SUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG

Size: px
Start display at page:

Download "SUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG"

Transcription

1 Introduction to Eni Our new mission: We are an energy company. We are working to build a future where everyone can access energy resources efficiently and sustainably. Our work is based on passion and innovation, on our unique strengths and skills, on the quality of our people and in recognizing that diversity across all aspects of our operations and organization is something to be cherished. We believe in the value of long term partnerships with the countries and communities where we operate. Highlights: Eni is active in 69 countries in the upstream sector the exploration, development and extraction of oil and natural gas. In particular, we are the world s number one in oil exploration; since 2004 we have discovered 11.9 billion barrels of resources, representing around 2.4 times our total production in the same period, when the industry average is 0.3. In 2015 Eni supplied 4.2 BSCM of feedgas to LNG plants, held 10.9 BSCM of liquefaction capacity, 15.6 BSCM of regasification capacity and sold 13.5 BSCM equivalent of LNG. Eni intends to significantly strengthen its position along the whole LNG chain. This growth will be largely driven by Mozambique where Eni is a significant player. Mozambique / Area 4 Eni entered Mozambique in December 2006, with the signature of the Exploration and Production Concession Contract (EPCC) for the Area 4 block in the Northern deep offshore area in the Rovuma Basin. The first discovery in the Area 4 block was made in October As of today, fourteen exploration and appraisal wells have been drilled. The wells have confirmed the huge gas discoveries of Area 4 at around 85 Tcf of gas in place, of which around 35 Tcf exclusively located in Area 4, the remaining straddling between Area 4 and the adjacent Area 1 block. The exploration success in Mozambique expands the leadership of Eni in Africa and opens a new Eastern front to its activities. Eni East Africa (71.43% Eni, 28.57% CNPC) is the operator of the Offshore Area 4 block with a 70% participating interest. Co-venturers in the Area 4 are Empresa Nacional de Hidrocarbonetos de Mozambique E.P. (ENH) (10%), Galp Energia Rovuma (10%) and Kogas Mozambique (10%). Coral South FLNG project involves the construction of 6 subsea wells connected to a floating production facility FLNG (Floating Liquefied Natural Gas), with a liquefaction capacity of over 3.3 million tons of liquefied natural gas (LNG) per year, equivalent to approximately 5 billion cubic meters. Mozambique authorities approved the project development plan in February

2 This project highlights Eni s technological leadership in the development of deepwater gas fields via FLNG facilities. The Coral field, discovered in May 2012 and outlined in 2013, is entirely located within Area 4 and contains about 450 billion cubic meters (16 TCF) of gas in place. In October 2016, Eni and its Area 4 partners signed an agreement with BP for the sale of the entire volumes of LNG produced by the FLNG Coral South, for a period of over twenty years. In November 2016 Eni's Board of Directors has authorized the investment for the first phase of the development of the Coral discovery (Coral South project), located in the deep waters of the Rovuma Basin (Area 4), offshore Mozambique. Coral South FLNG Subsea Eni has been one of the first oil Companies in developing Deep Water exploration and production technologies. Eni has acquired considerable know-how and has adopted state of the art technologies and methodologies in this sector installing XTs around the world at different level of water depths from shallow to deep. Subsea production facilities for Coral South FLNG project, illustrated in the figure below, will include 6 subsea wells, 3 production manifolds, 6 flexible flowlines, 6 flexible risers and 3 umbilical lines connecting the wellheads to the FLNG vessel. Figure 1 Coral South pictorial The subsea system architecture has been developed considering the operating philosophy and constraints of the whole field: 2

3 No bottlenecks in the subsea production system: the feed gas producible from the subsea wells can satisfy the maximum capacity of the liquefaction unit onboard the FLNG. Full subsea system redundancy, for maximising availability: the system is designed to guarantee the required feed gas rate even in case of shutdown of one cluster of two wells; Continuous MEG injection for hydrate prevention at the Xmas tree through the umbilicals, so to optimize the number of lines to be installed; Round-trip pigging capability from topside for flowline inspection and cleaning as might eventually be required; As the individual well productivity is substantially higher than the actual production rates required during most of the project life, the impact of planned or unplanned events on gas production and deliverability from individual wells or flowlines can be mitigated by increasing production from the unaffected wells. This provides a high level of operational flexibility not typically encountered in most upstream gas field developments associated with LNG projects. Coral South FLNG Seabed Figure 2 Area 4 subsea geophysics The predominant feature of the Coral development area is the Vamizi Canyon which crosses from west to east across Coral. The Vamizi Canyon is joined by the Metundo Canyon and the Nuini Canyon to the west of development resulting in a large canyon complex. Coral South is located on the 3

4 southern side of this canyon complex. Studies of the canyon itself have shown a complex geological composition of sand, gravel, clay and silt from historical spreading slides and flow events which have resulted in a very uneven canyon floor which has proven difficult to investigate due to the very heterogeneous geological composition. Evidences obtained through age dating showed that turbidite flow events through the canyon have taken place within the last 250 years hence the canyon is considered as potentially active for debris and turbidite flows. The potential size and strength of these flows have been assessed and an FLNG is considered the most prudent solution in de-risking the project of possible future geological events, since the whole Coral South FLNG development is out of the canyon boundaries. The geophysical and geotechnical campaign investigated the canyon area and focused on the development area. In order to add confidence in the subsea development, an extensive geophysical and geotechnical campaign has been implemented within the Rovuma Basin of North East Mozambique in the last five years. Being an unexplored area, at the beginning of the project there was very few data available with almost no geological information in the deep water areas. The first phase of the campaign was a detailed geophysical AUV campaign implemented in 2013 consisting of 2m x 2m bathymetry across the development area with side scan sonar, boomer and pinger. This information was reviewed in parallel with the survey and a shallow geotechnical campaign covering 6m below the seabed to enable an initial profile of the area and to validate the interpretation of the geophysical survey. Following this campaign and the first detailed geological model of the development area, a second more intensive campaign was implemented with a variety of investigation techniques including CPTs, piston cores, box cores and boreholes (up to 120m depth) for a total of about 250 sampling and testing. This was organised in parallel with the FEED for Coral South project to ensure that the data collected were relevant to the proposed design of the FLNG and to reduce uncertainty in the geological model and therefore to reduce project risks. The information were collected and used for geotechnical investigation for flowlines and foundations, slope stability analysis and geohazard review. With all the available data acquired, a ground model of the area has been created which enabled a detailed understanding of the processes that created the geology of the area and what processes are active today. At present, the site area is considered fully characterized allowing the project to be brought forward with confidence. Coral South FLNG Subsea facilities The subsea facilities are designed for up to 2,300 m water depth, with service life of 30 years and will generally comply with the following criteria: Use of well-proven, reliable technology, plus standard and qualified equipment; Modularity and interchangeability of components with other Area 4 projects; Flexibility of the system; and 4

5 Optimisation of the number and complexity of the subsea structures. As the availability of the facilities depends on maintainability aspects, equipment and components have been standardised to reduce maintenance costs and to increase the overall system reliability. The 6 subsea Xmas trees consider a horizontal 7 tree, with a pressure rating of 690 bara (10,000 psi). Figure 3 Xmas tree All the subsea wellhead trees will be provided with a multiphase wet gas flow meter (WGFM) upstream of the choke valve. As a back-up to the flow meters, pressure transducers upstream and downstream of the wellhead choke will also be used to monitor flow rates. All chemicals, including MEG, will be delivered to the XTs for the injection into production. The subsea facilities will include three production manifolds that are controlled from the FLNG vessel through umbilical lines. The manifolds have an arrangement that has been field proven in other applications. Each manifold will have two main headers to collect the individual well streams, allowing a range of operations like commingling gas wells in a single flowline or even switching the flowline. 5

6 Figure 4 Subsea manifold The manifolds are connected to the flexible risers located near the FLNG vessel through six flexible flowlines, with a total combined flowline length of approximately 21 km. The flexible risers will have two different sections, a bottom section that connects to the flowlines and a top segment that connects to the FLNG turret. The risers will have the same internal diameter as the flowlines. The umbilical system comprises the following main facilities: Topside termination unit providing the physical interface connection between the subsea umbilical network and the topside production control system equipment. Three umbilicals and ancillary equipment connecting the topside FLNG equipment and the subsea production system; Three subsea termination assemblies, including ROV operated isolation valves, hydraulic and electrical distributions, and couplers and connectors; The topside facilities associated with the SPCS will include the following components: Master Control Stations (MCS) to control and monitor the subsea and topside control systems and to interface with other FLNG systems; Uninterruptible Power Supply (UPS) unit to provide electrical power to the subsea equipment; Hydraulic Power Unit (HPU) to generate and provide hydraulic power to the subsea control system equipment at the required pressure levels; and Topside Umbilical Termination (TUTU) unit to provide the physical interface connections between the umbilical network and the topside SPCS equipment. The MCS will include the control and data processing units, the Human-Machine Interface (HMI) unit, and the subsea communication units. 6

7 CONCLUSION Coral South Development Project started in 2011 with the first gas discovery in Area 4. The interested area has been covered by extensive surveys which provided all the data required for the design of the subsea facilities and to minimise the relevant risks. The design of the subsea facilities has been carried out with the objective to avoid bottlenecks for the FLNG production in all the operating conditions and to have full redundancy in order to maximise the availability and production of the whole Project. 7

Oil & Gas Offshore. Industry challenges in deepwater discover

Oil & Gas Offshore. Industry challenges in deepwater discover Oil & Gas Offshore Industry challenges in deepwater discover Galp Energia E&P portfolio spread over 4 continents, with main assets located in Portuguese speaking countries 2 Integrated position Enduring

More information

Subsea Structural Engineering Services. Capability & Experience

Subsea Structural Engineering Services. Capability & Experience Subsea Structural Engineering Services Capability & Experience Capability Overview INTECSEA s subsea structural engineering team has a proven track record for providing solutions to problems in the implementation

More information

Flow Assurance. Capability & Experience

Flow Assurance. Capability & Experience Flow Assurance Capability & Experience Capability Overview Flow assurance encompasses the thermal-hydraulic design and assessment of multiphase production/ transport systems as well as the prediction,

More information

Floating LNG facilities

Floating LNG facilities Lessons learned from three of the industry s first FLNG contracts position TechnipFMC as the pioneer developer for the next generation of FLNG facilities facilities As one of the pioneers in the provision

More information

Survey and Geosciences. Capability & Experience

Survey and Geosciences. Capability & Experience Survey and Geosciences Capability & Experience Capability Overview INTECSEA s Survey and Geoscience group is a team of Subject-Matter Experts in survey, geology and geophysics, geohazards, geotechnical

More information

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application 2 Virtus Subsea Connectors Delivering Long-Lasting Reliability at Each Subsea Connection Subsea production

More information

Offshore Pipelines. Capability & Experience

Offshore Pipelines. Capability & Experience Offshore Pipelines Capability & Experience Capability Overview INTECSEA is a leading engineering and project delivery company in the offshore oil and gas sector. It operates across the full project cycle

More information

INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France

INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES Y. OLANIYAN TOTAL S.A. France CONTENTS Introduction Slug flow in field design phase Field case study Conclusion Investigation of Slug flow in Deepwater

More information

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World 1 Overview About Subsea UK Facts and figures UK industry evolution Centre of Excellence Technology and Innovation

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our

More information

New Field Development Challenges in a Late Life Setting - Cladhan

New Field Development Challenges in a Late Life Setting - Cladhan New Field Development Challenges in a Late Life Setting - Cladhan Billy MacRae - Senior Geologist Acknowledgements: Sterling Resources, MOL 24th May 2017 1 Outline Introduction Cladhan field Appraisal

More information

Quad 204 Schiehallion Field Restarting a brownfield subsea development

Quad 204 Schiehallion Field Restarting a brownfield subsea development Quad 204 Deepsea Aberdeen: New 6 th Gen semi dual derrick Quad 204 New FPSO, Glen Lyon: biggest in N hemi-sphere Quad 204 Schiehallion Field Restarting a brownfield subsea development Thomas Harpley, Reservoir

More information

Oil&Gas Subsea Subsea Technology and Equipments

Oil&Gas Subsea Subsea Technology and Equipments Subsea Technology Equipments and Oil&Gas Subsea Subsea Technology and Equipments The exploration and production of oil and gas reservoirs in a variety of water depth has become a challenge to the offshore

More information

QUARTERLY UPDATE. Summary

QUARTERLY UPDATE. Summary QUARTERLY UPDATE Q2 FY14 Summary Production levels returning to higher rates Higher production output anticipated for 2H FY14 to support compressed delivery times Current order book increased to US$88m

More information

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012 Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012 1 Advisories Forward-Looking Statements Certain statements in this presentation are forward-looking

More information

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept The Market :- Focus on Platform or Gas-to-Surface Replacement Summary Many global

More information

Subsea Developments Status and Trends. Tore Halvorsen Senior Vice President

Subsea Developments Status and Trends. Tore Halvorsen Senior Vice President Subsea Developments Status and Trends Tore Halvorsen Senior Vice President FMC Technologies at a Glance 2005 Revenue: $3.2 Billion Subsea Trees Surface Wellheads Manifolds Control Systems Floating Production

More information

In-line Subsea Sampling: Non-disruptive Subsea Intervention Technology for Production Assurance

In-line Subsea Sampling: Non-disruptive Subsea Intervention Technology for Production Assurance In-line Subsea Sampling: Non-disruptive Subsea Intervention Technology for Production Assurance Hua Guan, Principal Engineer, OneSubsea Phillip Rice, Sales&Commercial Manager, OneSubsea February 8, Subsea

More information

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil Implementing FPSO Digital Twins in the Field David Hartell Premier Oil Digital Twins A Digital Twin consists of several key elements and features: 1. A virtual, dynamic simulation model of an asset; 2.

More information

Reliance Industries Limited. Notice Inviting Expression of Interest

Reliance Industries Limited. Notice Inviting Expression of Interest Reliance Industries Limited Notice Inviting Expression of Interest (RIL/E&P/EOI/2010/02) (Under International Competitive Bidding) For Oil & Gas Field Developments A) Block ALL BLOCKS Reliance Industries

More information

Research for Ultra-Deepwater Production

Research for Ultra-Deepwater Production Research for Ultra-Deepwater Production Opening Seminar Marintek do Brasil Rio de Janeiro, Apr 19, 2007 Mauricio Mauricio Werneck Werneck PROCAP PROCAP 3000 3000 Coordinator Coordinator Petrobras Investment

More information

Oil & Gas

Oil & Gas The Professional Choice Oil & Gas www.olaer.com 2 Oil & Gas Equipment Olaer is a global player specialising in innovative, efficient system solutions for temperature optimisation and energy storage. All

More information

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010 The Marine Well Containment System LSU Center for Energy Studies Energy Summit 2010 October 26, 2010 Restoring Confidence in Deepwater Drilling Operations Our initiatives are aligned with Administration

More information

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Offshore Development Concepts: Capabilities and Limitations Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Outline Platforms Floating Structures Semi-Submersible/ Floating Production

More information

Surveyors in The Oil & Gas Industry. Walter Jardine Lead Surveyor, BP North Sea Region Hydrofest 13 April 2011

Surveyors in The Oil & Gas Industry. Walter Jardine Lead Surveyor, BP North Sea Region Hydrofest 13 April 2011 Surveyors in The Oil & Gas Industry what on earth do those guys do? Walter Jardine Lead Surveyor, BP North Sea Region Hydrofest 13 April 2011 Why Geography Matters in the O&G Industry Around 80% of the

More information

Evolution of Deepwater Subsea / Offshore Market

Evolution of Deepwater Subsea / Offshore Market Evolution of Deepwater Subsea / Offshore Market Amar UMAP Vice President, Technip COOEC Alliance DMFT 2014 Zhu Hai, China 18 October 2014 Table of contents 1. Evolution of Offshore/ Subsea Oil & Gas Industry

More information

Active Heating Potential Benefits to Field Development

Active Heating Potential Benefits to Field Development Active Heating Potential Benefits to Field Development Journées Annuelles du Pétrole 12/13 Octobre Paris Atelier Champs Matures et Satellites Technip Subsea Innovation Management (T-SIM) Contents 1. INTRODUCTION

More information

Learn more at

Learn more at Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry

More information

OBSERVATORY SERVICING AND MAINTENANCE

OBSERVATORY SERVICING AND MAINTENANCE OBSERVATORY SERVICING AND MAINTENANCE How to deploy and maintain a network of observatories around Europe? We don t built what we cannot maintain! Jean-François DROGOU IFREMER Steve ETCHEMENDY M.B.A.R.I

More information

Deepwater Precommissioning Services

Deepwater Precommissioning Services Deepwater Precommissioning Services Featuring Denizen remote subsea technologies Drilling Evaluation Completion Production Intervention Pipeline & specialty services Nitrogen services Pipeline services

More information

SUBSEA CONTROLS & COMMUNICATIONS SOLUTIONS

SUBSEA CONTROLS & COMMUNICATIONS SOLUTIONS SUBSEA CONTROLS & COMMUNICATIONS SOLUTIONS Proserv is the fresh alternative in global energy services. Combining technical ingenuity with design, engineering, manufacturing and field services expertise,

More information

MARS. Multiple application reinjection system

MARS. Multiple application reinjection system MARS Multiple application reinjection system Unique Technology. Universal Application. Historically, installing processing hardware on existing subsea trees has been a high-risk and costly activity due

More information

Deepwater Subsea Tie-Back Flow Assurance Overview M U R P H Y S A B A H O I L C O M P A N Y L T D.

Deepwater Subsea Tie-Back Flow Assurance Overview M U R P H Y S A B A H O I L C O M P A N Y L T D. Deepwater Subsea Tie-Back Flow Assurance Overview 1 Contents Case Study Overview Flow Assurance Basis/Data Results Pre-FEED/FEED Considerations Flow Assurance Field Architecture Technologies 2 Preliminary

More information

Oil&Gas Subsea Production

Oil&Gas Subsea Production Oil&Gas Subsea Production Oil&Gas Subsea Production The first subsea technologies were developed in the 1970s for production at depths of a few hundred meters. Technology has advanced since then to enable

More information

Enabling Subsea Processing by Connecting Innovation with Experience

Enabling Subsea Processing by Connecting Innovation with Experience Subsea solutions Enabling Subsea Processing by Connecting Innovation with Experience Products and systems for deepwater oil and gas developments Answers for energy. Enhancing oil and gas recovery in challenging

More information

RELIANCE INDUSTRIES LIMITED

RELIANCE INDUSTRIES LIMITED RELIANCE INDUSTRIES LIMITED Petroleum Business (E&P) Notice Inviting Expression of Interest (RIL/E&P/EOI/2012/07) (Under International Competitive Bidding) A] For All Oil & Gas Fields Reliance Industries

More information

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success Deepsea technologies Streamlining Subsea Production Systems for Smaller Fields AFGlobal

More information

Britcham Brasil X Seminário Internacional de Energia

Britcham Brasil X Seminário Internacional de Energia Britcham Brasil X Seminário Internacional de Energia Aker Solutions Provedor de Tecnologia no Presente e no Futuro Nov.2012 Public 2012 Aker 2012 Solutions Aker Solutions From reservoir to production Aker

More information

OneSubsea Pumps and Subsea Processing Systems

OneSubsea Pumps and Subsea Processing Systems OneSubsea Pumps and Subsea Processing Systems Pumps and Subsea ProcessING Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our aim is to provide comprehensive technical

More information

Latest developments in Asset Management - Oil and Gas production via Internet?

Latest developments in Asset Management - Oil and Gas production via Internet? Workshop - Virtual Institute of Scientific Users of Deep-Sea Observatories (VISO) - Tromsø (Norway), June 11-12, 2009 Latest developments in Asset Management - Oil and Gas production via Internet? Dr.-Ing.

More information

HorizontalBore SUBSEA TREE

HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.

More information

AADE Houston Chapter. Group. 26 January 2011

AADE Houston Chapter. Group. 26 January 2011 AADE Houston Chapter Deepwater and Emerging Technologies Group 26 January 2011 BOEMRE Compliance Guidelines Department of Interior s Increased Safety Measures for Energy Development on the Outer Continental

More information

Engineering and Procurement We are designing and purchasing everything we can firmly identify

Engineering and Procurement We are designing and purchasing everything we can firmly identify Tamar Field Development NPC PROJECT UPDATE 13 JUNE, 2010 1 Engineering and Procurement We are designing and purchasing everything we can firmly identify Offshore and Onshore FEED Studies Subsea FEED Engineering

More information

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel

More information

Opportunities and Challenges in Deepwater West Africa Projects

Opportunities and Challenges in Deepwater West Africa Projects Opportunities and Challenges in Deepwater West Africa Projects Finding Petroleum - Finding African Oil Mark Jones - INTECSEA (UK) Royal Society of Chemistry, London 28th January 2015 Opportunities and

More information

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL Prelude FLNG Project DOT conference presentation Jaap de Vries, Prelude FLNG Project Director FINAL Copyright of Royal Dutch Shell plc 1 Prelude FLNG: the largest offshore floating facility ever The Prelude

More information

The use of an integrated contract model (iepci) for Subsea developments

The use of an integrated contract model (iepci) for Subsea developments NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 The use of an integrated contract model (iepci) for Subsea developments Tim Crome 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 MCE Deepwater

More information

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald Managing Director, Enpro Subsea idonald@enpro-subsea.com Agenda Enpro

More information

Slug Flow Loadings on Offshore Pipelines Integrity

Slug Flow Loadings on Offshore Pipelines Integrity Subsea Asia 2016 Slug Flow Loadings on Offshore Pipelines Integrity Associate Professor Loh Wai Lam Centre for Offshore Research & Engineering (CORE) Centre for Offshore Research and Engineering Faculty

More information

16/09/2014. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems

16/09/2014. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems OIL & GAS Introduction to Subsea Production Systems 08 Production Control Systems September 2014 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER Module structure Section 1 Introduction to control systems

More information

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer

Subsea Asia Subsea Processing. June 2008 Dennis Lim Senior Field Development Engineer Subsea Asia 2008 - Subsea Processing June 2008 Dennis Lim Senior Field Development Engineer Agenda Overview of FMC Subsea processing projects History and on-going projects Recent development within subsea

More information

Presenter: John T. Gremp President and Chief Operating Officer. February 2011

Presenter: John T. Gremp President and Chief Operating Officer. February 2011 Presenter: John T. Gremp President and Chief Operating Officer February 2011 Director, Investor Relations Robert K. Cherry +1 281 591 4560 rob.cherry@fmcti.com These slides and the accompanying presentation

More information

BROWSE BASIN NORTH-WEST AUSTRALIA

BROWSE BASIN NORTH-WEST AUSTRALIA Consultation Information Sheet October 2018 PROPOSED BROWSE TO NORTH WEST SHELF DEVELOPMENT ENVIRONMENTAL REFERRAL BROWSE BASIN NORTH-WEST AUSTRALIA Key Information + + In September 2018, the Browse Joint

More information

Offshore Wind Risks - Issues and Mitigations

Offshore Wind Risks - Issues and Mitigations DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years

More information

Subsea and Export Systems. The world s leading independent provider of subsea and export systems, engineering and technology solutions.

Subsea and Export Systems. The world s leading independent provider of subsea and export systems, engineering and technology solutions. Subsea and Export Systems The world s leading independent provider of subsea and export systems, engineering and technology solutions. Wood is a global leader in project delivery, engineering and technical

More information

Integrated Modeling of Complex Gas-Condensate Networks

Integrated Modeling of Complex Gas-Condensate Networks Integrated Modeling of Complex Gas-Condensate Networks Elliott Dudley (Senior Consultant MSi Kenny) Subsea UK 2013 Aberdeen, UK Experience that Delivers Overview Agenda Integrated Modelling Methodology

More information

A marginal field (re-)development using several alternative methodologies 1

A marginal field (re-)development using several alternative methodologies 1 Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy

More information

Subsea Control Systems

Subsea Control Systems Subsea Control Systems Simplifying Subsea Production INGENIOUS SIMPLICITY Proserv s direct hydraulic and multiplexed production subsea control systems provide control and shutdown of subsea wells together

More information

Simulation Study of Subsea Control System Based on SimulationX

Simulation Study of Subsea Control System Based on SimulationX Simulation Study of Subsea Control System Based on SimulationX Xin Wang, Xin Zuo*, Hua-qing Liang Department of Automation, China University of Petroleum, Beijing 02200, China *Corresponding author (E-mail:

More information

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE 4 What we do 6 Why choose us? 7 Service and product capabilities For more than 35 years, we have been providing clients with standalone and

More information

Operating topsides or onshore. It s a lot easier to picture what is happening within the process..

Operating topsides or onshore. It s a lot easier to picture what is happening within the process.. 서유택 해저공학 Objectives Understand the operation of subsea tie-backs on typical oil and large gas condensate developments. Understand the vulnerabilities of subsea systems. Operating topsides or onshore It

More information

Subsea Innovation : a key for cost reduction?

Subsea Innovation : a key for cost reduction? PAU, FRANCE 5-7 APRIL 2016 Subsea Innovation : a key for cost reduction? Luc RIVIERE, Clément BOIREAU, Jérôme ANFRAY TOTAL SA INTRODUCTION 2 Facilities CAPEX = 100% Power Generation, Chemicals Storage

More information

By: Derek Watson and Lee Robins, Tracerco, UK

By: Derek Watson and Lee Robins, Tracerco, UK TRACERCO DISCOVERY SUBSEA CT (COMPUTED TOMOGRAPHY) HELPS TO OPTIMISE YOUR OPERATIONAL PIGGING CAMPAIGN AND VERIFY ILI RESULTS: TECHNOLOGY FOR PIPELINE INTEGRITY AND FLOW ASSURANCE VISUALISATION By: Derek

More information

CFD modeling and optimization of a cooling pond

CFD modeling and optimization of a cooling pond CFD modeling and optimization of a cooling pond Sylvain Devynck TechnipFMC - Ph.D., CFD Engineer Aurélien Davailles TechnipFMC - Ph.D., CFD Engineer STAR Global Conference 2017 March 6-8, 2017 Berlin Agenda

More information

Safety and Environment considerations override all other items and should be considered in all design aspects.

Safety and Environment considerations override all other items and should be considered in all design aspects. 서유택 해저공학 Lecture plan Introduction The design and operation of offshore production facilities are becoming a critical component as the industry goes to deeper water, longer tiebacks, higher temperature

More information

QUARTERLY UPDATE Q2 FY13

QUARTERLY UPDATE Q2 FY13 QUARTERLY UPDATE Q2 FY13 Summary Current order book increased by 51 per cent Quotes remain at near record highs Launch of new high impact resistant centralisers Reconfigured plant shift roster and operational

More information

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery Flexible Pipe Solutions a competitive approach for Shallow water development Sylvain Cabalery Agenda 1. Subsea at Technip in Brief and Asia Pacific presence 2. Flexible Pipes Solutions a. Main differences

More information

Seabed preparation on Edradour Glenlivet project campaigns

Seabed preparation on Edradour Glenlivet project campaigns PAU, FRANCE 5-7 APRIL 2016 Seabed preparation on Edradour Glenlivet project 2014-2015 campaigns Loic Delebecque, TOTAL E&P EDRADOUR GLENLIVET PROJECT Edradour and Glenlivet are gas condensate fields located

More information

Mozambique. Energy, Society, Sustainability October 2016

Mozambique. Energy, Society, Sustainability October 2016 B Mozambique Energy, Society, Sustainability October 2016 2 Enrico Mattei: it s their oil It s their oil, said Enrico Mattei in 1957. Eni s first Chairman is often remembered as the man of the future due

More information

Offshore Construction Management Services. Capability & Experience

Offshore Construction Management Services. Capability & Experience Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by

More information

CAPETANO OIL LIMITED (+233) (+233)

CAPETANO OIL LIMITED (+233) (+233) 1 CAPETANO OIL LIMITED (+233) 202 027 485 (+233) 209 985 175 www.capetano.com info@capetano.com C90/24 Osu Badu Street, Airport Residential Area, Accra Ghana. 2017 Capetano Oil Limited. All rights reserved.

More information

Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers

Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers An Intensive 5 Day Training Course Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers 16-20 Dec 2018, Dubai 09-13 Jun 2019, Dubai 15-19 Dec 2019, Dubai 20-NOV-18 This

More information

Personalized Service, Industry Expertise. Franklin Howard

Personalized Service, Industry Expertise. Franklin Howard Personalized Service, Industry Expertise. Franklin Howard PRODUCTS Franklin Howard International provides high quality drilling equipment and spare parts from top manufacturers in the United States. Warranty

More information

Excellence in Deepwater through Innovation Paul H. Hillegeist President & COO Quest Offshore Resources, Inc.

Excellence in Deepwater through Innovation Paul H. Hillegeist President & COO Quest Offshore Resources, Inc. Excellence in Deepwater through Innovation Paul H. Hillegeist President & COO Quest Offshore Resources, Inc. Paul.Hillegeist@questoffshore.com Image courtesy of: EMAS AMC 1 Table of Contents A Few Examples

More information

Training: Industry Overview

Training: Industry Overview The Fundamentals of Subsea Date & Time: Wednesday, November 4, 2015 9:00 am 4:30 pm Host Company: EIC Location: EIC, 11490 Westheimer Rd Ste 110, Houston, TX, 77077 Contact: Natalia Bueno Email: natalia.bueno@the-eic.com

More information

Next Generation Training for Subsea & Marine Operations Engineers & Asset Managers May 2018, Dubai Dec 2018, Dubai

Next Generation Training for Subsea & Marine Operations Engineers & Asset Managers May 2018, Dubai Dec 2018, Dubai 06-10 May 2018, Dubai 16-20 Dec 2018, Dubai REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction This interactive, applications-driven 5-day training course

More information

COMPREHENSIVE SOLUTIONS

COMPREHENSIVE SOLUTIONS COMPREHENSIVE SOLUTIONS MCDERMOTT IS A PREMIER, FULLY INTEGRATED PROVIDER OF ENGINEERING, CONSTRUCTION AND TECHNOLOGY SOLUTIONS TO THE ENERGY INDUSTRY PROBLEM SOLVERS For more than a century, customers

More information

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA Dagang Zhang COTEC Offshore Engineering Solutions China Offshore Oil Engineering Company 2011 China-America Frontiers of Engineering Symposium San Diego, USA Presentation Outline Current Status of Deepwater

More information

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value SUBSEA 7 AND GRANHERNE ALLIANCE Viable Solutions Operators are seeking novel and reliable concepts to overcome industry challenges such as complex reservoirs, cost, growth and schedule creep and to optimise

More information

Planned Obsolescence and Mid Life Updates -

Planned Obsolescence and Mid Life Updates - Planned Obsolescence and Mid Life Updates - Life of field is more than just existence Kevin Glanville, Design & Development Manager, Proserv [UK]; Presenting Paul Hunter, Subsea controls / Systems technical

More information

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Marine Well Containment Company. Charlie Miller, Chief Technology Officer Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company

More information

AFRICA FUGRO MOZAMBIQUE. UNDERSTANDING your operational objectives. TACKLING your complex challenges. DELIVERING your global success stories

AFRICA FUGRO MOZAMBIQUE. UNDERSTANDING your operational objectives. TACKLING your complex challenges. DELIVERING your global success stories AFRICA FUGRO MOZAMBIQUE UNDERSTANDING your operational objectives TACKLING your complex challenges DELIVERING your global success stories FUGRO MOZAMBIQUE Fugro Mozambique provides diving and ROV support,

More information

Husky Energy East Coast Update

Husky Energy East Coast Update Husky Energy June 17, 2009 Trevor Pritchard General Manager Operations Advisory Husky Energy is an integrated energy and energy-related company headquartered in Calgary, Alberta, Canada. Husky Energy is

More information

ACTEON FLS - DECOMMISSIONING

ACTEON FLS - DECOMMISSIONING ACTEON FLS - DECOMMISSIONING CLIENT VERSION 15 FEBRUARY 2016 INTRODUCTION TO ACTEON FLS ACTEON FLS Subsea services company Acteon has launched a new service. Acteon Field Life Service (FLS) offers a joined-up

More information

M. Kevin McEvoy. Oceaneering International, Inc. Chief Executive Officer 2015 GLOBAL ENERGY AND POWER EXECUTIVE CONFERENCE JUNE 2, 2015 NEW YORK, NY

M. Kevin McEvoy. Oceaneering International, Inc. Chief Executive Officer 2015 GLOBAL ENERGY AND POWER EXECUTIVE CONFERENCE JUNE 2, 2015 NEW YORK, NY 2015 GLOBAL ENERGY AND POWER EXECUTIVE CONFERENCE JUNE 2, 2015 NEW YORK, NY M. Kevin McEvoy Chief Executive Officer Oceaneering International, Inc. Safe Harbor Statement Statements we make in this presentation

More information

Esso offshore projects

Esso offshore projects Esso offshore projects Introduction Esso Australia, a subsidiary of ExxonMobil Australia, is undertaking a program of work across some of its offshore assets, including those owned jointly by the Gippsland

More information

International Journal of Marine Engineering Innovation and Research, Vol. 2(2), Mar (pissn: , eissn:

International Journal of Marine Engineering Innovation and Research, Vol. 2(2), Mar (pissn: , eissn: (pissn: 2541-5972, eissn: 2548-1479 117 Configuration Selection Based On Lifecycle Cost Of Subsea Production System: Case Of Indonesia Deepwater Field Christoffel.F.B. Sa u 1, Daniel.M.Rosyid 2 Abstract

More information

FMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer

FMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer FMC Overview Fourth Quarter 2016 Director, Investor Relations Matt Seinsheimer +1 281.260.3665 matthew.seinsheimer@fmcti.com This presentation contains forward-looking statements intended to qualify for

More information

SWiG Subsea Wireless Group - Presentation to API

SWiG Subsea Wireless Group - Presentation to API Commercial in Confidence SWiG Subsea Wireless Group - Presentation to API January 14 Commercial in Confidence Agenda About SWiG What is the technology? Where is it used? SWiG family of standards Where

More information

Pipeline Design & Installation Systems

Pipeline Design & Installation Systems Pipeline Design & Installation Systems Rigid pipeline subsea tie-backs new operational challenges Paul Georgeson Operations Support Manager Wood Group Kenny Agenda - Overview - Materials - Inspection -

More information

Subsea Positioning In deep water

Subsea Positioning In deep water Subsea Positioning In deep water PETRONAS - PETRAD - INTSOK CCOP DEEPWATER SUBSEA TIE-BACK Damai Puri Resort & Spa, Kuching, Sarawak, MALAYSIA 24TH - 26TH January, 2011 Supplier to the oil & gas industry

More information

Investor Presentation

Investor Presentation Connecting What s Needed with What s Next Investor Presentation September 2017 Forward-Looking Statements Statements we make in this presentation that express a belief, expectation, or intention are forward

More information

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE 3 About us 4 What we do 6 Why choose us? 7 Service and product capabilities OUR VALUES Safety Integrity Innovation

More information

Subsea Field Development

Subsea Field Development Subsea Field Development Presented by Oseghale Lucas Okohue BEngr. Msc. CIPMP Course Instructor Name: Oseghale Lucas Okohue Position: Subsea Engineer Consultant Production Systems Drilling Systems Website:

More information

Survey Operations Pipeline Inspection

Survey Operations Pipeline Inspection Survey Operations Pipeline Inspection HydroFest 16 th April 20 Kevin Donald Agenda Why Inspect? Definition of a Pipeline Types of Survey Positioning Data Processing The Future Conclusions Page 2 Why Inspect?

More information

Contents of the Presentation

Contents of the Presentation Offshore Market Outlook Contents of the Presentation I. What is Offshore Business II. Offshore Market Outlook III. Deltamarin Offshore Services What is Offshore Business Offshore is all activities done

More information

Meters. Surveillance on demand.

Meters. Surveillance on demand. Meters Surveillance on demand www.exprogroup.com Innovative metering technology 2 EXP_Meters_A4 06/04/2017 14:15 Page 3 Clamp-on wellhead surveillance Expro Meters offers on-demand wellhead surveillance

More information

2009 Half Year Results Summary

2009 Half Year Results Summary Rig Activity - 2 - 2009 Half Year Results Summary 2009 m 2008 m Change % Revenue 219.8 201.2 +9% EBITDA 30.7 32.1-4% Profit from operations 23.0 24.0-4% Finance income (expense) 3.3 (2.9) Profit before

More information