1 Marathon Drilling Indonesia Case History of Managed Pressure Drilling in Deepwater Marathon International Petroleum Indonesia Limited
2 Introduction Marathon signed a PSC for Pasangkayu block in Makassar Strait in September 2006 Potential prospects within the block included prognosed carbonate build-ups with potential for encountering karstified reservoirs which could result in massive losses while drilling In deep water a gas influx will not really start to expand until after it is above the Subsea BOP With the potential for massive losses, we were concerned that swapping of fluids (gas coming in with mud being lost) could mask an influx and result in gas getting into the riser without being detected Standard set up on most deepwater drilling rigs is not suited for handling a situation like this
3 Rig Sharing Consortium Six Companies with well commitments in the Makassar Strait area signed a Rig Sharing Agreement in October 2007 A rig tender was issued and evaluated with a Drilling Rig Contract for a DP Drillship being signed in February 2008 Several Consortium members had similar concerns regarding potential for encountering losses and have a gas influx get above the Subsea BOP undetected After signing the Drilling Rig Contract we immediately started discussions the Drilling Contractor to investigate methods to mitigate the risks of this unplanned event The Drilling Contractor was very proactive in providing ideas and g y p p g their engineering team provided details of equipment that was available from a project which had been cancelled
4 Riser Gas Handling On the Contracted rig the Choke, Kill, Boost and Hydraulic lines terminate on a dedicated termination joint below the slip joint This arrangement means that there are no lines attached to the slip joint therefore installing a shut off device below the slip joint is possible An 18-3/4 Annular BOP was available together th with an 18-3/4 flow spool with 2 x 6 outlets Had to commit quickly to have time to order forgings g for riser crossovers, long 6 high pressure hoses and extension hoses for the rig Choke, Kill, Boost and service lines Four of the Consortium members agreed a Contract Amendment with to add this to the Drilling Rig Contact The equipment was procured and shipped to Singapore where the rig was undergoing maintenance and planned SPS work at Sembawang shipyard
5 Riser Gas Handling Equipment Description Marine Riser - 21-in Stewart & Stevenson with SSQR-F connectors rated to 2,000,000, lbs tension. 3 15k C&K lines and 6 boost line Riser Circulating Spool with 2 x 6 outlets with double valves and hoses back to moonpool. A separate control panel was installed for the flow spool and annular 21-1/4 x 2K Hydril MSP subsea annular BOP above the flow spool Marine riser crossovers installed at the top and bottom of the RGH system to make up to the SSQR riser connections Control panel for the Annular BOP and Flowspool Valves complete with an umbilical and reel B ff if ld d fi d li i th l t ti i t th Buffer manifold and fixed lines in the moonpool area to tie in to the rig choke manifold and boost line
6 Riser Gas Handling additional equipment Following the decision to install the Riser Gas Handling system one of the Consortium members took the lead in exploring the possibility of adding a Rotating Control Device (RCD) into the set-up, together with flow control and pressure management systems (MPD Equipment) An MPD Contractor proposed their new below-tension-ring RCD which was designed to be deployed below the water line All parties worked together to develop detailed plans to install all the equipment necessary in the confined space available around the moonpool on the rig Marathon signed a contract to have the complete MPD system Marathon signed a contract to have the complete MPD system available for the first Marathon Well which was scheduled to start in the 2 nd quarter of 2010.
7 Riser Gas Handling Equipment Description The flowspool, annular, RCD, and crossovers were integrated into a 40ft joint, with standard riser connectors at each end which made allowed handling using the riser running tools, and the whole assembly could be installed through the rotary table The 40ft assembly was made up and loaded onboard the rig in Singapore in mid-april 2010 The buffer manifold and fixed lines were partially installed in the shipyard and had to be completed after the rig came on hire while drilling our riserless sections The MPD Manifold complete with Control system was also installed in the shipyard with final rig up and testing being completed at the first drilling location
8 Riser Gas Handling (RGH) & Riser Arrangement
9 9
10 P&ID GSF Explorer 09CPDT004 MSEC Weatherford MPD equipment rig up RIG CHOKE MANIFOLD RC27 RC25 RC26 RC28 To MGS RC23 RC24 V4 STANDPIPE MANIFOLD P P P RC20 RC21 RC22 To Shakers SP9 SP10 SP11 SP5 SP6 SP7 SP8 SP4 SP1 SP2 SP3 RISER BOOST MANIFOLD P P To Shakers RC15 RC16 RC17 RC18 RC11 RC12 RC13 RC14 RC9 RC10 RC5 RC6 RC7 RC8 RC1 RC2 RC3 RC4 From CMT Unit RC19 Boost line Kill Line Choke Line P To Shakers KL1 BUFFER MANIFOLD BM1 BM2 BM3 BM4 BM5 BM6 BM7 V1 P SC1 CORIOLIS Choke A GV4 GV7 GV3 GV1 GV6 GV2 GV8 GV5 Choke B SC2 SECURE MANIFOLD V2 V3 se Separator Two Phas Gas to Vent RB1 RB2 RB3 RB6 MP8 MP7 MP6 RB5 Boost line RB7 Kill Line RCD oke Line Cho MP5 MP4 Annular BOP MP3 MP2 MP1 RB4 Boost line Riser B Mud Pump 3 Mud Pump 2 Mud Pump 1 Riser boost pump PV4 PV3 Flow spool PV2 PV1
11 MPD System actual performance After installing the surface rig up described we also replaced a set of pipe rams on the SSBOP with a second set of Blind Shear Rams This allowed us to use the entire riser as a long lubricator for running BHA s s, Liners, Wireline Logging Strings while holding pressure below a set of Blind Shear Rams (did not want to be using the main BSR for this purpose and possibly compromising their integrity) The system was used very successfully to log under pressure, run liners and to drill using Pressurised Mud Cap Drilling on both the Bravo and Romeo Wells Prior to drilling out from the 16 and from the 13-5/8 we installed the RCD bearing assembly and allowed all crews to familiarise themselves with the system, circulate through it and become comfortable with how it was set up
Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.
Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational
More informationDesign and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion
Design and Concept Integration- MPD Technology in Deepwater Rigs Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion Managed Pressure Drilling An adaptive drilling process used
More informationManaged Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International
Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International June 18-19 2014 Vienna, Austria. 2011 Weatherford. All rights reserved. 1
More informationMPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists
MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists Our experienced service personnel have supported operators with more than 80+ wells drilled to date. Our
More informationECDM System. November, Security Classification: Restricted - Status: Draft
ECDM System November, 2014 Objective Enhance the ability to safely and efficiently drill deep-water wells High uncertainty in pore and fracture pressure gradients Narrow drilling margins Develop system
More informationClick to edit Master title style
Atwood Osprey Construction, Commissioning & Operations John Connor Chevron Sr. D&C Superintendent Gorgon Mark Stewart Operations Manager Atwood Osprey Perth 8 September 2011 F&G Enhanced Pacesetter Water
More informationThe intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.
1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local
More information@balance Deepwater. MPD services
@balance Deepwater MPD services Drill faster and reach farther with @balance Deepwater MPD services Achieve drilling objectives with closed-loop systems MPD provides a closed-loop circulation system in
More informationAPI STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd
API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd This paper has been written for presentation at the API Axis Conference to held in Kuala Lumpur, Malaysia, 13-15
More informationUltra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN
INVEST White Paper Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole Engineering Development Advisory Committee J-DESC, JAPAN Corresponding Author: Yoshiyasu WATANABE, Tokai
More informationModuels in PetroTrainer. PetroTrainer. How PetroTrainer is used
PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started
More informationInternational Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0
International Well Control Forum IWCF Well Control Training Drilling Level 2 1 st January 2014 Version.0 Drilling Well Control Written Test Level 2 Surface & Subsea BOP Stack s and Structure Written Test
More informationDrilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton
7 Drilling Systems Cameron has designed, manufactured and delivered surface and subsea drilling systems from the wellhead through the manifold to meet a wide variety of customer requirements and drilling
More informationGeoprober Drilling Moving from Ideas To Reality (Status August, 2005)
Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Reel A 4 OD Reel B 3-1/8 OD Anaconda CT Unit Drilling Rig 27 m derrick, 200 tonnes Heave comp 120 tonnes 4.8m Existing Equipment Refurbishment
More informationSiem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.
AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation
More informationDeep Water Definitions
DST in Deep Water Deep Water Definitions Depth of Water (Deepwater >1000ft (300m), Ultra- Deepwater > 5000ft (1500m)) Rig Type - Floaters (Drillships and Semi-Submersibles) Approach and Profile (risk,
More informationEnhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective
Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Kevin Taylor September 26, 2011 Eleventh U.S.-China Oil and Gas Industry Forum Chevron is a Major Operator in Subsea and
More informationSend your directly to
Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.
More informationSUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012
SUBSEA WELL CONTAINMENT Global Basis Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 Bill Mahler Wild Well Control, Inc. Response Components - Plus Many More Components
More informationJune 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com
June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration
More informationSubsea Well Engineering
Subsea Well Engineering Prof. Marcio Yamamoto UNIVERSITY OF SÃO PAULO Dept. of Mining and Petroleum Engineering December 11th, 2014 Kashiwa, Chiba Subsea Well Engineering Water Depth Petroleum Well Classification
More informationAdvancing Global Deepwater Capabilities
Advancing Global Deepwater Capabilities BP s commitments Determined to accelerate and further deploy the capabilities and practices that enhance safety in our company and the deepwater industry 200+ meetings
More informationBP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE
Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel
More informationAPI RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011
API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 Meeting with BOEMRE March 1, 2011 Presented by: Frank Gallander Chevron Chair
More informationInternational Well Control Forum Well Intervention Pressure Control Subsea Syllabus
International Well Control Forum Well Intervention Pressure Control Subsea Syllabus November 2017 Version 1.0 IWCF Well Intervention Pressure Control Subsea Syllabus Contents Guidance Notes... 1. Introduction...
More informationAn Introduction to Oil & Gas Drilling and Well Operations
An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals
More informationDeepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.
Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus
More informationWell Control Considerations of MPD on Deepwater Rigs
Well Control Considerations of MPD on Deepwater Rigs Don Hannegan, P.E., Strategic Technologies Development - Well Construction Products DEA Q1 - March, 2014 2013 Weatherford. All rights reserved. 1 MPD:
More informationIndustry Response - Post Macondo
Industry Response - Post Macondo Charlie Williams Chief Scientist Well Engineering Shell Energy Resource Company CSIS Energy and National Security Program - future of offshore oil & gas developments in
More informationMærsk Deliverer. Ultra deepwater drilling and development. semi-submersible
Mærsk Deliverer Ultra deepwater drilling and development semi-submersible Maersk Drilling Mærsk Deliverer TYPE DPS2/M, Column stabilised dynamically positioned semisubmersible drilling rig with capability
More informationOn the Development of the Blowout Preventer PRA Model
On the Development of the Blowout Preventer PRA Model Jan Swider *ac, Charley Gallo bc, Gregg Walz c, and Jim Raney c a Cogoto, Inc., Simi Valley, USA b The Frontline Group, Houston, USA c Anadarko Petroleum
More information4 Briefing. Responsible investor
Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP
More informationEC-Drill MPD Dual Gradient Drilling
16th US-Norway Technology Partnership Conference 2014 EC-Drill MPD Dual Gradient Drilling John A. Cohen, R&D Technology Manager AGR Enhanced Drilling February 26, 2014 Houston, Texas Enhanced Drilling
More informationDrilling Courses Overview Pressure control and drilling equipment course offering
Drilling Courses Pressure control and drilling equipment course offering Content Introduction 3 Pressure control equipment Multiplex (MUX) control system overview Mark III subsea BOP control system electrical
More informationPersonalized Service, Industry Expertise. Franklin Howard
Personalized Service, Industry Expertise. Franklin Howard PRODUCTS Franklin Howard International provides high quality drilling equipment and spare parts from top manufacturers in the United States. Warranty
More informationSERVICE IN ACTION. : Jackup Drilling Rig. : Johor Bahru Malaysia (on-site) DURATION : 4 days on-site STATUS : Periodic maintenance ACTIVITIES
Jackup ASSET LOCATION : Jackup : Johor Bahru Malaysia (on-site) DURATION : 4 days on-site STATUS : Periodic maintenance ACTIVITIES Inspection, maintenance and recertification SCOPE OF WORK Conduct on-site
More informationMarine Well Containment Company. Charlie Miller, Chief Technology Officer
Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company
More informationNOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1
Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V -
More informationInvestor Relations Presentation April 30, 2013
Investor Relations Presentation April 30, 2013 FORWARD LOOKING STATEMENTS In addition to the historical data contained herein, this document may include forward-looking statements regarding the future
More informationSinking of the Deepwater Horizon. 11 perish and 115 survive
Sinking of the Deepwater Horizon 11 perish and 115 survive The Rig Rig cost about $500,000 per day to contract With all the drilling spread, helicopters, support vessels, other services cost about $1,000,000
More informationRPSEA PROJECT STATUS REPORT FEB 2011
RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA Project 08121-2301-03 Ultra-Deepwater Riserless Intervention System (RIS) & RPSEA Project 09121-3500-07 Ultra-Deepwater Subsea Test Tree (SSTT) and Intervention
More informationOffshore Drilling Rigs
Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions
More informationSubSea MudLift Drilling: from JIP to the Classroom
Session 2478 SubSea MudLift Drilling: from JIP to the Classroom Jerome J. Schubert, Ph.D. PE Texas A&M University Abstract As the worlds proven oil reserves continue to be depleted through consumption
More informationMarine Well Containment Company. Charlie Miller, Chief Technology Officer
Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company
More informationTore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13
Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of
More informationTexas Oil Tools Bop Manual READ ONLINE
Texas Oil Tools Bop Manual READ ONLINE Our BOP parts, BOP spares, perform under the most demanding conditions and have great quality. We have parts for Cameron BOP's, Titan Oil Tools, Titan Oil Tools oilfield
More informationClick to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response
APPEA AWIC UPDATE Click to edit Mutual Master Aid subtitle style Self Audit Checklist Source Control First Response Presenter: Tom Nolan Perth 1st 4 th March, 2010 2012 WHAT IS APPEA? The Australian Petroleum
More information7 Briefing. Responsible investor
Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed
More informationMacondo Blowout Lessons Learned for Prevention and Mitigation
Macondo Blowout Lessons Learned for Prevention and Mitigation Lars Herbst, P.E. BSEE Gulf of Mexico Regional Director 05 October 2017 To promote safety, protect the environment and conserve resources offshore
More informationC o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!
DEEPWATER WELL CONTORL C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! Course Overview This course covers the key aspects of Deepwater Well Control through the media of:- 1) Lectures
More informationULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)
RPSEA PROJECT DW 2301 ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) DTC International, Inc. 5540 Brittmoore Road Houston, Texas 77041 23 March 2010 RIS PROJECT TEAM MEMBERS DTC International, Inc.
More informationHans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions
Lett Brønnintervensjon Hans J Lindland FMC Kongsberg Subsea Why Light Well Intervention? Reservoir recovery is significantly lower (oil) for subsea wells than for platform wells Cost for drilling units
More informationC o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!
HPHT WELL CONTROL C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! Course Overview This course covers the key aspects of HPHT Well Control in detail through the media of:- 1. Lectures
More informationMarginal Project Development
Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor
More informationSubsea Intervention: Is It Worth It? Drummond Lawson
Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What
More informationDoing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director
Doing More With Lightweight Well Intervention Subsea Europe 2008 London, 30 th October 2008 Drummond Lawson Managing Director What Is It? Lightweight Subsea Well Intervention (LSWI) Re-entering existing
More informationDry trees for cost effective solution with the Wellhead Barge: WHB
Dry trees for cost effective solution with the Wellhead Barge: WHB Benjamin MAURIES SAIPEM PAU, FRANCE 5 7 APRIL 2016 Dry Tree Solution for Mild Environments Dry Tree solutions have been developed and
More informationSpeaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015
Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general
More informationC o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!
HPHT DRILLING OPERATIONS C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! HPHT DRILLING OPERATIONS Course Overview This course covers the key aspects HPHT Drilling Operations in detail
More informationISO/TR TECHNICAL REPORT
TECHNICAL REPORT ISO/TR 13624-2 First edition 2009-12-01 Petroleum and natural gas industries Drilling and production equipment Part 2: Deepwater drilling riser methodologies, operations, and integrity
More informationENSCO 8500 Series. 11 April Mark Burns Senior Vice President Western Hemisphere. David Hensel Vice President North and South America
8500 Series Mark Burns Senior Vice President Western Hemisphere David Hensel Vice President North and South America 11 April 2012 1 Strategy Addressing Heart of the Deepwater Market Cost-effective design
More informationDevelopment. JOGMEC Techno Forum November 2014 Japan Drilling Co., Ltd. Drilling Technology Department Masahiro Nakamura
JOGMEC Techno Forum 2014 JDC s Approach to Offshore Resources Development 27 November 2014 Japan Drilling Co., Ltd. Drilling Technology Department Masahiro Nakamura 1 Japan Drilling Co. Ltd. Explor ration
More informationOTC seems to be able to afford to fix the problems associated with downtime due to an incomplete design.
OTC 15194 DEEPWATER BOP CONTROL SYSTEMS - A LOOK AT RELIABILITY ISSUES Earl Shanks, Transocean; Andrew Dykes, ABS Consulting; Marc Quilici, ABS Consulting; John Pruitt, ABS Consulting Copyright 2003, Offshore
More information3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).
Operator Torchlight Energy Page 1 3/12/2015 Mark McCoy, engineer with Mojo, met with University Lands representative, Drew McEachern and the land rancher, John Hunter to discuss access roads to Orogrande
More informationChallenges of Deep Water To Jackup Conductors And Risers
Challenges of Deep Water To Jackup Conductors And Risers Alex Rimmer Engineering Team Leader, 2H Offshore Subsea Europe 14-15th November 2011 Overview What is deep water for jackup rigs? Jackup conductor/riser
More informationTo Jackup Conductors And Risers
Challenges of Deep Water To Jackup Conductors And Risers Alex Rimmer Engineering Team Leader, 2H Offshore SUT International Subsea Technical Conference 18th April 2012 Overview What is deep water for jackup
More informationTOP HOLE DRILLING WITH DUAL GRADIENT TECHNOLOGY TO CONTROL SHALLOW HAZARDS
TOP HOLE DRILLING WITH DUAL GRADIENT TECHNOLOGY TO CONTROL SHALLOW HAZARDS A Thesis by BRANDEE ANASTACIA MARIE ELIEFF Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment
More informationMarine Well Containment Company Outer Continental Shelf Summer Seminar
Marine Well Containment Company Outer Continental Shelf Summer Seminar June 4, 2015 INTRODUCTION 2 Why We re Here In order to receive a permit to drill in the U.S. Gulf of Mexico, regulations require operators
More informationRiserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N
Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375
More informationCasing while Drilling. Enhanced Casing Installation
Casing while Drilling Enhanced Casing Installation CWD Definition, History & Experience Casing while Drilling means utilizing the casing string as the drill string instead of drill pipe. 1907 Reuben Baker
More informationSubsea Structural Engineering Services. Capability & Experience
Subsea Structural Engineering Services Capability & Experience Capability Overview INTECSEA s subsea structural engineering team has a proven track record for providing solutions to problems in the implementation
More informationINDONESIA DEEPWATER INVESTMENT
INDONESIA DEEPWATER INVESTMENT SUBSEA ASIA 23-24 NOVEMBER 2015 @ DHARMAWANGSA HOTEL - JAKARTA PRESENTED BY DINAR INDRIANA KHOIRIAH HEAD PROJECT COMMUNICATIONS INPEX CORPORATION AGENDA Supply Chain Investment
More informationMarine Risers. Capability & Experience
Marine Risers Capability & Experience Capability Overview INTECSEA now offers, in a single company, industry leading capability for all marine riser systems including top-tensioned risers (TTRs) for direct
More informationMSV Seawell. The vessel that pioneered subsea light well intervention
MSV Seawell The vessel that pioneered subsea light well intervention PRODUCTION ENHANCEMENT WELL MAINTENANCE SATURATION DIVING WELL ABANDONMENT/FIELD DECOMMISSIONING MSV Seawell specifications Classification
More informationHeidrun Inverted Gas Lift System
Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques
More informationIncreased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells
Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells A Truly Integrated Service Delivery 09 August 2017 Agenda Introduction to Light Well Intervention
More informationDrilling Courses
2017-2018 Drilling Courses Includes Prentice Training Company Courses Taught By: Calvin Barnhill NORTHSTAR TRAINING Northstar Training is very excited to be able to continue to teach the Prentice Training
More informationMPD Application Process
MPD Application Process Fred Brink Chief, District Operations Support (DOS) September 19, 2017 To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight
More informationDeepwater well design, construction & drilling operations
Deepwater well design, construction & drilling operations Training and development 1 Kingdom Drilling Services Ltd Our Mission Deliver a recognized excellence in deepwater industry training, education
More informationModule No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)
Health, Safety and Environmental Management in Petroleum and offshore Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute Of Technology, Madras Module No. #
More informationThe Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014
The Future of Offshore Drilling: Beyond Ultra Deep Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014 Pacific Drilling: Committed to being the Preferred Ultra Deepwater Driller Only 100% high
More informationDeepwater Precommissioning Services
Deepwater Precommissioning Services Featuring Denizen remote subsea technologies Drilling Evaluation Completion Production Intervention Pipeline & specialty services Nitrogen services Pipeline services
More informationThe Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010
The Marine Well Containment System LSU Center for Energy Studies Energy Summit 2010 October 26, 2010 Restoring Confidence in Deepwater Drilling Operations Our initiatives are aligned with Administration
More informationWhen a drilling project is commenced, two goals must be achieved:
Technologies Drilling Technologies Oil well drilling is a complex operation and the drilling industry engages the services of personnel and a complicated array of machinery and materials to drill an oil/gas
More informationAn informal discussion of drilling contractors was held prior to the Well Control Committee meeting. Key topics discussed included the following:
IADC Well Control Committee Meeting Minutes 22 nd June 2017 IADC Crown Center Houston, TX USA Contractor roundtable An informal discussion of drilling contractors was held prior to the Well Control Committee
More informationCasing Recovery. Pre-Job Meeting
Casing Recovery Pre-Job Meeting Make up casing spear assembly and rack back Make up casing cutting assembly RIH with cutting assembly to calculated free point Make first cut, flow check. POOH & lay down
More informationJune 16, Via Electronic Transmission. Lamar McKay Chairman and President BP America, Inc 501 Westlake Park Boulevard Houston, TX 77079
June 16, 2010 Via Electronic Transmission Lamar McKay Chairman and President BP America, Inc 501 Westlake Park Boulevard Houston, TX 77079 Dear Mr. McKay: As the ranking member of the Committee on Finance,
More informationDEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company
DEA Quarterly Meeting 18 November 2010 Bill Pike NISC, an IBM Company DISCLAIMER I am an employee of NISC, an IBM company, working under contract in the U.S. Department of Energy s National Energy Technology
More informationLloyd s BOP Register energy Risk servicesmodel Project Development. Scotty Roper Project Manager Moduspec USA, Inc.
Lloyd s BOP Register energy Risk servicesmodel Project Development Scotty Roper Project Manager Moduspec USA, Inc. October 18, 2012 Agenda Project summary Product demonstration Conclusion Who we are Lloyd
More informationDE120 Successful Well Completion and Workover Practices:
DE120 Successful Well Completion and Workover Practices: A Practical Approach from Design to Field Operations H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae
More informationGTSC Rig for Hands-on Training
GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location
More informationTEPZZ _49_B_T EP B1 (19) (11) EP B1 (12) EUROPEAN PATENT SPECIFICATION. (51) Int Cl.: E21B 33/035 ( ) E21B 33/076 (2006.
(19) TEPZZ _49_B_T (11) EP 2 321 491 B1 (12) EUROPEAN PATENT SPECIFICATION (4) Date of publication and mention of the grant of the patent:.04.13 Bulletin 13/ (21) Application number: 0979092.3 (22) Date
More informationMarine Well Containment Company Response Overview New Orleans Area Committee
Marine Well Containment Company Response Overview New Orleans Area Committee Marty Massey, Chief Executive Officer Carmine Dulisse, HSE Officer November 10, 2011 Agenda Company Overview How MWCC Responds
More informationNew Developments in Regulation of U.S. Offshore Oil and Gas Operations
New Developments in Regulation of U.S. Offshore Oil and Gas Operations Peking University Law School and The University of Texas School of Law Carol Dinkins Partner Vinson & Elkins, LLP August 21, 2012
More informationLearn more at
Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry
More informationRELIANCE INDUSTRIES LIMITED
RELIANCE INDUSTRIES LIMITED Petroleum Business (E&P) Notice Inviting Expression of Interest (RIL/E&P/EOI/2012/07) (Under International Competitive Bidding) A] For All Oil & Gas Fields Reliance Industries
More informationThe use of Mechanical Connectors throughout Life of Field
The use of Mechanical Connectors throughout Life of Field Andrew Woodward Subsea Sales Engineer andrew.woodward@hydratight.com 1 What I will cover Safety Moment Introduction to Hydratight What are Mechanical
More informationSingle / Dual Barrier HP Drilling Risers
Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction
More informationSUBSEA 101. Find more Subsea 101 case studies online
SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section
More information03/31/2012. Site Preparation. Classifying Oil & Gas Operations. Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV
Classifying Oil & Gas Operations Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV 1. Catline Boom and Hoist Line 2. Drilling Line 3. Monkeyboard 4. Traveling Block 5.
More information