MENCK GmbH. Nils Raab. Presented to: German American Chamber of Commerce

Similar documents
Passion at work. Renewables

Author: Anders Moeller Telephone: Company: Densit ApS Origin: Denmark

Challenges in the Construction of Offshore Wind Structures. Dr Ned Minns IT Power UK

Technical aspects of Offshore Wind Farms

monopile gripper arms

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

DONG ENERGY LEADING THE ENERGY TRANSFORMATION

OFFSHORE SOLUTIONS FOR WIND TURBINE SUPPORTING STRUCTURES

Phil de Villiers 17 April Offshore Wind Accelerator (OWA)

Innovative marine & offshore solutions

VISION MISSION ABOUT A2SEA. Stay ahead in taking wind power offshore and the future of energy in a sustainable direction.

Conductor Installation Services. Today s technology traditional values

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

FOUNDATION ISSUES: OFFSHORE WIND FARMS Indian Context

Offshore Wind Project Logistics & Unique Site Technology Investigation Fabrication - Installation

The future of offshore wind in the US

Offshore Wind Floating Turbines

Monopile Upending Tool (MP-UT)

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director

2017 Vattenfall Horns Rev 3 Substation Diving Works Messenger Wire and Cap installation J-Tubes

Innovative marine & offshore solutions

WAY AHEAD IN CORROSION CONTROL OFFSHORE WIND. stoprust.com

NSRI/ORE Subsea Technological Challenges in Offshore Wind

Offshore Trends Deep Pockets, Deepwater. Presented by: Mark Peters Group Publisher

DONG ENERGY LEADING THE ENERGY TRANSFORMATION INNOVATION IN OFFSHORE WIND POWER

Pelastar TLP Floating Wind Turbine Foundation

CONTENTS. Supplements. Supplement 1 Selected project references

SHAPING THE FUTURE OF OFFSHORE WIND

Oil&Gas Subsea Production

Passion at work. Oil & Gas

Walney Wind Farm. Track record

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery

FoundOcean All-Energy Presentation May The experts in subsea grouting for the offshore energy construction industry

Offshore Renewable. Energy Conversion platforms Coordination. Action

Wind Turbine Decommissioning in the UK Offshore Zone

OFFSHORE ENGINEERING KNOW-HOW. MOAB AC Substation for GLOBAL TECH 1 Wind Park German North Sea

Next generation WTG foundation and WTG installation. WindDays Rotterdam, 14 June 2018 Arnoud Bosch Engineering Director

Capability statement and track record

GE Oil & Gas. Oil & Gas. Business Imperatives. Winning in a strong market ~60%+ $3.0. Lead in technology $1.9. Capture robust market upturn ~80%+ $0.

Offshore Cable Installation. November 2010 John Davies Global Marine Systems Limited

25/Sep 2018 WindEnergy, Hamburg

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

Offshore Energy Solutions. Technologies and products

TIME SAVING FOUNDATION EQUIPMENT OFFSHORE. Vibratory Hammers up to 2,000 Kgm Vibrating and Upending Vibrating and Drilling

Walney Offshore Wind Farm

Floating wind turbines: the future of wind energy? Axelle Viré Faculty of Aerospace Engineering

Seeing Suction Buckets and Large Monopiles Cut Offshore Wind s Expenses

OFFSHORE ENERGY DIVISION OFFSHORE WIND SOLUTIONS

EVALUATION OF ALTERNATIVES FOR OFFSHORE PETROLEUM PRODUCTION SYSTEM IN DEEP AND ULTRADEEP WATER DEPTH

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

The Renewables Story INGENIOUS SIMPLICITY

Rapid Deployment System. subsea pipelines

The WindFloat Project

Jørn Scharling Holm DONG Energy

Marine Risers. Capability & Experience

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

5.1 Optimal integrated combination of foundation concept and installation method

How not to Build an Offshore Wind Farm Bronwyn Sutton 04 October 2016

Contents of the Presentation

SOLVE DEEPEST LEVEL FLUID CHALLENGES. at their

Swiber Holdings Limited 1Q FY08 Results Briefing

Subsea Tieback Forum

Underwater Tool Section

No limits No boundaries. IHC Handling Systems product overview 2014/2015

Energy Transition Partner. Created and produced by

Subsea UK Springboard

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

Floating Systems. Capability & Experience

Inter Array Cable Technology Development. Jeremy Featherstone Product Development Director JDR Cable Systems Ltd

Offshore Renewables Institute

Marine Construction Support & Dimensional Control

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

Next generation offshore wind tools

IHC Handling Systems. High quality offshore. Head Office The Netherlands Sliedrecht

Offshore Wind Risks - Issues and Mitigations

Pareto Oil & Offshore Conference 2010

The potential for windpower in the Baltic Sea

OSPAR Database on Wind-farms

An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years!

Offshore Renewable Energy Conversion platforms - Coordination Action

RENEWABLE ENERGY SOLUTIONS. oceaneering.com

Strategic Ornithological Support Services. Project SOSS-02. A review of flight heights and avoidance rates of birds in relation to offshore wind farms

Local Contribution to the Aasta Hansteen development

Product overview SIP I SIP II SIP III SIP IV

Subsea Well Engineering

Riser Installation in Deep & Ultra Deep Water

The new noise mitigation system Hydro Sound Dampers : history of development with several hydro sound and vibration measurements

Delivering Subsea Solutions Using a Systems Engineering Approach

The WindFloat Project. February 2010

Galloper Wind Farm Limited. Galloper Wind Farm Project Environmental Statement Chapter 1 Introduction October 2011 Document Reference 5.2.

Going Digital The New Normal in Oil & Gas

Latest developments in Asset Management - Oil and Gas production via Internet?

Subsea STP Buoy Mooring

STRUCTURAL PIPES Building the future piece by piece

GH Marine & Offshore Wind Current Activities and Future Perspectives. Lucy Craig, Director Lisbon, 24 th November 2008 WavEC Symposium

ENGINEERING SOLUTIONS AND CAPABILITIES. Capacity enhancement for deep water operations THE CHALLENGE THE SOLUTION

TIDEWAY OFFSHORE SOLUTIONS

Taking the Temperature of Scottish oil & gas industry Gerry Love

Transcription:

MENCK GmbH 150 Years of Experience with Construction Equipment Applied for Decades in the Offshore Industries Presented to: German American Chamber of Commerce Nils Raab Sales Manager MENCK GmbH Febuary 27th 2018

MENCK History 150 Years of Experise First steam hammer produced 1883 Acquired by Koehring 1966 MUP introduced 1981 Foundation of MENCK GmbH 1992 Acquired by UWG (Acteon) 2003 MHU 1900S introduced 2007 MHU 3500S introduced 2013 1868 MENCK & Hambrock founded 1934 MRB introduced 1967 MRBS introduced 1977 First hydraulic hammer 1980 MHU introduced 1989 MHU-T introduced 1993 Acquired by J.R. McDermott 2004 MNRS / MHC21 introduced 2010 MHU 100C introduced Type MRB MRBS MHF MHU MHU-T Mode Steam /Air Freefall Steam /Air Freefall Hydraulic Freefall Hydraulic Double Act Hydraulic Double Act Energy (kj) 25 245 129 2190 30 200 220 3000 100 3500 Ratio kj/t 7.6 8.9 8.4 11.8 6 7.3 8.8 11.6 7.1 10.2

Knowledge Transfer from Offshore Oil & Gas to Offshore Wind Jacket Installation vs. Monopile Installation Shackle Intermediate flange Ram weight Hammer foot Anvil Underwater ballast Drive unit Piston rod Hydraulic Hoses Hammer housing Shock absorber Pile sleeve

MENCK Business Offshore Foundations

MENCK Business Offshore Foundations Hydraulic Hammers of variable sizes and energies from 100 kj to 3.500 kj customized pile adaption systems worldwide availability of all systems Installation of very large and long piles installation of Piles of Length > 100m at OD 2,2m installation of Piles with top OD 6,5 m (+1000t weight in air) On land, offshore and deep to ultra-deep waters deepest Installation to date: 2,200m preparing for 3,000m

MENCK Markets & Knowledge transfer from Offshore Oil & Gas to Offshore Wind

MENCK Markets Diversified Expertise and Knowhow Bridge & Port Conventional Oil & Gas Deepwater Oil & Gas Offshore Wind SERVICES

MENCK Markets Conventional Oil & Gas Installations up to a water depth of 400m. Installed structures are Jackets, Conductors, Tripods and shallow water FPSO s. Year Project Structure Hammer Region 2011 Jalilah Jacket MHU 500T Middle East 2011 Bien Dong Jacket MHP/Winches Asia 2011 Spur Lines Jacket S-90 Far-East 2011 SHWE Jacket MHU 1200S India 2011 PNG Jacket S-90 South America 2010 Bongkot Jacket MHU 1700T Far-East 2010 Platong Jacket MHP/Winches Far-East 2010 Karan Jacket MHU 800S Middle East 2010 Kipper Tuna Jacket MHU 400T Australia 2010 PCSB Jacket MHU 800S Far-East 2010 Topaz Jacket MHU 500T Asia 2010 MHNRDII Jacket MHU 270T India 2010 VungTau Jacket MHP/Winches Far-East 2010 FPSO-Brazil Jacket MHU 270T South America 2010 DDW1 Jacket MHU 800S India 2010 Guendalina Jacket MHU 500T Europe 2009 Talisman + Newfield Malaysia Tripod MHU 150S Asia-Pacific 2009 Yuri FSO MHU 800S Europe 2009 MHSRPII Jacket MHU 800S Asia-Pacific 2009 Baraka Jacket MHU 270T North-Africa 2009 UjungPangkah Jacket MHU 270T Far-East 2009 Bohai Jacket MHU 800S Asia 2009 CVX Jacket MHU 500T Far-East 2009 Platong Jacket MHP/Winches Far-East

MENCK Markets Conventional Oil & Gas Jacket Installation Leg Piles, inclined, above water Jacket Installation Skirt Piles, under water

MENCK Markets Offshore Wind Installation of Monopiles, Jackets, Tripods and Tri-piles with outer diameters ranging from 1.37 m to 6.50 m Year Project Structure Hammer Region 2017 Walney Extension Monopile MHU 3500S Europe 2016 Burbo Bank Extension Monopile MHU 3500S Europe 2016 Rampion Monopile MHU 3500S Europe 2016 Wikinger Jacket MHU 1200S Europe 2015 Sandbank 24 Monopile MHU 3500S Europe 2015 Block Island Jacket MHU 800S North America 2014 Wikinger Test Piles Jacket MHU 800S Europe 2014 Amrumbank Monopile MHU 1900S Europe 2013 Humber Gateway Monopile MHU 1900S / 500T Europe 2013 HelWin & BorWin Jacket MHU 1900S / 1200S Europe 2012 Gwynt y Mor Monopile MHU 1900S Europe 2012 Globaltech I Tripod MHU 1200S / 800S Europe 2012 Bard Offshore I Tri-pile MHU 1900S / 1200S Europe 2011 North Sea East and Ijmuiden Monopile MHU 800S Europe 2011 Lincs Monopile MHU 1900S Europe 2009 Bard Hooksiel Tri-pile MHU 1900S / 1200S Europe 2009 Alpha Ventus Jacket / Tripod MHU 500T Europe 2008 Rhyl Flatts Monopile MHU 800S Europe 2008 Gunfleet Sands Monopile MHU 800S Europe 2008 Fino 3 Monopile MHU 800S Europe 2007 Lynn & Inner Dowsing Monopile MHU 1900S Europe 2006 Burbo Bank Monopile MHU 800S Europe 2005 Greater Gabbard Monopile MHU 500T Europe 2004 Amrumbank West Monopile MHU 800S Europe 2004 North Hoyle Monopile MHU 600B Europe 2002 Samso Monopile MHU 600B Europe 2000 Utgrunden Monopile MHU 500T Europe

MENCK Markets Offshore Wind Expertise in installing: Monopiles Twisted Jackets Tripods Jackets (pre- and post-piled) Tri-piles Anchor piles

Knowledge Transfer from Offshore Oil & Gas to Offshore Wind One-Off Installation vs. Serial Installation

Knowledge Transfer from Offshore Oil & Gas to Offshore Wind One-Off Installation vs. Serial Installation Various challenges on different ends of the Supply Chain Material Fabrication Logistics Installation

Knowledge Transfer from Offshore Oil & Gas to Offshore Wind One-Off Installation vs. Serial Installation Various challenges on different ends of the Supply Chain Material Fabrication Logistics Installation Use of Template for Pre-Installation of Piles to decouple above steps Modified storage and handling to allow uninterrupted pile driving

Knowledge Transfer from Offshore Oil & Gas to Offshore Wind Jacket Installation vs. Monopile Installation Jacket Installation - Diameter up to 3m - Length up to 100m - Required energy up to 1900kJ - Number of piles up to 12 for platforms - Turbines 3 or 4 piles New Challange - Installation tolerances in serial production Monopile Installation - Diameter up to 6,5m - Length up to 70m - Required energy up to 3500kJ Average 2400kJ - Number of piles up to 100 Average 80 New Challanges - More Energy - Bigger Pile Adaptation - Flange Protection - Paint Protection - Horizontality Measurment - Serial Installation - Noise Mitigation

Knowledge Transfer from Offshore Oil & Gas to Offshore Wind Jacket Installation vs. Monopile Installation Car 1,3t 1,5m Truck 28t 4m MHU100C 15,6t 10,4m MHU270T 66t 12,7m MHU500T 113,7t 14,5m MHU800S 139t 17,1m MHU1200S 203,5t 18,9m MHU1900S 244,5t 22,1m MHU3500S 425t 24m MHU3500S 566t Ø6,5m 20m

Knowledge Transfer from Offshore Oil & Gas to Offshore Wind Jacket Installation vs. Monopile Installation

Knowledge Transfer from Offshore Oil & Gas to Offshore Wind Jacket Installation vs. Monopile Installation Weight & Dimensions MHU3500S For pile diameter of 5,5m 6,5m Above water configuration Part Weight (t) -------------------------------------------------------------------- MHU 3500S, 6.5m hammer foot 318 Anvil 6,5m 178 Pile sleeve 6,5m 70 -------------------------------------------------------------------- Total weight above water 566

Experience Transfer Conclusion Proven technology New challenges by market driven requirements Driving on a Flange Paint Protection with Plastic Strips inside Pile Sleeve Horizontal Measurement System Noise Mitigation System Optimized operation and maintenance procedures for serial installation

Knowledge Transfer from Offshore Oil & Gas to Offshore Wind