FOLDING DOOR INSTRUCTIONS
|
|
- Ethelbert Dixon
- 5 years ago
- Views:
Transcription
1 FOLDING DOOR INSTRUCTIONS Please read these instructions carefully and follow them step by step to insure a smooth installation. Most importantly DO NOT open hardware boxes and mix hardware up. Hardware boxes are numbered to match panel installation one by one. Mixing hardware will cause an improper install and doors will not operate properly. FRAMING/JAMB STEP 1: Remove packaging from the 4 piece frame system. Remove upper aluminum track from frame. Place each piece with the label INSIDE facing up. Line up the pre drilled screw holes and connect jamb with 3 screws included in the kit labeled Frame. STEP 2: Stand framing up and place it into the rough opening we recommended for installation. Begin installation with a ROTATING LAZER LEVEL to determine your high side and your low side.
2 (WARNING!!! DO NOT USE A STANDARD LEVEL TO DETERMINE THIS. SYSTEM MUST BE WITHIN 3MM FROM LEFT TO RIGHT HORIZONALLY AND VERTICALLY) STEP 3: Begin leveling the jamb using a 4 screw (included labeled HEADER ) on the low side of the frames pre drilled header raising the framing slowly. Using the laser and a tape measure, insure that you are as close to perfect as you can get on the left and the right of the frame. (Remember 3mm is the tolerance from left to right) Page 3 in the detailed instructions will show tolerance allowed which goes for any length system. STEP 4: Once you are level you can begin shimming the rest of the upper frame header, lower tracking and vertical jamb legs. Be sure to continually check your vertical spacing from the bottom of the frame header to the top of the lower tracking. (Example if you have 85 between these two points on the right side of the frame, you should have 85 in the center as well as the left side of the frame). STEP 5: Double check all above to insure the frame is installed as plumb and level as possible. Once confirmed, reinstall the upper tracking using flat #10 screws or lag bolts (Labeled Track ) and beginning with the side that is marked PIVOT END on both frame and track. Leave small piece of track out. Install
3 the Pyle weather strip brush into the upper track as shown on page 3 before proceeding to door and hardware installation. HARDWARE & DOOR INSTALLATION Step 1: In your box of hardware locate the pivot hardware box labeled PIVOT END and insert the upper pivot into the upper track sliding it to the end of the track. If the hinge sits flush against the jamb it is in correctly. Use the two machine screws to tighten pivot to track. (DO NOT INSTALL PIVOT COVER WITH SCREWS AS IT IS JUST A COVER AND WILL BE INSTALLED AFTER ADJUSTMENTS ARE COMPLETED). Once the upper pivot is installed, remove the bolts from the lower pivot block installed in the lower track and install lower pivot (both are shown on page 8, 9). Adjust both upper and lower pivots so that the hinge sits flush against jamb. Step 2: Locate your first panel you will be hanging labeled PIVOT END on one side and the number 2 on the other. (ATTENTION! SPLIT DOOR SYSTEMS EXAMPLE 2+3 WILL BE LABEL ON THE OUTSIDE OF PANEL). Align pivot end with pivot hinges and connect. If pivot hinge is to low see page () for adjustment instructions.
4 STEP 3: Locate the hardware box with the number 2 on the front. (Other than a two panel door system or split 2+2 panel system this box should read OFFSET HINGE SET ). Install hinges to your first panel on the side that is marked #2 with the handle hinge in the center of the panel. (Handle should rest against the flat surface/face of panel). Once installed, swing out and locate your second panel marked with a #2 and #3. Connect the side marked with the #2 to the hinges on your pivot panel as if they were in the folded position. (Example of this would be in comparison to older style folding closet doors). Step 4: Locate the hardware box with the number 3 on the front. Remove the upper wheels with hinge and insert them into the upper track. (ATTENTION! IF HINGE IS REVERSED, UPSIDE DOWN OR NOT LINING UP WITH PRE DRILLED HOLES ON PANEL ITS OK, ALL HARDWARE IS UNIVERSAL AND CAN BE TAKEN APART TO CONFIGURE TO PROPER DRILL PATERN). Once installed in the track connect the upper wheel hinge to the second panel on the side marked with the #3. After this is completed you can then and only then remove the lower guide hinge as well as the center hinge and install accordingly. (KEEP
5 NOTE THAT ADJUSTMENT TO UPPER WHEEL HANGER AND PIVOT MAY BE NEEDED IF SYSTEM IS TO LOW. DOORS BEING TO LOW MAY NOT ALLOW INSTALLATION OF LOWER TRACK GUIDE. ALL ADJUSTMENT INFORMATION IS LOCATED IN MAIN INSTRUCTIONS). STEP 5: Locate your third panel with the #3 and hang on the other side of the wheel hinge set. Once the panel is hung adjust all panels to spec. If adjusted properly you should have a ¼ inch gab between the upper track and the top of the panels all the way across and the Pyle brush touching the panels. IF YOU PURCHASED A 3 PANEL SYSTEM THIS WILL COMPLETE YOUR INSTALLATION OF THE SYSTEM. IF YOU HAVE A SYSTEM WITH MORE THAN 3 PANELS THEN YOU WILL CONTINUE THE PROCEDURE OF MATCHING THE NUMBERED BOXES OF HARDWARE TO THE NUMBERS LOCATED ON THE PANELS. SOME FOLDING DOOR SYSTEMS ARE SLIT SYSTEMS WHICH MEANS SOME PANELS WILL FOLD LEFT AND SOME WILL FOLD RIGHT. (EXAMPLE 2L + 3R) IN THIS CASE YOU WILL NEED TO START AS INSTRUCTED ABOVE STARTING WITH THE LARGER TRACK PANEL PORTION AND THEN REVERSE UPPER TRACK HARDWARE INSTALLATION BEFORE INSERTING THE SMALL PIECE OF TRACK.
6 DUAL POINT LOCK SYSTEM Once you have installed all the panels it is time to install the final touches. Before installing the Dual Point lock handles you will need to do the following. If you do not take the time to do so and jump to the handle itself you may find difficulty aligning your locks as well as you lock &handle set for your swing door. STEP 1: Install all weather stripping provided between panels and around perimeter of frame in the rebates that are precut. STEP 2: First notice that the upper strike plate for the top bolt in the panel is not install. Leave it uninstalled until the end for alignment and adjustment. Locate the Dual Point Handle. Keep the doors folded away from all tracking and framing and Use the handle to position the upper and lower bolts to the unlocked position.(this means that the bolts are retracted into the panel and not visible). Once they are retracted face the handle upward and insert the handle into the 3 holes on the door. Turn the handle towards the glass leaving it in a horizontal position allowing you to install the screws provided for the handle. (DO NOT OVER TIGHTEN OR FORCE HANDLE INTO POSITON. IF HANDLE IS NOT
7 OPERATING AS EXPLAIN ABOVE YOU MOST LIKELY ARE IN THE DOWN POSITION OR TRYING TO TURN IT AWAY FROM THE GLASS) STEP 3: Once the handle is installed, verify that the locking system is working properly. (EXAMPLE: HANDLE FACING UP= UNLOCKED, HANDLE FACING DOWN= LOCKED). STEP 4: After you have verified that the handle is working properly you can now test the alignment in the closed position. To do this you will put the handle in the UNLOCKED position, grab the hinge handle in the center of the panels and close. While holding the hinge handle use your other hand to move the Dual Point handle into the LOCKED positon. Both bolts should fall into upper and lower strike areas. STEP 5: Once the door locks successfully you can then determine if your upper strike plate hole is in the correct area. (TIP: USE SMALL SHORT SCREWS (NOT INCLUDED) TO TEST INTALLATION OF UPPER STRIKE PLATE. IN THE CASE YOU HAVE TO MOVE IT YOU WILL STILL HAVE PLENTY OF SURFICE FOR A FINAL SCREW TO GRAB.)
8
Bi-Pass And Bi-Fold Sliders
Bi-Passs and Bi-Fold Sliders Installation Guide Bi-Pass And Bi-Fold Sliders Tools required: Hand Drill Counter Sink Drill BitSet #8 Philips Screw Driver Measuring Tape Level What s Included: Panels with
More informationPhone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels
Phone # 800-440-8785 www.lajolladoors.com La Jolla Doors Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels Thank you for choosing La Jolla Doors In this manual you will
More informationGlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationINSTALLATION INSTRUCTIONS
www.marwincompany.com Kit Number Door Height Rough Opening Height KD200BB68 80 84 ½ KD200BB70 84 88 ½ KD200BB80 96 100 ½ INSTALLATION INSTRUCTIONS 200BB SERIES KD POCKET DOOR FRAME FOR 2 X 4 STUD WALLS
More informationChapter 18. Interior Doors
Chapter 18. Interior Doors 18.1 SWINGING DOORS 18.2 SLIDING DOORS 18.3 BIFOLD DOORS Tools needed by volunteers: Hammer Nail apron Tape measure Square Pencil Tools and equipment needed: Extension cords
More informationThermally Broken Framing and Door Installation
INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation problems
More informationHeavy Wall Applied Stop Tube Frame and Door Installation
INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation Read all instructions before beginning installation. These instructions are provided to help prevent installation problems
More informationLOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page
LOFT DOOR HANGER Page 1 Specifications 2 7/16" 3/8" 1-1/2 1-3/4 Ø3 3 7/8" 11-1/16 Page 2 Parts and Tools Tools Needed Tape Measure Pencil Drill with 1/8, 1/4 and 3/8 bits, 1 spade bit and Phillips bit
More informationPocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.
Pocket Door Kit PD1 / PD2 Installation Instructions Kit Contents. 1, Create Rough Opening In Stud Wall Construct rough opening ensuring all sides are square and level. Rough opening should be; Height =
More informationROOM FOLD SLIDING FOLDING INTERNAL DOORSET FITTING & FIXING GUIDELINES
EDITION 7 ROOM FOLD SLIDING FOLDING INTERNAL DOORSET IMPORTANT You can only assemble these door configurations by using the frame provided. Your warranty will be invalid if other alternatives are used.
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation SL-450TB (2" x 4-1/2" with 1" Glazing) & SL-600TB (2" x 6" with 1" Glazing) IMPORTANT: Read all instructions before beginning installation.
More informationINS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER
INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER 6-1/2" 5" 2-7/16" 3-7/16" Ø2-7/8" 4-7/8" 11" 2" 3/16" 1/2" HORSESHOE W/ BAR S P ECIFICATIONS PARTS AND TOOLS Tools Needed Tape Measure Pencil
More informationEXTRUTECH PLASTICS, INC. Custom Extruder of Close Tolerance Profiles
PVC SINGLE DOOR INSTALLATION INSTRUCTIONS Single Pre-Hung Doors are shipped assembled in most cases ready for installation. Check the sill; in some cases you may want a sill in this door or if not requested
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationINSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H
INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER 10.6.2016 PARTS INSTALLATION SPECIFICATIONS AND TOOLS INSTRUCTIONS 2-1/4" 2-7/8 11-3/8" 1/4" 2-1/8 PARTS INSTALLATION AND INSTRUCTIONS TOOLS
More informationInstalling Your Electronic Deadbolt
Ultra Security Plus Electronic Deadbolt Installation Instructions http://www.hberger.com/video-gallery/electronic-deadbolt New Installation Lock Location Preparation (Skip this section if you door has
More informationRequired Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench
Thank you for your recent purchase of a Cabinets by Hayley garage cabinet system. You are about to experience the best made cabinets that you can purchase. Cabinets by Hayley are designed for beauty and
More informationHow To Measure Your Finished Opening
3000 Series Bifold Doors How To Measure Your Finished Opening MEASURE FROM RIGHT TO LEFT 2 PLACES (WIDTH) MEASURE FROM TOP TO BOTTOM 2 PLACES (HEIGHT) Tools Required for Assembly: Tools Needed: Phillips
More informationseries 9500 top load bi4fold installation instructions
instructions Head Deflection (+0.12 / -0.00 ) Right Jamb Note: This is a top hung product. Provide adequate structure at head. Continuous threshold support is required. Left Jamb Head 4Lay bed of sealant
More informationwestern series 9500 f loor load The Volume Program window systems westernwindowsystems.com bi fold installation instructions
series 9500 f loor load bi fold The Volume Program Note: This is a bottom hung product. Provide adequate structure at threshold. Continuous threshold support is required. Right Jamb Head Deflection (+0.12
More informationWAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S
INS T A L L A TIO N INS T R U C TIO N S WAREHOUSE HANGER NOTE: Due to the size and weight of the Warehouse Hanger it is recommended that this Hanger be installed on 3 4 or wider doors. 10.11.2016 2-3/16"
More informationSliding Glass Door Assembly and Installation Guide
Sliding Glass Door Assembly and Installation Guide Index Door System Components and Hardware The following components are needed to complete the installation of your Sliding Patio Door unit. Check all
More informationINSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H
INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER 10.5.2016 2-1- 3/16" 11/16" 8" 8 O 2-7/8 Ø2-7/8" 3-1/2 3-1/2" 12-9/16 12-9/16" PLEASE NOTE: These instructions are specific to a particular
More informationPanoramic Door Block Frame Installation Manual
Units 5 & 6 Park House Lane Sheffield S9 1XA 01142 439593 Panoramic Door Block Frame Installation Manual Panoramic Door Block Frame Door Installation Guide 10-10-17 1 of 1 Thank you for choosing Panoramic
More informationSERIES 360. Single Hung Windows. NOTE: Read instructions completely before attempting any installation.
Installation Instructions SERIES 360 Single Hung Windows Page 2: Opening Preparation and Wood Buck Installation and Figure 1 Page 3-5: Installation Instructions for Series 360 WINDOWS Page 6: Figure 2:
More informationFigure #1 - ATE-ASE & UTE-USE Shower Door Assembly
Figure #1 - ATE-ASE & UTE-USE Shower Door Assembly Refer to FIG #3A or 3B For detail and orientation of towel bar and pull assemblies. Page Figure # 2 - Shower Door Assembly - Side View Figure # 3a - Shower
More informationHeavy-Duty Bypass Track System
Heavy-Duty Bypass Track System Please Note: This track system must be installed with the screws going into a solid surface such as studs or a header. Due to the spacing of the holes on these Brackets,
More informationSafety glasses Measuring tape Level Pencil Power drill Center punch Phillips screw driver Saw horse
EX76 Concealed Vertical Rod Exit Device Preparation Guide and Installation Instructions Box Contents EX76 Concealed Vertical Rod Exit Device Back Bar Active Push Bar Filler Plate Door Kit with Templates
More informationMagnaline Systems Block Frame Installation Manual
2515 Industry St. Oceanside, CA 92058 Magnaline Systems Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels Thank you for choosing Magnaline Systems! Congratulations!
More informationInstallation Manual For ToddPod Outdoor Shower Enclosures
Installation Manual For ToddPod Outdoor Shower Enclosures Contact us at 888-545-9763 or email us at office@toddpod.com with any questions during the installation process. Our service team is available
More informationChapter 9. Windows and Exterior Doors
Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail apron
More informationFor installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.
SARGENT Installation Instructions for LP8600 x LR8600 & 12-LP8600 x 12-LR8600 Series Low Profile Panic and Fire Exit Devices on Double Egress & Double Doors or LS8600 & 12-LS8600 Low Profile Exit Device
More informationAcoustical Surfaces, Inc.
RECEIVING 1. Immediately inspect shipment for damage during transit, for example: damage caused by fork lifts, stacking, water stains etc. and disclose to delivery driver prior to signing for receipt.
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationOxford Stalls Installation Instructions
Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or
More informationROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door
ROCKWELL 4 in 1 DOOR Choose between four door styles with this Door Kit. Our versatile Rockwell Door Kit is very easy to assemble. All materials and hardware needed to assemble any of the four styles are
More information2. Skid should contain the following: A door & jamb B casing C seal cover kit & D extension jamb set (if ordered), E hardware box.
RECEIVING 1. Immediately inspect shipment for damage during transit, for example: damage caused by fork lifts, stacking, water stains etc. and disclose to delivery driver prior to signing for receipt.
More informationAgave Standard Series
Mailing Address: 033 San Elijo Ave, #464 Cardiff, CA 9007 619.708.917 619.330.88 fax info@agaveiron.com www.agaveiron.com Agave Standard Series Flat Track Hardware Systems General Information and Installation
More information1. Begin by rolling your window up all the way 2. Remove your door and window handles by unscrewing the flat head set screws behind each handle.
1. Begin by rolling your window up all the way 2. Remove your door and window handles by unscrewing the flat head set screws behind each handle. 3. Remove the 12 screws that attach the steel interior door
More informationPanoramic Door. Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels
2515 Industry St. Oceanside, CA 92058 760-722-1250 www.panoramicdoors.com Panoramic Door Block Frame Installation Manual Aluminum top and bottom track with either aluminum or vinyl panels Signature Aluminum
More informationINSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING
JANUARY, 2014 1 INSTALLATION Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING INSTRUCTIONS 2 FRAME ASSEMBLY JANUARY, 2014 601442 SHEAR BLOCK BALL BEARING NRP BUTT (FACTORY APPLIED
More informationNORMAN SHUTTERS INSTALLATION INSTRUCTIONS. Hang Strip. (Inside Mount 2 Panel) Getting Started
NORMAN SHUTTERS INSTALLATION INSTRUCTIONS Hang Strip (Inside Mount 2 Panel) Getting Started Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6 Philips head driver Make sure
More informationSemi-Frameless Hinged Door With Panel And Return
202 Anderson Ave., Belvue, KS 66407 Phone: 800-669-9867 Fax: 800-393-6699 www.onyxcollection.com 800-643-1514 www.alumaxbath.com Semi-Frameless Hinged Door With Panel And Return Full Showers with Return
More informationINSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS
2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed
More information1 PREPARE HEADER AND ROUGH OPENING
CONTENTS. HEADER & TRACK ASSEMBLY. END BRACKET PLAIN 3. FLOOR PLATE.. 8. 4. SPLIT STUD 6 5. CARRIER (987) 6. QUICK RELEASE PLATE (960) 7. DOOR GUIDE SET (9883) 3. 4. 7. 8. BUMPER KIT (988) 9. #8 X 3/4
More informationINS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System
Ceiling Mount Track System 10.26.2016 Specifications Ceiling Post: Unassembled 2-7/8 Assembled 1-11/16 7/8 7-9/16 5-7/8 3/8 2 Tubes 1/2 2-3/8 5 Parts and Tools Tools Needed Tape Measure Pencil Drill with
More informationEntry Mortise Lock Set Lever to Lever
Entry Mortise Lock Set Lever to Lever 1 Lever 2 Escutcheon 3 Turn Piece 4 Mortise Lock 5 Scalp 6 Mortise Lock Strike 7 Mortise Lock Dust Box 8 Mortise Cylinder 9 Cylinder Swing Cover 10 Spindle 11 Spindle
More informationHeavy Wall Applied Stop Tube Frame and Door Installation
INSTALLATION INSTRUCTIONS Heavy Wall Applied Stop Tube Frame and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation
More informationInstallation Instructions
Supafold Slide Aside System Three Fold Room Divider Installation Instructions Distinctive Doors Ltd Supafold Slide Aside Internal Folding System IMPORTANT: Before proceeding with the installation, and
More informationXL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS
XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT
More informationPage 1. FIG. #1 - Shower Door Assembly SHOWER & BATH ENCLOSURES BUILT TO LAST A LIFETIME HANDLE ASSEMBLIES REMOVED FOR CLARITY.
FIG. #1 - Shower Door Assembly 29 1 2 1 6 9 9 5 HANDLE ASSEMBLIES REMOVED FOR CLARITY. 25 25 PLEASE REFER TO FIG. #2 FOR INSTALLATION 26 12 17 18 18 17 10 3 11 7 10 8 Page 1 FIG. #2 - Top View 5 21 10
More informationSeries 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)
Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing) Things to Know Before You Start Things to Know Before You Start Removal of Old Fenestration Products Ensure any old fenestration
More informationESA-100 Fixed Sidelite/Non Breakout
/Non Breakout Exterior View Installation Instructions For use with ESA II Controller 1 Tools Required: Suggested Fasteners Required - (Not supplied) Screwdrivers Small Straight (FlatBlade) - for Terminal
More informationPassage Mortise Lock Set Lever to Lever
Passage Mortise Lock Set Lever to Lever 1 Lever 2 Escutcheon 3 Mortise Lock 4 Scalp 5 Mortise Lock Strike 6 Mortise Lock Dust Box 7 Spindle 8 Spindle Spring 9 Spindle Retainer 2 1 9 8 7 9 7 8 3 1 2 4 5
More informationSwing Door Installation Manual
Manual 20D/35D/50D 20DH/35DH 40M/50M 25FD 35XT 50XT 01-4000-03 2010 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes.......................................
More informationinstallation guide
JANUS INTERNATIONAL 1 866 562 2580 w w w. j a n u s i n t l. c o m 2000 2500 3000 installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 2000 2500 3000
More informationa.k.a. casegoods instructions
a.k.a. casegoods instructions a a.k.a. workwall installation IMPORTANT NOTES Failure to install product according to installation instruction will result in loss of warranty. Tools required for assembly
More informationSTACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS
STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions
More informationIDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames
IDP Entry-Fit Steel Door Frames Installation Instructions K2A and NK2A Series Frames IDP Inc 21300 W. 8 Mile Rd. Southfield, MI 48075 1-877-645-2770 www.idpframes.com email: info@idpframes.com K2A and
More informationInstallation Operation Care
Installation Operation Care Palm Beach Polysatin Shutters CONTENTS Getting Started Installation Overview...1 Unpacking...1 Tools and Materials Needed...1 Fasteners...2 Frame Assembly Assemble the Frame
More informationWINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS
WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS Wayne Dalton, a division of Overhead Door Corporation P.O. Box 67, Mt. Hope, OH 44660 www.wayne-dalton.com See garage door owner s manual for
More informationDIANE MODEL PASS-THRU
INSTALLATION INSTRUCTIONS MODELS D101 AND D10 DIANE MODEL PASS-THRU 50 E. Vernon Avenue, Los Angeles, CA 90058-186 Phone: (800) 41-6144 EXT. 7760 Fax: (800) 458-7496 crlaurence.com Email: transaction@crlaurence.com
More informationINSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230
INSTALLATION INSTRUCTIONS Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230 QCI5230 Rev 0 6 shower new QCI5230 Rev 0 Page 2 Certified 06/20/2016 Parts List A. Curb (w/ weep holes) (1)
More informationInstallation Instructions. Oakmont Folding Doors
Before You Start For quick and easy installation of your Oakmont folding door, read these instructions thoroughly. A few minutes of prior planning will make the job easier and ensure years of trouble-free
More informationINOVO 2-LITE SLIDING PATIO DOOR
INOVO 2-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.
More informationSliding Door Kit
YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE DOOR KIT. Thank you for purchasing this GrowSpan door kit. When properly assembled and maintained, this product will provide years of reliable
More informationChapter 9. Windows and Exterior Doors
Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING BASEMENT EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail
More informationINOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS
INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.
More informationInstallation Instructions
Contents Page General Information and Installer Tips.......... 2 Panels & Posts............................. 3 Enclosure Description..................... 4 Hinge Door Hardware................... 4-5 Step-by-Step
More informationVYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4
VYTEX PREMIUM SLIDING GLASS DOOR Table of Contents Precautions and Safety 2 Tools Required...3 Inspect and Prepare Door...4 Hardware and Parts Check List....4 Master Frame Assembly 5 Master Frame Installation..7
More informationSIDE FOLDING POST ADJUSTMENTS
SIDE FOLDING POST ADJUSTMENTS TABLE OF CONTENTS WARNINGS AND SAFETY INFORMATION 3 TOOLS REQUIRED 4 GENERAL NOTES 5 POST IDENTIFICATION 6 POST TO CURTAIN CONNECTIONS 8 P01/P03 LOCK PLATE HEIGHT ADJUSTMENT
More informationHD installation guide
JANUS INTERNATIONAL 1 866 562 2580 www.janusintl.c o m 1950 1950HD installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 1950 1950HD SHOWN A rolling
More informationInstallation Instruction
Tools Needed for Assembly Stud finder (for wood stud wall) Pencil Mark Electric drill Wood Stud Wall Installation Step 1. Locate the Wood Studs Installation Instruction Drill bit (for wood stud wall) Masonry
More informationTRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS
DOORS/DRAWERS/LIDS 55 56 NOTES DOORS/DRAWERS/LIDS Swing s 73 74 NOTES INSTALLATION OF A GDM-SWING DOOR Phillips Head Screwdriver (2) - 1/8" Drift Punches (forged) Top Bracket NOTE: It may be necessary
More informationGARAGE DOOR WITH TORSION SPRING
GARAGE DOOR WITH TORSION SPRING DIMENSIONS 9 WIDTH X 7 HEIGHT (2.74m x 2.13m) IMPORTANT SAFETY INSTRUCTIONS WARNING: Read all instructions and warnings before use. Failure to follow all instructions may
More informationDoor Hardware Installation Instructions. For Assistance Call:
For Assistance Call: Door Hardware Installation Instructions Single Cylinder NOTE: s fit doors 1-3/4 to 2-1/4 thick. For thicker doors, please call customer service. Carefully unpackage all components
More informationVideo Wall Installation Instructions 2W X 3H, 3W X 3H
Video Wall Installation Instructions 2W X 3H, 3W X 3H www.microndisplaysolutions.com Table of Contents Important Safety Instructions... 3 Configuration... 4 Package Contents, included and optional items...
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationNORMAN SHUTTERS INSTALLATION INSTRUCTIONS. 4 sided Deco Frame. (Outside Mount - 2 Panel) Getting Started
NORMAN SHUTTERS INSTALLATION INSTRUCTIONS 4 sided Deco Frame (Outside Mount - 2 Panel) Getting Started Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6 Philips head driver
More informationICU TRACKLESS SLIDING DOOR
Interior View 0 Installation Instructions Tools Required: Screwdrivers Small Straight (Flat Blade) - for Terminal Block wiring # Phillips (Crosspoint) - for various #8, #0, and #4 screws Wrenches / Sockets
More informationWindload Post 9100/9600/9900 Installation Instructions
Windload Post 9100/9600/9900 Installation Instructions Wayne Dalton, a division of Overhead Door Corporation P.O. Box 67, Mt. Hope, OH 44660 www.wayne-dalton.com Wayne-Dalton Corp. P.O. Box 67 Mt. Hope,
More informationDOOR SECURITY AND REPAIR KIT
DOOR SECURITY AND REPAIR KIT MODEL #S SET-SLP-X0552 SET-STD-X0552 SET-UNI-X0002 SET-ULT-X0002 R Questions? Call customer service at -888-582-2294 or visit www.armorconcepts.com PACKAGE CONTENTS A B C E
More informationC-Series & S-Series Classic Frame with Transom (Single or Pair)
1. TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Safety Glasses Screw gun #2 Screwdriver tip #3 Screwdriver tip Philips Head screwdriver (Used to move frame on wall using oval slots on
More informationASS 70 FD folding / sliding door. Installation Guide
ASS 70 FD folding / sliding door Installation Guide IMPORTANT! These doors should be fitted by competent and trained installers. Please read these instructions thoroughly before beginning the installation.
More informationASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL
ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL January 2013 The SL500A is a square upright glass cabinet with a single hinged lockable door. It has five adjustable shelves plus the base. It also has an optional
More informationBefore Assembling the Storage Wall
Chapter 1 Assembling the Lista Storage Wall Lista provides two types of standard Storage Walls: B251 and B255. The design, construction, assembly, and quality are identical for both types, however, B251
More informationPet Door Panel Installation Manual
Pet Door Panel Installation Manual 400-558-1 1 4/3/03, 3:26 PM Components: Pet Door Panel Panel Latch Assembly Foam Weather-stripping Glass Sweep (4) Binding Posts (6) #6 x 1/2 Sheet Metal Screws (4) 8-32
More informationParveneer Positive Pressure Fire Rated Frames Double rabbet with T stop for 20 minutes
Section P/J Page 1 Double rabbet with T stop for 20 minutes Smoke seals are installed in the frame, not the door Section P/J Page 2 Throated jamb with T stop for 20 minutes Smoke seals are installed in
More informationCloset System Installation Manual
Closet System Manual Thank you For choosing our Custom Closet Collection to fit all your needs Closets come fully assembled to make your project an enjoyable and satisfying experience. With quality Custom
More informationMODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Door Operator Owner's Manual
MODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Operator Owner's Before you begin, please read this ENTIRE instruction manual. One- Piece
More informationNORMAN SHUTTERS INSTALLATION INSTRUCTIONS. 4 Sided Z Frame. (Inside Mount - 2 panel) Getting Started
NORMAN SHUTTERS INSTALLATION INSTRUCTIONS 4 Sided Z Frame (Inside Mount - 2 panel) Getting Started Recommended Tools: Nail Gun or Drill, Tape Measure, Torpedo Level, Box Knife, 6 Philips head driver Make
More informationINSTALLATION MANUAL FORTRESS SERIES
Guardian Security Structures TEL 1-406-212-2334 EMAIL rg@gssdoors.com WEB www.gssdoors.com FORTRESS SERIES GENERAL INSTALLATION GUIDELINES 1. The door frame is installed using 16 bolt screws 7,5 mm in
More informationFOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL
FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to
More informationBefore fitting door, check opening size and squareness of timber frame. The door is made smaller to give correct clearance within the frame.
Slideaway Single & Maximizer Door Gear INSTALLATION INSTRUCTIONS 11 This garage door has been designed to be as as easy as possible to use, service and automate when installed correctly. Please therefore
More informationFOR PROFESSIONAL GARAGE DOOR INSTALLERS
Composite Garage Doors Installation Instructions FOR PROFESSIONAL GARAGE DOOR INSTALLERS Tools required Screwdriver Claw Hammer Locking Pliers Power Drill Level with a 3/32" Drill Bit Utility Knife 9/16",
More informationStage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).
There are three stages to fitting the CL100 mortise case: Stage 1: Marking out the position of the lock. Stage 2: Preparing the door by mortising and drilling holes. Stage 3: Fitting lock, door furniture,
More informationESA-300 Full Breakout
Interior View 0 Installation Instructions For use with ESA II Controler DORMA AUTOMATICS, Inc. 94 Sherwood Drive Toll-Free: 877-67-6 DL844-00 Lake Bluff, IL 60044 Fax: 877-4-7999 Rev. /07 Tools Required:
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS TOOLS REQUIRED Rechargeable, variable speed drill 3/8 diameter drill bit 3 Robertson bits #0, #1 and #2 Slot screwdriver Non marring hammer with 1 head Level Caulk or sealant
More informationIMPORTANT NOTICE WARRANTY WILL BE HONORED ONLY IF THE JAMBS HAVE BEEN INSTALLED IN ACCORDANCE WITH THESE INSTALLATION INSTRUCTIONS
LAMBTON JAMB SERIES INSTALLATION INSTRUCTIONS NON-RATED & 20 MINUTE WOOD JAMBS IMPORTANT NOTICE WARRANTY WILL BE HONORED ONLY IF THE JAMBS HAVE BEEN INSTALLED IN ACCORDANCE WITH THESE INSTALLATION INSTRUCTIONS
More informationInstallation Instructions
by Plato Woodwork Installation Instructions Plato Woodwork, Inc. 200 Third Street SW P.O. Box 98 Plato, MN 55370 www.platowoodwork.com 800.328.5924 SECTION GUIDE GETTING STARTED PAGE # Installation Methods...
More information