ADDENDUM NO. 02 July 31, 2012

Similar documents
ADDENDUM NO. 01 July 20, 2012

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1

HUSSEY GAY BELL SAVANNAH, GEORGIA

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

PALM COAST WASTEWATER TREATMENT PLANT NO. 2

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

ADDENDUM NO. 04 April 04, 2012

TG Glazing Design-Build

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

Bid No. B14-02 Building 100 HVAC Improvements

CONVEYANCE PIPELINE AND PUMP STATION

This specification describes the minimum requirements for piping systems for the following service:

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

OFFICE OF MANAGEMENT AND FINANCE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

1. Attached is a copy of addendum #4 issued by Diamond Schmitt Architects, dated

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

710 AVIS DRIVE WASTEWATER TREATMENT PLANT PHONE: FAX: INCINERATOR SCRUBBER REPLACEMENT

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

Answer: Only to ChurchWoods, LLC.

Merrick Pet Care New Distribution Center Hereford, Texas

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

ADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m.

Addendum No. 3 Tender Call No Revised Closing: 12:00 NOON (LOCAL TIME), April 24, 2017

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

9. Pay for the power consumed until the project has been accepted as substantially complete.

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

CITY OF NEW ROCHELLE RENOVATIONS TO FIRE STATION NO WEBSTER AVENUE, NEW ROCHELLE, NEW YORK

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

ADDENDUM #1. April 29, 2009

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

State College of Florida, Manatee-Sarasota

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A


ADDENDUM NUMBER ONE (1) For. Occoquan Regional Park Jean R. Packard Center 1608 Room Exhibit Fabrication & Installation

Specifications: Other: sign in sheet

TO: All Recipients Date: March 20, 2015

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

This specification describes the minimum requirements for piping systems for the following service:

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

INVITATION FOR BID (IFB) IFB NO. GSWA

SECTION PROJECT MANAGEMENT AND COORDINATION

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Montclair, NJ ADDENDUM NO. 2. Request for Proposal # 1144 Digital Printing Services and Photocopying June 17, 2014

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Notre Dame High Addition/Renovation Addendum 3 Page 1

CHAPTER A-15 INTERIOR DESIGN INDEX

10930 W. Sam Houston Parkway N., Suite 900

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SECTION CABLE TRAYS

SECTION PROJECT COORDINATION VIA BIM

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

Answer: Qualification statement should be provided with the bid.

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

Addendum No. 1 page 1

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

ALL PLAN HOLDERS NANCY MAGER, NPSR ARCHITECTS, INC. DATE: November 29, Lea County General Service Building PROJECT NO: ADDENDUM NO: 1

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

HOENER ASSOCIATES INC. ARCHITECTS

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Transcription:

Post Point Wastewater Treatment Plant Improvements Owner: Engineer: GC/CM: City of Bellingham Carollo Engineers Mortenson Construction ADDENDUM NO. 02 July 31, 2012 THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE BID PACKAGE BID FORM FOR BID PACKAGE 114 This addendum forms a part of the Contract Documents and modifies the original bidding documents only to the extent specifically shown and noted below. All other conditions shall remain the same. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. BP 114 MECHANICAL SYSTEMS: 1. Carollo Engineers Addendum No. 11 Dated July 27, 2012 is incorporated in this addendum as an attachment (Note: All previous addenda issued by Carollo are incorporated into the Conformed Contract Documents, Dated July 2012) 2. Drawing 030-Y-107 Section B: the 4-W4 line adjacent to the secondary clarifier references Key Note 5. Change reference to Key Note 6. BP 114 Bidder Questions/Responses(all responses italicized): 1. Per 11294B Gate G-30506 is listed as 72" x 60". Should this be 60" x 72"? The gate should be 60"x72". Revised in Addendum 11. 2. Per 11294B Gate EDR-31144 and EDR-31145 are 48" x 48" but gate travel is stated as 54". Should this be 48"? Per dwg 311-M-101 & 311-M-102 gate EDR-31144 is a 48"x48" gate with 48" travel. Gate EDR-31145 is a 54"x54" gate with 54" travel. Schedule revised in Addendum 11 for gate EDR-31144 3. The Valve and Gate Actuator Schedule in Section 13447 - Electric Motorized Actuators indicates that gates (EDR-31144, EDR-31145, EDR-33011,12,13 and G-33011,12,13) are part of bid alternate #2. What part or parts of these gates are bid alternate #2? Bid alternative #2 has been removed. Revised in Addendum 11. 4. Regarding the Double Containment Specification 15245; Spears Mfg Co would like to be included as an "equal" to the manufactures listed. I have included 3 attachments (see attachments) for review: #1. DC Tech Data Sheet, #2. DC Installation Guide, #3. CPVC Sch 80 Fittings Tech Data Sheet. Spears manufactures and fabricates in Jerome, Idaho and Caney, Kansas (as well as other US locations), and has 9 regional warehouses throughout the United States, including our Pacific Northwest Warehouse in Auburn, WA. In addition, Spears provides installer training at no charge for our specialty systems including Double Containment and ASME Bonder Training. Unless specifically stated otherwise, the technical documents for the Post Point project do not exclude any manufacturer that believes they meet the requirements listed in the specifications from bidding as an or equal. 5. Victaulic is requesting to be considered an "equal" for plug and check valves on the Post Point project. Unless specifically stated otherwise, the technical documents for the Post Point project do not exclude any manufacturer that believes they meet the requirements listed in the specifications from bidding as an or equal. 6. Section 01010-3, Paragraph 1.03 Key Personnel Do these requirements apply to the Mechanical Contractor, or GCCM. Key Personnel requirements in this section apply to the GCCM. 7. Drawing 306-M-102 Engineered Biofilter Media Require a specification on the Biofilter, and who is responsible for installation. Engineered Biofilter Media is specified in Section 13329 - Biofilter System. Per 00080-Summary of Work 2.03 1 this section is provided under BP 114. 8. Reference Responsibility Matrix, Item # 11-14; Verify Bid Package 114B, Contractor will install the ALP piping drops from the butterfly valve, which is located on top off the Sludge Basins, back down to their ADDENDUM No. 02 Page 1 of 2 July 31, 2012

Diffuser Header. If so, does that include all the piping supports and cores/sleeves required for that piping. This is correct. 9. Reference Responsibility Matrix, Item #11-12, SST Drop legs installed to within 2 of the manifold. Please provide details or where located in the RFQ. BP 114 will provide and install the stainless drop legs to the diffuser equipment. BP 114B will provide and install the diffuser PVC piping. For bidding purposes, assume the transition from stainless to PVC will occur 2' above the diffuser manifold piping. 10. The CPM Schedule provided in the Bidders Manual has an activity for the Existing 72" ML Line from ASB 2&3 to the Flow Splitter Box. This work is not identified in BP114 scope of work, is the investigation of the existing 72" ML line part of the BP114 subcontract package, or is this being completed under a different agreement? The investigation of the 72" ML pipe adjacent to Clarifier #4 will be performed by BP 101. 11. Sheet 214 (330-M-101) Ref Addendum #1: Sheet shows highlighted under-slab piping that will be removed from the BP-114 Scope, there is additional piping under the slab of SC#4 that has not been highlighted. The 4-W4 line that wraps around the SC #4 will also need to be installed prior to slab installation. Please clarify if this piping is still in BP-114 package or if it has been removed? The referenced 4-W4 piping will be installed by BP 114. This piping is installed under the sidewalk, but above the base slab. See B/030-Y-107 for approximate elevation. 12. Sheet 57 (030-Y-108) Partial Plan view show the ALP pipe between ASB #4 and ASB #2 & #3 as 20", in the Section E the same line is shown as 24". Please clarify as to the correct size call out for the ALP line. The 30" ALP line tees at the NE corner of ASB #4. From there a 24" line supplies ASB #2&#3 and a 20" line supplies ASB #4. The referenced drawings are correct. 13. Are all control panels in the N drawings, associated with our equipment, identified as LCPs (local control panels) provided by others? Please clarify that BP-114 will only provide panels in the N drawings, associated with our equipment, identified as VCPs (vendor control panels). Confirmed, unless the control panel is specified with the equipment spec provided under BP 114. 14. We interpret our electrical scope to be only interconnect wiring between the HVAC control panel and HVAC field equipment as well as interconnect wiring between any of our equipment and vendor supplied control panels (VCPs). Anything outside of this is considered work by others. Please confirm. BP 114 shall provide control wiring for HVAC equipment from control panels to field equipment, as noted above. Interconnect field wiring between equipment and remote VCPs will be provided by BP 115, unless specified as manufacturer supplied cables. 15. All disconnect switches for field equipment will be covered by others. Please confirm. Confirmed, unless specified with the equipment provided under BP 114. 16. Please provide the electrical and control drawings associated with fans F-13091, F-13092, and F-13093 listed on the fan schedule in section 15830. Could not find any drawings associated with these fans in our package. Do not include fans F-13091, F-13092, and F-13093 in the BP 114 bid. These fans will not be provided under this contract. 17. Please provide contact information for the Electrical Subcontractor and the Systems Integrator. BP 115 will be performed by Seahurst Electric 425.258.1882. The System Integrator will be subcontracted under Seahurst Electric. 18. Please provide a copy of the Building Permit for the Project. Building permits are viewable at the Mortenson Project Office, 206 McKenzie Ave, Bellingham WA 98225 19. Note 3 on dwg 030-Y-105 shows a future 30" connection. It is not shown on dwg 310-M-101 or 310-M- 104. Is this required? See Carollo Engineers Addendum No. 11, attached. ATTACHMENTS: 1. Carollo Engineers Addendum No. 11 - Dated July 27, 2012 End of Addendum No. 02 ADDENDUM No. 02 Page 2 of 2 July 31, 2012

ADDENDUM NO. 11 Carollo Project No. 8153A.30 July 27, 2012 Page 1 of 3 ADDENDUM NO. 11 TO CONTRACT DOCUMENTS FOR CITY OF BELLINGHAM POST POINT WASTEWATER TREATMENT PLANT IMPROVEMENTS CITY PROJECT NUMBER: EU-145 July 27, 2012 pw://carollo/documents/client/w A/Bellingham/8153A30/Addenda/Addendum 11.docx

ADDENDUM NO. 11 July 27, 2012 Carollo Project No. 8153A.30 Page 2 of 3 VOLUME 2 OF 4, TECHNICAL SPECIFICATIONS DIVISIONS 01-14: 1. Specification Section 11294B STAINLESS STEEL SLIDE GATES: a. Section 3.03 Sluice Gate Schedule: REVISE the following gates: Equipment Number Opening Size, (W x H) Inches Min. Gate Travel, Inches DELETE REPLACE with DELETE REPLACE with G-30506 72 X 60 60 X 72 - - EDR-31144 - - 54 48 2. Specification Section 13447 ELECTRIC MOTORIZED ACTUATORS: a. Section 3.02 Valve and Gate Actuator Schedule, Note 3: DELETE Bid Alternative No. 2. and REPLACE with NOT USED. VOLUME 4 OF 4, CONTRACT DRAWINGS: 3. Drawing 030-Y-105 YARD PIPING PLAN AREA C a. Center of sheet on the north side of the junction box attached to west face of the Activated Sludge Basin 2&3: DELETE callouts and associated arrows for 36 3 BTV, INV 20.50, and 4. Drawing 305-M-103 SELECTOR/ACTIVATED SLUDGE BASIN 1 TOP PLAN a. Key Note 16: DELETE NOT USED and REPLACE with FUTURE GATE 5. Drawing 340-D-101 SECONDARY SLUDGE PUMP STATION PUMP ROOM PLAN 4 a. Plan A: DELETE callout and associated arrow for b. KEY NOTE 4: DELETE Blind flange existing connection and REPLACE with NOT USED 6. Drawing 340-D-102 SECONDARY SLUDGE PUMP STATION MOTOR ROOM PLAN a. Upper right corner of sheet below General Notes: ADD KEY NOTES: 1 DEMOLISH EXISTING W3 PUMP POWER FACTOR CORRECTION CAPACITORS AND ALL ASSOCIATED CONDUIT AND CONDUCTORS. pw://carollo/documents/client/wa/bellingham/8153a30/addenda/addendum 11.docx

ADDENDUM NO. 11 July 27, 2012 Carollo Project No. 8153A.30 Page 3 of 3 This Addendum No. 11, pages 1 through 3 shall become part of the Contract and all provisions of the Contract shall apply thereto. The time provided for completion of the Contract is not changed. Bidders shall acknowledge receipt of all Addenda by number in the space provided in the Proposal. CAROLLO ENGINEERS WASHINGTON, P.C. pw://carollo/documents/client/wa/bellingham/8153a30/addenda/addendum 11.docx