Addendum #1 - Bid Package #

Similar documents
ADDENDUM NO. 1 November 10, 2016

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

CHAPTER 5 ARCHITECTURE

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

ADDENDUM #1. April 29, 2009

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

REVISIONS TO SPECIFICATION SECTIONS: Section Allowances: 12. Replace paragraphs 1.05, A and B with the following:

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

Notre Dame High Addition/Renovation Addendum 3 Page 1

Answer: Qualification statement should be provided with the bid.

SPARTAN DAY CAMP 4814 FREEDOM RING RD

10930 W. Sam Houston Parkway N., Suite 900

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

Merrick Pet Care New Distribution Center Hereford, Texas

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

(Full legal name of business submitting the offer)

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

Section Meetings Section Material and Equipment. None Required

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

TG Glazing Design-Build

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

RENOVATION OF THE FARMERS MARKET Reference Number:

SECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

RENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

TELEPHONE: (215) Addendum No. 01

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION CUSTOM CASEWORK

1.01 NOTICE TO BIDDERS

SECTION PROJECT MANAGEMENT AND COORDINATION

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

SPECIFICATIONS DRAWINGS. To: Plans and Specifications for:

ADDENDUM #2 September 12, 2018

Specifications: Other: sign in sheet

CS2.0 COVER SHEET VOL. 2

ARCHITECT S SUPPLEMENTAL INSTRUCTIONS

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

Architecture Firm ID 439 Contract Design I Due: May 4, 2015

Chuck Caesar. VIA: /Webposting April 27, 2017

Last Name: First Name: M.I:

Bovard Studios Inc. Section April 6, 2004 Page 1

SECTION SUBMITTAL PROCEDURES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Architectural Design Process

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:

Addendum No. 4 page 1

PLAN SUBMITTAL REQUIREMENTS

Music Area Casework General 1.01 Summary Related Sections Definitions Qualifications and Quality Assurance

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB. Job # BID-CDBG #16

SECTION PRE-MANUFACTURED CABINETS

Addendum. McKee and Associates Architecture and Interior Design. No. ONE Date: Project:

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

SECTION SUBMITTAL PROCEDURES

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

214 Wilshire Blvd., Suite 102 Santa Monica California 90401

DIVISION 12 - FURNISHINGS. Section General Discussion. Introduction

Single-Family Dwelling Submittal Requirements

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

Jan H: ARCHITECTURAL WOODWORK (06410-H)

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

*********************************************************************************************************

Newport News Public Schools

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

A. Submit properly identified manufacturer's literature before starting work.

SECTION MANUFACTURED CASEWORK

HOENER ASSOCIATES INC. ARCHITECTS

State College Area School District

Solid Surface Countertops

The CAD Technician s Role in Office Practice and Procedure

SECTION IDENTIFYING DEVICES

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2

Transcription:

Addendum #1 - Bid Package #6929-08 Project Name: Lincoln Public Schools District Office 5901 O Street Lincoln, NE Project No.: 11065 Issued: September 18, 2012 This Addendum is issued by Hampton Construction to all known sub-contractors working on the preparation of proposals associated with the Bid Documents dated September 7, 2012. This Addendum is to authorize the use of the following information in preparing proposals for the above named project. GENERAL QUESTIONS AND CLARIFICATIONS ADD 1-1. ADD 1-2. ADD 1-3. ADD 1-4. All bids are to include a Bid Bond from the Surety Company. Contractors are responsible for Performance & Payment Bonds, the costs of which shall be included within their bid. The Pre-bid Agenda and Pre-bid Attendance Sheet are included with this addendum. Exterior blocking and backing: Question: Response: Is all exterior blocking / backing and plywood sheeting at parapets to be pressure treated? No. There are no requirements specified for pressure treated wood. ADD 1-5. Interior blocking / backing: Question: Response: Is all the interior blocking / backing to be fire treated? No. The only products specified or noted to be fire-treated are those panels utilized for equipment backing panels. ADD 1-6. Interior blocking: Question: Response: Is metal strapping an approved alternate for interior wood backing? Yes. ADD 1-7. Wood Wall Paneling Finish Behind Panels: Question: Response: Are there any special requirements for finishing of the GWB surfaces behind the Wood Wall Panels? The WP-1 wall panels specified (at wall locations) should result in a closed system where no GWB will be visible. The WP-2 panels specified (at Board Room Ceiling) will likely have some GWB visible behind the panels and as

Lincoln Public Schools District Office such, the GWB surface will require painting prior to installation of the wood panels. ADD 1-8. Rigid Insulation behind Exterior Metal Wall Panels: Question: Response: Who is responsible for providing and installing the 2 rigid insulation shown behind the metal wall panel system? The framer / drywall contractor is responsible for this product. MODIFICATIONS TO THE SPECIFICATIONS ADD 1-9. ADD 1-10. ADD 1-11. ADD 1-12. ADD 1-13. ADD 1-14. ADD 1-15. ADD 1-16. ADD 1-17. ADD 1-18. ADD 1-19. Refer to Section 000000-C Bid Form ; Delete this section in its entirety and replace with the Attached Revised 000000-C Bid Form. Refer to Section 011000-08C Summary 08C Resilient Flooring ; Resilient flooring will no longer be bidding in this package. DELETE this scope of work in its entirety. Refer to Section 011000-08D Summary 08D Carpet & Resilient Base ; Carpet & Resilient Base will no longer be bidding in this package. DELETE this scope of work in its entirety. Refer to Section 011000-#6929-08K Casework Supply ; Delete this section in its entirety. Add the Attached Section 011000-#6929-08K.1 Casework & Millwork Supply. Add the Attached Section 011000-#6929-08K.2 Plastic Laminate Countertop Supply. Refer to Section 011000-#6929-08L Casework Installation ; Delete this section in its entirety. Add the Attached Section 011000-#6929-08L.1 Casework & Millwork Installation. Add the Attached Section 011000-#6929-08L.2 Plastic Laminate Countertop Installation. Add the Attached Section 011000-#6929-08Z Solid Surface Sills & Countertops. Refer to Section 064023, Interior Architectural Woodwork, Article 2.8, Paragraph B.1.a.2; Change this line to read: 2) All Break Room Counters including Islands (Break 105, 127, 213, 234, 315, 337) ADD 1-20. Refer to Section 064023, Interior Architectural Woodwork, Article 2.8, Paragraph B.1.a; Add the following: 6) Kitchenette 101B counters. 7) Executive Board Room 100A, Board Worksurface ADD 1-21. Refer to Section 064023, Interior Architectural Woodwork, Article 2.9, Paragraph B.1; Change this paragraph to the following: Addendum #1, Bid Package #6929-08 - Page 2

Lincoln Public Schools District Office 1. Wilsonart International #9062GG White Pepper ADD 1-22. Refer to Section 093000 Tiling, Article 2.2, Paragraph E.7.b; Add the following rooms to the list of rooms to receive this floor tile: Equipment 281C, 281D, 381A, 381C ADD 1-23. Refer to Section 096516 Resilient Sheet Flooring, Article 2.1, Paragraph G; Delete lines 2 and 3 associated with RUB-2 and RUB-3. There will only be one color of Rubber. ADD 1-24. Refer to Section 097700 Interior Wood Wall Cladding System, Article 2.3, Paragraph A; Add the following after the keynote indicated with the Basis-of-Design Product in the first line: A. Basis-of-Design Product (097700.A WP-1) ADD 1-25. Refer to Section 097700 Interior Wood Wall Cladding System, Article 2.3, Paragraph B; Add the following after the keynote indicated with the Basis-of-Design Product in the first line: B. Basis-of-Design Product (097700.A2 WP-2) MODIFICATIONS TO THE DRAWINGS ADD 1-26. Refer to the Master Keynote Legend on the Cover Sheet. Add the following keynotes: 064023.A6 1/2" THICK, 4 TALL SOLID SURFACE BACKSPLASH 083323.A INSULATED OVERHEAD COILING DOOR 083323.B SUPPORT ANGLE ASSEMBLY 083323.C MANUALLY OPERATED COUNTER DOOR ADD 1-27. Refer to Sheet G101, Detail A8; Add the following abbreviation: WWB Wood Wall Base ADD 1-28. ADD 1-29. Refer to Sheet C300; REPLACE this sheet in its entirety with the attached C300 sheet. Dimensional errors were discovered and have been corrected. Refer to Sheet A101, Sheet A101 Sheet Specific Notes, Note 10; Change Note 10 to read as follows: NOTE 10 END OF BASE CABINET TO BE LAMINATE CLAD WHERE EXPOSED TO THE EXTERIOR ABOVE THE WINDOW SILL ADD 1-30. ADD 1-31. ADD 1-32. ADD 1-33. Refer to Sheet A101, Production 182C; West of Grid B, adjacent to the north wall of Office 113, place a detail callout for A13/A601. There is a coat rod and shelf located here. Refer to Sheet A101, Production 184C; West of Grid B, adjacent to the south wall of Office 120, place a detail callout for A13/A601. There is a coat rod and shelf located here. Refer to Sheet A101, Files 185A, south wall; place a detail callout for A13/A601. There is a coat rod and shelf located here. Refer to Sheet A101, Custodial 184N; Add a mop sink in the southwest corner of the room. Addendum #1, Bid Package #6929-08 - Page 3

Lincoln Public Schools District Office ADD 1-34. Refer to Sheet A102; Add callout for Note 6 as shown on attached Sketch A5 and add Sheet Note 6 to Sheet A102 Sheet Specific Notes as follows: NOTE 6 TERMINATION OF WOOD WALL PANEL SYSTEM ADD 1-35. Refer to Sheet A102; Eliminate reference to Corridors C17 and C19 found south of Grid 3 between Grids B and C. These rooms no longer exist and this area is to be considered part of Break 234 as is the case on other Levels. ADD 1-36. ADD 1-37. ADD 1-38. ADD 1-39. Refer to Sheet A102, Detail A1; There are a couple of horizontal lines that extend from Grid 2 to just north of Grid 13.1 between Grids B and C. Ignore these lines, they are errant. Refer to Sheet A105, Detail K12; The description below the title of this detail should read: Typical Women s Restroom Second Level (Third Level Similar). Refer to Sheet A105, Detail A12; Add Note 17 callout as well as additional dimensions to counter surface and opening 109 at the west side of Kitchenette 101B. Also add detail callout D1/A601 across this same location. Refer to attached Sketch A1. Refer to Sheet A105, Sheet A105 Sheet Specific Notes; Add Note 17 as follows: NOTE 17 TERMINATE WOOD WALL PANELING AT INSIDE CORNER ADD 1-40. ADD 1-41. ADD 1-42. Refer to Sheet A106, Detail G1, Shower 081D; The accessories shown in the toilet stall indicate the presence of a sanitary napkin disposal unit. This item does not occur in this stall and should be removed. Refer to Sheet A107; Remove Sheet A107 in its entirety and replace with the attached Revised A107. Refer to Sheet A502, Detail M1, Door Type OHC; Change the keynote associated with this door type to 083323.A ADD 1-43. Refer to Sheet A503, Detail F4; 1. Change keynote 064023.B to 064023.A2 2. Add keynote 064023.A6 ADD 1-44. Refer to Sheet A503, Detail F8; 1. Change keynote 064023.B to 064023.A2 2. Add keynote 064023.A6 ADD 1-45. Refer to Sheet A503, Detail F11; 1. Change keynote 064023.B to 064023.A2 2. Add keynote 064023.A6 ADD 1-46. Refer to Sheet A503, Detail F13; 1. Change keynote 064023.B to 064023.A2 2. Add keynote 064023.A6 ADD 1-47. Refer to Sheet A503, Detail L13; Addendum #1, Bid Package #6929-08 - Page 4

Lincoln Public Schools District Office 1. Change keynote 064023.B to 064023.A2 2. Add keynote 064023.A6 ADD 1-48. Refer to Sheet A601, Detail A7; Wood paneling has been added to the conference room side of the wall assembly. Refer to attached Sketch A2 for revisions. ADD 1-49. Refer to Sheet A601; Add Detail D1 as shown on the attached Sketch A3. ADD 1-50. ADD 1-51. ADD 1-52. ADD 1-53. ADD 1-54. ADD 1-55. ADD 1-56. Refer to Sheet A601, Detail D7; Wood paneling has been added to the conference room side of the wall assembly. Refer to attached Sketch A4 for revisions. Refer to Sheet A701, Detail A1; West of Grid A.5, at Grid 8.2 there is a GWB ceiling surface. Add Room Tag ST04 and add elevation callout 9-11 3/4". Refer to Sheet A701, Detail A1, Custodial Room 180C and 180F located by restrooms 180B and 180G; GWB ceilings at 9-0 should be placed for Custodial 180C and 180F. Refer to Sheet A703, Lobby 381; The GWB area on the west side (at Grid B) and on the east side (at Grid C) are to have elevation callouts of 10-0 to match what is shown in the same location on Sheet A702. Refer to Sheet A703, Restrooms 381B and 381G. At the entrances to these restrooms there are Equipment rooms 381A and 381C that currently show an exposed ceiling. Provide a GWB ceiling within these rooms at 9-0 AFF. Refer to Sheet A800, Detail A1; The floor material abbreviation for Men s 081B and Women s 081G should be changed from CT-1 to CT-4. Refer to Sheet A801, Detail A1; The floor material abbreviation for Restroom 117B located west of Grid A.5 between Grids 6 and 7 should be changed from CT-1 to CT-4. ADD 1-57. Refer to Sheet A802; Eliminate reference to Corridors C17 and C19 found south of Grid 3 between Grids B and C. These rooms no longer exist and this area is to be considered part of Break 234 as is the case on other Levels. ADD 1-58. Refer to Sheet A802, Floor Transition Annotations at entry to Men 281B and Women 281G; The CT-1 should be changed to CT-4. ADD 1-59. ADD 1-60. ADD 1-61. Refer to Sheet A802, Café 207; The north and west floor transition callouts have the CPT-2 and RUB-1 annotations on the wrong side. Refer to attached Sketch A6 for modifications. Refer to Sheet A802, Workstations 220; The north partial height wall has a heavy dashed line on it to help identify the location of the PNT-13 color. This heavy line does not extend all the way to the eastern edge of the partial height wall and should. Refer to Sheet A802, Production 284; The paint color transition lines have been modified at the corridor niches west of Grid B and east of Grid C to reflect what has been indicated in the Room Finish Schedules. Refer to attached Sketch A7. ADD 1-62. Refer to Sheet A803, Floor Transition Annotations at entry to Men 381B and Women 381G; The CT-1 should be changed to CT-4. ADD 1-63. Refer to Sheet A803, Production 382; The paint color transition lines have been modified at the east and west ends to reflect what has been indicated in the Room Finish Schedules. Refer to attached Sketch A8. Addendum #1, Bid Package #6929-08 - Page 5

Lincoln Public Schools District Office ADD 1-64. ADD 1-65. ADD 1-66. ADD 1-67. ADD 1-68. ADD 1-69. ADD 1-70. ADD 1-71. Refer to Sheet A803, Production 384; The paint color transition lines have been modified at the east and west ends to reflect what has been indicated in the Room Finish Schedules. Refer to attached Sketch A9. Refer to Sheet A904, Detail K4; Replace the equipment schedule with the schedule found in the attached Sketch A10. The Columns have been adjusted to match the order of the other equipment schedules, Item 6A has been added and the responsibility associated with Item 5B has been modified. Refer to Sheet A904, Detail K10; Add Item 5B to the schedule. It is a Full refrigerator that is to be Owner Provided, Contractor Installed. Refer to Sheet A904, Detail K13; Item 5B is to be Owner Provided, Contractor Installed. Modify the yes and no indicators accordingly. Refer to Sheet A904, Detail A4; Item 4B is to be Owner Provided, Contractor Installed. Modify the yes and no indicators accordingly. Refer to Sheet A904, Detail A7; Items 3A, 4B and 5B are to be Owner Provided, Contractor installed. Modify the yes and no indicators accordingly. Refer to Sheet A904, Detail A10; Eliminate one of the 5B Full Refrigerators from the schedule. There is only one Refrigerator in this space. Refer to Sheet A904, Detail A13; Add Item 10 to the schedule. It is an Ice machine that is to be Owner Provided, Contractor Installed. End of Addendum #1, Bid Package #6929-08 Addendum #1, Bid Package #6929-08 - Page 6

LINCOLN PUBLIC SCHOOLS DISTRICT BID FORM **REVISED** Owner: Lincoln Public Schools Construction Manager: Hampton Commercial Construction, Inc. Name of Bidder Bid Package No: #6929-08 Address Bid Package Title: Finish 02 Package City / State / Zip Date of Plans: September 7, 2012 Telephone #6929-06C.1 Metal Wall Panels [ ] Fax Scope of Work: (Option 1) #6929-06C.2 Metal Wall Panels [ ] Contact (Option 2) #6929-07C Firestopping & Fire [ ] Email Address Resistive Systems [ ] #6929-07D Joint Sealants [ ] #6929-08A Gypsum Board Systems [ ] #6929-08B Acoustical Ceilings [ ] #6929-08C Resilient Flooring [ ] #6929-08D Carpet & Resilient Base [ ] #6929-08E Tiling [ ] #6929-08F Terrazzo [ ] #6929-08G Painting [ ] #6929-08H Specialties [ ] #6929-08J Window Coverings #6929-08K.1 - Casework & [ ] Millwork Supply #6929-08K.2 - Plastic Laminate [ ] Countertop Supply #6929-08L.1 - Casework & Millwork [ ] Installation #6929-08L.2 - Plastic Laminate Countertop Installation The undersigned acknowledges having reviewed the Contract Documents and is familiar with any and all conditions affecting the cost of the Work at the proposed site and hereby agrees to provide and furnish all labor, material, equipment and other necessary items to perform and complete the Work as per the Contract Documents for the proposed Base Bid amount. The Bid shall include any and all permits, Fees, Bid Bond, Insurance, payroll taxes and other applicable charges necessary to perform the proposed Work. Make a check next to the item(s) that you will be bidding. Bids may be determined to be incomplete if a bid bond is not included or the Scope of Work is not bid complete and in its entirety. Dollar amounts shall be stated in words and figures and in case of discrepancy between the two, the amount written in words shall govern. #6929-08M Doors, Frames, [ ] Hardware Installation [ ] #6929-08N Interior Glazing [ ] #6929-08P Wood Paneling System #6929-08Q Appliances & [ ] Equipment [ ] #6929-08R Fine Grading [ ] #6929-08S Sodding [ ] #6929-08T Retaining Wall [ ] #6929-08U Landscaping [ ] #6929-08V Lawn Sprinkler [ ] #6929-08W Site Furnishings [ ] #6929-08X Paving Inside of Curb [ ] #6929-08Y Vinyl Fencing #6929-08Z Solid Surface Sills & [ ] Counters 1

The undersigned also agrees to receipt and has included the following addenda in the Bid: Addendum No. Addendum No. Addendum No. Dated Dated Dated BID BOND The required 5% Bid Bond payable to Lincoln Public School is included in this proposal. *This Project is exempt from Nebraska Sales Tax. DO NOT INCLUDE SALES TAX IN YOUR BID. BASE BID & ALTERNATES [ ] #6929-06C.1 Metal Wall Panels (Option 1) $ [ ] #6929-06C.2 Metal Wall Panels (Option 2) $ [ ] #6929-07C Firestopping & Fire Resistive Systems $ [ ] #6929-07D Joint Sealants $ [ ] #6929-08A Gypsum Board Systems $ [ ] #6929-08B Acoustical Ceilings $ [ ] ALTERNATE for #6929-08B $ [ ] #6929-08C Resilient Flooring $ [ ] #6929-08D Carpet & Resilient Base $ [ ] ALTERNATE for #6929-08D $ [ ] #6929-08E Tiling $ [ ] #6929-08F Terrazzo $ [ ] #6929-08G Painting $ [ ] #6929-08H Specialties $ 2

[ ] #6929-08J Window Coverings $ [ ] #6929-08K.1 - Casework & Millwork Supply $ [ ] #6929-08K.2 - Plastic Laminate Countertop Supply $ [ ] #6929-08L.1 - Casework & Millwork Installation $ [ ] #6929-08L.2 - Plastic Laminate Countertop Installation $ [ ] #6929-08M Doors, Frames, Hardware Installation $ [ ] #6929-08N Interior Glazing $ [ ] #6929-08P Wood Paneling System $ [ ] #6929-08Q Appliances & Equipment $ [ ] #6929-08R Fine Grading $ [ ] #6929-08S Sodding $ [ ] #6929-08T Retaining Wall $ [ ] #6929-08U Landscaping $ [ ] #6929-08V Lawn Sprinkler $ [ ] #6929-08W Site Furnishings $ [ ] #6929-08X Paving Inside of Curb $ [ ] #6929-08Y Vinyl Fencing $ [ ] #6929-08Z Solid Surface Sills & Counters $ 3

The following Fees for Changes in Work shall include all lump sum pricing and actual cost pricing on additions or deletions to Work included in the Bid. The Fees shall include all supervision, general requirements, overhead and profit and shall not exceed the following: Contractor Performed by Own Forces 10% Contractor Performed by Other Forces 5% Contractor s Subcontractor or Material Supplier Performed by Subcontractor s Subcontractor or Material Supplier Own Forces Subcontractor s Subcontractor or Material Supplier Performed by Other Forces than Subcontractor s Subcontractor or Material Supplier 10% 5% The undersigned Bidder agrees to the following, if awarded the Contract: 1. Commencement of Work shall be within seven (7) calendar days after Notice to Proceed, unless otherwise established in notice. 2. Shop Drawing Submittals shall be submitted to the Construction Manager within fourteen (14) calendar days after Notice to Proceed, unless otherwise established in notice. 3. Substantial Completion of Work shall be in accordance with the Construction Managers schedule, whether the Work is to be prepared for the following Contractor s Work or for Final Inspection and acceptance by Owner. 4. The Contractor shall be liable for actual damages for any and all delays in the completion of the Contract Work. 5. The Contract Documents have been carefully examined and the stated Bid amount is correct and no errors have occurred in calculating the amount, and the Bidder shall agree to make no claim for modification or correction to Bid after scheduled Bid time. 6. The Bid shall not be withdrawn or altered for a period of sixty (60) calendar days after scheduled date for submission of Bids. 7. Each Bidder certifies the Bid was delivered without consultation, communication or agreement as to any and all matters relating to the Bid with any other Bidder or competitor. 8. The Owner shall reserve the right to waive informalities and to reject any or all Bids. The undersigned Bidder agrees to these requirements and will execute an agreement with the Owner on the Standard Form of Agreement Between Owner, Construction Manager & Subcontractor. DATED THIS DAY OF, 2012. Name of Bidder Name and Title of Authorized Officer Signature of Authorized Officer 4

Lincoln Public Schools District Office SHA Project No. 11065 SECTION 011000 SUMMARY (#6929-08K.1 CASEWORK & MILLWORK SUPPLY) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: Lincoln Public Schools District Office 1. Project Location: 5905 O Street, Lincoln, NE 68510 B. Owner: Lincoln Public Schools, 5905 O Street, Lincoln, NE 68510 C. Architect: Drawings have been prepared by Sinclair Hille Architects, 700 Q Street, Lincoln, NE 68508 D. Construction Manager: Hampton Commercial Construction, Inc., 3701 Union Drive, Suite 100 Lincoln, NE 68516 E. The Work consists of the following: 1. Provide all labor, materials, equipment and other items necessary for the furnishing of the architectural casework and millwork per contract drawings and specifications. This is to include, but not limited to the following: a. Furnish all casework per contract documents and Division Section 064023 Interior Architectural Woodwork. b. Furnish all millwork per contract documents and Division Section 064023 Interior Architectural Woodwork. c. All plastic laminate countertops per contract documents and Division Section 064023 Interior Architectural Woodwork are NOT INCLUDED in this Scope of Work. d. All Solid Surface Sills & Countertops per contract documents and Division Section 064023 Interior Architectural Woodwork are NOT INCLUDED in this Scope of Work. e. Furnish all submittals and shop drawing in accordance with the drawings and specifications. f. Furnish all miscellaneous materials as required for the Scope of Work listed above. g. Coordination with the Casework Installer. h. Project foreman or project manager is required to attend periodic progress meetings to coordinate with other contractors. i. All clean-up of work area on a weekly basis. Place debris in a dumpster provided by others. j. Provide record documents upon completion of work to show work as-built conditions for the project. 1.3 USE OF PREMISES A. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. SUMMARY - CASEWORK & MILLWORK SUPPLY 011000-#6929-08K.1 1

Lincoln Public Schools District Office SHA Project No. 11065 B. Lincoln Public Schools does not allow the use of tobacco products within any facility or on any school grounds. No tobacco use is permitted on the property by any contractor or subcontractor. C. All workers or visitors to the site must check in to the construction office reporting their name and company. Identification badges may be required. 1.4 WORK SCHEDULE A. The work is to commence per Construction Manager s schedule, but is subject to change. B. Submit all shop drawings and/or product data within 2 weeks of acceptance of this proposal. END OF SECTION 011000 (#6929-08K.1 CASEWORK & MILLWORK SUPPLY) * SUMMARY - CASEWORK & MILLWORK SUPPLY 011000-#6929-08K.1 2

Lincoln Public Schools District Office SHA Project No. 11065 SECTION 011000 SUMMARY (#6929-08K.2 PLASTIC LAMINATE COUNTERTOP SUPPLY) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: Lincoln Public Schools District Office 1. Project Location: 5905 O Street, Lincoln, NE 68510 B. Owner: Lincoln Public Schools, 5905 O Street, Lincoln, NE 68510 C. Architect: Drawings have been prepared by Sinclair Hille Architects, 700 Q Street, Lincoln, NE 68508 D. Construction Manager: Hampton Commercial Construction, Inc., 3701 Union Drive, Suite 100 Lincoln, NE 68516 E. The Work consists of the following: 1. Provide all labor, materials, equipment and other items necessary for the furnishing of the plastic laminate countertops per contract drawings and specifications. This is to include, but not limited to the following: a. Furnish all plastic laminate countertops & backsplashes per contract documents and Division Section 064023 Interior Architectural Woodwork. b. All casework per contract documents and Division Section 064023 Interior Architectural Woodwork is NOT INCLUDED in this Scope of Work. c. All millwork per contract documents and Division Section 064023 Interior Architectural Woodwork is NOT INCLUDED in this Scope of Work. d. All Solid Surface Sills & Countertops per contract documents and Division Section 064023 Interior Architectural Woodwork are NOT INCLUDED in this Scope of Work. e. Furnish all submittals and shop drawing in accordance with the drawings and specifications. f. Furnish all miscellaneous materials as required for the Scope of Work listed above. g. Coordination with the Casework Installer. h. Project foreman or project manager is required to attend periodic progress meetings to coordinate with other contractors. i. All clean-up of work area on a weekly basis. Place debris in a dumpster provided by others. j. Provide record documents upon completion of work to show work as-built conditions for the project. 1.3 USE OF PREMISES A. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. SUMMARY- PLASTIC LAMINATE COUNTERTOP SUPPLY 011000-#6929-08K.2 1

Lincoln Public Schools District Office SHA Project No. 11065 B. Lincoln Public Schools does not allow the use of tobacco products within any facility or on any school grounds. No tobacco use is permitted on the property by any contractor or subcontractor. C. All workers or visitors to the site must check in to the construction office reporting their name and company. Identification badges may be required. 1.4 WORK SCHEDULE A. The work is to commence per Construction Manager s schedule, but is subject to change. B. Submit all shop drawings and/or product data within 2 weeks of acceptance of this proposal. END OF SECTION 011000 (#6929-08K.2 PLASTIC LAMINATE COUNTERTOP SUPPLY) SUMMARY- PLASTIC LAMINATE COUNTERTOP SUPPLY 011000-#6929-08K.2 2

Lincoln Public Schools District Office SHA Project No. 11065 SECTION 011000 SUMMARY (#6929-08L.1 CASEWORK & MILLWORK INSTALLATION) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: Lincoln Public Schools District Office 1. Project Location: 5905 O Street, Lincoln, NE 68510 B. Owner: Lincoln Public Schools, 5905 O Street, Lincoln, NE 68510 C. Architect: Drawings have been prepared by Sinclair Hille Architects, 700 Q Street, Lincoln, NE 68508 D. Construction Manager: Hampton Commercial Construction, Inc., 3701 Union Drive, Suite 100 Lincoln, NE 68516 E. The Work consists of the following: 1. Provide all labor, materials, equipment and other items necessary for the installation of the architectural casework and millwork per contract drawings and specifications. This is to include, but not limited to the following: a. Install all casework per contract documents and Division Section 064023 Interior Architectural Woodwork. b. Install all millwork per contract documents and Division Section 064023 Interior Architectural Woodwork. c. Installation of all plastic laminate countertops per contract documents and Division Section 064023 Interior Architectural Woodwork are NOT INCLUDED in this Scope of Work. d. Installation of all Solid Surface Sills & Countertops per contract documents and Division Section 064023 Interior Architectural Woodwork are NOT INCLUDED in this Scope of Work. e. Install all miscellaneous materials as required for the Scope of Work listed above. f. Coordination with the Casework Supplier. g. Project foreman or project manager is required to attend periodic progress meetings to coordinate with other contractors. h. All unloading, hoisting, moving of own materials and equipment. i. All clean-up of work area on a weekly basis. Place debris in a dumpster provided by others. j. Provide record documents upon completion of work to show work as-built conditions for the project. 1.3 USE OF PREMISES A. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. SUMMARY- CASEWORK & MILLWORK INSTALLATION 011000-#6929-08L.1 1

Lincoln Public Schools District Office SHA Project No. 11065 B. Lincoln Public Schools does not allow the use of tobacco products within any facility or on any school grounds. No tobacco use is permitted on the property by any contractor or subcontractor. C. All workers or visitors to the site must check in to the construction office reporting their name and company. Identification badges may be required. 1.4 WORK SCHEDULE A. The work is to commence per Construction Manager s schedule, but is subject to change. B. Submit all shop drawings and/or product data within 2 weeks of acceptance of this proposal. END OF SECTION 011000 (#6929-08L.1 CASEWORK & MILLWORK INSTALLATION) SUMMARY- CASEWORK & MILLWORK INSTALLATION 011000-#6929-08L.1 2

Lincoln Public Schools District Office SHA Project No. 11065 SECTION 011000 SUMMARY (#6929-08L.2 PLASTIC LAMINATE COUNTERTOP INSTALLATION) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: Lincoln Public Schools District Office 1. Project Location: 5905 O Street, Lincoln, NE 68510 B. Owner: Lincoln Public Schools, 5905 O Street, Lincoln, NE 68510 C. Architect: Drawings have been prepared by Sinclair Hille Architects, 700 Q Street, Lincoln, NE 68508 D. Construction Manager: Hampton Commercial Construction, Inc., 3701 Union Drive, Suite 100 Lincoln, NE 68516 E. The Work consists of the following: 1. Provide all labor, materials, equipment and other items necessary for the installation of the plastic laminate countertops and backsplashes per contract drawings and specifications. This is to include, but not limited to the following: a. Install all plastic laminate countertops & backsplashes per contract documents and Division Section 064023 Interior Architectural Woodwork. b. Installation of all casework per contract documents and Division Section 064023 Interior Architectural Woodwork is NOT INCLUDED in this Scope of Work. c. Installation of all millwork per contract documents and Division Section 064023 Interior Architectural Woodwork is NOT INCLUDED in this Scope of Work. d. All Solid Surface Sills & Countertops per contract documents and Division Section 064023 Interior Architectural Woodwork are NOT INCLUDED in this Scope of Work. e. Install all miscellaneous materials as required for the Scope of Work listed above. f. Coordination with the Casework Supplier. g. Project foreman or project manager is required to attend periodic progress meetings to coordinate with other contractors. h. All unloading, hoisting, moving of own materials and equipment. i. All clean-up of work area on a weekly basis. Place debris in a dumpster provided by others. j. Provide record documents upon completion of work to show work as-built conditions for the project. 1.3 USE OF PREMISES A. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. B. Lincoln Public Schools does not allow the use of tobacco products within any facility or on any school grounds. No tobacco use is permitted on the property by any contractor or subcontractor. SUMMARY- PLASTIC LAMINATE COUNTERTOP INSTALLATION 011000-#6929-08L.2 1

Lincoln Public Schools District Office SHA Project No. 11065 C. All workers or visitors to the site must check in to the construction office reporting their name and company. Identification badges may be required. 1.4 WORK SCHEDULE A. The work is to commence per Construction Manager s schedule, but is subject to change. B. Submit all shop drawings and/or product data within 2 weeks of acceptance of this proposal. END OF SECTION 011000 (#6929-08L.2 PLASTIC LAMINATE COUNTERTOP INSTALLATION) SUMMARY- PLASTIC LAMINATE COUNTERTOP INSTALLATION 011000-#6929-08L.2 2

Lincoln Public Schools District Office SHA Project No. 11065 SECTION 011000 SUMMARY (#6929-08Z SOLID SURFACE SILLS & COUNTERS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: Lincoln Public Schools District Office 1. Project Location: 5905 O Street, Lincoln, NE 68510 B. Owner: Lincoln Public Schools, 5905 O Street, Lincoln, NE 68510 C. Architect: Drawings have been prepared by Sinclair Hille Architects, 700 Q Street, Lincoln, NE 68508 D. Construction Manager: Hampton Commercial Construction, Inc., 3701 Union Drive, Suite 100 Lincoln, NE 68516 E. The Work consists of the following: 1. Provide all labor, materials, equipment and other items necessary for the solid surface sills and countertops per contract drawings and specifications. This is to include, but not limited to the following: a. Furnish and install all Solid Surface Sills & Countertops per contract documents and Division Section 064023 Interior Architectural Woodwork. b. All casework per contract documents and Division Section 064023 Interior Architectural Woodwork is NOT INCLUDED in this Scope of Work. c. All millwork per contract documents and Division Section 064023 Interior Architectural Woodwork is NOT INCLUDED in this Scope of Work. d. All plastic laminate countertops per contract documents and Division Section 064023 Interior Architectural Woodwork are NOT INCLUDED in this Scope of Work. e. Furnish all submittals and shop drawing in accordance with the drawings and specifications. f. Furnish and install all miscellaneous materials as required for the Scope of Work listed above. g. Project foreman or project manager is required to attend periodic progress meetings to coordinate with other contractors. h. All unloading, hoisting, moving of own materials and equipment. i. All clean-up of work area on a weekly basis. Place debris in a dumpster provided by others. j. Provide record documents upon completion of work to show work as-built conditions for the project. 1.3 USE OF PREMISES A. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. SUMMARY- SOLID SURFACE SILLS & COUNTERS 011000-#6929-08Z 1

Lincoln Public Schools District Office SHA Project No. 11065 B. Lincoln Public Schools does not allow the use of tobacco products within any facility or on any school grounds. No tobacco use is permitted on the property by any contractor or subcontractor. C. All workers or visitors to the site must check in to the construction office reporting their name and company. Identification badges may be required. 1.4 WORK SCHEDULE A. The work is to commence per Construction Manager s schedule, but is subject to change. B. Submit all shop drawings and/or product data within 2 weeks of acceptance of this proposal. END OF SECTION 011000 (#6929-08Z SOLID SURFACE SILLS & COUNTERS) SUMMARY- SOLID SURFACE SILLS & COUNTERS 011000-#6929-08Z 2

F12 SCALE: 1/4" = 1'-0" ENLARGED PLAN BREAK ROOM 117A AND RECEPTION 183 12 12.5 13 13.1 8'-6" 7'-6" 8" 4'-10" 6'-0" 13.5 D D.1 100A.2 2b 2f 2f EXEC. BOARD ROOM 100A 2f 6" 3'-10" 1'-8" 6'-8" 1'-8" 3'-10" 2" 2b 2b 4'-8" 2'-7" 1'-3" 10" 101A 2f NOTE 17 2d 2f 2f 2" 3a 2f EQ D1 A601 3a 109 L13 A503 2'-8". EQ 1a KITCHENETTE 101B 102800.J 102800.H 1a 2f 2f 2f 4" 1a 1a 2'-7" 11" NOT IC 042000.F 7'-4" TALL 047200.A3 AT TOP SOUTH PUBLIC LOBBY 180D NOTE 2 064023.A BELOW AL 7 NOTE 3 N4 A401 G4 A401 K4 A401 A1 A300 D.9 E 034100.D2 064023.A BELOW 034100.D2 AL 5 180 AL 6 FACE OF VENEER FACE OF V 91'-6" OUT TO OUT OF VENEER 5'-0 3/8" 2'-7 5/8" 5'-4 5/8" 12 12.5 13 13.1 13.5 A12 SCALE: 1/4" = 1'-0" ENLARGED FLOOR PLAN GROUND LEVEL EXIT VESTIBULE - NORTH FACADE Sketch A1 1 12 13 14 Bid Package 6929-08 Addendum 01 Revised Detail A12/A105

3' 097700.A 4" 097700.A 092900.C 4 5/8" D7 SCALE: 1 1/2" = 1'-0" PLAN DETAIL NORTH BOARD ROOM WALL - TERMINATION OF WOOD WALL PANELING D1 SCALE: 1" 4 5/8" 097700.A 6.C 0.C 0.A 0.D 1'-3" 097700.A 8" 1'-0" NOTE 4 097700.A 099123.A 097700.A 092900.C 10" 097700.A 6.B 0.A 0.A A7 PLAN DETAIL A1 SCALE: 1 1/2" = 1'-0" NORTH BOARD ROOM WALL - WOOD WALL PANELING JAMB DETAIL 6 7 8 9 SCALE: 3" Sketch A2 Bid Package 6929-08 Addendum 01 Revised Detail A7/A601

084113.A2 079200.C BREAK 127 VESTIBULE 184A G G1 SCALE: 3" = 1'-0" JAMB DETAIL ALUMINUM JAMB DETAIL AT VESTIBULE 184A SCALE: G4 F 083323.C 061053.A AS REQUIRED FOR SUPPORT OF COUNTER DOOR 6". FINISHED SOFFIT EL. = 8'-0" AFF E 083323.B 064023.A2 T.O. COUNTER EL. = 2'-10" AFF 1" 061053.C 2" 1 1/2" D D1 SCALE: 1" = 1'-0" SECTION DETAIL COUNTER DOOR AND COUNTER DETAIL AT KITCHENETTE 101B D4 SCALE: 1 1/2" = C Sketch A3 Bid Package 6929-08 Addendum 01 New Detail D1/A601 D

15'-0" RADIU 2 92900.A 064023.A4 097700.A F 4 1/4" G7 SCALE: 3" = 1'-0" PLAN DETAIL MAIN ENTRY LOBBY RECEPTION DESK - SOUTHEAST CORNER G10 SCALE: 1" = 1'-0" 6" 092900.C 081113.A 3'-2" 097700.A 4" 097700.A 092900.C 097700.A 064023.N 4" 4 5/8" D7 SCALE: 1 1/2" = 1'-0" PLAN DETAIL NORTH BOARD ROOM WALL - TERMINATION OF WOOD WALL PANELING D10 SCALE: 1" = 1'-0" 4 5/8" 097700.A 1 3 1'-0" OTE 4 097700.A 099123.A 097700.A 092900.C Sketch A4 Bid Package 6929-08 Addendum 01 Revised Detail D7/A601 6 1/2"

E 210 211 CW 2 2'-7 5/8". 2b 2b 2b 2b 2b 210 2d 2d 211 NOTE 6 UALLY DIVIDED S 1'-6" 8'-10" 1'-6" 2a 2e D1 A401 1b 2f A7 A300 D10 A401 ALIGN 064023.E 064023.F 2a 7'-9 3/8" 4'-1" G4 A506 064023.E2 064023.F 1'-8" 034100.D2 K7 A506 PROCESSING 208 N4 A506 CAFE 207 1'-9" 2c ALIGN 2a 7'-9 3/8" 7'-10 3/8" 2b 034100.D2 2a 2a AL 24 G1 A506 1'-11" 3'-2" 4'-11" 4'-1" 8'-2" AL 24 3b 4'-4" AL 26 205 AL 26 206 2'-1 5/8" 2e 2e 10" 034100.D2 122113.A TYP. AT EXTERIOR WINDOWS AL 25 CONFERENCE 205 CONFERENCE 206 2b 11 5/16" 1'-2" 034100.D2 AL 034100.D2 AL 034100.D2 25 25 2e 2'-6" 2e 10" NOTE 6 TO OUTS AL 23 K13 A401 STUD TO FACE OF INTERIOR STUD F STUD TO FACE OF STUD 4'-3 13/16" 16'-0" 16'-0" 8'-6" 7'-6" 8" 4'-10" 4'-1 13/16" 1'-8" 4'-10" Sketch A5 Bid Package 6929-08 Addendum 01 Modification to Detail A1/A102

216 CONFERENCE 215 OPP. HAND 214 PNT-10 PNT-11 PNT-5 EL. = 108'-7 1/2" PNT-7 SE ELEC. M PRODUCTION 282 DN STAIR ST02 UP PNT-12 BREAK 213 PNT-7 STORAGE 212 PNT-8 PNT-5 PNT-6 210 211 5 PNT-5 T-10 PROCESSING 208 CAFE 207 Sketch A6 Bid Package 6929-08 Addendum 01 Modification to A1/A802

232 PNT-5 233 CONFERENCE 231 230 PNT-7 PNT-9 PNT-5 PNT-6 PNT-13 BREAK 234 UP STAIR ST03 DN PRODUCTION 284 CHASE C1 MECH / ELEC. 284M EL. = 116'-8" STORAGE 235 PNT-6 PNT-5 PNT-5 PNT-8 PNT-6 P 236 238 240 237 Sketch A7 Bid Package 6929-08 Addendum 01 Modification to A1/A802

317 PNT-5 320 319 CONFERENCE 318 316 PNT-7 PNT-9 PNT-5 PNT-10 EL. = 131'-4" PNT-6 MECH / ELEC 382M CHASE C2 PRODUCTION 382 DN EL. = 124'-0" STAIR ST02 UP PNT-13 BREAK ROOM 315 PNT-5 PNT-6 PNT-11 312 311 FILES 380A 310 RD OD 309 Sketch A8 Bid Package 6929-08 Addendum 01 Modification to A1/A803

334 PNT-5 335 CONFERENCE 336 330 OFFI 329 PNT-8 PNT-5 PNT-7 EL. = 131'-4" PNT-10 PNT-14 BREAK ROOM 337 UP DN EL. = 124'-0" STAIR ST03 PRODUCTION 384 CHASE C1 STORAGE 338 PNT-10 PNT-5 PNT-6 PNT-11 PNT-10 339 CONFERENCE 340 343 OFF 34 341 Sketch A9 Bid Package 6929-08 Addendum 01 Modification to A1/A803

4 5 6 7 Type Mark BREAK ROOM 117A EQUIPMENT SCHEDULE Owner Owner Contractor Description Provided Installed Provided Contractor Installed Type Mark 4A Small Microwave Yes Yes No No 5B Full Refrigerator Yes No No Yes 6A Trash/Recycle Yes Yes No No 7A Marker Board No No Yes Yes 7B Tack Board No No Yes Yes 8 Locker No No Yes Yes 8 Locker No No Yes Yes 8 Locker No No Yes Yes 8 Locker No No Yes Yes 8 Locker No No Yes Yes 8 Locker No No Yes Yes 8 Locker No No Yes Yes 8 Locker No No Yes Yes Grand total: 13 7 8 8.2 1A 2 4C 5C 9 Grand t 5B 4A 6A 8 7A DOUBLE SINK w/ GARBAGE DISPOSAL BREAK ROOM L8 A503 117A 7B Sketch A10 Bid Package 6929-08 Addendum 01 Modification to K4/A904