CONTENTS MESSAGE FROM THE CHAIRMAN OF THE BOARD OF MANAGEMENT [4,5] DEVELOPMENT HISTORY [6] GENERAL INTRODUCTION [7] BOARD OF MANAGEMENT [8]

Size: px
Start display at page:

Download "CONTENTS MESSAGE FROM THE CHAIRMAN OF THE BOARD OF MANAGEMENT [4,5] DEVELOPMENT HISTORY [6] GENERAL INTRODUCTION [7] BOARD OF MANAGEMENT [8]"

Transcription

1

2

3 CONTENTS MESSAGE FROM THE CHAIRMAN OF THE BOARD OF MANAGEMENT [4,5] DEVELOPMENT HISTORY [6] GENERAL INTRODUCTION [7] BOARD OF MANAGEMENT [8] BOARD OF GENERAL DIRECTORS [9] BOARD OF SUPERVISION [10] ORGANIZATION STRUCTURE [10,11] FIELDS OF BUSINESS [12] BUSINESS TARGETS [14] IMPLEMENTATION PLAN [15] 10 SIGNIFICANT ACHIEVEMENTS OF PVC IN 2009 [16-17] REPORT OF THE BOARD OF MANAGEMENT [20-23] PVC COMMITMENTS [13] REPORT OF THE BOARD OF GENERAL DIRECTORS [26-31] DEVELOPMENT PLAN ( ) [32-36] AUDITED CONSOLIDATED FINANCIAL REPORT [38-72] MAJOR PROJECTS [74-81] COMPANY MEMBERS [82-86]

4 MESSAGE FROM CHAIRMAN OF THE BOARD OF MANAGEMENT Dear Shareholders, Hanoi April 2010 The year 2009 has witnessed remarkable footprints of Petrovietnam Construction Joint Stock Corporation (PVC) on the way of renovation and speedy development. In the context that Vietnamese economy was affected by extensive global financial crises and economic recession. However, with the unity, proactiveness, creativity, motivation, determination, self-responsibility, PVC has gained successes in any aspect to re-affirm the role and position of a leading enterprise in the field of petroleum installation and construction, contributing to the overall development of Petro Vietnam. In 2009, PVC s major economic targets were increased approximately 100% compared to The output value was 4,775 billion VND, with turn over of 4,247 billion VND and profit of billion VND. From the role of a Sub-contractor for international Contractors, PVC has become an EPC Contractor for large scale projects with complicated technical requirements including Thai Binh Thermal Power Plant II, Nhon Trach Thermal Power Plant II, Phu Tho Bio-ethanol Plant, Dinh Vu Polyester Plant. PVC also continued to re-affirm its strength in the field of petroleum installation and construction by implementing all of the projects that related to oil and gas transportation and storage in the form of EPC such as Cu Lao Tao Storage, Go Dau LPG, and Dung Quat Tank Loading Station... In addition, PVC experienced significantly progress in the construction technology of large scale high-rise buildings, such as Petroleum Hotel Complex, Petroleum Financial Center, Office of Petroleum Institute, Phu My Hung Petroleum Building, Vung Tau Petroleum Hotel, Dragon Tower Office Building. 4

5 MESSAGE FROM CHAIRMAN OF THE BOARD OF MANAGEMENT The year 2010 opens new opportunities and challenges. With the spirit and foundation developed in 2009, PVC is striving to overcome difficulties and obstacles, to take advantages of all resources and exploit every opportunity for continuing sustainable and stronger development, with an aim to achieve the output value of 8,000 billion VND, revenue of 7,000 billion VND and profit of 731 billion VND. Ambitious goals require enormous efforts. This is the momentum that PVC staffs and leaders deeply understand. With the firm foundation built along the development road and the determination of PVC people, PVC is resolved to continue engraving their footprints on the new development and contribute to the overall development of PetroVietnam in particular and Vietnam in general. On behalf of the Board of Management, I would like to express my gratitude for the trust, credibility and support of Shareholders, Investors in country and overseas, for the efforts of PVC leaders and the creativity of staffs who have made an important contribution to the success of PVC today and tomorrow! TRINH XUAN THANH Chairman of Board of Management 5

6 DEVELOPMENT HISTORY 08/1983: Chairman of the Council of Ministers approved Petroleum General Department to establish Petroleum Construction Complex Enterprise. 14/09/1983: Petroleum General Department decided to establish Petroleum Construction Complex Enterprise. 19/09/1995: The name of Petroleum Construction Complex Enterprise was changed into Petroleum Design and Construction Company. 17/03/2005: Minister of Industry approved the plan for privatization and to change Petroleum Design and Construction Company into Petro Construction Joint Stock Company. 26/10/2007: Vietnam Oil and Gas Group approved the plan to change Petroleum Construction Joint Stock Company into Petrovietnam Construction Joint Stock Corporation (PVC). 21/11/2007: The General Shareholders Meeting of PVC adopted the plan to change Petroleum Construction Joint Stock Company into Petrovietnam Construction Joint Stock Corporation (PVC). 27/06/2008: The Annual General Shareholders Meeting of PVC adopted the plan to increase legal capital up to 1,500 billion VND. 16/5/2009: The Annual General Shareholders Meeting of PVC adopted the plan for stock listing to Hanoi Stock Exchange and development strategy up to the year 2015, plan direction for the year /8/2009: PVC listed 150 million stocks with the stock code PVX on the Hanoi Stock Exchange. 20/1/2010: The Extraordinary General Shareholders Meeting of PVC adopted the plan to increase the charter capital up to 2,500 billion VND. 6

7 DEVELOPMENT HISTORY- INTRODUCTION INTRODUCTION PETROVIETNAM CONSTRUCTION JOINT STOCK CORPORATION (PVC) Head office: CEO Building, Pham Hung Road, Tu Liem District, Hanoi city, Vietnam Tel: (0084) /3/4/5 Fax: (0084) / info@pvc.vn Website: Stock code: PVX Professional strength: - Construction and installation in petroleum industry; - Industrial and civil engineering; - Construction investment of industrial and urban zone; - Investment of real estate, business in office, supermarket and housing; - Financial investment Charter capital in 2009: 1,500 billion VND Charter capital in 2010: 2,500 billion VND Chairman of the Board of Management: Mr. Trinh Xuan Thanh General Director: Mr. Vu Duc Thuan Number of company members: 43 Number of staff members: 6266 (*) (*) as at March

8 BOARD OF MANAGEMENT Mr. TRINH XUAN THANH Chairman of the Board of Management Mr. NGUYEN NGOC QUY Vice Chairman of the Board of Management Mr. VU DUC THUAN Member of the Board of Management Mr. BUI TIEN THANH Member of the Board of Management Mrs. NGUYEN THI THU HUONG Member of the Board of Management 8

9 BOARD OF MANAGEMENT - BOARD OF GENERAL DIRECTORS BOARD OF GENERAL DIRECTORS Mr. VU DUC THUAN President & C.E.O Mr. NGUYEN HUY HOA Permanent Standing Vice President Mr. PHAM HUU NGHIA Vice President Mr. LE CHUNG DUNG Vice President Mr. NGUYEN NGOC DUNG Vice President Mr. CHU VAN MINH Vice President Mr. LY NGOC TUAN Vice President Mr. NGUYEN MANH TIEN Vice President 9

10 BOARD OF SUPERVISION Mr. NGUYEN VAN LAI Head of Board of Supervision Mr. HUA XUAN NAM Member of Board of Supervision Mr. VU HUU NGHI Member of Board of Supervision Mrs. NGUYEN HONG ANH Member of Board of Supervision Mrs. TRAN THI TRANG Member of Board of Supervision ORGANIZATION STRUCTURE GENERAL SHAREHOLDERS MEETING BOARD OF MANAGEMENT BOARD OF SUPERVISION BOARD OF GENERAL DIRECTORS FUNCTIONAL DEPARTMENTS PROJECT MANAGEMENT UNITS COMPANY MEMBERS 10

11 BOARD OF SUPERVISION - ORGANIZATION STRUCTURE FUNCTIONAL DEPARTMENTS - PROJECT MANAGEMENT UNITS- COMPANY MEMBERS FUNCTIONAL DEPARTMENTS PROJECT MANAGEMENT UNITS 1. Office of PVC 1.1 Administration Division 1.2 General Emulation Division 1.3 Secretary and Archive Division 2. Personnel Organization Department 2.1 Training and Human Resource Development Division 2.2 Personnel Organization Labor Division 2.3 Salary and Welfare Division 3. Finance Accounting Department 3.1 Finance Division 3.2 Accounting and Internal Auditing Division 4. Technical Safety Department 4.1 Safety Environment Division 5. Commercial Department 6. Planning Department 7. Economic Tendering Department 7.1 Tendering Division 8. Project Investment Department 8.1 Business Division 1. Project Management Unit Polypropylene Plant 2. Project Management Unit Nghi Son Petro-Chemical Refinery Complex 3. Project Management Unit for Projects in Hanoi 4. Project Management Unit Thai Binh II Thermal Power Plant 5. Project Management Unit Vung Ang Power Plant 6. Project Management Unit Ethanol Plant 7. Project Management Unit Nhon Trach II Power and Gas Plant 8. Project Management Unit Polyester Plant 9. Project Management Unit Petroleum Cement Plant 12/9 10. Project Management Unit Southern Gas Pipeline Project 11. Project Management Unit Building Materials Mechanical Manufacturing and Production Plant 12. Project Management Unit LPG Storage Project 13. Project Management Unit Petroleum University and Urban Area 9. Legal Department 10. Communication Department 10.1 Brand Development and Events Organization Division 10.2 Internal Communication and Media Relation Division COMPANY MEMBERS 1. PVC SHAREHOLDING CONTROL COMPANIES 2. PARTNERSHIP, CAPITAL INVESTMENT COMPANIES 11

12 FIELDS OF BUSINESS PVC HAS NEARLY 30 YEARS OF EXPERIENCE AND PROFESSIONAL CAPABILITY IN THE FOLLOWING FIELDS: A. Petroleum installation and construction Construction of petro-chemical refinery plants Design, manufacture, installation of petrol and gas pipelines Design, construction, repair oil rig, platform and tank Manufacture, installation of petrol and gas drilling accessories Ship building and trading petroleum equipment B. Industrial engineering EPC Contractor to develop thermal power plants, power and gas plants, installation of power cable up to 35 kv. Investment and development of mechanical manufacture plants, ship building, building materials. Design and EPC Contractor for transportation and irrigation infrastructure projects. Installation of industrial equipment system, control equipment, automation for industrial projects. C. Civil engineering Investment, consultancy, design civil projects; EPC Contractor for development projects including office, hotel and high quality apartment, especially steel structured building, high rise buildings and sky buildings. D. Investment in development of industrial zone Construction of industrial and new urban areas Land fill, road construction Development of cement plants, concrete mixing station and building materials E. Financial investment Investment and capital contribution to subsidiaries / company members Exploit external financial resources, joint venture, partnership and issuing stock Joint venture with foreign partners to invest in large scale projects F.Investment in real estate Office, supermarket and residence 12

13 SCOPE OF BUSINESS- PVC COMMITMENTS PVC COMMITMENTS Staff: Respect and create the best condition for professional development. Customers: Provide the best quality product/service. Partners: Bring benefit and successful cooperation. Investors/shareholders: Generate highest profit; Community: PVC develops for the community 13

14 BUSINESS TARGETS A. ECONOMIC TARGETS IN 2010 PVC REVENUE AND OUTPUT VALUE (bil. VND) 10,000 8,000 6,000 4,000 2,000 2,406 4,776 8, Plan in 2010 Revenue 1,866 4,247 7,000 Output 2,406 4,776 8,000 PVC PROFIT BEFORE TAX (bil.vnd) DIVIDEND IS 15% Plan in 2010 Profit before tax B. INVESTMENT PROPORTION IN DIFFERENT FIELDS IN ,000 2,500 PVC CHARTER CAPITAL (bil.vnd) 2,000 1,500 1, ,500 1, ,500 2,500 Construction and installation of petro-chemical refinery plant, gas processing and other industrial plants; Construction of storage system and transportation of petroleum products; Petroleum equipment manufacture and mechanical; Investment in industrial areas, petroleum service base; Construction of high rise building; Business in real estate; Construction and installation of off shore petroleum projects 14

15 BUSINESS TARGETS - IMPLEMENTATION PLAN IMPLEMENTATION PLAN Year To build and to develop PVC brand, to enhance competitiveness in the market of petroleum civil and industrial construction and installation. Year To expand and occupy the market in country and in the region. To build professionally qualified project management staff with international management qualification in order implement EPC contracts for overseas projects. Year To continue re-affirming the leading role in Petro Vietnam, to strengthen the position and brand of PVC in domestic and international market. 15

16 TEN SIGNIFICANT ACHIEVEMENTS OF PVC IN 2009 Having completed the schedule target and 2. ensured construction quality of major projects, most significantly was the inauguration and commencing operation of Go Dau LPG Storage after 16 months with a total investment of 196 billion VND. This was the largest LPG Storage in the Southern area with hi-tech application, each year it supplies to the market more than 100,000 tons of LPG. This is also the first project that PVC carried out in the form of EPC, marking an important step forward relating to the design, manufacture, construction and installation capability for a petroleum professional project, becoming one of the leading EPC in Vietnam. Having restructured capital contribution 4. of PVC at Incomex, PVNC, PVE and coordinated with Petro Vietnam to sell part of state capital at PVC, earning 1,520 billion VND. Having completed the reform of 6. enterprise administration in the direction of setting up Project Management Unit to directly manage on site; The internal regulations, and management policy were improved to meet with the practical business requirement. Having completed all and exceeded the 1. production and business targets for Having successfully implemented the 3. listing of PVX stock code at Hanoi Stock Exchange. Soon after the listing, PVX was evaluated by the Investor as strong stock, with high liquidity and positive transaction. Having expanded international cooperation 5. by signing Agreement on Strategy Cooperation with Zarubezneft of Russian Federation, partnership with major international groups like Huyndai, Daewoo (Korea), JGC (Japan), Cornell Wagner and Worley Parson (Australia) in order to implement large scale projects in the field of petroleum, energy and civil engineering. Having completed enterprise reform and 7. development plan for the year as assigned by the Group in 2009; Having re-organized, restructured subsidiaries in appropriate way, which contributed to the improvement of business effectiveness in subsidiaries. 16

17 TEN SIGNIFICANT ACHIEVEMENTS OF PVC IN 2009 Having signed Contract and 8. constructed major national projects like: the Gas Pipeline for Lot B in O Mon, Vung Ang 1 Thermal Power Plant, Nhon Trach II Thermal Power Plant, Bio-ethanol Plant in the North, Thi Vai LPG Storage, Landfill in Nghi Son Petro-chemical Refinery Complex, Thai Binh II Thermal Power Plant, Long Phu 1 Thermal Power Plant with the total value of more than 7,500 billion VND. Having made the reputation, brand of 9. PVC reinforced and recognized at Prize Award Ceremonies, namely Vietnam Land Golden Star ; Golden Brand, Enterprise for Community, Commerce and Service - Year Especially PVC and its subsidiaries was awarded by the Party and the Government with Labor Medals of First, Second, Third Grade; received emulation flag of the Government and many Certificates of Merit. 10. Having actively implemented social welfare activities like supporting to develop Unity House, school, donation to the flood and storm victims and disadvantaged families; the contribution to other social welfare funds was worth billion VND. 17

18 18

19 REPORT OF THE BOARD OF MANAGEMENT 19

20 REPORT OF THE BOARD OF MANAGEMENT 2009 SUCCESS AFTER SUCCESS 2009 was the year for PVC to stabilize its organization, maximize resources to implement major tasks set forth, with economic targets being double than 2008 and with the requirement to speedily complete key projects of the Investors. In the context of Vietnam s being affected by global financial crisis and economic recession, long lasting inflation, fluctuating market price, especially in the field of building investment, which seriously affected the business activities of enterprises. However, with strong and timely measures, together with the unity, unanimous determination of leaders, staff members, the consideration and support of shareholders, PVC has successfully completed its business tasks in 2009, namely: Charter capital: 1,500 billion VND Output value: 4, billion VND, equivalent to % plan Revenue: 4, billion VND, equivalent to % plan Profit before tax: billion VND, equivalent to % plan Profit after tax: billion VND, equivalent to % plan Total tax and contributions to State budget: billion VND, equivalent to % plan Ratio between dividend/ charter capital: 10% RE-STRUCTURE, REFORM AND DEVELOP THE ENTERPRISE In 2009, the Board of Management continued to improve the organization structure of the holding Company and subsidiaries in the direction of specialization, concentration according to areas, locations to maximize the strength of each subsidiaries, to avoid competitiveness between subsidiaries within the Corporation. At present, PVC has 43 subsidiaries, in which there are 9 joint stock companies hold controlling share and controlling right, among them 4 companies were successfully converted to limited companies with one member; new joint stock companies were set up including Hanoi Petroleum Construction and Installation JSC (basing on Hanoi Petroleum Construction and Installation JSC Branch); Petroleum Mechanical Construction and Machinery Installation JSC (basing on Petroleum Mechanical Construction Branch); Petroleum Housing Management and Development JSC, Petroleum Housing Management and Development JSC, Southern Area; 32 partnership companies, 2 joint ventures - Vietubes Joint Venture Company and Heerim PVC International Design JSC. All PVC subsidiaries are key players to contribute to the success of PVC at projects. At the holding Company, in addition to functional departments, supporting to the leaders, PVC has established Project Management Units for major projects. PVC Board of Management, acting as representative for shareholders, have strived hard to issue accurate, timely decisions and to direct, monitor the implementation progress of plans, decisions of PVC in order to implement the Resolution of General Shareholders Meeting in 2009, reflecting in the following actions In parallel with the improvement of organization structure, the Board of Management also completed key personnel and recruited, trained qualified and experienced staff members. At the companies where PVC contributed capital, the Board of Management decided to nominate management officers to manage the capital contribution and to stipulate in details the obligation, authority of capital representatives at such companies. Through this representative, PVC manages its subsidiaries on the business result, quality, 20

21 REPORT OF THE BOARD OF MANAGEMENT project progress and effectiveness of project investment. SUPERVISING BUSINESS AND PRODUCTION OPERATION. The Board of Management always tried to strengthen the supervision and management to the Board of Directors, functional departments and capital representatives of PVC in other enterprises via resolutions and decisions of the Board of Management, and regulations on managing representatives, financial management, capital management of PVC in other enterprises, regulations on management hierarchy for branches, regulations on operation and financial economic management hierarchy for dependent accounting management units. Through internal management regulations, PVC strongly delegated tasks for subsidiaries and project management units to proactively and timely act in their operation process to ensure meeting the schedule, economic effectiveness and to enhance the role and responsibilities of heads of units and directors of the Project Management Units, to improve the transparency, professionalism in business management tasks of PVC. Further more, with hundreds of civil and specialized projects locating along the country, the Board of Management always stood by and supported PVC Board of Directors to overcome difficulties, obstacles in the construction work, so as to complete and to handover the projects on time, with good quality according to the requirement of the Investor, namely, Hanoi Petroleum Finance Center, Go Dau LPG Storage, Cu Lao Tao Petroleum Storage, Hai Phong LPG Storage, Vung Tau Petroleum Hotel, Nha Be General Store, Phase II. FINANCIAL MANAGEMENT The Board of Management issued regulations on internal financial management in order to strengthen financial supervision; issued internal norm, unit price in order to reduce cost and increase business effectiveness. In addition, the Board of Management always directed PVC Board of Directors and its subsidiaries to improve accounting mechanism to ensure health and stable accounting policy while complying with the law. Reporting was relatively in good timing, especially with regards to the notifying dates for listing enterprises. Obligations to the State budget was well completed. INVESTMENT With regards to the investment in basic construction: The Board of Management approved and invested in major projects within its authority, directed the Board of Directors to adjust the plan timely according to the Government plan on inflation control, analyzed, evaluated the effectiveness of project, the importance of project so as to suspend, extend the progress due to its non urgency, poor effectiveness or inability to secure funding in order to have reasonable investment plan, to prevent extensive investment. In addition to the accelerating construction work, the Board of Management concentrated on directing the speed of projects for petroleum construction and installation, investment in machinery, equipment so as to timely supplement the technical infrastructure and equipment used for business production development demand. The value of investment in basic construction and fixed asset in 2009 was 1, billion VND. Further more, for specialized investment projects, PVC was able to attract investment capital some strategic counterparts like Welded Steel Pipeline Manufacture Project (Korean counterpart) Hoang Mai Industrial Zone (Japanese, British counterpart). In financial investment: PVC reviewed and restructured subsidiaries and re-arranged investment structure to other enterprises during the time when stock market suffered from fluctuation in order to maximize effectiveness in financial investment, collected funding for business purpose. 21

22 REPORT OF THE BOARD OF MANAGEMENT LISTING PVX STOCK ON THE STOCK EXCHANGE In August 2009, PVC officially listed on Hanoi Stock Exchange the PVX Stock Code. Becoming a public company helped PVC to easily access capital sources from the public for expansion and development purpose. Major shareholders holding PVC shares including Petro Vietnam, Petroleum Financial Corporation, Petroleum Insurance Corporation, Ocean Bank, VIB with potential financial capacity and capital mobilization not only commit long term holding of PVC stock but also support and advise PVC in its development strategy, management experience, and market expansion. In addition, PVC concentrated on the cooperation with strategic counterparts and prestigious organizations. At present, PVC has signed Agreement on Strategic Cooperation with Zarubezneft a leading company in the field of petroleum construction in Russian Federation. PVC is actively completing procedures to increase legal capital from 1,500 billion VND to 2,500 billion VND. At present written approval from the State Securities Commission was obtained. After completing the capital increase procedures, PVC will immediately list the stocks, which are newly issued in PVC always complied well and timely to provide information according to the regulation for a listing company, namely Quarterly/ Yearly Financial Report, International Stock Transaction Report, Report on closing the list of shareholders and other reports according to the requirement of State Securities Commission, Hanoi Stock Exchange as well as the information provided upon request of the clients. PVC has advanced first dividend of 2009 with the value of 7%/ per value. Further, the PVC Board of Management developed good international relation, maintained sustainable and trustworthy partnership with investors, state management authorities and always proactively strives to look for new partners and markets. Over the past year, under the direction of Board of Management and the Board of General Director, PVC becomes stable and growing, which is clearly reflected in the business result in Together with the excessive growth, the position and brand of PVC on the construction market become stronger and stronger. 22

23 REPORT OF THE BOARD OF MANAGEMENT 2010 CONTINUE ACCELERATION AND DEVELOPMENT Based on the business results in 2009, on the current capability of PVC, the Board of Management submitted to the General Shareholders Meeting to adopt PVC Business Plan of 2010, details are: - Charter capital: 2,500 billion VND Output value: 8,000 billion VND, increasing % compared to Total revenue: 7,000 billion VND, increasing % compared to Profit before tax: 731 billion VND, increasing % compared to Profit after tax: 642 billion VND, increasing 280.4% compared to Contribution to State budget: 248 billion VND, increasing % compared to Ratio between dividend/ charter capital: 15%, increasing 150% compared to Investment in basic construction, fixed asset and financial investment: 3, billion VND, increasing % compared to 2009 To achieve the target and plan of 2010, PVC Board of Management have set out specific and effective action plan, namely: + To continue improvement and re-structure the organization of PVC to be in line with the function, obligation of a holding company and subsidiaries according to the Law on Enterprise. To continue improving management mechanism at the head quarter and subsidiaries in the form of simple, specialization so as to enhance working efficiency and business effectiveness of the entire Corporation. + To continue development, perfection of regulations, stipulations on internal financial control of PVC according to the holding-subsidiary model so as to strengthen the supervision of financial status and close control of business implementation of PVC. + To continue monitoring the project implementation progress in order to exercise appropriate investment plan, to avoid extensive investment, and to proactively accelerate the progress of key projects including Welded Steel Pipe Plant, Anh Son Cement Plant, Dung Quat Plastic Packaging Manufacture, Long Son Petroleum Industrial Area, Nam Dan Plaza Project in Hanoi, Petroleum Urban Area in Hoai Duc, Hanoi, Phu My Hung Trade Centre, Petroleum Landmark in Ho Chi Minh City and explore other effective investment opportunities. To strengthen investment in high-tech projects and materials to serve for petroleum industry in order to enhance investment effectiveness and production development. + To strengthen the monitoring, direction, management, especially in major projects of the State, the industry to ensure quality, architecture and to hand over the project on time. + To direct the implementation of major projects in 2010 including: 5 star Hotel Complex, Thai Binh 2 Thermal Power Plant, Nhon Trach 2 Thermal Power Plant, Long Phu Thermal Power Plant, Vung Ang Power Plant, Dinh Vu Polyester Plant, Phu Tho Ethanol Plant, O Mon Gas Pipeline Project, Lot B. + To pay attention and to protect maximum legitimate rights of shareholders and to considerate the income, welfare and working conditions of staff members in PVC. + To concentrate on the development, training and to apply appropriate policy to attract qualified staff members who have acquired international qualification, and project management officers according to the international standard. Besides, to study to apply project management technology, advanced production management with high efficiency, to incorporate advanced software in the management areas of PVC. TRINH XUAN THANH CHAIRMAN OF THE BOARD OF MANAGEMENT 23

24 24

25 REPORT OF THE BOARD OF GENERAL DIRECTORS 25

26 REPORT OF THE BOARD OF GENERAL DIRECTORS Revenue BUSINESS OUTCOME IN 2009 In 2009, PetroVietnam experienced excessive development with multi operation, continuing affirm its position as a leading economic group in Vietnam, actively contributing to the national development. Being a member of PetroVietnam, PVC plays an important role in the development process. In addition, PVC always receives direction from the Party, the Government, Central Ministries and Petro Vietnam, as well as the collaboration with internal and external agencies. To successfully completed the business tasks of 2009, with an united, dynamic, proactive, self responsible leadership mechanism, PVC has well prepared from the beginning of the year. The objective is clearly analyzed, identified advantages, difficulties and developed appropriate, complete solutions to maximize opportunities in order to speed up the development. In 2009, PVC has excessively completed business targets compared to the plan approved at the General Shareholders Meeting in ENSURING PROJECT PROGRESS AND QUALITY In 2009, PVC completed and handed over a number of large scale projects such as Cu Lao Tao Petroleum Storage, Hai Phong LPG Petroleum Storage, Vung Tau Petroleum Hotel, Nha Be Petroleum Storage, Phase 2, Petroleum Financial Centre at No. 22 Ngo Quyen, Hanoi, ground levelling for Phase I of Nghi Son Petrochemical Refinery Complex, Petroleum Vocational College etc. Especially, one of the remarkable achievements of PVC was the completion and putting into operation of Go Dau Petroleum Storage, the largest LPG storage in the South, which supplies more than 100,000 tons of LPG to the market. This is the first project that PVC completed in the form of EPC. The project was applied high technoplogy that completed after 16 month construction, marking an important growth of PVC in terms of design capacity, manufacture, specialized installation and construction, demonstrating high competitiveness to become one of the largest EPC Contrators of Vietnam. PVC also inaugurated a number of large scale projects in the form of EPC, namely Bio Ethanol Plant in the North, Thai Binh 2 Thermal Power Plant, Dinh Vu Polyester Plant in Hai Phong, Vung Ang 1 Thermal Power Plant, 12/9 Petroleum Cement Plant in Nghe An. Almost all other large scale projects completed by PVC, for example, Office of Petroleum Institute, Office of Ministry of Home Affairs. The Dung Quat Polypropylene Plant had met construction schedule, quality and valued by the Investors. TECHNICAL, QUALITY MANAGEMENT AND LABOR SAFETY Identifying science technology and technique as an important levelling to enable PVC to 26

27 REPORT OF THE BOARD OF GENERALDIRECTORS develop, to reach the competitiveness with other contractors in the world, PVC is currently completing and systematically applying of the quality standard according to ISO 9001:2008; PVC applied technologies in project management, advanced production management and software to the management of schedule, planning and finance. project management officers according to international standards. At present PVC has 6,266 staffs, among them 5 PhD, 48 Masters, 1,610 University graduates, 2,355 technical workers. The management officers are 185 people, most of them are young, dynamic at an average age of 39. In addition, PVC always strives to proactively update advanced technology in the world and in the field of construction to develop petroleum and civil projects. Especially, all production and business process of PVC strictly complied with Health Safety Environment Quality (HSEQ) policies and procedures. The technology, quality, administration and management of construction schedule of PVC and its subsidiaries were well completed and excessively improved, making significant contribution to the assurance of project progress and quality. PVC always directed, supervised strict execution of the safety and labor protection; to ensure providing sufficient labor safety equipment and to improve the working conditions for staff members. CONTINUE DEVELOPING HUMAN RESOURCES In their development plan, PVC always valued human resources, science technology and management science to be the most important foundation. Therefore, over the past few years, the human resource planing and attracting qualified personnel was focused. To realize the ambition to become a leading construction enterprise, PVC was continuing recruitment of qualified, experienced staffs to place them to key positions, to develop policies to attract well qualified managers and engineers, to create convenient, equal and flexible working environment, to promote motivation effort from all staff members. PVC also continued offering professional training program for technical officers specialized in petroleum construction; for skillful workers to obtain international certificate and for In 2009 in PVC, there was 4,901 times of staff, workers and laborers being sent for training program, the cost of which was almost 9.7 billion VND. EFFECTIVE AND SUSTAINABLE INVESTMENT PVC has concentrated its efforts to strengthen investment and to enhance the value of investment; especially it developed investment plan and direction to high-tech projects and projects specialized in petroleum industry. PVC and its subsidiaries has been implementing more than 70 investment projects in major provinces, cities, localities over Vietnam with the total investment value of 70,000 billion VND, among them 15 projects belonged to industrial production, infrastructure system in industrial area; 55 projects belonged to residence, office, infrastructure system in urban area, tourism areas. The typical projects including Welded Steel Pipeline Plant to serve petroleum projects in the South, 12/9 Petroleum Cement Project in Nghe An, Plastic Packaging Manufacture Plant in Dung Quat, Quang Ngai, Long Son Petroleum Industrial Area in Vung Tau, Hoang Mai Industrial Area in Nghe An. To enhance construction capacity, PVC has invested in advanced construction equipments, especially equipment specialized in petroleum industry with the value of 293 billion VND, which enhances construction capacity in technically complicated projects. SIGNING MAJOR ECONOMIC CONTRACTS In 2009, PVC won 40 tendering packages with a total value of 12,535 billion VND; signed 34 economic contracts with a total value of 7,553 27

28 REPORT OF THE BOARD OF GENERAL DIRECTORS billion VND, increasing more than double compared to 2008 (3,332 billion VND), among which 5 EPC contracts worth of 3,650 billion VND, amounting 48% of the value of signed contracts. The major projects are included Nhon Trach 2 Power Plant, Dinh Vu Polyester Plant in Hai Phong, Vung Ang Thermal Power Plant, Bio Ethanol Energy Plant in the North, Vietnam Petroleum Institute and other petroleum projects such as the Head Office of Ministry of Home Affairs (393 billion VND); Ministry of Natural Resources and Environment (500 billion VND) The management of economic contracts were strictly and seriously implemented. Regulations on management, delegation or authorization in Contract signing and implementation was in place. The regular inspection, assessment, evaluation of Contract implementation has met the management of economic contract requirements. HEALTHY FINANCE CREDIT PVC has timely arranged capital sources to ensure business and investment operation. Internal finance management regulations was completed. Obligation to the State budget was timely and sufficiently fulfilled. PVC has successfully listed its stock on Hanoi Stock Exchange in August 2009 with the stock code PVX. In addition, PVC had restructured some investment contributed at PVA, PVE, ICG which brought positive effectiveness to them. In coordination with Petro Vietnam, PVC has sold part of the State capital. MAIN ECONOMIC TARGETS IN 2007, 2008, 2009 Source: Audited Financial Report of PVC in 2007, 2008 and

29 REPORT OF THE BOARD OF GENERALDIRECTORS EXPANDING INTERNATIONAL COOPERATION PVC is striving to implement strategic solutions being as cooperation, joint venture, partnership with strategically experienced counterparts in country. At the same time, expanding international cooperation by signing Agreement on Strategic Cooperation with Zarubeneft Company of Russian Federation; partnership with major Groups like Hyundai, Daewoo (Korea), JGC (Japan), Cornell Wagner and Worley Parson (Australia), Technip Consortium (France), Alfa Laval (India) in order to implement construction projects in the field of petroleum industry, petro-chemistry, energy, and civil engineering. This is an opportunity for PVC to share experience and improve the project management expertise, to expand and occupy the domestic and regional market. ATTENTION TO BUSINESS INSTITUTIONALIZATION The issue of institutionalization has been strengthened and reinforced. Most of agreements and contracts were evaluated before signing to ensure compliance with the law and to prevent risk. PVC is currently negotiating with the Ministry of Justice to conduct training cooperation and consultancy on legal aspects. ENHANCING TRANSPARENCY AND RELATIONSHIP WITH THE INVESTORS. In addition to the acceleration of business development, PVC has also promoted the disclosure of information, connected shareholders and investors. In parallel with the dissemination on public media, the website and the PVC news were the main information channels which update and upload PVC daily news. MAINTAINING EMPLOYMENT SOCIAL ACTIVITY PVC maintained stable employment for more than 6,000 staffs with an average income of more than 6.3 million VND/ person/ month. PVC offered good welfare policy to its staffs. PVC has actively been involved in social activities namely, donation to build Unity Houses, to upgrade schools for localities, for instant, Nam Hong Primary School (Hanoi), Tan Phu Primary School (Phu Tho), Ho Tung Mau Secondary School, donation for the victims of flood, for disadvantaged families and contribution to other social security funds with a total value of billion VND. Hence, after 4 years changing from the State Owned Company to Joint Stock Company, PVC has experienced steady development. In 2007, PVC charter capital was 150 billion VND with output value of 827 billion VND, revenue of 750 billion VND, profit of 20 billion VND, then in 2008, PVC reached the output value of 2,405 billion VND, revenue of 1,866 billion VND and profit of 98 billion VND. In order to meet the requirement, PVC increased its charter capital up to 1,500 billion VND at the end of In 2009, the output value reached 4,775 billion VND, revenue of 4,247 billion VND, profits of billion VND, increasing twice compared to last year. According to the business plan of 2010, major economic targets of PVC were maintained at high growth rate and PVC will increase its charter capital to 2,500 billion VND. Previously, the operation territory was mainly in the South, PVC expands operation through out the country, it has reaffirmed the role of a leading corporation in Vietnam in the field of investment and construction, especially in EPC, BOT areas for petroleum specialized projects and the large scale project. 29

30 REPORT OF THE BOARD OF GENERAL DIRECTORS BUSINESS PLAN FOR 2010 The year 2010 is significantly important to PVC. This is the year when the Party Congress at different levels takes place before progressing to 11th National Party Congress, the year to decide successful implementation of 5 year plan ( ) and to prepare conditions to further implement 5 year plan ( ). OVERALL GOAL Building and developing PVC to become a key specialized construction corporation of Petro Vietnam, PVC is striving to become professional construction and investment group, ranking number 1 in Vietnamese construction industry by SPECIFIC OBJECTIVES 1. To focus on three main business areas, namely construction, industrial manufacture and property. To strengthen operating in the field of manufacturing building materials, metal structure to serve for construction work of PVC and to supply to the market. 2. To maintain high growth rate, to ensure stable employment and to improve income for staff. 3. To direct the development of PVC and subsidiaries according to specialized direction in each field, to promote competitiveness. To expand joint venture and partnership with major groups overseas. 4. To complete on time, to ensure good quality of projects. In 2010, PVC will complete and handover 17 projects and project items such as: Polypropylene Plant, expansion of Nha Be Petroleum Store, Office of Petroleum Institute, Head office of Ministry of Home Affairs, Vina Food 1 Building, Landfill for Thai Binh II Thermal Power Plant; Nghi Son Petrochemistry Refinery Complex, LPG Storage and Dung Quat Tank Loading Station. 5. To strengthen the investment, especially investment in industrial production, to place priority to mobilize resources to implement key projects, potential and high effective projects like Welded Steel Pipeline Plant, Dung Quat Packaging Manufacture Plant, Pipeline Coverage Plant, Valve Manufacture Plant so as to put into operation as early as possible. 6. To enhance business accounting settlement to develop, issue internal unit price norm for cost management. To strongly promote saving practice, business cost reduction to ensure positively effective production and business. MAIN ECONOMIC TARGETS IN

31 7. To increase the legal capital of holding Company to 2,500 billion VND so as to proactively control capital sources, to timely arrange other capital source to meet with the business demand. 8. To continue investment in advanced equipment, to enhance capacity in design in order to carry out EPC and BOT contracts. 9. To complete regulations and rules on management and direction. To enhance qualification, quality of enterprise administration and professionalism in every aspect, to overcome weakness in order to improve business effectiveness. 10. To continue improvement of quality, quantity of management officers, technical workers to satisfy the development demand. To focus on training essential areas to serve for business activities, to ensure sufficient structure, quantity and quality. DEVELOPMENT PLAN FOR THE YEAR Looking back the past development, especially in 2009, with the excessive growth rate has been reaffirming its capabilities, credibility and brand in the fields of petroleum construction, industrial and civil engineering. The year 2010 offers a lot of opportunities but not less challenges to PVC. With the attention and support of the Party, the Government and local authorities, close direction and support of PetroVietnam, PVC is resolved to maximize its unity, proactive teaming, creativeness in order to complete the business plan of VU DUC THUAN PRESIDENT & C.E.O

32 DEVELOPMENT PLAN FOR THE YEAR BASIS TO DEVELOP 5 YEAR I. PLAN FOR PVC 5 year plan was developed on the following legal basis: - The Government Decree No. 92/2006/ND-CP dated 7/9/2006 and No. 04/2008/ND-CP dated 11/1/2008 relating to the amendment, supplement to some Articles of the Decree No. 92/2006/ND-CP relating to the development, approval and management of master plan for socio-economic development. - The Decision No. 386/QD-TTg dated 9/3/32006 of the Prime Minister to approve Development strategy of Vietnamese Petroleum Industry by 2015 and direction to The Resolution No. 7610/NQ-DKVN dated 13/10/2008 of Petro Vietnam to adopt the Development Strategy of PVC by 2015 and direction to OBJECTIVE OF 5 YEAR II. PLAN ( ) OVERALL GOAL PVC is striving to become professional construction and investment group, ranking number 1 in Vietnamese construction industry by the end of SPECIFIC OBJECTIVES To focus on three main business areas, namely construction, industrial manufacture and property. - To strengthen operation in the field of building materials, metal structure to serve for construction work of PVC and to supply to the market. - PVC is striving to ensure that by the year 2015: charter capital 10,000 billion VND, total turn over of 35,000 billion VND, average ratio of profit/ charter capital is 20%, average income is 15 million VND/ month. The ration of construction value by the year 2015 will be reduced to 50% of the total. - To maintain high growth rate, to ensure stable employment and to raise income for staffs III. IMPLEMENTATION DIRECTION FOR CONSTRUCTION AREA: - To focus on construction of onshore petroleum project. To gradually expand the operation to international petroleum development projects. At the same time, to build capacity to develop other industrial projects (like thermal power plant, bio-energy plant), civil projects using high-tech in high rise building. Based on the Development Strategy by 2015 and the development direction for 2025, approved by PVC, the specific implementation plan for is to expand and occupy the market in country, to gradually expand operation to the region and international. The specific direction of PVC during this period focuses on the following areas: 32

33 DEVELOPMENT PLAN FOR THE YEAR FOR SPECIALIZED CONSTRUCTION AREA: Construction of petrochemical refinery, gas processing industrial plant and other industrial plant. - To successfully complete Dinh Vu PVTex Plant, Nghi Son and Long Son Petrochemical refinery complex, Phu Tho Binh Phuoc Ethanol Energy Plant, Nhon Trach 2, Thai Binh 2, Vung Ang 1, Long Phu 1 Power Plants. - To participate in construction of some oversea projects invested by PVC. Construction of petroleum storage and transportation. - With regards to the construction of petroleum storage and transportation as EPC Contractor: PVC occupies most of the market share, it is striving to participate in tendering and complete projects which counted about 50% of external market in country, and expand to the South East Asia market. Construction of petroleum offshore projects: - To continue maintaining and repairing offshore projects. - To reinforce project management with good competitiveness compared to other contractors in the region. - To design project items which do not require complicated technology to serve for the construction work of petrochemical refinery plants, gas processing industrial plants and other industrial plants. steel processing plant, valve manufacture plant, welding rod manufacture plant, non-baking brick plant, mechanical processing and building material manufacture plant, pre-tension concrete structure plant, PVC door, aluminum glass door. - To research, explore the international market to identify export opportunities for mechanical products. 3. FOR INVESTMENT, CONSTRUCTION AND PROPERTY BUSINESS - To complete and exploit effectively the invested industrial areas. PVC is striving to fill up industrial areas by 2015, namely Hoang Mai Industrial Area, Nghe An ( hectares), Hoa Cam Industrial Area (120 hectares). To study and invest further in other potential industrial areas, it is strived to manage and operate effectively more than 2000 hectares of industrial area. - To invest and exploit petroleum services like the yard to manufacture metal structures in Sao Mai, Ba Dinh. - To specify and plan investment management for new projects during to ensure completion of development plan, to review and identify investment priority for property projects. - To determine that development of high rise building (from 30 storeys and above) is a potential market, especially for steel structure building. Development of high rise building will count about 7.5% total turnover of PVC in FOR INDUSTRIAL PRODUCTION AREA - To invest in production equipment and installation of non-standard steel structure, tank, tower for petrochemical refinery complex petroleum tank and transportation projects. - To invest in developing industrial plants such as packaging manufacture plants, pipeline coverage plants, welded steel pipe plants, tank 33

34 DEVELOPMENT PLAN FOR THE YEAR INVESTMENT PROPORTION IN DIFFERENT FIELDS BY THE YEAR 2015 SOLUTIONS TO V. IMPLEMENT IN 5 YEARS PLAN ( ) To implement 5 year plan ( ), PVC will concentrate on the development and implementation on 3 break through solutions in Science technology management and human resource development. 1. SCIENCE TECHNOLOGY SOLUTION Applying technology in project management, advanced productions management with high effectiveness. - To establish management tool for quality management and total solutions in order to enhance working effectiveness so as to gradually use the management software in PVC brand name. Construction and installation of petro-chemical refinery plant, gas processing and other industrial plants; Construction of storage system and transportation of petroleum products; Petroleum equipment manufacture and mechanical; Investment in industrial areas, petroleum service base; Construction of high rise building; Business in real estate; Construction and installation of off shore petroleum projects - To maintain and improve management system according to ISO 9001: 2008 in the entire PVC. - To develop and implement according to HSEQ procedures (Health, Safety, Environment and Quality) for all projects of PVC. MAIN TARGETS OF 5 YEAR PLAN IV. ( ) Unit: billion VND 34

35 DEVELOPMENT PLAN FOR THE YEAR To develop management program in the brand name of PVC in progress management, planning management and financial management. - In addition, PVC will work closely with the international cooperation development strategy of Petro Vietnam during the new phase, to develop their own cooperation strategy overseas in order to integrate the project construction of Petro Vietnam overseas. To review, assess the capacity of PVC at the current partnership, joint venture companies, to initiate complex measures in order to protect and develop capital. 2. ORGANIZATION AND MANAGEMENT SOLUTION a.organization and management work - To complete internal management procedures - To build standard position system for each management post - To complete organization structure of PVC in the form of holding subsidiaries Company, and to strongly delegate tasks to Project Steering/ Management Committee and subsidiaries in order to enhance the proactiveness ad to maximize resources of the Company under the supervision and control of the holding Company. - To continue improvement of leaders for units, to prepare personnel for newly established units; to develop planning and assessment of leaders, rotation and nomination, placement of leaders so as to enhance management effectiveness at the subsidiaries. - To continue improvement of management practice at PVC head office and its subsidiaries according to the simple and specialized direction in order to increase working effectiveness and business value of the Corporation. b.capital solution - To enhance the effectiveness of capital utilization by investment according to stages in response to the market demand, taking the earnings from depreciation, profit for investment and development, maximizing the capacity of investment projects. c. Restructure and reform the business - To continue evaluation, classification of units according to business areas, capacity and operational territory to focus on three main areas: construction, industrial production and property business; to develop capital road map at units and to re-structure capital investment plan of PVC; to register upgrading the grade of enterprise; to implement publication and listing stock of joint stock companies where PVC holds the stock on the stock market. - To review, analyze and assess the operational model of PVC, and to recommend method of improvement according to each development stage for strong and sustainable development. - To investigate and attract strategic shareholders who have financial capability, suitable experience. To study, recommend admission of new members to PVC. - To implement the direction of Petro Vietnam in the process of enterprise reform, year d. Social welfare policy - To implement well the welfare policy for employees; to ensure good salary policy with an average income of 2011: 9.1 million VND/ person/ month and 2015: 15 million VND/ person/ month; to improve continously living standards and working conditions for all staff members, especially for those working on the construction site. - To strengthen the assurance of social welfare, care for the living and housing condition for employees. 3. HUMAN RESOURCE TRAINING AND DEVELOPMENT SOLUTION The planning for 3 priority development areas of PVC during the year and 35

36 DEVELOPMENT PLAN FOR THE YEAR direction for 2025 including: construction, industrial production and real estate business (in which the turn over from construction account for 50%) according to the direction of concentration, specialization and developing suitable personnel development strategy according to each area and industry. Such development strategy of PVC during the years and direction of 2025 including: Objective: Being the leading construction companies in Vietnam, PVC has trained the management team and technical staffs with professional qualification, scientific knowledge and leadership skill in construction, investment fields. Annual plan: - To complete training system and human resource development, to strengthen training for management officers according to specialized direction, from the head office to PVC company members. - To develop the plan Training and re-utilizing professional personnel specialized in construction after completing labor export to overseas, in order to maximize experienced, specialized, industrial working style and foreign language after returning from the Middle East, Malaysia, Taiwan to serve for national and international projects of PVC (complete the Project in the first quarter of 2011 and expand annually to the entire phase). - To standardize and improve the quality of recruitment and to improve the utilization of labor source; to exercise breakthrough in the staff nomination policy. - To maximize delegation in managing and developing human resource. 36

37 VIETNAM NATIONAL OIL AND GAS GROUP PETROVIETNAM CONSTRUCTION JOINT STOCK CORPORATION (PVC) AUDITED CONSOLIDATED FINANCIAL STATEMENTS

38 PETROVIETNAM CONSTRUCTION JOINT STOCK CORPORATION (Incorporated in the Socialist Republic of Vietnam) 25th Floor, CEO Building, Pham Hung Road, Tu Liem District, Hanoi City, S.R. Vietnam AUDITED CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2009 TABLE OF CONTENTS CONTENT PAGE(S) STATEMENT OF THE BOARD OF DIRECTORS AUDITORS REPORT 41 CONSOLIDATED BALANCE SHEET CONSOLIDATED INCOME STATEMENT 44 CONSOLIDATED CASH FLOW STATEMENT NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

39 STATEMENT OF THE BOARD OF DIRECTORS 39

40 STATEMENT OF THE BOARD OF DIRECTORS 40

41 199 AUDITORS REPORT Deloitte Viet Nam, Ltd. No.8, Pham Ngoc Thach Rd, Dong Da Dist, Ha Noi city, Viet Nam Tel: Fax: to 72 41

42 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER to 72

43 CONSOLIDATED BALANCE SHEET 47 to 72 43

44 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2009 CONSOLIDATED INCOME STATEMENT to 72

45 CONSOLIDATED CASH FLOW STATEMENT 47 to 72 45

46 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2009 CONSOLIDATED CASH FLOW STATEMENT to 72

47 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 47

48 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

49 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 49

50 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

51 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 51

52 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

53 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 53

54 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

55 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 55

56 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

57 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 57

58 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

59 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 59

60 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

61 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 61

62 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

63 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 63

64 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

65 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 65

66 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

67 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 67

68 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

69 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 69

70 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER

71 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 71

72 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 DECEMBER 2009 NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 72

73 MAJOR PROJECTS 73

74 INDUSTRIAL INFRASTRUCTURE DEVELOPMENT PROJECTS INVESTED BY PVC Tien Giang Petroleum Service Industrial Zone Location: Tien Giang Province Total investment:4,200 billion VND Hoang Mai Industrial Zone Location: Nghe An Province Total investment: billion VND Welded Steel Pipeline Plant Project and Metal Structure Processing Workshop Location: Maritime Petroleum Service Area, Sao Mai, Ben Dinh, Vung Tau Total investment: 1,450 billion VND and 912 billion VND Mechanical Equipment and Metal Structure Manufacturing Workshop at Tien Giang Petroleum Service Industrial Zone Location: Tien Giang Province Total investment: 911 billion VND Nghi Son Mechanical and Building Materials Manufacturing Plant Project Location: Thanh Hoa Province Total investment: 148 billion VND PROJECT OF PETROLEUM TANKS MANUFACTURE FOR PHU MY FERTILIZER PLANT 74

75 MAJOR PROJECTS CIVIL CONSTRUCTION PROJECTS TO SERVE FOR PETROLEUM INDUSTRY Hoai Duc Petroleum Urban Zone Location: Hoai Duc, Hanoi Implementation value: 2,000 billion VND Phu My Hung Petroleum Trading and Finance Center Location: Ho Chi Minh City Implementation value: 1003,684 billion VND Vietnam Petroleum Institute Project Location: Hanoi Implementation value: 938 billion VND High Quality Apartment at 97 Lang Ha Location: Hanoi Implementation value: billion VND Nghe An Petroleum Building Location: Nghe An province Implementation value: 515 billion VND PROJECT OF PHUONG DONG HOTEL IN NGHE AN Vung Tau Petroleum New Urban Area Location: Vung Tau City Implementation value: 1,500 billion VND PROJECT OF DRAGON TOWER PROJECT OF PETROLEUM FINANCE CENTER 75

76 CIVIL CONSTRUCTION PROJECTS TO SERVE FOR PETROLEUM INDUSTRY Administration Building and Accommodation for Management Department of Ca Mau Gas, Power and Nitrogen Project, Phase 3 Location: Ca Mau Province Implementation value: 277 billion VND APARTMENT PROJECT PETROLAND DISTRICT 2 Petroleum Financial Centre, Hanoi Location: No. 22 Ngo Quyen, Hanoi Implementation value: 267 billion VND Hoang Mai Petroleum Urban Zone Location: Nghe An Province Implementation value: billion VND Petroland Apartment in District 2 Location: Binh Trung Dong Precinct, District 2, Ho Chi Minh City Implementation value: 425 billion VND PROJECT FINANCE TRADE CENTER PHU MY HUNG PETROLEUM PROJECT OF PETROLEUM INSTITUTE PROJECT OF NGHE AN PLAZA CENTER 76

77 MAJOR PROJECTS PROJECT OF VIETNAM PETROLEUM HOTEL COMPLEX THE COMMERCE- OFFICE- APARTMENT BUILDING COMPLEX IN VUNG TAU PROJECT OF NAM RONG DOI MOI OIL FIEL PROJECT OF DUNG QUAT REFINERY 77

78 THERMAL POWER PROJECTS Long Phu Thermal Power Plant Location: Soc Trang Province Total investment: 28,500 billion VND Role: EPC Contractor Ca Mau I & II Power Plant Location: Ca Mau Province Implementation value: 30 billion VND Role: Construction work Nhon Trach II Power Plant Location: Dong Nai Province Total investment: 1,366 billion VND Vung Ang 1 Power Thermal Plant Location: Ha Tinh Province Total investment: 1,454 billion VND Ground levelling work project for Thai Binh II Electric Centre Location: Thai Binh Province Total investment: 336 billion VND 78

79 MAJOR PROJECTS PROJECT OF CA MAU THERMAL ELECTRIC PLANT PROJECT OF CA MAU 1 POWER PLANT PROJECT OF NHON TRACH 2 THERMAL ELECTRIC PLANT 79

80 EPC CONTRACTOR IN INDUSTRIAL AND PETROLEUM SPECIALIZED PROJECTS Bio Ethanol Plant in Phu Tho Location: Phu Tho Province Total investment: 1,032 billion VND Dinh Vu Polyester Plant Location: Hai Phong City Total investment: 1,000 billion VND Gas Pipeline Construction, Lot B, O Mon Location: Hau Giang Province Investment valua in partneshipwith VSP-PTSC: 800 billion VND Polypropylene Plant Location: Quang Ngai Province Total investment: 560 billion VND Ground levelling for Nghi Son Petrochemical Refinery Plant Location: Thanh Hoa Province Total investment: 521 billion VND Cu Lao Tao Petroleum Tank Location: Vung Tau City Total investment: 490 billion VND Go Dau LPG Project Location: Tay Ninh Province Total investment: 168 billion VND PROJECT OF LEVELLING OF NGHI SON REFINERY 80

81 MAJOR PROJECTS PROJECT OF WHARFS FOR DUNG QUAT REFINERY PROJECT OF CU LAO TAO TANK 81

82 COMPANY MEMBERS HANOI PETROLEUM CONSTRUCTION J.S.C (PVC HN) Head office: 5th Floor, Sannam Building, Dich Vong Ward, Cau Giay, Hanoi Tel: Fax: PETROLEUM MECHANICAL MACHINERY CONSTRUCTION J.S.C (PVC-ME) Head office: Sannam Building, Dich Vong Ward, Cau Giay, Hanoi Tel: Fax: PETROLEUM METAL STRUCTURE AND EQUIPMENT INSTALLATION J.S.C (PVC MS) Head office: No. 35G, 30/4 Road, Ward 9, Vung Tau City Tel: Fax: Website: pvc-ms.vn PETROLEUM PIPELINE & TANK CONSTRUCTION J.S.C (PVC PT) Head office: 33A 30/4 Road, Ward 9, Vung Tau City Tel: Fax: MIEN TRUNG PETROLEUM CONSTRUCTION J.S.C (PVC-MT) Head office: 1st Floor, EVN Building, Land Central, No. 78A Duy Tan, Hai Chau District, Da Nang City Tel: Fax: PETROLEUM INDUSTRIAL & CIVIL CONSTRUCTION J.S.C (PCV-IC) Head office: No. 35D, 30/4 Road, Ward 9, Vung Tau City Tel: / / Fax: PETROLEUM CONSTRUCTION JOINT STOCK COMPANY - NGHE AN (PVNC) Head office: 45 Tran Phu, Vinh City, Nghe An Tel: / Fax: xdddaukhina@yahoo.com.vn Website: PETROLEUM INVESTMENT CONSULTANCY AND DESIGN JSC (PVE) Head office: 8th Floor, CT Plaza Building, No. 60A Truong Son, Ward 3, Tan Binh District, Ho Chi Minh City Tel: Fax: pve@pvengineering.com.vn Website: PETROLEUM URBAN DEVELOPMENT JSC (PVC-CM) Head office: No. 3 An Duong Vuong, Ward 7, Ca Mau City, Ca Mau Province Tel: Fax: pvccm@pvccm.vn Website: SAIGON PETROLEUM CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY (PVC-SG) Head office: 8th Floor, Medinanet Building, 11 Bis Nguyen Gia Thieu, Ward 6, District 3, Ho Chi Minh City Tel: ; Fax:

83 SUBSIDIARIES COMPANY MEMBERS VINACONEX PVC CONSTRUCTION AND INVESTMENT J.S.C (VINACONEX PVC) Head office: 10th Floor, CT3-3 building, Me Tri Ha Urban Area, Pham Hung Road, Tu Liem, Hanoi Tel: Fax: PETROLEUM INVESTMENT & TRADING JSC NGHE AN (PVIT) Head office: No.12 Tecco, Quang Trung, Vinh City, Nghe An Tel: Fax: Website: 12/9 PETROLEUM CEMENT JSC (PVC-12/9) Head office: Km 62, National Road No. 1, Hoi Son, Anh Son, Nghe An Tel: Fax: Website: IDICO LONG SON PETROLEUM INDUSTRIAL ZONE INVESTMENT JSC (PIV LONG SON) Head office: 3rd Floor, Hodeco Plaza, No. 36 Nguyen Thai Ho, Ward 7, Vung Tau City, Ba Ria Vung Tau Tel: Fax: GAS CONSTRUCTION AND INVESTMENT JSC (PVID) Head office: 3rd floor, No. 1A Nguyen Trung Truc, Ward 9, Vung Tau City Tel: Fax: VIETUBES CORPORATION LIMITED (VIETUBES) Head office: Road No. 11, Dong Xuyen Industrial Area, Rach Dua Ward, Vung Tau Tel: /839268/839269/ Fax: Website: PETROVIETNAM CONSTRUCTION INVESTMENT JSC (PVCI) Head office: Room 2207, 22nd Floor, 57 Lang Ha Building, Dong Da, Hanoi Tel: Fax: Website: PETROWACO PROPERTY JSC (PETROWACO) Head office: No. 52 Quoc Tu Giam, Van Mieu Ward, Dong Da District, Hanoi Tel: Fax: Website: PETROLEUM INFRASTRUCTURE AND URBAN INVESTMENT JSC (PETROLAND) Head office: No. 16 Truong Dinh, Ward 6, District 3, Ho Chi Minh City Tel: / Fax: Website: 83

84 COMPANY MEMBERS PETROLEUM CONSTRUCTION 1 JSC (PVC1) Head office: No. 242 National Road No. 9, Dong Da District-town, Quang Tri Tel: Fax: HEERIM PVC INTERNATIONAL DESIGN JSC (PVC HEERIM) Head office: 4th Floor, CEO Building, Pham Hung Road, Hanoi Tel: (844) / (844) Fax: (844) Contract@heerimpvc.com Website: SOUTHERN PETROLEUM BUILDING DEVELOPMENT AND MANAGEMENT JSC (PV SBD) Head office: Apartment 1, Long Tho Residence Area, Phuoc An, Nhon Trach, Dong Nai Tel: / / Fax: PETROLEUM BUILDING MANAGEMENT AND DEVELOPMENT JSC (PV BUILDING) Head office: CNCNVNMLD Dung Quat Residence Area, Van Tuong New Urban Area, Binh Son, Quang Ngai Tel: Fax: PACIFIC PETROLEUM CONSTRUCTION JSC (PVC-TBD) Head office: 48B Dang Dung, Tan Dinh Ward, District 1, Ho Chi Minh City Tel: ; Fax: Website: KINH BAC PETROLEUM CONSTRUCTION AND INVESTMENT JSC (PVC KBC) Head office: No. 5 Le Quy Don, Suoi Hoa Ward, Bac Ninh City, Bac Ninh Province Tel: Fax: HIGH TECH CONCRETE INVESTMENT JSC (SOPEWACO) Head office: Ong Keo Industrial Zone, Hamlet 3, Tay Khanh Village, Phuoc Khanh commune, Nhon Trach District, Dong Nai Province Tel: / Fax: PETROLEUM CONSTRUCTION 4 JSC (PVC4) Head office: No. 6 Alley 192, Giai Phong Road, Phuong Liet Ward, Thanh Xuan, Hanoi Tel: Fax: PVC TRUONG SON PETROLEUM CONSTRUCTION JSC (PVC-TS) Head office: No. 98 Huu Nghi Road, Dong Hoi, Quang Binh Tel: Fax: PETROIMICO CONSTRUCTION INVESTMENT JSC (PVC- IMICO) Head office: Office No. 1: 4th Floor, No. 623 La Thanh, Ba Dinh District, Hanoi Tel: Fax: info@pvc-imico.vn Website: 84

85 SUBSIDIARIES COMPANY MEMBERS PETROVIETNAM MECHANICAL ELECTRICITY JSC (PVM&E) Head office: Floor 4, LOD Building, No.38, Nguyen Phong Sac street, Cau Giay Dist, Ha Noi Tel: Fax: PETROLEUM HIGH-CLASS SERVICE JSC (PVR) Head office: 6th Floor, Anh Minh Building, 36 Hoang Cau, Dong Da District, Hanoi Tel: Fax: Website: HONG HA PETROLEUM JSC (PVC HONG HA) Head office: 206A Nguyen Trai, Thanh Xuan, Hanoi Tel: Fax: Website: NHA TRANG PETROLEUM INVESTMENT JSC (PVIN) Head office: 04 An Duong Vuong, Phuoc Tan Ward, Nha Trang, Khanh Hoa Tel: Fax: PETROLEUM POWER PROPERTY JSC (PVPOWER LAND) Head office: 3rd floor, CEO Building, Pham Hung Road, Tu Liem, Hanoi Tel: Fax: Website: PETROLEUM INTERNAL AND EXTERNAL EQUIPMENT JSC (PVC-METAL) Head office: 5th floor, Media building, No. 11 Bis Nguyen Gia Thieu, Ward 6, District 3, Ho Chi Minh City Tel: Fax: PVC FECON PRE-TENSION CONCRETE JSC (PVC-FECON) Head office: Thi Son Industrial Group Zone, Kim Bang District, Ha Nam Tel: Fax: Website: pvc-fecon.com.vn PETROLEUM CONSTRUCTION AND TRADING INVESTMENT JSC (PV-SSG) Head office: No. 8 Le Tai To, 7th floor, Bao Viet Building, Hanoi Tel: Fax: Website: pv-ssg.com.vn PETROLEUM FINAL AND PROPERTY JSC (PVFC LAND) Head office: No.9 CT5, My Dinh Urban Area, Me Tri, Tu Liem, Hanoi Tel: Fax: info@pvfc-land.com.vn Website: pvfc-land.vn SONG HONG CONSTRUCTION JSC Head office: No. 164 Lo Duc, Dong Mac, Hai Ba Trung, Hanoi Tel: Fax: Website: incomex.com.vn 85

86

87

88

SUBMISSION Re: the replacement of Management Board Member and assigning President & CEO PetroVietnam Drilling & Well Services

SUBMISSION Re: the replacement of Management Board Member and assigning President & CEO PetroVietnam Drilling & Well Services Ref. No. 07A/TT-HĐQT Hochiminh City, April 22 nd 2011 SUBMISSION Re: the replacement of Management Board Member and assigning President & CEO PetroVietnam Drilling & Well Services Address to: GENERAL SHAREHOLDERS

More information

NAM LONG INVESTMENT CORPORATION MANAGEMENT PRESENTATION

NAM LONG INVESTMENT CORPORATION MANAGEMENT PRESENTATION NAM LONG INVESTMENT CORPORATION MANAGEMENT PRESENTATION Gateway to Vietnam 2010 Intercontinental Hotel Saigon 11 November 2010 DEVELOPMENT MILESTONES 2 18 years of Real Estate development experience 1996

More information

THE ORIENTATION IN THE PRODUCTION AND USE OF BIO-FUELS IN VIETNAM

THE ORIENTATION IN THE PRODUCTION AND USE OF BIO-FUELS IN VIETNAM REGIONAL WORKSHOP ON SUSTAINABLE BIOENERGY PRODUCTION AND USE IN SOUTHEAST ASIA THE ORIENTATION IN THE PRODUCTION AND USE OF BIO-FUELS IN VIETNAM Presenter: Dr. Dong Do-Xuan Department of Science and Technology

More information

No.:01/2019/CV-HDQT Hochiminh City, January CORPORATE GOVERNANCE REPORT OF THE LISTED COMPANY In 2018

No.:01/2019/CV-HDQT Hochiminh City, January CORPORATE GOVERNANCE REPORT OF THE LISTED COMPANY In 2018 APPENDIX 05 CORPORATE GOVERNANCE REPORT (Issued under Circular No. 155/2015/TT-BTC dated October 6th 2015 of the Ministry of Finance On guidelines for information disclosure on securities market) LIX DETERGENT

More information

SUBSIDIARIES ASSOCIATED COMPANY HOA SEN SOUTH EXECUTIVE OFFICE. ADDRESS No. 183 Nguyen Van Troi, Ward 10, Phu Nhuan District, Ho Chi Minh City

SUBSIDIARIES ASSOCIATED COMPANY HOA SEN SOUTH EXECUTIVE OFFICE. ADDRESS No. 183 Nguyen Van Troi, Ward 10, Phu Nhuan District, Ho Chi Minh City SUBSIDIARIES ASSOCIATED COMPANY HOA SEN SOUTH EXECUTIVE OFFICE ADDRESS No. 183 Nguyen Van Troi, Ward 10, Phu Nhuan District, Ho Chi Minh City MANAGEMENT AREA Manage Southern region starts from Ninh Thuan

More information

Nasir, Dao PKM Abdul Partner PwC Legal (Vietnam) Co., Ltd

Nasir, Dao PKM Abdul Partner PwC Legal (Vietnam) Co., Ltd Nasir, Dao PKM Abdul Partner PwC Legal (Vietnam) Co., Ltd Get in touch Tel. (direct): +84 (8) 3824 0109 nasir.pkm@pwc.com Professional profile Nasir is a partner and the Legal Services Leader in Vietnam.

More information

REPORT ON CORPORATE GOVERNANCE OF LISTING COMPANY (6 months/2016)

REPORT ON CORPORATE GOVERNANCE OF LISTING COMPANY (6 months/2016) ENGLISH TRANSLATION COPY DIGIWORLD CORPORATION ------- THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- 03/07-2016/HĐQT/DGW Ho Chi Minh City, 22th July 2016 REPORT ON

More information

CONFERENCE AGENDA (Tentative)

CONFERENCE AGENDA (Tentative) CONFERENCE AGENDA (Tentative) 07:30 08:00 REGISTRATION OPENING CEREMONY CEO WORLD FORUM 2012 08:00 08:30 OPENING SPEECH Mr. Le Thanh Tam, CEO, IDG ASEAN, Founder & Chairman of CEO&CIO Club WELCOME ADDRESSES

More information

School of Economics, University of Economics Ho Chi Minh City.

School of Economics, University of Economics Ho Chi Minh City. s Nguyen Kim Duc Department of Valuation School of Economics, University of Economics Ho Chi Minh City, Vietnam. Summary Name: Nguyen Kim Duc (NGUYEN, Kim Duc). Date of birth: 26.08.1989 Gender: Citizenship:

More information

Application of Modern Technology Solutions for Oil & Gas Industry

Application of Modern Technology Solutions for Oil & Gas Industry PetroTimes, 23 August 2013, www.petrotimes.vn Application of Modern Technology Solutions for Oil & Gas Industry A range of modern technology solutions for consultancy, design, construction management,

More information

Explore MLM Potential Opportunity in Vietnam

Explore MLM Potential Opportunity in Vietnam Explore MLM Potential Opportunity in Vietnam www.vim2u.com The Socialist Republic of Vietnam Mainland Territory: 331,114 sq. km. (127,243 sq. mi.) Population: 90,549,390 (July 2011 est.) National Capital:

More information

INTEGRATED COASTAL MANAGEMENT IN VIETNAM: OPPORTUNITIES AND CHALLENGES. Pham Van Lam Agency of Islands and Seas Use Management 15/11/2015

INTEGRATED COASTAL MANAGEMENT IN VIETNAM: OPPORTUNITIES AND CHALLENGES. Pham Van Lam Agency of Islands and Seas Use Management 15/11/2015 INTEGRATED COASTAL MANAGEMENT IN VIETNAM: OPPORTUNITIES AND CHALLENGES Pham Van Lam Agency of Islands and Seas Use Management 15/11/2015 Contents 1.Beginning of ICM in Viet Nam 2.Achievements 3.Difficulties

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the project Country: The Socialist Republic of Viet Nam Project: Hoa Lac Science and Technology City Development Project (II) Loan

More information

THE ASIAN CFO AMIDST THE FINANCIAL TURBULENCE

THE ASIAN CFO AMIDST THE FINANCIAL TURBULENCE THE FASS FORUM VIETNAM Hosted by Vietnam CFO Club & Japan Association for CFOs THE ASIAN CFO AMIDST THE FINANCIAL TURBULENCE EVENT OVERVIEW Date: Wednesday, November 24, 2010 Venue: Melia Hanoi Hotel 44B

More information

Your Excellency, President of the Socialist Republic of Vietnam Tran Dai Quang. Minister and Chairman of the President s Office Dao Viet Trung

Your Excellency, President of the Socialist Republic of Vietnam Tran Dai Quang. Minister and Chairman of the President s Office Dao Viet Trung Embargoed till after delivery Please check against delivery OPENING REMARKS BY MR S ISWARAN MINISTER FOR TRADE AND INDUSTRY (INDUSTRY) AT THE SINGAPORE-VIETNAM BUSINESS FORUM GRAND BALLROOM, THE RITZ-CARLTON

More information

LIST OF CORPORATIONS ATTENDING EVENTS IN KAZAKHSTAN, ALGERIA, PORTUGAL, BULGARIA FROM 29-06/06/2015

LIST OF CORPORATIONS ATTENDING EVENTS IN KAZAKHSTAN, ALGERIA, PORTUGAL, BULGARIA FROM 29-06/06/2015 LIST OF CORPORATIONS ATTENDING EVENTS IN KAZAKHSTAN, ALGERIA, PORTUGAL, BULGARIA FROM 29-06/06/2015 No of person No NAME OF COMPANY REPRESENTATIVE POSITION DD/MM/YY FIELD(S) OF WORK FIELD(S) OF INTEREST

More information

DECISION. Approving the strategy on Vietnam information and communication technology development till 2010 and orientations toward 2020

DECISION. Approving the strategy on Vietnam information and communication technology development till 2010 and orientations toward 2020 THE PRIME MINISTER OF GOVERNMENT No: 246/2005/QD-TTg DECISION SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness Ha Noi, day 06 month 10 year 2005 Approving the strategy on Vietnam information

More information

SMEs Development: Vietnamese Experience

SMEs Development: Vietnamese Experience SMEs Development: Vietnamese Experience Presenter: Dr. CAN Van Luc at the Conference on APEC s Post 2020 Agenda: Rising Protectionism, Economic Rebalancing and Diversified Growth Session 2: Micro Competitiveness,

More information

VIETNAM. Star of Southeast Asia in economic growth. presented by Viet Huy Nguyen

VIETNAM. Star of Southeast Asia in economic growth. presented by Viet Huy Nguyen VIETNAM Star of Southeast Asia in economic growth presented by Viet Huy Nguyen Vice chairman / Indochina International Consulting (IICo) Managing Director / Vietnam Industrial Park Investment Promotion

More information

Exploitation and Commercialization of Inventions towards Green Economy

Exploitation and Commercialization of Inventions towards Green Economy Journal of Business and Economics, ISSN 2155-7950, USA December 2014, Volume 5, No. 12, pp. 2400-2405 DOI: 10.15341/jbe(2155-7950)/12.05.2014/020 Academic Star Publishing Company, 2014 http://www.academicstar.us

More information

Phu Vinh Village (Bamboo & Rattan)

Phu Vinh Village (Bamboo & Rattan) Phu Vinh Village (Bamboo & Rattan) I. Overview of Phu Nghia commune 1. The geographical position Phu Nghia commune is located in Chuong My District. It is 5 km away from the district center, 15 km away

More information

Nguyen Thi Thu Huong. Hanoi Open University, Hanoi, Vietnam. Introduction

Nguyen Thi Thu Huong. Hanoi Open University, Hanoi, Vietnam. Introduction Chinese Business Review, June 2016, Vol. 15, No. 6, 290-295 doi: 10.17265/1537-1506/2016.06.003 D DAVID PUBLISHING State Policy on the Environment in Vietnamese Handicraft Villages Nguyen Thi Thu Huong

More information

TECHNOLOGY TRANSFER: Challenges, Opportunities and Successful Cases. Phan Quoc Nguyen

TECHNOLOGY TRANSFER: Challenges, Opportunities and Successful Cases. Phan Quoc Nguyen COUNTRY REPORT OF VIETNAM TECHNOLOGY TRANSFER: Challenges, Opportunities and Successful Cases Phan Quoc Nguyen VNU University of Engineering and Technology, Email:pqnguyen@vnu.edu.vn Hanoi, November 3

More information

BROSS & PARTNERS EXPERIENCE AND TRACK RECORDS IN THE LAST 2 YEARS RANKINGS OF US. LEGAL500 Asia Pacific

BROSS & PARTNERS EXPERIENCE AND TRACK RECORDS IN THE LAST 2 YEARS RANKINGS OF US. LEGAL500 Asia Pacific BROSS & PARTNERS EXPERIENCE AND TRACK RECORDS IN THE LAST 2 YEARS RANKINGS OF US LEGAL500 Asia Pacific BROSS & PARTNERS has been ranked by Legal500 Asia Pacific in four consecutive years from 2012 to 2015

More information

Korea s Industries in the World Market (Shares and Ranking)

Korea s Industries in the World Market (Shares and Ranking) - 1 - - 2 - The Industrial Leader from an Unknown LDC in the 1960s Many think that HCI policies in the 70s established the basis of current Manufacturing-strong economy and HCI industries. Korea s Industries

More information

Intellectual Property

Intellectual Property Intellectual Property 1 Overview In a progressively uncertain economy, counterfeit products are becoming more prevalent particularly in Vietnam. Therefore, companies should be increasingly vigilant in

More information

Textron Reports Third Quarter 2014 Income from Continuing Operations of $0.57 per Share, up 62.9%; Revenues up 18.1%

Textron Reports Third Quarter 2014 Income from Continuing Operations of $0.57 per Share, up 62.9%; Revenues up 18.1% Textron Reports Third Quarter Income from Continuing Operations of $0.57 per Share, up 62.9%; Revenues up 18.1% 10/17/ PROVIDENCE, R.I.--(BUSINESS WIRE)-- Textron Inc. (NYSE: TXT) today reported third

More information

population and housing censuses in Viet Nam: experiences of 1999 census and main ideas for the next census Paper prepared for the 22 nd

population and housing censuses in Viet Nam: experiences of 1999 census and main ideas for the next census Paper prepared for the 22 nd population and housing censuses in Viet Nam: experiences of 1999 census and main ideas for the next census Paper prepared for the 22 nd Population Census Conference Seattle, Washington, USA, 7 9 March

More information

Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5%

Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5% Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5% 07/16/2014 PROVIDENCE, R.I.--(BUSINESS WIRE)-- Textron Inc. (NYSE: TXT) today reported

More information

Re-viewing Daewoo E&C

Re-viewing Daewoo E&C Re-viewing Daewoo E&C How well would you say you know about Daewoo E&C? Daewoo E&C has been achieving steady but meaningful growth while undertaking strenuous efforts to lead the development of sustainable

More information

Information Technology Policy

Information Technology Policy Vision Information Technology Policy "To place Nepal on the global map of information technology within the next five years." Background The world's least developed countries including Nepal have availed

More information

in Developing Countries in FY2008

in Developing Countries in FY2008 Study on Economic Partnership Projects in Developing Countries in FY2008 Study on Research and Development Center for Space Technology of Vietnam Academy of Science and Technology in Hoa Lac in Socialist

More information

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO Brief to the Senate Standing Committee on Social Affairs, Science and Technology Dr. Eliot A. Phillipson President and CEO June 14, 2010 Table of Contents Role of the Canada Foundation for Innovation (CFI)...1

More information

VIETNAM PULP AND PAPER INDUSTRY REPORT Q2/2018

VIETNAM PULP AND PAPER INDUSTRY REPORT Q2/2018 VIETNAM PULP AND PAPER INDUSTRY REPORT Q2/2018 1 Table of contents Content Page Content Page Abbreviations 4 2.2. Paper 25 Summary 5 2.2.1. Production 25 1. Business environment 7 2.2.2. Consumption 31

More information

COMPANY PROFILE. We, Han Viet Companions - We always stand with you - Today, Tomorrow, Together

COMPANY PROFILE. We, Han Viet Companions - We always stand with you - Today, Tomorrow, Together 2018 COMPANY PROFILE OUTLINE INTRODUCTION ABOUT US Organizational Chart Key Milestones Professional Services ACCOMPLISHMENTS Company Relationships Major Clients FUTURE PLAN LICENSES CONTACT INTRODUCTION

More information

FSIC FRANCHISE. Frequently asked questions

FSIC FRANCHISE. Frequently asked questions Frequently asked questions FSIC FRANCHISE 1. What are the details of the announced transaction? FS Investments ( FS ) and KKR Credit ( KKR ) announced an agreement to form a partnership to provide investment

More information

Turning the wheels of your success

Turning the wheels of your success INDUSTRIAL SERVICES Turning the wheels of your success A comprehensive package of integrated services combining traditional certification and inspection with innovative business solutions based on the

More information

Interview with YB Haryono, President Director, ENCONA INTI INDUSTRI, PT Indonesia

Interview with YB Haryono, President Director, ENCONA INTI INDUSTRI, PT Indonesia Interview with YB Haryono, President Director, ENCONA INTI INDUSTRI, PT Indonesia 13.04.2012 / Energyboardroom Encona Inti Industri has been diversifying its operations since 1985 with an increasing focus

More information

Chiyoda Corporation and Ezra Holdings Limited enter into MOU to establish 50:50 Joint Venture, EMAS CHIYODA Subsea

Chiyoda Corporation and Ezra Holdings Limited enter into MOU to establish 50:50 Joint Venture, EMAS CHIYODA Subsea Chiyoda Corporation and Ezra Holdings Limited enter into MOU to establish 50:50 Joint Venture, EMAS CHIYODA Subsea Chiyoda will invest in Ezra s Subsea Services business, EMAS AMC, to form EMAS CHIYODA

More information

RESEARCH ON ECONOMIC EFFECTIVENESS OF EXPLOITING MARGINAL FIELDS IN VIETNAM

RESEARCH ON ECONOMIC EFFECTIVENESS OF EXPLOITING MARGINAL FIELDS IN VIETNAM MINISTRY OF EDUCATION AND TRAINING UNIVERSITY OF MINING AND GEOLOGY RESEARCH STUDENT NGO SY THO RESEARCH ON ECONOMIC EFFECTIVENESS OF EXPLOITING MARGINAL FIELDS IN VIETNAM Branch: Economic Management Code:

More information

COUNTRY PROGRESS REPORT: VIETNAM

COUNTRY PROGRESS REPORT: VIETNAM COUNTRY PROGRESS REPORT: VIETNAM PSC MEETING OF THE GEF/UNDP/PEMSEA PROJECT ON SCALING UP IMPLEMENTATION OF THE SDS-SEA JULY 24, 2017 1 VIETNAM Summary of Major Achievements/Outputs in 2016 2017 National

More information

Higher Education for Science, Technology and Innovation. Accelerating Africa s Aspirations. Communique. Kigali, Rwanda.

Higher Education for Science, Technology and Innovation. Accelerating Africa s Aspirations. Communique. Kigali, Rwanda. Higher Education for Science, Technology and Innovation Accelerating Africa s Aspirations Communique Kigali, Rwanda March 13, 2014 We, the Governments here represented Ethiopia, Mozambique, Rwanda, Senegal,

More information

Confirms 2013 Financial Guidance

Confirms 2013 Financial Guidance Confirms 2013 Financial Guidance PROVIDENCE, R.I.--(BUSINESS WIRE)--Jul. 17, 2013-- Textron Inc. (NYSE: TXT) today reported second quarter 2013 income from continuing operations of $0.40 per share, compared

More information

Pacific Place, Suite B Ly Thuong Kiet Street, Hoan Kiem District, Hanoi T F

Pacific Place, Suite B Ly Thuong Kiet Street, Hoan Kiem District, Hanoi T F Pacific Place, Suite 404 83B Ly Thuong Kiet Street, Hoan Kiem District, Hanoi T + 844.3942.5633 F + 844.3942.5632 Room 601, Bitexco Office Tower 19-25 Nguyen Hue Street, District 1, Ho Chi Minh City T

More information

AUDIT COMMITTEE MASTER PROGRAM

AUDIT COMMITTEE MASTER PROGRAM AUDIT COMMITTEE MASTER PROGRAM GEP01_ACMP1 May 30-31, 2018 InterContinental Saigon Hotel, Ho Chi Minh City IN PARTNERSHIP WITH First time introduced in Vietnam and designed specifically for the Board of

More information

Export Promotion and Industrial Development - The Case of Korea

Export Promotion and Industrial Development - The Case of Korea The 14 th GCC Industrialist Conference March 31, 2014, Muscat, Oman, Export Promotion and Industrial Development - The Case of Korea Dr. Dong-Joo Joo Director, Division for International Development Cooperation

More information

THE STARS GROUP 2017 ANNUAL AND SPECIAL MEETING MANAGEMENT PRESENTATION MAY 10, 2018, TORONTO, 11:30 (ET)

THE STARS GROUP 2017 ANNUAL AND SPECIAL MEETING MANAGEMENT PRESENTATION MAY 10, 2018, TORONTO, 11:30 (ET) Please Note: THE STARS GROUP 2017 ANNUAL AND SPECIAL MEETING MANAGEMENT PRESENTATION MAY 10, 2018, TORONTO, 11:30 (ET) Some of our comments today will contain forward-looking information and statements

More information

Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V

Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V SEPTEMBER 26, 2017, ST. PETERSBURG, HOTEL ASTORIA Definitions and cautionary

More information

PLAN OF DEVELOPMENT: ASPECT ON THE GOVERNMENTAL POLICY

PLAN OF DEVELOPMENT: ASPECT ON THE GOVERNMENTAL POLICY PLAN OF DEVELOPMENT: ASPECT ON THE GOVERNMENTAL POLICY By: SARYONO HADIWIDJOYO Head Sub Directorate Exploration & Exploitation Development Directorate of Exploration & Exploitation Directorate General

More information

CURRICULUM VITAE. Alastair David Maclean. Senior leader with considerable commercial and change management experience

CURRICULUM VITAE. Alastair David Maclean. Senior leader with considerable commercial and change management experience CURRICULUM VITAE Name Alastair David Maclean Address Home telephone Mobile Email alastairdavidmaclean@gmail.com Professional qualifications 1999 Admitted to the Law Society of England & Wales 1997 Investment

More information

Textron Reports First Quarter 2016 Income from Continuing Operations of $0.55 per Share, up 19.6%; Reaffirms 2016 Financial Outlook

Textron Reports First Quarter 2016 Income from Continuing Operations of $0.55 per Share, up 19.6%; Reaffirms 2016 Financial Outlook Textron Reports First Quarter 2016 Income Continuing Operations of $0.55 per Share, up 19.6%; Reaffirms 2016 Financial Outlook April 20, 2016 06:30 AM Eastern Daylight Time PROVIDENCE, R.I.--(BUSINESS

More information

Halliburton and Baker Hughes Creating the leading oilfield services company

Halliburton and Baker Hughes Creating the leading oilfield services company Halliburton and Baker Hughes Creating the leading oilfield services company Halliburton Investor Relations Contacts: Kelly Youngblood, Vice President Scott Danby, Manager 281.871.2688 or investors@halliburton.com

More information

Complete everything in the most optimum conditions, enable your strategic plannings to succeed

Complete everything in the most optimum conditions, enable your strategic plannings to succeed INDEX 04 Chairman s Message 07 Overview 08 Company Vision Company Mission Core Value 10 Board of Directors 11 Board of Management 13 Development Strategy 14 Company Portfolio 16 Trading and Distribution

More information

Enhancing Audit Quality and Transparency Supplement Additional information required by Article 13 of EU Regulation 537/2014

Enhancing Audit Quality and Transparency Supplement Additional information required by Article 13 of EU Regulation 537/2014 Enhancing Audit Quality and Transparency Supplement Additional information required by Article 13 of EU Regulation 537/2014 December 2017 kpmg.com Contents 1. Network arrangement 1 1.1 Legal structure

More information

Getting Started. This Lecture

Getting Started. This Lecture Getting Started Entrepreneurship (MGT-271) Lecture 9-11 This Lecture Intellectual Property Rights Forms of intellectual property Patent, its types and steps to obtaining patent Potential financing sources

More information

Overview of Intellectual Property Policy and Law of China in 2017

Overview of Intellectual Property Policy and Law of China in 2017 CPI s Asia Column Presents: Overview of Intellectual Property Policy and Law of China in 2017 By LIU Chuntian 1 & WANG Jiajia 2 (Renmin University of China) October 2018 As China s economic development

More information

Annual Press Conference Bilfinger Berger SE, Mannheim March 21, 2012 Roland Koch, Chairman of the Executive Board

Annual Press Conference Bilfinger Berger SE, Mannheim March 21, 2012 Roland Koch, Chairman of the Executive Board Annual Press Conference 2012 Bilfinger Berger SE, Mannheim March 21, 2012 Roland Koch, Chairman of the Executive Board Annual Press Conference March 21, 2012 page 1 Financial year 2011 Order and earnings

More information

Textron Reports Third Quarter 2018 Results; Narrows Full-Year EPS and Cash Guidance

Textron Reports Third Quarter 2018 Results; Narrows Full-Year EPS and Cash Guidance Corporate Communications Department NEWS Release Textron Reports Third Quarter 2018 Results; Narrows Full-Year EPS and Cash Guidance $468 million returned to shareholders through share repurchases Completed

More information

TRACY SEWARD CPA DECEMBER 2015 PAGE 1

TRACY SEWARD CPA DECEMBER 2015 PAGE 1 TRACY SEWARD CPA Tracy Seward has over 20 years of financial accounting experience obtained through a diverse range of industry and senior management experience. He is a team leader devoted to creating

More information

Infrastructure services for private sector development (P) Project

Infrastructure services for private sector development (P) Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document () Report No: 30298 Project Name CROATIA - Croatia

More information

Thai. - Master of. None. None 3 companies. None. - Specialist. Nationality. Business Law

Thai. - Master of. None. None 3 companies. None. - Specialist. Nationality. Business Law Independent Director to be Newly Elected Mr. Paisan Mahapunnaporn Age Nationality Educational Background Director s Certificates Proposed Position Current Positionss in Other Organization Listed Companies

More information

1Q 2016 Results. Mermaid Maritime Plc. May 23, 2016

1Q 2016 Results. Mermaid Maritime Plc. May 23, 2016 Mermaid Maritime Plc 1Q 2016 Results May 23, 2016 Disclaimer: The information contained in this document is intended only for use during the presentation and should not be disseminated or distributed to

More information

National Innovation System of Mongolia

National Innovation System of Mongolia National Innovation System of Mongolia Academician Enkhtuvshin B. Mongolians are people with rich tradition of knowledge. When the Great Mongolian Empire was established in the heart of Asia, Chinggis

More information

HOA PHAT GROUP 2009 ANNUAL REPORT Annual report

HOA PHAT GROUP 2009 ANNUAL REPORT Annual report HOA PHAT GROUP 2009 ANNUAL REPORT 1 2 HOA PHAT GROUP NEW STRATEGY, NEW STATURE 2009 AnnuAl report 3 COMPANY PROFILE Trading name in Vietnamese: Cong ty Co Phan Tap Doan Hoa Phat Trading name in English:

More information

Oxfam SME Development Program. Hanoi, March 2016

Oxfam SME Development Program. Hanoi, March 2016 Oxfam SME Development Program Hanoi, March 2016 Who is Oxfam? Oxfam confederation was formed in 1995 There are 17 affiliates operating in 94 countries: America, Belgium, Canada, France, Germany, England,

More information

THE ESTABLISHMENT CENSUS IN VIET NAM

THE ESTABLISHMENT CENSUS IN VIET NAM THE ESTABLISHMENT CENSUS IN VIET NAM The 1 st Establishment Census was nation-wide conducted in Viet Nam in 1995, the 2 nd Census was in 2002 and the 3 rd Census was in 2007. This Census aims to collect

More information

The Enlightenment of Israeli Innovation-driven Experience to the Economic Development of Suzhou

The Enlightenment of Israeli Innovation-driven Experience to the Economic Development of Suzhou 2018 5th International Conference on Business, Economics and Management (BUSEM 2018) The Enlightenment of Israeli Innovation-driven Experience to the Economic Development of Suzhou Bin Chen Suzhou Vocational

More information

Amsterdam. allenovery.com

Amsterdam. allenovery.com Amsterdam 2 Allen & Overy Amsterdam Companies today have to be able to respond to global trends while still building on strong, local foundations. As a truly global firm, with strong attachment to our

More information

Research on Venture Capital Exit for Science and Technology Innovation Enterprise Ding Wenhui Guangdong University of Science and Technology

Research on Venture Capital Exit for Science and Technology Innovation Enterprise Ding Wenhui Guangdong University of Science and Technology 5th International Conference on Social Science, Education and Humanities Research (SSEHR 2016) Research on Venture Capital Exit for Science and Technology Innovation Enterprise Ding Wenhui Guangdong University

More information

The Future of Growth and the Energy Industry

The Future of Growth and the Energy Industry The Future of Growth and the Energy Industry July 20, 2017 Grant Thornton LLP. All rights reserved. 1 Our Speakers Steve Toon Editor in Chief Oil and Gas Investor Kevin Schroeder National Managing Partner,

More information

Speech by Lars Renström, President and CEO AGM Ladies and gentlemen, shareholders and co-workers,

Speech by Lars Renström, President and CEO AGM Ladies and gentlemen, shareholders and co-workers, AGM 2015 Ladies and gentlemen, shareholders and co-workers, A good year for oil, gas and marine 2014 began with an optimistic view of the global economy, although this optimism successively waned as the

More information

Operational Intelligence to deliver Smart Solutions

Operational Intelligence to deliver Smart Solutions Operational Intelligence to deliver Smart Solutions Presented by John de Koning Shell Global Solutions DEFINITIONS AND CAUTIONARY NOTE Reserves: Our use of the term reserves in this presentation means

More information

ONG CONSULTANTS PROFILE

ONG CONSULTANTS PROFILE ONG CONSULTANTS PROFILE 01 INTRODUCTION 02 ABOUT US 03 MANAGING DIRECTOR Message 04 COO Message 05 MISSION & VISION 06 ASSOCIATED COMPANIES AND PARTNERS 07 SERVICES CEO Message INTRODUCTION Despite the

More information

Measures for the Administration of Securities Investment within the Borders of China by Qualified Foreign Institutional Investors

Measures for the Administration of Securities Investment within the Borders of China by Qualified Foreign Institutional Investors Measures for the Administration of Securities Investment within the Borders of China by Qualified Foreign Institutional Investors Promulgation date: 08-24-2006 Department: China Securities Regulatory Commission,

More information

SMART CITY VNPT s APPROACH & EXPERIENCE. VNPT Group

SMART CITY VNPT s APPROACH & EXPERIENCE. VNPT Group SMART CITY VNPT s APPROACH & EXPERIENCE VNPT Group Thanh Hoa, 5 th July 2018 1 SmartCity AGENDA 1 Technology context for Smart City 2 VNPT s Approach for Smart City 3 VNPT s Experience in Smart City Development

More information

Research of Tender Control Price in Oil and Gas Drilling Engineering Based on the Perspective of Two-Part Tariff

Research of Tender Control Price in Oil and Gas Drilling Engineering Based on the Perspective of Two-Part Tariff 4th International Education, Economics, Social Science, Arts, Sports and Management Engineering Conference (IEESASM 06) Research of Tender Control Price in Oil and Gas Drilling Engineering Based on the

More information

FREQUENTLY ASKED QUESTIONS ABOUT TEMASEK. 1. Why was Temasek established?

FREQUENTLY ASKED QUESTIONS ABOUT TEMASEK. 1. Why was Temasek established? FREQUENTLY ASKED QUESTIONS ABOUT TEMASEK 1. Why was Temasek established? Temasek was incorporated under the Singapore Companies Act in 1974 to hold and manage investments and assets previously held by

More information

Eastern Seaboard Development Program

Eastern Seaboard Development Program IV JICA/OECF Joint Evaluation Thailand Eastern Seaboard Development Program Project Sites Laemchabang 1. Background and Objectives of Evaluation Survey Through the Japan International Cooperation Agency

More information

MISSION, GOALS AND STRATEGY OF THE INNOVATION OFFICE OF ODESSA I.I.MECHNIKOV NATIONAL UNIVERSITY

MISSION, GOALS AND STRATEGY OF THE INNOVATION OFFICE OF ODESSA I.I.MECHNIKOV NATIONAL UNIVERSITY MISSION, GOALS AND STRATEGY OF THE INNOVATION OFFICE OF ODESSA I.I.MECHNIKOV NATIONAL UNIVERSITY Innovation office is a structural subdivision of the Odessa I.I.Mechnikov National University (here and

More information

Accenture plc (Exact name of registrant as specified in its charter)

Accenture plc (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, DC 20549 Form 8-K CURRENT REPORT Pursuant to Section 13 OR 15(d) of the Securities Exchange Act of 1934 Date of Report (Date of earliest event

More information

Tel: Mobile:

Tel: Mobile: John Scutt Biography Tel: 02 8407 9372 Mobile: 0401 767 639 Email: john@lindfieldpartners.com.au John is Managing Director of The Lindfield Partners Pty Ltd trading as Essential Management Services (Lindfield

More information

THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT BELARUS

THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT BELARUS THE INTERNATIONAL COMPETITIVENESS OF ECONOMIES IN TRANSITION THE UNTAPPED POTENTIAL: A CHALLENGE FOR BUSINESS AND GOVERNMENT BELARUS NATIONAL COMPETITIVENESS ISSUES, CONSTRAINTS AND STRATEGIC IMPLICATIONS

More information

Choosing the Right Partner for Global Expansion. Oded Shenkar & Lou Longo

Choosing the Right Partner for Global Expansion. Oded Shenkar & Lou Longo Choosing the Right Partner for Global Expansion Oded Shenkar & Lou Longo Oded Shenkar, Ford Motor Company Chair in Global Business Management Biography Oded Shenkar is currently the Ford Motor Company

More information

S. ANDREW MCINTOSH EDUCATION TECHNICAL EXPERIENCE

S. ANDREW MCINTOSH EDUCATION TECHNICAL EXPERIENCE S. ANDREW MCINTOSH Mr. S. Andrew McIntosh is a Senior Principal with Long International and has over 40 years of engineering, construction, onshore and offshore oil & gas operations and management consulting

More information

8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES. March 9, 2010 William T. Welch

8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES. March 9, 2010 William T. Welch 8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES March 9, 2010 William T. Welch THE AUDIENCE How many individuals here represent companies that are now or have been in the 8(a) program? How many

More information

WINDSOR FAMILY CREDIT UNION (WFCU) PRESIDENT AND CEO, MARTIN J. KOMSA APPOINTED TO LASALLE POLICE SERVICES BOARD

WINDSOR FAMILY CREDIT UNION (WFCU) PRESIDENT AND CEO, MARTIN J. KOMSA APPOINTED TO LASALLE POLICE SERVICES BOARD News Release May 1, 2014 Corporate Office 3000 Marentette Avenue Windsor, ON N8X 4G2 p. 519.974.3100 f. 519.974.9098 For Release WINDSOR FAMILY CREDIT UNION (WFCU) PRESIDENT AND CEO, MARTIN J. KOMSA APPOINTED

More information

Commission on science and Technology for Development. Ninth Session Geneva, May2006

Commission on science and Technology for Development. Ninth Session Geneva, May2006 Commission on science and Technology for Development Ninth Session Geneva, 15-19 May2006 Policies and Strategies of the Slovak Republic in Science, Technology and Innovation by Mr. Stefan Moravek Head

More information

In the quarter, Textron returned $344 million to shareholders through share repurchases, compared to $186 million in the first quarter of 2017.

In the quarter, Textron returned $344 million to shareholders through share repurchases, compared to $186 million in the first quarter of 2017. Corporate Communications Department NEWS Release Textron Reports First Quarter 2018 Income from Continuing Operations of $0.72 per Share; Signs Agreement to Sell Tools & Test Business for $810 Million

More information

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame Regulatory Reforms in Mexico Energy Production and Environmental Protection A Technical Regulator for a New Market Frame February 12th, 2014 CONTENT Legal Framework Strategic Design Regulatory Policy Gradual

More information

maintaining our leadership in a changing market Refining: Markets

maintaining our leadership in a changing market Refining: Markets Refining: maintaining our leadership in a changing market Technip is a long-standing leader in refining. Our position on this market is based on vast and successful experience in the design and construction

More information

UTILIZING COMPREHENSIVE ADVANTAGES TO EXPAND PPP AND INFRASTRUCTURE FINANCING IN ASIA PACIFIC

UTILIZING COMPREHENSIVE ADVANTAGES TO EXPAND PPP AND INFRASTRUCTURE FINANCING IN ASIA PACIFIC UTILIZING COMPREHENSIVE ADVANTAGES TO EXPAND PPP AND INFRASTRUCTURE FINANCING IN ASIA PACIFIC GUIYANG, CHINA 12 TH SEPT,2018 CITIC S Unique Advantage in PPP Business Products and services Industrial chain

More information

CAPETANO OIL LIMITED (+233) (+233)

CAPETANO OIL LIMITED (+233) (+233) 1 CAPETANO OIL LIMITED (+233) 202 027 485 (+233) 209 985 175 www.capetano.com info@capetano.com C90/24 Osu Badu Street, Airport Residential Area, Accra Ghana. 2017 Capetano Oil Limited. All rights reserved.

More information

Feature. Accelerate Business Development Contributing to Further Enhance Ophthalmic Treatment in Asia. 2020, our goal is to become #1 in

Feature. Accelerate Business Development Contributing to Further Enhance Ophthalmic Treatment in Asia. 2020, our goal is to become #1 in Feature Accelerate Business Development Contributing to Further Enhance Ophthalmic Treatment in Asia Based on our long-term strategic vision toward 2020, our goal is to become #1 in Asia in terms of our

More information

BARAN GROUP IS A LEADING GLOBAL ENGINEERING & CONSTRUCTION COMPANY THAT DELIVERS LARGE PROJECTS FOR A WIDE RANGE OF CLIENTS AROUND THE WORLD

BARAN GROUP IS A LEADING GLOBAL ENGINEERING & CONSTRUCTION COMPANY THAT DELIVERS LARGE PROJECTS FOR A WIDE RANGE OF CLIENTS AROUND THE WORLD BARAN GROUP IS A LEADING GLOBAL ENGINEERING & CONSTRUCTION COMPANY THAT DELIVERS LARGE PROJECTS FOR A WIDE RANGE OF CLIENTS AROUND THE WORLD barangroup.com FOUNDED AND CENTERED IN ISRAEL, BARAN S NAME

More information

ASCENDAS-SINGBRIDGE AND SEMBCORP FORMALISE AGREEMENTS TO DEVELOP AMARAVATI CAPITAL CITY IN INDIA

ASCENDAS-SINGBRIDGE AND SEMBCORP FORMALISE AGREEMENTS TO DEVELOP AMARAVATI CAPITAL CITY IN INDIA PRESS RELEASE For Immediate Release ASCENDAS-SINGBRIDGE AND SEMBCORP FORMALISE AGREEMENTS TO DEVELOP AMARAVATI CAPITAL CITY IN INDIA Vijayawada, India, 7 June 2018 Asia s leading sustainable urban development

More information

RESTRUCTURING TECHNOLOGICAL INNOVATION ACTIVITIES IN VIETNAM

RESTRUCTURING TECHNOLOGICAL INNOVATION ACTIVITIES IN VIETNAM MINISTRY OF PLANNING AND INVESTMENT RESTRUCTURING TECHNOLOGICAL INNOVATION ACTIVITIES IN VIETNAM (Sub-component of the Project Restructuring the economy ) (First Draft) Ms. Vu Xuan Nguyet Hong Mr. Hoang

More information

2Q 2016 Results. Mermaid Maritime Plc. August 2016

2Q 2016 Results. Mermaid Maritime Plc. August 2016 Mermaid Maritime Plc 2Q 2016 Results August 2016 Disclaimer: The information contained in this document is intended only for use during the presentation and should not be disseminated or distributed to

More information

arbitration commercial disputes corporate Get The Right Lawyer For The Right Advice From Prominent Indonesian Law Firm

arbitration commercial disputes corporate Get The Right Lawyer For The Right Advice From Prominent Indonesian Law Firm arbitration commercial disputes corporate Get The Right Lawyer For The Right Advice From Prominent Indonesian Law Firm Success Stories A Few of Our Spring Success Stories ARBITRATION We represented an

More information

Career Education Corporation Bear Stearns 2007 SMid-Cap Investor Conference

Career Education Corporation Bear Stearns 2007 SMid-Cap Investor Conference Career Education Corporation Bear Stearns 2007 SMid-Cap Investor Conference November 13, 2007 Safe Harbor This presentation contains certain forward-looking statements, as defined in Section 21E of the

More information

FOR RELEASE MAY 19, 2016

FOR RELEASE MAY 19, 2016 FOR RELEASE MAY 19, 2016 TRAYLOR BROS. TO ACQUIRE FIFTY PERCENT OWNERSHIP OF STERLING BOILER & MECHANICAL INC., A&D CONTRACTORS INC., AND ONYETT FABRICATORS (EVANSVILLE, IN, May 19, 2016) Traylor Bros.,

More information