1 SECTION PRECAST CULVERT STEAM TUNNEL -, PART I - GENERAL LI STIPULATIONS - A. The Specification Sections "General Conditions of Contract", "Special Conditions" and "Division 01 - General Requirements" form a part of this Section by this reference thereto, and shall have the same force and effect as if printed herewith in ff DESCRIPTION OF WORK A. The Contractor shall famish all labor, equipment and appurtenancei, and materials necessary for the installation of precast box culvert steam tunnels and manholes in accordance with the Contract Specifications and Drawings, PemIDOT Specifications, or as directed by the Using Agency's Representative. 1.3 RELATED SECTIONS A. Section Site Concrete Reinforcement B. Section Cast-in-Place Concrete, C. Section Aggregates for Earthwork D, Section Trenching 1.4 SUBMIUALS A. Comply with the contract provisions for submittals. B. Certificates 1. Submit materials certificates for material covered by this section and shop drawings as specified signed by material supplier and Contractor, certiing that materials comply ;'ith, or exceed, the requirements of this Section. C. Shop Drawings I. The drawings for precast concrete units shall be furnished by the precast concrete producer for approval. These drawings shall show the design loads and standards have been met. Installation and construction information shall be included on shop drawings upon request. Details of steel reinforcing size and placement shall be submitted. Shop drawings shall be stamped and sealed by a professional engineer. 2. For custom made precast concrete units, in addition to the requirements in B.l, the drawing for submittal shall show locations and dimensions to all penetrations and special embed items. Product dimensions and thicknesses shall be shown, and the drawing shall be to a common architectural scale with the precast producer's information in the title block. D. Precast Concrete Unit Data 1. Anchorage, Lifting Inserts and Devices i, For anchors, lifting inserts and other devices, the precast concrete producer shall provide product data sheets and proper installation instructions upon request. 2.. Accessory Items i. For items including, but not limited to sealants, gaskets, steam tunnel unit pipe entry connectors, steps, racks, and other items installed before or after delivery, the precast concrete producer shall include proper installation instructions and relevant product data DGS Phase 1.1 PRECAST CULVERT STEAM TUNNEL

2 F. Design Data upon request. The precast concrete producer shall supply submittals showing design loading and material specifications for supplied products. At a minimum, the following shall be shown on the submittals: i. Live load used in design ii. iii. iv. Vertical and lateral earth loads used in design Depth of soil fill on the sthicture Water table depth used in calculations 2. Upon request, the precast concrete producer shall supply precast concrete unit design calculations and concrete mix design proportions and appropriate mix design test data. Structural design calculations shall be sealed by a licensed Engineer. F. Submit results for the tests performed on the box culvert and manholes 1.5 REFERENCES A. AASHTO LRFD Bridge Design Specifications, Latest Edition B. AASHTO M55 - Standard Specification for Steel Welded Wire Fabric Plain for Concrete Reinforcement C. AASHTO Ml 98 Standard Specification for Joints for Concrete Pipe. Martholes. and Precast Box Sections Using Preformed Flexible Joint Sealants D. AASHTO M221 - Standard Specification for Steel Welded Wire Reinforceicient, Deformed, for - Concrete E. AASHTO M259 - Standard Specification for Precast Reinforced Concrete Box Sections for Culverts. Storm Drains, and Sewers F. AAS1-ITO M Standard Specification for Precast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers with Less Than 2 ft of Cover Subjected to Highway Loadings G. ACI 305 R - Hot Weather Ccincreting H. ACI 306 R Cold Weather Concreting I. ACT Building Code Requirements for Structural Concrete 3. ACPA - Concrete Pipe Handbook K. ACPA - Design Manual L. ASTM A185 Standard Specification for Steel Welded Wire Reinforcement. Plain. for Concrete M. ASTM A497 - Standard Specification for Steel Welded Wire Reinforcement, Deformed, for Concrete N. ASTM A615 - Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement 0. ASTM A706 - Standard Specification for Deformed and Plain Low-Alloy Steel Bars for Concrete Reinforcement.-.- DGS Phase 1.1 PRECAST CULVERT STEAM TUNNEL

3 -a W -. P. ASTM C923 - Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes, and Laterals Q. ASTM C Standard Specification for Precast Reinforced Concrete Monolithic Box Sections for Culverts, Storm Drains, and Sewers Designed According to AASHTO LRFD R. ASTM D698 - Test Methods for Moisture - Density Re]ations of Soils and Soil - Aggregate Mixtures, Using 5.5 lb (2.49 kg) Rammer and 12 inch (304.8 mm) Drop S. ASTM Dl056 - Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber T. ASTM D30l 7-Test Methods for Moisture Content of Soil and Soil - Aggregate Mixtures U. Pennsylvania Department of Transportation (PermDOT) Publication 15 Design Manual, Part 4, latest edition and subsequent supplements and addendums. V. PennDOT Publication 34 Bulletin 14, Aggregate Producers, latest edition W. PennDOT Publication 35 - Bulletin 15, Approved Construction Materials, latest edition X. PennsDOT Publication 72M - Standards for Roadway Construction, latest edition and subsequent supplements and addendums. Y. PennDOT Publication 21 SM - Standards for Bridge Design, BD-600M Series, latest edition and subsequent supplements and addendums. Z. PennDOT Publication Construction Specifications, latest edition and subsequent supplements and addendums. 1.6 REGULATORY REQUIREMENTS A. The specifications indicated are the minimum requirements to be applied to the Work. In instances where Federal, State. and Local codes and/or ordinances conflict with these specifications, the more stringent requirement shall apply. PART 2 PRODUCTS 2.1 MATERIALS A. Precast concrete steam tunnel and manhole unit bedding, unless otherwise indicated, shall be AASHTO No.57 Aggregate. I. Aggregate supplier shall be listed in PennDOT Bulletin 14 B. Precast concrete steam tunnel and manhole units shall be of size and type indicated on the drawings. Precast steam tunnel units must conform to PennDOT Publication 21 SM, BD 632M and Publication 408, Section Precast steam tunnel manholes must conform to PennDOT Publication 72M. RC-39M and RC-46M; Publication 408, Section 605. I. Precast concrete steam tunnel and manhole units and components shall be supplied by a manufacturer approved under PennDOT Bulletin Concrete and masonry materials for construction of precast concrete steam tunnel and manhole units shall conform to Section Cast-in-Place Concrete and PennDOT Standard Specifications and Standard Details. a. Precast steam tunnel and manhole units and components shall be manufactured of PennDOT Class AA concrete (design 28-day minimum compressive strength 5000 psi). DOS Phase 1.] PRECAST CULVERT STEAN TUNNEL

4 3. Flexible sealing compound shall be packaged in extruded preformed shape, sized to completely fill the joint between precast sections, and form permanently flexible watertight seal. The sealing compound shall be non-shrink and meet AASHTO M198B. 4. Iron castings for manholes shall conform to ASTM A48, Class 30. a. Bearing surfaces between cast iron frames and covers shall be machined, fitted together and match marked to prevent rocking. System identi'ing letter 2" high shall be stamped or cast into all covers so that they may be plainly visible. 5. Manhole steps shall conform to the PennDOT Standard Specifications and Standard Details. 6. Reinforcing shall conform to the Construction Drawings, PennDOT Standard Specifications and Standard Details, and Section Site Concrete Reinforcement. C. Resilient Connectors: Flexible, watertight connectors used for pipe/conduit penetrations at precast concrete steam tunnel and manholes shall conform to ASTM C923. D. Waterproofing: Flexible adhesive-backed preformed membrane sheets shall comply with PennDOT Publication 408 Section a or b and Publication 21 SM, BD-632M. 1. Waterproofing material shall be desighèd for buried concrete or masonry construction. 2.2 MANUFACTURE A. Forms 1. Forms for manufacturing precast concrete units shall be of the type and design consistent with industry standards and practices. They should be-capable of consistently providing uniform products and dimensions. Forms shall be constructed so that the forces and vibrations to which the forms will be subjected cause no damage to the precast concrete unit Fdrths shall be cleaned of eoncrete build-up after each use. 3. Form release agents shall be applied according to the manufacturer's recommendations and shall not be allowed to build up on the form casting surface. B. Reinforcement 1. Reinforcement shall comply with PennDOT Publications 72M, 218M. and 408. C. Embedded Items 1. Embedded items shall be positioned at locations specified in the design documents. Inserts and other embeds shall be held rigidly in place so that they do not move significantly during casting operations. D. Concrete 1. Concrete Mixing a. Mixing operations shall produce batch-to-batch uniformity of strength, consistency and app Sran cc b. Batching weight and volume measurement devices shall be annually calibrated by an independent testing laboratory or more frequently if batching irregularities or concrete inconsistencies are observed 2. Concrete placing a. Concrete shall be placed in a manner in which it flows and consolidates without segregation or air entrapment. The freefall of concrete shall be kept to a minimum. DGS Phase 1.1 PRECAST CUL\'ERT STEAM TUNNEL

5 b. Cold Weather Concreting Recommendations for cold weather concreting are given in detail in AC! 306 R. Adequate equipment shall be provided for heating concrete materials and protecting concrete during freezing or near-freezing temperatures. All concrete materials, reinforcement, and forms shall be free from frost. In cold weather, the temperature of the concrete at the time of placement shall not be below 45 degrees F. Concrete that freezes before it reaches a compressive strength of 500 psi shall be discarded. c. Hot Weather Concreting i. Recommendations for hot weather concreting are given in detail in ACI 305 R. During hot weather excessive concrete temperatures and water evaporation shall be minimized. The temperature of concrete at the time of placing shall not exceed 95 degrees F. 3. Concrete Curing a. Curing operations shall commence immediately following the initial set of the concrete and completion of surface finishing. b. Curing by moisture retention i. Precast products shall be protected from drafts and wind to prevent plastic shrinkage cracking. ii. Moisture shall be prevented from excessively evaporating from exposed surfaces until adequate strength for stripping the precast concrete unit from the form is reached. - c. Curing with Heat and Moisture i. Concrete shall not be subjected to steam or hot air until after the concrete has attained its initial set. If hot air is used, precautions shall be taken to prevent moisture lass from the concrete. The temperature of the concrete shall not be permitted to exceed ISO degrees F. The temperature gain shall not exceed 40 degrees F per hour. 4. Surface Finish a. The surface finish shall be as specified on the contract documents and/or approved shop drawings. Provide non-slip texture finish on floor. 5. Stripping Precast Concrete Units from Forms a. Precast concrete units shall not be removed from the forms until the concrete reaches the compressive strength for stripping required by design. Stripping strengths shall be routinely measured to ensure product has attained sufficient strength for safe handling. 6. Patching and Repair a. Repairing Minor Defects i. Defects that will not impair the functional use or expected life of the precast concrete unit may be repaired by any method that does not impair the product b. Repairing Honeycombed Areas i.. When honeycombed areas are to be repaired, all loose material shall be removed and the areas cut back into essentially horizontal or vertical planes to a depth at which coarse aggregate particles break under chipping rather than being dislodged. DGS Phase 1.1 PRECAST CULVERT STEAM TUNNEL

6 Proprietary repair materials shall be used in accordance with the manufacturer's instructions. Otherwise, the area shall be saturated with water. Immediately prior to repair, the area should be damp, but free of excess water. A cement-sand grout or an approved bonding agent shall be applied to the chipped surfaces, followed immediately by consolidating an appropriate repair material into the cavity. c, Repairing Major Defects Defects in precast concrete products which impair the functional use or the expected life of products shall be evaluated by qualified personnel to determine if repairs are feasible and, if so, to establish the repair procedure. 7. Shipping Precast Concrete Units a. Precast concrete units shall not be shipped until they have reached at least 70% of their specified 28-day design strength, unless damage will not result, impairing the performance of the product. 2.3 PRODUCT DELIVERY, STORAGE, AND HANDLJNG A. Pre-Cast Concrete Units: 1. Transport units to the site after fabrication and curing. Protect until required for installation. 2. Handle to avoid damage to surfaces, edges and corners to avoid creation of stresses within the units. Remove damaged materials from the job site. B. Delivery and Handling: 1. Do not place materials on private property without written permission of the property owner. 2. Precast concrete units shall be delivered to the site in accordance with the delivery schedule. Upon delivery to the jobsite, all precast concrete units shall be inspected by the customer's agent for quality and final acceptahce: 3. Precast concrete units shall be handled and transported in a manner to minimize damage. Lifting devices or holes shall be consistent with industry standards. Lifting shall be accomplished with methods or devices intended for this purpose as indicated on the shop drawings. Upon request, the precast concrete producer shall provide documentation on acceptable handling methods for the product. 4. Proper implements, tools and facilities shall be provided and used for unloading and distributing materials along the line of the work. Unload and store precast units with minimum handling. Precast units and accessories shall be handled so as to insure delivery to the installed location in sound undamaeed condition. Precast units shall be carried into position and not dragged. Any precast unit or accessory damaged in transportation or handling shall be rejected and immediately removed from the job site. C. Storage: I. Precast concrete units shall be stored in a manner that will minimize potential damage. 2. Materials shall be kept safe from damage. Store materials on site in enclosures or under protective covering as per manufacturer's recommendations. Do not store materials directly on the ground The interior of all steam tunnel unit, fittings, and other appurtenances shall be kept free from dirt or foreign mater at all times..- DGS Phase Li PRECAST CUL\'ERT STEAM TUNNEL

7 4. The Contractor shall be responsible for the safe storage of all material intended for the work. The Contractor shall take all necessary precautions to prevent damage to materials, equipment and work. 5. Rubber gaskets, gasket lubricants and other appurtenances shall be protected from excessive exposure to heat, direct sunlight, ozone (from electric motors and equipment), oil, grease, or other contaminants. Gaskets shall be stored in a cool location, out of direct sunlight. Gaskets shall not come in contact with petroleum products. Gaskets shall be used on a firstin, first-out basis. Rubber gaskets that are not to be installed immediately shall be stored in a cool and dark place. 2.4 QUAlITY ASSURANCE A. The manufacturer of any precast concrete steam tunnel and manhole unit; shall upon the request of the Professional, Contractor, or Using Agency, furnish certified evidence that all material tests and inspections have been performed and that the product has been manufactured in compliance with the applicable specifications. PART 3 EXECUTION 3.1 EXAMINATION A. VerifSi existing site conditions. Veri' that trenching and drainage structures in the area of the storm drainage system installation have been completed to the finished sub-arade elevations. Report any discrepancies to the Professional. I. Any discrepancies discovered must be resolved to the satisfaction of the Professional prior to beginning storm draining system installation. B. Veri' that all bench marks and elevation reference data are in place. 3.2 JOB CONDITIONS A. The Contractor shall provide the services of a competent Civil Engineer or Land Surveyor to establish all lines, levels, grades, bench marks and measurements required to complete the Work. At no cost to the Using Agency, the Contractor shall be responsible to resolve any discrepancies which may arise due to errors resulting from said services, as provided by the Contractor's consultant. 3.3 INSTALLATION A. Install precast concrete steam tunnel units at locations and details indicated on the drawings. I. Normally, the width of the trench shall be forty-eight (48) inches plus the outside wal] to outside wall width of the precast concrete steam tunnel. The trench width shall permit the tunnel units to be laid and joined properly and to allow the bacifll to be placed in accordance with the specifications. When required, trenches shall be wider to permit the placement of timber supports, sheeting, bracing, and appurtenances as required by the safety requirements of the agency having jurisdiction. 2. When trench has been excavated to required depth, the bottom shall be tested to determine its suitability for tunnel support. The french shall be approved by the Professional/inspector and modified as directed if required. a. Remove any loose earth, trash or debris. Hand trim bottom elevation for accurate installation of steam tunnel unit. DGS Phase 1.1 PRECAST CULVERT STEAM TUNNEL

8 b. Where bottom of trench cannot be made suitable to support the tunnel unit, provide concrete cradles. Deposit concrete the full width of trench, 8" deep minimum, to bottom of tunnel. Reinforce continuous])' with two (2) No. 4 reinforcing bars. Before concrete is set, embed tunnel unit evenly, deposit remainder of concrete to three (3) feet above bottom of turmel unit and tamp in a manner to avoid disturbing tunnel. 3. Place twelve (12) inches of PennDOT No. 2A aggregate for bedding. Place materials in 4 inch loose lifts with mechanical tamper or 8 inch loose lifts if vibratory compaction is used. Compact each layer to not less than 97% of the dry weight density of the material, as determined in accordance with the Standard Proctor method (ASTh4 D 698). Form the bedding material to provide uniform contact under and around the tunnel unit. After the tunnel unit is satisfactorily laid, backfill the trench with PennDOT No. 2A in 4 inch loose lifts to the recommended by the precast concrete tunnel manufacturer (12" minimum). Thoroughly compact each layer of backfill with mechanical tampers, or by other acceptable methods for the full trench width. Compact to not less thani 00% of the dry weight density of the material, as determined in accordance with the Standard Proctor method (ASTM D 698). Tunnel units that are damaged or moved out of alignment shall be replaced and/or re-aligned by the Contractor at his expense. 4. Lay tunnel units to slope grade as shown on the drawings. Grade by measuring with rod from overhead grade line or centerline batter boards. 5. Fit tunnel unit ends together per manufacturer's recommendations and seal joints water tight. 6. As tunnel unit laying progresses, clear interior of dirt or other superfluous materials. During work stoppage periods provide effective plugs or covers for open ends of ttiimel units to prevent foreign matter from entering. a. Clean joint contact surfaces immediately prior to jointing. Use lubricants, primers or adhesives as recommended by joint manufacturer. 7. Each section of tunnel unit shall be inspected before being lowered into the trench. Defective, damaged or unsound tunnel units shall be rejected and removed from the site 8. Connect tunnel units to manholes per manufacturer's recommendations. Provide lean concrete support for tunnel units at manholes as required. Provide minor adjustments in openings as required to provide proper fit and maintain slope of tunnel. 9. Trench excavations shall not be backfilled until all test and inspections covering the installation of the steam tunnel system have been performed and approved. 10. Backfill shall be as described in the Drawings and Section Trenching of these Specifications. II. Install flexible adhesive-backed preformed waterproofing membrane sheets per PennDOT Publication 408 Section 680 and manufacturer's recommendation with the exception that the membrane must be installed on entire exterior side walls and roof of steam tunnel units. B. Install precast concrete steam manholes to locations, elevations, sizes, and types indicated on the Construction Drawings. I. Precast concrete steam manhole components shall be installed true and plumb. Thejoints between components shall be sealed with a pre-form flexible gasket material specifically manufactured for this type of application and shall be watertight. - DGS Phase 1.1 PRECAST CULVERT STEAM TUNNEL

9 1 Adjust riser, if applicable, with a maximum of two concrete grade rings so that the top section is at the required elevation. Cutting the top section is not acceptable. 3. Set cast iron frames and covers in full bed of stiff mortar or bituminous masticjointing compound at final e]evations so as to pmvent rocking. a. Install cover flush with sidewalk, if applicable. b. In unpaved areas, the rim elevation shall be 2 inches above the adjacent finish grade or as directed by the Using Agency's Representative. 4. The wall that supports access rungs or ladder shall be 90 degrees vertical from the floor of structure to manhole cover. 5. Chamfer exposed edges (¼." x /2"), except as noted. 6. Precast concrete steam manholes shall be installed on a bedding of 12" PennDOT No. 2A. 7. Install flexible adhesive-backed preformed waterproofing membrane sheets per PennDOT Publication 408 Section 680 and manufacturer's recommendation with the exception that the membrane must be installed on entire exterior side walls and roofs of steam manholes. 3.4 TOLERANCES A. Precast steam tunnel units shall be installed to the slope gradient shown on the drawings with a maximum variation of 1/8" (0.1 25") in ten feet (I 0_0t1). 3.5 FIELD QUALITY CONTROL A. Afterjoints have been inspected and approved, tunnel trench shall be filled with bedding material to a I' minimum above top of tunnel or as directed by tunnel unit manufacturer. Before remainder of trench is backfilled, the tunnel shall be checked for displacement and alignment. I. All inspections shall be conducted under the supervision of the Professional, and all governmental agencies having jurisdiction and evidence of compliance shall be forwarded to Using Agency's Representative prior to acceptance. B. Steam Tunnel bedding, backfilling and compaction operations shall be observed by the inspector or Using Agency's Representative. Field density and moisture tests shall be performed by the Contractor's Agent. 1. The Contractor shall re-compact, over-excavate, backfill, moisture control or otherwise modi& in place any material that does not meet compaction tests to the satisfaction ofthe Professional, Inspector, or Using Agency's Representative. C. Final field elevations shall be verified and documented. 3.6 RESTORATION damage done by the contractor to existing pipe lines, underground structures, utilities, etc., shall be fepaired by him at his expense in a manner acceptable to the owner of the damaged property. The contractor shall report any existing damage to the Professional prior to beginning the Work. B. The contractor shall restore an)' pavement or public right-of-way that is disturbed by the Work to equivalent or better than original condition. C. At completion of work, remove all waste materials and debris resulting from operations and leave everything in a complete and satisfactoiy condition as approved by the Professional. END OF SECTJON DGS Phase 1.1 PRECAST CULVERT STEAM TUNNEL

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES SECTION 02545 PRECAST CONCRETE SECTIONAL MANHOLES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Precast reinforced concrete cylindrical sectional manholes, complete with openings, inserts, hardware,

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS SECTION 39 - MANHOLES TABLE OF CONTENTS Section Page 39-1 GENERAL... 39.1 39-2 PRECAST CONCRETE MANHOLES... 39.1 39-2.01 Precast Concrete Sewer Manholes... 39.1 39-2.02 Precast Concrete Storm Drain Manholes...

More information

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 StormTrap Guide Specification StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17 This product guide specification is written according to the Construction Specifications

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 33 05 13 MANHOLES PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish and install precast concrete manhole base, sections, adjusting rings, steps, and manhole ring and cover, complete.

More information

1. Architectural precast concrete cladding units.

1. Architectural precast concrete cladding units. SECTION 034500 - PRECAST ARCHITECTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Architectural precast concrete cladding units. 1.2 DEFINITION A. Design Reference

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes MANHOLES PART I: GENERAL A. Precast Concrete Manholes 1) Manholes shall be made of precast concrete sections of which the top section shall be eccentric or flat slab top. The bottom section shall be a

More information

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 StormTrap Guide Specification StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18 This product guide specification is written according to the Construction Specifications Institute

More information

SECTION MANHOLES

SECTION MANHOLES SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard

More information

SECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials.

SECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials. SECTION 02082 PUBLIC UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Modular precast concrete manholes with tongue-and-groove joints, transition to cover frame, covers,

More information

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1 Page 1 of 6 ADDENDUM #1 PART 1 GENERAL 1.01 PRINCIPAL WORK IN THIS SECTION A. The requirements of the Owner's General Conditions, Supplementary Conditions, Special Conditions, and Division 1 - General

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

14 March 2016 City Hall Station Renovations Bid Documents 15 th Street Station Phase Station Improvements SECTION PRECAST CONCRETE

14 March 2016 City Hall Station Renovations Bid Documents 15 th Street Station Phase Station Improvements SECTION PRECAST CONCRETE SECTION 03400 PRECAST CONCRETE PART 1 GENERAL 1.01 DESCRIPTION A. The work specified in this Section consists of designing, furnishing and installing precast concrete components. 1.02 RELATED SECTIONS

More information

SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT

SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 1085.2(k) SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 DESCRIPTION This work is the manufacture, storage, delivery, installation, and assembly of precast reinforced concrete box culvert

More information

SECTION ARCHITECTURAL PRECAST CONCRETE

SECTION ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Column covers. 1.2 SUBMITTALS A. Design Mixtures: For each precast concrete mixture. Include compressive strength and waterabsorption

More information

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural

More information

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting

1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting Page -1-1. INTRODUCTION 1.1 Scope This specification covers non-shrink and epoxy grouting of structural column base plates and equipment bases, Portland cement grout for minor elements and bonding agents

More information

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by AMENDMENTS to 2012 Manual of STANDARD SPECIFICATIONS Adopted by Standard Specifications Committee Amendment No. 6 Published by Utah LTAP Center Utah State University 8305 Old Main Hill Logan UT 84322-8205

More information

Section 914. JOINT AND WATERPROOFING MATERIALS

Section 914. JOINT AND WATERPROOFING MATERIALS 914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

SECTION PRECAST CONCRETE STRUCTURES

SECTION PRECAST CONCRETE STRUCTURES SECTION 02605 PRECAST CONCRETE STRUCTURES PART 1 GENERAL 1.01 DESCRIPTION A. CONTRACTOR shall provide all professional services, labor, materials, equipment and incidentals as shown, specified and required

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

BPDL Architectural precast concrete specifications USA TESTING AND INSPECTION A. Testing by Independent Agency : Materials and workmanship furn

BPDL Architectural precast concrete specifications USA TESTING AND INSPECTION A. Testing by Independent Agency : Materials and workmanship furn BPDL Architectural precast concrete specifications USA 01 PART 1 General 1.1 DESCRIPTION OF WORK The work includes, but is not limited to : 1. Architectural precast concrete 2. Structural design, fabrication,

More information

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION

SECTION CONCRETE REINFORCEMENT FOR STEAM UTILITY DISTRIBUTION PAGE 032015-1 SECTION 032015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction This standard developed by the International Grooving and Grinding Association (IGGA) specifies the procedures for construction of dowel

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

EXCAVATION AND BACKFILL

EXCAVATION AND BACKFILL Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed

More information

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,

More information

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo 2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract

More information

SECTION COUNTERTOPS ecox PART 1 GENERAL

SECTION COUNTERTOPS ecox PART 1 GENERAL SECTION 11456 COUNTERTOPS ecox PART 1 GENERAL 1.1 SECTION INCLUDES A. Countertops B. Bar tops C. Vanity tops D. Table tops E. Reception counters F. Cash/back wraps G. Transaction counters H. Service counters

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8 September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of air release chambers, flushout chambers, valve chambers, meter chambers

More information

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing 10-1. JOINTED PLAIN CONCRETE PAVEMENT GENERAL Summary This work includes constructing jointed plain concrete pavement. Comply with Section 40, "Concrete Pavement," of the Standard Specifications. Submittals

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION SECTION 502 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) Page 500-20, subsection 502.2.

More information

SECTION TRACER WIRE FOR NONMETALLIC PIPE

SECTION TRACER WIRE FOR NONMETALLIC PIPE PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities

More information

SECTION PRECAST HOLLOW CORE PLANKS

SECTION PRECAST HOLLOW CORE PLANKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Roof planks. B. Floor planks. C. Accessories. 1.2 RELATED REQUIREMENTS A. Division 01 General Requirements. SECTION 03 4113 PRECAST HOLLOW CORE PLANKS B. Section

More information

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following. SAMPLING AND TESTING. The Sampling and Testing requirements contained in -03 shall apply. MARKING. The Marking requirements contained in -03 shall apply. FINAL PRODUCTION INSPECTION. The Final Production

More information

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS 8.01 - Page i UDNP Standard Specifications SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS Table of Contents SECTION

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

3400 Tectura Designs Precast Concrete

3400 Tectura Designs Precast Concrete 3400 Tectura Designs Precast Concrete PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to furnish and complete the proper installation of precast concrete. B. Types of Precast Concrete work include:

More information

A. Deviation from this standard must be approved by the Project Architect.

A. Deviation from this standard must be approved by the Project Architect. September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of

More information

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846 PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y Proposal P.O. Box 846 Baker, MT 59313 P R E C A S T R E I N F O R C E D C O N C R E T E B O X C U L V E R T F O R W E S T M O

More information

STRUCTURES FOR SANITARY AND STORM SEWERS

STRUCTURES FOR SANITARY AND STORM SEWERS SUDAS Standard Specifications Division 6 - Structures for Sanitary and Storm Sewers Section 600 - Structures for Sanitary and Storm Sewers STRUCTURES FOR SANITARY AND STORM SEWERS PART - GENERAL.0 SECTION

More information

SECTION ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL

SECTION ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL SECTION 03450 - ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL 1.01 DESCRIPTION A. Work of this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary

More information

Ash Brook Golf Course Scotch Plains, New Jersey

Ash Brook Golf Course Scotch Plains, New Jersey SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved:

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved: To: New York State Department of Transportation ENGINEERING INSTRUCTION Title: PRECAST CONCRETE PAVEMENT SLAB SYSTEMS STANDARD SPECIFICATION Distribution: Manufacturers (18) Local Govt. (31) Agencies (32)

More information

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................

More information

Pipe Product Catalog Table of Contents

Pipe Product Catalog Table of Contents Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"

More information

Manholes Table of Contents

Manholes Table of Contents Standard MH 300 Title Manholes Requirements MH 300.1 Manholes Requirements Manholes Table of Contents Underground Structures Standards MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Precast Tub-Type

More information

NITTERHOUSE CONCRETE PRODUCTS, INC Molly Pitcher Highway South Chambersburg, PA

NITTERHOUSE CONCRETE PRODUCTS, INC Molly Pitcher Highway South Chambersburg, PA NITTERHOUSE CONCRETE PRODUCTS, INC. 2655 Molly Pitcher Highway South Chambersburg, PA 17201 717-267-4505 GUIDE SPECIFICATION FOR ARCHITECTURAL PRECAST CONCRETE INDEX Page PART I - GENERAL...1 A. DESCRIPTION...1

More information

PART MATERIALS. Section Fencing Materials. Description

PART MATERIALS. Section Fencing Materials. Description PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain

More information

Foundation Specifications

Foundation Specifications Installation Instructions Bulletin 237746 Foundation Specifications for High-Wind 4.5-Meter Earth Station Antennas Revision C 1.0 INTRODUCTION 1.1 This document specifies typical foundation characteristics,

More information

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP 1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of

More information

Item 550 Chain Link Fence

Item 550 Chain Link Fence Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating

More information

1. Land survey Work. 2. Civil and Structural engineering services.

1. Land survey Work. 2. Civil and Structural engineering services. SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division-1 Specification

More information

SECTION THERAPEUTIC POOL ACCESSORIES

SECTION THERAPEUTIC POOL ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 13 17 23.11 THERAPEUTIC POOL ACCESSORIES SPEC WRITER NOTES: Delete between // // if not applicable to project. Also, delete any other item or paragraph not applicable

More information

SECTION TRAFFIC SIGNAGE

SECTION TRAFFIC SIGNAGE SECTION 10 14 53 TRAFFIC SIGNAGE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnishing and installing roadside traffic signage. B. Providing additional traffic signs as required in Sections 01 55 28 Controlling

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Series Sloped glazed Curtain wall. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End

More information

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

Installing a COMROD AS1R Whip Antenna with Anchor Post

Installing a COMROD AS1R Whip Antenna with Anchor Post Installing a COMROD AS1R Whip Antenna with Anchor Post IS10012 Issue 1.0...15 September 2010 Nautel Limited 10089 Peggy's Cove Road, Hackett's Cove, NS, Canada B3Z 3J4 T.877 6 nautel (628835) or +1.902.823.2233

More information

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant) SECTION 066030 EXTERIOR PVC PERGOLAS (IBC Compliant) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and other Contract Documents, listed in the agreement between the Owner and Contractor, apply to

More information

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence MILWAUKIE OR #3144-00 ADDENDUM #5 NARRATIVE: 11-08-12 WAL-MART SUPERCENTER #3144-00; Milwaukie, OR: SPECIFICATIONS SPECIFICATIONS Revisions to Specification 02822 Fence Spec division 02822 has been revised

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY SECTION 07312 PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This Section Includes the following: 1. Endureed Dominica PVC thatch shingles. 2. Self- adhering sheet underlayment. B. Related

More information

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO. 2012-16A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST 2014 CHAIN LINK FENCE SPECIFICATIONS Chain link fence,

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification

More information

SECTION G ESTIMATE OF QUANTITIES

SECTION G ESTIMATE OF QUANTITIES PROJECT STATE OF SOUTH DAKOTA NH 2115(45)87 SHEET G2 TOTAL SHEETS G27 SECTION G ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 560E0068 7'x3' Precast Concrete

More information

Slate Shingle Specifications

Slate Shingle Specifications Slate Shingle Specifications California Slate is a proud member of the Slate Roofing Contractors Association of North America, Inc. (SRCA) which publishes Section 07310 Slate Shingles setting forth architectural

More information

AIA Specification. Section Slate Shingles PART 1 GENERAL

AIA Specification. Section Slate Shingles PART 1 GENERAL AIA Specification Section 07315 Slate Shingles PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced

More information

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM). PART 1 - GENERAL 1.1 SECTION INCLUDES A. Benches. B. Trash receptacles. C. Bike storage. 1.2 REFERENCE STANDARDS A. Including but not limited to: 1. American Society for Testing and Materials (ASTM). 1.3

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

eco-shake INSTALLATION INSTRUCTION

eco-shake INSTALLATION INSTRUCTION 1 eco-shake INSTALLATION INSTRUCTION NOTE: Shuffling the eco-shakes during installation may be necessary to obtain a uniform color throughout the roof. Due to the natural wood content in the ecoshakes,

More information

Precast Concrete. Installation Guide V GR-WI-599. Page 1

Precast Concrete. Installation Guide V GR-WI-599. Page 1 Precast Concrete Installation Guide V.1 2019 GR-WI-599 Page 1 Introduction Cubis Systems designs, manufactures and distributes a wide range of precast concrete cable pits and access covers for all major

More information

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting SECTION 33 71 19 UNDERGROUND POWER DUCT AND SUB-STRUCTURES PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 33: Trenching, Backfilling, and Compacting B. Section 32 01 00: Site Restoration and Rehabilitation

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

A. Dewatering observation wells are part of dewatering allowance.

A. Dewatering observation wells are part of dewatering allowance. SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

2. Wood grounds, nailers, blocking, miscellaneous framing, sleepers, etc.

2. Wood grounds, nailers, blocking, miscellaneous framing, sleepers, etc. 06100 - ROUGH CARPENTRY PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"

More information

SECTION SAND CUSHION TERRAZZO FLOORING

SECTION SAND CUSHION TERRAZZO FLOORING SECTION 09 66 13.13 SAND CUSHION TERRAZZO FLOORING THIS GUIDE SPECIFICATION HAS BEEN PREPARED BY THE NATIONAL TERRAZZO AND MOSAIC ASSOCIATION, INC., AND IS DISTRIBUTED FOR USE BY ITS MEMBERS AND DESIGN

More information

Design and Construction of Highway Pavement Joint Systems

Design and Construction of Highway Pavement Joint Systems Design and Construction of Highway Pavement Joint Systems Troubleshooting Joint Design and Construction Issues Mark B. Snyder, Ph.D., P.E. Engineering Consultant to the American Concrete Pavement Association

More information

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL. METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

ENDUREED VIVA SERIES Specifications

ENDUREED VIVA SERIES Specifications ENDUREED VIVA SERIES Specifications SECTION 07312 HDPE THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This Section Includes the following: 1. Endureed Viva Series synthetic thatch shingles.

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 SHEET METAL FLASHING AND TRIM PART 1 GENERAL 1.1 SUMMARY A. Section includes flashings and counterflashings, sheet metal roofing and fabricated sheet metal items, as indicated in Schedule.