1 Subsea Boosting John Friedemann

2 GE Oil & Gas Land Pipelines ipigs Offshore LNG Liquefied Natural Gas Compression Trains Refinery Subsea

3 A little History 969 OTC SPE OTC

4 Topics Why? Field Example Pumps Compressors Multiphase Boosters Operational Issues Questions 4

5 Artificial Lift: A definition Simply put, artificial lift describes the application of technology to ensure production when the well or riser will not flow naturally (GE Oil and Gas) 5

6 The Boosting Decision Process 6

7 Operator Steps - Defining the Problem - Setting the goals 3- Building Models 4- Optimizing the Process 5- Verifying the solution 6- Field testing 7

8 Problem: Increasing Recovery Oil or Gas Rate Effect of Boosting / Separation But this has a cost: need to be sure 8

9 Building the model Based on net available data 9

10 FDCP Tubing Performance Graphical method to Describe Wells Built from: - Pressure drop from reservoir DP=Q/J J Production index (for example) - Tubing Pressure Drop DP=rgDz + /rfq L/D 3- Choke DP=rQ /C v Rate Note: using single phase flow for this example 0

11 FRBP Riser Performance Graphical method to Describe Wells Built from: - Tubing Pressure Drop DP=rgDz + /rfq L/D Riser Rate Note: using single phase flow for this example

12 FDCP/FRBP Operating Point is the Intersection Riser Rate

13 Pressure The Boosting Problem is Gap-Filling Simple Well Or Riser Supply Flow 3

14 Pressure In Well Compensation Simple Well Or Riser Effect in Well Flow Offshore version is a drilling rig 4

15 Booster Gas ESP Issues: Reliability Normal Operations Gaslift? Pros Simplicity Cons Reliability Maintenance 5

16 Pressure Solution 3: Compensate Simple Well Or Riser Effect in Well Supply Flow (GE Oil and Gas)

17 Pressure Or Curve Displacemnt: Gas Lift Simple Well Or Riser Effect in Well Supply Flow (GE Oil and Gas)

18 Depth Gas Lift Design: Simple Density Method Source Pressure Gas Gradient Mandrel Location Pressure Valve Opening Pressure 8

19 Flow Rate Gaslift Issues: Efficiency and Flow Optimum? Gas Lift GLR Pros Simplicity Maintenance Cons Efficiency Stability Fluids Related 9

20 Pressure Solution 4: Seabed Compensation Flowline NPV Supply Flow (GE Oil and Gas) NP 99 KBS 00 0

21 Pressure, bar Reservoir Fluids Oil 0 Bubble Point Gas Cap 0vol% Gas vol% Gas Dew Point 80 40vol% Gas 99.9vol% Gas 60 99vol% Gas 60vol% Gas Dew Point 40 Bubble Point 80vol% Gas Temperature, oc

22 Back to our field

23 Optimizing: Options - Local processing FPSO,. - Subsea to Beach Separation Singlephase boosting Multiphase Boosting Sevan Marine Rule: Concept independence ie, ignore benefit? 3

24 Export Solutions Melkøya ca. 90 km Sørøya ca. 70 km Snøhvit ca. 70 km Water Depth: 380 m 4

25 What options did they look at? Combinations. Boosting. Separation What are the issues with boosting? 5

26 Pump Technologies Centrifugal Low GVF High Boost Heli-Coaxial Broad GVF Range Moderate Boost Range Twin-Screw High Viscosity High Boost High GVF No Full Spectrum Solution 6

27 Verification & Risk: Tech. Readiness Levels TRL 0 Unproven Concept: Basic R&D, paper concept Basic scientific/engineering principles observed and reported; paper concept; no analysis or testing completed; no design history TRL Proven concept: Proof of Concept as a paper study or R&D experiments ( a ) Technology concept and/or application formulated ( b ) Concept and functionality proven by analysis or reference to features common with/to existing technology ( c ) No design history; essentially a paper study not involving physical models but may include R&D experimentation TRL Validated Concept: Experimental proof of concept using physical model tests Concept design or novel features of design is validated by a physical model, a system mock up or dummy and functionally tested in a laboratory environment; no design history; no environmental tests; materials testing and reliability testing is performed on key parts or components in a testing laboratory prior to prototype construction TRL 3 Prototype tested: System function, performance and reliability tested (a) Item prototype is built and put through (generic) functional and performance tests; reliability tests are performed including; reliability growth tests, accelerated life tests and robust design development test program in relevant laboratory testing environments; tests are carried out without integration into a broader system (b) The extent to which application requirements are met are assessed and potential benefits and risks are demonstrated TRL 4 Environment Tested: Pre production system environment tested Meets all requirements of TRL 3; designed and built as production unit (or full scale prototype) and put through its qualification program in simulated environment (e.g., hyperbaric chamber to simulate pressure) or actual intended environment (e.g., subsea environment) but not installed or operating; reliability testing limited to demonstrating that prototype function and performance criteria can be met in the intended operating condition and external environment.trl 5 System Tested. Production system interface tested Meets all the requirements of TRL 4; designed and built as production unit (or full scale prototype) and integrated into intended operating system with full interface and functional test but outside the intended field environment TRL 6 System Installed: Production System Installed and tested Meets all the requirements of TRL 5; production unit (or full scale prototype) built and integrated into the intended operating system; full interface and function test program performed in the intended (or closely simulated) environment and operated for less than 3 years; at TRL 6 new technology equipment might require additional support for the first to 8 months TRL 7 Field Proven: Production System Field Proven Production unit integrated into intended operating system, installed and operating for more than three years with acceptable reliability, demonstrating low risk of early life failures in the field 7

28 Testing: Need to verify everything Dry vs Wet 8

29 Pressure Basics of Pump Design Assumptions Incompressible liquid No gas Liquid not near vapor pressure Pump path Temperature 9

30 Total Discharge Head and NPSH Total Discharge Head TDH = h d -h s Net Positive Suction Head Available P v = vapor pressure of fluid at inlet NPSHA P inlet r P v h v Pump Power Delivered Required Power Q * TDH * r * g DP * Q DP * Q Required Power Efficiency 30

31 Definitions Note difference in suction elevation Head [=] m or ft 3

32 Head Pump head V [=] m/s G=9.8 m/s D [=] m n=rotational frequency Velocity head= h v Q [=] m 3 /s Head Head v tangential g v g flow D n pipe g D g 4Q impeller Pressure head P [=] Pa Ρ [=] kg/m 3 Head P r g 3

33 Head Total Dynamic Discharge head, h s Static Discharge Head+Velocity head+outlet friction head Head at pump outlet during operation Friction head = h f f = friction factor Head vflow f g L D pipe Total Dynamic Suction Head, h d Static Suction Head+Velocity head-inlet friction head Head at pump inlet during operation 33

34 Effect of Changing Speed 34

35 Multistage vs Single Stage 35

36 Pumps as they are really installed 36

37 Affinity Laws: Used to evaluate sizing Impeller diameter D held constant: pump speed Rate Head Power With speed N held constant: Diameter Rate Head Power N N Q Q N Q N N H H N H 3 3 N N P P N P D D Q Q D Q D D H H D H 3 3 D D P P D P

38 Affinity Laws: Used to evaluate sizing Impeller diameter D held constant: pump speed Rate Head Power With speed N held constant: Diameter Rate Head Power N N Q Q N Q N N H H N H 3 3 N N P P N P D D Q Q D Q D D H H D H 3 3 D D P P D P

39 Pump Curves 39

40 Pump Cavitation Handled by inlet pipe line sizing rule: API RP 4E v max fps = 50 ρ,( lb m ft 3 ) (carbon steel) 40

41

Building Subsea Capability in a Major Operating Company

Building Subsea Capability in a Major Operating Company Building Subsea Capability in a Major Operating Company Marine Technology Society Houston, August 2012. Paul S Jones Subsea Manager Building Subsea Capability to deliver Chevron s Deepwater Assets. Chevron

More information

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our

More information

Use of subsea Multiphase pumps as an alternative to ESP workover in a mature field development Kia Katoozi

Use of subsea Multiphase pumps as an alternative to ESP workover in a mature field development Kia Katoozi Use of subsea Multiphase pumps as an alternative to ESP workover in a mature field development Kia Katoozi May 216 1 Agenda The Otter Field ESP History Otter production & Injection scenarios MPP Feasibility

More information

OneSubsea Pumps and Subsea Processing Systems

OneSubsea Pumps and Subsea Processing Systems OneSubsea Pumps and Subsea Processing Systems Pumps and Subsea ProcessING Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our aim is to provide comprehensive technical

More information

Learn more at

Learn more at Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry

More information

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept The Market :- Focus on Platform or Gas-to-Surface Replacement Summary Many global

More information

Slug Flow Loadings on Offshore Pipelines Integrity

Slug Flow Loadings on Offshore Pipelines Integrity Subsea Asia 2016 Slug Flow Loadings on Offshore Pipelines Integrity Associate Professor Loh Wai Lam Centre for Offshore Research & Engineering (CORE) Centre for Offshore Research and Engineering Faculty

More information

Safety and Environment considerations override all other items and should be considered in all design aspects.

Safety and Environment considerations override all other items and should be considered in all design aspects. 서유택 해저공학 Lecture plan Introduction The design and operation of offshore production facilities are becoming a critical component as the industry goes to deeper water, longer tiebacks, higher temperature

More information

INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France

INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES Y. OLANIYAN TOTAL S.A. France CONTENTS Introduction Slug flow in field design phase Field case study Conclusion Investigation of Slug flow in Deepwater

More information

Industry collaboration to develop next generation subsea (well stream) compression system

Industry collaboration to develop next generation subsea (well stream) compression system PAU, FRANCE 5-7 APRIL 2016 Industry collaboration to develop next generation subsea (well stream) compression system Marco Gabelloni, Knut Nyborg, Anders Storstenvik Aker Solutions Alexandre de Rougemount

More information

Gas Well Dewatering Efforts in OMV-Petrom Fields, Romania

Gas Well Dewatering Efforts in OMV-Petrom Fields, Romania Gas Well Dewatering Efforts in OMV-Petrom Fields, Romania September 2012 Vasile Stanculescu, Laurentiu Niculeanu - OMV Petrom Silviu Ungureanu, Bogdan Iordanescu - Weatherford Company CONTENT Background

More information

Cost Reduction in Frontier Deepwater Riser Systems

Cost Reduction in Frontier Deepwater Riser Systems NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Cost Reduction in Frontier Deepwater Riser Systems Ray Burke Global Product Leader GE Oil & Gas Applications Subsea Production, Injection, Export Combines

More information

Liquid ring vacuum pumps in compact design

Liquid ring vacuum pumps in compact design Liquid ring vacuum pumps in compact design SIHI extruvac LEME 13, LEME 155 Pressure range: Suction volume flow: 1 to 113 mbar 3 to 17 m³/h CONSTRUCTION TYPE SIHI liquid ring vacuum pumps are displacement

More information

The Partnership Between Solution Providers and Oil Companies

The Partnership Between Solution Providers and Oil Companies The Partnership Between Solution Providers and Oil Companies Morten Wiencke Director DEMO 2000 OTC 18576 Offshore Technology Conference,, Houston May 2007 Vision 1999 = Reality 2007 Yesterday Today Tomorrow

More information

Thermodynamic Modelling of Subsea Heat Exchangers

Thermodynamic Modelling of Subsea Heat Exchangers Thermodynamic Modelling of Subsea Heat Exchangers Kimberley Chieng Eric May, Zachary Aman School of Mechanical and Chemical Engineering Andrew Lee Steere CEED Client: Woodside Energy Limited Abstract The

More information

Oil&Gas Subsea Production

Oil&Gas Subsea Production Oil&Gas Subsea Production Oil&Gas Subsea Production The first subsea technologies were developed in the 1970s for production at depths of a few hundred meters. Technology has advanced since then to enable

More information

BC-10 PARQUE DAS CONCHAS

BC-10 PARQUE DAS CONCHAS BC-10 PARQUE DAS CONCHAS Deployment and Replication of New Technology Ebere G. Chimezie Director of Subsea Projects Shell Brasil Petroleo Ltda September 2012 1 DEFINITIONS AND CAUTIONARY NOTE Resources:

More information

Investor Relations Presentation April 30, 2013

Investor Relations Presentation April 30, 2013 Investor Relations Presentation April 30, 2013 FORWARD LOOKING STATEMENTS In addition to the historical data contained herein, this document may include forward-looking statements regarding the future

More information

Setting new records with subsea boosting systems in fields in the Gulf of Mexico, North Sea, and offshore Angola

Setting new records with subsea boosting systems in fields in the Gulf of Mexico, North Sea, and offshore Angola Setting new records with subsea boosting systems in fields in the Gulf of Mexico, North Sea, and offshore Angola Arne B. Olsen PAU, FRANCE 5 7 APRIL 2016 Content Introduction Historic view of boosting

More information

Active Heating Potential Benefits to Field Development

Active Heating Potential Benefits to Field Development Active Heating Potential Benefits to Field Development Journées Annuelles du Pétrole 12/13 Octobre Paris Atelier Champs Matures et Satellites Technip Subsea Innovation Management (T-SIM) Contents 1. INTRODUCTION

More information

ADCHEM International Symposium on Advanced Control of Chemical Processes Gramado, Brazil April 2-5, 2006

ADCHEM International Symposium on Advanced Control of Chemical Processes Gramado, Brazil April 2-5, 2006 ADCHEM 26 International Symposium on Advanced Control of Chemical Processes Gramado, Brazil April 2-5, 26 CONTROL SOLUTIONS FOR SUBSEA PROCESSING AND MULTIPHASE TRANSPORT Heidi Sivertsen John-Morten Godhavn

More information

Applied Technology Workshop Twin Screw Multiphase Pump. Ove Jahnsen 08 February 2005

Applied Technology Workshop Twin Screw Multiphase Pump. Ove Jahnsen 08 February 2005 Applied Technology Workshop Twin Screw Multiphase Pump Ove Jahnsen 08 February 2005 Introduction SUBSEA MULTIPHASE TWIN SCREW PUMPS MultiBooster A part of AkerKvaerner's Subsea Integral Product Line Main

More information

DEEP AND ULTRADEEP WATER PRODUCTION IN BRAZIL a high value knowledge base. Solange Guedes Petrobras Head of Exploration & Production

DEEP AND ULTRADEEP WATER PRODUCTION IN BRAZIL a high value knowledge base. Solange Guedes Petrobras Head of Exploration & Production DEEP AND ULTRADEEP WATER PRODUCTION IN BRAZIL a high value knowledge base Solange Guedes Petrobras Head of Exploration & Production Safety is our most important value Safety First PREVENTIVE VISION BEHAVIOR

More information

Deepwater Subsea Tie-Back Flow Assurance Overview M U R P H Y S A B A H O I L C O M P A N Y L T D.

Deepwater Subsea Tie-Back Flow Assurance Overview M U R P H Y S A B A H O I L C O M P A N Y L T D. Deepwater Subsea Tie-Back Flow Assurance Overview 1 Contents Case Study Overview Flow Assurance Basis/Data Results Pre-FEED/FEED Considerations Flow Assurance Field Architecture Technologies 2 Preliminary

More information

Analysis of Multiphase Flow Instabilities in the Girassol Deep Offshore Production System

Analysis of Multiphase Flow Instabilities in the Girassol Deep Offshore Production System Analysis of Multiphase Flow Instabilities in the Girassol Deep Offshore Production System Erich Zakarian, Dominique Larrey Total E&P, Process Department, France ABSTRACT After over 6 years as operator

More information

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Offshore Development Concepts: Capabilities and Limitations Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Outline Platforms Floating Structures Semi-Submersible/ Floating Production

More information

Opportunities and Challenges in Deepwater West Africa Projects

Opportunities and Challenges in Deepwater West Africa Projects Opportunities and Challenges in Deepwater West Africa Projects Finding Petroleum - Finding African Oil Mark Jones - INTECSEA (UK) Royal Society of Chemistry, London 28th January 2015 Opportunities and

More information

Research for Ultra-Deepwater Production

Research for Ultra-Deepwater Production Research for Ultra-Deepwater Production Opening Seminar Marintek do Brasil Rio de Janeiro, Apr 19, 2007 Mauricio Mauricio Werneck Werneck PROCAP PROCAP 3000 3000 Coordinator Coordinator Petrobras Investment

More information

Abstract. Keywords: Petroleum. Production. Water injection system. Control system. Dynamic computational modeling. 1. Introduction

Abstract. Keywords: Petroleum. Production. Water injection system. Control system. Dynamic computational modeling. 1. Introduction IBP1340_18 WATER INJECTION DYNAMIC MODEL FOR PRESSURE INSTABILITIES INVESTIGATION Álvaro M. Borges Filho 1, Kamila S. Oliveira 2, Rodrigo S. Monteiro³, Ana Cristina B. Garcia 4, Fernando B. Pinto 5. Copyright

More information

Integrated Modeling of Complex Gas-Condensate Networks

Integrated Modeling of Complex Gas-Condensate Networks Integrated Modeling of Complex Gas-Condensate Networks Elliott Dudley (Senior Consultant MSi Kenny) Subsea UK 2013 Aberdeen, UK Experience that Delivers Overview Agenda Integrated Modelling Methodology

More information

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING Red Marine provides intelligent engineering solutions to global clients working in the oil & gas, nuclear and renewable energy industries. With a broad

More information

Computational Fluid Dynamic Modelling of a Gas-Motive, Liquid-Suction Eductor for Subsea Gas Processing Applications

Computational Fluid Dynamic Modelling of a Gas-Motive, Liquid-Suction Eductor for Subsea Gas Processing Applications Computational Fluid Dynamic Modelling of a Gas-Motive, Liquid-Suction Eductor for Subsea Gas Processing Applications Tristan Ashford Jeremy Leggoe Zachary Aman School of Mechanical and Chemical Engineering

More information

ECDM System. November, Security Classification: Restricted - Status: Draft

ECDM System. November, Security Classification: Restricted - Status: Draft ECDM System November, 2014 Objective Enhance the ability to safely and efficiently drill deep-water wells High uncertainty in pore and fracture pressure gradients Narrow drilling margins Develop system

More information

API COPM CPMA Chapter 20.X

API COPM CPMA Chapter 20.X API COPM CPMA Chapter 20.X David Courtney Pamela Chacon Matt Zimmerman Dan Cutting 24 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February

More information

A Methodology for Efficient Verification of Subsea Multiphase Meters used in Fiscal Allocation

A Methodology for Efficient Verification of Subsea Multiphase Meters used in Fiscal Allocation A Methodology for Efficient Verification of Subsea Multiphase Meters used in Fiscal Allocation Richard Streeton FMC Technologies Ian Bowling - Chevron 24 25 February 2016 Houston, TX Contents The MPM Meter

More information

By: Derek Watson and Lee Robins, Tracerco, UK

By: Derek Watson and Lee Robins, Tracerco, UK TRACERCO DISCOVERY SUBSEA CT (COMPUTED TOMOGRAPHY) HELPS TO OPTIMISE YOUR OPERATIONAL PIGGING CAMPAIGN AND VERIFY ILI RESULTS: TECHNOLOGY FOR PIPELINE INTEGRITY AND FLOW ASSURANCE VISUALISATION By: Derek

More information

In detailed design the station is prepared for operation

In detailed design the station is prepared for operation Deep Water Boosting Design in an Operational Perspective Tine Bauck Irmann-Jacobsen TechnipFMC NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 The Multiphase Boosting Station operation in the system

More information

Gulfstar One FPS. Nathan Davidson. February 26, 2015

Gulfstar One FPS. Nathan Davidson. February 26, 2015 Gulfstar One FPS Nathan Davidson February 26, 2015 1 Outline > Williams Gulfstar strategy > The first Gulfstar: Gulfstar One ( GS1 ) Overview Specifications Fabrication Installation Challenges and lessons

More information

Subsea Well Engineering

Subsea Well Engineering Subsea Well Engineering Prof. Marcio Yamamoto UNIVERSITY OF SÃO PAULO Dept. of Mining and Petroleum Engineering December 11th, 2014 Kashiwa, Chiba Subsea Well Engineering Water Depth Petroleum Well Classification

More information

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value SUBSEA 7 AND GRANHERNE ALLIANCE Viable Solutions Operators are seeking novel and reliable concepts to overcome industry challenges such as complex reservoirs, cost, growth and schedule creep and to optimise

More information

Offshore Construction Management Services. Capability & Experience

Offshore Construction Management Services. Capability & Experience Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by

More information

Made to Measure. New upstream control and optimization techniques increase return on investment

Made to Measure. New upstream control and optimization techniques increase return on investment Software Made to Measure New upstream control and optimization techniques increase return on investment Bård Jansen, Morten Dalsmo, Kjetil Stenersen, Bjørn Bjune, Håvard Moe With most oil and gas fields

More information

Guiding questionnaire for re-sitting examination

Guiding questionnaire for re-sitting examination TPG 4230 Spring 2015 Page 1 of 17 Norwegian University of Science and Technology (NTNU). INSTITUTT FOR PETROLEUMSTEKNOLOGI OG ANVENDT GEOFYSIKK Guiding questionnaire for re-sitting examination Course:

More information

Missing the Potential Value of Subsea Processing Technology

Missing the Potential Value of Subsea Processing Technology Missing the Potential Value of Subsea Processing Technology Produced Water Club Intro Talk Ian Ball, Technical Advisor INTECSEA UK Aberdeen, 10 th December 2014 DISCLAIMER This presentation contains the

More information

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr. Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational

More information

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE Project Discipline Technology Product Line TECHNOLOGY DEVELOPMENT Technology WITHIN SBM OFFSHORE TECHNOLOGY CREATING VALUE 1959 1960 1972 1973 1977 1981 1985 1985 1986 CALM Buoy Drilling Jack-up DP Drillship

More information

Enabling Subsea Processing by Connecting Innovation with Experience

Enabling Subsea Processing by Connecting Innovation with Experience Subsea solutions Enabling Subsea Processing by Connecting Innovation with Experience Products and systems for deepwater oil and gas developments Answers for energy. Enhancing oil and gas recovery in challenging

More information

January 11, Block BS-4 Atlanta Field Early Production System (EPS)

January 11, Block BS-4 Atlanta Field Early Production System (EPS) January 11, 2013 Block BS-4 Atlanta Field Early Production System (EPS) DISCLAIMER This document contains some statements and information about the Company that reflect the current views and/or expectations

More information

www. otech.com.sg EFS801 ELECTROMAGNETIC FLOWMETER

www. otech.com.sg EFS801 ELECTROMAGNETIC FLOWMETER www. otech.com.sg EFS801 ELECTROMAGNETIC FLOWMETER 1 www. otech.com.sg EFS801 - CFT181/RFT201 ELECTROMAGNETIC FLOWMETER Accurate, Reliable and Stable Flow Measurement. Measuring Principle The measuring

More information

2018 Tulane Engineering Forum

2018 Tulane Engineering Forum 2018 Tulane Engineering Forum Friday, April 20, 2018, Morial Convention Center, New Orleans, LA Offshore Oil & Gas Exploration & Production An Overview from a Technical Perspective Okite Obakponovwe BEng

More information

Design and Performance Testing of an Integrated, Subsea Compact Separation System for Deep-water Applications

Design and Performance Testing of an Integrated, Subsea Compact Separation System for Deep-water Applications Design and Performance Testing of an Integrated, Subsea Compact Separation System for Deep-water Applications MCE Deepwater Development April 8 & 9, 2014 Madrid, Spain Ed Grave Fractionation & Separation

More information

Subsea Processing and Cold Flow Technology for Extended Oil and Gas Developments

Subsea Processing and Cold Flow Technology for Extended Oil and Gas Developments Subsea Processing and Cold Flow Technology for Extended Oil and Gas Developments Samuel Paul Flow Assurance Engineer Ratnam Sathananthan Global Flow Assurance Manager / Technical Authority 20 th June 2018

More information

Deep offshore gas fields: a new challenge for the industry

Deep offshore gas fields: a new challenge for the industry Deep offshore gas fields: a new challenge for the industry Emil Gyllenhammar Aker Solutions PAU, FRANCE 5 7 APRIL 2016 The challenge Remote gas fields in offshore depths of up to 3000 m Far away from the

More information

Control and Monitoring of Subsea Power Grid

Control and Monitoring of Subsea Power Grid Control and Monitoring of Subsea Power Grid 26.05.2011 Siemens Oil & Gas solutions - Offshore 2010. All rights reserved. Siemens Subsea Solution Segments 5 Main Solution Segments That are Evolving Subsea

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

Offshore Pipelines. Capability & Experience

Offshore Pipelines. Capability & Experience Offshore Pipelines Capability & Experience Capability Overview INTECSEA is a leading engineering and project delivery company in the offshore oil and gas sector. It operates across the full project cycle

More information

Passive Acoustic Leak Detection

Passive Acoustic Leak Detection GE GE Oil & Gas Measurement & Control Passive Acoustic Leak Detection Jens Abrahamsen Business Manager GE Digital Solutions Naxys SEMINAR: LEKKASJEDETEKSJON PETROLEUMSTILSYNET, 04.05.207, STAVANGER TECHOLOGY

More information

Deepwater Precommissioning Services

Deepwater Precommissioning Services Deepwater Precommissioning Services Featuring Denizen remote subsea technologies Drilling Evaluation Completion Production Intervention Pipeline & specialty services Nitrogen services Pipeline services

More information

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Dag Almar Hansen, CEO Feb. 3-7, 2014 2014 Gas-Lift Workshop 1 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Pressure management

More information

Produced Water Results

Produced Water Results Produced Water Results A View of the Vortex With Produced Water VORTEX SOLIDS Voraxial Separator Benefits No Pressure Drop provides a pressure increase High G force Separation of 3 components simultaneously

More information

ARTIFICIAL LIFTING TRAINING

ARTIFICIAL LIFTING TRAINING Training Title ARTIFICIAL LIFTING TRAINING Duration 5 days Training Venue and Dates Artificial Lifting Training 5 18-22 Nov $3,300 Kuwait In any of 5 star hotel. Exact venue will be informed later. Training

More information

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 August 2015

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 August 2015 Introduction to Subsea Production Systems 02 What is Subsea? August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER What is Subsea? 2 1 Goals Know the main building blocks forming a subsea production

More information

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer Subsea Asia 2008 - Subsea Processing June 2008 Dennis Lim Senior Field Development Engineer Agenda Overview of FMC Subsea processing projects History and on-going projects Recent development within subsea

More information

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA Dagang Zhang COTEC Offshore Engineering Solutions China Offshore Oil Engineering Company 2011 China-America Frontiers of Engineering Symposium San Diego, USA Presentation Outline Current Status of Deepwater

More information

LOCAL CONTENT UFRJ ROLE Professor Adilson de Oliveira Professor Edson Watanabe

LOCAL CONTENT UFRJ ROLE Professor Adilson de Oliveira Professor Edson Watanabe LOCAL CONTENT UFRJ ROLE Professor Adilson de Oliveira Professor Edson Watanabe adilson@ie.ufrj.br watanabe@adc.coppe.ufrj.br SUMMARY Background Observatory of Local Content Technological Park (COPPE) Vast

More information

Real-time Gas Lift Optimisation using Production Universe RTO

Real-time Gas Lift Optimisation using Production Universe RTO 32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 Real-time Gas Lift Optimisation using Production Universe RTO Filip Stroobant Shell Global Solutions International BV This presentation

More information

Analyzing Thermal Insulation for Effective Hydrate Prevention in Conceptual Subsea Pipeline Design

Analyzing Thermal Insulation for Effective Hydrate Prevention in Conceptual Subsea Pipeline Design International Journal of Current Engineering and Technology E-ISSN 2277 4106, P-ISSN 2347 5161 2015INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijcet Research Article Analyzing

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

OPTISONIC Ultrasonic flowmeter for liquids in all industrial applications

OPTISONIC Ultrasonic flowmeter for liquids in all industrial applications OPTISONIC 3400 Ultrasonic flowmeter for liquids in all industrial applications Measurement of conductive and non-conductive, low and high viscous liquids, from -200 to +250 C / -328 to +482 F medium temperature

More information

bakerhughes.com Artificial Lift Research and Technology Center Pushing production boundaries

bakerhughes.com Artificial Lift Research and Technology Center Pushing production boundaries bakerhughes.com Artificial Lift Research and Technology Center Pushing production boundaries 2 Production challenges are becoming more complicated 3 The oil required to fuel the world s future energy requirements

More information

Applying Earned Value to Overcome Challenges. In Oil and Gas Industry Surface Projects

Applying Earned Value to Overcome Challenges. In Oil and Gas Industry Surface Projects Abstract Series on Earned Value Management 1 In Oil and Gas Industry Surface Projects By Williams Chirinos, MSc, PEng, PMP Statistics show that the failure rate of projects in the oil and gas industry

More information

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants OFFSHORE SPECIALIST ENGINEERING SERVICES ZEE Engineering Consultants With experienced engineers, with advanced knowledge in FEA modeling and backed by state of the art software, ZEE Engineering Consultants

More information

Experimental Study on the Down-Speed of Conductor Pipe Influenced by Jetting Displacement in Deepwater Drilling

Experimental Study on the Down-Speed of Conductor Pipe Influenced by Jetting Displacement in Deepwater Drilling Advances in Petroleum Exploration and Development Vol. 10, No. 2, 2015, pp. 88-92 DOI:10.3968/7742 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Experimental Study on

More information

Center for Deepwater Technology

Center for Deepwater Technology Center for Deepwater Technology 2 Center for Deepwater Technology { CTAP will increase IMP capacities for research, scaling and technological services Mission To asimilate, generate and qualify technologies

More information

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information

Advancing Global Deepwater Capabilities

Advancing Global Deepwater Capabilities Advancing Global Deepwater Capabilities BP s Commitment The Deepwater Horizon incident was a tragic accident that took 11 lives and impacted thousands of people and the Gulf environment Going forward,

More information

Nils J. Vågen Framo Engineering

Nils J. Vågen Framo Engineering First World Wide Subsea Raw Seawater Injection System in Operation on CNR s Columba E Field Nils J. Vågen Framo Engineering Columba E First Raw Seawater Injection System PROTECTIVE STRUCTURE & FRAMO DUAL

More information

En strategi for å levere mer verdiskapende prosjekter

En strategi for å levere mer verdiskapende prosjekter En strategi for å levere mer verdiskapende prosjekter Marie Ravnestad VP Modification Projects AKER BP ASA Modifikasjonskonferansen 7. mars 2018 CORPORATE STRATEGY A focused portfolio on the NCS Skarv

More information

HEALTH-AWARE OPERATION OF A SUBSEA GAS COMPRESSION SYSTEM UNDER UNCERTAINTY

HEALTH-AWARE OPERATION OF A SUBSEA GAS COMPRESSION SYSTEM UNDER UNCERTAINTY HEALTH-AWARE OPERATION OF A SUBSEA GAS COMPRESSION SYSTEM UNDER UNCERTAINTY A. Verheyleweghen and J. Jäschke Dept. of Chemical Engineering, Norwegian University of Science and Technology, NTNU, Trondheim,

More information

Study of development alternatives for remote offshore, low energy reservoirs: the Wisting field case

Study of development alternatives for remote offshore, low energy reservoirs: the Wisting field case Study of development alternatives for remote offshore, low energy reservoirs: the Wisting field case Elshad Yadigarov Petroleum Engineering Submission date: July 2017 Supervisor: Milan Stanko, IGP Norwegian

More information

Flow Assurance A System Perspective

Flow Assurance A System Perspective MEK4450 - FMC Technologies Flow Assurance A System Perspective By Tine Bauck Irmann-Jacobsen Contact: TineBauck.Irmann-Jacobsen@fmcti.com MobPhone: 9175 9872 The objective of this part is to familiarize

More information

Compact subsea gas compression solution for maximized recovery

Compact subsea gas compression solution for maximized recovery Compact subsea gas compression solution for maximized recovery Aberdeen, 6 th February 2014 Marco Gabelloni Senior engineer 2014 Aker Solutions Why subsea gas compression Gas fields require boosting of

More information

Marathon Drilling Indonesia

Marathon Drilling Indonesia Marathon Drilling Indonesia Case History of Managed Pressure Drilling in Deepwater Marathon International Petroleum Indonesia Limited Introduction Marathon signed a PSC for Pasangkayu block in Makassar

More information

Building Subsea Capability

Building Subsea Capability Building Subsea Capability Paul S Jones Subsea Manager Energy Technology Company Subsea UK 8 February 2012, Aberdeen. Chevron Global Subsea Presence One of the largest in the industry Production/ MCPs

More information

Experimental investigation of pressure instabilities affected by cavitation for a double-suction centrifugal pump

Experimental investigation of pressure instabilities affected by cavitation for a double-suction centrifugal pump IOP Conference Series: Earth and Environmental Science Experimental investigation of pressure instabilities affected by cavitation for a double-suction centrifugal pump To cite this article: Z F Yao et

More information

April 10, 2013 Washington DC. Joe Levine, BSEE John Cushing, BSEE

April 10, 2013 Washington DC. Joe Levine, BSEE John Cushing, BSEE April 10, 2013 Washington DC Joe Levine, BSEE John Cushing, BSEE Emerging Technologies Branch Best Available and Safest Technology (BAST) Systems Reliability Contracts Oil and gas research of interest

More information

The Use Of Innovative Multi-Phase Flow Meters to Achieve Superior Measurement Accuracy and Reliability, While Lowering Overall Cost of Facility

The Use Of Innovative Multi-Phase Flow Meters to Achieve Superior Measurement Accuracy and Reliability, While Lowering Overall Cost of Facility The Use Of Innovative Multi-Phase Flow Meters to Achieve Superior Measurement Accuracy and Reliability, While Lowering Overall Cost of Facility 5 th Annual Cost-Effective Well Site Facilities Onshore 2018

More information

Marine Risers. Capability & Experience

Marine Risers. Capability & Experience Marine Risers Capability & Experience Capability Overview INTECSEA now offers, in a single company, industry leading capability for all marine riser systems including top-tensioned risers (TTRs) for direct

More information

Technical Challenges in Offshore Development New Technology Required for Future Offshore Development

Technical Challenges in Offshore Development New Technology Required for Future Offshore Development JOGMEC Techno Forum 2013 Technical Challenges in Offshore Development New Technology Required for Future Offshore Development Jim Raney Director of Engineering Global Engineering & Technology Anadarko

More information

Summary of Changes and Current Document Status

Summary of Changes and Current Document Status DNV SERVICE DOCUMENTS Summary of Changes and Current Document Status FEBRUARY 2012 FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life,

More information

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS) Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines

More information

Subsea compression. The big boost for subsea gas fields Knut Nyborg - VP Power & Process/Presented by Morten R Pedersen.

Subsea compression. The big boost for subsea gas fields Knut Nyborg - VP Power & Process/Presented by Morten R Pedersen. part of Aker Subsea compression The big boost for subsea gas fields Knut Nyborg - VP Power & Process/Presented by Morten R Pedersen 2008 Aker Solutions Topics Rationale of subsea processing and subsea

More information

Water Circulation Pumps & Circulators PERFORMANCE CURVES. CI Pumps. FI Pumps. Taco Curve Book B

Water Circulation Pumps & Circulators PERFORMANCE CURVES. CI Pumps. FI Pumps. Taco Curve Book B Water Circulation Pumps & Circulators PERFORMANCE CURVES FI Pumps CI Pumps Taco Curve Book 300-2.5B Effective April 27, 2017 (Supersedes March 31, 2012 CAPACITY IN LITERS/SEC FLOW IN GALLONS PER MINUTE

More information

Evolution of Deepwater Subsea / Offshore Market

Evolution of Deepwater Subsea / Offshore Market Evolution of Deepwater Subsea / Offshore Market Amar UMAP Vice President, Technip COOEC Alliance DMFT 2014 Zhu Hai, China 18 October 2014 Table of contents 1. Evolution of Offshore/ Subsea Oil & Gas Industry

More information

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations Presented by: James Young, JDR Engineering Director 1 MCE DEEPWATER DEVELOPMENT 2015 1. Introduction 2. JDR Cables and Umbilicals

More information

An Improved Analytical Model for Efficiency Estimation in Design Optimization Studies of a Refrigerator Compressor

An Improved Analytical Model for Efficiency Estimation in Design Optimization Studies of a Refrigerator Compressor Purdue University Purdue e-pubs International Compressor Engineering Conference School of Mechanical Engineering 2014 An Improved Analytical Model for Efficiency Estimation in Design Optimization Studies

More information

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil Implementing FPSO Digital Twins in the Field David Hartell Premier Oil Digital Twins A Digital Twin consists of several key elements and features: 1. A virtual, dynamic simulation model of an asset; 2.

More information

R&D - Technology Development November Conference RJ, 3-4 November by Innovation Norway

R&D - Technology Development November Conference RJ, 3-4 November by Innovation Norway R&D - Technology Development November Conference RJ, 3-4 November by Innovation Norway Mika Tienhaara 04.11.2014 RJ GENERAL ASPECTS 2 R&D CENTERS IN WINTERTHUR (DOWNSTREAM) & ARNHEM (UPSTREAM) 3 SINCE

More information

Subsea Processing. Largest contributor to Increased Recovery Enabler for difficult production regimes:

Subsea Processing. Largest contributor to Increased Recovery Enabler for difficult production regimes: Subsea Processing & Boosting OMC 2011,, IOR Workshop Ravenna 24 th March 2011 Ove F Jahnsen MamagerEarly Phase & Market Ovefritz.jahnsen@fks.fmcti.com 1 Subsea Processing Boosting Station Compression Station

More information