ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

Similar documents
ADDENDUM #1. April 29, 2009

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice

RENOVATION OF THE FARMERS MARKET Reference Number:

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

.2 Section Steel Doors and Frames.1 Item 1.6 Delete for ten (10) years respectively. and replace with for two (2) years respectively.

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

ADDENDUM NO. 1 November 10, 2016

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

WASHROOM ACCESSORIES 2013 CATALOG

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

Priority 3 - Toilet Rooms

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

WALKS AND SIDEWALKS REQUIREMENTS:

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

SPARTAN DAY CAMP 4814 FREEDOM RING RD

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

1.01 NOTICE TO BIDDERS

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

HOENER ASSOCIATES INC. ARCHITECTS

ADDENDUM NO. 3. Ellis County Elections Building

ADDENDUM #2 September 12, 2018

A. It is preferred that all submittals to be submitted electronically in PDF format.

ADDENDUM TO RFP DOCUMENTS

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Specifications: Other: sign in sheet

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

Priority 3 - Toilet Rooms

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre

Addendum #1 - Bid Package #

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

TELEPHONE: (215) Addendum No. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1

Architectural Floor Plan Symbols

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:

Activity Commercial Electrical Systems (Optional)

1. Name the horizontal member that rests on the foundation wall to support other wood members.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

RENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA

Multilift (B613 & B355)

Addendum No. 1 page 1

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE

PLAN SUBMITTAL REQUIREMENTS

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

Company. Signed: Date:

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

Lincoln County Tax Appraisal Office Project No. RFB

PROCUREMENT SERVICES th St, SW Calgary, AB T2R 0L4 Telephone: (403) Fax: (403)

REAR FRONT 93' 20' 12' 48' 120' 30' 52' 75' Sample Shopping Center. Unit # 5 +/- 10,920 GLA GROUND FLOOR. Width +/- 105' Depth +/- 120' Site Map

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

WEST HOLLYWOOD ACCESSIBLE UNISEX BATHROOMS: COMMERCIAL CLEARANCES. Accessible Unisex Bathrooms: Commercial Page 1 of 5

***************************************************************************************************************

INVITATION TO TENDER ITT / NO. PS CONSTRUCTION SERVICES FOR THE VANCOUVER SOUTH TRANSFER STATION ODOR AND DUST CONTROL SYSTEM IMPROVEMENTS

CKBD Peakes Bath Scoresheet

RFQ Question and Answer List State of Ohio Standard Forms and Documents

Notre Dame High Addition/Renovation Addendum 3 Page 1

DIVISION 26 ELECTRICAL SECTION ELECTRICAL

Bathroom Fittings. Hardware Bathroom Washroom Handrail Wardrobe Signs KNUD HOLSCHER H DESIGN

UNIFIED FACILITIES GUIDE SPECIFICATIONS

NIAGARA REGIONAL HOUSING MZE FILE NO

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

Hardware Bathroom Washroom Handrail Signs. Bathroom Fittings

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

Commercial Infill Project Guide

Solicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers

City of St. Charles School District New Addition and Renovation at George M. Null Elementary School 435 Yale Boulevard St. Charles, Missouri 63301

COMPILATION OF TENDER DOCUMENTS

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

Transcription:

The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON THE additions, deletions and/or revisions as hereinafter specified, shall form an integral part of the bid document and shall be read in conjunction with the requirements set forth in the bid document. THE Addendum shall take precedence over all requirements to the aforementioned information in which it may prove to be at variance. QUESTIONS AND ANSWERS SEE ATTACHED FOUR (4) PAGES THIS Addendum shall be acknowledged in the spaces provided on the Bid Form. THIS Addendum has been issued by the City of Vaughan and is in effect this 18 TH day of April, 2018. Scott Wigmore, CPPB, Buyer Procurement Services Department Tel: (905)832-8555, Ext. 8040 Email: scott.wigmore@vaughan.ca mb Page 1 of 1

1 April 17, 2018 Project: Bid No.: T18-003 900 Clark Avenue West, Thornhill, ON L4J 8C1 ward99 architects Project No. 16037 RE: Addendum No.3 Pages: 4 1.1 General 1.1.1 Addendum No.3 forms part of the Contract Documents and amends the drawings and specifications as noted below. 1.1.2 Receipt of this addendum shall be acknowledged on the Bid Form. 1.1.3 Clarification in response to submitted questions: 1.1.3.1 Question: Demolition Drawing: Please clarify what items to be demolished/removed are being re-used or disposed (refer to Drawing A2). Refer to Architectural Drawing A2, General Demolition Notes, Note 1 that indicates that all items noted to be demolished and/or removed are to be disposed of off-site unless noted otherwise. Refer to Structural, Mechanical and Electrical Drawings for additional noted demolition and removals. Refer to additional clarifications below. 1.1.3.2 Question: Washroom Accessories: Please clarify if items being installed are from existing demolished/removed items. Note #6 (on architectural drawing A6) related to hand dryers to be installed do not mention if re-use or new. Please note that there were four (4) hand dryer that were removed from the existing washroom, but there are five (5) to be installed. All existing four (4) hand dryers in the Existing Men s Washroom G105 and Existing Women s Washroom G106 are to be demolished as noted by demolition Note 17 on architectural drawing 1/A2 and as noted by Note 6 on Electrical Drawing E3. Electrical Drawing E3 indicates to demolish existing hand dryers and replace with new. Refer to architectural drawing 1/A6 and Electrical Drawing E5 for the location of all five (5) new hand dryers. Refer to Project Manual Section 10 28 13 Washroom Accessories page 5 of 7 and Section 26 60 20 - Electric Heaters for specification of new electric hand dryer. 1.1.3.3 Question: Referring to Drawing A4: are the MS-BAYS supplied by the Owner? Refer to Architectural Drawing A4, General Ground Floor Plan Notes, Note 10 that indicates MS refers to metal shelving. Note 10 indicates that the Owner is to supply and install metal shelving. 1.1.3.4 Question: As per the Schedule 1B Cash Allowance, it is mentioned that Cash Allowance (as described under item 1.24 in Project Manual, 01 10 00 General Instructions. Kindly specify the item no.1.24, since it has two different items which represent 1.2.4 and 1.2.4 respectively. For the list and description of Cash Allowance Items, refer to page 13 of 18 in the Project Manual, Section 01 10 00 General Instructions under paragraph 1.24 Cash Allowances. 1.1.3.5 Question: Can we use existing water and power for construction purposes? Refer to Project Manual Section 01 51 00 Temporary Utilities.

2 1.1.3.6 Question: Can we use the existing Library area for a site office? Refer to Project Manual 01 52 00 Construction Facilities. 1.1.3.7 Question: Does the demolition involve asbestos removal? Asbestos removal is not required in this facility. 1.1.3.8 Question: Can you specify PRE-FABRICATED WIER DECK LAVATORY SYSTEM shown on 2/A6 and give supplier? Refer to Project Manual Section 22 42 00 Plumbing Fixtures and Fittings, page 4. 1.1.3.9 Question: Phasing the project calls for 2 phases but all of the demolition work seems to fall under one. Do phases apply for demolition scope? All demolition work is to occur in Construction Phase One. Refer to Project Manual Section 01 10 00 General Instructions and notes on Architectural Drawing A1. 1.1.3.10 Question: Garbage Bin will the bin location be shared with other trades? What is the preferred route for the disposal through the building? Can the bin be placed closer to the entrance? All disposal bins must be located within the General Contractor Mobilization Area indicated on architectural drawing 1 on A1. It is the General Contractor s responsibility to coordinate all trades and their required disposal bins. During Construction Phase One, the route to exit the building can be from any door on the north side of the building (that is not within the Staff Area). During Construction Phase Two, the route to exit the building is the south door noted with the number 5 and as the Main Construction Entry on architectural drawings on A1. 1.2 Project Manual Project Manual Architectural, Mechanical and Electrical Specifications 1.2.1 No amendments to the Architectural and Mechanical Specifications in this addendum. 1.2.2 Electrical Addendum No. E-1 issued by WSP Canada and dated April 17, 2018 is hereby issued and forms an integral part of this Addendum. 1.3 Architectural Drawings 1.3.1 REF: Architectural Drawing A2; Architectural Drawing 1 on A2 Existing Demolition Ground Floor Plan 1.3.1.1 All lines noted as dashed indicate gypsum board finished steel stud partitions that are to be demolished and disposed of in their entirety from top of existing concrete slab to underside of existing roof assembly. Height to underside of existing roof assembly is approximately 8000mm. Refer to Construction Legend Note 2 on Architectural Drawing A4. 1.3.1.2 Demolish existing hollow metal door frame, screen frames and doors as noted by demolition notes 2 and 9 and demolish existing doors and door frames noted with dashed door swings including the existing doors and door frames to Existing Men s Wrm G105 and Existing Women s Wrm G106, existing door between Existing South Lobby G104 and Existing Corridor G129 and existing door between Existing Program Room G126 and Existing Corridor G114. 1.3.1.3 In Existing Family Washrooms G122 and G123, demolish existing recessed waste receptacles (total of 2), mirrors (total of 2) and coat hooks (total of 2). In Existing Family Washrooms G122 and G123, uninstall existing soap dispensers (total of 2), baby change tables (total of 2), paper towel dispensers (total of 2) and toilet tissue dispensers (total of 2) and hand over to the Owner. 1.3.1.4 In Existing Family Washrooms G122 and G123 and Existing Men s Washroom G105 and Existing Women s Washroom G106, demolish existing grab bars (total of 8). 1.3.1.5 In Existing Family Washroom G123, patch the opening at the location of the demolished waste receptacle with 16mm gypsum board and steel stud framing as required. 1.4 Structural Drawings and Specifications 1.4.1 No amendments to the Structural Drawings and Specifications in this Addendum.

3 1.5 Mechanical Drawings 1.5.1 No amendments to the Mechanical Drawings in this addendum. 1.6 Electrical Drawings 1.6.1 No amendments to the Electrical Drawings in this Addendum. End of Addendum No.3 ward99 architects info@ward99architects.com 2053 Williams Parkway, unit 49A p.416 613 5880 www.ward99architects.com Brampton Ontario L6S 5T4

WSP Canada 600 Cochrane Drive, 5 th Floor Markham, ON Canada L3R 5K3 t: 905.475.7270 www.wsp.ca The Corporation of the City of Vaughan BATHURST CLARK LIBRARY WSP Project No. 17M-01662-00 Electrical Addendum No. E-1 April 17, 2018 INCLUDE IN YOUR BID AMOUNT FOR THE FOLLOWING ITEMS OF ADDITION, DELETION OR CLARIFICATION. INDICATE IN THE SPACE PROVIDED ON THE BID FORM THAT YOU HAVE RECEIVED AND INCLUDED FOR THE REQUIREMENTS OF THIS ADDENDUM. 1. SPECIFICATIONS 1.1 SECTION 26 05 00 BASIC ELECTRICAL MATERIALS AND METHODS 1.1.1 Refer to article 2.02 and add item.4 as follows: Hubbell Canada Inc. HBLCFB7G series multi-service floor box, CSA approved, fully adjustable, both vertically and angular, formed galvanized steel, round/rectangular/square as required, flush, concrete floor mounting, boxes complete with adjustable collars, brass screw on or hinged flip open covers with provisions for mounting of duplex power receptacles, telephone jacks and data jacks. Boxes with both power and communication outlets shall be barriered. Acceptable manufacturers are Hubbell Canada Inc., Cooper Wiring Division, Pass & Seymour Canada Inc. and Leviton. END OF ADDENDUM E-1 Page 1