources Required 2 Preparation 3 Installation 4 Installing the ssist Handle Door 4 Interior Frame and Hinge Installation - Motorized
More informationFOLDING DOOR INSTRUCTIONS
FOLDING DOOR INSTRUCTIONS Please read these instructions carefully and follow them step by step to insure a smooth installation. Most importantly DO NOT open hardware boxes and mix hardware up. Hardware
More informationTherma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)
Swing Unit with Hardware Kit - Hardware Tools Included: 4mm Allen Wrench, 6mm Allen Wrench, 8mm T-Handle Allen Wrench (1) 3/4" Drill Bit, (1) 7/32" Drill Bit and Hole Template Guide Tools Required: Phillips
More informationINSTALLATION MANUAL. 2. Check with local utility companies for locations of underground cables or pipe lines.
INSTALLATION MANUAL Install our maintenance free fencing system yourself! About 90% of our residential clientele install our fencing systems themselves. Why hire and pay someone to install it when you
More informationClearview Railing System Installation Instructions
Clearview Railing System Installation Instructions Disclaimer: AGS Stainless, Inc. has its Clearview Railing Systems designed by a professional engineer to meet the requirements of the latest national
More informationAUTO STABILIZING AND LEVELLING SYSTEM
Installation Manual Make sure the caravan is parked in a safe place. Make sure the caravan brake is on. Remove all 4 corner steady legs from the caravan. Remove the corner steady legs by removing the 3
More informationVERTICAL PLATFORM LIFT
VERTICAL PLATFORM LIFT HERCULES DC INSTALLATION GUIDE Please read this installation guide carefully to ensure correct installation of your HERCULES Vertical Platform Lift. HERCULES RESIDENTIAL & COMMERCIAL
More informationINS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...
INS-88.300-0A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Verify Curb Installation... 2 2. Required Installation Tools... 2 3. Unpacking the KSR... 3 4. Attach KSR Bottom Rail to Curb... 5 5. Attach
More informationAS-TX86. Please read these instructions carefully before using. This model will hold most Flat Panel TVs. Load capacity: 60kg (132Lbs).
AS-TX86 Please read these instructions carefully before using. This model will hold most 52-84 Flat Panel TVs. Load capacity: 60kg (132Lbs). AS-TX86 Information Please read these instructions carefully
More informationMast Solutions Document/Installation Manual
Mast Solutions Document/Installation Manual The Mast family from Veritas is the perfect answer to movable and stationery partitions and room dividers, and hinged doors. This system is extremely versatile
More informationINSTRUCTIONS FOR HIT TEMPLATE FOR ALARM LOCK DL3500 MORTISE LOCK
1825 VIA BURTON ANAHEIM CA 92806 714-772-5202 / FAX 714-772-2302 EMAIL: MAIL@MAJORMFG.COM WEB: WWW.MAJORMFG.COM INSTRUCTIONS FOR HIT-66-210 TEMPLATE FOR ALARM LOCK DL3500 MORTISE LOCK WHEN USING POWER
More informationSteele TV Stand Stock # BH
LOT NUMBER: DATE PURCHASED: / / Steele TV Stand Stock # BH46-084-899-02 ADULT ASSEMBLY REQUIRED If you have any questions regarding assembly or if parts are missing, DO NOT return this item to the store
More informationBefore Lock Installation Surface Mount Installation. Door Preparation
Installation Guide Before Lock Installation... 3 Surface Mount Installation For door thickness measuring between.01" -.91" (0.2 mm - 23 mm)... 4 Required Components... 4 Installation... 5 Door Preparation
More informationINSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET
HIGH EDGE 2 1/4"(57mm) 03079400070 INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET IMPORTANT: THIS LOCK IS NON-HANDED. LOCK IS FACTORY PACKED PREADJUSTED FOR 1³ ₄" (45mm)
More informationM10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required
Door System Unit - Hardware Tools Included: (2) 2mm Allen Wrenches, (2) 3mm Allen Wrenches, (2) 4mm Allen Wrenches, (2) 6mm Allen Wrenches, and (1) 8mm T-Handle Allen Wrench Tools Required: Phillips Screwdriver,
More informationInstallation instructions for: Visi-Guard and EZ-Guard Pool Fence Kits
Installation instructions for: Visi-Guard and EZ-Guard Pool Fence Kits Planning: Layout Your Pool Fence Planning is the first step of any successful project. Decide where you would like your fence to surround;
More information3 D Printer Enclosure Assembly Instructions
3 D Printer Enclosure Assembly Instructions Tools Required: 2.5 mm Allen wrench (included) Phillips screwdriver Adjustable Wrench Parts Included: Plexiglas Back with fan and filters installed (29.5 x 35.5
More informationA. Top Unit 1 Pc. For assembly see instructions in carton:
88 5005 9441 Kitchen Island IMPRTANT NTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches or other damage occurring to the parts. We have taken
More informationLinear Hook- on Worksurfaces
Linear Hook- on Worksurfaces Linear Hook-On Worksurfaces come in three depths and seven lengths. Different worksurfaces have different reqirements for installation that are outlined below. 27 inch deep
More informationIMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the
PART # 1608990 STATIC BRIDGE & RETURN MODULE 1. This sheet covers the steps to install a static bridge or return module with the FX no hinged access panel back option to a height adjustable freestanding
More informationRV Entry Door OEM INSTALLATION MANUAL
RV Entry Door OEM INSTLLTION MNUL TBLE OF CONTENTS Introduction 2 Safety 2 Resources Required 2 Installation 3 Exterior Frame Installation - Towable and Motorized 3 Interior Frame and Hinge Installation
More informationSide "A" Stake here. Side "C" Side "D" Side "B" Here Shirley and I are setting up a 10 X 16 ground work.
Choosing the Location It is always best to locate your greenhouse so that it can receive maximum sunlight at all times of the year especially in winter months. If Possible orient the long side towards
More informationENC 125 T/E. Quill Installation... Mounting Information... Center reading head... First Steps...
Quill Installation... * Supplied with encoder hardware M6 flat washer.017 thk. (2) 1/4 Flat washer.09 thk. (2) 1/4-20 x 1/2 BHCS (2) M4 x 8mm SHSS (2) (special length) 4 Encoder 8-32 x 1/4 SHSS (4) 1/4
More informationVERTICAL PLATFORM LIFT
HERCULES II VERTICAL PLATFORM LIFT INSTALLATION GUIDE Please read this installation guide carefully to ensure correct installation of your HERCULES II Vertical Platform Lift. HERCULES II RESIDENTIAL &
More informationIn-Tube Motorized SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST
In-Tube Motorized SCREEN-PRO All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged,
More informationINSTRUCTIONS FOR HIT TEMPLATE FOR BEST 34H-37H MORTISE LOCK
1825 VIA BURTON ANAHEIM CA 92806 714-772-5202 / FAX 714-772-2302 EMAIL: MAIL@MAJORMFG.COM WEB: WWW.MAJORMFG.COM INSTRUCTIONS FOR HIT-66-230 TEMPLATE FOR BEST 34H-37H MORTISE LOCK WHEN USING POWER TOOLS
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and Handling Information on last page. Review
More informationColonial Classic Bar
88 5528 991 Colonial Classic Bar IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches or other damages occuring to the wood parts.
More informationApexDesk Assembly Guide
ELECTRIC HEIGHT-ADJUSTED SIT TO STAND DESK ApexDesk Assembly Guide REV-1507C Table of Contents CAUTION, USE & LIABILITY... 3 PARTS & HARDWARE LIST... 4 PARTS / COMPONENT DIAGRAMS... 5 ASSEMBLY INSTRUCTIONS...
More informationCustom Wood Frame Overlay for Glass Doors Installation Instructions
MARVEL CUSTOM WOOD FRAME OVERLAY FOR GLASS DOORS Custom Wood Frame Overlay for Glass Doors Installation Instructions Wine Cellars 6SWC 6SWCE 61WC 61WCM 66SWC (2 required) 66SWCE (2 required) Beverage Centers
More informationCopyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax
Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 JULY 2003 RM3010A RM315-R2 RM323-R2 RM329 RM451 RM457 RM3020A RM316 RM324-R2
More informationINSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01
MOUNT INSTALLATION GUIDE PUB5JAN0 SM SOLAR Wrenches and Torque Wrench Size Recommended Torque (ft-lbs) /4 Hardware 7/6 *0 3/8 Hardware 9/6 *30 # Hardware 5/6 0 Torques are not designed for use with wood
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More informationINS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...
INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...
More informationINSTALLATION INSTRUCTIONS FOR PLASCORE NARROW STILE DOORS
INSTALLATION INSTRUCTIONS FOR PLASCORE NARROW STILE DOORS The following information is provided by Plascore, Inc., as a general guideline for the installation of the Plascore Narrow Stile Door and Jamb
More informationUniversal Adaptor Kit
TigerRip Fence Universal Adaptor Kit Guide Version 2.30 À Á Ã Ä Å Â Æ Ç An illustrated replacement parts list with order numbers is found on the last page of this guide. Illustrated Accessory Parts List
More information105" TIGER MOTH ARF INSTRUCTION MANUAL VERSION 1.0
105" TIGER MOTH ARF INSTRUCTION MANUAL VERSION 1.0 Step 1. Installation of the aileron servos 1) Mount aileron servo to servo mounting blocks with servo s screws. Install servo mounting plate with screws.
More informationAssembly Instructions
Unite Panel System Hinge Door July 2016 #12 x / slotted hex washer head bolt Figure 1 threshold bracket frame Detail F threshold bracket threshold bracket (installed) #12 x / slotted hex washer head bolt
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationCountryAccents Pergola Assembly Instructions
CountryAccents Pergola Assembly Instructions Options 11 2" Squares Lattice Railing Gingerbread Scroll (For 5" Posts Only) Site Preparation Site preparation for either the round column or the 5" post pergola
More informationHeight Adjustable Benching End Panel and Utility Pole
Height Adjustable Benching End Panel and Utility Pole Tools required: END PANEL Jig Saw Power Drill END PANEL WITH UTILITY POLE Bit Holder Long #2 Square Drive Bit 5mm Hex Drive Bit UTILITY POLE Level
More informationLSM PF 5 - Lift System Medium with Push Up Flap
DESIGN HIGHLIGHTS Quiet smooth action at approximately 40mm [1.6] per second Full cable management Wide range of mounting options 24V DC motor. Suitable for direct DC supply Marine suitable robust beam
More informationWARNINGS & SAFETY INFORMATION: PLEASE READ CAREFULLY AND KEEP A COPY ON THE PROPERTY FOR FUTURE REFERENCE!
WARNINGS & SAFETY INFORMATION: PLEASE READ CAREFULLY AND KEEP A COPY ON THE PROPERTY FOR FUTURE REFERENCE! General Safety Information To reduce the risk of death, personal injury or property damage from
More informationKIT. Assembly Instructions. HayDay, LLC
KIT Assembly Instructions HayDay, LLC 1-800-732-1654 www.stablegrazer.com Read completely through the assembly instructions before starting assembly. The Stable Grazer Kit comes in two boxes. Remove all
More informationN. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Dump Body tarping system. With tarping systems
More information