GMES TERRAFIRMA. ESRIN/Contract no /03/I-IW. User Systems Inventory U8 30 th April 2004 Version 1.0. Luc Closset, Christine King BRGM

Size: px
Start display at page:

Download "GMES TERRAFIRMA. ESRIN/Contract no /03/I-IW. User Systems Inventory U8 30 th April 2004 Version 1.0. Luc Closset, Christine King BRGM"

Transcription

1 GMES TERRAFIRMA ESRIN/Contract no /03/I-IW User Systems Inventory U8 30 th April 2004 Version 1.0 Luc Closset, Christine King BRGM Contributors to Dossier Reviewed by: Project Manager Ren Capes/ / Approved by: Project Contract Officer David Morten/ /

2 STRATEGY GROUP MEMBER ENDORSEMENT I, the undersigned, confirm that I have read and endorse this dossier. Strategy group member for policy Name.. Signature.... Strategy group member for science Name.. Signature. Strategy group member for users Name.. Signature. Copyright NPA and Terrafirma collaborators 2003 i

3 EXECUTIVE SUMMARY This dossier is trying to demonstrate the experience acquired by the Core User Group based on their work on Terra-Firma products realised to assess urban area ground movement. The information used to prepare this dossier is based on the Service Utility Reports as drafted into dossier U7 and fulfilled by the end users after reception of H1 Terra Firma product as defined in Dossier S5 and according to the following table. Town Code Supplier Delivery date Recipient Utility Report availability Athens H1c TRE NKUA, EPPO, IGME yes Athens H1a BRGM TBC NKUA, EPPO, IGME yes Thessaloniki H1b BRGM TBC NKUA, EPPO, IGME no Palermo H1c TRE Enel Hydro yes Amsterdam H1c TRE TNO no Sosnowiec H1c TRE TBC PGI (Poland) no Stoke-on-trent H1c TRE TBC BGS no Haifa H1c TRE Due GII, GSI (Israel) no Istanbul H1c TRE Due Kandilli Observatory no Lisbon H1c TRE Due TBD no TBD H1c TRE TBD TBD no Moscow H1c NPA TBD TBD no St Petersburg H1c NPA TBD TBD no Additional information as been acquired by personal contacts with the TerraFirma partners and associate partners. These data are representing detailed ground movement over a surface of 250 square kilometres and for a period of approximately 12 years. Each Service Utility Report ideally includes according to U7: the case study of utilisation an account of integration with other information sources Copyright NPA and Terrafirma collaborators 2004 ii

4 examples of end users assessment of impact and benefit critical analysis of utility for end-user-organisation comparison with alternative service and information sources recommendations for service improvements recommendations for products improvements record of complaints, problems, resolutions; and a value statement Based on the three Service Utility reports actually available, on the U4: Service Prospectus Appraisal and discussions held during TerraFirma meetings, the following conclusions may be issued : Acquiring geographical, geological and other data is a difficult matter and their comparison with ancillary data is not an easy task; For these three users, validating the data is passing through a mandatory cross-checking with ground information; Historical Ground movement detected by TerraFirma product where known for some areas but unknown (at least by the user in charge of the SUR) for others; There is a need for a processing report issued by the VAC to explain in detail the processing ; The interpretation of the historical movement and the seismic activity need more interpretation and ground information. This is outlining the fact that there is a real need of research activities in this direction; An effort of standardising the Service Utility Report has to be done to insure a full and accurate communication between VACS and his end-users at any levels; Validation, passing through the evaluation of the precision and the accuracy of the product, is a very important matter which has to be addressed as soon as possible; The exact location of a persistent or permanent reflectors (PSINSAR) is a subject of great concern among the Core User Group. For a persistent reflector located on the vicinity of a building should we consider this one at the ground surface or on the building top. H1 product may be considered as a final product only for users which have already a good knowledge of the mechanisms which has triggered the ground movement. For non specialist and non advised users, the product should include at least an explanation of the cause of the movement. For such reasons, H2 products are almost mandatory for institutional and public users. A special effort of communications showing quality products has to be directed for this specific end-user segment in stage 2. The political issue of disseminating such data without accepted ground validation as to be addressed. It is unlikely that TerraFirma partners is welcome in most of the local authorities offices without such a validation and their data accepted as the full truth. For some local authorities, communication about these subjects, and specially if the considered hazards are not fully demonstrated, should be restricted or at least limited in extent. H1 product should not be restricted in TerraFirma Stage 2 (If any) at only PSINSAR but should include some conventional or stacked INSAR and specially in area where large and fast ground movement are anticipated. For such case, some limitations seems to apply to PSINSAR accuracy. Copyright NPA and Terrafirma collaborators 2004 iii

5 TABLE OF CONTENTS 1 INTRODUCTION Objective Document Structure Terminology and Acronyms REVIEW OF SERVICE UTILITY REPORT Introduction case study of utilisation integration with other information sources End Users Assessment of impact and benefit Critical analysis of utility for end-user-organisation comparison with alternative service and information sources recommendations for service improvements recommendations for products improvements Value statement CONCLUSIONS Conclusions coming from Service Utility Report (SUR) Conclusions coming from other users statements... 7 Copyright NPA and Terrafirma collaborators 2004 iv

6 1 INTRODUCTION 1.1 Objective The main objective of this document is to pass in review the Service Utility Report (SUR) provided by the VAC to the end user and to extract from the collection of the available report the main comments, benefits and shortcomings of the data received in order to assess the main trends into users perception of the products and eventually react on some As defined by U7 dossier untitled Service Utility Reports and by the SOW the following points are of major interest : the case study of utilisation an account of integration with other information sources examples of end users assessment of impact and benefit critical analysis of utility for end-user-organisation comparison with alternative service and information sources recommendations for service improvements recommendations for products improvements record of complaints, problems, resolutions; and a value statement 1.2 Document Structure The document will summarise the utility report received and some of the already known comments about the products. The chapter 2 will pass in review each point of major interest for the received SUR. The chapter 3 will conclude in trying to summarise and give general trends of the user perception, benefit and the possible improvement to the product coming either from the Service Utility Report and from comments already arising during TerraFirma Stage 1 meetings. 1.3 Terminology and Acronyms Global User Base This is the complete set of all potential users (in the world) for a given set of services. It is made up of a collection of different user-segments Acronyms SP CUG GUB VAC SUR Service Portfolio Core User Group consisting of: Arup, BGS, BRGM, Enel.Hydro, TNO Global User Base Value Adding Company Service Utility Report Copyright NPA and Terrafirma collaborators

7 2 REVIEW OF SERVICE UTILITY REPORT 2.1 Introduction The actual available SUR are summarise into the following table Town Code Supplier Delivery date Recipient 1 Athens H1c TRE NKUA, EPPO, IGME 1 Athens H1a BRGM NKUA, EPPO, IGME 2 Thessaloniki H1b BRGM NKUA, EPPO, IGME 3 Palermo H1c TRE Enel Hydro Table 2. Actual Service Utility Report completed by end users For the sake of convenience and as the users have produced only one SUR for both products in Athens and Thessaloniki, the review will keep comments together. 2.2 case study of utilisation Ideally this section should include a full description of the area concerned with the evaluation of ground movement including : Size of the area (in square km2) ; Size of the conventional INSAR ground movement (including size of area of the zone where movement cannot be evaluate because of low coherence) ; Number of PSINSAR detected ( with densities in urban and rural areas), Socio-Economic data as population, major infrastructure and transportation systems, etc... Only Enel (Palermo) is giving few of this data in his SUR. It should also include the name of his author(s) as some information to reach him (them) if any questions is arising. For Athens, The Athens SUR is well documented but the scale of the presentation in SUR is quite low ( < 1/100000) and designed as a scientific paper. For Thessaloniki The Thessaloniki SUR is well documented but the scale of the presentation in SUR is quite low ( < 1/100000) and designed as a scientific paper. Most of the SUR evaluation point are not present. Copyright NPA and Terrafirma collaborators

8 For Palermo The SUR is very well documented and demonstrated by several maps. Some maps (Table?) documented inside the SUR are not available inside the U7 dossier. 2.3 integration with other information sources For Athens, the following data has been overlaid into a H2a product to evaluate the product received by the consortia of NKUA, EPPO and IGME (TerraFirma Associate Partners). Geographical data were available under the form of the 2 EO images; Geological (no presentation of geological map); Old Coal Mining (boundary of exploitation works); Water Resources (location of the main water drillings); Earthquakes (no presentation of epicenter or any concerned fault is presented); Transport Infrastructure (Athens Subway pattern). The data are described in detail into the utility report but no comments are accessible the following characteristic of such : Availability or eventually price of acquisition or licensing Format, Scale and accuracy For Thessaloniki Four maps at scale between 1 / and 1 / are proposed. There are presenting 2 Geographical maps (one EO Image at different scale with some text) Geological data : Fault and seismic event imposed on EO Images PS map For Palermo Geographical data (none specify) Geological and hydro-geological data a scan of a soil map at 1/ is presented a scan of a soil and vulnerability map of Palermo (no scale mentioned but close from 1 / ) is presented including some layers (independent?) showing buildings and infrastructure ; a scan of crustal movement map (no scale but < 1 / ) a scan of North-Western Sicily showing hydro-geological degradation (no scale mentioned) referring to building constraint a scan of deterioration map ( Landslide hazard?) of the city of Palermo (1/50 000? tbc) an hydrology map of the basin of Palermo (no scale) Several seismicity hazard maps of Italy and Sicily (no scale but smaller than 1/ ) 3 macrosismisity site effect of Palermo at large scale ( from scale 1/ to 1/ ) None of this map are overlaid with the H1 product. Copyright NPA and Terrafirma collaborators

9 There is some table introduced into the text which are not available into U7 dossier. 2.4 End Users For Athens, some potential end users (5) are specified. No attempt to communicate results are specified inside the SUR. For Thessaloniki, no potential end-users are specified. For Palermo, only the city of Palermo is considered as a possible end-user 2.5 Assessment of impact and benefit For Athens,. no direct impact or benefit are clearly established by the SUR For Thessaloniki, no direct impact or benefit are clearly established by the SUR For Palermo, several potential benefits are clearly established mainly concerning building stability ( either from subsidence and seismic hazard) and for water extraction 2.6 Critical analysis of utility for end-user-organisation For Athens, it clearly stated that TerraFirma general information will benefit to the knowledge of seismicity and subsidence mechanisms. Meanwhile seismic mechanisms are not described and used for interpreting deformation pattern produced by INSAR technology. This indicates some R&D should be initiated to link INSAR detected ground movement and seismicity. For Thessaloniki, as no real conclusion is given to the SUR, no critical analysis is available. Interpretations done for the detected ground movement can attribute mechanisms either to seismic activity or to water pumping. No correlation seems to have been performed with any other ground movement evaluation. For Palermo, there is an evident need of validation as the indication of ground movement is concerning small area involving small amount of buildings. 2.7 comparison with alternative service and information sources This part of the utility report should try to make some correlation between the ground or ancillary data and the evaluated ground movement. For Athens, none are specified For Thessaloniki, none are specified For Palermo, This point is considered but no other measurement available are specified about some GPS based crustal movement assessment at the scale of Italy. 2.8 recommendations for service improvements For Athens, the service (H1 or H2) should focus of the specific end-users requirements. The example given is referring more to H2 than H1. Copyright NPA and Terrafirma collaborators

10 For Thessaloniki, no recommendation is given For Palermo, the lack of ancillary data to make comparison with EO based ground movement measurement is outlined. This recommendation is again referring more to an H2 product than an H recommendations for products improvements For Athens, none are specified. For Thessaloniki, none are specified. For Palermo, it is recommended that an extensive report, issued by the VAC, will be furnished to the user. This document should contain most of the information validating the process and making possible its follow-up (images used, accuracy of the measurement, etc...) 2.10 Value statement For Athens, no general comment about the value of the product is given inside the SUR For Thessaloniki, the H1 product have outlined ground movement problem on area for which no general information is largely available. For Palermo, The H1 products has to be accompanied with detailed complementary information ( geotechnical studies are pointed out). This outlines the need of a large scale (equal or superior to 1/25000 scale to be consider for land management policies) H2 product for commercialisation and specially for considering local and national authorities as final endusers Copyright NPA and Terrafirma collaborators

11

12 3 CONCLUSIONS 3.1 Conclusions coming from Service Utility Report (SUR) The actual low number of available SUR do not allow to make definite conclusions about the TerraFirma users view of the product. At this stage it appear: Acquiring geographical, geological and other data is a difficult matter and their comparison with ancillary data is not a such an easy task that it may have been seen previously. These ancillary data, when available, are produced and stored in a large variety of format, scale and precision which may or may not be fully compatible with TerraFirma product. For example, none of the actual available SUR are presenting maps with PSINsar data overlaid on the regional geology ; For these three users, validating the data is passing through a mandatory cross-checking with ground information. This is in fact outlining the need of a least a preliminary H2 product ( Conventional Insar with some geographical and geological data at small scale?). For two of the three SUR the recommendations for improving the product are concerning H2 product, based in their experience to validate the data through building of H2, instead of H1 product improvement; Historical Ground movement detected by TerraFirma product where known for some area but unknown (at least by the user in charge of the SUR) for others area ; There is a need for a processing report issued by the VAC to explain in detail the processing ; The interpretation of the historical movement and the seismic activity known in the area for the three towns considered by the SUR needs more interpretation and ground information. This is outlining the fact that there is a real need of research activities in this direction ; An effort of standardising the Service Utility Report has to be done to insure a full and accurate communication between VACS and his end-users at any level. 3.2 Conclusions coming from other users statements The core users group as chance to met at several time for progress meeting and other TerraFirma meeting. From these discussions and as well from BRGM experience in France and notably in Paris, it appears : Validation, passing through the evaluation of the precision and the accuracy of the product, is a very important matter which as to be addressed as soon as possible and not only by the VAC s but by the entire TerraFirma group. The exact location of a persistent or permanent reflector (PSINSAR) is a subject of great concern among the Core User Group. For a persistent reflector located on the vicinity of a building should we consider this one at the ground surface or on the building top. Copyright NPA and Terrafirma collaborators

13 H1 product may be considered as a final product only for users which have already a good knowledge of the mechanisms which as triggered the ground movement. For non specialist and non advised user, the product should include at least an explanation of the cause of the movement. For such reasons, H2 product is almost mandatory for institutional and public users. A special effort of communications showing quality products has to be directed for this specific end-user segment in stage 2. The political issue of disseminating such data without accepted ground validation has to be addressed. It is unlikely that TerraFirma partners is welcome in most of the local authorities offices without such a validation and their data accepted as the full truth. For some local authorities, communication about these subjects, and specially if the considered hazards are not fully demonstrated, should be restricted or at least limited in extent. H1 product should not be restricted in TerraFirma Stage 2 (If any) at only PSINSAR but should include some conventional or stacked INSAR and specially in area where large and fast ground movement are anticipated. For such case, some limitations seems to apply to PSINSAR accuracy. Copyright NPA and Terrafirma collaborators

Change detection in cultural landscapes

Change detection in cultural landscapes 9-11 November 2015 ESA-ESRIN, Frascati (Rome), Italy 3 rd ESA-EARSeL Course on Remote Sensing for Archaeology Day 3 Change detection in cultural landscapes DeodatoTapete (1,2) & Francesca Cigna (1,2) (1)

More information

Seismic Hazards Demonstrator

Seismic Hazards Demonstrator CEOS Disaster Risk Management Seismic Hazards Demonstrator CEOS WG Disasters 9 th meeting Philippe Bally (ESA) Stefano Salvi (INGV) Theodora Papadopoulou (ARGANS c/ ESA) CEOS WG Disasters Buenos Brussels

More information

URBAN MONITORING USING PERSISTENT SCATTERER INSAR AND PHOTOGRAMMETRY

URBAN MONITORING USING PERSISTENT SCATTERER INSAR AND PHOTOGRAMMETRY URBAN MONITORING USING PERSISTENT SCATTERER INSAR AND PHOTOGRAMMETRY Junghum Yu *, Alex Hay-Man Ng, Sungheuk Jung, Linlin Ge, and Chris Rizos. School of Surveying and Spatial Information Systems, University

More information

GALILEO Research and Development Activities. Second Call. Area 1B. Interference Detection Mitigation and Isolation.

GALILEO Research and Development Activities. Second Call. Area 1B. Interference Detection Mitigation and Isolation. GALILEO Research and Development Activities Second Call Area 1B Interference Detection Mitigation and Isolation Statement of Work Rue du Luxembourg, 3 B 1000 Brussels Tel +32 2 507 80 00 Fax +32 2 507

More information

SARscape Modules for ENVI

SARscape Modules for ENVI Visual Information Solutions SARscape Modules for ENVI Read, process, analyze, and output products from SAR data. ENVI. Easy to Use Tools. Proven Functionality. Fast Results. DEM, based on TerraSAR-X-1

More information

EO-MINERS. The EO-MINERS project: Stakeholders needs and gaps in EO information. Copernicus for Raw Materials Workshop Brussels, Sept.

EO-MINERS. The EO-MINERS project: Stakeholders needs and gaps in EO information. Copernicus for Raw Materials Workshop Brussels, Sept. EO-MINERS Earth Observation for Monitoring and Observing Environmental and Societal Impacts of Mineral Resources Exploration and Exploitation The EO-MINERS project: Stakeholders needs and gaps in EO information

More information

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance City and County of San Francisco Department of Building Inspection London N. Breed, Mayor Tom C. Hui, S.E., C.B.O., Director INFORMATION SHEET. S-19 DATE : October 2, 2018 CATEGORY SUBJECT : Structural

More information

1. Introduction. defining and producing new materials with advanced properties, or optimizing industrial processes.

1. Introduction. defining and producing new materials with advanced properties, or optimizing industrial processes. Call for Interest Commercial Agents to market and sell the use of the facilities, resources and services on board the International Space Station in the Materials and Processes sector across Europe 1.

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

COSMO-SkyMed Mission Status Presented by Giovanni VALENTINI (ASI)

COSMO-SkyMed Mission Status Presented by Giovanni VALENTINI (ASI) COSMO-SkyMed Mission Status Presented by Giovanni VALENTINI (ASI) FIRST SATELLITE FIRST SATELLITE OF THE CONSTELLATION SUCCESSFULLY LAUNCHED 08 June 2007 03:35 (GMT) Vandenberg U.S.A. Air Force Base SECOND

More information

GALILEO JOINT UNDERTAKING

GALILEO JOINT UNDERTAKING GALILEO Research and development activities First call Activity A User receiver preliminary development STATEMENT OF WORK GJU/03/094/issue2/OM/ms Issue 2 094 issue2 6th FP A SOW 1 TABLE OF CONTENTS 1.

More information

High resolution ground deformations monitoring by COSMO-SkyMed PSP SAR interferometry

High resolution ground deformations monitoring by COSMO-SkyMed PSP SAR interferometry High resolution ground deformations monitoring by COSMO-SkyMed PSP SAR interferometry Mario Costantini e-geos - an ASI/Telespazio Company, Rome, Italy mario.costantini@e-geos.it Summary COSMO-SkyMed satellite

More information

SEAM Pressure Prediction and Hazard Avoidance

SEAM Pressure Prediction and Hazard Avoidance Announcing SEAM Pressure Prediction and Hazard Avoidance 2014 2017 Pore Pressure Gradient (ppg) Image courtesy of The Leading Edge Image courtesy of Landmark Software and Services May 2014 One of the major

More information

Persistent Scatterer InSAR

Persistent Scatterer InSAR Persistent Scatterer InSAR Andy Hooper University of Leeds Synthetic Aperture Radar: A Global Solution for Monitoring Geological Disasters, ICTP, 2 Sep 2013 Good Interferogram 2011 Tohoku earthquake Good

More information

Annual General Meeting 11 September 2017

Annual General Meeting 11 September 2017 Sacramento Basin Project California Block 29/11 China Annual General Meeting 11 September 2017 Duyung PSC Indonesia Forward-looking statements This presentation may contain forward-looking statements and

More information

Client: Statens vegvesen, Region midt County: Sør Trondelag

Client: Statens vegvesen, Region midt County: Sør Trondelag Geological Survey of Norway N-7441 Trondheim, Norway REPORT Report no.: 2004.043 ISSN 0800-3416 Grading: Open Title: Preliminary analysis of InSAR data over Trondheim with respect to future road development

More information

EIA FOR EXPLORATION DRILLING WITHIN BLOCK ER236, OFFSHORE OF THE EAST COAST OF SOUTH AFRICA. Background Information Document. Purpose of this Document

EIA FOR EXPLORATION DRILLING WITHIN BLOCK ER236, OFFSHORE OF THE EAST COAST OF SOUTH AFRICA. Background Information Document. Purpose of this Document Background Information Document EIA FOR EXPLORATION DRILLING WITHIN BLOCK ER236, OFFSHORE OF THE EAST COAST OF SOUTH AFRICA Purpose of this Document Eni South Africa BV (Eni), and Sasol Africa Limited

More information

clarify the roles of the Department and minerals industry in consultation; and

clarify the roles of the Department and minerals industry in consultation; and Procedures for Crown Consultation with Aboriginal Communities on Mineral Exploration Mineral Resources Division, Manitoba Science, Technology, Energy and Mines The Government of Manitoba recognizes it

More information

User Guide Mining Hazard (not including coal) in Great Britain v1.

User Guide Mining Hazard (not including coal) in Great Britain v1. User Guide Mining Hazard (not including coal) in Great Britain v1. Contents 1 Introductory Information 1.1 Introduction 1.2 Mining Hazard (not including coal) in Great Britain 2 Technical Information &

More information

Systemic Seismic Vulnerability and Risk Analysis for Buildings, Lifeline Networks and Infrastructures Safety Gain. The SYNER-G project

Systemic Seismic Vulnerability and Risk Analysis for Buildings, Lifeline Networks and Infrastructures Safety Gain. The SYNER-G project Systemic Seismic Vulnerability and Risk Analysis for Buildings, Lifeline Networks and Infrastructures Safety Gain The SYNER-G project Kyriazis Pitilakis, Coordinator Aristotle University of Thessaloniki

More information

The experimental evaluation of the EGNOS safety-of-life services for railway signalling

The experimental evaluation of the EGNOS safety-of-life services for railway signalling Computers in Railways XII 735 The experimental evaluation of the EGNOS safety-of-life services for railway signalling A. Filip, L. Bažant & H. Mocek Railway Infrastructure Administration, LIS, Pardubice,

More information

APPLICATION OF HIGH-RESOLUTION SATELLITE IMAGERRY FOR DETECTION OF DISASTER DAMAGES AND DISASTER MONITORING -THROUGH THE PRODUCE OF INTERPRETATION CHARACTERSTICS CARDS OF SATELLITE IMAGERIES FOR DISASTER

More information

Communication and dissemination strategy

Communication and dissemination strategy Communication and dissemination strategy 2016-2020 Communication and dissemination strategy 2016 2020 Communication and dissemination strategy 2016-2020 Published by Statistics Denmark September 2016 Photo:

More information

Vision. The Hague Declaration on Knowledge Discovery in the Digital Age

Vision. The Hague Declaration on Knowledge Discovery in the Digital Age The Hague Declaration on Knowledge Discovery in the Digital Age Vision New technologies are revolutionising the way humans can learn about the world and about themselves. These technologies are not only

More information

Earth Observation Products & Services in support of the Mining Industry

Earth Observation Products & Services in support of the Mining Industry Earth Observation Products & Services in support of the Mining Industry Stephen Coulson European Space Agency Directorate of Earth Observation Programmes ESA/ESRIN 27 April 2017, Lisbon 1 ESA Earth Observation

More information

There are not any on site emergency medical facilities in Holberg.

There are not any on site emergency medical facilities in Holberg. 12.2 HOLBERG Holberg is located on Holberg Inlet which has access to the Pacific Ocean on the west coast of Vancouver Island. Population is approximately 70 persons with the village located mainly at the

More information

SLIDE FOR DISCUSSION NICOLE & KATE

SLIDE FOR DISCUSSION NICOLE & KATE SLIDE FOR DISCUSSION NICOLE & KATE Outline presentation Tuesday December 4 th at 1PM Hawaii time (?) 14 th US Japan Workshop on the improvement of structural design & construction practices Session 3:

More information

For personal use only

For personal use only ASX Release 30 April 2012 Activities Report Period Ending 31 March 2012 Highlights Operational Chorbane Permit, onshore Tunisia - Sidi Dhaher-1 discovery A rig contract with Dietswell SA, for the provision

More information

An inventory of collocated and nearly-collocated CGPS stations and tide gauges

An inventory of collocated and nearly-collocated CGPS stations and tide gauges 1 sur 6 An inventory of collocated and nearly-collocated CGPS stations and tide gauges Progress report on the survey - (July 25, 2007) - by Guy Wöppelmann, Thorkild Aarup, and Tilo Schoene Note : The dynamic

More information

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016 The world s largest oil discovery 2014 Melbourne Mining Club Cutting Edge Series 15 March 2016 FAR snapshot Two major basin opening oil discoveries in Senegal in 2014 SNE Field largest global oil find

More information

The future role of libraries in the information age

The future role of libraries in the information age The future role of libraries in the information age J.S. Mackenzie Owen, TICER (owen@hum.uva.nl) International Summer School on the Digital Library 10-22 August 1997 Tilburg University The traditional

More information

USE OF EGNOS AND GALILEO FOR SCIENTIFIC APPLICATIONS & INNOVATIVE APPLICATIONS IN NEW DOMAINS

USE OF EGNOS AND GALILEO FOR SCIENTIFIC APPLICATIONS & INNOVATIVE APPLICATIONS IN NEW DOMAINS USE OF EGNOS AND GALILEO FOR SCIENTIFIC APPLICATIONS & INNOVATIVE APPLICATIONS IN NEW DOMAINS Carmen Aguilera Market Development Project Officer European GNSS Supervisory Authority 1 1 GALILEO TECHNICAL

More information

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia ASX Release 20 April 2018 Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia ADX Energy Ltd (ASX: ADX) are pleased to advise that the Tunisian national oil company ETAP has requested

More information

PROJECT LOCATION PROJECT DESCRIPTION

PROJECT LOCATION PROJECT DESCRIPTION APPLICATION: Environmental Authorisation for Prospecting Activities REF NO: NW 12443 PR APPLICANT: Khuma Mining and Exploration (Pty) Ltd MINERALS: Gold, Silver and associated precious metals LOCATION:

More information

SHTG primary submission process

SHTG primary submission process Meeting date: 24 April 2014 Agenda item: 8 Paper number: SHTG 14-16 Title: Purpose: SHTG primary submission process FOR INFORMATION Background The purpose of this paper is to update SHTG members on developments

More information

Town of Skowhegan Application For Development Review

Town of Skowhegan Application For Development Review Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:

More information

NCEA Level 3 Geography (91429) 2013 page 1 of 7

NCEA Level 3 Geography (91429) 2013 page 1 of 7 NCEA Level 3 Geography (91429) 2013 page 1 of 7 Assessment Schedule 2013 Geography: Demonstrate understanding of a given environment(s) through selection and application of geographic concepts and skills

More information

Fact Sheet IP specificities in research for the benefit of SMEs

Fact Sheet IP specificities in research for the benefit of SMEs European IPR Helpdesk Fact Sheet IP specificities in research for the benefit of SMEs June 2015 1 Introduction... 1 1. Actions for the benefit of SMEs... 2 1.1 Research for SMEs... 2 1.2 Research for SME-Associations...

More information

SUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG

SUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG Introduction to Eni Our new mission: We are an energy company. We are working to build a future where everyone can access energy resources efficiently and sustainably. Our work is based on passion and

More information

Getting the evidence: Using research in policy making

Getting the evidence: Using research in policy making Getting the evidence: Using research in policy making REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 586-I Session 2002-2003: 16 April 2003 LONDON: The Stationery Office 14.00 Two volumes not to be sold

More information

GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES

GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES GSO Framework Presented to the G7 Science Ministers Meeting Turin, 27-28 September 2017 22 ACTIVITIES - GSO FRAMEWORK GSO FRAMEWORK T he GSO

More information

E m e r g e n c y M a n a g e m e n t S e r v i c e. C o p e r n i c u s A e r i a l c o m p o n e n t s t a t u s s t u d y

E m e r g e n c y M a n a g e m e n t S e r v i c e. C o p e r n i c u s A e r i a l c o m p o n e n t s t a t u s s t u d y E m e r g e n c y M a n a g e m e n t S e r v i c e C o p e r n i c u s A e r i a l c o m p o n e n t s t a t u s s t u d y Peter Spruyt European Commission Joint Research Centre EMS Mapping User Workshop

More information

REGAE NEWS Number 11, December 1997

REGAE NEWS Number 11, December 1997 Page 1 of 5 REGAE NEWS Number 11, December 1997 Australian Agricultural and Resource Economics Society Inc. Coordinator s Comments ISSN 1324-2806 Welcome to the latest edition of REGAE News. In REGAE News

More information

By SveMin, FinnMin and Norsk Bergindustri

By SveMin, FinnMin and Norsk Bergindustri Recommended Rules for Public Reporting of Exploration Results, Surveys, Feasibility Studies and Estimates of Mineral Resources and Mineral Reserves in Sweden, Finland and Norway By SveMin, FinnMin and

More information

EXPERT GROUP MEETING ON CONTEMPORARY PRACTICES IN CENSUS MAPPING AND USE OF GEOGRAPHICAL INFORMATION SYSTEMS New York, 29 May - 1 June 2007

EXPERT GROUP MEETING ON CONTEMPORARY PRACTICES IN CENSUS MAPPING AND USE OF GEOGRAPHICAL INFORMATION SYSTEMS New York, 29 May - 1 June 2007 EXPERT GROUP MEETING ON CONTEMPORARY PRACTICES IN CENSUS MAPPING AND USE OF GEOGRAPHICAL INFORMATION SYSTEMS New York, 29 May - 1 June 2007 STATEMENT OF DR. PAUL CHEUNG DIRECTOR OF THE UNITED NATIONS STATISTICS

More information

Module Catalogue Westminster School of Media, Arts and Design Postgraduate Study Abroad 2018/9 Semester 1

Module Catalogue Westminster School of Media, Arts and Design Postgraduate Study Abroad 2018/9 Semester 1 Module Catalogue Westminster School of Media, Arts and Design Postgraduate Study Abroad 8/9 Module Code Module Name Level UK Credit Value Credit Equivalency Creative Industries Management FAMN00W Fashion

More information

CERN PS, SL & ST Divisions

CERN PS, SL & ST Divisions EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN PS, SL & ST Divisions CERN-PS-2002 CERN-SL-2002 CERN-ST-2002 1 st February 2002 TOWARDS A COMMON MONITORING

More information

ASX ANNOUNCEMENT ASX: IVZ CLARIFICATION REGARDING PRESS REPORTS ON OIL DISCOVERY IN ZIMBABWE. 2 NOVEMBER 2018.

ASX ANNOUNCEMENT ASX: IVZ CLARIFICATION REGARDING PRESS REPORTS ON OIL DISCOVERY IN ZIMBABWE.   2 NOVEMBER 2018. ASX ANNOUNCEMENT ASX: IVZ ABOUT INVICTUS ENERGY LTD Invictus Energy Ltd is an independent oil and gas exploration company focused on high impact energy resources in sub-saharan Africa. Our asset portfolio

More information

Guide to the Requirements for Public Information and Disclosure GD-99.3

Guide to the Requirements for Public Information and Disclosure GD-99.3 Guide to the Requirements for Public Information and Disclosure GD-99.3 November 2010 Guide to the Requirements for Public Information and Disclosure Guidance Document GD-99.3 Minister of Public Works

More information

Re: Gazette Notice SLPB : Consultation on Releasing Millimetre Wave Spectrum to Support 5G

Re: Gazette Notice SLPB : Consultation on Releasing Millimetre Wave Spectrum to Support 5G September 15, 2017 Senior Director, Spectrum Licensing and Auction Operations Innovation, Science and Economic Development Canada ic.spectrumauctions-encheresduspectre.ic@canada.ca Re: Gazette Notice SLPB-001-17:

More information

Quarterly Activities Report for Quarter Ended 31 March 2010

Quarterly Activities Report for Quarter Ended 31 March 2010 Quarterly Activities Report for Quarter Ended 31 March 2010 30 April 2010 Highlights Substantial increase (up 46%) in Maryborough coking coal resource to 83Mt Indicated and Inferred (9.5Mt Indicated, 73.5Mt

More information

COSMO-SkyMed Mission Status Presented by Fabrizio BATTAZZA (ASI)

COSMO-SkyMed Mission Status Presented by Fabrizio BATTAZZA (ASI) COSMO-SkyMed Mission Status Presented by Fabrizio BATTAZZA (ASI) COSMO-1 & COSMO-2 LAUNCHES FIRST SATELLITE OF THE CONSTELLATION SUCCESSFULLY LAUNCHED 08 June 2007 03:35 (GMT) Vandenberg U.S.A. Air Force

More information

Terrain Motion and Persistent Scatterer InSAR

Terrain Motion and Persistent Scatterer InSAR Terrain Motion and Persistent Scatterer InSAR Andy Hooper University of Leeds ESA Land Training Course, Gödöllő, Hungary, 4-9 th September, 2017 Good Interferogram 2011 Tohoku earthquake Good correlation

More information

Report OIE Animal Welfare Global Forum Supporting implementation of OIE Standards Paris, France, March 2018

Report OIE Animal Welfare Global Forum Supporting implementation of OIE Standards Paris, France, March 2018 Report OIE Animal Welfare Global Forum Supporting implementation of OIE Standards Paris, France, 28-29 March 2018 1. Background: In fulfilling its mandate to protect animal health and welfare, the OIE

More information

Spatial coherency of earthquake-induced ground accelerations recorded by 100-Station of Istanbul Rapid Response Network

Spatial coherency of earthquake-induced ground accelerations recorded by 100-Station of Istanbul Rapid Response Network Spatial coherency of -induced ground accelerations recorded by 100-Station of Istanbul Rapid Response Network Ebru Harmandar, Eser Cakti, Mustafa Erdik Kandilli Observatory and Earthquake Research Institute,

More information

Urban tunneling and the advantages of using InSAR SPN satellite technology to detect and monitor surface deformation effects

Urban tunneling and the advantages of using InSAR SPN satellite technology to detect and monitor surface deformation effects Urban tunneling and the advantages of using InSAR SPN satellite technology to detect and monitor surface deformation effects María de Faragó 1, Geraint Cooksley 1 1 Altamira Information, Spain ABSTRACT

More information

Technology and Innovation in the NHS Scottish Health Innovations Ltd

Technology and Innovation in the NHS Scottish Health Innovations Ltd Technology and Innovation in the NHS Scottish Health Innovations Ltd Introduction Scottish Health Innovations Ltd (SHIL) has, since 2002, worked in partnership with NHS Scotland to identify, protect, develop

More information

Title: care.data Pathfinder Stage CCG Recruitment and Selection Process

Title: care.data Pathfinder Stage CCG Recruitment and Selection Process Ref: care.data/programme Board/Paper 06 Title: care.data Pathfinder Stage CCG Recruitment and Selection Process Author: David Corbett, Programme Head, Data Delivery Programme Board Sponsor: Eve Roodhouse,

More information

World Leader in Rating Technology OFFSHORE RACING CONGRESS

World Leader in Rating Technology OFFSHORE RACING CONGRESS World Leader in Rating Technology OFFSHORE RACING CONGRESS ORC Championship Rules 2018 ORC Championship Rules 1 Authority The Offshore Racing Congress (ORC) is the international authority recognised by

More information

For personal use only

For personal use only Genesis Minerals Limited (ASX: GMD) ASX Announcement 20 February 2017 DRILLING UNDERWAY TO TEST EXTENSIVE GOLD ZONE AND NEWLY IDENTIFIED COBALT ANOMALY AT ULYSSES EAST Exciting new phase of extended exploration

More information

The basics of successful IP-Management in Horizon 2020

The basics of successful IP-Management in Horizon 2020 The basics of successful IP-Management in Horizon 2020 Jörg Scherer CEO Eurice GmbH Prague 11/05/2017 Roadmap Setting the scene The Framework Our service offer Speaker profile: Jörg Scherer Managing Director

More information

Digital Geotechnical Data: An Informed Client s Perspective

Digital Geotechnical Data: An Informed Client s Perspective Digital Data in Geotechnics BDA 20 April 2016 Digital Geotechnical Data: An Informed Client s Perspective Paul Mellon Geotechnical Manager Transport Scotland Transport Scotland The national transport agency

More information

International Financial Reporting Standards. IASC Foundation

International Financial Reporting Standards. IASC Foundation International Financial Reporting Standards Extractive Activities Research Project 7 th session of the ECE Ad Hoc Group of Experts on Harmonization of Fossil Energy and Mineral Resources Terminology Geneva,

More information

QUESTIONS - ANSWERS. Contents. 1. Right to take part. 2. Cost of participation. 3. Registration procedure. 4. Procedure for submission entries

QUESTIONS - ANSWERS. Contents. 1. Right to take part. 2. Cost of participation. 3. Registration procedure. 4. Procedure for submission entries Our warmest thanks to all those who have sent in their questions about the competition and have contributed to more exact formulations. We would remind those interested that the period for the submission

More information

Submission 2016 National Research Infrastructure Roadmap Capability Issues Paper

Submission 2016 National Research Infrastructure Roadmap Capability Issues Paper Submission 2016 National Research Infrastructure Roadmap Capability Issues Paper Name Title/role Organisation Professor Sue O Reilly & Dr Tim Rawling Chair AAS - National Committee for Earth Sciences Questions

More information

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation The Republic of Belarus, Republic of Kazakhstan and the Russian

More information

Highways, ring road, expressways of tomorrow in the Greater Paris

Highways, ring road, expressways of tomorrow in the Greater Paris Highways, ring road, expressways of tomorrow in the Greater Paris Presentation File MAY 2018 This document doest not replace in any case legal contract documents n Op2_2018 consultation internationale

More information

For personal use only

For personal use only 7 August 2017 ASX: MOD Drilling Resumes at T3 Copper Project Drilling at T3 Copper Project resumes today following DEA approval Approval granted for 17 months, until December 2018 Initial program will

More information

ESA Earth Observation Exploitation Programmes. Yves-Louis DESNOS Head R&D, EO Science and Applications Dept ESA Directorate of EO Programmes

ESA Earth Observation Exploitation Programmes. Yves-Louis DESNOS Head R&D, EO Science and Applications Dept ESA Directorate of EO Programmes ESA Earth Observation Exploitation Programmes Yves-Louis DESNOS Head R&D, EO Science and Applications Dept ESA Directorate of EO Programmes Exploitation Programmes ESA Mission R&D exploitation R&D Path

More information

Network Standard NS

Network Standard NS Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION

More information

Using machine learning to identify remaining hydrocarbon potential

Using machine learning to identify remaining hydrocarbon potential Using machine learning to identify remaining hydrocarbon potential The Oil & Gas Technology Centre Open Innovation Programme Call for Ideas Technical Documentation A Call for Ideas, part of the OGTC Open

More information

Newsletter Issue 2 Summer 2014

Newsletter Issue 2 Summer 2014 Providing efficient and reliable geotechnical solutions for the most challenging projects Newsletter Issue 2 Summer 2014 In this Issue: CEDR REGEN RAMPION WIND FARM NATIONAL GALLERY OF IRELAND Welcome

More information

Hillside & Foothills Development Application

Hillside & Foothills Development Application Hillside & Foothills Development Application This box for office use only File #: Cross Referenced File(s): Fee: Zone(s): Are Pre-Application materials attached? Yes No This application is a request to

More information

Transmission Innovation Strategy

Transmission Innovation Strategy Transmission Innovation Strategy Contents 1 Value-Driven Innovation 2 Our Network Vision 3 Our Stakeholders 4 Principal Business Drivers 5 Delivering Innovation Our interpretation of Innovation: We see

More information

State of Shimane Nuclear Power Station

State of Shimane Nuclear Power Station Investors Meeting for FY2017-2Q Financial Results State of Shimane Nuclear Power Station November 8, 2016 The Chugoku Electric Power Co., Inc. 1. Process of Compliance Examinations 1 In December 2013,

More information

Digitisation Plan

Digitisation Plan Digitisation Plan 2016-2020 University of Sydney Library University of Sydney Library Digitisation Plan 2016-2020 Mission The University of Sydney Library Digitisation Plan 2016-20 sets out the aim and

More information

3D Oil Limited Accelerated Growth Strategy

3D Oil Limited Accelerated Growth Strategy 3D Oil Limited Level 5, 164 Flinders Lane Melbourne VIC 3000 Tel: +61 3 9650 9866 Fax: +61 3 9639 1960 www.3doil.com.au ASX Release 3 September 2009 3D Oil Limited Accelerated Growth Strategy 3D Oil Limited

More information

87R14 PETROLEUMEXPLORATI

87R14 PETROLEUMEXPLORATI E 87R14 SA M PL COSTESTI MATECLASSI FI CATI ON SYSTEM-ASAPPLI EDFORTHE PETROLEUMEXPLORATI ONAND PRODUCTI ONI NDUSTRY AACE International Recommended Practice No. 87R-14 COST ESTIMATE CLASSIFICATION SYSTEM

More information

Information & Communication Technology Strategy

Information & Communication Technology Strategy Information & Communication Technology Strategy 2012-18 Information & Communication Technology (ICT) 2 Our Vision To provide a contemporary and integrated technological environment, which sustains and

More information

GENEVA COMMITTEE ON DEVELOPMENT AND INTELLECTUAL PROPERTY (CDIP) Fifth Session Geneva, April 26 to 30, 2010

GENEVA COMMITTEE ON DEVELOPMENT AND INTELLECTUAL PROPERTY (CDIP) Fifth Session Geneva, April 26 to 30, 2010 WIPO CDIP/5/7 ORIGINAL: English DATE: February 22, 2010 WORLD INTELLECTUAL PROPERT Y O RGANI ZATION GENEVA E COMMITTEE ON DEVELOPMENT AND INTELLECTUAL PROPERTY (CDIP) Fifth Session Geneva, April 26 to

More information

Museum & Archives Access Policy

Museum & Archives Access Policy Museum & Archives Access Policy The access policy sets out how we will make the museum and archives collections accessible to a wide audience. Policy owner Executive Director of Communications & Engagement

More information

COLLABORATION PROTOCOL BY AND BETWEEN THE CITY OF CAPE TOWN AND THE CAPE HIGHER EDUCATION CONSORTIUM

COLLABORATION PROTOCOL BY AND BETWEEN THE CITY OF CAPE TOWN AND THE CAPE HIGHER EDUCATION CONSORTIUM COLLABORATION PROTOCOL BY AND BETWEEN THE CITY OF CAPE TOWN AND THE CAPE HIGHER EDUCATION CONSORTIUM COLLABORATION PROTOCOL by and between the CITY OF CAPE TOWN (Hereinafter referred to as the CITY ) Duly

More information

CHAPTER 3. Public Schools Facility Element

CHAPTER 3. Public Schools Facility Element CHAPTER 3 Public Schools Facility Element Page 1 of 12 CHAPTER 3 PUBLIC SCHOOL FACILITIES ELEMENT GOAL 3.1: Collaborate and coordinate with the School Board of Volusia County to provide and maintain a

More information

Usage of any items from the University of Cumbria s institutional repository Insight must conform to the following fair usage guidelines.

Usage of any items from the University of Cumbria s institutional repository Insight must conform to the following fair usage guidelines. Peck, Frank (2016) SMEs in the nuclear supply chain in Cumbria. In: Wales Labour Market Summit II: Comparing policy interventions to challenge business as usual, 14 September 2016, Bangor University, Wales.

More information

EUROPEAN GNSS APPLICATIONS IN H2020

EUROPEAN GNSS APPLICATIONS IN H2020 EUROPEAN GNSS APPLICATIONS IN H2020 Introduction to Call H2020-Galileo-2014-1 Marta Krywanis-Brzostowska Market Development European GNSS Agency www.gsa.europa.eu/r-d/h2020 Agenda R&D in the European GNSS

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 13 March 2018 ASX Market Announcements ASX Limited 20 Bridge Street Sydney NSW 2000 Clarification on 31 December 2017 Quarterly Activities Report and Recent Corporate Presentation Vector

More information

For personal use only

For personal use only 1 September 2017 ASX: MOD MOD Doubles Exploration Budget to A$10M MOD doubles exploration spend to fast track drilling of regional targets A$10M exploration budget approved for 12 months from October 2017

More information

No Export Licence Required - Not Protectively Marked

No Export Licence Required - Not Protectively Marked Discipline or report series #10 Technology/CASE Title #15 Summary and Completion Report for the Clean Sky CASE Project Date #40 15 November 25 Summary #60 This report summarises the work undertaken on

More information

Coda Waveform Correlations

Coda Waveform Correlations Chapter 5 Coda Waveform Correlations 5.1 Cross-Correlation of Seismic Coda 5.1.1 Introduction In the previous section, the generation of the surface wave component of the Green s function by the correlation

More information

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires

More information

Innovation Management Processes in SMEs: The New Zealand. Experience

Innovation Management Processes in SMEs: The New Zealand. Experience Innovation Management Processes in SMEs: The New Zealand Experience Professor Delwyn N. Clark Waikato Management School, University of Waikato, Hamilton, New Zealand Email: dnclark@mngt.waikato.ac.nz Stream:

More information

Athanassios Ganas, Research Director, NOA

Athanassios Ganas, Research Director, NOA Advanced GNSS techniques for earthquake assessment and monitoring Athanassios Ganas, aganas@noa.gr Research Director, NOA NOA GPS Project http://www.gein.noa.gr/gps.html Hemus NET Project http://www.hemus-net.org/

More information

PSInSAR validation by means of a blind experiment using dihedral reflectors

PSInSAR validation by means of a blind experiment using dihedral reflectors PSInSAR validation by means of a blind experiment using dihedral reflectors A.Ferretti( 1 )( 2 ), S. Musazzi( 3 ), F.Novali ( 2 ), C. Prati( 1 ), F. Rocca( 1 ), G. Savio ( 2 ) ( 1 ) Politecnico di Milano

More information

Future Concepts for Galileo SAR & Ground Segment. Executive summary

Future Concepts for Galileo SAR & Ground Segment. Executive summary Future Concepts for Galileo SAR & Ground Segment TABLE OF CONTENT GALILEO CONTRIBUTION TO THE COSPAS/SARSAT MEOSAR SYSTEM... 3 OBJECTIVES OF THE STUDY... 3 ADDED VALUE OF SAR PROCESSING ON-BOARD G2G SATELLITES...

More information

MOSCOW TRANSLATION AGENCY. When translation matters

MOSCOW TRANSLATION AGENCY. When translation matters MOSCOW TRANSLATION AGENCY When translation matters Moscow Translation Agency When translation matters Dear partners, Moscow Translation Agency has been working on the translation services market since

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

Delivering the Turnaround. Leigh Junk - Managing Director February 2018

Delivering the Turnaround. Leigh Junk - Managing Director February 2018 Delivering the Turnaround Leigh Junk - Managing Director February 2018 Cautionary Statement This presentation has been prepared by Doray Minerals Limited ( Doray ) to provide an update regarding the company

More information

TIGER-NET Newsletter. The TIGERNET Newsletter Issue 3 April Welcome to the third issue of the TIGER-NET newsletter.

TIGER-NET Newsletter. The TIGERNET Newsletter Issue 3 April Welcome to the third issue of the TIGER-NET newsletter. Content TIGER-NET Newsletter Qualification Review Meeting Progress of system development: the first WOIS prototype Progress of product development: the first TigerNet product prototypes Expanding the user

More information

University of Massachusetts Amherst Libraries. Digital Preservation Policy, Version 1.3

University of Massachusetts Amherst Libraries. Digital Preservation Policy, Version 1.3 University of Massachusetts Amherst Libraries Digital Preservation Policy, Version 1.3 Purpose: The University of Massachusetts Amherst Libraries Digital Preservation Policy establishes a framework to

More information

For application: Benoit BOISSIN DSP/OT. Redacted by: Hélène de Boissezon -DCT/SI/AP

For application: Benoit BOISSIN DSP/OT. Redacted by: Hélène de Boissezon -DCT/SI/AP Reference: DSP/OT 06-9042 Redacted by: Hélène de Boissezon -DCT/SI/AP For application: / Benoit BOISSIN DSP/OT Siège: 2 place Maurice Quentin -75039 Paris cedex 01 -Tél. : 33 (0)1 44 76 75 00- www.cnes.fr

More information