12. PROVIDE TEMPORARY BARRIERS TO CONTAIN DUST AND DEBRIS RESULTING FROM THE PERFORMANCE OF THE WORK TO THE AREA WHERE WORK IS BEING PERFORMED.

Size: px
Start display at page:

Download "12. PROVIDE TEMPORARY BARRIERS TO CONTAIN DUST AND DEBRIS RESULTING FROM THE PERFORMANCE OF THE WORK TO THE AREA WHERE WORK IS BEING PERFORMED."

Transcription

1 I SYOS V UI & UWO O: U ISIOS SOW O WIS ISI ISIOS. S SIO 550 O SIIIO O UWO O IV ISUIO O I. I SO IUS ISU XI U (X. 5'-0" O) U WI 5 -OU II U VOU OW WI UI VS II W SW W W 0 S S OSI O W (W) SO O W (SW) OSI O W (W) OSI O W I. (W) 0 OSI O W (0 ) I I () SOI II - OV OO (S) SOI II - OW OO (S) v.0 O: IS IS S O SYOS, VIIOS,. SSIY US O WIS. OO SI (S), SIZ & Y OO I (), SIZ & Y OO I (), SIZ & Y OXY OU IOUS OXI OU I I OU IO OU O IOXI OU.. W OS: IO O SUII I, VISI O SI O UY UI WI XISI OIIOS O O. VIW OS, SIIIOS O WIS O IIO UIS WI Y O SIIY OU I IS OIO O OSUIO OUS. OIY I, I /O OW O OIS O ISIS IO O SUISSIO O I. XISI OIIOS W O OII WIS SI VISIS Y O X S-UI OIIOS. I VIY XISI OIIOS IO O SUII I IS. OOI W WO OIIO WI O ISIIS XISI OIIOS IO O OSUIO. OOI ISIO O I SYSS WI O S O SU OY ISIO. IS UWO II S I O SUU S OSSI. OOI WI O S O VOI OIS. OOI ISIO O UWO II O VOI OIS WI I S, II IXUS,. Y OIIIOS UI U O O OOIIO WI SOSIIIY O OO O X OS O OW. # S S V (,, USS O OWIS) I OSS (US US)(O O VI) OOS (O O VI) UI IS UI IXUS WI OUI IS IV OW USS II OWIS O IU WIS. I OV O OUI IS S Y I. VOY O SI S SSI I S UI S SSI W OS S SSI I SSI W OO O II OUI S SSI I S SOW VVS S SSI SOW S U VVS S SSI II SVI SIS SUO'S SU-U SIS I OU OXS WSI I OU OXS IO'S SI U IIS OS IS O Z W Y U WI -OU II & U VOU OO x I I SO SO VOU OOIZ OS SIZ Y O XUS I U VOU SU O OU SIIO IS SIIO UIIS UI WI XI U OIO OUI IS U I U U U I U OW SUY O OUSI I U U 0" 00 - SSI S SUY O OUSI I U OW XUS I U U XUS I U OW SIZ Y O SUY IUS O IS U OU SO O (S=SUY/=U) O O S S S S S O OOXI SSO O IOXI SSO II SSU SSO OW SWI UIIY SSO U SIO SI SSU O U SSO " OO O I " OO O I " OO O I " OO O I 7" OO O I 5" OO O I 7" O 9" OO O O O S 5" OO O I " OO O I " OO O I 6" OO O SOU 0" OO O I 8" & " WO OO O I 8" 8" 8" IIU O 8" XIU OO O I 6'-6" & 6'-0" WO OO O I " OO O I W U I 0" OO O I 5" OO O O I " OO O O OX " OO O I " OO O I 6" O I 8" O I W W S S OS W W V V V V I S OS O OV I V V V O O O W WS S S S WS W WS W S WS W WS W S V OIO U W W WV WV WS II - OV OO (W) WS II - OW OO (W) S WS - OV OO (W) S WS - OW OO (W) SO I - OV OO (S) SO I - OW OO (S) OVOW SO I - OV OO (OS) I WS - OV OO (W) I WS - OW OO (W) I V (V) V II (V) V OW (V) V OW OO (V) OIIO WS V OIIO S WS V II I (I) OS I - I IIY U () OS I () UXIIY OS I () SU O SW U IS (S) OSS I () OW SSU U S () OW SSU U S O OO () IU SSU U S () IU SSU U S O OO () U OI SUY (OS) U OI U (O) U OI V (OV) I I I (I) I I () I VUU (V) I VUU XUS (V) VUIO (V) O IOXI (O) IO () OXY (O) IOUS OXI (O) O O W (W) IUII OU S () W SVI (WS) I OIO () I SSU S SUY (S) I SSU S OS () IU SSU S SUY (S) IU SSU S OS () OW SSU S SUY (S) OW SSU S OS () OS U IS () I O W SUY (WS) I O W U (W) I W SUY (WS) I W U (W) O/I W SUY (S) O/I W U () OS W SUY (WS) OS W U (W) U W SUY (WS) U W U (W) I IUI () I IS (O S) () I SUIO (S) I IS YSS () I V (V) IIO O OW I O I OIO OU UI O OU I O OU OOY OU UI UI SIIO. (OO UIS IS). O UI IXU O UI SUS UI SIIO (OW UIS, OO IS) I UI SIIO (OO UIS IS USS O OWIS) OIO OI O W WO O XISI I U U IIS I U OW U IIS S U V V "" I VUU I WO-WY OO VV -WY OO VV SUO VV VV OW OO VV (V) I UY VV WI SSU OS W SI SI WI OWO VV I/SY VV SOOI VV SSU UI VV (V) S SSU UO () OSI IXI VV I O XSIO OI I UI II SUO & U OSI OW V SSU U O SSU U S U UIO OIO OS I () OZ W Y (W) U/UOI I V O VUU I VV UOI I V U I V SSU/VUU SWI OU W OU (WO) OO OU (O) XIO OU (O) OW U OW OW U OW OW U WI SU-O VV (SOV) OW OW WI SU-O VV (SOV) U WI SU-O VV (SOV) OW WI SU-O VV (SOV) U W S (W) WI I SIZS, (,,,, & ) IUIO U - S O I I WI ISIUIO UI I OIO I U S ISO'S S OIO / UXIIY I SI IS O Z W SUOW O XISI SYSS IS UI UI W WO, OOI SUOW I UIO WI OW O IIIZ OWI. OIY OW SV (7) YS IO O IUIO O SVI. UI ISIO O W WO, VOI I XISI SUS UI O I. I US UI OSUIO O X OS O OW. OVI OY IS O OI US IS SUI O O O WO O W WO IS I O. I UI SOW O I S S OVI Y I OO USS OWIS O. W I UI, UWO II SOW OXI OIOS. I SU I UWO II OIOS IO O IIO USS S UI O I UWO II WII VI S. VIY I UI OIOS UU S OIOS I SVI O IOW OU UI. O IU WIS O OSUIO IS S I O V SYS. VIY SS IOS SOW O IU WIS I O UWO II UIS. IOO I UIY SUS: O ISI O (IS IV) UWO V UIS O XOSU O US, I, I OISU. ISUIO S O W Y I UI OSUIO, YI ISUIO IS O. S Y S O OIS O I ISS ISUIO. OV IS O II/U I U IUI US. I, OSSIO U I OY S VUU Y UWO O O V UIS W O UI OSUIO IO W IS IS IO O UI SYS OV O OW. I SUS SSOI OIS O Y V UIS W O S SO. IS UWO II O UII OU IS USS OWIS SOW O O. OV S SUOS O UI, UWO II S S O UII OISS O S. O O S SUOS O OV OO S O OO X W O ISS I O SS OW Y SIIIOS. OOI OIO O UI SUOS WI OIO O UI SS S/OOS O SVI O UI /O I. S IOS OU UII OOS I O WI O SIIIOS. IOO IOS OU I OOS I O WI U.. UIS. OO S I, US, I II SYSS SSY O O WO. SIIIOS O USI O UIS SUI USI O I O VIW. OVI I O II SYSS USI II SYS. OOI X OUI SIZ Y O IUSS, ISS IS WI SUI O II, W U ISIO UIS. US OIO O II IUSS, ISS IS S UI O OO I II I II OIOS. UWO OSSI I WS O O I SSIS S IIU 6 U S. OVI I O I/SO S, S I, I UWO IIS WS OIOS SOW O S. I I/SO S S OO O S I. OOI SV WI UIS O IS OIO. OVI W O U SS S O OOS O SS O I I/SO S. SS O OO S IIU SIZ O 0 Y 0 S IS WII O. OVI OV U SIO W U SIZ IS OO S O 0 Y 0 SS OO. O S OSS UIISS OIOS SOW O S. VIY X OIOS WI I IO O ISIO. IS VIS WI O O VI XIU 8 O UIS USS O OWIS O S. OVI ISU I O OSS OU O XIO UII WS. IS WII I OUI OVI Y IVISIO 6. IIU, OVI OUI I W O UIO OX O 6 OV II. OOI OIO VIO O W-OU VIS WI SIO OS, ISY IS, SVS O O OOS SOW O IU WIS O IS U O IVISIOS. OO WI O IUS O OIO O W-OU VIS US Y O OOIIO. OVI U I I U O O I SUY, U, OUOO XUS I US. OVI I 5, I IIY, U/OU U O II WI U I OI U O U OIOS -OS O IIVIU IUSS, ISS IS. UWO O I OUS S S SIZ S OU SIZ USS OWIS O. O SIIIOS O UWO II ISUIO UIS. U SIZS O I S II ISI IOW ISIOS, IS S SIZS OIY O OU O ISS O U I. XI UWO S O X 5-0 I S IS SUO O VOI S S SI. O SIIIOS O IIO UIS. OVI W S O I IS I UIS IO O SI, USI I O UI SYS(S) OV O OW. OO S I VIY XISI UI IUI SSOIS I US O IS O IS O IS I OO WOI O. O Y IIIS O OW O I. OO S SUI O OW I WI O SII SS O O VIY OIO SUS O SS. XISI UI UI OOS I US O IS O. OVI W IS O XISI I I UI IO O SU O UI. W IS S OI WI XISI UI U I O O XISI IS W OIIO USS OWIS O. SIS I II SYSS IO O SI US. UI XISI UI I US O IS O I O WI UU S WI ISUIOS. OI ISUIOS O UU I Y O VI SI. ollis + iller rchitects issouri State ertificate of uthority rchitecture # Structure # 0060 onsultant # onsultant - enderson ngineers issouri # ain, Suite 00 ansas ity, O phone fax - SU SUSS etropolitan ommunity ollege 0 SW rafficway ansas ity, O 6 idding ocuments VISIOS: # escription ate SIO U SIIO I SIS UI SI SI O SI Y SI Y SIW SI SIW SI S. IZ IS # he rofessional rchitects seal affixed to this sheet applies only to the material and items shown on this sheet. ll O O: W Y: I Y: I : //07 //07 :8:0 S. IZ I, SUI 00 SS IY, O X O. OO U: -556 XIS //08 lease consider the environment before printing 000 I OS S

2 W OS:. O S 000 O I OS. O S 50 O IS. I OS IS W IUS I II O O XISI UWO O II IOW. I VIY UWO YOU IO O I O OI XISI X UWO S U O SV IUS. YI O SUY IUSS. X UWO S UI O X U XIU O 8'-0". O XISI OS O II OIO. O WII O XISI I UI. X SUY UWO O W SUY IUS OIO. I VIY UWO YOU IO O I O OI OUI. -OISSIO XISI I I UI SVI OO. OIS, IS, SS, OO SS, U XISI OO. O OS: xist. Stair 6 50 eeting 5 0"x" - 50 "x" - "x" S- 50 Stor. oom "x8" 50 0"x8" uiet rea 6 "x" - "x" - "x8" 50 "x" - 0"x" eeting 09 0"x" "x" - 0"x" - 0 0"x" - oom "x" "x" - lass oom 5 0"x" - 50 oom rea oom 0"x" - 0"Ø orridor lass oom 6 utor rea 08 Y "x" - 75 "x" Y 0 50 Y 0"x" Office "x" - (Y) ollaboration 7 eeting 0 "x" "x" Seminar oom 0-50 "x" - Y "x" - Y "x" "x0" "x0" 50 S S ' IO ' IO quip. 5 W.oilet 5 S S.oilet 5 8"x" "x" 50 Y S- 50 xist. Open Stair 0"x" - Walk Way uddle m elp esk 00 "x" irculation "x" - Outer Walk Way "x" - irculation 9.. S I OO O OVISIOS O 0 IIO Y OSVIO O (I) S Y. XISI OUY Y (OI SUY S) S O WI OVIO. UII OUOO I I S O OII S O IS SO O WO. Y "x" - Vending 0 Staff ounge ' IO oilet 0 ' IO S- 50 oilet levator X - 75 ollis + iller rchitects issouri State ertificate of uthority rchitecture # Structure # 0060 onsultant # onsultant - enderson ngineers issouri # ain, Suite 00 ansas ity, O phone fax - SU SUSS etropolitan ommunity ollege 0 SW rafficway ansas ity, O 6 idding ocuments VISIOS: # escription ate V - V /8" = '-0" S. IZ IS # he rofessional rchitects seal affixed to this sheet applies only to the material and items shown on this sheet. ll O O: W Y: I Y: I : //07 //07 :8:6 S. IZ I, SUI 00 SS IY, O X O. OO U: -556 XIS //08 lease consider the environment before printing 0 V - V

3 I O O-I (Y) I O O-I OV ISUIO (Y) ISU U O O XI UWO O SUY U WI " OI S SUY U WI /" OS I ISUIO. WO OO SU S O /" SO/ U IV II I (Y) "S" I OIO WY OI UO OU OUSI O U OUI O OV W " IIU O SIS, SU OUI O I SV (O O U) OU UY WI O OO -ISU XI U S UI, IS Y S SUO O V II S US O O OO O O SI VIW O OO OU O XIO O U O SU O O Y II (Y) I SO IUS OW SI VIW OS OI II I OW O SU O O Y O SUY U OIO O SUY U S I O U. OI II I O O-I OV ISUIO (YI) I IIY O XY ISU, WI VOU O WI XSIO S O. OI ISUIO OI ISU U ollis + iller rchitects issouri State ertificate of uthority rchitecture # Structure # 0060 onsultant # onsultant - enderson ngineers issouri # ain, Suite 00 ansas ity, O phone fax 6"x6" SS OO OS: " X OIIO I SO WI -S U VI I SO W S O.. IS I/SO UUS OIO SS. W OI /8" OO ISIOS WI /" IIU UI, XIU ".. IVISIO 6 OO S OVI OW OIO O S. U I/SO I S II U WI " I OUSI I. S SIIIOS. O IIO O W I O SI YI U I S U I (-S) S 6" I IIU.5 OVI U SUO ISOI VIW I SO IUS S X I O SO I O (/) I I O I O O OW SS O O OO OS:. X U SO XIU XI U OS O X 5'-0". OVI II 90 OW W UI O XI U WII 5'-0" IIIO.. OOI X OIO O SO IUS WI I'S II.. OIOS O SO IUS O US O SUY S I O O U O U USS O OWIS.. XI U OSS S II IUS O.5 IS I. 5. O IUS UU'S ISIO ISUIOS O SU O Y. I SO IUS I S -ISU XI U S UI, IS Y S SUO O V II S US II I O O-I (YI) II IUS S SU OVI " I, -6 ISS ISUIO O OY OV IUS O W SU O SII. OS:. X II U SO XIU XI U OS O X 5'-0". OVI II 90 OW W UI O XI U WII 5'-0" IIIO. Y-I II IUS I II IUS I S O US S O OSI O I S O O Y UU O US OY. VIW O SIIO, OS SIIIOS O I X I SSOIS O O. UUS IS SIS O SI. OS: I, IS IUS SU UU SVI O Y OUI OIO SIZ (I) X X SS O (I W..) OS - I XUS O II "x" ,,, I SUY - I II 8 x () " SO ,,,,, - I SUY - I II x () " SO ,,,,, I SUY - I II 8 x () " SO ,,,,,, I SUY S U II "x" ,,,, S- I SUY S O II ''x'' ,,,, S- I SUY 50 OUV W O S ,,,, - I S O II ''x'' ,, - I S O II ''x'' ,, - I S 50 OUV W O S ,,, - I S O II ''x'' ,,. -WY OW USS OWIS II Y OW OWS O WIS.. SIZ SOW O WIS. OVI U O SIZ USS OWIS SOW O WIS.. IIS, WI O II OO.. O S O O ISIO.. OU IO S S US.. Y O II/W OSUIO, OOI WI IU II/W.. Y O OVI O II OSUIO. OO O S Y I. OOI WI IU II/W.. OVI OOS US O O VI.. OVI O Y O II OSUIO WI OUI, ISU U OX WI.. OVI IUSS, I SOS, IS WI O XOS OUI SWS.. I IIO SUS SOS, IS US OO S Y I.. OO S OVI O -O VOU Y OOI I OOIS O -50 WI X WO OO O UIV YOU UO UY WI OO. OO S V SU IV O /" U IV. SSY S IU VIZ S U WI O SIS, IO, S UII I WO OUI. (: 50). SUY U S US O SO IUS UU. OVI /" OS ISUIO O IIO O SUY U. - SU SUSS etropolitan ommunity ollege 0 SW rafficway ansas ity, O 6 idding ocuments VISIOS: # escription ate S. IZ IS # he rofessional rchitects seal affixed to this sheet applies only to the material and items shown on this sheet. ll O O: W Y: I Y: I : //07 //07 :8:0 S. IZ I, SUI 00 SS IY, O X O. OO U: -556 XIS //08 lease consider the environment before printing 50 I SUS IS

4 5: I, VII, I OIIOI. ISUIOS. UIS ll requirements under ivision 0 and the general and supplementary conditions of these specifications apply to this section and division. Where the requirements of this section and division exceed those of ivision 0, this section and division take precedence. ecome thoroughly familiar with all its contents as to requirements that affect this division, section, or both. Work required under this division includes all material, equipment, appliances, transportation, services, and labor required to complete the entire system as required by the drawings and specifications, or reasonably inferred to be necessary to facilitate the function of each system as implied by the design and the equipment specified. he specifications and drawings for the project are complementary, and any portion of work described in one shall be provided as if described in both. In the event of discrepancies, notify the ngineer and request clarification prior to proceeding with the work involved. rawings are graphic representations of the work upon which the contract is based. hey show the materials and their relationship to one another, including sizes, shapes, locations, and connections. hey convey the scope of work, indicating the intended general arrangement of the systems without showing all of the exact details as to elevations, offsets, control lines, and other installation requirements. Use the drawings as a guide when laying out the work and to verify that materials and equipment will fit into the designated spaces, and which when installed per manufacturers' requirements, will ensure a complete, coordinated, satisfactory, and properly operating system.. IIIOS urnish: to supply and deliver to the project site, ready for unloading, unpacking, assembly, installation and similar operations. Install: to perform all operations at the project site including, but not limited to, the actual unloading, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, testing, commissioning, starting up and similar operations, complete, and ready for the intended use. rovide: to furnish and install. urnished by Owner (or Owner-urnished) or urnished by Others: an item furnished by the Owner or under other divisions or contracts, and installed under the requirements of this division, complete and ready for intended use, including all items and services incidental to the work necessary for proper installation and operation. Include the installation under the warranty required by this division. ngineer: Where referenced in this division, ngineer is the ngineer of ecord and the esign rofessional for the work under this division, and is a consultant to, and an authorized representative of the rchitect, as defined in the eneral and/or Supplementary onditions. When used in this division, ngineer means increased involvement by and obligations to the ngineer, in addition to involvement by and obligations to the rchitect. : he local code and/or inspection agency (uthority) aving urisdiction over the work. : ationally recognized testing laboratory, as defined and listed by OS in (e.g., U,, S), and acceptable to the over this project. ationally recognized testing laboratories and standards listed are used only to represent the characteristics required and are not intended to restrict the use of other s that are acceptable to the and standards that meet the specified criteria. he terms "approved equal", equivalent, or "equal" are used synonymously and shall mean accepted by or acceptable to the ngineer as equivalent to the item or manufacturer specified. he term "approved" shall mean labeled, listed, or both, by an, and acceptable to the over this project.. I SI VISI rior to submitting bid, visit the site of the proposed work and become fully informed as to the conditions under which the work is to be done. ailure to comply with this requirement shall not be considered sufficient justification to request or obtain extra compensation over and above the contract price.. I WOSI rovide new material, equipment, and apparatus under this contract unless otherwise stated herein, of best quality normally used for the purpose in good commercial practice, and free from defects. odel numbers listed in the specifications or shown on the drawings are not necessarily intended to designate the required trim, written descriptions of the trim govern model numbers. ipe, pipe fittings, pipe specialties and valves shall be manufactured in plants located in the United States or certified to meet the specified S and SI standards. Work performed under this contract shall provide a neat and "workmanlike" appearance when completed, to the satisfaction of the rchitect and ngineer. Workmanship shall be the finest possible by experienced mechanics. Installations shall comply with applicable codes and laws. he complete installation shall function as designed and intended with respect to efficiency, capacity, noise level, etc. bnormal noise caused by rattling equipment, piping, ducts, air devices, and squeaks in rotating components shall not be acceptable. aterials and equipment shall be of commercial specification grade in quality. ight duty and residential grade equipment shall not be accepted unless otherwise indicated. emove from the premises waste material present as a result of work, including cartons, crating, paper, stickers, and/or excavation material not used in backfilling, etc. lean equipment installed under this contract to present a neat and clean installation at the termination of the work. epair or replace public and private property damaged as a result of work performed under this contract to the satisfaction of authorities and regulations having jurisdiction. rovide all safety lights, guards, and warning signs required for the performance of the work and for the safety of the public.. UUS In other articles where lists of manufacturers are introduced, subject to compliance with requirements, provide products by one of the manufacturers specified. Where a list is provided, manufacturers are listed alphabetically and not in accordance with any ranking or preference. Where manufacturers are not listed, provide products subject to compliance with requirements from manufacturers that have been actively involved in manufacturing the specified product for no less than 5 years.. OOIIO oordinate work with that of other trades so that the various components of the systems are installed at the proper time, will fit the available space, and will allow proper service access to those items requiring maintenance. omponents which are installed without regard to the above shall be relocated at no additional cost to the Owner. Unless otherwise indicated, the eneral ontractor shall provide chases and openings in building construction required for installation of the systems specified herein. ontractor shall furnish the eneral ontractor with information where chases and openings are required. ontractor shall keep informed as to the work of other trades engaged in the construction of the project and shall execute work in a manner as to not interfere with or delay the work of other trades. igured dimensions shall be taken in preference to scale dimensions. ontractor shall take his own measurements at the building, as variations may occur. ontractor shall be held responsible for errors that could have been avoided by proper checking and inspection. rovide materials with trim that will properly fit the types of ceiling, wall, or floor finishes actually installed. odel numbers listed in the specifications or shown on the drawings are not intended to designate the required trim.. OIS OS Work performed under this contract shall, at a minimum, be in conformance with applicable national, state and local codes having jurisdiction. quipment furnished and associated installation work performed under this contract shall be in strict compliance with current applicable codes adopted by the local, including any amendments and standards as set forth by the following:. ational lectric ode (). ational ire rotection ssociation (). Underwriters aboratories (U). Occupational Safety and ealth dministration (OS) 5. merican Society of echanical ngineers (S) 6. merican Society of eating, efrigeration, and ir onditioning ngineers (S) 7. merican ational Standards Institute (SI) 8. merican Society of esting aterials (S) 9. Other national standards and codes where applicable. Where the contract documents exceed the requirements of the referenced codes, standards, etc., the contract documents shall take precedence. Where conflicts between various codes, ordinances, rules, and regulations exist, comply with the most stringent. romptly bring all conflicts observed between codes, ordinances, rules, regulations, referenced standards, and these documents to the attention of the rchitect and ngineer for final resolution. ontractor will be held responsible for any violation of the law. rocure and pay for permits and licenses required for the accomplishment of the work herein described. Where required, obtain, pay for, and furnish certificates of inspection to Owner.. OIO O UI IS Store and protect from damage equipment and materials delivered to job site. or materials and equipment susceptible to changing weather conditions, dampness, or temperature variations, store inside in conditioned spaces. or materials and equipment not susceptible to these conditions, cover with waterproof, tear-resistant, heavy tarp or polyethylene plastic as required to protect from plaster, dirt, paint, water, or physical damage. quipment and material damaged by construction activities shall be rejected and ontractor shall furnish new equipment and material of a like kind at his own expense. eep premises broom clean of foreign material created during work performed under this contract. iping, equipment, etc. shall have a neat and clean appearance at the termination of the work. lug or cap open ends of ductwork and piping systems while stored and installed during construction when not in use to prevent the entrance of debris into the systems. I. SUSIUIOS he base bid shall include only the products from manufacturers specifically named in the drawings and specifications. o substitution will be considered prior to receipt of bids unless written request for approval to bid has been received by the ngineer at least ten (0) calendar days prior to the date for receipt of bids. ach such request shall include the name of the material or equipment for which substitution is requested and a complete description of the proposed substitution including drawings, cuts, performance and test data, and other information necessary for an evaluation. Include a statement setting forth changes in other materials, equipment or other work that incorporation of the substitute would require. he burden of proof of the merit of the proposed substitute is upon the proposer. he ngineer's decision of approval or disapproval to bid of a proposed substitution shall be final. oordinate and verify with other trades whether or not the substituted equipment can be installed as shown on the construction drawings without modification to associated systems or architectural or engineering design. Include additional costs for architectural and engineering design fees in bid if drawing modifications are required because of substituted equipment. If the proposed substitution is approved prior to receipt of bids, such approval will be stated in an addendum. idders shall not rely upon approvals made in any other way. Verbal approval will not be given. o substitutions will be considered after the contract is awarded unless specifically provided in the contract documents. he terms "approved", "approved equal", and "equal refer to approval by the ngineer as an acceptable alternate bid. o substitutions will be considered that are not bid as an alternate. o material substitutions shall be considered for approval prior to award of contract.. SUIS ssemble and submit for review shop drawings, material lists, manufacturer product literature for equipment to be furnished, and items requiring coordination between contractors under this contract. rovide submittals in sufficient detail so as to demonstrate compliance with these contract documents and the design concept. rior to transmitting submittals, verify that the equipment submitted is mutually compatible and suitable for the intended use, will fit the available space, and maintain manufacturer recommended service clearances. If the size of equipment furnished makes necessary any change in location or configuration, submit a shop drawing showing the proposed layout. ransmit submittals as early as required to support the project schedule. llow for two weeks ngineer review time, plus to/from mailing time via the rchitect, plus a duplication of this time for resubmittal, if required. Only resubmit those sections requested for resubmittal. Submittals shall contain the project name, applicable specification section, submittal date, equipment identification acronym as used on the drawings, and the ontractor's stamp. he stamp shall certify that the submittal has been checked by the ontractor, complies with the drawings and specifications, and is coordinated with other trades. anufacturer product literature shall include shop drawings, product data, performance sheets, samples and other submittals required by this division. ighlight, mark, list, or indicate the materials, performance criteria, and accessories that are being proposed. eneral product catalog data not specifically noted to be part of the specified product will be rejected and returned without review. Submittals and shop drawings shall not contain the firm name, logo, seal, or signature of the ngineer. hey shall not be copies of the work product of the ngineer. If the ontractor desires to use elements of such product, refer to paragraph lectronic rawing iles for procedures to be used. Separate submittals according to individual specification sections. Illegible submittals will be rejected and returned without review. atalog data shall be properly bound, identified, indexed and tabbed in a -ring binder. ach item or model number shall be clearly marked and accessories indicated. abel the catalog data with the equipment identification acronym or number as used on the drawings and include performance curves, capacities, sizes, weights, materials, finishes, wiring diagrams, electrical requirements and deviations from specified equipment or materials. or equipment with motor starters or Vs, include short circuit current ratings. ark out inapplicable items. Shop drawings will be returned without review if the above mentioned requirements are not met. rovide the quantity of submittals required by ivision 0. If not indicated and hard-copy sets are provided, submit a minimum of six (6) copies. efer to ivision 0 for acceptance of electronic submittals for this project. or electronic submittals, ontractor shall submit the documents in accordance with the procedures specified in ivision 0. ontractor shall notify the rchitect and ngineer that the submittals have been posted. If electronic submittal procedures are not defined in ivision 0, ontractor shall include the website, user name, and password information needed to access the submittals. or submittals sent by , ontractor shall copy the designated representatives of the rchitect and ngineer. ontractor shall allow for the ngineer review time as specified above in the construction schedule. ontractor shall submit only the documents required to purchase the materials and/or equipment in the electronic submittal. he checking and subsequent acceptance of submittals by the ngineer and/or rchitect shall not relieve the ontractor from responsibility for deviations from the drawings and specifications, errors in dimensions, details, size of members, or quantities, omissions of components or fittings; coordination of electrical requirements; and not coordinating items with actual building conditions and adjacent work. roceed with the procurement and installation of equipment only after receiving approved shop drawings relative to each item.. OI WI IS In preparation of shop drawings or record drawings, ontractor may, at his option, obtain electronic drawing files in uto or X format on -O disk, V disk, flash drive or direct download, as desired, from the ngineer for a shipping and handling fee of $00 for a drawing set up to sheets and $5 per sheet for each additional sheet. ontact the rchitect for written authorization and ngineer for the necessary release agreement form and to specify shipping method and drawing format. In addition to payment, the written authorization from the rchitect and release agreement form from the ngineer must be received before electronic drawing files will be sent.. O WIS (S-UI WIS) uring progress of the work in this division, ontractor shall maintain an accurate record of all changes made during the installation of the system. Upon completion of the work, accurately transfer all record information to three identical sets of the approved shop drawings. Insert one set into each copy of the manual described below. See ivision 0 and eneral onditions for additional information.. OIO I ISUIOS uring the course of construction, collect and compile a complete brochure of equipment furnished and installed on this project. Include operational and maintenance instructions, manufacturer's catalog sheets, wiring diagrams, parts lists, approved submittals and shop drawings, warranties, and descriptive literature as furnished by the equipment manufacturer. Include an inside cover sheet that lists the project name, date, Owner, rchitect, ngineer, eneral ontractor, Sub-ontractor, and an index of contents. Submit three copies of literature bound in approved binders with index and tabs separating equipment types to the rchitect, for ngineer's review, at the termination of the work. aper clips, staples, rubber bands, loose-leaf binding, and mailing envelopes are not considered approved binders. inal approval of systems installed under this contract shall be withheld until this equipment brochure is received and deemed complete by the rchitect and ngineer. Instruct workmen to save required literature shipped with the equipment itself for inclusion in this brochure. Include ecord rawings as described above. efer to ivision 0 for acceptance of electronic manuals for this project. or electronic manuals, refer to paragraph Submittals for requirements.. IS ISIO. UII OIO omply with the schedule of operations as outlined in the architectural portions of this specification. ccomplish work requiring interruption of building operation at a time when the building is not in operation and only with written approval of building Owner and/or tenant. oordinate interruption of building operation with the Owner and/or tenant a minimum of seven (7) days in advance of work.. XISI UI US OV emove all unused equipment, ductwork, piping, and associated supports. ap ductwork and piping at mains and seal air and water tight. rovide items of V systems modification required because of building remodeling, as noted on the drawings or necessary for proper operation. atch existing materials and construction techniques when modifying existing systems unless specified otherwise. oordinate additional requirements with eneral ontractor and rchitect. Seal airtight existing ductwork required to be abandoned in place or not in use at the termination of the work. ap and seal weathertight existing roof curbs and roof openings to be abandoned in place as a result of equipment removal. lean and rebalance existing ductwork, diffusers, registers, and grilles intended for reuse as required or as indicated on drawings. lean and refurbish existing V equipment intended for reuse as required for proper operation including replacement of filters, belts, motors, remote controls, and safety interlocks.. UI I onform to the requirements in ivision 0. ut walls, floors, ceilings, and other portions of the facility as required to install work under this division. Obtain permission from the rchitect prior to cutting. o not cut or disturb structural members without prior approval from the rchitect. ut holes as small as possible. atch walls, floors, and other portions of the facility as required by work under this division. atching shall match the original material and construction including fire ratings, if applicable. epair and refinish areas disturbed by work to the condition of adjoining surfaces in a manner satisfactory to the rchitect.. OU-I oordinate without delay all roughing-in with other divisions. onceal piping, conduit, and rough-in except in unfinished areas and where otherwise shown.. SUO SYSS Structural steel used for support of equipment, ductwork and piping shall be new, clean, and conform to S esignation -6. Support mechanical components from the building structure. o not support mechanical components from ceilings, other mechanical or electrical components, and other non-structural elements.. SS OOS rovide access doors for all concealed equipment where indicated or as required, except where above lay-in ceilings. ccess doors shall be adequately sized for the devices served with a minimum size of 8 inches x 8 inches. ccess doors must be of the proper construction for type of construction in which it is installed. Obtain rchitect's approval of type, size, location and color before ordering. rovide factory-fabricated and assembled units, complete with attachment devices and fasteners ready for installation, concealed hinges, flush screwdriver-operated cam lock, and anchor straps. rovide access doors manufactured by ilcor, itus, Zurn, or equal.. IOS Seal around penetrations of fire rated assemblies. oordinate fire ratings and locations with the architectural drawings. efer to architectural specifications for fire stoppings. rovide a product schedule for U listing, location, wall or floor rating and installation drawing for each penetration fire stop system. xtend pipe insulation for insulated pipe through floor, wall and roof penetrations, including fire rated walls and floors. he vapor barrier shall be maintained. Size sleeve for a minimum of inch annular clear space between inside of sleeve and outside of insulation. rovide box frames for rectangular openings welded gauge galvanized steel attached to forms and of a maximum dimension established by the rchitect. otify the eneral ontractor or rchitect before installing any box openings not shown on the rchitectural or Structural drawings.. ISOI Sealants and accessories shall have fire-resistance ratings indicated, as established by testing identical assemblies in accordance with U 079 or S 8, or other acceptable to. anufacturers: ilti, ectorseal, Specified echnologies Inc., United States ypsum ompany, or corp. hrough and embrane enetration irestopping Systems roduct Schedule: rovide U listing, location, wall or floor rating, and installation drawing for each penetration fire stop system. Where project conditions require modification to qualified testing and inspecting agency's illustrations for a particular firestopping condition, submit illustration, with modifications marked, approved by penetration firestopping manufacturer's fire-protection engineer as an engineering judgment or equivalent fire-resistance-rated assembly. Include qualifications data for testing agency. I. I WII ow voltage control wiring shall be provided by ivision 5ontractor. urnish wiring diagrams to ivision 6 as required for proper equipment hookup. oordinate with ivision 6 the actual wire sizing amps for mechanical equipment (from the equipment nameplate) to ensure proper installation.. UI UIS Y OS rovide necessary equipment and accessories that are not provided by the equipment supplier or Owner to complete installation of equipment furnished by others in locations as indicated on the drawings, specified herein, or both. quipment and accessories not provided by the equipment supplier may include, but not be limited to flues, vents, intakes, associated roof jacks and caps to outdoors, dampers, in-line fans, roof fans, and control interlocks, etc. as required for proper operation of the complete system in accordance with the manufacturer's instructions. ontractor shall be responsible for correct rough-in dimensions and shall verify them with rchitect and/or equipment supplier prior to service installations.. SYS SI USI Upon completion of each phase of the installation, test each system in conformance with local code requirements and as noted below. urnish labor and equipment required to test each system installed under this contract. ssume all costs involved in making the tests and repairing and/or replacing any damages resulting therefrom. inal system testing, balancing and adjustments () shall be performed by a ontractor certified by the ational nvironmental alancing ureau (. shall be performed in accordance with the most current edition of the certified agencies procedural standard for testing, adjusting and balancing and shall comply with the strictest interpretation of that standard for execution and reporting of all work. Work shall include but not be limited to: erform test readings on units, and adjust equipment to deliver specified amounts of air. repare testing and balancing report log showing air supply quantities, air entering and leaving temperatures and unit test readings, and submit six copies of the final compilation of data to the rchitect for evaluation and approval before final inspection of the project. alance air systems to within plus or minus 0 percent for terminal devices and branch lines and plus or minus 5 percent for main ducts and air handling equipment of the amount of air shown on the drawings. ontractor shall record space temperatures and make adjustments in airflow to each diffuser to obtain uniform temperature (no greater than +/- ) in spaces. ocument temperatures and adjustments in tab report. djust equipment to operate as intended by the specification. report shall include a 'report summary/remarks' section in accordance with the procedural standard that provides both system set up and a summary of deficiencies as defined by the procedural standard.. ontractor shall be responsible to calibrate, set, and adjust automatic temperature control sensors, actuators and control devices. heck proper sequencing of interlock systems, and operation of safety controls, adjust thermostats, and control setpoints, limits and time based adjustment to operate in accordance with the performance requirements of the onstruction ocuments. djust pumps, fans, etc. for proper and efficient operation. ertify to rchitect that adjustments have been made and that system is operating satisfactorily. alibrate, set, and adjust automatic temperature controls. heck proper sequencing of interlock systems, and operation of safety controls. echanical contractor shall align bearings and replace bearings that have dirt or foreign material in them with new bearings without additional cost to the Owner.. I IS rovide arr 0/0, pleated, throwaway type filters, or similar as manufactured by ir ilter, Inc., merican ir ilter, landers, or approved equal, unless otherwise indicated. ir units shall have new filters installed when they are operated before final acceptance. If V equipment is used during the construction period, ontractor shall provide one set of filters when the unit is started and replace filters when needed, but not less than every month. On the day of Substantial ompletion, the ontractor shall clean the unit and provide a new set of filters in the unit.. U ISUIO, UWO, SSOIS, US S. U ISUIO rovide fiberglass duct liner with fibers firmly bonded together with a thermosetting resin. iner surface shall serve as a barrier against infiltration of dust and dirt, shall meet S 8 for fungi resistance, and shall be cleanable using duct cleaning methods and equipment outlined by orth merican Insulation anufacturers ssociation (I) duct cleaning guide. Install with liner adhesive and mechanical fasteners in accordance with manufacturer's instructions and recommendations. uctwork sizes shown on drawings are inside clear dimensions. Increase sheet metal by liner thickness in both directions where liner is installed. rovide rectangular liner conforming to S 07, ype I or II that is inch thick, -/ pound density, minimum -.0 ertainteed orp. oughgard or equivalent, ohns anville, Owens-orning, or nauf. rovide liner on the following interior air ducts and where specified on the drawings:. ll new supply rectangular ductwork.. ll rectangular return ductwork t interface of lined and wrapped ductwork, overlap lined ductwork at least feet beyond wrapped insulation. over concealed, rigid ductwork with S 55, ype II flexible fiberglass insulation. Installed insulation shall be -/ inch thick, / pound density, minimum -. duct wrap, ertainteed or equivalent ohns anville, Owens-orning, or nauf with heavy-duty foil-scrim-kraft facing, and with joints taped with inch wide foil tape as follows:. ound supply and return air ductwork.. UWO rovide galvanized steel ductwork and housings as shown on drawings. onstruct ductwork including fittings and transitions in conformance with current S standards relative to gauge, bracing, joints, etc. inimum thickness of duct shall be 6-gauge sheet metal. einforce housings and ductwork over 0 inches with -/ inch angles not less than 5'-6" on centers, and closer if required for sufficient rigidity to prevent vibration. Support horizontal runs of duct from strap iron hangers on centers not to exceed 8'-0". o not support ceiling grid, conduits, pipes, equipment, etc. from ductwork. oordinate routing of ductwork with other contractors such that piping, electrical conduit, and associated supports are not routed through the ductwork. onstruct non-vv supply ducts to meet S positive pressure of inches w.g. onstruct eturn ductwork upstream of fans to meet S negative pressure of inch w.g. onstruct exhaust ductwork downstream of fans to meet S positive pressure of inch w.g. rovide radius elbows, turns, and offsets with a minimum centerline radius of -/ times the duct width. Where space does not permit full radius elbows, provide short radius elbows with a minimum of two continuous splitter vanes. Vanes shall be the entire length of the bend. rovide mitered elbows where space does not permit radius elbows, where shown on the drawings, or at the option of the contractor with the engineer's approval. itered elbows less than 5 degrees shall not require turning vanes. itered elbows 5 degrees and greater shall have single thickness turning vanes of same gauge as ductwork, rigidly fastened with guide strips in ductwork. Vanes for mitered elbows shall be provided in all supply and exhaust ductwork and in return and outside air ductwork that has an air velocity exceeding 000 fpm. o not install vanes in grease ductwork. rovide balancing dampers, manufactured by esco, reenheck, ouvers & ampers, ailor Industries, ottorff, uskin, amco, or approved equal, where shown on drawings and wherever necessary for complete control of air flow. Splitter dampers shall be controlled by locking quadrants; provide Young egulator or Ventlok end bearings for the damper rod. ectangular volume dampers shall be opposed blade interlocking type. ound volume dampers shall be butterfly type consisting of circular blade mounted to a shaft. rovide spin-in fitting with standoff connection and volume damper for round ductwork branch takeoffs to individual air devices. Omit damper at takeoff fitting when damper is located downstream of takeoff. Where access to dampers through a hard ceiling is required, provide a etropolitan ir echnology model -50 or equal by Young's egulator concealed, cable operated volume damper with remote operator. amper shall be adjustable through the diffuser face or frame with standard / inch nutdriver or flat screwdriver. able assembly shall attach to damper as one piece with no linkage adjustment. ositive, direct, two-way damper control shall be provided with no sleeves, springs or screw adjustments to come loose after installation. Support cable assembly to avoid bends and kinks in cable. ound or oval ductwork shall be Semco, United, Wesco or equal, sheetmetal, with smooth interior surface, with low pressure (duct pressure class up to and including inches w.g.) ound ductwork gauges per the following table (reference S V duct construction standards for gauges when pressures exceed inches w.g.): Size uct auge itting auge & under 6 5 thru 6" 8 thru 6" 0 8 thru 50" thru 60" 8 8 ow pressure (duct pressure class up to and including inches w.g.) ittings inches in diameter and less shall be prefabricated, spotwelded and internally sealed. ontinuously weld fittings larger than inches in diameter. itting gauge shall be gauge for 6 inch fittings and under, 0 gauge for larger sizes. 90 degree tee's shall be conical type. Seal longitudinal and transverse ductwork joints airtight with heavy liquid sealant applied according to manufacturer's instructions. rovide gauge thickness in medium pressure (duct pressure class inches to 6 inches w.g.) ductwork as recommended by S.. XI U ow pressure (duct pressure class up to and including inches w.g.) and medium pressure (duct pressure class. inch to 6 inches w.g.) flexible duct shall be lexmaster type 8, hermaflex type -, -, type Silver acket, or equal (fire retardant polyethylene) protective vapor barrier, U..8 lass, acoustical insulated duct, [-.][r-5.0][-6.0][r-8.0] fiberglass insulation. rovide liner with steel wire helix mechanically locked or permanently bonded to the liner. lexible duct runs shall not exceed 5 feet in length, and shall be installed fully extended and straight as possible avoiding tight turns. Install flexible duct in accordance with manufacturer's instructions. Support flexible duct at maximum 5 feet on center and within 6 inches of bends. ends shall not exceed a centerline radius of one duct diameter. uct sag shall not exceed / inch. Supporting material in direct contact with the duct shall not be less than -/ inches in width. onnect flexible duct to rigid metal duct or air devices as recommended by the manufacturer. t a minimum, install two wraps of duct tape around the inner core connection and a metallic or non-metallic clamp over the tape and two wraps of duct tape or a clamp over the outer jacket. uct clamps shall be labeled in accordance with U-8 and marked 8 -. uct tape shall be labeled in accordance with U 8 and marked 8-X.. I VIS rovide air devices as scheduled on drawings, manufactured by arnes, rueger, etalaire, ailor Industries, rice, itus, or uttle & ailey. Select air devices to limit room noise level to no higher than -0 unless otherwise shown. rovide devices with a soft plastic gasket to make an airtight seal against the mounting surface. oordinate final location, frame, and mounting type of air devices with rchitectural reflected ceiling plans. Submit complete shop drawings including information on noise level, pressure drop, throw, for each air device, styles, borders, etc. learly marked with specified equipment number. Submit samples of each air device as requested by the ngineer. rovide wall supply air registers with double deflection blades and opposed blade dampers. rovide wall return air grilles and exhaust air registers with horizontal 5 or 5 degree angle vision-proof bars. rovide concealed fasteners for wall mounted registers and grilles. rovide ceiling mounted air devices of lay-in or surface mounted type as required to be compatible with ceiling construction. rovide ceiling diffusers and grilles with white enamel finish unless noted otherwise. rovide linear slot diffusers of standard one-piece lengths up to 6-feet and furnish in multiple sections greater than 6-feet. oin multiple sections together end-to-end with alignment pins to form a continuous slot appearance. rovide alignment components by the manufacturer. rovide plenums by the slot diffuser manufacturer. lenums shall be internally insulated by the manufacturer with minimum / inch thick, fiberglass insulation.. OIIO I/SO S rovide combination fire/smoke dampers where shown on drawings and as required by ode enforcing authority with fire/smoke ratings as required to maintain the fire rating noted on the rchitectural drawings. ampers shall meet U 555 classification for fire rating and U 555S classification of leakage class II smoke damper; damper shall bear a U label attesting to these classifications. rovide fire damper with a 65 degrees ahrenheit resettable temperature device. ate fire/smoke dampers for a minimum velocity of,000 and pressure of inches W.. rovide manufacturer recommended steel sleeve of length as required to meet the installed location. rovide a qualified 0 volt electric actuator installed by the manufacturer at time of damper fabrication. ctuators shall be rated for a minimum of 0,000 cycles of operation, shall comply with the locally adopted building code and shall open in 5 seconds or less and close in 5 seconds or less after alarm or smoke detection has occurred. rovide stainless steel spring loaded leakage seals in sides of casing, and 6 inch long wire leads for connecting smoke link to smoke detector. nd terminal block for connection to the building fire alarm system. amper shall be manufactured by ir alance, esco, reenheck, ailor Industries, uskin, or United ir. rovide access door, sized per S with minimum size of 0 inch by 0 inch, in duct for inspection and service to fire damper and fusible link. rovide duct access door(s) within inches of the device to allow for testing and maintenance. abel each door (with minimum inch lettering) indicating which damper type is served. oor should be capable of being fully opened or provide removable door. rovide removable section of duct where duct size is too small for 0 inch by 0 inch access door. rovide access door in ceiling or wall as required to access damper.. WII igh voltage wiring is defined as 50 Volts or higher. ow voltage wiring is defined as less than 50 Volts. ivision 5 shall be responsible for all low voltage wiring. oordinate high voltage wiring and interlocks to control devices with ivision 6. rovide power and communication wiring with transient protection in accordance with I 6... ll control and interlock wiring shall comply with the. ontrol wiring shall be sized to accommodate the voltage drop associated with the distance between the control device and the controller. ontrol wiring not installed in conduit shall be U rated for plenum installation. ll lass (line voltage) wiring shall be U listed in approved raceway according to the and ivision 6 requirements. aximum allowable voltage for control wiring shall be 0 V. ll low-voltage wiring shall meet lass requirements. ow-voltage power circuits shall be sub-fused when required to meet lass current limit. onduit for ontrol Wiring: with compression fittings, cold rolled steel, zinc coated or zinc-coated rigid steel with threaded connections. ull and unction oxes: Size according to number, size, and position of entering raceway as required by ational lectrical odes. nclosure type shall be suited to location. onceal all control wiring in finished rooms. o not install lass wiring in raceway containing lass wiring. oxes and panels containing high voltage wiring and equipment may not be used for low-voltage wiring except for the purpose of interfacing the two wires (e.g., relays and transformers). ll wire-to device and wire-to-wire connections shall be made at a terminal block or terminal strip. ll runs of communication wiring shall be unspliced length when that length is commercially available. abel all wiring and cabling at each end within inches of termination with the controller termination number. abel control devices used in the system with permanent labels using the identifiers that match the record documents.. OS OO UI anufacturers and model numbers are listed for reference as to quality and features required for the control devices. rovide control devices by arber-olman, oneywell, ohnson ontrols, rane or White odgers with quality and features as indicated. rovide thermostats capable of operating with the S. rovide button interface with or display screen. Include the following features: temperature information display, setpoint display and adjust, operation mode display and adjustoverride. rovide the following accessories with each thermostat: efer to the drawings where additional sensors are required. O SIO 5 X W Y: : VISIOS: 6 7 Y: onsultant # onsultant - enderson ngineers issouri # ain, Suite 00 ansas ity, O phone fax he rofessional rchitects seal affixed to this sheet applies only to the material and items shown on this sheet. ll lease consider the environment before printing issouri State ertificate of uthority rchitecture # Structure # 0060 ollis + iller rchitects O O: SS IY, O I, SUI 00 //07 :8: I etropolitan ommunity ollege - SU SUSS 70 I SIIIOS 0 SW rafficway ansas ity, O 6 //07 I idding ocuments S. IZ IS # S. IZ O. OO U: -556 XIS //08 # escription ate

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 23 3113 - LOW PRESSURE DUCTWORK PART 1 - GENERAL 1.1 SCOPE OF WORK: A. The work required under this section includes all work necessary for a complete installation of ductwork and accessories.

More information

SECTION LOW PRESSURE DUCTWORK

SECTION LOW PRESSURE DUCTWORK SECTION 15841 LOW PRESSURE DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07270 - Firestopping and Fire and Smoke Barrier Caulking. 2. 15260 - Vibration Isolation. 3. 15280 - Thermal Insulation

More information

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing. SECTION 15841 LOW PRESSURE STEEL DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15180 - Mechanical Systems Insulation. 2. 15940 - Outlets (HVAC). 3. 15991 - Testing and Balancing. 1.02 SUBMITTALS

More information

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows. SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insulation shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System.

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System. SECTION 15910 DUCT ACCESSORIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15890 - Ductwork. 2. 15900 - Controls and Instrumentation. 3. 15940 - Outlets (HVAC). 4. 15970 - HVAC Control System.

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section. SECTION 23 31 13 METAL HVAC DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

METROPOLITAN COMMUNITY COLLEGE 3200 Broadway Kansas City, MO ADDENDUM No. 2 TO Bid # CP Penn Valley Kitchen & Servery Renovation

METROPOLITAN COMMUNITY COLLEGE 3200 Broadway Kansas City, MO ADDENDUM No. 2 TO Bid # CP Penn Valley Kitchen & Servery Renovation TOOIT OUITY O 3200 roadway ansas ity, O 64111 U o. 2 TO id # 19-7220- enn Valley itchen & Servery enovation This ddendum o. 2 is issued on September 12, 2018 to modify the previously issued documents and/or

More information

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section. SECTION 15800! AIR DISTRIBUTION PART 1! GENERAL 1.01 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe Markers. 2. Valve Tags. 3. Equipment Nameplates. 4. Underground Marking Tape. 5. Duct

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410 DOCUMENT 009104 - ADDENDUM NO. 4 Issued to all Bidders: Date: October 14, 2015 Contract Name: Electrical Installation Contract Number: C8410 This addendum forms a part of the Bid described above. The original

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT SECTION 21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2015-2015 ARCAT, Inc. - All rights reserved PART 1 GENERAL

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017 SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

St. Monica Food Pantry

St. Monica Food Pantry St. Monica Food Pantry 26 5113-1 ELECTRICAL WORK DIVISION 26 SECTION 265113 INTERIOR LIGHTING FIXTURES PART 1. GENERAL 1.1 WORK INCLUDES A. Extent, location, and details of interior lighting fixture work

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 00 00.00 20 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding UFGS-26 00 00.00 20 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

*************************************************************************************************************

************************************************************************************************************* 15890 DUCTWORK ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 23 33 13 *************************************************************************************************************

More information

SECTION LIGHTING PART 1- GENERAL

SECTION LIGHTING PART 1- GENERAL SECTION 16500 LIGHTING PART 1- GENERAL 1.01 WORK INCLUDED A. The Contractor shall provide all lighting fixtures, panelboards, labor, material, etc., in accordance with the preceding specifications, the

More information

SECTION CABLE TRAYS

SECTION CABLE TRAYS SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP 1 1 1 0 1 0 1 0 1 SECTION 1 1 CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP BASED ON DFD MASTER SPECIFICATION DATED /01/ P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of

More information

Technical Development Program

Technical Development Program Technical Development Program COMMERCIAL DISTRIBUTION SYSTEMS PRESENTED BY: Ray Chow Duct Design Level 1 Fundamentals Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Introduction

More information

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

SECTION AIR DISTRIBUTION SYSTEM

SECTION AIR DISTRIBUTION SYSTEM SECTION 23 30 00 AIR DISTRIBUTION SYSTEM PART 1 - GENERAL 1.1 Scope of Work: The work covered by this section consists of providing all labor, equipment and materials and performing all operations necessary

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

SECTION BASIC MECHANICAL REQUIREMENTS GENERAL BASIC MECHANICAL REQUIREMENTS PART RELATED DOCUMENTS

SECTION BASIC MECHANICAL REQUIREMENTS GENERAL BASIC MECHANICAL REQUIREMENTS PART RELATED DOCUMENTS SECTION 15010 - BASIC MECHANICAL REQUIREMENTS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Requirements of the Contract Forms, Conditions of the Contract, Specifications, Drawings, and

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation

More information

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS PART 1 - GENERAL 1.1 DESCRIPTION A. This work pertains to furnishing and installing Helical Piles and Bracket Assemblies shown in the Contract in accordance

More information

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers. SECTION 23 05 53 IDENTIFICATION OF HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00 Common

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS SECTION 15062 NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS For best results, display hidden notes to specifier. PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe supports. B. Conduit supports. C. Duct supports,

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

Piping & Equipment Identification

Piping & Equipment Identification Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers. SECTION 22 05 53 IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00

More information

SUNSET & FRANCISQUITO SHOPPING CENTER S I G N P R O G R A M

SUNSET & FRANCISQUITO SHOPPING CENTER S I G N P R O G R A M SUNSET & FRANCISQUITO SHOPPING CENTER WEST COVINA, CALIFORNIA S I G N P R O G R A M PROJECT LOCATION: 1200-1314 West Francisquito Ave., West Covina, CA 91790 PREPARED BY: 6399 Wilshire Blvd., Ste. #604

More information

GE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -

GE Monogram. Installation. Instructions. 36 Vent Hood. Model ZV750. Call anywhere in the US and Canada - at :: rangehoods. com GE Monogram Instructions Model ZV750 GE Monogram at:: rangehoods. com is a division of CAUTION WARNING Before you begin Read these instructions completely and carefully. IMPORTANT:

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

Sheet Metal Worker Level 2

Sheet Metal Worker Level 2 Level 2 Unit: B1 Welding 2 (GMAW and SMAW) Level: Two Duration: 25 hours Theory: Practical: 5 hours 20 hours Overview: Upon completion of this unit of instruction the apprentice will demonstrate knowledge

More information

M1.0 MECHNANICAL FLOOR PLAN

M1.0 MECHNANICAL FLOOR PLAN GENERAL NOTES A. CONTRACTORS AND SUB CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY

More information

IMPORTANT! READ BEFORE PROCEEDING! SV Weather Caps

IMPORTANT! READ BEFORE PROCEEDING! SV Weather Caps SV Weather Caps OPERATION & MAINTENANCE Revised: 08/24/15 IMPORTANT! READ BEFORE PROCEEDING! The information contained herein is, to the best of our knowledge, accurate and applicable for proper operation

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

1. ASME A Scheme for the Identification of Piping Systems.

1. ASME A Scheme for the Identification of Piping Systems. SECTION 40 05 53 - IDENTIFICATION FOR PROCESS PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Labels. 6. Lockout devices. B. Related Requirements:

More information

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing). SECTION 15047 - IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Identification including necessary accessories indicated on Construction Documents and specified in this section or as required

More information

Slate Shingle Specifications

Slate Shingle Specifications Slate Shingle Specifications California Slate is a proud member of the Slate Roofing Contractors Association of North America, Inc. (SRCA) which publishes Section 07310 Slate Shingles setting forth architectural

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

Installation Instructions/Operation and Maintenance Manual. PS DOORS Contact Information. Website psdoors.com

Installation Instructions/Operation and Maintenance Manual. PS DOORS Contact Information. Website psdoors.com Ladder Safety Gate Installation Instructions/Operation and Maintenance Manual Models All Models: LSG-5 to LSG-48 Table of Contents Product Information...2 Inspection & Mainteance...2 Warranty Information...2

More information

Never fill any required clearance space with insulation or any other building materials surrounding the chimney.

Never fill any required clearance space with insulation or any other building materials surrounding the chimney. INSTALLATION AND MAINTENANCE INSTRUCTIONS 1700ºF Air-Cooled Temp/Guard Chimney Sizes 8-16 Listing No. MH8251 Tested to UL103/ULC-S604 A MAJOR CAUSE OF RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCE

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to

More information

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL. METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

Full Height Ladder Safety Gate

Full Height Ladder Safety Gate Full Height Ladder Safety Gate Installation Instructions/Operation and Maintenance Manual Models Powder Coat Yellow (PCY) 304 Stainless Steel (SS) Hot Dipped Galvanized (GAL) Table of Contents Product

More information

Music Area Casework General 1.01 Summary Related Sections Definitions Qualifications and Quality Assurance

Music Area Casework General 1.01 Summary Related Sections Definitions Qualifications and Quality Assurance 1.00 General 1.01 Summary Music Area Casework A. This section includes the following Scope of Work as referred to in the plans: 1. Thermally Fused Laminate manufactured casework, for use in music areas,

More information

INSTALLATION MANUAL STOREFRONT DOORS

INSTALLATION MANUAL STOREFRONT DOORS INSTALLATION MANUAL STOREFRONT DOORS www.aluflam-usa.com SYSTEM DESCRIPTION - Extruded and filled aluminum framing, tested and approved by UL - 3-3/8 frame depth - Clear, fire-rated safety glazing - Door

More information

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply

More information

Standard Specifications

Standard Specifications Standard Specifications PART 1.00 GENERAL 1.01 DECRIPTION SECTION 02620 PRECAST REINFORCED CONCRETE SANITARY MANHOLES A. Work included: The Contractor shall furnish all labor, materials, equipment, and

More information

PAINTING PAINTING

PAINTING PAINTING 09920 - PAINTING 09920-1 PART ONE: GENERAL PAINTING 1.1 Description 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.

More information

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification. Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.